RESUMEN DE METRADOS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y


EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE CHALHUANI,
PROY:
RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

FECHA: Apr-22
UBIC.: APURIMAC - CHINCHEROS - OCOBAMBA

ITEM DESCRIPCION UNIDAD METRADOS


01 OBRAS PRELIMINARES
01.01 CARTEL DE OBRA IMPRESION DE BANNER DE 8.50 m X 3.60 m (Sopor UND 1.00
01.02 OFICINA Y ALMACEN MES 6.00

02 TRABAJOS PRELIMINARES
02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00
02.02 LIMPIEZA DE TERRENO MANUAL M2 15,854.04
02.03 TRAZO NIVELACION Y REPLANTEO DE INICIO DE OBRA M2 15,854.04

03 MOVIMIENTO DE TIERRAS
03.01 CORTE A NIVEL DE SUBRASANTE M3 7,422.11
03.02 ELIMINACION DE MATERIAL EXCEDENTE m3 10,759.40

04 PAVIMENTOS
04.01 PAVIMENTO RIGIDO
04.01.01 PERFILADO Y COMPACTADO DE SUB RASANTE M2 10,852.24
04.01.02 CONFORMACION Y COMPACTACION BASE GRANULAR E=0.30 m M2 10,852.24
04.01.03 ENCOFRADO Y DESENCOFRADO DE PAVIMENTO RIGIDO M2 1,697.49
04.01.04 CONCRETO F'C=210 KG/CM2 EN PAVIMENTO RIGIDO e=0.20m. M3 2,170.45
04.01.05 CURADO DEL CONCRETO EN PAVIMENTO RIGIDO M2 10,852.24
04.01.06 JUNTAS ASFALTICAS ML 5,710.63
04.01.07 ACERO F´Y=4200 KG/CM2 (PASADORES) KG 3,943.90

04.02 BERMAS DE CONCRETO SIMPLE


04.02.01 TRAZO NIVELACION Y REPLANTEO M2 98.82
04.02.02 EXCAVACION MANUAL EN TERRENO SUELTO M3 29.65
04.02.03 NIVELACION Y COMPACTADO DE SUB RASANTE M2 98.82
04.02.04 CONFORMACION Y COMPACTACION BASE GRANULAR EN BERMAS M2 98.82
04.02.05 CONCRETO FC=175 KG/CM2 EN BERMAS M3 19.76
04.02.06 CURADO DEL CONCRETO EN BERMAS M2 98.82

05 SEÑALIZACION
05.01 PINTADO DE SARDINELES M 3,109.21
05.02 PINTADO DE SIMBOLOS Y LETRA DE TRANSITO M2 173.67

06 VEREDAS
06.01 VEREDAS
06.01.01 TRAZO NIVELACION Y REPLANTEO M2 3,698.20
06.01.02 EXCAVACION MANUAL EN TERRENO SUELTO M3 739.64
06.01.03 PERFILADO Y COMPACTADO DE SUB RASANTE PARA VEREDA M2 3,698.20
06.01.04 CONFORMACION Y COMPACTACION BASE GRANULAR EN VEREDA M2 3,698.20
06.01.05 CONCRETO FC=175 KG/CM2 M3 554.73
06.01.06 JUNTAS ASFALTICAS M 1,046.19
06.01.07 CURADO DEL CONCRETO EN VEREDAS M2 3,698.20
06.02 SARDINELES
06.02.01 TRAZO NIVELACION Y REPLANTEO M2 330.13
06.02.02 EXCAVACION MANUAL EN TERRENO SUELTO M3 66.03
06.02.03 CONCRETO FC=175 KG/CM2 M3 115.54
06.02.04 ENCOFRADO Y DESENCOFRADO DE SARDINELES M2 1,155.44
06.02.05 JUNTAS ASFALTICAS M 220.08
06.02.06 CURADO DEL CONCRETO EN SARDINELES DE VEREDA M2 330.13

06.03 RAMPA PARA DISCAPACITADOS


06.03.01 TRAZO NIVELACION Y REPLANTEO M2 171.00
06.03.02 EXCAVACION MANUAL EN TERRENO SUELTO M3 17.10
06.03.03 CONCRETO FC=175 KG/CM2 M3 17.10
06.03.04 BRUÑA DE RAMPA M 2,280.00
06.03.05 CURADO DEL CONCRETO EN RAMPAS M2 171.00

07 CUNETAS PARA LA EVACUACION DE AGUAS PLUVIALES


07.01 CUNETAS
07.01.01 TRAZO NIVELACION Y REPLANTEO M2 605.71
07.01.02 EXCAVACION MANUAL EN TERRENO SUELTO M3 302.86
07.01.03 CONCRETO FC=175 KG/CM2 M3 157.48
07.01.04 ENCOFRADO Y DESENCOFRADO DE CUNETAS M2 969.14
07.01.05 JUNTAS ASFALTICAS M 1,821.05
07.01.06 REJILLA METALICA EN CUNETAS M 1,211.42
07.01.07 CURADO DEL CONCRETO EN CUNETAS M2 1,574.85

07.02 ALCANTARILLA DE EVACUACION DE AGUAS PLUVIALES


07.02.01 TRAZO NIVELACION Y REPLANTEO M2 55.65
07.02.02 EXCAVACION MANUAL EN TERRENO SUELTO M3 47.25
07.02.03 ENCOFRADO Y DESENCOFRADO M2 91.87
07.02.04 CONCRETO FC=210 KG/CM2 M3 27.82
07.02.05 TARRAJEO CON IMPERMEABILIZANTES M2 106.10
07.02.06 REJILLA SUMIDERO-PLAT 1 1/4"X1/4"+L 1 1/1/4" M 26.27

08 OBRAS DE MUROS DE CONTENCION CONCRETO ARMADO


08.01 MURO CºAº tipo I,II y III
08.01.01 OBRAS PRELIMINARES
08.01.01.01 TRAZO NIVELACION Y REPLANTEO m2 428.07
08.01.02 MOVIMIENTO DE TIERRAS
08.01.02.01 EXCAVACION MANUAL EN TERRENO SUELTO m3 462.66
08.01.02.02 RELLENO CON MATERIAL PROPIO m3 273.06
08.01.02.03 RELLENO CON MATERIAL DE PRESTAMO MANUAL m3 273.06
08.01.02.04 ELIMINACION DE MATERIAL EXEDENTE m3 237.00
08.01.03 OBRAS DE CONCRETO SIMPLE
08.01.03.01 SOLADO CONCRETO FC=100 KG/CM2 m3 42.81
08.01.04 OBRAS DE CONCRETO ARMADO
08.01.04.01 CONCRETO F'C=210 KG/CM2 m3 311.09
08.01.04.02 ENCOFRADO Y DESENCOFRADO DE MUROS DE CONTENCION m2 890.19
08.01.04.03 ACERO F´Y=4200 KG/CM2 kg 19,114.57
08.01.04.04 JUNTAS DE DILATACION CON ASFALTO ml 153.60

09 MITIGACION DE IMPACTO AMBIENTAL


09.01 MITIGACION DE IMPACTO AMBIENTAL GLB 1.00

10 OTROS
10.01 FLETE TERRESTRE GLB 1.00
10.02 MANTENIMIENTO Y SEGURIDAD VIAL GLB 1.00
10.03 REPOSICION DE CAJAS DE REGISTRO DE AGUA Y DESAGUE GLB 45.00
10.04 LIMPIEZA FINAL DE OBRA M2 15,854.04
METRADO MOVIMIENTO DE TIERRA

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL


Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO
PROYECTO:
DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS –
APURIMAC” SEGUNDA ETAPA

CORTE A NIVEL DE SUB RASANTE 7,422.11 m3


RELLENO CON MATERIAL PROPIO 0.00 m3

PROL. JR. ANDAHUAYLAS


PROGRESIVA AREA AREA DISTANCIA VOLUMEN VOLUMEN
(m) CORTE RELLENO (m) CORTE RELLENO
(m2) (m2) (m3) (m3)

642.45 0.00
0+000.00 2.59 0.00
0+020.00 3.16 0.00 20.00 57.50
0+055.00 2.71 0.00 35.00 102.73
0+060.00 2.72 0.00 5.00 13.58
0+080.00 3.11 0.00 20.00 58.30
0+100.00 2.52 0.00 20.00 56.30
0+120.00 2.58 0.00 20.00 51.00
0+140.00 3.17 0.00 20.00 57.50
0+160.00 3.09 0.00 20.00 62.60
0+180.00 2.99 0.00 20.00 60.80
0+200.00 3.25 0.00 20.00 62.40
0+220.00 2.64 0.00 20.00 58.90
0+220.32 2.63 0.00 0.32 0.85

JR. ANDAHUAYLAS
PROGRESIVA AREA AREA DISTANCIA VOLUMEN VOLUMEN
(m) CORTE RELLENO (m) CORTE RELLENO
(m2) (m2) (m3) (m3)

1,453.68 0.00
0+000.00 3.68 0.00
0+020.00 2.47 0.00 20.00 61.50
0+040.00 3.23 0.00 20.00 57.00
0+060.00 2.35 0.00 20.00 55.80
0+080.00 3.30 0.00 20.00 56.50
0+100.00 3.83 0.00 20.00 71.30
0+120.00 5.77 0.00 20.00 96.00
0+140.00 5.13 0.00 20.00 109.00
0+160.00 4.56 0.00 20.00 96.90
0+180.00 5.75 0.00 20.00 103.10
0+200.00 5.33 0.00 20.00 110.80
0+220.00 3.59 0.00 20.00 89.20
0+240.00 4.45 0.00 20.00 80.40
0+260.00 3.90 0.00 20.00 83.50
0+280.00 2.55 0.00 20.00 64.50
0+300.00 2.38 0.00 20.00 49.30
0+320.00 4.42 0.00 20.00 68.00
0+340.00 3.50 0.00 20.00 79.20
0+360.00 3.48 0.00 20.00 69.80
0+374.80 3.53 0.00 14.80 51.88
JR. PERU
PROGRESIVA AREA AREA DISTANCIA VOLUMEN VOLUMEN
(m) CORTE RELLENO (m) CORTE RELLENO
(m2) (m2) (m3) (m3)

667.80 0.00
0+000.00 13.25 0.00
0+020.00 3.12 0.00 20.00 163.70
0+040.00 3.43 0.00 20.00 65.50
0+060.00 2.70 0.00 20.00 61.30
0+080.00 3.36 0.00 20.00 60.60
0+100.00 2.72 0.00 20.00 60.80
0+120.00 4.01 0.00 20.00 67.30
0+140.00 5.02 0.00 20.00 90.30
0+160.00 4.81 0.00 20.00 98.30

JR. SAN MARTIN 01


PROGRESIVA AREA AREA DISTANCIA VOLUMEN VOLUMEN
(m) CORTE RELLENO (m) CORTE RELLENO
(m2) (m2) (m3) (m3)

258.46 0.00
0+000.00 2.63 0.00
0+020.00 2.97 0.00 20.00 56.00
0+040.00 2.26 0.00 20.00 52.30
0+060.00 2.93 0.00 20.00 51.90
0+080.00 2.10 0.00 20.00 50.30
0+100.00 2.60 0.00 20.00 47.00
0+100.37 2.61 0.00 0.37 0.96

JR. SAN MARTIN 02


PROGRESIVA AREA AREA DISTANCIA VOLUMEN VOLUMEN
(m) CORTE RELLENO (m) CORTE RELLENO
(m2) (m2) (m3) (m3)

185.32 0.00
0+000.00 2.17 0.00
0+020.00 2.59 0.00 20.00 47.60
0+040.00 1.27 0.00 20.00 38.60
0+060.00 1.34 0.00 20.00 26.10
0+080.00 2.86 0.00 20.00 42.00
0+090.52 3.04 0.00 10.52 31.02
JR. LAS FLORES 01
PROGRESIVA AREA AREA DISTANCIA VOLUMEN VOLUMEN
(m) CORTE RELLENO (m) CORTE RELLENO
(m2) (m2) (m3) (m3)

413.11 0.00
0+000.00 2.46 0.00
0+020.00 1.92 0.00 20.00 43.80
0+040.00 2.06 0.00 20.00 39.80
0+060.00 2.40 0.00 20.00 44.60
0+080.00 2.87 0.00 20.00 52.70
0+100.00 2.51 0.00 20.00 53.80
0+120.00 2.40 0.00 20.00 49.10
0+140.00 2.47 0.00 20.00 48.70
0+160.00 2.57 0.00 20.00 50.40
0+172.15 2.41 0.00 12.15 30.21

JR. LAS FLORES 02


PROGRESIVA AREA AREA DISTANCIA VOLUMEN VOLUMEN
(m) CORTE RELLENO (m) CORTE RELLENO
(m2) (m2) (m3) (m3)

499.40 0.00
0+000.00 5.14 0.00
0+020.00 5.42 0.00 20.00 105.60
0+040.00 4.96 0.00 20.00 103.80
0+060.00 4.95 0.00 20.00 99.10
0+080.00 4.60 0.00 20.00 95.50
0+100.00 4.94 0.00 20.00 95.40

JR. AMARGURA 01
PROGRESIVA AREA AREA DISTANCIA VOLUMEN VOLUMEN
(m) CORTE RELLENO (m) CORTE RELLENO
(m2) (m2) (m3) (m3)

1,045.84 0.00
0+000.00 3.02 0.00
0+020.00 6.42 0.00 20.00 94.40
0+040.00 4.75 0.00 20.00 111.70
0+060.00 4.19 0.00 20.00 89.40
0+080.00 3.08 0.00 20.00 72.70
0+100.00 2.73 0.00 20.00 58.10
0+120.00 4.06 0.00 20.00 67.90
0+140.00 4.33 0.00 20.00 83.90
0+160.00 4.19 0.00 20.00 85.20
0+180.00 3.19 0.00 20.00 73.80
0+200.00 3.14 0.00 20.00 63.30
0+220.00 2.69 0.00 20.00 58.30
0+240.00 2.32 0.00 20.00 50.10
0+260.00 2.19 0.00 20.00 45.10
0+280.00 2.99 0.00 20.00 51.80
0+293.68 2.88 0.00 13.68 40.14

JR. AMARGURA 02
PROGRESIVA AREA AREA DISTANCIA VOLUMEN VOLUMEN
(m) CORTE RELLENO (m) CORTE RELLENO
(m2) (m2) (m3) (m3)

1,493.27 0.00
0+000.00 2.93 0.00
0+020.00 3.14 0.00 20.00 60.70
0+040.00 3.06 0.00 20.00 62.00
0+060.00 4.60 0.00 20.00 76.60
0+080.00 2.29 0.00 20.00 68.90
0+100.00 3.60 0.00 20.00 58.90
0+120.00 3.76 0.00 20.00 73.60
0+140.00 4.28 0.00 20.00 80.40
0+160.00 3.91 0.00 20.00 81.90
0+180.00 2.48 0.00 20.00 63.90
0+200.00 3.53 0.00 20.00 60.10
0+220.00 3.44 0.00 20.00 69.70
0+240.00 2.69 0.00 20.00 61.30
0+260.00 2.14 0.00 20.00 48.30
0+280.00 4.02 0.00 20.00 61.60
0+300.00 5.57 0.00 20.00 95.90
0+320.00 2.52 0.00 20.00 80.90
0+340.00 1.92 0.00 20.00 44.40
0+360.00 4.44 0.00 20.00 63.60
0+380.00 7.67 0.00 20.00 121.10
0+400.00 5.69 0.00 20.00 133.60
0+406.03 2.89 0.00 6.03 25.87

JR. AMARGURA 03
PROGRESIVA AREA AREA DISTANCIA VOLUMEN VOLUMEN
(m) CORTE RELLENO (m) CORTE RELLENO
(m2) (m2) (m3) (m3)

164.61 0.00
0+000.00 2.16 0.00
0+020.00 1.74 0.00 20.00 39.00
0+040.00 2.04 0.00 20.00 37.80
0+060.00 2.13 0.00 20.00 41.70
0+080.00 2.22 0.00 20.00 43.50
0+081.19 2.16 0.00 1.19 2.61

JR. 02 DE MAYO
PROGRESIVA AREA AREA DISTANCIA VOLUMEN VOLUMEN
(m) CORTE RELLENO (m) CORTE RELLENO
(m2) (m2) (m3) (m3)

213.76 0.00
0+000.00 2.08 0.00
0+020.00 2.58 0.00 20.00 46.60
0+040.00 2.27 0.00 20.00 48.50
0+060.00 2.39 0.00 20.00 46.60
0+080.00 3.08 0.00 20.00 54.70
0+085.82 2.89 0.00 5.82 17.36

JR. 28 DE JULIO
PROGRESIVA AREA AREA DISTANCIA VOLUMEN VOLUMEN
(m) CORTE RELLENO (m) CORTE RELLENO
(m2) (m2) (m3) (m3)

153.08 0.00
0+000.00 2.58 0.00
0+020.00 2.97 0.00 20.00 55.50
0+040.00 2.50 0.00 20.00 54.70
0+057.47 2.41 0.00 17.47 42.88

JR. AMAUTA
PROGRESIVA AREA AREA DISTANCIA VOLUMEN VOLUMEN
(m) CORTE RELLENO (m) CORTE RELLENO
(m2) (m2) (m3) (m3)

231.33 0.00
0+000.00 1.90 0.00
0+020.00 2.66 0.00 20.00 45.60
0+040.00 2.76 0.00 20.00 54.20
0+060.00 2.22 0.00 20.00 49.80
0+080.00 1.78 0.00 20.00 40.00
0+100.00 2.13 0.00 20.00 39.10
0+101.23 2.14 0.00 1.23 2.63
HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

01 OBRAS PRELIMINARES

01.01 CARTEL DE OBRA IMPRESION DE BANNER DE 8.50 m1.00 1.00 1.00 1.00 UND 0.00

01.02 OFICINA Y ALMACEN 1.00 6.00 6.00 6.00 MES 2.50

02 TRABAJOS PRELIMINARES

02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO 1.00 1.00 1.00 1.00 GLB 0.50

02.02 LIMPIEZA DE TERRENO MANUAL 15,854.04 M2

PAVIMENTOS

PROLONG. ANDAHUAYLAS - P01 1.00 1.00 1,101.62 1,101.62 0.00

JR. ANDAHUAYLAS - P02 1.00 1.00 2,248.66 2,248.66 0.00

JR. PERU - P03 1.00 1.00 614.15 614.15 0.00

JR. SAN MARTIN (TRAMO 01) - P04 1.00 1.00 450.07 450.07 0.00

TRAMO 02 - P05 1.00 1.00 501.84 501.84 0.00

JR. LAS FLORES (TRAMO 01) - P06 1.00 1.00 399.97 399.97 0.00

TRAMO 02 - P07 1.00 1.00 688.58 688.58 62.58

JR. AMARGURA (TRAMO 01) - P08 1.00 1.00 1,463.20 1,463.20 112.40

TRAMO 02 - P09 1.00 1.00 2,024.03 2,024.03 3.58

TRAMO 03 - P10 1.00 1.00 324.78 324.78 0.00

JR. 02 DE MAYO - P11 1.00 1.00 343.27 343.27 0.00

JR. 28 DE JULIO - P12 1.00 1.00 287.23 287.23 57.35

JR. AMAUTA - P13 1.00 1.00 404.84 404.84 0.00

VEREDAS

JR. ANDAHUAYLAS - V01 1.00 1.00 22.16 22.16 0.00

JR. ANDAHUAYLAS - V02 1.00 1.00 21.33 21.33 0.00

JR. ANDAHUAYLAS - V03 1.00 1.00 20.59 20.59 0.00

JR. ANDAHUAYLAS - V04 1.00 1.00 8.89 8.89 0.00

JR. ANDAHUAYLAS - V05 1.00 1.00 16.05 16.05 0.00

JR. ANDAHUAYLAS - V06 1.00 1.00 76.11 76.11 0.00

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. ANDAHUAYLAS - V07 1.00 1.00 98.67 98.67 0.00

JR. ANDAHUAYLAS - V08 1.00 1.00 5.39 5.39 0.00

JR. ANDAHUAYLAS - V09 1.00 1.00 4.82 4.82 0.00

JR. ANDAHUAYLAS - V10 1.00 1.00 140.92 140.92 0.00

JR. ANDAHUAYLAS - V11 1.00 1.00 140.08 140.08 0.00

JR. ANDAHUAYLAS - V12 1.00 1.00 17.08 17.08 0.00

JR. ANDAHUAYLAS - V13 1.00 1.00 21.71 21.71 0.00

JR. ANDAHUAYLAS - V14 1.00 1.00 14.64 14.64 0.00

JR. ANDAHUAYLAS - V15 1.00 1.00 124.94 124.94 0.00

JR. ANDAHUAYLAS - V16 1.00 1.00 125.08 125.08 0.00

JR. ANDAHUAYLAS - V17 1.00 1.00 15.34 15.34 0.00

JR. ANDAHUAYLAS - V18 1.00 1.00 10.41 10.41 0.00

JR. SAN MARTIN - V19 1.00 1.00 7.98 7.98 0.00

JR. SAN MARTIN - V20 1.00 1.00 8.05 8.05 0.00

JR. SAN MARTIN - V21 1.00 1.00 85.93 85.93 0.00

JR. SAN MARTIN - V22 1.00 1.00 85.99 85.99 0.00

JR. SAN MARTIN - V23 1.00 1.00 9.20 9.20 0.00

JR. SAN MARTIN - V24 1.00 1.00 8.62 8.62 0.00

JR. LAS FLORES - V25 1.00 1.00 4.48 4.48 0.00

JR. LAS FLORES - V26 1.00 1.00 4.48 4.48 0.00

JR. LAS FLORES - V27 1.00 1.00 85.86 85.86 0.00

JR. LAS FLORES - V28 1.00 1.00 85.86 85.86 0.00

JR. LAS FLORES - V29 1.00 1.00 2.82 2.82 0.00

JR. LAS FLORES - V30 1.00 1.00 3.65 3.65 0.00

JR. LAS FLORES - V31 1.00 1.00 4.05 4.05 0.00

JR. LAS FLORES - V32 1.00 1.00 3.35 3.35 0.00

JR. LAS FLORES - V33 1.00 1.00 158.65 158.65 8.65

JR. LAS FLORES - V34 1.00 1.00 158.27 158.27 7.89

JR. LAS FLORES - V35 1.00 1.00 4.78 4.78 0.00

JR. LAS FLORES - V36 1.00 1.00 4.78 4.78 -21.63

JR. AMARGURA - V37 1.00 1.00 56.38 56.38 -56.38

JR. AMARGURA - V38 1.00 1.00 3.85 3.85 0.00

JR. AMARGURA - V39 1.00 1.00 286.80 286.80 9.43

JR. AMARGURA - V40 1.00 1.00 287.86 287.86 11.55

JR. AMARGURA - V41 1.00 1.00 6.74 6.74 0.00

JR. AMARGURA - V42 1.00 1.00 3.10 3.10 0.00

JR. AMARGURA - V43 1.00 1.00 4.96 4.96 0.00

JR. AMARGURA - V44 1.00 1.00 4.88 4.88 0.00

JR. AMARGURA - V45 1.00 1.00 102.36 102.36 0.00

JR. AMARGURA - V46 1.00 1.00 102.42 102.42 0.00

JR. AMARGURA - V47 1.00 1.00 3.32 3.32 0.00

JR. AMARGURA - V48 1.00 1.00 35.94 35.94 0.00

JR. AMARGURA - V49 1.00 1.00 16.24 16.24 0.00

JR. AMARGURA - V50 1.00 1.00 7.04 7.04 0.00

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. AMARGURA - V51 1.00 1.00 5.54 5.54 0.00

JR. AMARGURA - V52 1.00 1.00 137.99 137.99 0.00

JR. AMARGURA - V53 1.00 1.00 114.74 114.74 0.00

JR. 02 DE MAYO - V54 1.00 1.00 3.91 3.91 0.00

JR. 02 DE MAYO - V55 1.00 1.00 4.09 4.09 0.00

JR. 02 DE MAYO - V56 1.00 1.00 72.88 72.88 0.00

JR. 02 DE MAYO - V57 1.00 1.00 72.88 72.88 0.00

JR. 02 .DE MAYO Y JR. AMARGURA - V58 1.00 1.00 7.53 7.53 -7.53

JR. 02 .DE MAYO Y JR. AMARGURA - V59 1.00 1.00 6.24 6.24 -6.24

JR. AMARGURA - V60 1.00 1.00 5.09 5.09 -5.09

JR. AMARGURA - V61 1.00 1.00 4.27 4.27 -4.27

JR. AMARGURA - V62 1.00 1.00 68.24 68.24 -68.24

JR. AMARGURA - V63 1.00 1.00 56.69 56.69 -56.69

JR. AMAUTA - V64 1.00 1.00 4.72 4.72 0.00

JR. AMAUTA - V65 1.00 1.00 4.71 4.71 0.00

JR. AMAUTA - V66 1.00 1.00 87.66 87.66 0.00

JR. AMAUTA - V67 1.00 1.00 87.66 87.66 0.00

JR. AMAUTA Y JR. AMARGURA - V68 1.00 1.00 5.76 5.76 -5.76

JR. AMAUTA Y JR. AMARGURA - V69 1.00 1.00 5.56 5.56 -5.56

JR. AMARGURA - V70 1.00 1.00 3.77 3.77 -3.77

JR. AMARGURA - V71 1.00 1.00 5.19 5.19 -5.19

JR. AMARGURA - V72 1.00 1.00 61.08 61.08 -61.08

JR. AMARGURA - V73 1.00 1.00 51.22 51.22 -51.22

JR. AMARGURA - V74 1.00 1.00 5.05 5.05 -5.05

JR. AMARGURA - V75 1.00 1.00 3.34 3.34 -3.34

JR. AMARGURA - V76 1.00 1.00 3.11 3.11 -3.11

JR. AMARGURA - V77 1.00 1.00 2.97 2.97 -2.97

JR. AMARGURA - V78 1.00 1.00 70.71 70.71 -70.71

JR. AMARGURA - V79 1.00 1.00 69.81 69.81 -69.81

JR. AMARGURA - V80 1.00 1.00 2.69 2.69 -2.69

JR. AMARGURA - V81 1.00 1.00 2.69 2.69 -2.69

PROLONG. JR. ANDAHUAYLAS - V82 1.00 1.00 70.63 70.63 0.00

PROLONG. JR. ANDAHUAYLAS - V83 1.00 1.00 56.88 56.88 0.00

BERMAS

PROLONG. JR. ANDAHUAYLAS - B01 1.00 1.00 35.56 35.56 35.56

PROLONG. JR. ANDAHUAYLAS - B02 1.00 1.00 3.82 3.82 3.82

JR. SAN MARTIN - B03 1.00 1.00 34.86 34.86 0.00

JR. SAN MARTIN - B04 1.00 1.00 24.58 24.58 0.00

CUNETAS Y EVACUACION DE AGUAS PLUVIALES 0.00

JR. ANDAHUAYLAS 1.00 1.00 348.19 0.50 174.10 0.00

JR. PERU - MARGEN DERECHA 1.00 1.00 154.83 0.50 77.42 77.42

JR. PERU - MARGEN IZQUIERDA 1.00 1.00 152.25 0.50 76.13 76.13

JR. AMARGURA 1.00 1.00 556.15 0.50 278.08 3.92

MUROS DE CONTENCION

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

tipo II 1.00 1.00 138.64 2.89 400.67 146.35

tipo III 1.00 1.00 20.00 1.37 27.40 -97.60

RAMPA PARA DISCAPACITADOS 0.00

RAMPA PARA DISCAPACITADOS 57.00 1.00 3.00 1.00 171.00 0.00

02.03 TRAZO NIVELACION Y REPLANTEO DE INICIO DE OBRA 15,854.04 M2

PAVIMENTOS

PROLONG. ANDAHUAYLAS - P01 1.00 1.00 1101.62 1,101.62 0.00

JR. ANDAHUAYLAS - P02 1.00 1.00 2248.66 2,248.66 0.00

JR. PERU - P03 1.00 1.00 614.15 614.15 0.00

JR. SAN MARTIN (TRAMO 01) - P04 1.00 1.00 450.07 450.07 0.00

TRAMO 02 - P05 1.00 1.00 501.84 501.84 0.00

JR. LAS FLORES (TRAMO 01) - P06 1.00 1.00 399.97 399.97 0.00

TRAMO 02 - P07 1.00 1.00 688.58 688.58 62.58

JR. AMARGURA (TRAMO 01) - P08 1.00 1.00 1463.2 1,463.20 112.40

TRAMO 02 - P09 1.00 1.00 2024.03 2,024.03 3.58

TRAMO 03 - P10 1.00 1.00 324.78 324.78 0.00

JR. 02 DE MAYO - P11 1.00 1.00 343.27 343.27 0.00

JR. 28 DE JULIO - P12 1.00 1.00 287.23 287.23 57.35

JR. AMAUTA - P13 1.00 1.00 404.839 404.84 0.00

VEREDAS

JR. ANDAHUAYLAS - V01 1.00 1.00 22.16 22.16 0.00

JR. ANDAHUAYLAS - V02 1.00 1.00 21.33 21.33 0.00

JR. ANDAHUAYLAS - V03 1.00 1.00 20.59 20.59 0.00

JR. ANDAHUAYLAS - V04 1.00 1.00 8.89 8.89 0.00

JR. ANDAHUAYLAS - V05 1.00 1.00 16.05 16.05 0.00

JR. ANDAHUAYLAS - V06 1.00 1.00 76.11 76.11 0.00

JR. ANDAHUAYLAS - V07 1.00 1.00 98.67 98.67 0.00

JR. ANDAHUAYLAS - V08 1.00 1.00 5.39 5.39 0.00

JR. ANDAHUAYLAS - V09 1.00 1.00 4.82 4.82 0.00

JR. ANDAHUAYLAS - V10 1.00 1.00 140.92 140.92 0.00

JR. ANDAHUAYLAS - V11 1.00 1.00 140.08 140.08 0.00

JR. ANDAHUAYLAS - V12 1.00 1.00 17.08 17.08 0.00

JR. ANDAHUAYLAS - V13 1.00 1.00 21.71 21.71 0.00

JR. ANDAHUAYLAS - V14 1.00 1.00 14.64 14.64 0.00

JR. ANDAHUAYLAS - V15 1.00 1.00 124.94 124.94 0.00

JR. ANDAHUAYLAS - V16 1.00 1.00 125.08 125.08 0.00

JR. ANDAHUAYLAS - V17 1.00 1.00 15.34 15.34 0.00

JR. ANDAHUAYLAS - V18 1.00 1.00 10.41 10.41 0.00

JR. SAN MARTIN - V19 1.00 1.00 7.98 7.98 0.00

JR. SAN MARTIN - V20 1.00 1.00 8.05 8.05 0.00

JR. SAN MARTIN - V21 1.00 1.00 85.93 85.93 0.00

JR. SAN MARTIN - V22 1.00 1.00 85.99 85.99 0.00

JR. SAN MARTIN - V23 1.00 1.00 9.20 9.20 0.00

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. SAN MARTIN - V24 1.00 1.00 8.62 8.62 0.00

JR. LAS FLORES - V25 1.00 1.00 4.48 4.48 0.00

JR. LAS FLORES - V26 1.00 1.00 4.48 4.48 0.00

JR. LAS FLORES - V27 1.00 1.00 85.86 85.86 0.00

JR. LAS FLORES - V28 1.00 1.00 85.86 85.86 0.00

JR. LAS FLORES - V29 1.00 1.00 2.82 2.82 0.00

JR. LAS FLORES - V30 1.00 1.00 3.65 3.65 0.00

JR. LAS FLORES - V31 1.00 1.00 4.05 4.05 0.00

JR. LAS FLORES - V32 1.00 1.00 3.35 3.35 0.00

JR. LAS FLORES - V33 1.00 1.00 158.65 158.65 8.65

JR. LAS FLORES - V34 1.00 1.00 158.27 158.27 7.89

JR. LAS FLORES - V35 1.00 1.00 4.78 4.78 0.00

JR. LAS FLORES - V36 1.00 1.00 4.78 4.78 4.78

JR. AMARGURA - V37 1.00 1.00 56.38 56.38 -54.46

JR. AMARGURA - V38 1.00 1.00 3.85 3.85 0.00

JR. AMARGURA - V39 1.00 1.00 286.80 286.80 -267.94

JR. AMARGURA - V40 1.00 1.00 287.86 287.86 11.55

JR. AMARGURA - V41 1.00 1.00 6.74 6.74 0.00

JR. AMARGURA - V42 1.00 1.00 3.10 3.10 0.00

JR. AMARGURA - V43 1.00 1.00 4.96 4.96 0.00

JR. AMARGURA - V44 1.00 1.00 4.88 4.88 0.00

JR. AMARGURA - V45 1.00 1.00 102.36 102.36 0.00

JR. AMARGURA - V46 1.00 1.00 102.42 102.42 0.00

JR. AMARGURA - V47 1.00 1.00 3.32 3.32 0.00

JR. AMARGURA - V48 1.00 1.00 35.94 35.94 0.00

JR. AMARGURA - V49 1.00 1.00 16.24 16.24 0.00

JR. AMARGURA - V50 1.00 1.00 7.04 7.04 0.00

JR. AMARGURA - V51 1.00 1.00 5.54 5.54 0.00

JR. AMARGURA - V52 1.00 1.00 137.99 137.99 0.00

JR. AMARGURA - V53 1.00 1.00 114.74 114.74 0.00

JR. 02 DE MAYO - V54 1.00 1.00 3.91 3.91 3.91

JR. 02 DE MAYO - V55 1.00 1.00 4.09 4.09 4.09

JR. 02 DE MAYO - V56 1.00 1.00 72.88 72.88 72.88

JR. 02 DE MAYO - V57 1.00 1.00 72.88 72.88 72.88

JR. 02 .DE MAYO Y JR. AMARGURA - V58 1.00 1.00 7.53 7.53 0.00

JR. 02 .DE MAYO Y JR. AMARGURA - V59 1.00 1.00 6.24 6.24 0.00

JR. AMARGURA - V60 1.00 1.00 5.09 5.09 0.00

JR. AMARGURA - V61 1.00 1.00 4.27 4.27 0.00

JR. AMARGURA - V62 1.00 1.00 68.24 68.24 0.00

JR. AMARGURA - V63 1.00 1.00 56.69 56.69 0.00

JR. AMAUTA - V64 1.00 1.00 4.72 4.72 4.72

JR. AMAUTA - V65 1.00 1.00 4.71 4.71 4.71

JR. AMAUTA - V66 1.00 1.00 87.66 87.66 87.66

JR. AMAUTA - V67 1.00 1.00 87.66 87.66 87.66

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. AMAUTA Y JR. AMARGURA - V68 1.00 1.00 5.76 5.76 0.00

JR. AMAUTA Y JR. AMARGURA - V69 1.00 1.00 5.56 5.56 0.00

JR. AMARGURA - V70 1.00 1.00 3.77 3.77 0.00

JR. AMARGURA - V71 1.00 1.00 5.19 5.19 0.00

JR. AMARGURA - V72 1.00 1.00 61.08 61.08 0.00

JR. AMARGURA - V73 1.00 1.00 51.22 51.22 0.00

JR. AMARGURA - V74 1.00 1.00 5.05 5.05 0.00

JR. AMARGURA - V75 1.00 1.00 3.34 3.34 0.00

JR. AMARGURA - V76 1.00 1.00 3.11 3.11 0.00

JR. AMARGURA - V77 1.00 1.00 2.97 2.97 0.00

JR. AMARGURA - V78 1.00 1.00 70.71 70.71 0.00

JR. AMARGURA - V79 1.00 1.00 69.81 69.81 -69.81

JR. AMARGURA - V80 1.00 1.00 2.69 2.69 0.00

JR. AMARGURA - V81 1.00 1.00 2.69 2.69 0.00

PROLONG. JR. ANDAHUAYLAS - V82 1.00 1.00 70.63 70.63 0.00

PROLONG. JR. ANDAHUAYLAS - V83 1.00 1.00 56.88 56.88 0.00

BERMAS 0.00

PROLONG. JR. ANDAHUAYLAS - B01 1.00 1.00 35.56 35.56 0.00

PROLONG. JR. ANDAHUAYLAS - B02 1.00 1.00 3.82 3.82 0.00

JR. SAN MARTIN - B03 1.00 1.00 34.86 34.86 0.00

JR. SAN MARTIN - B04 1.00 1.00 24.58 24.58 0.00

CUNETAS Y EVACUACION DE AGUAS PLUVIALES 0.00

JR. ANDAHUAYLAS 1.00 1.00 348.19 0.50 174.10 0.00

JR. PERU - MARGEN DERECHA 1.00 1.00 154.83 0.50 77.42 0.00

JR. PERU - MARGEN IZQUIERDA 1.00 1.00 152.25 0.50 76.13 0.00

JR. AMARGURA -278.08

tipo II - Ver metrado de explanaciones 1.00 1.00 556.15 0.50 278.08 176.93

tipo II - Ver metrado de explanaciones -125.00

MUROS DE CONTENCION 0.00

tipo II 1.00 1.00 138.64 2.89 400.67 55.67

tipo III 1.00 1.00 20.00 1.37 27.40

RAMPA PARA DISCAPACITADOS

RAMPA PARA DISCAPACITADOS 57.00 1.00 3.00 1.00 171.00 -72.00

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

03 MOVIMIENTO DE TIERRAS

03.01 CORTE A NIVEL DE SUBRASANTE 7,422.11 M3

PROL. JR. ANDAHUAYLAS 1.00 642.45 VER PLANILLA DE VOLUMEN 642.45 224.82

JR. ANDAHUAYLAS 1.00 1,453.68 VER PLANILLA DE VOLUMEN 1,453.68 -126.31

JR. PERU 1.00 667.80 VER PLANILLA DE VOLUMEN 667.80 36.26

JR. SAN MARTIN 01 1.00 258.46 VER PLANILLA DE VOLUMEN 258.46 -77.02

JR. SAN MARTIN 02 1.00 185.32 VER PLANILLA DE VOLUMEN 185.32 -198.69

JR. LAS FLORES 01 1.00 413.11 VER PLANILLA DE VOLUMEN 413.11 142.96

JR. LAS FLORES 02 1.00 499.40 VER PLANILLA DE VOLUMEN 499.40 61.36

JR. AMARGURA 01 1.00 1,045.84 VER PLANILLA DE VOLUMEN 1,045.84 103.74

JR. AMARGURA 02 1.00 1,493.27 VER PLANILLA DE VOLUMEN 1,493.27 94.77

JR. AMARGURA 03 1.00 164.61 VER PLANILLA DE VOLUMEN 164.61 -177.22

JR. 02 DE MAYO 1.00 213.76 VER PLANILLA DE VOLUMEN 213.76 -7.39

JR. 28 DE JULIO 1.00 153.08 VER PLANILLA DE VOLUMEN 153.08 -48.71

JR. AMAUTA 1.00 231.33 VER PLANILLA DE VOLUMEN 231.33 -25.27

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

03.02 ELIMINACION DE MATERIAL EXCEDENTE Esponjamiento 1.25 8,607.52 10,759.40 m3

VOLUMEN DE EXCAVACION EN PAVIMENTO 1.00 7,422.11 7,422.11 -1,982.03

VOLUMEN DE EXCAVACION DE BERMAS 1.00 29.65 29.65 29.65

VOLUMEN DE EXCAVACION DE VEREDAS 1.00 739.64 739.64 -184.90

VOLUMEN DE EXCAVACION DE SARDINELES 1.00 66.03 66.03 66.03

VOLUMEN DE EXCAVACION DE CUNETAS 1.00 302.86 302.86 -75.72

VOLUMEN DE EXCAVACION DE ALCANTARILLAS 1.00 47.25 47.25 47.25

04 PAVIMENTOS

04.01 PAVIMENTO RIGIDO

04.01.01 PERFILADO Y COMPACTADO DE SUB RASANTE 10,852.24 M2

PROLONG. ANDAHUAYLAS - P01 1.00 1.00 1,101.62 1,101.62 251.62

JR. ANDAHUAYLAS - P02 1.00 1.00 2,248.66 2,248.66 0.00

JR. PERU - P03 1.00 1.00 614.15 614.15 -25.85

JR. SAN MARTIN (TRAMO 01) - P04 1.00 1.00 450.07 450.07 0.00

TRAMO 02 - P05 1.00 1.00 501.84 501.84 0.00

JR. LAS FLORES (TRAMO 01) - P06 1.00 1.00 399.97 399.97 0.00

TRAMO 02 - P07 1.00 1.00 688.58 688.58 61.30

JR. AMARGURA (TRAMO 01) - P08 1.00 1.00 1,463.20 1,463.20 1,463.20

TRAMO 02 - P09 1.00 1.00 2,024.03 2,024.03 0.00

TRAMO 03 - P10 1.00 1.00 324.78 324.78 0.00

JR. 02 DE MAYO - P11 1.00 1.00 343.27 343.27 343.27

JR. 28 DE JULIO - P12 1.00 1.00 287.23 287.23 0.00

JR. AMAUTA - P13 1.00 1.00 404.84 404.84 404.84

04.01.02 CONFORMACION Y COMPACTACION BASE GRANULAR E=0.30 m 10,852.24 M2

PROLONG. ANDAHUAYLAS - P01 1.00 1.00 1,101.62 1,101.62 1,101.62

JR. ANDAHUAYLAS - P02 1.00 1.00 2,248.66 2,248.66 2,248.66

JR. PERU - P03 1.00 1.00 614.15 614.15 614.15

JR. SAN MARTIN (TRAMO 01) - P04 1.00 1.00 450.07 450.07 450.07

TRAMO 02 - P05 1.00 1.00 501.84 501.84 501.84

JR. LAS FLORES (TRAMO 01) - P06 1.00 1.00 399.97 399.97 399.97

TRAMO 02 - P07 1.00 1.00 688.58 688.58 688.58

JR. AMARGURA (TRAMO 01) - P08 1.00 1.00 1,463.20 1,463.20 1,463.20

TRAMO 02 - P09 1.00 1.00 2,024.03 2,024.03 1,024.03

TRAMO 03 - P10 1.00 1.00 324.78 324.78 324.78

JR. 02 DE MAYO - P11 1.00 1.00 343.27 343.27 343.27

JR. 28 DE JULIO - P12 1.00 1.00 287.23 287.23 287.23

JR. AMAUTA - P13 1.00 1.00 404.84 404.84 404.84

04.01.03 ENCOFRADO Y DESENCOFRADO DE PAVIMENTO RIGIDO 1,697.49 M2

EN VERTICAL

UN PAÑO

PROLONG. JR. ANDAHUAYLAS 1.00 2.00 220.00 0.20 88.00 26.00

JR. ANDAHUAYLAS 1.00 3.00 374.80 0.20 224.88 224.88

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. PERU 1.00 2.00 160.00 0.20 64.00 64.00

JR. SAN MARTIN (TRAMO 01) 1.00 2.00 90.52 0.20 36.21 36.21

TRAMO 02 1.00 2.00 100.37 0.20 40.15 40.15

JR. LAS FLORES (TRAMO 01) 1.00 2.00 100.00 0.20 40.00 40.00

TRAMO 02 1.00 2.00 172.15 0.20 68.86 68.86

JR. AMARGURA (TRAMO 01) 1.00 2.00 293.68 0.20 117.47 117.47

TRAMO 02 1.00 2.00 406.03 0.20 162.41 162.41

TRAMO 03 1.00 2.00 81.19 0.20 32.48 32.48

JR. 02 DE MAYO 1.00 2.00 85.82 0.20 34.33 34.33

JR. 28 DE JULIO 1.00 2.00 57.47 0.20 22.99 22.99

JR. AMAUTA 1.00 2.00 100.00 0.20 40.00 40.00

EN HORIZONTAL

UN PAÑO

PROLONG. JR. ANDAHUAYLAS 1.00 73.33 5.00 0.20 73.33 21.67

JR. ANDAHUAYLAS 1.00 124.93 6.00 0.20 149.92 149.92

JR. PERU 1.00 53.33 4.00 0.20 42.67 42.67

JR. SAN MARTIN (TRAMO 01) 1.00 30.17 5.00 0.20 30.17 30.17

TRAMO 02 1.00 33.46 5.00 0.20 33.46 33.46

JR. LAS FLORES (TRAMO 01) 1.00 33.33 4.00 0.20 26.67 26.67

TRAMO 02 1.00 57.38 4.00 0.20 45.91 45.91

JR. AMARGURA (TRAMO 01) 1.00 97.89 5.00 0.20 97.89 97.89

TRAMO 02 1.00 135.34 5.00 0.20 135.34 135.34

TRAMO 03 1.00 27.06 4.00 0.20 21.65 21.65

JR. 02 DE MAYO 1.00 28.61 4.00 0.20 22.89 22.89

JR. 28 DE JULIO 1.00 19.16 5.00 0.20 19.16 19.16

JR. AMAUTA 1.00 33.33 4.00 0.20 26.67 26.67

04.01.04 CONCRETO F'C=210 KG/CM2 EN PAVIMENTO RIGIDO e=0.20m. 2,170.45 M3

PROLONG. ANDAHUAYLAS - P01 1.00 1.00 1,101.62 0.20 220.32 65.32

JR. ANDAHUAYLAS - P02 1.00 1.00 2,248.66 0.20 449.73 449.73

JR. PERU - P03 1.00 1.00 614.15 0.20 122.83 122.83

JR. SAN MARTIN (TRAMO 01) - P04 1.00 1.00 450.07 0.20 90.01 90.01

TRAMO 02 - P05 1.00 1.00 501.84 0.20 100.37 100.37

JR. LAS FLORES (TRAMO 01) - P06 1.00 1.00 399.97 0.20 79.99 79.99

TRAMO 02 - P07 1.00 1.00 688.58 0.20 137.72 137.72

JR. AMARGURA (TRAMO 01) - P08 1.00 1.00 1,463.20 0.20 292.64 292.64

TRAMO 02 - P09 1.00 1.00 2,024.03 0.20 404.81 404.81

TRAMO 03 - P10 1.00 1.00 324.78 0.20 64.96 64.96

JR. 02 DE MAYO - P11 1.00 1.00 343.27 0.20 68.65 68.65

JR. 28 DE JULIO - P12 1.00 1.00 287.23 0.20 57.45 57.45

JR. AMAUTA - P13 1.00 1.00 404.84 0.20 80.97 80.97

04.01.05 CURADO DEL CONCRETO EN PAVIMENTO RIGIDO 10,852.24 M2

PROLONG. ANDAHUAYLAS - P01 1.00 1.00 1,101.62 1,101.62 326.62

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. ANDAHUAYLAS - P02 1.00 1.00 2,248.66 2,248.66 2,248.66

JR. PERU - P03 1.00 1.00 614.15 614.15 614.15

JR. SAN MARTIN (TRAMO 01) - P04 1.00 1.00 450.07 450.07 450.07

TRAMO 02 - P05 1.00 1.00 501.84 501.84 501.84

JR. LAS FLORES (TRAMO 01) - P06 1.00 1.00 399.97 399.97 399.97

TRAMO 02 - P07 1.00 1.00 688.58 688.58 688.58

JR. AMARGURA (TRAMO 01) - P08 1.00 1.00 1,463.20 1,463.20 1,463.20

TRAMO 02 - P09 1.00 1.00 2,024.03 2,024.03 2,024.03

TRAMO 03 - P10 1.00 1.00 324.78 324.78 324.78

JR. 02 DE MAYO - P11 1.00 1.00 343.27 343.27 343.27

JR. 28 DE JULIO - P12 1.00 1.00 287.23 287.23 287.23

JR. AMAUTA - P13 1.00 1.00 404.84 404.84 404.84

04.01.06 JUNTAS ASFALTICAS 5,710.63 ML

VERTICAL

PROLONG. ANDAHUAYLAS - P01 1.00 1.00 220.00 220.00 220.00

JR. ANDAHUAYLAS - P02 1.00 1.00 374.80 374.80 -123.93

JR. PERU - P03 1.00 1.00 160.00 160.00 160.00

JR. SAN MARTIN (TRAMO 01) - P04 1.00 1.00 90.52 90.52 90.52

TRAMO 02 - P05 1.00 1.00 100.37 100.37 100.37

JR. LAS FLORES (TRAMO 01) - P06 1.00 1.00 100.00 100.00 100.00

TRAMO 02 - P07 1.00 1.00 172.15 172.15 172.15

JR. AMARGURA (TRAMO 01) - P08 1.00 1.00 293.68 293.68 293.68

TRAMO 02 - P09 1.00 1.00 406.03 406.03 406.03

TRAMO 03 - P10 1.00 1.00 81.19 81.19 81.19

JR. 02 DE MAYO - P11 1.00 1.00 85.82 85.82 85.82

JR. 28 DE JULIO - P12 1.00 1.00 57.47 57.47 57.47

HORIZONTAL

PROLONG. ANDAHUAYLAS - P01 1.00 72.33 5.00 361.67 361.67

JR. ANDAHUAYLAS - P02 1.00 123.93 6.00 743.60 618.67

JR. PERU - P03 1.00 52.33 4.00 209.33 209.33

JR. SAN MARTIN (TRAMO 01) - P04 1.00 29.17 5.00 145.87 145.87

TRAMO 02 - P05 1.00 32.46 5.00 162.28 162.28

JR. LAS FLORES (TRAMO 01) - P06 1.00 32.33 4.00 129.33 129.33

TRAMO 02 - P07 1.00 56.38 4.00 225.53 225.53

JR. AMARGURA (TRAMO 01) - P08 1.00 96.89 5.00 484.47 484.47

TRAMO 02 - P09 1.00 134.34 5.00 671.72 671.72

TRAMO 03 - P10 1.00 26.06 4.00 104.25 104.25

JR. 02 DE MAYO - P11 1.00 27.61 4.00 110.43 110.43

JR. 28 DE JULIO - P12 1.00 18.16 5.00 90.78 90.78

JR. AMAUTA 1.00 32.33 4.00 129.33 129.33

04.01.07 ACERO F´Y=4200 KG/CM2 (PASADORES) 3,943.90 KG

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

VERTICAL peso (kg)

JR. ANDAHUAYLAS 1.00 498.73 0.75 1.02 381.53 169.49

JR. SAN MARTIN (TRAMO 01) 1.00 119.69 0.75 1.02 91.57 91.57

TRAMO 02 1.00 132.83 0.75 1.02 101.61 101.61

JR. AMARGURA (TRAMO 01) 1.00 390.57 0.75 1.02 298.79 298.79

TRAMO 02 1.00 540.37 0.75 1.02 413.39 413.39

JR. 28 DE JULIO 1.00 75.63 0.75 1.02 57.85 57.85

HORIZONTAL

PROLONG. ANDAHUAYLAS - P01 5.25 72.33 0.45 1.55 264.88 264.88

JR. ANDAHUAYLAS - P02 6.50 123.93 0.45 1.55 561.88 561.88

JR. PERU - P03 4.00 52.33 0.45 1.55 146.01 146.01

JR. SAN MARTIN (TRAMO 01) - P04 5.25 29.17 0.45 1.55 106.83 106.83

TRAMO 02 - P05 5.25 32.46 0.45 1.55 118.85 118.85

JR. LAS FLORES (TRAMO 01) - P06 4.00 32.33 0.45 1.55 90.21 90.21

TRAMO 02 - P07 4.00 56.38 0.45 1.55 157.31 157.31

JR. AMARGURA (TRAMO 01) - P08 5.25 96.89 0.45 1.55 354.81 354.81

TRAMO 02 - P09 5.25 134.34 0.45 1.55 491.95 491.95

TRAMO 03 - P10 4.00 26.06 0.45 1.55 72.72 72.72

JR. 02 DE MAYO - P11 4.00 27.61 0.45 1.55 77.02 77.02

JR. 28 DE JULIO - P12 5.25 18.16 0.45 1.55 66.49 66.49

JR. AMAUTA 4.00 32.33 0.45 1.55 90.21 90.21

04.02 BERMAS DE CONCRETO SIMPLE

04.02.01 TRAZO NIVELACION Y REPLANTEO 98.82 M2

PROLONG. JR. ANDAHUAYLAS - B01 1.00 1.00 35.56 35.56 35.56

PROLONG. JR. ANDAHUAYLAS - B02 1.00 1.00 3.82 3.82 3.82

JR. SAN MARTIN - B03 1.00 1.00 34.86 34.86 34.86

JR. SAN MARTIN - B04 1.00 1.00 24.58 24.58 24.58

04.02.02 EXCAVACION MANUAL EN TERRENO SUELTO 29.65 M3

PROLONG. JR. ANDAHUAYLAS - B01 1.00 1.00 35.56 0.30 10.67 10.67

PROLONG. JR. ANDAHUAYLAS - B02 1.00 1.00 3.82 0.30 1.15 1.15

JR. SAN MARTIN - B03 1.00 1.00 34.86 0.30 10.46 10.46

JR. SAN MARTIN - B04 1.00 1.00 24.58 0.30 7.37 7.37

04.02.03 NIVELACION Y COMPACTADO DE SUB RASANTE 98.82 M2

PROLONG. JR. ANDAHUAYLAS - B01 1.00 1.00 35.56 35.56 35.56

PROLONG. JR. ANDAHUAYLAS - B02 1.00 1.00 3.82 3.82 3.82

JR. SAN MARTIN - B03 1.00 1.00 34.86 34.86 34.86

JR. SAN MARTIN - B04 1.00 1.00 24.58 24.58 24.58

04.02.04 CONFORMACION Y COMPACTACION BASE GRANULAR EN BERMAS E=0.15 m 98.82 M2

PROLONG. JR. ANDAHUAYLAS - B01 1.00 1.00 35.56 35.56 35.56

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

PROLONG. JR. ANDAHUAYLAS - B02 1.00 1.00 3.82 3.82 3.82

JR. SAN MARTIN - B03 1.00 1.00 34.86 34.86 34.86

JR. SAN MARTIN - B04 1.00 1.00 24.58 24.58 24.58

04.02.05 CONCRETO FC=175 KG/CM2 EN BERMAS 19.76 M3

PROLONG. JR. ANDAHUAYLAS - B01 1.00 1.00 35.56 0.20 7.11 7.11

PROLONG. JR. ANDAHUAYLAS - B02 1.00 1.00 3.82 0.20 0.76 0.76

JR. SAN MARTIN - B03 1.00 1.00 34.86 0.20 6.97 6.97

JR. SAN MARTIN - B04 1.00 1.00 24.58 0.20 4.92 4.92

04.02.06 CURADO DEL CONCRETO EN BERMAS 98.82 M3 0.00

PROLONG. JR. ANDAHUAYLAS - B01 1.00 1.00 35.56 35.56 35.56

PROLONG. JR. ANDAHUAYLAS - B02 1.00 1.00 3.82 3.82 3.82

JR. SAN MARTIN - B03 1.00 1.00 34.86 34.86 34.86

JR. SAN MARTIN - B04 1.00 1.00 24.58 24.58 24.58

05 SEÑALIZACION

05.01 PINTADO DE SARDINELES 3,109.21 M 0.00

PROLONG. JR. ANDAHUAYLAS - MARGEN DERECHA 1.00 1.00 47.35 47.35 47.35

PROLONG. JR. ANDAHUAYLAS - MARGEN IZQUIERDA 1.00 1.00 67.65 67.65 67.65

JR. ANDAHUAYLAS - MARGEN DERECHA 1.00 1.00 363.75 363.75 363.75

JR. ANDAHUAYLAS - MARGEN IZQUIERDA 1.00 1.00 371.27 371.27 371.27

JR. SAN MARTIN - MARGEN DERECHA 1.00 1.00 83.84 83.84 83.84

JR. SAN MARTIN - MARGEN IZQUIERDA 1.00 1.00 85.35 85.35 85.35

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. LAS FLORES - MARGEN DERECHA 1.00 1.00 260.61 260.61 260.61

JR. LAS FLORES - MARGEN IZQUIERDA 1.00 1.00 260.42 260.42 260.42

JR. AMARGURA - MARGEN DERECHA 1.00 1.00 687.39 687.39 687.39

JR. AMARGURA - MARGEN IZQUIERDA 1.00 1.00 720.34 720.34 720.34

JR. 2 DE MAYO - MARGEN DERECHA 1.00 1.00 80.48 80.48 80.48

JR. 2 DE MAYO - MARGEN IZQUIERDA 1.00 1.00 80.76 80.76

05.02 PINTADO DE SIMBOLOS Y LETRA DE TRANSITO 173.67 M2

PINTADO DE FLECHAS DIRECCIONALES HACIA LA DERECHA E IZQUIERDA

JR. HUASCAR 1.00 1.00 2.06 2.06 2.06

JR. SAN MARTIN 1.00 1.00 2.06 2.06 2.06

PINTADO DE FLECHAS DIRECCIONALES DEFRENTE COMBINADA

JR. ANDAHUAYLAS 5.00 1.00 1.78 8.90 8.90

JR. HUASCAR 2.00 1.00 1.78 3.56 3.56

JR. AMARGURA 1.00 1.00 1.78 1.78 1.78

PINTADO DE FLECHAS DIRECCIONALES DEFRENTE COMBINADA

JR. AMARGURA 9.00 1.00 2.28 20.52 20.52

PINTADO DE FLECHAS DIRECCIONALES DEFRENTE

JR. AMARGURA 2.00 1.00 1.28 2.56 2.56

PINTADO DE LINEAS DE PASE PEATONALES

JR. MICAELA BASTIDAS 1.00 4.00 4.00 0.50 8.00 8.00

JR. ANDAHUAYLAS 1.00 5.00 4.00 0.50 10.00 10.00

JR. HUASCAR 1.00 4.00 4.00 0.50 8.00 8.00

JR. ESTUDIANTES 1.00 3.00 4.00 0.50 6.00 6.00

JR. SAN MARTIN 1.00 2.00 4.00 0.50 4.00 4.00

JR. LAS FLORES 1.00 4.00 4.00 0.50 8.00 8.00

JR. AMARGURA 1.00 12.00 4.00 0.50 24.00 24.00

JR. 2 DE MAYO 1.00 2.00 4.00 0.50 4.00 4.00

PINTADO DE LETRAS DE PASE PEATONALES

JR. ANDAHUAYLAS 1.00 5.00 3.17 15.85 15.85

JR. HUASCAR 1.00 3.00 3.17 9.51 9.51

JR. SAN MARTIN 1.00 1.00 3.17 3.17 3.17

JR. AMARGURA 1.00 10.00 3.17 31.70 31.70

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

06 VEREDAS

06.01 VEREDAS

06.01.01 TRAZO NIVELACION Y REPLANTEO 3,698.20 M2

JR. ANDAHUAYLAS - V01 1.00 1.00 22.16 22.16 22.16

JR. ANDAHUAYLAS - V02 1.00 1.00 21.33 21.33 21.33

JR. ANDAHUAYLAS - V03 1.00 1.00 20.59 20.59 20.59

JR. ANDAHUAYLAS - V04 1.00 1.00 8.89 8.89 8.89

JR. ANDAHUAYLAS - V05 1.00 1.00 16.05 16.05 16.05

JR. ANDAHUAYLAS - V06 1.00 1.00 76.11 76.11 76.11

JR. ANDAHUAYLAS - V07 1.00 1.00 98.67 98.67 98.67

JR. ANDAHUAYLAS - V08 1.00 1.00 5.39 5.39 5.39

JR. ANDAHUAYLAS - V09 1.00 1.00 4.82 4.82 4.82

JR. ANDAHUAYLAS - V10 1.00 1.00 140.92 140.92 140.92

JR. ANDAHUAYLAS - V11 1.00 1.00 140.08 140.08 140.08

JR. ANDAHUAYLAS - V12 1.00 1.00 17.08 17.08 17.08

JR. ANDAHUAYLAS - V13 1.00 1.00 21.71 21.71 21.71

JR. ANDAHUAYLAS - V14 1.00 1.00 14.64 14.64 14.64

JR. ANDAHUAYLAS - V15 1.00 1.00 124.94 124.94 124.94

JR. ANDAHUAYLAS - V16 1.00 1.00 125.08 125.08 125.08

JR. ANDAHUAYLAS - V17 1.00 1.00 15.34 15.34 15.34

JR. ANDAHUAYLAS - V18 1.00 1.00 10.41 10.41 10.41

JR. SAN MARTIN - V19 1.00 1.00 7.98 7.98 7.98

JR. SAN MARTIN - V20 1.00 1.00 8.05 8.05 8.05

JR. SAN MARTIN - V21 1.00 1.00 85.93 85.93 85.93

JR. SAN MARTIN - V22 1.00 1.00 85.99 85.99 85.99

JR. SAN MARTIN - V23 1.00 1.00 9.20 9.20 9.20

JR. SAN MARTIN - V24 1.00 1.00 8.62 8.62 8.62

JR. LAS FLORES - V25 1.00 1.00 4.48 4.48 4.48

JR. LAS FLORES - V26 1.00 1.00 4.48 4.48 4.48

JR. LAS FLORES - V27 1.00 1.00 85.86 85.86 85.86

JR. LAS FLORES - V28 1.00 1.00 85.86 85.86 85.86

JR. LAS FLORES - V29 1.00 1.00 2.82 2.82 2.82

JR. LAS FLORES - V30 1.00 1.00 3.65 3.65 3.65

JR. LAS FLORES - V31 1.00 1.00 4.05 4.05 4.05

JR. LAS FLORES - V32 1.00 1.00 3.35 3.35 3.35

JR. LAS FLORES - V33 1.00 1.00 158.65 158.65 158.65

JR. LAS FLORES - V34 1.00 1.00 158.27 158.27 158.27

JR. LAS FLORES - V35 1.00 1.00 4.78 4.78 4.78

JR. LAS FLORES - V36 1.00 1.00 4.78 4.78 4.78

JR. AMARGURA - V37 1.00 1.00 56.38 56.38 0.00

JR. AMARGURA - V38 1.00 1.00 3.85 3.85 0.00

JR. AMARGURA - V39 1.00 1.00 286.80 286.80 9.43

JR. AMARGURA - V40 1.00 1.00 287.86 287.86 11.55

JR. AMARGURA - V41 1.00 1.00 6.74 6.74 0.00

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. AMARGURA - V42 1.00 1.00 3.10 3.10 0.00

JR. AMARGURA - V43 1.00 1.00 4.96 4.96 0.00

JR. AMARGURA - V44 1.00 1.00 4.88 4.88 0.00

JR. AMARGURA - V45 1.00 1.00 102.36 102.36 0.00

JR. AMARGURA - V46 1.00 1.00 102.42 102.42 0.00

JR. AMARGURA - V47 1.00 1.00 3.32 3.32 0.00

JR. AMARGURA - V48 1.00 1.00 35.94 35.94 0.00

JR. AMARGURA - V49 1.00 1.00 16.24 16.24 0.00

JR. AMARGURA - V50 1.00 1.00 7.04 7.04 0.00

JR. AMARGURA - V51 1.00 1.00 5.54 5.54 0.00

JR. AMARGURA - V52 1.00 1.00 137.99 137.99 0.00

JR. AMARGURA - V53 1.00 1.00 114.74 114.74 0.00

JR. 02 DE MAYO - V54 1.00 1.00 3.91 3.91 3.91

JR. 02 DE MAYO - V55 1.00 1.00 4.09 4.09 4.09

JR. 02 DE MAYO - V56 1.00 1.00 72.88 72.88 72.88

JR. 02 DE MAYO - V57 1.00 1.00 72.88 72.88 72.88

JR. 02 .DE MAYO Y JR. AMARGURA - V58 1.00 1.00 7.53 7.53 7.53

JR. 02 .DE MAYO Y JR. AMARGURA - V59 1.00 1.00 6.24 6.24 6.24

JR. AMARGURA - V60 1.00 1.00 5.09 5.09 0.00

JR. AMARGURA - V61 1.00 1.00 4.27 4.27 0.00

JR. AMARGURA - V62 1.00 1.00 68.24 68.24 0.00

JR. AMARGURA - V63 1.00 1.00 56.69 56.69 0.00

JR. AMAUTA - V64 1.00 1.00 4.72 4.72 4.72

JR. AMAUTA - V65 1.00 1.00 4.71 4.71 4.71

JR. AMAUTA - V66 1.00 1.00 87.66 87.66 87.66

JR. AMAUTA - V67 1.00 1.00 87.66 87.66 87.66

JR. AMAUTA Y JR. AMARGURA - V68 1.00 1.00 5.76 5.76 5.76

JR. AMAUTA Y JR. AMARGURA - V69 1.00 1.00 5.56 5.56 5.56

JR. AMARGURA - V70 1.00 1.00 3.77 3.77 0.00

JR. AMARGURA - V71 1.00 1.00 5.19 5.19 0.00

JR. AMARGURA - V72 1.00 1.00 61.08 61.08 0.00

JR. AMARGURA - V73 1.00 1.00 51.22 51.22 0.00

JR. AMARGURA - V74 1.00 1.00 5.05 5.05 0.00

JR. AMARGURA - V75 1.00 1.00 3.34 3.34 0.00

JR. AMARGURA - V76 1.00 1.00 3.11 3.11 0.00

JR. AMARGURA - V77 1.00 1.00 2.97 2.97 0.00

JR. AMARGURA - V78 1.00 1.00 70.71 70.71 0.00

JR. AMARGURA - V79 1.00 1.00 69.81 69.81 0.00

JR. AMARGURA - V80 1.00 1.00 2.69 2.69 0.00

JR. AMARGURA - V81 1.00 1.00 2.69 2.69 0.00

PROLONG. JR. ANDAHUAYLAS - V82 1.00 1.00 70.63 70.63 70.63

PROLONG. JR. ANDAHUAYLAS - V83 1.00 1.00 56.88 56.88 56.88

06.01.02 EXCAVACION MANUAL EN TERRENO SUELTO 739.64 M3

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. ANDAHUAYLAS - V01 1.00 1.00 22.16 0.20 4.43 4.43

JR. ANDAHUAYLAS - V02 1.00 1.00 21.33 0.20 4.27 4.27

JR. ANDAHUAYLAS - V03 1.00 1.00 20.59 0.20 4.12 4.12

JR. ANDAHUAYLAS - V04 1.00 1.00 8.89 0.20 1.78 1.78

JR. ANDAHUAYLAS - V05 1.00 1.00 16.05 0.20 3.21 3.21

JR. ANDAHUAYLAS - V06 1.00 1.00 76.11 0.20 15.22 15.22

JR. ANDAHUAYLAS - V07 1.00 1.00 98.67 0.20 19.73 19.73

JR. ANDAHUAYLAS - V08 1.00 1.00 5.39 0.20 1.08 1.08

JR. ANDAHUAYLAS - V09 1.00 1.00 4.82 0.20 0.96 0.96

JR. ANDAHUAYLAS - V10 1.00 1.00 140.92 0.20 28.18 28.18

JR. ANDAHUAYLAS - V11 1.00 1.00 140.08 0.20 28.02 28.02

JR. ANDAHUAYLAS - V12 1.00 1.00 17.08 0.20 3.42 3.42

JR. ANDAHUAYLAS - V13 1.00 1.00 21.71 0.20 4.34 4.34

JR. ANDAHUAYLAS - V14 1.00 1.00 14.64 0.20 2.93 2.93

JR. ANDAHUAYLAS - V15 1.00 1.00 124.94 0.20 24.99 24.99

JR. ANDAHUAYLAS - V16 1.00 1.00 125.08 0.20 25.02 25.02

JR. ANDAHUAYLAS - V17 1.00 1.00 15.34 0.20 3.07 3.07

JR. ANDAHUAYLAS - V18 1.00 1.00 10.41 0.20 2.08 2.08

JR. SAN MARTIN - V19 1.00 1.00 7.98 0.20 1.60 1.60

JR. SAN MARTIN - V20 1.00 1.00 8.05 0.20 1.61 1.61

JR. SAN MARTIN - V21 1.00 1.00 85.93 0.20 17.19 17.19

JR. SAN MARTIN - V22 1.00 1.00 85.99 0.20 17.20 17.20

JR. SAN MARTIN - V23 1.00 1.00 9.20 0.20 1.84 1.84

JR. SAN MARTIN - V24 1.00 1.00 8.62 0.20 1.72 1.72

JR. LAS FLORES - V25 1.00 1.00 4.48 0.20 0.90 0.90

JR. LAS FLORES - V26 1.00 1.00 4.48 0.20 0.90 0.90

JR. LAS FLORES - V27 1.00 1.00 85.86 0.20 17.17 17.17

JR. LAS FLORES - V28 1.00 1.00 85.86 0.20 17.17 17.17

JR. LAS FLORES - V29 1.00 1.00 2.82 0.20 0.56 0.56

JR. LAS FLORES - V30 1.00 1.00 3.65 0.20 0.73 0.73

JR. LAS FLORES - V31 1.00 1.00 4.05 0.20 0.81 0.81

JR. LAS FLORES - V32 1.00 1.00 3.35 0.20 0.67 0.67

JR. LAS FLORES - V33 1.00 1.00 158.65 0.20 31.73 31.73

JR. LAS FLORES - V34 1.00 1.00 158.27 0.20 31.65 31.65

JR. LAS FLORES - V35 1.00 1.00 4.78 0.20 0.96 0.96

JR. LAS FLORES - V36 1.00 1.00 4.78 0.20 0.96 0.96

JR. AMARGURA - V37 1.00 1.00 56.38 0.20 11.28 9.26

JR. AMARGURA - V38 1.00 1.00 3.85 0.20 0.77 0.77

JR. AMARGURA - V39 1.00 1.00 286.80 0.20 57.36 57.36

JR. AMARGURA - V40 1.00 1.00 287.86 0.20 57.57 57.57

JR. AMARGURA - V41 1.00 1.00 6.74 0.20 1.35 1.35

JR. AMARGURA - V42 1.00 1.00 3.10 0.20 0.62 0.62

JR. AMARGURA - V43 1.00 1.00 4.96 0.20 0.99 0.99

JR. AMARGURA - V44 1.00 1.00 4.88 0.20 0.98 0.98

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. AMARGURA - V45 1.00 1.00 102.36 0.20 20.47 20.47

JR. AMARGURA - V46 1.00 1.00 102.42 0.20 20.48 20.48

JR. AMARGURA - V47 1.00 1.00 3.32 0.20 0.66 0.66

JR. AMARGURA - V48 1.00 1.00 35.94 0.20 7.19 7.19

JR. AMARGURA - V49 1.00 1.00 16.24 0.20 3.25 3.25

JR. AMARGURA - V50 1.00 1.00 7.04 0.20 1.41 1.41

JR. AMARGURA - V51 1.00 1.00 5.54 0.20 1.11 1.11

JR. AMARGURA - V52 1.00 1.00 137.99 0.20 27.60 27.60

JR. AMARGURA - V53 1.00 1.00 114.74 0.20 22.95 22.95

JR. 02 DE MAYO - V54 1.00 1.00 3.91 0.20 0.78 0.78

JR. 02 DE MAYO - V55 1.00 1.00 4.09 0.20 0.82 0.82

JR. 02 DE MAYO - V56 1.00 1.00 72.88 0.20 14.58 14.58

JR. 02 DE MAYO - V57 1.00 1.00 72.88 0.20 14.58 14.58

JR. 02 .DE MAYO Y JR. AMARGURA - V58 1.00 1.00 7.53 0.20 1.51 1.51

JR. 02 .DE MAYO Y JR. AMARGURA - V59 1.00 1.00 6.24 0.20 1.25 1.25

JR. AMARGURA - V60 1.00 1.00 5.09 0.20 1.02 1.02

JR. AMARGURA - V61 1.00 1.00 4.27 0.20 0.85 0.85

JR. AMARGURA - V62 1.00 1.00 68.24 0.20 13.65 13.65

JR. AMARGURA - V63 1.00 1.00 56.69 0.20 11.34 11.34

JR. AMAUTA - V64 1.00 1.00 4.72 0.20 0.94 0.94

JR. AMAUTA - V65 1.00 1.00 4.71 0.20 0.94 0.94

JR. AMAUTA - V66 1.00 1.00 87.66 0.20 17.53 17.53

JR. AMAUTA - V67 1.00 1.00 87.66 0.20 17.53 17.53

JR. AMAUTA Y JR. AMARGURA - V68 1.00 1.00 5.76 0.20 1.15 1.15

JR. AMAUTA Y JR. AMARGURA - V69 1.00 1.00 5.56 0.20 1.11 1.11

JR. AMARGURA - V70 1.00 1.00 3.77 0.20 0.75 0.75

JR. AMARGURA - V71 1.00 1.00 5.19 0.20 1.04 1.04

JR. AMARGURA - V72 1.00 1.00 61.08 0.20 12.22 12.22

JR. AMARGURA - V73 1.00 1.00 51.22 0.20 10.24 10.24

JR. AMARGURA - V74 1.00 1.00 5.05 0.20 1.01 1.01

JR. AMARGURA - V75 1.00 1.00 3.34 0.20 0.67 0.67

JR. AMARGURA - V76 1.00 1.00 3.11 0.20 0.62 0.62

JR. AMARGURA - V77 1.00 1.00 2.97 0.20 0.59 0.59

JR. AMARGURA - V78 1.00 1.00 70.71 0.20 14.14 14.14

JR. AMARGURA - V79 1.00 1.00 69.81 0.20 13.96 13.96

JR. AMARGURA - V80 1.00 1.00 2.69 0.20 0.54 0.54

JR. AMARGURA - V81 1.00 1.00 2.69 0.20 0.54 0.54

PROLONG. JR. ANDAHUAYLAS - V82 1.00 1.00 70.63 0.20 14.13 14.13

PROLONG. JR. ANDAHUAYLAS - V83 1.00 1.00 56.88 0.20 11.38 11.38

JR. AMARGURA TRAMO I KM 0+000 @ 0+271.24 1.00 1.00 372.88 0.00 0.00 0.00 372.88 0.00

JR. AMARGURA TRAMO I- KM 0+130.40 @ 0+404.97 1.00 1.00 364.74 0.00 0.00 0.00 364.74 0.00

06.01.03 PERFILADO Y COMPACTADO DE SUB RASANTE PARA VEREDA 3,698.20 M2

JR. ANDAHUAYLAS - V01 1.00 1.00 22.16 22.16 22.16

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. ANDAHUAYLAS - V02 1.00 1.00 21.33 21.33 21.33

JR. ANDAHUAYLAS - V03 1.00 1.00 20.59 20.59 20.59

JR. ANDAHUAYLAS - V04 1.00 1.00 8.89 8.89 8.89

JR. ANDAHUAYLAS - V05 1.00 1.00 16.05 16.05 16.05

JR. ANDAHUAYLAS - V06 1.00 1.00 76.11 76.11 76.11

JR. ANDAHUAYLAS - V07 1.00 1.00 98.67 98.67 98.67

JR. ANDAHUAYLAS - V08 1.00 1.00 5.39 5.39 5.39

JR. ANDAHUAYLAS - V09 1.00 1.00 4.82 4.82 4.82

JR. ANDAHUAYLAS - V10 1.00 1.00 140.92 140.92 140.92

JR. ANDAHUAYLAS - V11 1.00 1.00 140.08 140.08 140.08

JR. ANDAHUAYLAS - V12 1.00 1.00 17.08 17.08 17.08

JR. ANDAHUAYLAS - V13 1.00 1.00 21.71 21.71 21.71

JR. ANDAHUAYLAS - V14 1.00 1.00 14.64 14.64 14.64

JR. ANDAHUAYLAS - V15 1.00 1.00 124.94 124.94 124.94

JR. ANDAHUAYLAS - V16 1.00 1.00 125.08 125.08 125.08

JR. ANDAHUAYLAS - V17 1.00 1.00 15.34 15.34 15.34

JR. ANDAHUAYLAS - V18 1.00 1.00 10.41 10.41 10.41

JR. SAN MARTIN - V19 1.00 1.00 7.98 7.98 7.98

JR. SAN MARTIN - V20 1.00 1.00 8.05 8.05 8.05

JR. SAN MARTIN - V21 1.00 1.00 85.93 85.93 85.93

JR. SAN MARTIN - V22 1.00 1.00 85.99 85.99 85.99

JR. SAN MARTIN - V23 1.00 1.00 9.20 9.20 9.20

JR. SAN MARTIN - V24 1.00 1.00 8.62 8.62 8.62

JR. LAS FLORES - V25 1.00 1.00 4.48 4.48 4.48

JR. LAS FLORES - V26 1.00 1.00 4.48 4.48 4.48

JR. LAS FLORES - V27 1.00 1.00 85.86 85.86 85.86

JR. LAS FLORES - V28 1.00 1.00 85.86 85.86 85.86

JR. LAS FLORES - V29 1.00 1.00 2.82 2.82 2.82

JR. LAS FLORES - V30 1.00 1.00 3.65 3.65 3.65

JR. LAS FLORES - V31 1.00 1.00 4.05 4.05 4.05

JR. LAS FLORES - V32 1.00 1.00 3.35 3.35 3.35

JR. LAS FLORES - V33 1.00 1.00 158.65 158.65 158.65

JR. LAS FLORES - V34 1.00 1.00 158.27 158.27 158.27

JR. LAS FLORES - V35 1.00 1.00 4.78 4.78 4.78

JR. LAS FLORES - V36 1.00 1.00 4.78 4.78 4.78

JR. AMARGURA - V37 1.00 1.00 56.38 56.38 56.38

JR. AMARGURA - V38 1.00 1.00 3.85 3.85 3.85

JR. AMARGURA - V39 1.00 1.00 286.80 286.80 286.80

JR. AMARGURA - V40 1.00 1.00 287.86 287.86 287.86

JR. AMARGURA - V41 1.00 1.00 6.74 6.74 6.74

JR. AMARGURA - V42 1.00 1.00 3.10 3.10 3.10

JR. AMARGURA - V43 1.00 1.00 4.96 4.96 4.96

JR. AMARGURA - V44 1.00 1.00 4.88 4.88 4.88

JR. AMARGURA - V45 1.00 1.00 102.36 102.36 102.36

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. AMARGURA - V46 1.00 1.00 102.42 102.42 102.42

JR. AMARGURA - V47 1.00 1.00 3.32 3.32 3.32

JR. AMARGURA - V48 1.00 1.00 35.94 35.94 35.94

JR. AMARGURA - V49 1.00 1.00 16.24 16.24 16.24

JR. AMARGURA - V50 1.00 1.00 7.04 7.04 7.04

JR. AMARGURA - V51 1.00 1.00 5.54 5.54 5.54

JR. AMARGURA - V52 1.00 1.00 137.99 137.99 137.99

JR. AMARGURA - V53 1.00 1.00 114.74 114.74 114.74

JR. 02 DE MAYO - V54 1.00 1.00 3.91 3.91 3.91

JR. 02 DE MAYO - V55 1.00 1.00 4.09 4.09 4.09

JR. 02 DE MAYO - V56 1.00 1.00 72.88 72.88 72.88

JR. 02 DE MAYO - V57 1.00 1.00 72.88 72.88 72.88

JR. 02 .DE MAYO Y JR. AMARGURA - V58 1.00 1.00 7.53 7.53 7.53

JR. 02 .DE MAYO Y JR. AMARGURA - V59 1.00 1.00 6.24 6.24 6.24

JR. AMARGURA - V60 1.00 1.00 5.09 5.09 5.09

JR. AMARGURA - V61 1.00 1.00 4.27 4.27 4.27

JR. AMARGURA - V62 1.00 1.00 68.24 68.24 68.24

JR. AMARGURA - V63 1.00 1.00 56.69 56.69 56.69

JR. AMAUTA - V64 1.00 1.00 4.72 4.72 4.72

JR. AMAUTA - V65 1.00 1.00 4.71 4.71 4.71

JR. AMAUTA - V66 1.00 1.00 87.66 87.66 87.66

JR. AMAUTA - V67 1.00 1.00 87.66 87.66 87.66

JR. AMAUTA Y JR. AMARGURA - V68 1.00 1.00 5.76 5.76 5.76

JR. AMAUTA Y JR. AMARGURA - V69 1.00 1.00 5.56 5.56 5.56

JR. AMARGURA - V70 1.00 1.00 3.77 3.77 3.77

JR. AMARGURA - V71 1.00 1.00 5.19 5.19 5.19

JR. AMARGURA - V72 1.00 1.00 61.08 61.08 61.08

JR. AMARGURA - V73 1.00 1.00 51.22 51.22 51.22

JR. AMARGURA - V74 1.00 1.00 5.05 5.05 5.05

JR. AMARGURA - V75 1.00 1.00 3.34 3.34 3.34

JR. AMARGURA - V76 1.00 1.00 3.11 3.11 3.11

JR. AMARGURA - V77 1.00 1.00 2.97 2.97 2.97

JR. AMARGURA - V78 1.00 1.00 70.71 70.71 70.71

JR. AMARGURA - V79 1.00 1.00 69.81 69.81 69.81

JR. AMARGURA - V80 1.00 1.00 2.69 2.69 2.69

JR. AMARGURA - V81 1.00 1.00 2.69 2.69 2.69

PROLONG. JR. ANDAHUAYLAS - V82 1.00 1.00 70.63 70.63 70.63

PROLONG. JR. ANDAHUAYLAS - V83 1.00 1.00 56.88 56.88 56.88

06.01.04 CONFORMACION Y COMPACTACION BASE GRANULAR EN VEREDAS E=0.10 m 3,698.20 M2

JR. ANDAHUAYLAS - V01 1.00 1.00 22.16 22.16 22.16

JR. ANDAHUAYLAS - V02 1.00 1.00 21.33 21.33 21.33

JR. ANDAHUAYLAS - V03 1.00 1.00 20.59 20.59 20.59

JR. ANDAHUAYLAS - V04 1.00 1.00 8.89 8.89 8.89

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. ANDAHUAYLAS - V05 1.00 1.00 16.05 16.05 16.05

JR. ANDAHUAYLAS - V06 1.00 1.00 76.11 76.11 76.11

JR. ANDAHUAYLAS - V07 1.00 1.00 98.67 98.67 98.67

JR. ANDAHUAYLAS - V08 1.00 1.00 5.39 5.39 5.39

JR. ANDAHUAYLAS - V09 1.00 1.00 4.82 4.82 4.82

JR. ANDAHUAYLAS - V10 1.00 1.00 140.92 140.92 140.92

JR. ANDAHUAYLAS - V11 1.00 1.00 140.08 140.08 140.08

JR. ANDAHUAYLAS - V12 1.00 1.00 17.08 17.08 17.08

JR. ANDAHUAYLAS - V13 1.00 1.00 21.71 21.71 21.71

JR. ANDAHUAYLAS - V14 1.00 1.00 14.64 14.64 14.64

JR. ANDAHUAYLAS - V15 1.00 1.00 124.94 124.94 124.94

JR. ANDAHUAYLAS - V16 1.00 1.00 125.08 125.08 125.08

JR. ANDAHUAYLAS - V17 1.00 1.00 15.34 15.34 15.34

JR. ANDAHUAYLAS - V18 1.00 1.00 10.41 10.41 10.41

JR. SAN MARTIN - V19 1.00 1.00 7.98 7.98 7.98

JR. SAN MARTIN - V20 1.00 1.00 8.05 8.05 8.05

JR. SAN MARTIN - V21 1.00 1.00 85.93 85.93 85.93

JR. SAN MARTIN - V22 1.00 1.00 85.99 85.99 85.99

JR. SAN MARTIN - V23 1.00 1.00 9.20 9.20 9.20

JR. SAN MARTIN - V24 1.00 1.00 8.62 8.62 8.62

JR. LAS FLORES - V25 1.00 1.00 4.48 4.48 4.48

JR. LAS FLORES - V26 1.00 1.00 4.48 4.48 4.48

JR. LAS FLORES - V27 1.00 1.00 85.86 85.86 85.86

JR. LAS FLORES - V28 1.00 1.00 85.86 85.86 85.86

JR. LAS FLORES - V29 1.00 1.00 2.82 2.82 2.82

JR. LAS FLORES - V30 1.00 1.00 3.65 3.65 3.65

JR. LAS FLORES - V31 1.00 1.00 4.05 4.05 4.05

JR. LAS FLORES - V32 1.00 1.00 3.35 3.35 3.35

JR. LAS FLORES - V33 1.00 1.00 158.65 158.65 158.65

JR. LAS FLORES - V34 1.00 1.00 158.27 158.27 158.27

JR. LAS FLORES - V35 1.00 1.00 4.78 4.78 4.78

JR. LAS FLORES - V36 1.00 1.00 4.78 4.78 4.78

JR. AMARGURA - V37 1.00 1.00 56.38 56.38 56.38

JR. AMARGURA - V38 1.00 1.00 3.85 3.85 3.85

JR. AMARGURA - V39 1.00 1.00 286.80 286.80 286.80

JR. AMARGURA - V40 1.00 1.00 287.86 287.86 287.86

JR. AMARGURA - V41 1.00 1.00 6.74 6.74 6.74

JR. AMARGURA - V42 1.00 1.00 3.10 3.10 3.10

JR. AMARGURA - V43 1.00 1.00 4.96 4.96 4.96

JR. AMARGURA - V44 1.00 1.00 4.88 4.88 4.88

JR. AMARGURA - V45 1.00 1.00 102.36 102.36 102.36

JR. AMARGURA - V46 1.00 1.00 102.42 102.42 102.42

JR. AMARGURA - V47 1.00 1.00 3.32 3.32 3.32

JR. AMARGURA - V48 1.00 1.00 35.94 35.94 35.94

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. AMARGURA - V49 1.00 1.00 16.24 16.24 16.24

JR. AMARGURA - V50 1.00 1.00 7.04 7.04 7.04

JR. AMARGURA - V51 1.00 1.00 5.54 5.54 5.54

JR. AMARGURA - V52 1.00 1.00 137.99 137.99 137.99

JR. AMARGURA - V53 1.00 1.00 114.74 114.74 114.74

JR. 02 DE MAYO - V54 1.00 1.00 3.91 3.91 3.91

JR. 02 DE MAYO - V55 1.00 1.00 4.09 4.09 4.09

JR. 02 DE MAYO - V56 1.00 1.00 72.88 72.88 72.88

JR. 02 DE MAYO - V57 1.00 1.00 72.88 72.88 72.88

JR. 02 .DE MAYO Y JR. AMARGURA - V58 1.00 1.00 7.53 7.53 7.53

JR. 02 .DE MAYO Y JR. AMARGURA - V59 1.00 1.00 6.24 6.24 6.24

JR. AMARGURA - V60 1.00 1.00 5.09 5.09 5.09

JR. AMARGURA - V61 1.00 1.00 4.27 4.27 4.27

JR. AMARGURA - V62 1.00 1.00 68.24 68.24 68.24

JR. AMARGURA - V63 1.00 1.00 56.69 56.69 56.69

JR. AMAUTA - V64 1.00 1.00 4.72 4.72 4.72

JR. AMAUTA - V65 1.00 1.00 4.71 4.71 4.71

JR. AMAUTA - V66 1.00 1.00 87.66 87.66 87.66

JR. AMAUTA - V67 1.00 1.00 87.66 87.66 87.66

JR. AMAUTA Y JR. AMARGURA - V68 1.00 1.00 5.76 5.76 5.76

JR. AMAUTA Y JR. AMARGURA - V69 1.00 1.00 5.56 5.56 5.56

JR. AMARGURA - V70 1.00 1.00 3.77 3.77 3.77

JR. AMARGURA - V71 1.00 1.00 5.19 5.19 5.19

JR. AMARGURA - V72 1.00 1.00 61.08 61.08 61.08

JR. AMARGURA - V73 1.00 1.00 51.22 51.22 51.22

JR. AMARGURA - V74 1.00 1.00 5.05 5.05 5.05

JR. AMARGURA - V75 1.00 1.00 3.34 3.34 3.34

JR. AMARGURA - V76 1.00 1.00 3.11 3.11 3.11

JR. AMARGURA - V77 1.00 1.00 2.97 2.97 2.97

JR. AMARGURA - V78 1.00 1.00 70.71 70.71 70.71

JR. AMARGURA - V79 1.00 1.00 69.81 69.81 69.81

JR. AMARGURA - V80 1.00 1.00 2.69 2.69 2.69

JR. AMARGURA - V81 1.00 1.00 2.69 2.69 2.69

PROLONG. JR. ANDAHUAYLAS - V82 1.00 1.00 70.63 70.63 70.63

PROLONG. JR. ANDAHUAYLAS - V83 1.00 1.00 56.88 56.88 56.88

06.01.05 CONCRETO FC=175 KG/CM2 554.73 M3

JR. ANDAHUAYLAS - V01 1.00 1.00 22.16 0.15 3.32 3.32

JR. ANDAHUAYLAS - V02 1.00 1.00 21.33 0.15 3.20 3.20

JR. ANDAHUAYLAS - V03 1.00 1.00 20.59 0.15 3.09 3.09

JR. ANDAHUAYLAS - V04 1.00 1.00 8.89 0.15 1.33 1.33

JR. ANDAHUAYLAS - V05 1.00 1.00 16.05 0.15 2.41 2.41

JR. ANDAHUAYLAS - V06 1.00 1.00 76.11 0.15 11.42 11.42

JR. ANDAHUAYLAS - V07 1.00 1.00 98.67 0.15 14.80 14.80

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. ANDAHUAYLAS - V08 1.00 1.00 5.39 0.15 0.81 0.81

JR. ANDAHUAYLAS - V09 1.00 1.00 4.82 0.15 0.72 0.72

JR. ANDAHUAYLAS - V10 1.00 1.00 140.92 0.15 21.14 21.14

JR. ANDAHUAYLAS - V11 1.00 1.00 140.08 0.15 21.01 21.01

JR. ANDAHUAYLAS - V12 1.00 1.00 17.08 0.15 2.56 2.56

JR. ANDAHUAYLAS - V13 1.00 1.00 21.71 0.15 3.26 3.26

JR. ANDAHUAYLAS - V14 1.00 1.00 14.64 0.15 2.20 2.20

JR. ANDAHUAYLAS - V15 1.00 1.00 124.94 0.15 18.74 18.74

JR. ANDAHUAYLAS - V16 1.00 1.00 125.08 0.15 18.76 18.76

JR. ANDAHUAYLAS - V17 1.00 1.00 15.34 0.15 2.30 2.30

JR. ANDAHUAYLAS - V18 1.00 1.00 10.41 0.15 1.56 1.56

JR. SAN MARTIN - V19 1.00 1.00 7.98 0.15 1.20 1.20

JR. SAN MARTIN - V20 1.00 1.00 8.05 0.15 1.21 1.21

JR. SAN MARTIN - V21 1.00 1.00 85.93 0.15 12.89 12.89

JR. SAN MARTIN - V22 1.00 1.00 85.99 0.15 12.90 12.90

JR. SAN MARTIN - V23 1.00 1.00 9.20 0.15 1.38 1.38

JR. SAN MARTIN - V24 1.00 1.00 8.62 0.15 1.29 1.29

JR. LAS FLORES - V25 1.00 1.00 4.48 0.15 0.67 0.67

JR. LAS FLORES - V26 1.00 1.00 4.48 0.15 0.67 0.67

JR. LAS FLORES - V27 1.00 1.00 85.86 0.15 12.88 12.88

JR. LAS FLORES - V28 1.00 1.00 85.86 0.15 12.88 12.88

JR. LAS FLORES - V29 1.00 1.00 2.82 0.15 0.42 0.42

JR. LAS FLORES - V30 1.00 1.00 3.65 0.15 0.55 0.55

JR. LAS FLORES - V31 1.00 1.00 4.05 0.15 0.61 0.61

JR. LAS FLORES - V32 1.00 1.00 3.35 0.15 0.50 0.50

JR. LAS FLORES - V33 1.00 1.00 158.65 0.15 23.80 23.80

JR. LAS FLORES - V34 1.00 1.00 158.27 0.15 23.74 23.74

JR. LAS FLORES - V35 1.00 1.00 4.78 0.15 0.72 0.72

JR. LAS FLORES - V36 1.00 1.00 4.78 0.15 0.72 0.72

JR. AMARGURA - V37 1.00 1.00 56.38 0.15 8.46 8.46

JR. AMARGURA - V38 1.00 1.00 3.85 0.15 0.58 0.58

JR. AMARGURA - V39 1.00 1.00 286.80 0.15 43.02 43.02

JR. AMARGURA - V40 1.00 1.00 287.86 0.15 43.18 43.18

JR. AMARGURA - V41 1.00 1.00 6.74 0.15 1.01 1.01

JR. AMARGURA - V42 1.00 1.00 3.10 0.15 0.47 0.47

JR. AMARGURA - V43 1.00 1.00 4.96 0.15 0.74 0.74

JR. AMARGURA - V44 1.00 1.00 4.88 0.15 0.73 0.73

JR. AMARGURA - V45 1.00 1.00 102.36 0.15 15.35 15.35

JR. AMARGURA - V46 1.00 1.00 102.42 0.15 15.36 15.36

JR. AMARGURA - V47 1.00 1.00 3.32 0.15 0.50 0.50

JR. AMARGURA - V48 1.00 1.00 35.94 0.15 5.39 5.39

JR. AMARGURA - V49 1.00 1.00 16.24 0.15 2.44 2.44

JR. AMARGURA - V50 1.00 1.00 7.04 0.15 1.06 1.06

JR. AMARGURA - V51 1.00 1.00 5.54 0.15 0.83 0.83

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. AMARGURA - V52 1.00 1.00 137.99 0.15 20.70 20.70

JR. AMARGURA - V53 1.00 1.00 114.74 0.15 17.21 17.21

JR. 02 DE MAYO - V54 1.00 1.00 3.91 0.15 0.59 0.59

JR. 02 DE MAYO - V55 1.00 1.00 4.09 0.15 0.61 0.61

JR. 02 DE MAYO - V56 1.00 1.00 72.88 0.15 10.93 10.93

JR. 02 DE MAYO - V57 1.00 1.00 72.88 0.15 10.93 10.93

JR. 02 .DE MAYO Y JR. AMARGURA - V58 1.00 1.00 7.53 0.15 1.13 1.13

JR. 02 .DE MAYO Y JR. AMARGURA - V59 1.00 1.00 6.24 0.15 0.94 0.94

JR. AMARGURA - V60 1.00 1.00 5.09 0.15 0.76 0.76

JR. AMARGURA - V61 1.00 1.00 4.27 0.15 0.64 0.64

JR. AMARGURA - V62 1.00 1.00 68.24 0.15 10.24 10.24

JR. AMARGURA - V63 1.00 1.00 56.69 0.15 8.50 8.50

JR. AMAUTA - V64 1.00 1.00 4.72 0.15 0.71 0.71

JR. AMAUTA - V65 1.00 1.00 4.71 0.15 0.71 0.71

JR. AMAUTA - V66 1.00 1.00 87.66 0.15 13.15 13.15

JR. AMAUTA - V67 1.00 1.00 87.66 0.15 13.15 13.15

JR. AMAUTA Y JR. AMARGURA - V68 1.00 1.00 5.76 0.15 0.86 0.86

JR. AMAUTA Y JR. AMARGURA - V69 1.00 1.00 5.56 0.15 0.83 0.83

JR. AMARGURA - V70 1.00 1.00 3.77 0.15 0.57 0.57

JR. AMARGURA - V71 1.00 1.00 5.19 0.15 0.78 0.78

JR. AMARGURA - V72 1.00 1.00 61.08 0.15 9.16 9.16

JR. AMARGURA - V73 1.00 1.00 51.22 0.15 7.68 7.68

JR. AMARGURA - V74 1.00 1.00 5.05 0.15 0.76 0.76

JR. AMARGURA - V75 1.00 1.00 3.34 0.15 0.50 0.50

JR. AMARGURA - V76 1.00 1.00 3.11 0.15 0.47 0.47

JR. AMARGURA - V77 1.00 1.00 2.97 0.15 0.45 0.45

JR. AMARGURA - V78 1.00 1.00 70.71 0.15 10.61 10.61

JR. AMARGURA - V79 1.00 1.00 69.81 0.15 10.47 10.47

JR. AMARGURA - V80 1.00 1.00 2.69 0.15 0.40 0.40

JR. AMARGURA - V81 1.00 1.00 2.69 0.15 0.40 0.40

PROLONG. JR. ANDAHUAYLAS - V82 1.00 1.00 70.63 0.15 10.59 10.59

PROLONG. JR. ANDAHUAYLAS - V83 1.00 1.00 56.88 0.15 8.53 8.53

06.01.06 JUNTAS ASFALTICAS 1,046.19 M

PROLONG. JR. ANDAHUAYLAS - MARGEN DERECHA 1.00 15.78 1.10 17.36 17.36

PROLONG. JR. ANDAHUAYLAS - MARGEN IZQUIERDA 1.00 22.55 1.10 24.81 24.81

JR. ANDAHUAYLAS - MARGEN DERECHA 1.00 121.25 1.10 133.38 133.38

JR. ANDAHUAYLAS - MARGEN IZQUIERDA 1.00 123.76 1.10 136.13 136.13

JR. SAN MARTIN - MARGEN DERECHA 1.00 27.95 1.10 30.74 30.74

JR. SAN MARTIN - MARGEN IZQUIERDA 1.00 28.45 1.10 31.30 31.30

JR. LAS FLORES - MARGEN DERECHA 1.00 86.87 0.90 78.18 78.18

JR. LAS FLORES - MARGEN IZQUIERDA 1.00 86.81 0.90 78.13 78.13

JR. AMARGURA - MARGEN DERECHA 1.00 229.13 1.10 252.04 252.04

JR. AMARGURA - MARGEN IZQUIERDA 1.00 240.11 1.10 264.12 264.12

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. 2 DE MAYO - MARGEN DERECHA 1.00 26.83 0.90 24.14 24.14

JR. 2 DE MAYO - MARGEN IZQUIERDA 1.00 26.92 0.90 24.23 24.23

JR. AMAUTA - MARGEN DERECHA 1.00 31.96 0.90 28.76 28.76

JR. AMAUTA - MARGEN IZQUIERDA 1.00 32.06 0.90 28.85 28.85

06.01.07 CURADO DEL CONCRETO EN VEREDAS 3,698.20 M2

JR. ANDAHUAYLAS - V01 1.00 1.00 22.16 22.16 22.16

JR. ANDAHUAYLAS - V02 1.00 1.00 21.33 21.33 21.33

JR. ANDAHUAYLAS - V03 1.00 1.00 20.59 20.59 20.59

JR. ANDAHUAYLAS - V04 1.00 1.00 8.89 8.89 8.89

JR. ANDAHUAYLAS - V05 1.00 1.00 16.05 16.05 16.05

JR. ANDAHUAYLAS - V06 1.00 1.00 76.11 76.11 76.11

JR. ANDAHUAYLAS - V07 1.00 1.00 98.67 98.67 98.67

JR. ANDAHUAYLAS - V08 1.00 1.00 5.39 5.39 5.39

JR. ANDAHUAYLAS - V09 1.00 1.00 4.82 4.82 4.82

JR. ANDAHUAYLAS - V10 1.00 1.00 140.92 140.92 140.92

JR. ANDAHUAYLAS - V11 1.00 1.00 140.08 140.08 140.08

JR. ANDAHUAYLAS - V12 1.00 1.00 17.08 17.08 17.08

JR. ANDAHUAYLAS - V13 1.00 1.00 21.71 21.71 21.71

JR. ANDAHUAYLAS - V14 1.00 1.00 14.64 14.64 14.64

JR. ANDAHUAYLAS - V15 1.00 1.00 124.94 124.94 124.94

JR. ANDAHUAYLAS - V16 1.00 1.00 125.08 125.08 125.08

JR. ANDAHUAYLAS - V17 1.00 1.00 15.34 15.34 15.34

JR. ANDAHUAYLAS - V18 1.00 1.00 10.41 10.41 10.41

JR. SAN MARTIN - V19 1.00 1.00 7.98 7.98 7.98

JR. SAN MARTIN - V20 1.00 1.00 8.05 8.05 8.05

JR. SAN MARTIN - V21 1.00 1.00 85.93 85.93 85.93

JR. SAN MARTIN - V22 1.00 1.00 85.99 85.99 85.99

JR. SAN MARTIN - V23 1.00 1.00 9.20 9.20 9.20

JR. SAN MARTIN - V24 1.00 1.00 8.62 8.62 8.62

JR. LAS FLORES - V25 1.00 1.00 4.48 4.48 4.48

JR. LAS FLORES - V26 1.00 1.00 4.48 4.48 4.48

JR. LAS FLORES - V27 1.00 1.00 85.86 85.86 85.86

JR. LAS FLORES - V28 1.00 1.00 85.86 85.86 85.86

JR. LAS FLORES - V29 1.00 1.00 2.82 2.82 2.82

JR. LAS FLORES - V30 1.00 1.00 3.65 3.65 3.65

JR. LAS FLORES - V31 1.00 1.00 4.05 4.05 4.05

JR. LAS FLORES - V32 1.00 1.00 3.35 3.35 3.35

JR. LAS FLORES - V33 1.00 1.00 158.65 158.65 158.65

JR. LAS FLORES - V34 1.00 1.00 158.27 158.27 158.27

JR. LAS FLORES - V35 1.00 1.00 4.78 4.78 4.78

JR. LAS FLORES - V36 1.00 1.00 4.78 4.78 4.78

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. AMARGURA - V37 1.00 1.00 56.38 56.38 56.38

JR. AMARGURA - V38 1.00 1.00 3.85 3.85 3.85

JR. AMARGURA - V39 1.00 1.00 286.80 286.80 286.80

JR. AMARGURA - V40 1.00 1.00 287.86 287.86 287.86

JR. AMARGURA - V41 1.00 1.00 6.74 6.74 6.74

JR. AMARGURA - V42 1.00 1.00 3.10 3.10 3.10

JR. AMARGURA - V43 1.00 1.00 4.96 4.96 4.96

JR. AMARGURA - V44 1.00 1.00 4.88 4.88 4.88

JR. AMARGURA - V45 1.00 1.00 102.36 102.36 102.36

JR. AMARGURA - V46 1.00 1.00 102.42 102.42 102.42

JR. AMARGURA - V47 1.00 1.00 3.32 3.32 3.32

JR. AMARGURA - V48 1.00 1.00 35.94 35.94 35.94

JR. AMARGURA - V49 1.00 1.00 16.24 16.24 16.24

JR. AMARGURA - V50 1.00 1.00 7.04 7.04 7.04

JR. AMARGURA - V51 1.00 1.00 5.54 5.54 5.54

JR. AMARGURA - V52 1.00 1.00 137.99 137.99 137.99

JR. AMARGURA - V53 1.00 1.00 114.74 114.74 114.74

JR. 02 DE MAYO - V54 1.00 1.00 3.91 3.91 3.91

JR. 02 DE MAYO - V55 1.00 1.00 4.09 4.09 4.09

JR. 02 DE MAYO - V56 1.00 1.00 72.88 72.88 72.88

JR. 02 DE MAYO - V57 1.00 1.00 72.88 72.88 72.88

JR. 02 .DE MAYO Y JR. AMARGURA - V58 1.00 1.00 7.53 7.53 7.53

JR. 02 .DE MAYO Y JR. AMARGURA - V59 1.00 1.00 6.24 6.24 6.24

JR. AMARGURA - V60 1.00 1.00 5.09 5.09 5.09

JR. AMARGURA - V61 1.00 1.00 4.27 4.27 4.27

JR. AMARGURA - V62 1.00 1.00 68.24 68.24 68.24

JR. AMARGURA - V63 1.00 1.00 56.69 56.69 56.69

JR. AMAUTA - V64 1.00 1.00 4.72 4.72 4.72

JR. AMAUTA - V65 1.00 1.00 4.71 4.71 4.71

JR. AMAUTA - V66 1.00 1.00 87.66 87.66 87.66

JR. AMAUTA - V67 1.00 1.00 87.66 87.66 87.66

JR. AMAUTA Y JR. AMARGURA - V68 1.00 1.00 5.76 5.76 5.76

JR. AMAUTA Y JR. AMARGURA - V69 1.00 1.00 5.56 5.56 5.56

JR. AMARGURA - V70 1.00 1.00 3.77 3.77 3.77

JR. AMARGURA - V71 1.00 1.00 5.19 5.19 5.19

JR. AMARGURA - V72 1.00 1.00 61.08 61.08 61.08

JR. AMARGURA - V73 1.00 1.00 51.22 51.22 51.22

JR. AMARGURA - V74 1.00 1.00 5.05 5.05 5.05

JR. AMARGURA - V75 1.00 1.00 3.34 3.34 3.34

JR. AMARGURA - V76 1.00 1.00 3.11 3.11 3.11

JR. AMARGURA - V77 1.00 1.00 2.97 2.97 2.97

JR. AMARGURA - V78 1.00 1.00 70.71 70.71 70.71

JR. AMARGURA - V79 1.00 1.00 69.81 69.81 69.81

JR. AMARGURA - V80 1.00 1.00 2.69 2.69 2.69

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. AMARGURA - V81 1.00 1.00 2.69 2.69 2.69

PROLONG. JR. ANDAHUAYLAS - V82 1.00 1.00 70.63 70.63 70.63

PROLONG. JR. ANDAHUAYLAS - V83 1.00 1.00 56.88 56.88 56.88

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

06.02 SARDINELES

06.02.01 TRAZO NIVELACION Y REPLANTEO 330.13 M2

PROLONG. JR. ANDAHUAYLAS - MARGEN DERECHA 1.00 1.00 23.16 0.10 2.32 2.32

1.00 1.00 6.00 0.10 0.60 0.60

1.00 1.00 18.19 0.10 1.82 1.82

MARGEN IZQUIERDA 1.00 1.00 22.42 0.10 2.24 2.24

1.00 1.00 19.61 0.10 1.96 1.96

1.00 1.00 22.49 0.10 2.25 2.25

1.00 1.00 3.13 0.10 0.31 0.31

JR. ANDAHUAYLAS - MARGEN DERECHA 1.00 1.00 10.26 0.10 1.03 1.03

1.00 1.00 51.07 0.10 5.11 5.11

1.00 1.00 47.83 0.10 4.78 4.78

1.00 1.00 5.22 0.10 0.52 0.52

1.00 1.00 2.93 0.10 0.29 0.29

1.00 1.00 3.70 0.10 0.37 0.37

1.00 1.00 5.47 0.10 0.55 0.55

1.00 1.00 2.26 0.10 0.23 0.23

1.00 1.00 6.06 0.10 0.61 0.61

1.00 1.00 3.97 0.10 0.40 0.40

1.00 1.00 25.77 0.10 2.58 2.58

1.00 1.00 46.63 0.10 4.66 4.66

1.00 1.00 14.80 0.10 1.48 1.48

1.00 1.00 17.18 0.10 1.72 1.72

1.00 1.00 13.00 0.10 1.30 1.30

1.00 1.00 4.02 0.10 0.40 0.40

1.00 1.00 4.49 0.10 0.45 0.45

1.00 1.00 40.95 0.10 4.10 4.10

1.00 1.00 22.47 0.10 2.25 2.25

1.00 1.00 14.17 0.10 1.42 1.42

1.00 1.00 3.04 0.10 0.30 0.30

1.00 1.00 18.46 0.10 1.85 1.85

MARGEN IZQUIERDA 1.00 1.00 5.06 0.10 0.51 0.51

1.00 1.00 3.67 0.10 0.37 0.37

1.00 1.00 51.12 0.10 5.11 5.11

1.00 1.00 53.10 0.10 5.31 5.31

1.00 1.00 2.89 0.10 0.29 0.29

1.00 1.00 15.21 0.10 1.52 1.52

1.00 1.00 25.83 0.10 2.58 2.58

1.00 1.00 46.83 0.10 4.68 4.68

1.00 1.00 15.03 0.10 1.50 1.50

1.00 1.00 16.69 0.10 1.67 1.67

1.00 1.00 12.41 0.10 1.24 1.24

1.00 1.00 4.84 0.10 0.48 0.48

1.00 1.00 54.99 0.10 5.50 5.50

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

1.00 1.00 22.42 0.10 2.24 2.24

1.00 1.00 6.45 0.10 0.65 0.65

1.00 1.00 7.26 0.10 0.73 0.73

1.00 1.00 3.97 0.10 0.40 0.40

1.00 1.00 5.72 0.10 0.57 0.57

1.00 1.00 17.78 0.10 1.78 1.78

JR. SAN MARTIN - MARGEN DERECHA 1.00 1.00 6.71 0.10 0.67 0.67

1.00 1.00 25.35 0.10 2.54 2.54

1.00 1.00 46.30 0.10 4.63 4.63

1.00 1.00 5.48 0.10 0.55 0.55

MARGEN IZQUIERDA 1.00 1.00 6.65 0.10 0.67 0.67

1.00 1.00 25.33 0.10 2.53 2.53

1.00 1.00 46.28 0.10 4.63 4.63

1.00 1.00 2.76 0.10 0.28 0.28

1.00 1.00 4.33 0.10 0.43 0.43

JR. LAS FLORES - MARGEN DERECHA 1.00 1.00 4.48 0.10 0.45 0.45

1.00 1.00 85.86 0.10 8.59 8.59

1.00 1.00 2.90 0.10 0.29 0.29

1.00 1.00 3.98 0.10 0.40 0.40

1.00 1.00 40.22 0.10 4.02 4.02

1.00 1.00 39.22 0.10 3.92 3.92

1.00 1.00 60.19 0.10 6.02 6.02

1.00 1.00 18.98 0.10 1.90 1.90

1.00 1.00 4.78 0.10 0.48 0.48

MARGEN IZQUIERDA 1.00 1.00 4.48 0.10 0.45 0.45

1.00 1.00 85.86 0.10 8.59 8.59

1.00 1.00 3.57 0.10 0.36 0.36

1.00 1.00 3.42 0.10 0.34 0.34

1.00 1.00 40.18 0.10 4.02 4.02

1.00 1.00 39.19 0.10 3.92 3.92

1.00 1.00 60.09 0.10 6.01 6.01

1.00 1.00 18.85 0.10 1.89 1.89

1.00 1.00 4.78 0.10 0.48 0.48

JR. AMARGURA - MARGEN DERECHA 1.00 1.00 2.69 0.10 0.27 0.27

1.00 1.00 18.66 0.10 1.87 1.87

1.00 1.00 23.43 0.10 2.34 2.34

1.00 1.00 15.54 0.10 1.55 1.55

1.00 1.00 13.00 0.10 1.30 1.30

1.00 1.00 3.12 0.10 0.31 0.31

1.00 1.00 4.12 0.10 0.41 0.41

1.00 1.00 46.89 0.10 4.69 4.69

1.00 1.00 4.04 0.10 0.40 0.40

1.00 1.00 2.74 0.10 0.27 0.27

1.00 1.00 1.87 0.10 0.19 0.19

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

1.00 1.00 3.14 0.10 0.31 0.31

1.00 1.00 56.87 0.10 5.69 5.69

1.00 1.00 3.56 0.10 0.36 0.36

1.00 1.00 4.24 0.10 0.42 0.42

1.00 1.00 18.77 0.10 1.88 1.88

1.00 1.00 66.84 0.10 6.68 6.68

1.00 1.00 29.36 0.10 2.94 2.94

1.00 1.00 4.62 0.10 0.46 0.46

1.00 1.00 29.95 0.10 3.00 3.00

1.00 1.00 28.96 0.10 2.90 2.90

1.00 1.00 29.57 0.10 2.96 2.96

1.00 1.00 26.82 0.10 2.68 2.68

1.00 1.00 4.07 0.10 0.41 0.41

1.00 1.00 2.59 0.10 0.26 0.26

1.00 1.00 9.26 0.10 0.93 0.93

1.00 1.00 12.23 0.10 1.22 1.22

1.00 1.00 13.36 0.10 1.34 1.34

1.00 1.00 15.88 0.10 1.59 1.59

1.00 1.00 41.97 0.10 4.20 4.20

1.00 1.00 12.81 0.10 1.28 1.28

1.00 1.00 39.23 0.10 3.92 3.92

1.00 1.00 16.89 0.10 1.69 1.69

1.00 1.00 13.53 0.10 1.35 1.35

1.00 1.00 33.57 0.10 3.36 3.36

1.00 1.00 30.00 0.10 3.00 3.00

1.00 1.00 3.20 0.10 0.32 0.32

MARGEN IZQUIERDA 1.00 1.00 2.69 0.10 0.27 0.27

1.00 1.00 18.46 0.10 1.85 1.85

1.00 1.00 13.54 0.10 1.35 1.35

1.00 1.00 9.34 0.10 0.93 0.93

1.00 1.00 16.18 0.10 1.62 1.62

1.00 1.00 12.39 0.10 1.24 1.24

1.00 1.00 2.95 0.10 0.30 0.30

1.00 1.00 3.34 0.10 0.33 0.33

1.00 1.00 47.02 0.10 4.70 4.70

1.00 1.00 4.18 0.10 0.42 0.42

1.00 1.00 2.92 0.10 0.29 0.29

1.00 1.00 3.14 0.10 0.31 0.31

1.00 1.00 56.69 0.10 5.67 5.67

1.00 1.00 4.71 0.10 0.47 0.47

1.00 1.00 3.63 0.10 0.36 0.36

1.00 1.00 18.84 0.10 1.88 1.88

1.00 1.00 66.74 0.10 6.67 6.67

1.00 1.00 29.18 0.10 2.92 2.92

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

1.00 1.00 4.49 0.10 0.45 0.45

1.00 1.00 2.57 0.10 0.26 0.26

1.00 1.00 13.53 0.10 1.35 1.35

1.00 1.00 2.77 0.10 0.28 0.28

1.00 1.00 28.78 0.10 2.88 2.88

1.00 1.00 29.54 0.10 2.95 2.95

1.00 1.00 26.98 0.10 2.70 2.70

1.00 1.00 4.13 0.10 0.41 0.41

1.00 1.00 4.82 0.10 0.48 0.48

1.00 1.00 35.26 0.10 3.53 3.53

1.00 1.00 15.67 0.10 1.57 1.57

1.00 1.00 41.35 0.10 4.14 4.14

1.00 1.00 12.86 0.10 1.29 1.29

1.00 1.00 39.37 0.10 3.94 3.94

1.00 1.00 17.84 0.10 1.78 1.78

1.00 1.00 14.35 0.10 1.44 1.44

1.00 1.00 33.56 0.10 3.36 3.36

1.00 1.00 29.56 0.10 2.96 2.96

1.00 1.00 27.41 0.10 2.74 2.74

1.00 1.00 7.80 0.10 0.78 0.78

1.00 1.00 9.08 0.10 0.91 0.91

1.00 1.00 2.68 0.10 0.27 0.27

JR. 2 DE MAYO - MARGEN DERECHA 1.00 1.00 3.65 0.10 0.37 0.37

1.00 1.00 72.88 0.10 7.29 7.29

1.00 1.00 3.95 0.10 0.40 0.40

MARGEN IZQUIERDA 1.00 1.00 3.79 0.10 0.38 0.38

1.00 1.00 72.88 0.10 7.29 7.29

1.00 1.00 4.09 0.10 0.41 0.41

JR. AMAUTA MARGEN DERECHA 1.00 1.00 3.50 0.10 0.35 0.35

1.00 1.00 87.66 0.10 8.77 8.77

1.00 1.00 4.71 0.10 0.47 0.47

MARGEN IZQUIERDA 1.00 1.00 3.81 0.10 0.38 0.38

1.00 1.00 87.66 0.10 8.77 8.77

1.00 1.00 4.71 0.10 0.47 0.47

06.02.02 EXCAVACION MANUAL EN TERRENO SUELTO 66.03 M3

PROLONG. JR. ANDAHUAYLAS - MARGEN DERECHA 1.00 1.00 47.35 0.10 0.20 0.95 0.00

PROLONG. JR. ANDAHUAYLAS - MARGEN IZQUIERDA 1.00 1.00 67.65 0.10 0.20 1.35 0.00

JR. ANDAHUAYLAS - MARGEN DERECHA 1.00 1.00 363.75 0.10 0.20 7.28 0.00

JR. ANDAHUAYLAS - MARGEN IZQUIERDA 1.00 1.00 371.27 0.10 0.20 7.43 0.00

JR. SAN MARTIN - MARGEN DERECHA 1.00 1.00 83.84 0.10 0.20 1.68 0.00

JR. SAN MARTIN - MARGEN IZQUIERDA 1.00 1.00 85.35 0.10 0.20 1.71 0.00

JR. LAS FLORES - MARGEN DERECHA 1.00 1.00 260.61 0.10 0.20 5.21 0.00

JR. LAS FLORES - MARGEN IZQUIERDA 1.00 1.00 260.42 0.10 0.20 5.21 0.00

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. AMARGURA - MARGEN DERECHA 1.00 1.00 687.39 0.10 0.20 13.75 0.00

JR. AMARGURA - MARGEN IZQUIERDA 1.00 1.00 720.34 0.10 0.20 14.41 0.00

JR. 2 DE MAYO - MARGEN DERECHA 1.00 1.00 80.48 0.10 0.20 1.61 0.00

JR. 2 DE MAYO - MARGEN IZQUIERDA 1.00 1.00 80.76 0.10 0.20 1.62 0.00

JR. AMAUTA - MARGEN DERECHA 1.00 1.00 95.87 0.10 0.20 1.92 0.00

JR. AMAUTA - MARGEN IZQUIERDA 1.00 1.00 96.18 0.10 0.20 1.92 0.00

06.02.03 CONCRETO FC=175 KG/CM2 115.54 M3

PROLONG. JR. ANDAHUAYLAS - MARGEN DERECHA 1.00 1.00 47.35 0.10 0.35 1.66 1.66

PROLONG. JR. ANDAHUAYLAS - MARGEN IZQUIERDA 1.00 1.00 67.65 0.10 0.35 2.37 2.37

JR. ANDAHUAYLAS - MARGEN DERECHA 1.00 1.00 363.75 0.10 0.35 12.73 12.73

JR. ANDAHUAYLAS - MARGEN IZQUIERDA 1.00 1.00 371.27 0.10 0.35 12.99 12.99

JR. SAN MARTIN - MARGEN DERECHA 1.00 1.00 83.84 0.10 0.35 2.93 2.93

JR. SAN MARTIN - MARGEN IZQUIERDA 1.00 1.00 85.35 0.10 0.35 2.99 2.99

JR. LAS FLORES - MARGEN DERECHA 1.00 1.00 260.61 0.10 0.35 9.12 9.12

JR. LAS FLORES - MARGEN IZQUIERDA 1.00 1.00 260.42 0.10 0.35 9.11 9.11

JR. AMARGURA - MARGEN DERECHA 1.00 1.00 687.39 0.10 0.35 24.06 24.06

JR. AMARGURA - MARGEN IZQUIERDA 1.00 1.00 720.34 0.10 0.35 25.21 25.21

JR. 2 DE MAYO - MARGEN DERECHA 1.00 1.00 80.48 0.10 0.35 2.82 2.82

JR. 2 DE MAYO - MARGEN IZQUIERDA 1.00 1.00 80.76 0.10 0.35 2.83 2.83

JR. AMAUTA - MARGEN DERECHA 1.00 1.00 95.87 0.10 0.35 3.36 3.36

JR. AMAUTA - MARGEN IZQUIERDA 1.00 1.00 96.18 0.10 0.35 3.37 3.37

06.02.04 ENCOFRADO Y DESENCOFRADO DE SARDINELES 1,155.44 M2

PROLONG. JR. ANDAHUAYLAS - MARGEN DERECHA 1.00 1.00 47.35 0.35 16.57 16.57

PROLONG. JR. ANDAHUAYLAS - MARGEN IZQUIERDA 1.00 1.00 67.65 0.35 23.68 23.68

JR. ANDAHUAYLAS - MARGEN DERECHA 1.00 1.00 363.75 0.35 127.31 127.31

JR. ANDAHUAYLAS - MARGEN IZQUIERDA 1.00 1.00 371.27 0.35 129.94 129.94

JR. SAN MARTIN - MARGEN DERECHA 1.00 1.00 83.84 0.35 29.34 29.34

JR. SAN MARTIN - MARGEN IZQUIERDA 1.00 1.00 85.35 0.35 29.87 29.87

JR. LAS FLORES - MARGEN DERECHA 1.00 1.00 260.61 0.35 91.21 91.21

JR. LAS FLORES - MARGEN IZQUIERDA 1.00 1.00 260.42 0.35 91.15 91.15

JR. AMARGURA - MARGEN DERECHA 1.00 1.00 687.39 0.35 240.59 240.59

JR. AMARGURA - MARGEN IZQUIERDA 1.00 1.00 720.34 0.35 252.12 252.12

JR. 2 DE MAYO - MARGEN DERECHA 1.00 1.00 80.48 0.35 28.17 28.17

JR. 2 DE MAYO - MARGEN IZQUIERDA 1.00 1.00 80.76 0.35 28.27 28.27

JR. AMAUTA - MARGEN DERECHA 1.00 1.00 95.87 0.35 33.55 33.55

JR. AMAUTA - MARGEN IZQUIERDA 1.00 1.00 96.18 0.35 33.66 33.66

06.02.05 JUNTAS ASFALTICAS 220.08 M

PROLONG. JR. ANDAHUAYLAS - MARGEN DERECHA 1.00 15.78 0.20 3.16 3.16

PROLONG. JR. ANDAHUAYLAS - MARGEN IZQUIERDA 1.00 22.55 0.20 4.51 4.51

JR. ANDAHUAYLAS - MARGEN DERECHA 1.00 121.25 0.20 24.25 24.25

JR. ANDAHUAYLAS - MARGEN IZQUIERDA 1.00 123.76 0.20 24.75 24.75

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. SAN MARTIN - MARGEN DERECHA 1.00 27.95 0.20 5.59 5.59

JR. SAN MARTIN - MARGEN IZQUIERDA 1.00 28.45 0.20 5.69 5.69

JR. LAS FLORES - MARGEN DERECHA 1.00 86.87 0.20 17.37 17.37

JR. LAS FLORES - MARGEN IZQUIERDA 1.00 86.81 0.20 17.36 17.36

JR. AMARGURA - MARGEN DERECHA 1.00 229.13 0.20 45.83 45.83

JR. AMARGURA - MARGEN IZQUIERDA 1.00 240.11 0.20 48.02 48.02

JR. 2 DE MAYO - MARGEN DERECHA 1.00 26.83 0.20 5.37 5.37

JR. 2 DE MAYO - MARGEN IZQUIERDA 1.00 26.92 0.20 5.38 5.38

JR. AMAUTA - MARGEN DERECHA 1.00 31.96 0.20 6.39 6.39

JR. AMAUTA - MARGEN IZQUIERDA 1.00 32.06 0.20 6.41 6.41

06.02.06 CURADO DEL CONCRETO EN SARDINELES DE VEREDA 330.13 M2

PROLONG. JR. ANDAHUAYLAS - MARGEN DERECHA 1.00 1.00 47.35 0.10 4.74 4.74

PROLONG. JR. ANDAHUAYLAS - MARGEN IZQUIERDA 1.00 1.00 67.65 0.10 6.77 6.77

JR. ANDAHUAYLAS - MARGEN DERECHA 1.00 1.00 363.75 0.10 36.38 36.38

JR. ANDAHUAYLAS - MARGEN IZQUIERDA 1.00 1.00 371.27 0.10 37.13 37.13

JR. SAN MARTIN - MARGEN DERECHA 1.00 1.00 83.84 0.10 8.38 8.38

JR. SAN MARTIN - MARGEN IZQUIERDA 1.00 1.00 85.35 0.10 8.54 8.54

JR. LAS FLORES - MARGEN DERECHA 1.00 1.00 260.61 0.10 26.06 26.06

JR. LAS FLORES - MARGEN IZQUIERDA 1.00 1.00 260.42 0.10 26.04 26.04

JR. AMARGURA - MARGEN DERECHA 1.00 1.00 687.39 0.10 68.74 68.74

JR. AMARGURA - MARGEN IZQUIERDA 1.00 1.00 720.34 0.10 72.03 72.03

JR. 2 DE MAYO - MARGEN DERECHA 1.00 1.00 80.48 0.10 8.05 8.05

JR. 2 DE MAYO - MARGEN IZQUIERDA 1.00 1.00 80.76 0.10 8.08 8.08

JR. AMAUTA - MARGEN DERECHA 1.00 1.00 95.87 0.10 9.59 9.59

JR. AMAUTA - MARGEN IZQUIERDA 1.00 1.00 96.18 0.10 9.62 9.62

06.03 RAMPA PARA DISCAPACITADOS

06.03.01 TRAZO NIVELACION Y REPLANTEO 171.00 M2

57.00 1.00 3.00 1.00 171.00 171.00

06.03.02 EXCAVACION MANUAL EN TERRENO SUELTO 17.10 M3

57.00 1.00 3.00 1.00 0.10 17.10 17.10

06.03.03 CONCRETO FC=175 KG/CM2 17.10 M3

57.00 1.00 3.00 1.00 0.10 17.10 17.10

06.03.04 BRUÑA DE RAMPA 2,280.00 M

57.00 40.00 1.00 2,280.00 2,280.00

06.03.05 CURADO DEL CONCRETO EN RAMPAS 171.00 M2

57.00 1.00 3.00 1.00 171.00

07 CUNETAS PARA LA EVACUACION DE AGUAS PLUVIALES

07.01 CUNETAS

07.01.01 TRAZO NIVELACION Y REPLANTEO 605.71 M2 0.00

JR. ANDAHUAYLAS 1.00 1.00 31.70 0.50 15.85

1.00 1.00 55.00 0.50 27.50

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

1.00 1.00 19.90 0.50 9.95

1.00 1.00 16.73 0.50 8.37

1.00 1.00 15.01 0.50 7.51

1.00 1.00 46.82 0.50 23.41

1.00 1.00 43.64 0.50 21.82

1.00 1.00 58.59 0.50 29.30

1.00 1.00 55.40 0.50 27.70

1.00 1.00 5.40 0.50 2.70

JR. PERU - MARGEN DERECHA 1.00 1.00 7.22 0.50 3.61

1.00 1.00 52.71 0.50 26.36

1.00 1.00 54.77 0.50 27.39

1.00 1.00 40.13 0.50 20.07

MARGEN IZQUIERDA 1.00 1.00 7.21 0.50 3.61

1.00 1.00 52.80 0.50 26.40

1.00 1.00 54.83 0.50 27.42

1.00 1.00 37.41 0.50 18.71

JR. PERU KM 0+000 @ 0+160

JR. ANDAHUAYLAS- KM 0+000 @ 0+3454.61

JR. AMARGURA 1.00 1.00 8.02 0.50 4.01

1.00 1.00 7.68 0.50 3.84

1.00 1.00 59.54 0.50 29.77

1.00 1.00 33.56 0.50 16.78

1.00 1.00 14.28 0.50 7.14

1.00 1.00 17.75 0.50 8.88

1.00 1.00 39.32 0.50 19.66

1.00 1.00 12.88 0.50 6.44

1.00 1.00 41.41 0.50 20.71

1.00 1.00 15.70 0.50 7.85

1.00 1.00 40.60 0.50 20.30

1.00 1.00 2.12 0.50 1.06

1.00 1.00 2.58 0.50 1.29

1.00 1.00 36.30 0.50 18.15

1.00 1.00 66.75 0.50 33.38

1.00 1.00 25.06 0.50 12.53

1.00 1.00 69.75 0.50 34.88

1.00 1.00 1.03 0.50 0.52

1.00 1.00 8.69 0.50 4.35

1.00 1.00 53.13 0.50 26.57

07.01.02 EXCAVACION MANUAL EN TERRENO SUELTO 302.86 M3

JR. ANDAHUAYLAS 1.00 1.00 348.19 0.50 0.50 87.05 87.05

JR. PERU - MARGEN DERECHA 1.00 1.00 154.83 0.50 0.50 38.71 38.71

JR. PERU - MARGEN IZQUIERDA 1.00 1.00 152.25 0.50 0.50 38.06 38.06

JR. AMARGURA 1.00 1.00 556.15 0.50 0.50 139.04 134.45

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. AMARGURA TRAMO I KM 0+000 @ 0+271.24 1.00 1.00 0.00 271.24 0.50 0.00 135.62 0.00

JR. AMARGURA TRAMO I- KM 0+130.40 @ 0+404.97 1.00 1.00 0.00 274.57 0.50 0.00 137.29 0.00

07.01.03 CONCRETO FC=175 KG/CM2 157.48 M3

JR. ANDAHUAYLAS 1.00 1.00 348.19 1.30 0.10 45.26 45.26

JR. PERU - MARGEN DERECHA 1.00 1.00 154.83 1.30 0.10 20.13 20.13

JR. PERU - MARGEN IZQUIERDA 1.00 1.00 152.25 1.30 0.10 19.79 19.79

JR. AMARGURA 1.00 1.00 556.15 1.30 0.10 72.30 72.30

07.01.04 ENCOFRADO Y DESENCOFRADO DE CUNETAS 969.14 M2

JR. ANDAHUAYLAS 1.00 2.00 348.19 0.40 278.55 278.55

JR. PERU - MARGEN DERECHA 1.00 2.00 154.83 0.40 123.86 123.86

JR. PERU - MARGEN IZQUIERDA 1.00 2.00 152.25 0.40 121.80 121.80

JR. AMARGURA 1.00 2.00 556.15 0.40 444.92 444.92

07.01.05 JUNTAS ASFALTICAS 1,821.05 ML

JR. ANDAHUAYLAS 1.00 116.06 1.30 150.88 150.88

JR. PERU - MARGEN DERECHA 3.00 51.61 1.30 201.28 201.28

JR. PERU - MARGEN IZQUIERDA 4.00 50.75 1.30 263.90 263.90

JR. AMARGURA 5.00 185.38 1.30 1,204.99 1,204.99

07.01.06 REJILLA METALICA EN CUNETAS 1,211.42 M

JR. ANDAHUAYLAS 1.00 1.00 348.19 348.19 348.19

JR. PERU - MARGEN DERECHA 1.00 1.00 154.83 154.83 154.83

JR. PERU - MARGEN IZQUIERDA 1.00 1.00 152.25 152.25 152.25

JR. AMARGURA 1.00 1.00 556.15 556.15 556.15

07.01.07 CURADO DEL CONCRETO EN CUNETAS 1,574.85 M2

JR. ANDAHUAYLAS 1.00 1.00 348.19 1.30 452.65 452.65

JR. PERU - MARGEN DERECHA 1.00 1.00 154.83 1.30 201.28 201.28

JR. PERU - MARGEN IZQUIERDA 1.00 1.00 152.25 1.30 197.93 197.93

JR. AMARGURA 1.00 1.00 556.15 1.30 723.00 723.00

07.02 ALCANTARILLA DE EVACUACION DE AGUAS PLUVIALES

07.02.01 TRAZO NIVELACION Y REPLANTEO 55.65 M2

JR. ANDAHUAYLAS 1.00 1.00 7.70 0.50 3.85 3.85

JR. PERU 1.00 1.00 6.03 0.50 3.02 3.02

JR. SAN MARTIN 1.00 1.00 7.40 1.00 7.40 7.40

JR. LAS FLORES 1.00 1.00 26.50 1.00 26.50 26.50

JR. AMARGURA 1.00 1.00 12.54 0.50 6.27 6.27

1.00 1.00 1.86 0.50 0.93 0.93

1.00 1.00 7.35 0.50 3.68 3.68

1.00 1.00 4.00 0.50 2.00 2.00

1.00 1.00 4.01 0.50 2.01 2.01

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

07.02.02 EXCAVACION MANUAL EN TERRENO SUELTO 47.25 M3

JR. ANDAHUAYLAS 1.00 1.00 7.70 0.50 0.50 1.93 1.93

JR. PERU 1.00 1.00 6.03 0.50 0.50 1.51 1.51

JR. SAN MARTIN 1.00 1.00 7.40 1.00 1.20 8.88 8.88

JR. LAS FLORES 1.00 1.00 26.50 1.00 1.20 31.80 31.80

JR. AMARGURA 1.00 1.00 12.54 0.50 0.50 3.14 3.14

07.02.03 ENCOFRADO Y DESENCOFRADO 91.87 M2

JR. ANDAHUAYLAS 1.00 2.00 7.70 0.50 0.40 3.08 3.08

JR. PERU 1.00 2.00 6.03 0.50 0.40 2.41 2.41

JR. SAN MARTIN 1.00 2.00 7.40 1.00 1.20 17.76 17.76

JR. LAS FLORES 1.00 2.00 26.50 1.00 1.20 63.60 63.60

JR. AMARGURA 1.00 2.00 12.54 0.50 0.40 5.02 5.02

07.02.04 CONCRETO FC=210 KG/CM2 27.82 M3

JR. ANDAHUAYLAS 1.00 1.00 7.70 1.30 0.10 1.00 1.00

JR. PERU 1.00 1.00 6.03 1.30 0.10 0.78 0.78

JR. SAN MARTIN 1.00 1.00 7.40 3.60 0.20 5.33 5.33

JR. LAS FLORES 1.00 1.00 26.50 3.60 0.20 19.08 19.08

JR. AMARGURA 1.00 1.00 12.54 1.30 0.10 1.63 1.63

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

07.02.05 TARRAJEO CON IMPERMEABILIZANTES 106.10 M2

JR. ANDAHUAYLAS 1.00 1.00 7.70 1.20 9.24 9.24

JR. PERU 1.00 1.00 6.03 1.20 7.24 7.24

JR. SAN MARTIN 1.00 1.00 7.40 2.20 16.28 16.28

JR. LAS FLORES 1.00 1.00 26.50 2.20 58.30 58.30

JR. AMARGURA 1.00 1.00 12.54 1.20 15.05 15.05

07.02.06 REJILLA SUMIDERO-PLAT 1 1/4"X1/4"+L 1 1/1/4" 26.27 ML

JR. ANDAHUAYLAS 1.00 1.00 7.70 7.70 7.70

JR. PERU 1.00 1.00 6.03 6.03 6.03

JR. SAN MARTIN 0.00 0.00 0.00 - 0.00

JR. LAS FLORES 0.00 0.00 0.00 - 0.00

JR. AMARGURA 1.00 1.00 12.54 12.54 12.54

07.02.07 ACERO F´Y=4200 KG/CM2 2,461.34 KG

TRANSVERSAL

JR. SAN MARTIN 0.56 37.00 7.40 153.33 153.33

JR. LAS FLORES 0.56 132.50 26.50 1,966.30 1,966.30

LONGITUDINAL

JR. SAN MARTIN 0.56 18.00 7.40 74.59 74.59

JR. LAS FLORES 0.56 18.00 26.50 267.12 267.12

09 OBRAS DE MUROS DE CONTENCION CONCRETO ARMADO

09.01 MURO CºAº tipo I,II y III

09.01.01 OBRAS PRELIMINARES

09.01.01.01 TRAZO NIVELACION Y REPLANTEO 428.07 m2

tipo II JR. AMARGURA 1.00 1.00 138.64 2.89 400.67 263.76

39.11 0.00

16.69 0.00

13.36 0.00

33.57

35.91

tipo III JR AMARGURA 1.00 1.00 20.00 1.37 27.40 27.40

tipo II JR. AMARGURA 1.00 1.00 - 35.00 2.89 - 101.15

1.00 1.00 - 50.00 2.50 - 125.00

09.01.02 MOVIMIENTO DE TIERRAS

09.01.02.01 EXCAVACION MANUAL EN TERRENO SUELTO 462.66 m3

tipo II 1.00 1.00 138.64 2.89 1.10 440.74 1.04

tipo III 1.00 1.00 20.00 1.37 0.80 21.92 -1.05

09.01.02.02 RELLENO CON MATERIAL PROPIO 273.06 m3

50% DEL VOLUMEN DE RELLENO 1.00 271.81 =coef.esponj. 1.25 -180.33

09.01.02.03 RELLENO CON MATERIAL DE PRESTAMO MANUAL 273.06 m3

50% DE RELLENO 543.62 363.29

tipo II 1.00 1.00 138.64 1.27 3.00 528.22 528.22

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

tipo III 1.00 1.00 20.00 0.55 1.40 15.40 15.40

09.01.02.04 ELIMINACION DE MATERIAL EXEDENTE 189.60 1.25 =coef.esponj. 237.00 237.00 m3 0.00

09.01.03 OBRAS DE CONCRETO SIMPLE

09.01.03.01 SOLADO CONCRETO FC=100 KG/CM2 42.81 m3

en base de cimiento

tipo II 1.00 1.00 138.64 2.89 0.10 40.07 5.97

tipo III 1.00 1.00 20.00 1.37 0.10 2.74 2.74

09.01.04 OBRAS DE CONCRETO ARMADO

09.01.04.01 CONCRETO F'C=210 KG/CM2 311.09 m3

en cimiento 187.91

tipo II 1.00 1.00 138.64 2.89 0.40 160.27 -52.01

tipo II en dentellon 1.00 1.00 138.64 0.30 0.50 20.80 10.32

tipo III 1.00 1.00 20.00 1.37 0.25 6.85 6.85

en cuerpo 123.18

cuerpo inclinado

tipo II 1.00 1.00 138.64 0.28 3.00 116.46 77.85

tipo III 1.00 1.00 20.00 0.24 1.40 6.72 6.72

09.01.04.02 ENCOFRADO Y DESENCOFRADO DE MUROS DE CONTENCION 890.19 m2

encofrado frontal y posterior

tipo II 1.00 2.00 138.64 3.00 831.84 83.57

tipo III 1.00 2.00 20.00 1.40 56.00 54.35

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

lateral cuerpo recto

tipo II 1.00 2.00 0.28 3.00 1.68 -0.27

tipo III 1.00 2.00 0.24 1.40 0.67 0.67

09.01.04.03 ACERO F´Y=4200 KG/CM2 19,114.57 kg

en muro tipo II

armado en cimiento

as longitudinal 0.56 43.00 138.64 3,338.45 3/8"= -9,619.57

as trasnversal 1.02 1,067.00 6.84 7,444.25 1/2" 4,751.20

armado primera capa inclinada hacia el relleno 0.00

as horizontal 0.56 12.00 138.64 931.66 3/8"= 623.66

as vertical 1.02 1,067.00 3.70 4,026.86 1/2" 1,258.67

armado segunda capa inclinada hacia el relleno 0.00

as horizontal 0.56 12.00 138.64 931.66 3/8"= 623.66

as vertical 0.56 496.00 3.70 1,027.71 3/8"= 679.62

0.00

en dentellon 0.00

as longitudinal 0.56 2.00 138.64 155.28 3/8"= 99.28

as trasnversal 0.56 463.00 1.87 484.85 3/8"= 308.92

en muro tipo III

armado en cimiento

as longitudinal 0.56 11.00 20.00 123.20 3/8"= 123.20

as trasnversal 1.02 72.00 3.20 235.01 1/2" 235.01

armado primera capa inclinada hacia el relleno 0.00

as horizontal 0.56 6.00 20.00 67.20 3/8"= 67.20

as vertical 1.02 88.00 2.20 197.47 1/2" 197.47

armado segunda capa inclinada hacia el relleno 0.00

as horizontal 0.56 6.00 20.00 67.20 3/8"= 67.20

as vertical 0.56 68.00 2.20 83.78 3/8"= 83.78

0.00

09.01.04.04 JUNTAS DE DILATACION CON ASFALTO 153.60 ml

junta a cada 3.00 M.

tipo II 1.00 45.00 3.20 144.00 144.00

tipo III 1.00 6.00 1.60 9.60 9.60

10 MITIGACION DE IMPACTO AMBIENTAL

10.01 MITIGACION DE IMPACTO AMBIENTAL 1.00 1.00 1.00 1.00 GLB 0.60

11 OTROS

11.01 FLETE TERRESTRE 1.00 1.00 1.00 1.00 GLB 0.55

11.02 MANTENIMIENTO Y SEGURIDAD VIAL 1.00 1.00 1.00 1.00 GLB 1.00

11.03 REPOSICION DE CAJAS DE REGISTRO DE AGUA Y DESAGUE 45.00 GLB

45.00 1.00 45.00 45.00

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

11.04 LIMPIEZA FINAL DE OBRA 15,854.04 M2

PAVIMENTOS

PROLONG. ANDAHUAYLAS - P01 1.00 1.00 1,101.62 1,101.62 1,101.62

JR. ANDAHUAYLAS - P02 1.00 1.00 2,248.66 2,248.66 2,248.66

JR. PERU - P03 1.00 1.00 614.15 614.15 614.15

JR. SAN MARTIN (TRAMO 01) - P04 1.00 1.00 450.07 450.07 450.07

TRAMO 02 - P05 1.00 1.00 501.84 501.84 501.84

JR. LAS FLORES (TRAMO 01) - P06 1.00 1.00 399.97 399.97 399.97

TRAMO 02 - P07 1.00 1.00 688.58 688.58 688.58

JR. AMARGURA (TRAMO 01) - P08 1.00 1.00 1,463.20 1,463.20 1,463.20

TRAMO 02 - P09 1.00 1.00 2,024.03 2,024.03 2,024.03

TRAMO 03 - P10 1.00 1.00 324.78 324.78 324.78

JR. 02 DE MAYO - P11 1.00 1.00 343.27 343.27 343.27

JR. 28 DE JULIO - P12 1.00 1.00 287.23 287.23 287.23

JR. AMAUTA - P13 1.00 1.00 404.84 404.84 404.84

VEREDAS

JR. ANDAHUAYLAS - V01 1.00 1.00 22.16 22.16 22.16

JR. ANDAHUAYLAS - V02 1.00 1.00 21.33 21.33 21.33

JR. ANDAHUAYLAS - V03 1.00 1.00 20.59 20.59 20.59

JR. ANDAHUAYLAS - V04 1.00 1.00 8.89 8.89 8.89

JR. ANDAHUAYLAS - V05 1.00 1.00 16.05 16.05 16.05

JR. ANDAHUAYLAS - V06 1.00 1.00 76.11 76.11 76.11

JR. ANDAHUAYLAS - V07 1.00 1.00 98.67 98.67 98.67

JR. ANDAHUAYLAS - V08 1.00 1.00 5.39 5.39 5.39

JR. ANDAHUAYLAS - V09 1.00 1.00 4.82 4.82 4.82

JR. ANDAHUAYLAS - V10 1.00 1.00 140.92 140.92 140.92

JR. ANDAHUAYLAS - V11 1.00 1.00 140.08 140.08 140.08

JR. ANDAHUAYLAS - V12 1.00 1.00 17.08 17.08 17.08

JR. ANDAHUAYLAS - V13 1.00 1.00 21.71 21.71 21.71

JR. ANDAHUAYLAS - V14 1.00 1.00 14.64 14.64 14.64

JR. ANDAHUAYLAS - V15 1.00 1.00 124.94 124.94 124.94

JR. ANDAHUAYLAS - V16 1.00 1.00 125.08 125.08 125.08

JR. ANDAHUAYLAS - V17 1.00 1.00 15.34 15.34 15.34

JR. ANDAHUAYLAS - V18 1.00 1.00 10.41 10.41 10.41

JR. SAN MARTIN - V19 1.00 1.00 7.98 7.98 7.98

JR. SAN MARTIN - V20 1.00 1.00 8.05 8.05 8.05

JR. SAN MARTIN - V21 1.00 1.00 85.93 85.93 85.93

JR. SAN MARTIN - V22 1.00 1.00 85.99 85.99 85.99

JR. SAN MARTIN - V23 1.00 1.00 9.20 9.20 9.20

JR. SAN MARTIN - V24 1.00 1.00 8.62 8.62 8.62

JR. LAS FLORES - V25 1.00 1.00 4.48 4.48 4.48

JR. LAS FLORES - V26 1.00 1.00 4.48 4.48 4.48

JR. LAS FLORES - V27 1.00 1.00 85.86 85.86 85.86

JR. LAS FLORES - V28 1.00 1.00 85.86 85.86 85.86

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. LAS FLORES - V29 1.00 1.00 2.82 2.82 2.82

JR. LAS FLORES - V30 1.00 1.00 3.65 3.65 3.65

JR. LAS FLORES - V31 1.00 1.00 4.05 4.05 4.05

JR. LAS FLORES - V32 1.00 1.00 3.35 3.35 3.35

JR. LAS FLORES - V33 1.00 1.00 158.65 158.65 158.65

JR. LAS FLORES - V34 1.00 1.00 158.27 158.27 158.27

JR. LAS FLORES - V35 1.00 1.00 4.78 4.78 4.78

JR. LAS FLORES - V36 1.00 1.00 4.78 4.78 4.78

JR. AMARGURA - V37 1.00 1.00 56.38 56.38 56.38

JR. AMARGURA - V38 1.00 1.00 3.85 3.85 3.85

JR. AMARGURA - V39 1.00 1.00 286.80 286.80 286.80

JR. AMARGURA - V40 1.00 1.00 287.86 287.86 287.86

JR. AMARGURA - V41 1.00 1.00 6.74 6.74 6.74

JR. AMARGURA - V42 1.00 1.00 3.10 3.10 3.10

JR. AMARGURA - V43 1.00 1.00 4.96 4.96 4.96

JR. AMARGURA - V44 1.00 1.00 4.88 4.88 4.88

JR. AMARGURA - V45 1.00 1.00 102.36 102.36 102.36

JR. AMARGURA - V46 1.00 1.00 102.42 102.42 102.42

JR. AMARGURA - V47 1.00 1.00 3.32 3.32 3.32

JR. AMARGURA - V48 1.00 1.00 35.94 35.94 35.94

JR. AMARGURA - V49 1.00 1.00 16.24 16.24 16.24

JR. AMARGURA - V50 1.00 1.00 7.04 7.04 7.04

JR. AMARGURA - V51 1.00 1.00 5.54 5.54 5.54

JR. AMARGURA - V52 1.00 1.00 137.99 137.99 137.99

JR. AMARGURA - V53 1.00 1.00 114.74 114.74 114.74

JR. 02 DE MAYO - V54 1.00 1.00 3.91 3.91 3.91

JR. 02 DE MAYO - V55 1.00 1.00 4.09 4.09 4.09

JR. 02 DE MAYO - V56 1.00 1.00 72.88 72.88 72.88

JR. 02 DE MAYO - V57 1.00 1.00 72.88 72.88 72.88

JR. 02 .DE MAYO Y JR. AMARGURA - V58 1.00 1.00 7.53 7.53 7.53

JR. 02 .DE MAYO Y JR. AMARGURA - V59 1.00 1.00 6.24 6.24 6.24

JR. AMARGURA - V60 1.00 1.00 5.09 5.09 5.09

JR. AMARGURA - V61 1.00 1.00 4.27 4.27 4.27

JR. AMARGURA - V62 1.00 1.00 68.24 68.24 68.24

JR. AMARGURA - V63 1.00 1.00 56.69 56.69 56.69

JR. AMAUTA - V64 1.00 1.00 4.72 4.72 4.72

JR. AMAUTA - V65 1.00 1.00 4.71 4.71 4.71

JR. AMAUTA - V66 1.00 1.00 87.66 87.66 87.66

JR. AMAUTA - V67 1.00 1.00 87.66 87.66 87.66

JR. AMAUTA Y JR. AMARGURA - V68 1.00 1.00 5.76 5.76 5.76

JR. AMAUTA Y JR. AMARGURA - V69 1.00 1.00 5.56 5.56 5.56

JR. AMARGURA - V70 1.00 1.00 3.77 3.77 3.77

JR. AMARGURA - V71 1.00 1.00 5.19 5.19 5.19

JR. AMARGURA - V72 1.00 1.00 61.08 61.08 61.08

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


HOJA DE METRADOS

PROY: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS BARRIOS DE
CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA DE CHINCHEROS
– APURIMAC” SEGUNDA ETAPA
MODALIDAD DE EJECUCION: Contrata Plazo : 180 DIAS CALENDARIOS

ITEM DESCRIPCION / PARTIDAS Cant. N° Veces Area (m2) Largo Ancho Altura Parcial Total Und

JR. AMARGURA - V73 1.00 1.00 51.22 51.22 51.22

JR. AMARGURA - V74 1.00 1.00 5.05 5.05 5.05

JR. AMARGURA - V75 1.00 1.00 3.34 3.34 3.34

JR. AMARGURA - V76 1.00 1.00 3.11 3.11 3.11

JR. AMARGURA - V77 1.00 1.00 2.97 2.97 2.97

JR. AMARGURA - V78 1.00 1.00 70.71 70.71 70.71

JR. AMARGURA - V79 1.00 1.00 69.81 69.81 69.81

JR. AMARGURA - V80 1.00 1.00 2.69 2.69 2.69

JR. AMARGURA - V81 1.00 1.00 2.69 2.69 2.69

PROLONG. JR. ANDAHUAYLAS - V82 1.00 1.00 70.63 70.63 70.63

PROLONG. JR. ANDAHUAYLAS - V83 1.00 1.00 56.88 56.88 56.88

BERMAS

PROLONG. JR. ANDAHUAYLAS - B01 1.00 1.00 35.56 35.56 35.56

PROLONG. JR. ANDAHUAYLAS - B02 1.00 1.00 3.82 3.82 3.82

JR. SAN MARTIN - B03 1.00 1.00 34.86 34.86 34.86

JR. SAN MARTIN - B04 1.00 1.00 24.58 24.58 24.58

CUNETAS Y EVACUACION DE AGUAS PLUVIALES

JR. ANDAHUAYLAS 1.00 1.00 348.19 0.50 174.10 174.10

JR. PERU - MARGEN DERECHA 1.00 1.00 154.83 0.50 77.42 77.42

JR. PERU - MARGEN IZQUIERDA 1.00 1.00 152.25 0.50 76.13 76.13

JR. AMARGURA 1.00 1.00 556.15 0.50 278.08 278.08

MUROS DE CONTENCION

tipo II 1.00 1.00 138.64 2.89 400.67 400.67

tipo III 1.00 1.00 20.00 1.37 27.40 27.40

RAMPA PARA DISCAPACITADOS

RAMPA PARA DISCAPACITADOS 57.00 1.00 3.00 1.00 171.00 171.00

MUNIPALIDAD DISTRITAL DE PATAYPAMPA


DESCRIPCION / PARTIDAS
ITEM Cant. N° Veces Area (m2) Largo Ancho

07.02ALCANTARILLA DE EVACUACION DE AGUAS PLUVIALES


07.02.01 TRAZO NIVELACION Y REPLANTEO
JR. SAN MARTIN TRAMO 1, PROG. 0+043 1.00 1.00 7.50 1.00
JR. LAS FLORES TRAMO 1, PROG. 0+071 1.00 1.00 8.00 1.00
JR. LAS FLORES TRAMO 2, PROG. 0+010 1.00 1.00 10.00 1.00
JR. LAS FLORES TRAMO 2, PROG. 0+082 1.00 1.00 9.00 1.00
EXCAVACION MANUAL EN TERRENO
07.02.02
SUELTO
JR. SAN MARTIN TRAMO 1, PROG. 0+043 1.00 1.00 7.50 1.00
JR. LAS FLORES TRAMO 1, PROG. 0+071 1.00 1.00 8.00 1.00
JR. LAS FLORES TRAMO 2, PROG. 0+010 1.00 1.00 10.00 1.00
JR. LAS FLORES TRAMO 2, PROG. 0+082 1.00 1.00 9.00 1.00
07.02.03 ENCOFRADO Y DESENCOFRADO
JR. SAN MARTIN TRAMO 1, PROG. 0+043 1.00 1.00 7.90 7.60
JR. LAS FLORES TRAMO 1, PROG. 0+071 1.00 1.00 8.40 7.60
JR. LAS FLORES TRAMO 2, PROG. 0+010 1.00 1.00 10.40 7.60
JR. LAS FLORES TRAMO 2, PROG. 0+082 1.00 1.00 9.40 7.60

07.02.04 CONCRETO FC=210 KG/CM2


JR. SAN MARTIN TRAMO 1, PROG. 0+043 1.00 1.00 7.50 3.60
JR. LAS FLORES TRAMO 1, PROG. 0+071 1.00 1.00 8.00 3.60
JR. LAS FLORES TRAMO 2, PROG. 0+010 1.00 1.00 10.00 3.60
JR. LAS FLORES TRAMO 2, PROG. 0+082 1.00 1.00 9.00 3.60

07.02.05 TARRAJEO CON IMPERMEABILIZANTES


JR. SAN MARTIN TRAMO 1, PROG. 0+043 1.00 1.00 7.50
JR. LAS FLORES TRAMO 1, PROG. 0+071 1.00 1.00 8.00
JR. LAS FLORES TRAMO 2, PROG. 0+010 1.00 1.00 10.00
JR. LAS FLORES TRAMO 2, PROG. 0+082 1.00 1.00 9.00
07.02.06 ACERO ACERO F´Y=4200 KG/CM2
TRANSVERSAL
JR. SAN MARTIN TRAMO 1, PROG. 0+043 0.56 37.50 7.50
1.02 37.50 7.50 2.70
JR. LAS FLORES TRAMO 1, PROG. 0+071 0.56 40.00 8.00
1.02 40.00 8.00 2.70
JR. LAS FLORES TRAMO 2, PROG. 0+010 0.56 50.00 10.00
1.02 50.00 10.00 2.70
JR. LAS FLORES TRAMO 2, PROG. 0+082 3.56 45.00 9.00
LONGITUDINAL
TRANSVERSAL
JR. SAN MARTIN TRAMO 1, PROG. 0+043 0.56 18.00 7.50
JR. LAS FLORES TRAMO 1, PROG. 0+071 0.56 18.00 8.00
JR. LAS FLORES TRAMO 2, PROG. 0+010 0.56 18.00 10.00
JR. LAS FLORES TRAMO 2, PROG. 0+082 0.56 18.00 9.00
Altura Parcial Total Und

15.50 M2
7.50
8.00
10.00
9.00
18.60 M3
1.20 9.00
1.20 9.60
1.20 12.00
1.20 10.80
123.88 M2
60.04
63.84
79.04
71.44

11.16 M3
0.20 5.40
0.20 5.76
0.20 7.20
0.20 6.48

42.10 M2
2.20 16.50
3.20 25.60
4.20 42.00
5.20 46.80
2,757.40 KG

157.50 3/8"

103.28 1/2"

179.20 3/8"

110.16 1/2"

280.00 3/8"

137.70 1/2"

1,441.80 3/8"

75.60 3/8"

80.64 3/8"

100.80 3/8"
90.72 3/8"
MUROS h=3.00 m x DE 9 M.
CANTIDAD LONG Ø (") PESO

VERTICALES
POSTERIOR
1/2" 61.00 4.20 261.32
ANTERIOR
3/8" 31.00 3.81 66.14

DENTELLON
3/8" 31.00 2.05 35.59

HORIZONTALES

POSTERIOR
3/8" 11.00 9.00 55.44
ANTERIOR
3/8" 11.00 9.00 55.44

DENTELLON
3/8" 2.00 9.00 10.08

ZAPATA DE MURO

PARALELO A LA ZAPATA
inferiro
horizontales 1/2" 61.00 3.50 217.77
transversales 3/8" 21.71 9.00 199.34

superior
horizontales 1/2" 70.23 3.50 250.72
transversales 3/8" 21.71 9.00 199.34

1,351.18

MUROS h=3.00 m x DE 9 M.
CANTIDAD LONG Ø (") PESO

VERTICALES
POSTERIOR
3/4" 61.00 4.20 573.89
ANTERIOR
3/8" 31.00 3.81 66.14

DENTELLON
3/8" 31.00 2.05 35.59

HORIZONTALES

POSTERIOR
3/8" 11.00 9.00 55.44
ANTERIOR
3/8" 11.00 9.00 55.44

DENTELLON
3/8" 2.00 9.00 10.08

ZAPATA DE MURO

PARALELO A LA ZAPATA
inferiro
horizontales 1/2" 61.00 3.50 217.77
transversales 3/8" 21.71 9.00 199.34

superior
horizontales 1/2" 70.23 3.50 250.72
transversales 3/8" 21.71 9.00 199.34

1,663.75

MUROS h=1.4.00 m x DE 9 M.
CANTIDAD LONG Ø (") PESO

VERTICALES
POSTERIOR
1/2" 40.13 2.10 85.96
ANTERIOR
3/8" 31.00 3.81 66.14

DENTELLON
0.00

HORIZONTALES

POSTERIOR
3/8" 5.67 9.00 28.56
ANTERIOR
3/8" 5.67 9.00 28.56

DENTELLON
0.00

ZAPATA DE MURO

PARALELO A LA ZAPATA
inferiro
horizontales 1/2" 33.14 1.70 57.47
transversales 3/8" 6.27 9.00 31.60

superior
horizontales 1/2" 33.14 1.70 57.47
transversales 3/8" 6.27 9.00 31.60

387.35
20,769.16
25,573.62

4,804.46

860.79
AG 0.52
P CH 1/2" 0.73
CEMENT 9.73

ACEROS 1/2" 2.54 2.9972


1735 ARENA GRUESA 84.75 100.005 156157.8
4300 MATERIAL DE RELLENO CLASIFICADO 50.84 59.9912 232165.9
2485 PIEDRA CHANCADA DE 1/2" 101.74 120.0532 268499
31178 CEMENTO PORTLAND TIPO I 20.34 24.0012 673478.5
6 HORMIGON 135.59 159.9962
11646 MADERA TORNILLO 4.41 5.2038

35,993.04 42471.7872
93,584.29 110429.4622
27,112.10 31992.278
24,648.69 29085.4542
50,017.59 59020.7562
51,346.29 60588.6222

143,862.33 169757.5494
62,229.15 73430.397
37,852.13 44665.5134
34,506.71 40717.9178
9,601.78 11330.1004
0
0
2170.45 0
19.76 0
554.73
115.54
17.1
157.48
4.59
42.81
311.09
3350.74
28481.29
683550.96

CONCRETO F'C 210 KG/CM2


PAVIMENTO 2170.45 18448.825 17301.29856 675

ALCANTARILLA 4.59 39.015

MUROS DE C° A° 311.09 2644.265

CONCRETO F'C 175 KG/CM2


BERMAS 19.76 158.08
VEREDAS 554.73 4437.84 3328.38
SARDINELES 115.54 924.32
RAMPAS 17.1 136.8
CUNETAS 157.48 1259.84
C° A° SOLADO 42.81 214.05

28263.035 26006.04856
142364

173508.675 156150
257962.16
298332.202 236075
748309.4136
959.9772
60603.4548

10852
10177
0.937799484 2035.44689

4.59

311.09

19.76
416.0475
115.54
17.1
157.48
0
42.81
35.31466672 45.90906674
0.028316847

8.054222235
7.28715345 91.81813348
5.667786017
280 1 2 2.6
245 1 2.2 2.9
210 1 2.5 3.2 5.7 45.90906674
175 1 2.7 3.6 6.3 45.90906674
140 1 3.1 4.1
100 1 3.5 4.6 8.1 45.90906674

1.3

2351
2351
SE USARAN 18935.47647 BLS

725
725
SE USARAN 5283.186252 BLS

42.81
42.81
SE USARAN 242.6379194 BLS

24461.30064
PARA C° DE 210 KG/CM2

PARA C° DE 175 KG/CM2

PARA C° DE 175 KG/CM2

1.24
CUADERNO DE OBRA

PAG 1 HOJA DE LEGALIZACIO CON NOTARIO DEL CUADERNO DE OBRA

11/7/2019 PAG 2Y3 SE APERTURA EL CUADERNO DE OBRA


SUPER SE ADJUNTA EL ACTA DE ENTREGA DE TERRENO

1 11/14/2019
PAG 4Y5
RESI ACTA DE INICIO DE OBRA

ASIENTO N°: 01
SUPERV

ASIENTO N°: 02 SE DA INICIO DE OBRA 14 DE NOV 2019, EN FUNCION AL DOCUMENTO EMITIDO POR LA ENTIDAD
RESI CON CARTA N° 0139-2019-AL-MDO, DE FECHA 12 DE NOV 2019
NOTA: SE TRNSCRIBE EL ACTA DE INICO DE OBRA.
SE SOLICITA A LA SUPERVISION AUTORICE LA COLOCACION DE CARTEL DE OBRA ELABORADO EN BANER DE 8.5*3.60 SEÑALANDO UBICACIÓN
TODA VEZ QUE SE TIENE REALIZADOS LA IMPRESIÓN EN BANER ASI COMO LA ESTRUCTURA DE MADERA LISTO PARA SU COLOCACION.
SE PRESENTA A LA SUPERVISION CON CARTA N° 01-19-WSB-RO EL CRONOGRAMA VALORIZADO DE OBRA Y LA PROGRAMACION DE EJECUCION

PAG 6
2 11/15/2019 ASIENTO N°: 03
SUPER

PAG 6
11/15/2019 ASIENTO N°: 04
RESID SE REALIZA LA COLOCACION DEL CARTEL DE OBRA EN EL PUNTO SEÑALADO, ASI MISMO SE INICIA CON LAS LABORES DE
LEVANTAMIENTO TOPOGRAFICO PARA LA GENERACION DEL INFORME DE EVALUACION DE EXPE. TECNICO.
SE INICIA CON LAS LABORES DE LIMPIEZA DE TERRENO MANUALMENTE EN CUMPLIMIENTO DE LA PROGRAMACION DE OBRA. CALLE ANDAHUYLAS

PAG 8
3 11/16/2019

PAG 9
11/16/2019 ASIENTO N°: 05
RESID SE REALIZA LA INSTALACION DE LA OFICINA DE OBRA Y ALMACEN DE OBRA CON DIRECCION JR. HURACAN S/N PRIMERA CUADRA OCOBAMBA
SE VIENE CONTINUANDO CON LOS TRABAJOS DE LIMPIEZA DE TERRENO MANUALMENTE, CALLE ANDHUAYLAS, AMARGURA ,
SE CONTINUA CON LOS TRABAJOS DE LEVANTAMIENTO TOPOGRAFICO EN LAS CALLES JR. PERU, JR. SAN MARTIN Y JR. LASFLORES

PAG 10
5 11/18/2019

PAG 11
11/18/2019 ASIENTO N°: 06
RESID SE PROSIGUE CON LOS TRABAJOS DE LEVANTAMIENTO TOPOGRAFICO EN LAS CALLES DE AMARGURA I, II Y III
SE REALIZA LA VERIFICACION DE LAS CANTERAS PARA AFIRMADO TOMANDOSE MUESTRAS PARA SU RESPECTIVO ESTUDIO
PARA LA OBTENCION DEL ENSAYO DE GRANULOMETRIA, ENSAYOS DE PLASTICIDAD, CLASIFICACION DE SUELOS Y DESGASTE
UBICADOS: CANTERA FLORIDA A 8.5KM DISTANCIA DE OCOBAMBA Y CANTERA TUPAC AMARU A 4.00 KM DE CENTRO DE OCOBAMBA

6 11/19/2019

PAG 12
11/19/2019 ASIENTO N°: 08
RESID SE PROSIGUE CON LOS TRABAJOS DE LEVANTAMIENTO TOPOGRAFICO EN LAS CALLES DE 2 DE MAYO, 28 DE JULIO, JR AMAUTA
SE OBSRVA QUE EXISTE INCONGRUENCIA ENTRE EL EXP TEC Y EL TERRENO EN EL JR. PERU SE TIENE ANCHOS DE VIA DEL TERRENO ASI COMO POSTES DE ALUMBRADO
ELECTRICO DENTRO DE LA CALZADA.
ASI MISMO SE OBSERVA DE LA EXISTENCIA DE AFLORACION DE AGUA (PUQUIALES), QUE AMERITARIAN
PLANTEAMIENTOS DE MEJORA DE LA SUB RASANTE PRESENTADOS EN LAS CALLES ANDAHUAYLAS, JR. PERU, JR. SAN MARTIN JR, LAS FLORES, JR. AMAUTA Y PROLNG. ANDAHUAYLAS.
POR LO QUE SE PROGRAMARA LA VISITA DEL ESPECIALISTA DE SUELOS Y GEOTECNIA PARA EL DIA VIERNES 22/11/2019 Y QUE DE ACUERDO A LOS RESULTADOS
DEL ESTUDIO DEFINA O PLANTEE LOS TRABAJOS A REALIZAR PARA LA SOLUCION.

7 11/20/2019 ASIENTO N°: 09


SUPER

PAG 10
11/20/2019 ASIENTO N°: 10
RESID SE PROSIGUE CON LOS TRABAJOS DE LEVANTAMIENTO TOPOGRAFICO EN LAS CALLES DE PROLONGACION ANDAHUAYLAS CULMINANDOSE EL DIA DI HOY,
POR LO QUE SE PROCEDERA AL PROCESAMIENTO DE DATOS EN GABINETE.
SE PROCEDE A LA EXCAVACION DE CALICATAS DE ACUERDO A LA RECOMENDACIÓN DEL ESPECIALISTA. DEBIENDOSE CONTAR CON ESTAS PARA EL DIA DE MAÑANA
PUES SE ESTA PROGRAMADO LA VISITA DEL ESPECIALISTA
SE CONTINUAN CON LOS TRABAJOS DE LIMPIEZA MANUAL DEL TERRENO

8 11/21/2019 ASIENTO N°: 12


SUPER

PAG 11
11/21/2019 ASIENTO N°: 11
RESID SE PROSIGUE CON LOS TRABAJOS DE LEVANTAMIENTO TOPOGRAFICO EN LAS CALLES DE PROLONGACION ANDAHUAYLAS CULMINANDOSE EL DIA DI HOY,
POR LO QUE SE PROCEDERA AL PROCESAMIENTO DE DATOS EN GABINETE.
SE CONTINUA CON LA EXCAVACION DE CALICATAS DE ACUERDO A LA RECOMENDACIÓN DEL ESPECIALISTA. DEBIENDOSE CONTAR CON ESTAS PARA EL DIA DE MAÑANA
SE CONTINUAN CON LOS TRABAJOS DE LIMPIEZA

9 11/22/2019

PAG 12
11/22/2019 ASIENTO N°: 13
RESID SE PROCEDE A LOS TRABAJOS DE PROCESO DE DATOS EN GABIENTE Y ELABORACION DE LOS PLANOS DE VERIFICACION
SE TIENE LA PRESENCIA EN OBRA DEL ESPECIALISTA EN SUELOS, PARA LA TOMA DE MUESTRAS DE LAS CALICATAS EXCAVADAS,

EL CUAL SERVIRA PARA DEFINIR EL TIPO DE TRATAMIENTO DE LOS PUQUIALES PRESENTADOS EN LAS CALLES ANDAHUAYLAS, JR. PERU, SAN MARTIN, LAS FLORES Y PROLONG. AYACUCHO

10 11/23/2019

PAG 13
11/23/2019 ASIENTO N°: 14

SE TIENE CONCLUIDO LOS PLANOS REPLANTEADOS PARA LA CALLE PROLONG. ANDAHUAYLAS, POR LO QUE SE SOLICITA A LA SUPERVISION AUTORICE REALIZAR LOS TRAZOS, UBICACIÓN
RESID
DE EJES, ALTURAS DE CORTE A CADA 10 M.

EN LA CALLE PROLONG. ANDAHUAYLAS

11 11/25/2019 ASIENTO N°: 15


SUPER

PAG 14
11/25/2019 ASIENTO N°: 16
RESID SE REALIZA EN CONCORDANCIA CON LA AUTORIZACION DE LA SUPERVISION LA UBICACIÓN DE LOS EJES, ALTURAS DE CORTE ANCHO DE CALZADA, EN LA CALLE PROLONG ANDAHUAYLAS
POR LO QUE SE SOLICITA A LA SUPERVISION AUTORICE LOS TRABAJOS DE CORTE Y ELIMINACION.
SE COMUNICA A LA SUPERVISION QUE SE TIENE UN MAYOR METRADO EN CORTE Y POR TANTO EN ELIMINACION EN ESTA CALLE (PROLG ANDAHUAYALAS).
SE TIENE LAS ACTIVIDADES DE PREVENCION DE ACCIDENTES Y MEDIO AMBIENTE LLEVADO A CABO POR EL ING. RESPONSABLE, VERIFICANDOSE LOS PUNTOS DE LOS BOTADEROS, Y LAS
AUTORIZACIONES
SE DEL CASO
REALIZO LAS CHARLAS DE INDUCCION EN TEMA DE SEGURIDAD, SALUD OCUPACIONAL Y MEDIO AMBIENTE Y CALIDAD. AL PERSONAL EN GENERAL ANRTES DEL INGRESO A LABORAR EN
OBRA.
12 11/26/2019 ASIENTO N°: 17
SUPER

PAG 15
11/26/2019 ASIENTO N°: 18
RESID SE INICIA CON LOS TRABAJOS DE CORTE Y ELIMINACION EN LA CALLE PROLONG ANDAHUAYLAS, TENIENDOSE UN AVANCE DE …
ASI MISMO SE CONTINUA CON LOS TRABAJOS DE PROCESAMIENTO DE DATOS ASI COMO ELABORACION DE PLANOS. DE LA CALLE AMARGURA TRAMO III, JR. 28 DE JULIO
POR LO QUE SE SOLICITA A LA SUPERVISION AUTORIZACIO PARA REALIZAR LOS REPLANTEOS EN TERRENO DELAS CALLES AMARGURA TRAMO III, Y 28 DE JULIO

SE DELIMITO Y SEÑALIZO LAS AREAS DE TRABAJO DONDE SE TUVO MAQUINARIAS TRBABANDO, SE DELIMITO Y SEÑALIZO LOS DMEs (I Y II), EL PRIMERO UBICADO EN EL INGRESO A LA
CIUDAD DE OCABAMBA A 1KM APROXIMADAMENTE Y EL II SE ENCUENTRA ..............SE IDENTIFICO PELIGROS Y SE SEÑALIZO EL ALMACEN DE OBRA.
13 11/27/2019 ASIENTO N°: 19
SUPER

PAG 16
11/27/2019 ASIENTO N°: 20
RESID SE PROSIGUE CON LOS TRABAJOS DE CORTE CON MAQUINARIAS EN LA CALLE PROLONG ANDAHUAYLAS.

SE TIENE CONCLUIDO LOS TRABAJOS DE PROCESAMIENTO DE DATOS Y ELABORACION DE PLANOS PARA LA CALLE AMARGURA III, ASI COMO EL EL JR. 28 DE JULIO

POR LO QUE SE SOLICITA A LA SUPERVISION AUTORICE LA UNICACION DE EJES, ANCOS DE VIA Y ALTURAS DE CORTE, EN ESTA CALLE TAMBIEN SE ALERTA LA EXISTENCIA DE MAYORES
METRADOS.

SE REALIZA CONSTANTE SUPERVISION DEL AREA DE SSOMAC, EN LOS PROCESOS CONSTRUCTIVO DE LA EJECUCION DE LA OBRA, PREVENCION DE ACCIDENTES LABORES EN OBRA,
MEDIANTE CHARLAS DIARIAS DANDOSE RECOMENDACIONES BASICAS A TODO EL PERSONAL DE OBRA.

14 11/28/2019 ASIENTO N°: 21


SUPER

PAG 17
11/28/2019 ASIENTO N°: 22

SE REALIZA LOS TRABAJOS DE REPLANTEO EN LAS CALLES 28 DE JULIO, AMARGURA III, AMARGURA II, POR LOQ SE SOLICITA A LA SUPERVISION AUTORICE LOS TRABAJOS DE CORTE Y
ELIMINACION DE LA PLATAFORMA DE LA CALZADA DE DICHAS CALLES. ASI MISMO EN LA CALLE 28 DE JULIO DE LA PROGRSIVA 0+000 A LA PROGRESIVA 0+57.47, NO CUENTA CON
INSTALACIONES DE AGUA Y DESAGUE, POR LO QUE SE SOLICITA A LA SUPERVISION DEFINA TAL SITUACION. A FIN DE GARANTIZAR LOS TRABAJOS A REALIZAR SIN NINGUN INCONVENIENTE.
RESID
SE VIENE EJECUTANDO LOS TRABAJOS DE CORTE Y ELIMINACION DE LA PLATAFORMA DE LA CALZADA DE LA CALLE AMARGURA III. SE COMUNICA A LA SUPERVISION LA PRESENCIA DE
OJOS DE AGUA (PUQUIALES ) EN LA CALLE PROLG. ANDAHUAYLAS QUE SE PRESENTA A LO LARGO DE LA PROGRESIVA 0+100 A LA PROGRESIVA 0+220 SEGUN EXP TEC. POR LO QUE
AMERITARIA LA CONSTRUCCION DE UN SUBDREN Y CONSECUENTEMENTE LA PRESTACION DE ADICIONAL DE OBRA.

15 11/29/2019 ASIENTO N°: 23


SUPER

PAG 18
11/29/2019 ASIENTO N°: 24

DE ACUERDO AL ASIENTO N° .... DE LA SUPERVISION SE INICIA CON LOS CORTES DE LA TERRENO Y ELIMINACION DE LA PLATAFORMA DE LA CALZADA DE LAS CALLES 28 DE JULIO ASI
COMO DE LA CALLE AMARGURA III, ENCONTRANDONOS CON SE COMUNICA A LA SUPERVISION QUE ALGUNAS VIVENDAS ENTRE LAS CALLES, JR. AMAUTA Y CALLE AMARGURA II, SE
ENCUENTRAN DENTRO DE LA CALZADA DE LA VIAS COMO ES EL CASO DE PROPIEDAD DEL SR.HORACIO VILCHE AMES, DONDE LA VIVIENDA INGRESA HACIA LA VIA PROYECTADO EN EL
EXP. TEC. EN APROXIMADAMENTE 1.50 M. PARALELO A LA CALLE AMRGURA II. Y LA MISMA VIVIENDA OCUPA EL ANCHO DE VIA PARALELO A LA CALLE AMUTA EN APROXIMADAMENTE 1.50M.
ASI MISMO SE PRESENTA EL MISMO PROBLEMA EN LA CALLE AMARGURA Y EL JR. 2 DE MAYO, CON LA PROPIEDAD DEL SRA. EUFEMIA PACHECO SALCEDO, DONDE EN PARALELO A LA CALLE
RESID
AMARGURA II, SE TIENE QUE LA VIVIENDA OCUPA LA VIA EN APROXIMADAMENTE 1.6 M. Y PARALELO A LA CALLE 02 DE MAYO SE TIENE QUE RESPETANDO LOS PLANOS DEL EXP TEC. ESTA
INVADE LA PLATAFORMA DE LA VIA EN APROXIMADAMENTE 2.00 M. POR LO QUE PARA PODER INICIAR CON LOS TRABAJOS DE CORTE SE SOLICITA MEDIANTE LA SUPERVISION GESTIONAR
ANTE LA ENTIDAD LIBERAR DICHAS CALLES. SE COMIICA A LA SUPERVISION QUE LAS CALLES 2 DE MAYO, ASI COMO JR. AMAUTA NO CUENTA, ADEMAS CON INSTALACIONES DE AGUA Y
DESAGUE POR LO QUE SE SOLICITA A LA SUPERVISION DEFINA LA INTERVENCION A FIN DE NO PERJUDICAR EL PROCEDER DEL PROYECTO. PUES SE ESTARIA AFECTANDO LA RUTA CRITICA
DEL PROYECTO.

16 11/30/2019 ASIENTO N°: 25


SUPER

PAG 19
11/30/2019 ASIENTO N°: 26
SE CONTINUAN CON LOS TRABAJOS DE CORTE DE LAPLATAFORMA DE LA CALZADA EN LA CALLE AMRGURA II Y ELIMIACION A LOS BOTADEROS AUTORIZADOS, SE COMUNICA A LA
SUPERVISION QUE SE TIENE LA PRESENCIA DE POSTES DE ALUMBRADO ELECTRICO QUE SE ENCUENTRAN DENTRO DE LA CALZADA PROYECTADA EN LA CALLE AMARGURA TRAMOS I Y II
EN NUMERO TOTAL DE ( 15 ) POSTES. , POR LO QUE SE REQUIERE QUE SEAN RETIRADAS, DICHAS GESTIONES AMERITARAN LA PRESTACION DE ADICIONALES DE OBRA. EL CONTRATISTA
RESID CONJUNTAMENTE CON LA SUPERVISION REALIZA LOS METRADOS EJECUCTADOS Y ASI MISMO SE HACE ENTREGA DE LA VALORIACION CORRESPONDIENTE AL MES DE NOVIEMBRE CON
CARTA N° ......, SE COMUNICA A LA SUPERVISION QUE SE TIENE VIVIENDAS CONSTRUIDAS QUE IMPOSIBILITAN LA CONSTRUCCION DE VEREDAS Y EN ALGUNOS CASOS LA CONSTRUCCION
DE CUNETAS SIENDO NECESARIOS ACORTAR LOS ANCHO DE LA CALZADA PARA EL CASO DE CUNETAS POR SER INDISPENSABLE SU CONSTRUCCION, PUES LUEGO DE REPLANTEADAS EL
EJE Y ANCHOS DE VIA SE VERIFICAN QUE NO SE CUENTA CON LOS ESPACION QUE SE REQUIEREN PARA SU CONSTRUCCION

17 02/12/2019 ASIENTO N°: 27


SUPER

PAG 20
02/12/2019 ASIENTO N°: 28
SE CONTINUAN CON LOS TRABAJOS DE CORTE EN LA CALLE AMARGURA II, DONDE SE CONTINUAN CON LOS PROBLEMAS DE LIBERACION DE CALLES TANTO EN AMARGURA CON
RESID INTERSECCION JR, 2 DE MAYO COMO CON EL JR. AMAUTA, DONDE LOS PROPIETARIOS SE NIEGAN A ACCEDER LOS ESPACIOS REQUERIDOS PARA LA EJECUCION DE LOS CORTES DE LA
PLATAFORME DE LA VIA.

18 03/12/2019 ASIENTO N°: 29


SUPER

PAG 20
03/12/2019 ASIENTO N°: 30
SE CONTINUAN CON LOS TRABAJOS DE CORTE EN LA CALLE AMARGURA II, DONDE SE CONTINUAN CON LOS PROBLEMAS DE LIBERACION DE CALLES TANTO EN AMARGURA CON
INTERSECCION JR, 2 DE MAYO COMO CON EL JR. AMAUTA, DONDE LOS PROPIETARIOS SE NIEGAN A ACCEDER LOS ESPACIOS REQUERIDOS PARA LA EJECUCION DE LOS CORTES DE LA
RESID
PLATAFORME DE LA VIA. ASIMISMO SE SIGUE ESPERANDO LA RESPUESTA DE LA SUPERVISION Y LA ENTIDAD EN LOS CASOS DE LOS JIRONES AMAUTA Y 02 DE MAYO DONDE NO SE CUENTA
CON INSTALACIONES DE AGUA Y DESAGUE Y MAS AUN TENIENDOSE USUARIOS QUE REQUIEREN DE ESE SERVICIO.

19 04/12/2019 ASIENTO N°: 31


SUPER

PAG 20
04/12/2019 ASIENTO N°: 32
RESID

20 05/12/2019 ASIENTO N°: 33


SUPER

PAG 20
FECHA VIAJES PARCIAL M3

26/11/2019 15 15 225
27/11/2019 42 15 630
28/11/2019 60 15 900
29/11/2019 22 15 330
30/11/2019 12 15 180
2265
1/12/2019 15 0
2/12/2019 15 0
3/12/2019 15 0
4/12/2019 15 0
5/12/2019 15 0
6/12/2019 15 0
7/12/2019 15 0

0
1812
11/19/2019

0
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS


PROYECTO : BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA
DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
#REF! MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

ALTURA TIPO DE
VOLUMEN DE CORTE VOLUMEN DE RELLENO
ALTURA SUELO
PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
#REF! MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

#REF! TIPO DE SUELO


MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

PROYECTO : "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
PAVIMENTO
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 6.00 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 1,030.68 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 1 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 25.80 0.00
40 20.00 0.320 0.000 1 34.20 0.00
60 20.00 0.370 0.000 1 41.40 0.00
80 20.00 0.330 0.000 1 42.00 0.00
100 20.00 0.350 0.000 1 40.80 0.00
120 20.00 0.370 0.000 1 43.20 0.00
140 20.00 0.420 0.000 1 47.40 0.00
160 20.00 0.380 0.000 1 48.00 0.00
180 20.00 0.320 0.000 1 42.00 0.00
200 20.00 0.370 0.000 1 41.40 0.00
220 20.00 0.420 0.000 1 47.40 0.00
240 20.00 0.400 0.000 1 49.20 0.00
260 20.00 0.420 0.000 1 49.20 0.00
280 20.00 0.460 0.000 1 52.80 0.00
300 20.00 0.370 0.000 1 49.80 0.00
320 20.00 0.420 0.000 1 47.40 0.00
340 20.00 0.460 0.000 1 52.80 0.00
360 20.00 0.320 0.000 1 46.80 0.00
380 20.00 0.250 0.000 1 34.20 0.00
400 20.00 0.360 0.000 1 36.60 0.00
420 20.00 0.370 0.000 1 43.80 0.00
440 20.00 0.370 0.000 1 44.40 0.00
460 20.00 0.360 0.000 1 43.80 0.00
472.34 12.34 0.350 0.000 1 26.28 0.00
SUMATARIA TOTAL = 970.68 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN LOS


PROYECTO : BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA
DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
#REF! MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

ALTURA TIPO DE
VOLUMEN DE CORTE VOLUMEN DE RELLENO
ALTURA SUELO
PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
#REF! MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

#REF! TIPO DE SUELO


MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

PROYECTO : "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
BERMA
METRADO DE MOVIMIENTO DE TIERRAS

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN DE AGUAS PLUVIALES EN


PROYECTO : LOS BARRIOS DE CHALHUANI, RAYAMPAMPA, ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE
OCOBAMBA PROVINCIA DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

TIPO DE SUELO
AVENIDA MAUCACALLE MATERIAL SUELTO 1
ROCA SUELTA 2
ANCHO DE VÍA DE RODADURA= 3.20 ROCA FIJA 3

LONGITUD TOTAL : 472.34 M3. M3. M3. M3. M3. M3.


Totales de Movimiento de Tierras (M³): 549.70 0.00 0.00 0.00 0.00 0.00

ALTURA VOLUMEN DE CORTE VOLUMEN DE RELLENO


TIPO DE

ALTURA
SUELO

PROGRE LONGIT DE
DE CORTE
SIVA UD RELLENO MATERIAL ROCA ROCA MATERIAL ROCA
(M) ROCA FIJA
(M) SUELTO SUELTA FIJA SUELTO SUELTA
0 0.00 0.180 0.000 0 0.00 0.00 0.00 0.00 0.00 0.00
20 20.00 0.250 0.000 1 13.76 0.00
40 20.00 0.320 0.000 1 18.24 0.00
60 20.00 0.370 0.000 1 22.08 0.00
80 20.00 0.330 0.000 1 22.40 0.00
100 20.00 0.350 0.000 1 21.76 0.00
120 20.00 0.370 0.000 1 23.04 0.00
140 20.00 0.420 0.000 1 25.28 0.00
160 20.00 0.380 0.000 1 25.60 0.00
180 20.00 0.320 0.000 1 22.40 0.00
200 20.00 0.370 0.000 1 22.08 0.00
220 20.00 0.420 0.000 1 25.28 0.00
240 20.00 0.400 0.000 1 26.24 0.00
260 20.00 0.420 0.000 1 26.24 0.00
280 20.00 0.460 0.000 1 28.16 0.00
300 20.00 0.370 0.000 1 26.56 0.00
320 20.00 0.420 0.000 1 25.28 0.00
340 20.00 0.460 0.000 1 28.16 0.00
360 20.00 0.320 0.000 1 24.96 0.00
380 20.00 0.250 0.000 1 18.24 0.00
400 20.00 0.360 0.000 1 19.52 0.00
420 20.00 0.370 0.000 1 23.36 0.00
440 20.00 0.370 0.000 1 23.68 0.00
460 20.00 0.360 0.000 1 23.36 0.00
472.34 12.34 0.350 0.000 1 14.02 0.00
SUMATARIA TOTAL = 517.70 0.00 0.00 0.00 0.00 0.00
RESUMEN DEL PRESUPUESTO

"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y EVACUACIÓN


DE AGUAS PLUVIALES EN LOS BARRIOS DE CHALHUANI, RAYAMPAMPA,
PROYECTO: ANANSAYOCC, ALIANZA, 1° DE MAYO DEL DISTRITO DE OCOBAMBA PROVINCIA
DE CHINCHEROS – APURIMAC” SEGUNDA ETAPA

UBICACIÓN: TAMBURCO - ABANCAY - APURIMAC

DESCRIPCION IMPORTE
COSTO DIRECTO S/. 904,524.31
GASTOS GENERALES 8% S/. 72,361.94
UTILIDAD 7% S/. 63,316.70
---------------------------
SUBTOTAL S/. 1,040,202.95
I.G.V 18% S/. 187,236.53
---------------------------
TOTAL PRESUPUESTO S/. 1,227,439.48

SON : UN MILLON DOSCIENTOS VEINTISIETE MIL CUATROCIENTOS TRENTINUEVE Y 48/100 NUEVOS


SOLES

CONSTRUCCION DE PISTAS Y VEREDAS DE LAS URBANIZACIONES JUAN PABLO II, VICTOR ACOSTA RIOS I ETAPA, Y LAS
AVENIDAS SEÑOR DE LA EXALTACION, RICARDO PALMA Y GARCILAZO DE LA VEGA DEL DISTRITO DE TAMBURCO,
PROVINCIA ABANCAY - APURIMAC