Documentos de Académico
Documentos de Profesional
Documentos de Cultura
individual project
nies.shane@gmail.com
320.333.2999
6-9 16-17
4-5 10-15 18-19
2 3
Muncie, IN
4 5
Fargo, ND
As sustainable strategies
become increasingly important,
we need to take action. I
have proposed a Bus Rapid
Transit system throughout
the city of Fargo with another
Transit Hub Station on the
corner of broadway and 4th
ave. Throughout my design I
demonstrate the importance
of a public connection in
the city through my form,
sustainable strategies, detailed
connections, and spatial
organization. I strongly feel that
this Bus Rapid Transit System
will embrace a RE-Connection
throughout the city of Fargo.
6 7
8 9
San Francisco, CA
10 11
12 13
14 15
innovate research collaborate identify
studio
communicate coordinate
designbuild
2011
pha pha pha pha pha pha
se se se se se se
1 1 2 2 3 3
Schematic Presentation
74-77 74-77
Itasca Site Vist
CD Drawing Set
CD Drawing Set
132-143 132-143
DD Drawing Set
DD Drawing Set
122-131 122-131
site photos site photos
Initial Reactions
Initial Reactions
66-73 66-73
to be continued...
to be continued...
presentation presentation construction documents
construction documents
start
start
sketches sketches
models models
Passive House in the Woods
Eco-Experience Visit
Schematic Projects
Schematic Projects
FlatPak House
FlatPak House
preliminary preliminary
ICON House
ICON House
photos photos photos photos photos photos photos photos MSUM retro-fit MSUM retro-fit photos photos
Bio Haus
Bio Haus
Habit 4 Humaity Habit 4 Humaity
City of Fargo City of Fargo
36-39 36-39 40-43 40-43 44-47 44-47 48-51 48-51 52-59 52-59 60-63 60-63
16 17
18 19