CRONOGRAMA DE EJECUCION

MES1 MES2 MES3 MES4 MES5 MES6 MES7 MES8 MES9


Item Descripción Und. Metrado Precio S/. Parcial S/.
METR. S/. % METR. S/. % METR. S/. % METR. S/. % METR. S/. % METR. S/. % METR. S/. % METR. S/. % METR. S/. %
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 296062.41 296062.41
01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 163556.62 163556.62
01.01.01 CONSTRUCCIONES PROVISIONALES 36628.73 36628.73
01.01.01.01 OFICINAS m2 24.25 144.28 3498.79 24.25 3498.79 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.01.02 ALMACEN m2 42 154.11 6472.62 42.00 6472.62 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.01.03 CASETA DE GUARDIANIA m2 9 219.15 1972.35 9.00 1972.35 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.01.04 SERVICIO HIGIENICO mes 9 1800 16200 9.00 16200.00 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.01.05 CERCO CON POSTES DE MADERA Y MALLA RASHELL m 120 54.95 6594 120.00 6594.00 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.01.06 CARTEL DE OBRA 3.60X 2.40m und 1 1890.97 1890.97 1.00 1890.97 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.02 INSTALACIONES PROVISIONALES 55531.8 55531.80 100.00% 0.00 0.00
01.01.02.01 AGUA PARA LA CONSTRUCCION mes 9 5820.2 52381.8 9.00 52381.80 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.02.02 ENERGIA ELECTRICA PROVISIONAL glb 9 350 3150 9.00 3150.00 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.03 TRABAJOS PRELIMINARES 12454.22 12454.22 100.00% 0.00 0.00
01.01.03.01 LIMPIEZA DE TERRENO 12454.22 12454.22 100.00% 0.00 0.00
01.01.03.01.0 ELIMINACION DE BASURA Y ELEMENTOS SUELTOS LIVIANOS m2 144.38 86.26 12454.22 144.38 12454.22 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.04 MOVILIZACION DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS 12847.15 12847.15 100.00% 0.00 0.00
01.01.04.01 MOVILIZACION DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS glb 1 12847.15 12847.15 1.00 12847.15 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.05 DEMOLICION DE VEREDAS Y SARDINELES 46094.72 46094.72 100.00% 0.00 0.00
01.01.05.01 DEMOLICION DE VEREDAS DE 0.10 m m2 59.66 215.34 12847.18 59.66 12847.18 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.05.02 DEMOLICION DE VEREDAS LOSAS e=10 cm CON EQUIPO m2 72.71 143.57 10438.97 72.71 10438.97 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.05.03 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 19.86 33.6 667.3 19.86 667.30 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.05.04 LIMPIEZA DEL TERRENO MANUAL m2 802.5 10.2 8185.5 802.50 8185.50 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.05.05 TRAZO, NIVELES Y REPLANTEO 13955.77 13955.77 100.00% 0.00 0.00
01.01.05.05.0 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 144.38 10.24 1478.45 144.38 1478.45 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.05.05.0 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO m2 144.38 86.42 12477.32 144.38 12477.32 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02 SEGURIDAD Y SALUD 56659.6 56659.60 100.00% 0.00 0.00
01.02.01 SEGURIDAD EN OBRA 56659.6 56659.60 100.00% 0.00 0.00
01.02.01.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE ESTUDIO D glb 1 10410 10410 1.00 10410.00 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.01.02 EQUIPOS DE PROTECCION INDIVIDUAL und 45 319.04 14356.8 45.00 14356.80 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.01.03 EQUIPOS DE PROTECCION COLECTIVA glb 1 3245 3245 1.00 3245.00 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.01.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1 3123 3123 1.00 3123.00 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.01.05 CAPACITACION DE SEGURIDAD EN OBRA und 3 8000 24000 3.00 24000.00 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.01.06 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD glb 1 1524.8 1524.8 1.00 1524.80 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03 PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DEL COVID19 EN EL TRABAJO 75846.19 75846.19 100.00% 0.00 0.00
01.03.01 ELABORACION DE PLAN PARA LA VIGILANCIA Y CONTROL DEL COVID19 glb 1 6000 6000 1.00 6000.00 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03.02 LIMPIEZA Y DESINFECCION DE OBRA glb 1 11650.12 11650.12 1.00 11650.12 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03.03 LAVADO Y DESINFECCION DE MANOS glb 1 2124.36 2124.36 1.00 2124.36 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03.04 SENCIBILIZACION DE LA PREVENCION DEL CONTAGIO DEL COVID-19 EN OBRA glb 1 1088.8 1088.8 1.00 1088.80 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03.05 MEDIDAS DE PROTECCION PERSONAL glb 1 2462 2462 1.00 2462.00 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03.06 MEDIDAS DE PROTECCION COLECTIVA glb 1 3150.11 3150.11 1.00 3150.11 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03.07 PROFESIONAL DE SEGURIDAD Y SALUD mes 9 5102.83 45925.47 9.00 45925.47 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03.08 EQUIPAMIENTO PARA LA VIGILANCIA DE LA SALUD glb 1 3445.33 3445.33 1.00 3445.33 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02 ESTRUCTURAS 1415982.93 1415982.93 100.00% 0.00 0.00
02.01 MOVIMIENTO DE TIERRAS 63900.69 63900.69 100.00% 0.00 0.00
02.01.01 CORTE DE MATERIAL SUELTO CON EQUIPO m3 65.5 15.72 1029.66 65.50 1029.66 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02 EXCAVACIONES 44889.32 44889.32 100.00% 0.00 0.00
02.01.02.01 EXCAVACIONES A MANO EN TERRENO NORMAL 30947.05 30947.05 100.00% 0.00 0.00
02.01.02.01.0 EXCAVACION PARA CISTERNA m3 14.92 35.4 528.17 14.92 528.17 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.01.0 EXCAVACION PARA ESCALERA m3 1.2 28.32 33.98 1.20 33.98 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.01.0 EXCAVACION PARA ZAPATAS m3 328.96 67.98 22362.7 328.96 22362.70 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.01.0 EXCAVACION PARA VIGAS DE CIMENTACION m3 87.39 33.99 2970.39 87.39 2970.39 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.01.0 EXCAVACION PARA CIMIENTOS CORRIDOS m3 89.16 56.66 5051.81 89.16 5051.81 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.02 PERFILADO Y COMPACTADO DE SUB-RASANTE 11211.66 11211.66 100.00% 0.00
02.01.02.02.0 PERFILADO Y COMPACTADO EN CISTERNAS m2 37.2 11.4 424.08 37.20 424.08 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.02.0 PERFILADO Y COMPACTADO EN ESCALERAS m2 3.95 72.57 286.65 3.00 286.65 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.02.0 PERFILADO Y COMPACTADO EN ZAPATAS m2 251.84 32.36 8149.54 0.00 251.82 8149.00 99.99% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.02.0 PERFILADO Y COMPACTADO EN VIGAS DE CIMENTACION m2 77.14 22.26 1717.14 0.00 0.00 7.69 171.14 9.97% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.02.0 PERFILADO Y COMPACTADO EN CIMIENTOS CORRIDOS m2 76.6 8.28 634.25 0.00 0.00 76.60 634.25 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO 2730.61 0.00 2730.61 100.00% 0.00
02.01.02.03.0 RELLENO COMPACTADO CON MATERIAL PROPIO PARA CISTERNA m3 37.2 27.95 1039.74 0.00 0.00 37.20 1039.74 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.03.0 RELLENO COMPACTADO CON MATERIAL PROPIO PARA ESCALERA m3 3.95 42.6 168.27 0.00 0.00 3.95 168.27 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.03.0 RELLENO COMPACTADO CON MATERIAL PROPIO PARA ZAPATAS m3 39.79 22.92 911.99 0.00 0.00 39.79 911.99 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.03.0 RELLENO COMPACTADO CON MATERIAL PROPIO PARA CIMIENTOS CORRIDOS m3 24.24 25.19 610.61 0.00 0.00 24.24 610.61 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DM=10KM 17981.71 0.00 17981.71 100.00% 0.00
02.01.03.01 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 535.17 33.6 17981.71 0.00 0.00 0.00 8990.86 50.00% 267.58 8990.86 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
02.02 OBRAS DE CONCRETO SIMPLE 68664.87 0.00 34332.44 50.00% 34332.44 50.00% 0.00
02.02.01 CIMIENTO CORRIDO 13635.86 0.00 13635.86 100.00% 0.00
02.02.01.01 CONCRETO CILOPEO PARA CIMIENTACION 1:10 + 30% P.G. m3 47.52 286.95 13635.86 0.00 0.00 47.52 13635.86 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.02 SOLADOS 11455.85 0.00 11455.85 100.00% 0.00
02.02.02.01 CONCRETO SOLADO MEZCLA 1:10 CEMENTO-HORMIGON e=0.05 m. m2 355 32.27 11455.85 0.00 0.00 355.00 11455.85 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.03 SOBRECIMIENTOS 1376.05 0.00 1376.05 100.00% 0.00
02.02.03.01 CONCRETO SOBRECIMIENTOS f'c=175 kg/cm2 m3 1.35 365.25 493.09 0.00 0.00 1.35 493.09 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.03.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 17.54 50.34 882.96 0.00 0.00 17.54 882.96 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
02.02.04 FALSO PISO 42197.11 0.00 42197.11 100.00% 0.00
02.02.04.01 CONCRETO FALSO PISO e=4" m2 740.56 54.03 40012.46 0.00 0.00 370.28 20006.23 50.00% 370.28 20006.23 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
02.02.04.02 CURADO CON AGUA m2 740.56 2.95 2184.65 0.00 0.00 740.56 2184.65 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03 OBRAS DE CONCRETO ARMADO 1283417.37 0.00 256683.47 20.00% 256683.47 20.00% 256683.47 20.00% 256683.47 20.00% 0.00
02.03.01 ZAPATAS 57443.65 0.00 57443.65 100.00% 0.00
02.03.01.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 2693.47 8.57 23083.04 2,693.47 23083.04 100.00% 2,693.47 23083.04 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.01.02 CONCRETO ZAPATAS f'c=210 kg/cm2 m3 82.55 416.24 34360.61 82.55 34360.61 100.00% 1.00 416.24 1.21% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.02 VIGAS DE CIMENTACION 85153.42 85153.42 100.00% 85153.42 100.00% 0.00
02.03.02.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4466.09 8.57 38274.39 4,466.09 38274.39 100.00% 4,466.09 38274.39 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 354.58 66.05 23420.01 354.58 23420.01 100.00% 354.58 23420.01 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.02.03 CONCRETO VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 54.75 409.37 22413.01 54.75 22413.01 100.00% 54.75 22413.01 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.02.04 CURADO CON AGUA m2 354.58 2.95 1046.01 354.58 1046.01 100.00% 354.58 1046.01 100.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.03 SOBRECIMIENTO REFORZADO 48881.96 0.00 48881.96 100.00% 0.00 0.00
02.03.03.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 2086.98 8.57 17885.42 0.00 0.00 0.00 2,086.98 17885.42 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
02.03.03.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 289.13 50.34 14554.8 0.00 0.00 0.00 289.13 14554.8 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
02.03.03.03 CONCRETO SOBRECIMIENTOS f'c=210 kg/cm2 m3 38.08 409.37 15588.81 0.00 0.00 0.00 38.08 15588.81 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
02.03.03.04 CURADO CON AGUA m2 289.13 2.95 852.93 0.00 0.00 0.00 289.13 852.93 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
02.03.04 COLUMNAS 405390.58 0.00 135130.193 33.33% 135130.193 33.33% 135130.193 33.33% 0.00
02.03.04.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 29753.44 8.57 254986.98 0.00 0.00 0.00 11,901.38 101994.792 40.00% 11,901.38 101994.792 40.00% 5,950.69 50997.396 20.00% 0.00 0.00 0.00 0.00
02.03.04.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 1666.4 42.18 70288.75 0.00 0.00 0.00 666.56 28115.5 40.00% 666.56 28115.5 40.00% 333.28 14057.75 20.00% 0.00 0.00 0.00 0.00
02.03.04.03 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 173.77 432.75 75198.97 0.00 0.00 0.00 69.51 30079.588 40.00% 69.51 30079.588 40.00% 34.75 15039.794 20.00% 0.00 0.00 0.00 0.00
02.03.04.04 CURADO CON AGUA m2 1666.4 2.95 4915.88 0.00 0.00 0.00 666.56 1966.352 40.00% 666.56 1966.352 40.00% 333.28 983.176 20.00% 0.00 0.00 0.00 0.00
02.03.05 VIGAS 298046.74 0.00 178828.044 60.00% 119218.696 40.00% 0.00
02.03.05.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 20961.88 8.57 179643.31 0.00 0.00 0.00 0.00 12,577.13 107785.986 60.00% 8,384.75 71857.324 40.00% 0.00 0.00 0.00 0.00
02.03.05.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 1070.61 36.39 38959.5 0.00 0.00 0.00 0.00 642.37 23375.7 60.00% 642.37 23375.7 60.00% 0.00 0.00 0.00 0.00
02.03.05.03 CONCRETO VIGAS f'c=210 kg/cm2 m3 187.78 406.25 76285.63 0.00 0.00 0.00 0.00 112.67 45771.378 60.00% 112.67 45771.378 60.00% 0.00 0.00 0.00 0.00
02.03.05.04 CURADO CON AGUA m2 1070.61 2.95 3158.3 0.00 0.00 0.00 0.00 642.37 1894.98 60.00% 642.37 1894.98 60.00% 0.00 0.00 0.00 0.00
02.03.06 LOSAS 343438.03 0.00 206062.818 60.00% 137375.212 40.00% 0.00
02.03.06.01 LOSAS ALIGERADAS 339638.39 0.00 203783.034 60.00% 135855.356 40.00% 0.00
02.03.06.01.0 CONCRETO LOSAS f'c=210 kg/cm2 m3 463.12 381.99 176907.21 0.00 0.00 0.00 0.00 277.87 106144.326 60.00% 185.25 70762.884 40.00% 0.00 0.00 0.00 0.00
02.03.06.01.0 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA m2 1145.14 49.18 56317.99 0.00 0.00 0.00 0.00 687.08 33790.794 60.00% 458.06 22527.196 40.00% 0.00 0.00 0.00 0.00
02.03.06.01.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 6890.88 8.57 59054.84 0.00 0.00 0.00 0.00 4,134.53 35432.904 60.00% 2,756.35 23621.936 40.00% 0.00 0.00 0.00 0.00
02.03.06.01.0 CASETONES 0.15x0.30x1.20. und 2706.89 15.9 43039.55 0.00 0.00 0.00 0.00 1,624.13 25823.73 60.00% 1,082.76 17215.82 40.00% 0.00 0.00 0.00 0.00
02.03.06.01.0 CURADO CON AGUA m2 1464 2.95 4318.8 0.00 0.00 0.00 0.00 878.40 2591.28 60.00% 585.60 1727.52 40.00% 0.00 0.00 0.00 0.00
02.03.06.02 LOSAS MACISAS 3799.64 0.00 1899.82 50.00% 1899.82 50.00% 0.00
02.03.06.02.0 CONCRETO LOSAS MACISAS f'c= 210 kg/cm2 m3 5.46 405.88 2216.1 0.00 0.00 0.00 0.00 2.73 1108.05 50.00% 2.73 1108.05 50.00% 0.00 0.00 0.00 0.00
02.03.06.02.0 ENCOFRADO Y DESENCOFRADO m2 8.05 38.24 307.83 0.00 0.00 0.00 0.00 4.02 153.915 50.00% 4.02 153.915 50.00% 0.00 0.00 0.00 0.00
02.03.06.02.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 146.21 8.57 1253.02 0.00 0.00 0.00 0.00 73.11 626.51 50.00% 73.11 626.51 50.00% 0.00 0.00 0.00 0.00
02.03.06.02.0 CURADO CON AGUA m2 7.69 2.95 22.69 0.00 0.00 0.00 0.00 3.85 11.345 50.00% 3.85 11.345 50.00% 0.00 0.00 0.00 0.00
02.03.07 ESCALERAS 18247.66 0.00 9123.83 50.00% 0.00 9123.83 50.00% 0.00
02.03.07.01 CONCRETO ESCALERAS f'c=210 kg/cm2 m3 15.31 420.79 6442.29 0.00 0.00 0.00 0.00 7.65 3221.145 50.00% 7.65 3221.145 50.00% 0.00 0.00 0.00 0.00
02.03.07.02 ENCOFRADO Y DESENCOFRADO m2 99.47 38.24 3803.73 0.00 0.00 0.00 0.00 49.73 1901.865 50.00% 49.73 1901.865 50.00% 0.00 0.00 0.00 0.00
02.03.07.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 899.44 8.57 7708.2 0.00 0.00 0.00 0.00 449.72 3854.1 50.00% 449.72 3854.1 50.00% 0.00 0.00 0.00 0.00
02.03.07.04 CURADO CON AGUA m2 99.47 2.95 293.44 0.00 0.00 0.00 0.00 49.74 146.72 50.00% 49.74 146.72 50.00% 0.00 0.00 0.00 0.00
02.03.08 CISTERNA 26815.33 0.00 26815.33 100.00% 0.00
02.03.08.01 CONCRETO CISTERNA f'c=210 kg/cm2 m3 5.44 435.26 2367.81 0.00 0.00 0.00 5.44 2367.81 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
02.03.08.02 ENCOFRADO Y DESENCOFRADO m2 28.77 38.24 1100.16 0.00 0.00 0.00 28.77 1100.16 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
02.03.08.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 481.27 8.57 4124.48 0.00 0.00 0.00 481.27 4124.48 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
02.03.08.04 CURADO CON AGUA m2 28.77 2.95 84.87 0.00 0.00 0.00 28.77 84.87 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
02.03.08.05 MESONES 10547.53 0.00 10547.53 100.00%
02.03.08.05.0 CONCRETO MESONES f'c=210 kg/cm2 m3 6.56 347.02 2276.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.56 2276.45 100.00% 0.00 0.00
02.03.08.05.0 ENCOFRADO Y DESENCOFRADO m2 54.48 38.24 2083.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.48 2083.32 100.00% 0.00 0.00
02.03.08.05.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 714.38 8.57 6122.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 714.38 6122.24 100.00% 0.00 0.00
02.03.08.05.0 CURADO CON AGUA m2 22.21 2.95 65.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.21 65.52 100.00% 0.00 0.00
02.03.08.06 BANCAS DE CONCRETO 3979.24 0.00 0.00 3979.24 100.00%
02.03.08.06.0 CONCRETO BANCAS DE CONCRETO f'c=210 kg/cm2 m3 2.65 347.02 919.6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.65 919.6 100.00% 0.00
02.03.08.06.0 ENCOFRADO Y DESENCOFRADO m2 23.3 38.24 890.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.30 890.99 100.00% 0.00
02.03.08.06.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 245.03 8.57 2099.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 245.03 2099.91 100.00% 0.00
02.03.08.06.0 CURADO CON AGUA m2 23.3 2.95 68.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.30 68.74 100.00% 0.00
02.03.08.07 GRUTA 2905.75 0.00 0.00 2905.75 100.00%
02.03.08.07.0 CONCRETO GRUTAf'c=210 kg/cm2 m3 3.17 339.99 1077.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.17 1077.77 100.00% 0.00
02.03.08.07.0 ENCOFRADO Y DESENCOFRADO m2 15.85 38.24 606.1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.85 606.1 100.00% 0.00
02.03.08.07.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 137.12 8.57 1175.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 137.12 1175.12 100.00% 0.00
02.03.08.07.0 CURADO CON AGUA m2 15.85 2.95 46.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.85 46.76 100.00% 0.00
02.03.08.08 JUNTAS 1705.49 0.00 213.19 12.50% 213.19 12.50% 213.19 12.50% 213.19 12.50% 213.19 12.50% 213.19 12.50% 213.19 12.50% 213.19 12.50%
02.03.08.08.0 JUNTA FLEXIBLE m 79.51 21.45 1705.49 0.00 0.00 9.94 213.19 12.50% 9.94 213.19 12.50% 9.94 213.19 12.50% 9.94 213.19 12.50% 0.13 213.19 12.50% 9.94 213.19 12.50% 9.94 213.19 12.50% 9.94 213.19 12.50%
03 ARQUITECTURA Y ACABADOS 1799292.41 0.00 359858.482 20.00% 359858.482 20.00% 359858.482 20.00% 359858.482 20.00% 359858.482 20.00%
03.01 ALBAÑILERIA 416902.98 0.00 83380.596 20.00% 83380.596 20.00% 83380.596 20.00% 83380.596 20.00% 83380.596 20.00%
03.01.01 TABIQUES 133513.43 0.00 26702.686 20.00% 26702.686 20.00% 26702.686 20.00% 26702.686 20.00% 26702.686 20.00%
03.01.01.01 MURO LADRILLO K.K DE ARCILLA 18H ( 09x013x0.24) AMARRE DE CABEZA, JUNTA m2 451.36 115.55 52154.65 0.00 0.00 0.00 0.00 0.00 90.27 10430.93 20.00% 0.20 10430.93 20.00% 90.27 10430.93 20.00% 90.27 10430.93 20.00% 90.27 10430.93 20.00%
03.01.01.02 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUNTA m2 1018.64 79.87 81358.78 0.00 0.00 0.00 0.00 0.00 203.73 16271.756 20.00% 0.20 16271.756 20.00% 203.73 16271.756 20.00% 203.73 16271.756 20.00% 203.73 16271.756 20.00%
03.01.02 REVOQUES 283389.55 0.00 56677.91 20.00% 56677.91 20.00% 56677.91 20.00% 56677.91 20.00% 56677.91 20.00%
03.01.02.01 TARRAJEO DE CIELORASO m2 609.16 39.78 24232.38 0.00 0.00 0.00 0.00 0.00 121.83 4846.476 20.00% 0.20 4846.476 20.00% 121.83 4846.476 20.00% 121.83 4846.476 20.00% 121.83 4846.476 20.00%
03.01.02.02 TARRAJEO DE CIELORASO A DOBLE ALTURA m2 600.12 53.96 32382.48 0.00 0.00 0.00 0.00 0.00 120.02 6476.496 20.00% 0.20 6476.496 20.00% 120.02 6476.496 20.00% 120.02 6476.496 20.00% 120.02 6476.496 20.00%
03.01.02.03 TARRAJEO COLUMNAS m2 1478.8 30.64 45310.43 0.00 0.00 0.00 0.00 0.00 295.76 9062.086 20.00% 0.20 9062.086 20.00% 295.76 9062.086 20.00% 295.76 9062.086 20.00% 295.76 9062.086 20.00%
03.01.02.04 TARRAJEO FONDO DE ESCALERAS m2 65.9 37.45 2467.96 0.00 0.00 0.00 0.00 0.00 13.18 493.592 20.00% 0.20 493.592 20.00% 13.18 493.592 20.00% 13.18 493.592 20.00% 13.18 493.592 20.00%
03.01.02.05 TARRAJEO MUROS EXTERIORES m2 410.57 37.86 15544.18 0.00 0.00 0.00 0.00 0.00 82.11 3108.836 20.00% 0.20 3108.836 20.00% 82.11 3108.836 20.00% 82.11 3108.836 20.00% 82.11 3108.836 20.00%
03.01.02.06 TARRAJEO DE MUEBLE DE CEMENTO m2 171.12 29.52 5051.46 0.00 0.00 0.00 0.00 0.00 34.22 1010.292 20.00% 0.20 1010.292 20.00% 34.22 1010.292 20.00% 34.22 1010.292 20.00% 34.22 1010.292 20.00%
03.01.02.07 TARRAJEO VIGAS m2 1054.25 52.15 54979.14 0.00 0.00 0.00 0.00 0.00 210.85 10995.828 20.00% 0.20 10995.828 20.00% 210.85 10995.828 20.00% 210.85 10995.828 20.00% 210.85 10995.828 20.00%
03.01.02.08 TARRAJEO DE CISTERNA m2 24.29 41.91 1017.99 0.00 0.00 0.00 0.00 0.00 4.86 203.598 20.00% 0.20 203.598 20.00% 4.86 203.598 20.00% 4.86 203.598 20.00% 4.86 203.598 20.00%
03.01.02.09 TARRAJEO DE GRUTA m2 34.69 41.79 1449.7 0.00 0.00 0.00 0.00 0.00 6.94 289.94 20.00% 0.20 289.94 20.00% 6.94 289.94 20.00% 6.94 289.94 20.00% 6.94 289.94 20.00%
03.01.02.10 TARRAJEO DE SOBRECIMIENTO m2 3.78 26.68 100.85 0.00 0.00 0.00 0.00 0.00 0.76 20.17 20.00% 0.20 20.17 20.00% 0.76 20.17 20.00% 0.76 20.17 20.00% 0.76 20.17 20.00%
03.01.02.11 BRUÑAS DE 1 X 1 cm m 247.38 7.04 1741.56 0.00 0.00 0.00 0.00 0.00 49.48 348.312 20.00% 0.20 348.312 20.00% 49.48 348.312 20.00% 49.48 348.312 20.00% 49.48 348.312 20.00%
03.01.02.12 DERRAMES A m.MORTERO 1:5 m 195.31 45.31 8849.5 0.00 0.00 0.00 0.00 0.00 39.06 1769.9 20.00% 0.20 1769.9 20.00% 39.06 1769.9 20.00% 39.06 1769.9 20.00% 39.06 1769.9 20.00%
03.01.02.13 TARRAJEO MUROS INTERIORES m2 3406.11 26.5 90261.92 0.00 0.00 0.00 0.00 0.00 681.22 18052.384 20.00% 0.20 18052.384 20.00% 681.22 18052.384 20.00% 681.22 18052.384 20.00% 681.22 18052.384 20.00%
03.02 PISOS 283779.04 0.00 56755.808 20.00% 56755.808 20.00% 56755.808 20.00% 56755.808 20.00% 56755.808 20.00%
03.02.01 PISO CERAMICO 222916.74 0.00 44583.348 20.00% 44583.348 20.00% 44583.348 20.00% 44583.348 20.00% 44583.348 20.00%
03.02.01.01 CONTRAPISO DE 2" m2 2128.51 38.31 81543.22 0.00 0.00 0.00 0.00 0.00 425.70 16308.644 20.00% 0.20 16308.644 20.00% 425.70 16308.644 20.00% 425.70 16308.644 20.00% 425.70 16308.644 20.00%
03.02.01.02 PISO CERAMICO 0.45x0.45 COLOR CONCRETO GRIS m2 56.5 95.21 5379.37 0.00 0.00 0.00 0.00 0.00 11.30 1075.874 20.00% 0.20 1075.874 20.00% 11.30 1075.874 20.00% 11.30 1075.874 20.00% 11.30 1075.874 20.00%
03.02.01.03 PISO CERAMICO 0.45x0.45 COLOR PERLA m2 644.07 95.21 61321.9 0.00 0.00 0.00 0.00 0.00 128.81 12264.38 20.00% 0.20 12264.38 20.00% 128.81 12264.38 20.00% 128.81 12264.38 20.00% 128.81 12264.38 20.00%
03.02.01.04 PISO CERAMICO 0.45x0.45 COLOR BLANCO m2 784.29 95.21 74672.25 0.00 0.00 0.00 0.00 0.00 156.86 14934.45 20.00% 0.20 14934.45 20.00% 156.86 14934.45 20.00% 156.86 14934.45 20.00% 156.86 14934.45 20.00%
03.02.02 PISO CEMENTO PULIDO 6600.79 0.00 1320.158 20.00% 1320.158 20.00% 1320.158 20.00% 1320.158 20.00% 1320.158 20.00%
03.02.02.01 PISO DE CEMENTO ACABADO PULIDO m2 92.28 71.53 6600.79 0.00 0.00 0.00 0.00 0.00 18.46 1320.158 20.00% 0.20 1320.158 20.00% 18.46 1320.158 20.00% 18.46 1320.158 20.00% 18.46 1320.158 20.00%
03.02.03 ZOCALOS 54261.51 0.00 10852.302 20.00% 10852.302 20.00% 10852.302 20.00% 10852.302 20.00% 10852.302 20.00%
03.02.03.01 ZOCALO DE CERAMICA 0.15x0.45M PEGADO Y FRAGUADO COLOR CONCRETO GRm 212.97 61.27 13048.67 0.00 0.00 0.00 0.00 0.00 42.59 2609.734 20.00% 0.20 2609.734 20.00% 42.59 2609.734 20.00% 42.59 2609.734 20.00% 42.59 2609.734 20.00%
03.02.03.02 ZOCALO DE CERAMICA 0.15x0.45M PEGADO Y FRAGUADO COLOR PERLA m 592.94 61.27 36329.43 0.00 0.00 0.00 0.00 0.00 118.59 7265.886 20.00% 0.20 7265.886 20.00% 118.59 7265.886 20.00% 118.59 7265.886 20.00% 118.59 7265.886 20.00%
03.02.03.03 ZOCALO DE CERAMICA 0.15x0.45M PEGADO Y FRAGUADO COLOR BLANCO m 80.24 60.86 4883.41 0.00 0.00 0.00 0.00 0.00 16.05 976.682 20.00% 0.20 976.682 20.00% 16.05 976.682 20.00% 16.05 976.682 20.00% 16.05 976.682 20.00%
03.03 REVESTIMIENTOS 54884.55 0.00 10976.91 20.00% 10976.91 20.00% 10976.91 20.00% 10976.91 20.00% 10976.91 20.00%
03.03.01 MUROS 47866.62 0.00 9573.324 20.00% 9573.324 20.00% 9573.324 20.00% 9573.324 20.00% 9573.324 20.00%
03.03.01.01 CERAMICA 0.40X0.40 BLANCO MARMOLEADO m2 452.31 95.21 43064.44 0.00 0.00 0.00 0.00 0.00 90.46 8612.888 20.00% 0.20 8612.888 20.00% 90.46 8612.888 20.00% 90.46 8612.888 20.00% 90.46 8612.888 20.00%
03.03.01.02 CERAMICA 0.25X0.25 BRILLANTE BLANCO MARMOLEADO m2 18.9 95.21 1799.47 0.00 0.00 0.00 0.00 0.00 3.78 359.894 20.00% 0.20 359.894 20.00% 3.78 359.894 20.00% 3.78 359.894 20.00% 3.78 359.894 20.00%
03.03.01.03 CERAMICA 0.30X0.30 COLOR CELESTE m2 32.07 93.63 3002.71 0.00 0.00 0.00 0.00 0.00 6.41 600.542 20.00% 0.20 600.542 20.00% 6.41 600.542 20.00% 6.41 600.542 20.00% 6.41 600.542 20.00%
03.03.02 MESONES 7017.93 0.00 1403.586 20.00% 1403.586 20.00% 1403.586 20.00% 1403.586 20.00% 1403.586 20.00%
03.03.02.01 CERAMICA 0.25X0.25 BRILLANTE BLANCO MARMOLEADO m2 73.71 95.21 7017.93 0.00 0.00 0.00 0.00 0.00 14.74 1403.586 20.00% 0.20 1403.586 20.00% 14.74 1403.586 20.00% 14.74 1403.586 20.00% 14.74 1403.586 20.00%
03.04 PINTURAS 155306.68 0.00 31061.336 20.00% 31061.336 20.00% 31061.336 20.00% 31061.336 20.00% 31061.336 20.00%
03.04.01 PINTURA LATEX EN CIELO RASO m2 1216.46 19.12 23258.72 0.00 0.00 0.00 0.00 0.00 243.29 4651.744 20.00% 0.20 4651.744 20.00% 243.29 4651.744 20.00% 243.29 4651.744 20.00% 243.29 4651.744 20.00%
03.04.02 PINTURA LATEX EN MUROS EXTERIORES m2 432.33 29.32 12675.92 0.00 0.00 0.00 0.00 0.00 86.47 2535.184 20.00% 0.20 2535.184 20.00% 86.47 2535.184 20.00% 86.47 2535.184 20.00% 86.47 2535.184 20.00%
03.04.03 PINTURA LATEX EN MUROS INTERIORES m2 3440.17 19.48 67014.51 0.00 0.00 0.00 0.00 0.00 688.03 13402.902 20.00% 0.20 13402.902 20.00% 688.03 13402.902 20.00% 688.03 13402.902 20.00% 688.03 13402.902 20.00%
03.04.04 PINTURA LATEX EN COLUMNAS m2 1508.37 14.32 21599.86 0.00 0.00 0.00 0.00 0.00 301.67 4319.972 20.00% 0.20 4319.972 20.00% 301.67 4319.972 20.00% 301.67 4319.972 20.00% 301.67 4319.972 20.00%
03.04.05 PINTURA LATEX EN VIGAS m2 1478.8 14.91 22048.91 0.00 0.00 0.00 0.00 0.00 295.76 4409.782 20.00% 0.20 4409.782 20.00% 295.76 4409.782 20.00% 295.76 4409.782 20.00% 295.76 4409.782 20.00%
03.04.06 PINTURA FONDO DE ESCALERAS m2 69.19 21.53 1489.66 0.00 0.00 0.00 0.00 0.00 13.84 297.932 20.00% 0.20 297.932 20.00% 13.84 297.932 20.00% 13.84 297.932 20.00% 13.84 297.932 20.00%
03.04.07 PINTURA EN BAÑOS m2 180.53 22.75 4107.06 0.00 0.00 0.00 0.00 0.00 36.11 821.412 20.00% 0.20 821.412 20.00% 36.11 821.412 20.00% 36.11 821.412 20.00% 36.11 821.412 20.00%
03.04.08 PINTURA EN BRUÑAS COLOR BLANCO m 247.38 12.58 3112.04 0.00 0.00 0.00 0.00 0.00 49.48 622.408 20.00% 0.20 622.408 20.00% 49.48 622.408 20.00% 49.48 622.408 20.00% 49.48 622.408 20.00%
03.05 COBERTURAS 1216.46 4177.15 0.00 835.43 20.00% 835.43 20.00% 835.43 20.00% 835.43 20.00% 835.43 20.00%
03.05.01 COBERTURA DE LADRILLO PASTELERO EN AZOTEA m2 53.76 77.7 4177.15 0.00 0.00 0.00 0.00 0.00 10.75 835.43 20.00% 0.20 835.43 20.00% 10.75 835.43 20.00% 10.75 835.43 20.00% 10.75 835.43 20.00%
03.06 DRYWALL 14573.66 0.00 2914.732 20.00% 2914.732 20.00% 2914.732 20.00% 2914.732 20.00% 2914.732 20.00%
03.06.01 MURO DE DRYWALL m2 112.2 129.89 14573.66 0.00 0.00 0.00 0.00 0.00 22.44 2914.732 20.00% 0.20 2914.732 20.00% 22.44 2914.732 20.00% 22.44 2914.732 20.00% 22.44 2914.732 20.00%
03.07 CIELO RASOS 35080.53 0.00 7016.106 20.00% 7016.106 20.00% 7016.106 20.00% 7016.106 20.00% 7016.106 20.00%
03.07.01 CIELO RASO DE BALDOSAS m2 310.97 112.81 35080.53 0.00 0.00 0.00 0.00 0.00 62.19 7016.106 20.00% 0.20 7016.106 20.00% 62.19 7016.106 20.00% 62.19 7016.106 20.00% 62.19 7016.106 20.00%
03.08 MELAMINE 19192.8 0.00 3838.56 20.00% 3838.56 20.00% 3838.56 20.00% 3838.56 20.00% 3838.56 20.00%
03.08.01 BAÑOS 19192.8 0.00 3838.56 20.00% 3838.56 20.00% 3838.56 20.00% 3838.56 20.00% 3838.56 20.00%
03.08.01.01 SEPARADOR DE URINARIO und 12 899.9 10798.8 0.00 0.00 0.00 0.00 0.00 2.40 2159.76 20.00% 0.20 2159.76 20.00% 2.40 2159.76 20.00% 2.40 2159.76 20.00% 2.40 2159.76 20.00%
03.08.01.02 SEPARADOR DE INODOROS (SEGUN DISEÑO) und 6 1399 8394 0.00 0.00 0.00 0.00 0.00 1.20 1678.8 20.00% 0.20 1678.8 20.00% 1.20 1678.8 20.00% 1.20 1678.8 20.00% 1.20 1678.8 20.00%
03.08.02 LOCALES COMERCIALES 0.00 0 0 0 0 0
03.09 CARPINTERIA METALICA 679519.66 0.00 135903.932 20.00% 0.20 135903.932 20.00% 135903.932 20.00% 135903.932 20.00% 135903.932 20.00%
03.09.01 VENTANAS 46363.44 0.00 9272.688 20.00% 0.20 9272.688 20.00% 9272.688 20.00% 9272.688 20.00% 9272.688 20.00%
03.09.01.01 SUM. E INST. DE VENTANA V-01 (segun diseño) und 5 1482.72 7413.6 0.00 0.00 0.00 0.00 0.00 1.00 1482.72 20.00% 0.20 1482.72 20.00% 1.00 1482.72 20.00% 1.00 1482.72 20.00% 1.00 1482.72 20.00%
03.09.01.02 SUM. E INST. DE VENTANA V-02 (segun diseño) und 1 3570.64 3570.64 0.00 0.00 0.00 0.00 0.00 0.20 714.128 20.00% 0.20 714.128 20.00% 0.20 714.128 20.00% 0.20 714.128 20.00% 0.20 714.128 20.00%
03.09.01.03 SUM. E INST. DE VENTANA V-03 (segun diseño) und 6 4155.08 24930.48 0.00 0.00 0.00 0.00 0.00 1.20 4986.096 20.00% 0.20 4986.096 20.00% 1.20 4986.096 20.00% 1.20 4986.096 20.00% 1.20 4986.096 20.00%
03.09.01.04 SUM. E INST. DE VENTANA V-04 (segun diseño) und 2 3385.35 6770.7 0.00 0.00 0.00 0.00 0.00 0.40 1354.14 20.00% 0.20 1354.14 20.00% 0.40 1354.14 20.00% 0.40 1354.14 20.00% 0.40 1354.14 20.00%
03.09.01.05 SUM. E INST. DE VENTANA V-05 (segun diseño) und 1 3678.02 3678.02 0.00 0.00 0.00 0.00 0.00 0.20 735.604 20.00% 0.20 735.604 20.00% 0.20 735.604 20.00% 0.20 735.604 20.00% 0.20 735.604 20.00%
03.09.02 PUERTAS 519497.11 0.00 103899.422 20.00% 0.20 103899.422 20.00% 103899.422 20.00% 103899.422 20.00% 103899.422 20.00%
03.09.02.01 SUM. E INST. DE PUERTA P-1 (SEGUN DISEÑO) und 2 6543.13 13086.26 0.00 0.00 0.00 0.00 0.00 0.40 2617.252 20.00% 0.20 2617.252 20.00% 0.40 2617.252 20.00% 0.40 2617.252 20.00% 0.40 2617.252 20.00%
03.09.02.02 SUM. E INST. DE PUERTA P-2 (SEGUN DISEÑO) und 1 6732.1 6732.1 0.00 0.00 0.00 0.00 0.00 0.20 1346.42 20.00% 0.20 1346.42 20.00% 0.20 1346.42 20.00% 0.20 1346.42 20.00% 0.20 1346.42 20.00%
03.09.02.03 SUM. E INST. DE PUERTA P-3 (SEGUN DISEÑO) und 2 4739.67 9479.34 0.00 0.00 0.00 0.00 0.00 0.40 1895.868 20.00% 0.20 1895.868 20.00% 0.40 1895.868 20.00% 0.40 1895.868 20.00% 0.40 1895.868 20.00%
03.09.02.04 SUM. E INST. DE PUERTA P-4 (SEGUN DISEÑO) und 40 6385.65 255426 0.00 0.00 0.00 0.00 0.00 8.00 51085.2 20.00% 0.20 51085.2 20.00% 8.00 51085.2 20.00% 8.00 51085.2 20.00% 8.00 51085.2 20.00%
03.09.02.05 SUM. E INST. DE PUERTA P-5 (SEGUN DISEÑO) und 1 4368.96 4368.96 0.00 0.00 0.00 0.00 0.00 0.20 873.792 20.00% 0.20 873.792 20.00% 0.20 873.792 20.00% 0.20 873.792 20.00% 0.20 873.792 20.00%
03.09.02.06 SUM. E INST. DE PUERTA P-6 (SEGUN DISEÑO) und 1 4842.39 4842.39 0.00 0.00 0.00 0.00 0.00 0.20 968.478 20.00% 0.20 968.478 20.00% 0.20 968.478 20.00% 0.20 968.478 20.00% 0.20 968.478 20.00%
03.09.02.07 SUM. E INST. DE PUERTA P-7 (SEGUN DISEÑO) und 6 5480.16 32880.96 0.00 0.00 0.00 0.00 0.00 1.20 6576.192 20.00% 0.20 6576.192 20.00% 1.20 6576.192 20.00% 1.20 6576.192 20.00% 1.20 6576.192 20.00%
03.09.02.08 SUM. E INST. DE PUERTA P-8 (SEGUN DISEÑO) und 1 4700.66 4700.66 0.00 0.00 0.00 0.00 0.00 0.20 940.132 20.00% 0.20 940.132 20.00% 0.20 940.132 20.00% 0.20 940.132 20.00% 0.20 940.132 20.00%
03.09.02.09 SUM. E INST. DE PUERTA P-9 (SEGUN DISEÑO) und 9 5196.31 46766.79 0.00 0.00 0.00 0.00 0.00 1.80 9353.358 20.00% 0.20 9353.358 20.00% 1.80 9353.358 20.00% 1.80 9353.358 20.00% 1.80 9353.358 20.00%
03.09.02.10 SUM. E INST. DE PUERTA P-10 (SEGUN DISEÑO) und 1 5598.27 5598.27 0.00 0.00 0.00 0.00 0.00 0.20 1119.654 20.00% 0.20 1119.654 20.00% 0.20 1119.654 20.00% 0.20 1119.654 20.00% 0.20 1119.654 20.00%
03.09.02.11 SUM. E INST. DE PUERTA P-11 (SEGUN DISEÑO) und 1 5645.51 5645.51 0.00 0.00 0.00 0.00 0.00 0.20 1129.102 20.00% 0.20 1129.102 20.00% 0.20 1129.102 20.00% 0.20 1129.102 20.00% 0.20 1129.102 20.00%
03.09.02.12 SUM. E INST. DE PUERTA P-13 (SEGUN DISEÑO) und 4 5763.62 23054.48 0.00 0.00 0.00 0.00 0.00 0.80 4610.896 20.00% 0.20 4610.896 20.00% 0.80 4610.896 20.00% 0.80 4610.896 20.00% 0.80 4610.896 20.00%
03.09.02.13 SUM. E INST. DE PUERTA P-16 (SEGUN DISEÑO) und 2 4527.44 9054.88 0.00 0.00 0.00 0.00 0.00 0.40 1810.976 20.00% 0.20 1810.976 20.00% 0.40 1810.976 20.00% 0.40 1810.976 20.00% 0.40 1810.976 20.00%
03.09.02.14 SUM. E INST. DE PUERTA P-17 (SEGUN DISEÑO) und 2 4488.07 8976.14 0.00 0.00 0.00 0.00 0.00 0.40 1795.228 20.00% 0.20 1795.228 20.00% 0.40 1795.228 20.00% 0.40 1795.228 20.00% 0.40 1795.228 20.00%
03.09.02.15 SUM. E INST. DE PUERTA P-18 (SEGUN DISEÑO) und 4 5697.92 22791.68 0.00 0.00 0.00 0.00 0.00 0.80 4558.336 20.00% 0.20 4558.336 20.00% 0.80 4558.336 20.00% 0.80 4558.336 20.00% 0.80 4558.336 20.00%
03.09.02.16 SUM. E INST. DE PUERTA P-20 (SEGUN DISEÑO) und 1 6566.75 6566.75 0.00 0.00 0.00 0.00 0.00 0.20 1313.35 20.00% 0.20 1313.35 20.00% 0.20 1313.35 20.00% 0.20 1313.35 20.00% 0.20 1313.35 20.00%
03.09.02.17 SUM. E INST. DE PUERTA P-21 (SEGUN DISEÑO) und 4 6023.46 24093.84 0.00 0.00 0.00 0.00 0.00 0.80 4818.768 20.00% 0.20 4818.768 20.00% 0.80 4818.768 20.00% 0.80 4818.768 20.00% 0.80 4818.768 20.00%
03.09.02.18 SUM. E INST. DE PUERTA P-22 (SEGUN DISEÑO) und 6 5905.35 35432.1 0.00 0.00 0.00 0.00 0.00 1.20 7086.42 20.00% 0.20 7086.42 20.00% 1.20 7086.42 20.00% 1.20 7086.42 20.00% 1.20 7086.42 20.00%
03.09.03 REJAS 12477.44 0.00 2495.488 20.00% 2495.488 20.00% 2495.488 20.00% 2495.488 20.00% #DIV/0! 2495.488 20.00%
03.09.03.01 PUERTA DE REJAS ENRROLLABLE SEGUN DISEÑO und 2 6238.72 12477.44 0.00 0.00 0.00 0.00 0.00 0.40 2495.488 20.00% 0.20 2495.488 20.00% 0.40 2495.488 20.00% 0.40 2495.488 20.00% 0.40 2495.488 20.00%
03.09.04 CELOSIA 17567.4 0.00 3513.48 20.00% 0.20 3513.48 20.00% 3513.48 20.00% 3513.48 20.00% #DIV/0! 3513.48 20.00%
03.09.04.01 TUBO DE ACERO DE 1" m 308.2 57 17567.4 0.00 0.00 0.00 0.00 0.00 61.64 3513.48 20.00% 0.20 3513.48 20.00% 61.64 3513.48 20.00% 61.64 3513.48 20.00% 61.64 3513.48 20.00%
03.09.05 CUBIERTA DE ACERO 47139.47 0.00 9427.894 20.00% 9427.894 20.00% 9427.894 20.00% 9427.894 20.00% #DIV/0! 9427.894 20.00%
03.09.05.01 CUBIERTA DE ACERO PARA VENTANA EXTERIOR SEGUN DISEÑO (INCL. SUMI. E Im2 112.88 134.12 15139.47 0.00 0.00 0.00 0.00 0.00 22.58 3027.894 20.00% 0.20 3027.894 20.00% 22.58 3027.894 20.00% 22.58 3027.894 20.00% 22.58 3027.894 20.00%
03.09.05.02 ESTRUCTURA METALICA LIGERA AUTOPORTANTE SEGUN DISEÑO (incl. sumi. e instglb 1 32000 32000 0.00 0.00 0.00 0.00 0.00 0.20 6400 20.00% 0.20 6400 20.00% 0.20 6400 20.00% 0.20 6400 20.00% 0.20 6400 20.00%
03.09.06 BARANDAS 29107.02 0.00 5821.404 20.00% 5821.404 20.00% 5821.404 20.00% 5821.404 20.00% 5821.404 20.00%
03.09.06.01 BARANDA DE FIERRO GALVANIZADO EN ESCALERA SEGUN DISEÑO (incl. sum. e inm 78.16 207.98 16255.72 0.00 0.00 0.00 0.00 0.00 15.63 3251.144 20.00% 0.20 3251.144 20.00% 15.63 3251.144 20.00% 15.63 3251.144 20.00% 15.63 3251.144 20.00%
03.09.06.02 BARANDA DE CRISTAL TEMPLADO m 30.8 417.25 12851.3 0.00 0.00 0.00 0.00 0.00 6.16 2570.26 20.00% 0.20 2570.26 20.00% 6.16 2570.26 20.00% 6.16 2570.26 20.00% 6.16 2570.26 20.00%
03.09.07 REJILLAS 7367.78 0.00 1473.556 20.00% 0.20 1473.556 20.00% 1473.556 20.00% 1473.556 20.00% 1473.556 20.00%
03.09.07.01 REJILLA METALICA PARA CANALETAS A=0.25 m: m 159.2 46.28 7367.78 0.00 0.00 0.00 0.00 0.00 31.84 1473.556 20.00% 0.20 1473.556 20.00% 31.84 1473.556 20.00% 31.84 1473.556 20.00% 31.84 1473.556 20.00%
03.10 CARPINTERIA DE MADERA 24383.58 0.00 4876.716 20.00% 0.20 4876.716 20.00% 4876.716 20.00% 4876.716 20.00% 4876.716 20.00%
03.10.01 PUERTAS 6531.97 0.00 1306.394 20.00% 0.20 1306.394 20.00% 1306.394 20.00% 1306.394 20.00% 1306.394 20.00%
03.10.01.01 SUM. E INST. DE PUERTA P-12 (SEGUN DISEÑO) und 1 1375 1375 0.00 0.00 0.00 0.00 0.00 0.20 275 20.00% 0.20 275 20.00% 0.20 275 20.00% 0.20 275 20.00% 0.20 275 20.00%
03.10.01.02 SUM. E INST. DE PUERTA P-14 (SEGUN DISEÑO) und 6 549.55 3297.3 0.00 0.00 0.00 0.00 0.00 1.20 659.46 20.00% 0.20 659.46 20.00% 1.20 659.46 20.00% 1.20 659.46 20.00% 1.20 659.46 20.00%
03.10.01.03 SUM. E INST. DE PUERTA P-15 (SEGUN DISEÑO) und 3 619.89 1859.67 0.00 0.00 0.00 0.00 0.00 0.60 371.934 20.00% 0.20 371.934 20.00% 0.60 371.934 20.00% 0.60 371.934 20.00% 0.60 371.934 20.00%
03.10.02 CERRAJERIA 1851.61 0.00 370.322 20.00% 0.20 370.322 20.00% 370.322 20.00% 370.322 20.00% 370.322 20.00%
03.10.02.01 CERRADURA PARA PUERTA DE BAÑOS und 6 92.34 554.04 0.00 0.00 0.00 0.00 0.00 1.20 110.808 20.00% 0.20 110.808 20.00% 1.20 110.808 20.00% 1.20 110.808 20.00% 1.20 110.808 20.00%
03.10.02.02 CERRADURA PARA PUERTA DEPOSITO und 2 123.47 246.94 0.00 0.00 0.00 0.00 0.00 0.40 49.388 20.00% 0.20 49.388 20.00% 0.40 49.388 20.00% 0.40 49.388 20.00% 0.40 49.388 20.00%
03.10.02.03 CERRADURA PARA PUERTA INGRESO und 3 266.97 800.91 0.00 0.00 0.00 0.00 0.00 0.60 160.182 20.00% 0.20 160.182 20.00% 0.60 160.182 20.00% 0.60 160.182 20.00% 0.60 160.182 20.00%
03.10.02.04 CERRADURA PARA PUERTA INTERIORES und 3 83.24 249.72 0.00 0.00 0.00 0.00 0.00 0.60 49.944 20.00% 0.20 49.944 20.00% 0.60 49.944 20.00% 0.60 49.944 20.00% 0.60 49.944 20.00%
03.10.03 LETRERO 16000 0.00 3200 20.00% 0.20 3200 20.00% 3200 20.00% 3200 20.00% 3200 20.00%
03.10.03.01 LETRERO GENERAL und 1 16000 16000 0.00 0.00 0.00 0.00 0.00 0.20 3200 20.00% 0.20 3200 20.00% 0.20 3200 20.00% 0.20 3200 20.00% 0.20 3200 20.00%
03.11 VIDRIOS 102759.33 0.00 20551.866 20.00% 0.20 20551.866 20.00% 20551.866 20.00% 20551.866 20.00% 20551.866 20.00%
03.11.01 VENTANA DE VIDRIO TEMPLADO 6mm m2 92.19 515.1 47487.07 0.00 0.00 0.00 0.00 0.00 18.44 9497.414 20.00% 0.20 9497.414 20.00% 18.44 9497.414 20.00% 18.44 9497.414 20.00% 18.44 9497.414 20.00%
03.11.02 CUBIERTA DE VIDRIO SEGUN DISEÑO PARA ALTAR glb 1 8432.58 8432.58 0.00 0.00 0.00 0.00 0.00 0.20 1686.516 20.00% 0.20 1686.516 20.00% 0.20 1686.516 20.00% 0.20 1686.516 20.00% 0.20 1686.516 20.00%
03.11.03 MURO CORTINA DE CRISTAL TEMPLADO glb 1 46839.68 46839.68 0.00 0.00 0.00 0.00 0.00 0.20 9367.936 20.00% 0.20 9367.936 20.00% 0.20 9367.936 20.00% 0.20 9367.936 20.00% 0.20 9367.936 20.00%
03.12 JARDINERIA 3159.91 0.00 631.982 20.00% 0.20 631.982 20.00% 631.982 20.00% 631.982 20.00% 631.982 20.00%
03.12.01 TIERRA DE CHACRA EN JARDINES m3 4.35 87.95 382.58 0.00 0.00 0.00 0.00 0.00 0.87 76.516 20.00% 0.20 76.516 20.00% 0.87 76.516 20.00% 0.87 76.516 20.00% 0.87 76.516 20.00%
03.12.02 JARDINES m2 57.3 48.47 2777.33 0.00 0.00 0.00 0.00 0.00 11.46 555.466 20.00% 0.20 555.466 20.00% 11.46 555.466 20.00% 11.46 555.466 20.00% 11.46 555.466 20.00%
03.13 SEÑALIZACIONES 5572.54 0.00 1114.508 20.00% 0.20 1114.508 20.00% 1114.508 20.00% 1114.508 20.00% 1114.508 20.00%
03.13.01 SEÑALIZACIONES REGLAMENTARIAS, PREVENTIVAS E INFORMATIVAS glb 1 5572.54 5572.54 0.00 0.00 0.00 0.00 0.00 0.20 1114.508 20.00% 0.20 1114.508 20.00% 0.20 1114.508 20.00% 0.20 1114.508 20.00% 0.20 1114.508 20.00%
04 INSTALACIONES SANITARIAS 171652.35 0.00 0.00
04.01 SISTEMA DE DESAGUE 98745.21 0.00 0.00
04.01.01 RED DE DESAGUE 98745.21 0.00 49372.61 50.00% 49372.61 50.00% 0.00
04.01.01.01 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 2" m 504 45.54 22952.16 0.00 0.00 252.00 11476.08 50.00% 252.00 11476.08 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.02 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 4" m 68.5 44.53 3050.31 0.00 0.00 34.25 1525.16 50.00% 34.25 1525.16 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.03 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 6" m 75.26 111.8 8414.07 0.00 0.00 37.63 4207.04 50.00% 37.63 4207.04 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.04 CODO PVC SAL 4"x45º pza 7 34.86 244.02 0.00 0.00 3.50 122.01 50.00% 3.50 122.01 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.05 CODO PVC SAL 4"x90º pza 15 34.66 519.9 0.00 0.00 7.50 259.95 50.00% 7.50 259.95 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.06 CODO PVC SAL 4"x90º CON SALIDA A 2º pza 1 33.71 33.71 0.00 0.00 0.50 16.86 50.00% 0.50 16.86 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.07 CODO PVC SAL 2"x45º pza 39 31.43 1225.77 0.00 0.00 19.50 612.89 50.00% 19.50 612.89 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.08 CODO PVC SAL 2"x90º pza 2391 18.91 45213.81 0.00 0.00 1,195.50 22606.91 50.00% 1,195.50 22606.91 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.09 TEE SANITARIA DE 4" pza 3 36.61 109.83 0.00 0.00 1.50 54.92 50.00% 1.50 54.92 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.10 TEE SANITARIA DE 2" pza 32 33.64 1076.48 0.00 0.00 16.00 538.24 50.00% 16.00 538.24 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.11 YEE DE PVC SAL 6"X4" pza 23 45.28 1041.44 0.00 0.00 11.50 520.72 50.00% 11.50 520.72 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.12 YEE DE PVC SAL 4" pza 12 37.26 447.12 0.00 0.00 6.00 223.56 50.00% 6.00 223.56 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.13 YEE DE PVC SAL 2"X 4" pza 9 33.19 298.71 0.00 0.00 4.50 149.36 50.00% 4.50 149.36 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.14 YEE DE PVC SAL 2" pza 59 29.64 1748.76 0.00 0.00 29.50 874.38 50.00% 29.50 874.38 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.15 REDUCCION DE PVC DE 4" A 2" pza 26 24.62 640.12 0.00 0.00 13.00 320.06 50.00% 13.00 320.06 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.16 REGISTRO ROSCADO DE BRONCE 2" pza 53 70.24 3722.72 0.00 0.00 26.50 1861.36 50.00% 26.50 1861.36 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.17 REGISTRO ROSCADO DE BRONCE 4" pza 24 76.49 1835.76 0.00 0.00 12.00 917.88 50.00% 12.00 917.88 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.18 SOMBREROS DE VENTILACION 2" pza 21 24.92 523.32 0.00 0.00 10.50 261.66 50.00% 10.50 261.66 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.19 SOMBREROS DE VENTILACION 4" pza 2 56.63 113.26 0.00 0.00 1.00 56.63 50.00% 1.00 56.63 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.20 TRAMPA PARA OVALIN und 3 54.15 162.45 0.00 0.00 1.50 81.23 50.00% 1.50 81.23 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.21 SUMIDEROS 2" CROMADO pza 52 55.29 2875.08 0.00 0.00 26.00 1437.54 50.00% 26.00 1437.54 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.22 CAJA DE REGISTRO DE 0.35x0.70m CON TAPA DE CONCRETO pza 7 356.63 2496.41 0.00 0.00 3.50 1248.21 50.00% 3.50 1248.21 50.00% 0.00 0.00 0.00 0.00 0.00 0.00
04.02 APARATOS SANITARIOS 26480.23 0.00 0.00 26480.23 100.00% #DIV/0! #DIV/0!
04.02.01 SUMINISTRO DE APARATOS SANITARIOS 19193.36 0.00 0.00 19193.36 100.00% #DIV/0! #DIV/0!
04.02.01.01 INODORO NACIONAL ONE PIECE BLANCO und 12 398.03 4776.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 4776.36 100.00% 0.00 0.00
04.02.01.02 OVALIN (no inc. acce.) und 12 148.65 1783.8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 1783.8 100.00% 0.00 0.00
04.02.01.03 LAVADEROS EN COCINA und 19 515.6 9796.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.00 9796.4 100.00% 0.00 0.00
04.02.01.04 URINARIO NACIONAL MODELO CADET und 6 472.8 2836.8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 2836.8 100.00% 0.00 0.00
04.02.02 SUMINISTRO DE ACCESORIOS 598.8 0.00 0.00 598.8 100.00% #DIV/0! #DIV/0!
04.02.02.01 JABONERA LOSA BLANCO und 6 29.9 179.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 179.4 100.00% 0.00 0.00
04.02.02.02 DISPENSADOR DE PAPEL HIGUIENICO CROMADO und 6 69.9 419.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 419.4 100.00% 0.00 0.00
04.02.03 INSTALACION DE APARATOS SANITARIOS 6688.07 0.00 0.00 6688.07 100.00%
04.02.03.01 COLOCACION DE APARATOS SANITARIOS und 53 126.19 6688.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 53.00 6688.07 100.00% 0.00 0.00
04.03 SISTEMA DE AGUA FRIA 40878 0.00 0.00 40878 100.00%
04.03.01 SALIDAS DE AGUA FRIA 0.00 0
04.03.02 SALIDA DE AGUA FRIA pto 54 108.94 5882.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.00 5882.76 100.00% 0.00 0.00
04.03.03 RED DE DISTRIBUCION INTERNA CON TUBERIA DE PVC C-10 DE 1/2" m 123.9 16.96 2101.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 123.90 2101.34 100.00% 0.00 0.00
04.03.04 RED DE DISTRIBUCION INTERNA CON TUBERIA DE PVC C-10 DE 3/4" m 304 22.38 6803.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 304.00 6803.52 100.00% 0.00 0.00
04.03.05 RED DE DISTRIBUCION INTERNA CON TUBERIA DE PVC C-10 O 1¼" m 24 19.15 459.6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.00 459.6 100.00% 0.00 0.00
04.03.06 RED DE ABASTECIMIENTO DE CISTERNA TUBERIA PVC C-10 D=4" SAP m 17 34.33 583.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.00 583.61 100.00% 0.00 0.00
04.03.07 ACCESORIOS DE REDES DE AGUA 16092.08 0.00 0.00 16092.08 100.00%
04.03.07.01 CODO PVC SAP 90º x D=3/4 pza 49 30.84 1511.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.00 1511.16 100.00% 0.00 0.00
04.03.07.02 CODO PVC SAP 90º x D=1/2" pza 111 29.74 3301.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111.00 3301.14 100.00% 0.00 0.00
04.03.07.03 CODO PVC SAP 90º x D=1 1/4" pza 9 32.04 288.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 288.36 100.00% 0.00 0.00
04.03.07.04 CODO PVC SAP 90º x D=4" pza 5 34.68 173.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 173.4 100.00% 0.00 0.00
04.03.07.05 CODO PVC SAP 45º x D=4" pza 1 34.28 34.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 34.28 100.00% 0.00 0.00
04.03.07.06 TEE PVC SAP 90ª x D=3/4" pza 38 23.4 889.2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.00 889.2 100.00% 0.00 0.00
04.03.07.07 TEE PVC SAP 90ºx D=1/2" pza 27 22.8 615.6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.00 615.6 100.00% 0.00 0.00
04.03.07.08 ADAPTADORES PVC SAP D=1/2" pza 89 21.52 1915.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 89.00 1915.28 100.00% 0.00 0.00
04.03.07.09 NIPLE PVC SAP 1/2" pza 72 24.88 1791.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72.00 1791.36 100.00% 0.00 0.00
04.03.07.10 CODO GALVANIZADO DE 90ºX1/2" pza 55 19.82 1090.1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 55.00 1090.1 100.00% 0.00 0.00
04.03.07.11 TEE GALVANIZADO DE 90ºX1/2" pza 3 21.62 64.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 64.86 100.00% 0.00 0.00
04.03.07.12 REDUCCION DE PVC DE 3/4" A 1/2" pza 33 42.86 1414.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.00 1414.38 100.00% 0.00 0.00
04.03.07.13 UNIONES UNIVERSALES DE 1/2" pza 72 40.26 2898.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72.00 2898.72 100.00% 0.00 0.00
04.03.07.14 UNIONES UNIVERSALES DE 3/4" pza 1 41.26 41.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 41.26 100.00% 0.00 0.00
04.03.07.15 GRIFO 1/2" pza 1 62.98 62.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 62.98 100.00% 0.00 0.00
04.03.08 VALVULAS 3019.2 0.00 0.00 3019.2 100.00%
04.03.08.01 VALVULA DE PASO PVC 1/2" und 34 86.26 2932.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.00 2932.84 100.00% 0.00 0.00
04.03.08.02 VALVULA DE PASO PVC 3/4" und 1 86.36 86.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 86.36 100.00% 0.00 0.00
04.03.09 INSTALACION DE ACCESORIOS 2217.24 0.00 0.00 2217.24 100.00%
04.03.09.01 COLOCACION DE ACCESORIOS SANITARIOS und 54 41.06 2217.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.00 2217.24 100.00% 0.00 0.00
04.03.10 PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIAS 3718.65 0.00 0.00 3718.65 100.00%
04.03.10.01 PRUEBA HIDRAULICA Y DESINFECCION PARA AGUA FRIA m 130 6.83 887.9 0.00 0.00 0.00 0.00 0.00 0.00 0.00 130.00 887.9 100.00% 0.00 0.00
04.03.10.02 PRUEBA HIDRAULICA PARA DESAGUE m 647.77 4.37 2830.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 647.77 2830.75 100.00% 0.00 0.00
04.04 CISTERNA 5548.91 0.00 0.00 5548.91 100.00%
04.04.01 ACCESORIO PARA LA CISTERNA 2788.82 0.00 0.00 2788.82 100.00%
04.04.01.01 BOMBA CENTRIFUGA 1"X1" 1HP 220V MONOFASICA CON ACCESORIOS und 1 938.37 938.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 938.37 100.00% 0.00 0.00
04.04.01.02 VALVULA CHECK DE BRONCE DE 1" und 1 226.73 226.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 226.73 100.00% 0.00 0.00
04.04.01.03 VALVULA CHECK TIPO CANASTILLA und 1 363.79 363.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 363.79 100.00% 0.00 0.00
04.04.01.04 FLOTADOR Y ACCESORIOS und 2 189.9 379.8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 379.8 100.00% 0.00 0.00
04.04.01.05 ELECTRONIVEL 3m und 1 154.18 154.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 154.18 100.00% 0.00 0.00
04.04.01.06 TAPON MACHO 1" und 1 39.48 39.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 39.48 100.00% 0.00 0.00
04.04.01.07 TAPA METALICA PARA CISTERNA DE 0.70 X 0.70 m und 1 321.45 321.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 321.45 100.00% 0.00 0.00
04.04.01.08 PUERTA METALICA CON BISAGRAS Y CANDADO 0.30X0.20m glb 1 365.02 365.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 365.02 100.00% 0.00 0.00
04.04.02 IMPERMEABILIZADO 629.21 0.00 0.00 629.21 100.00%
04.04.02.01 IMPERMEABILIZACION INTERIOR DE CISTERNA m2 21.6 29.13 629.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.60 629.21 100.00% 0.00 0.00
04.04.03 TANQUE ELEVADO 2130.88 0.00 0.00 2130.88 100.00%
04.04.03.01 ACCESORIO PARA TANQUE ELEVADO 2130.88 0.00 0.00 2130.88 100.00%
04.04.03.01.0 TANQUE DE AGUA DE ETERNIT DE 2500 LITROS INCLUYE ACC. INTERNOS und 1 2130.88 2130.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2130.88 100.00% 0.00 0.00
05 INSTALACIONES ELECTRICAS 577555.74 0.00 0.00 288777.87 50.00% 288777.87 50.00%
05.01 SALIDAS PARA ALUMBRADO Y TOMACORRIENTE 402031.5 0.00 0.00 201015.75 50.00% 201015.75 50.00%
05.01.01 SALIDAS 63268.53 0.00 0.00 31634.265 50.00% 31634.265 50.00%
05.01.01.01 SALIDA PARA CENTRO DE LUZ pto 320 81.86 26195.2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 160.00 13097.6 50.00% 160.00 13097.6 50.00% 0.00
05.01.01.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE + LINEA A TIERRA pto 279 101.47 28310.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 139.50 14155.065 50.00% 139.50 14155.065 50.00% 0.00
05.01.01.03 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE pto 81 68.2 5524.2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.50 2762.1 50.00% 40.50 2762.1 50.00% 0.00
05.01.01.04 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE pto 8 84.24 673.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 336.96 50.00% 4.00 336.96 50.00% 0.00
05.01.01.05 SALIDA PARA INTERRUPTOR UNIPOLAR TRIPLE pto 8 87.43 699.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 349.72 50.00% 4.00 349.72 50.00% 0.00
05.01.01.06 SALIDA PARA INTERRUPTOR DE CONMUTACION pto 14 133.26 1865.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 932.82 50.00% 7.00 932.82 50.00% 0.00
05.01.02 CANALIZACION Y TUBERIAS 61535.93 0.00 0.00 30767.965 50.00% 30767.965 50.00%
05.01.02.01 TUBERIA PVC SAP ELECTRICA 25mm (TABLERO GENERAL-T DISTRIBUCION) m 42.5 30.08 1278.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.25 639.2 50.00% 21.25 639.2 50.00% 0.00
05.01.02.02 TUBERIA PVC SAP ELECTRICA 40mm (TECHO MALLA A TIERRA) m 9.9 32.44 321.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.95 160.58 50.00% 4.95 160.58 50.00% 0.00
05.01.02.03 TUBERIA PVC SAP ELECTRICA 20mm (ALUMBRADO Y TOMACORRIENTE) m 2441.4 24.55 59936.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,220.70 29968.185 50.00% 1,220.70 29968.185 50.00% 0.00
05.01.03 CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS 277227.04 0.00 0.00 138613.52 50.00% 138613.52 50.00%
05.01.03.01 CABLE ELECTRICO 2-2X2.5mm2-TW-80 - ALUMBRADO m 6210.01 16.51 102527.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,105.01 51263.635 50.00% 3,105.01 51263.635 50.00% 0.00
05.01.03.02 CABLE ELECTRICO 2-2X4mm2 (T) + 1X4mm2 TW-80-TOMACORRIENTE m 7240.1 23.89 172965.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,620.05 86482.995 50.00% 3,620.05 86482.995 50.00% 0.00
05.01.03.03 CABLE 2NYY (1X16+1X16(N)+1X10(T)) MM2 (T.G.D-TD) m 28 16.43 460.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 230.02 50.00% 14.00 230.02 50.00% 0.00
05.01.03.04 CABLE 2NYY (1X10+1X10(N)+1X10(T)) MM2 (T.G.D-TD) m 78 16.33 1273.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.00 636.87 50.00% 39.00 636.87 50.00% 0.00
05.02 TABLEROS DE DISTRIBUCION 8003.64 0.00 0.00 4001.82 50.00% 4001.82 50.00%
05.02.01 TABLERO GENERAL TGD und 1 1190.05 1190.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 595.025 50.00% 0.50 595.025 50.00% 0.00
05.02.02 TABLEROS DE DISTRIBUCION TD-1 und 1 973.37 973.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 486.685 50.00% 0.50 486.685 50.00% 0.00
05.02.03 TABLEROS DE DISTRIBUCION TD-2 und 1 973.37 973.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 486.685 50.00% 0.50 486.685 50.00% 0.00
05.02.04 TABLEROS DE DISTRIBUCION TD-3 und 1 973.37 973.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 486.685 50.00% 0.50 486.685 50.00% 0.00
05.02.05 TABLEROS DE DISTRIBUCION TD-4 und 1 973.37 973.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 486.685 50.00% 0.50 486.685 50.00% 0.00
05.02.06 TABLEROS DE DISTRIBUCION TD-5 und 1 973.37 973.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 486.685 50.00% 0.50 486.685 50.00% 0.00
05.02.07 TABLEROS DE DISTRIBUCION TD-6 und 1 973.37 973.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 486.685 50.00% 0.50 486.685 50.00% 0.00
05.02.08 TABLEROS DE DISTRIBUCION TD-7 und 1 973.37 973.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 486.685 50.00% 0.50 486.685 50.00% 0.00
05.03 INTERRUPTORES 4825.7 0.00 0.00 2412.85 50.00% 2412.85 50.00%
05.03.01 INTERRUPTOR TERMOMAGNETICO 3X100A und 1 426.9 426.9 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 213.45 50.00% 0.50 213.45 50.00% 0.00
05.03.02 INTERRUPTOR TERMOMAGNETICO 3X60A und 1 165.9 165.9 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 82.95 50.00% 0.50 82.95 50.00% 0.00
05.03.03 INTERRUPTOR TERMOMAGNETICO 2X60A und 7 89.9 629.3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.50 314.65 50.00% 3.50 314.65 50.00% 0.00
05.03.04 INTERRUPTOR TERMOMAGNETICO 2X40A und 7 76.2 533.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.50 266.7 50.00% 3.50 266.7 50.00% 0.00
05.03.05 INTERRUPTOR TERMOMAGNETICO 2X16A und 21 71.9 1509.9 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.50 754.95 50.00% 10.50 754.95 50.00% 0.00
05.03.06 INTERRUPTOR DIFERENCIAL und 7 222.9 1560.3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.50 780.15 50.00% 3.50 780.15 50.00% 0.00
05.04 VARIOS 9000 0.00 0.00 4500 50.00% 4500 50.00%
05.04.01 SERVICIO DE CONTROL DE CALIDAD und 1 9000 9000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 4500 50.00% 0.50 4500 50.00% 0.00
05.05 ARTEFACTOS DE ILUMINACION 146209 0.00 0.00 73104.5 50.00% 73104.5 50.00%
05.05.01 LAMPARAS 84067.8 0.00 0.00 42033.9 50.00% 42033.9 50.00%
05.05.01.01 FLUORESCENTE CON REJILLA 30X60 - INTERIORES und 70 669.78 46884.6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35.00 23442.3 50.00% 35.00 23442.3 50.00% 0.00
05.05.01.02 FLUORESCENTE CON REJILLA 120X60 - EXTERIORES und 34 725.28 24659.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.00 12329.76 50.00% 17.00 12329.76 50.00% 0.00
05.05.01.03 LUZ DE EMERGENCIA und 117 107.04 12523.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.50 6261.84 50.00% 58.50 6261.84 50.00% 0.00
05.05.02 LUMINARIAS 60840.08 0.00 0.00 30420.04 50.00% 30420.04 50.00%
05.05.02.01 CENTRO DE LUZ und 70 94.37 6605.9 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35.00 3302.95 50.00% 35.00 3302.95 50.00% 0.00
05.05.02.02 BRAQUETE REFLECTOR und 117 212.98 24918.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.50 12459.33 50.00% 58.50 12459.33 50.00% 0.00
05.05.02.03 LUMINARIA SPOT LED ADOSADO A PARED und 117 250.56 29315.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.50 14657.76 50.00% 58.50 14657.76 50.00% 0.00
05.05.03 REFLECTORES 1301.12 0.00 0.00 650.56 50.00% 650.56 50.00%
05.05.03.01 REFLECTOR SOLAR LED-EXTERIORES und 8 162.64 1301.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 650.56 50.00% 4.00 650.56 50.00% 0.00
05.06 POZO A TIERRA 7485.9 0.00 0.00 3742.95 50.00% 3742.95 50.00%
05.06.01 POZO A TIERRA und 1 7485.9 7485.9 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 3742.95 50.00% 0.50 3742.95 50.00% 0.00
06 MOBILIARIOS 58749.75 0.00 0.00 0 0 58749.75 100.00%
06.01 DISPENSADOR DE JABON und 10 110.58 1105.8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 10.00 1105.8 100.00%
06.02 DISPENSADOR DE PAPEL HIGIENICO DE 550 MT (SEGUN DISEÑO) und 14 105.74 1480.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 14.00 1480.36 100.00%
06.03 DISPENSADOR DE PAPEL TOALLA und 6 213.74 1282.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 6.00 1282.44 100.00%
06.04 PAPELERA PARA RECICLAJE 54.4L (PASADIZOS) und 20 81.63 1632.6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 20.00 1632.6 100.00%
06.05 PAPELERA PARA RECICLAJE 8L (BAÑOS) und 14 22.63 316.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 14.00 316.82 100.00%
06.06 PAPELERA PARA RECICLAJE 54L (BAÑOS EXTERIOR) und 4 93.63 374.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 4.00 374.52 100.00%
06.07 SUM. SILLAS BLANCAS PARA PATIO DE COMIDAS (SEGUN DISEÑO) día 116 114.23 13250.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 116.00 13250.68 100.00%
06.08 SUM. MESA DE ESTRUCTURA METALICA CON ENCHAPADO MDF (SEGUN DISEÑO)und 29 714.23 20712.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 29.00 20712.67 100.00%
06.09 BANCAS DE ACERO CON ENCHAPE DE MADERA und 30 343.73 10311.9 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 30.00 10311.9 100.00%
06.10 TELEVISOR SMART 42" MARCA RECONOCIDA pza 4 1935.58 7742.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 4.00 7742.32 100.00%
06.11 RACK PARA TELEVISOR DE 42". und 4 134.91 539.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 4.00 539.64 100.00%
07 MITIGACION DE IMPACTO AMBIENTAL 15135.3 1681.70 11.11% 1681.70 11.11% 1681.70 11.11% 1681.70 11.11% 1681.70 11.11% 1681.70 100.00% 1681.70 11.11% 1681.7 100.00% 1681.7 100.00%
07.01 RIEGO PARA EVITAR POLVO m2 802 7.65 6135.3 89.11 681.70 11.11% 89.11 681.70 11.11% 89.11 0.01 11.11% 89.11 0.01 11.11% 89.11 0.01 11.11% 89.11 0.01 11.11% 89.11 0.01 11.11% 89.11 0.01 11.11% 89.11 0.01 11.11%
07.02 MITIGACION DEL IMPACTO AMBIENTAL glb 1 9000 9000 0.11111111 1000.00 11.11% 0.11111111 1000.00 11.11% 0.11111111 1000.00 11.11% 0.11111111 1000.00 11.11% 0.11 1000.00 11.11% 0.11 1000.00 11.11% 0.11 1000.00 11.11% 0.11111111 1000.00 11.11% 0.11111111 1000.00 11.11%
1713045.34 39.52% 136163.29 3.14% 261413.27 6.03% 393026.85 9.07% 537007.50 12.39% 197072.93 4.55% 462922.75 10.68% 298409.49 6.88% 419821.42 9.69% 100.00%
COSTO DIRECTO 4,334,430.89
GASTOS GENERALES 8% 346754.4712
UTILIDAD 7% 303410.1623
SUB TOTAL 4,984,595.52
IGV 18% 897227.19423
PRESUPUESTO DE OBRA 5,881,822.72
SUPERVISION 235272.9087092 100.00%