Está en la página 1de 9

A.P.

U SALIDA DE ALUMBRADO
ITEM DESCRIPCION UNIDAD CANTIDAD
1 CAJA OCTOGONAL CONDUIT PVC U 1
2 PLAFON U 1
3 INTERRUPTOR SENCILLO 15A - 120V U 1
4 CAJA CONDUIT 2X4 PVC U 1
5 TUBO CONDUIT PVC 1/2" M 1
6 CURVA CONDUIT PVC 1/2 - 90°C U 2
7 CABLE AWG #14 THHN 90°C M 10
8 CONECTOR CONDUIT PVC 1/2" U 2
9 SOLDADURA 1/4 GL 0.25
10 OTROS (ABRAZADERAS Y TORNILLOS) GLB 1
V/UNITARIO V/TOTAL
1000 1000
2,000 2,000
4,600 4,600
800 800
2,300 2,300
700 1,400
1,400 14,000
525 1,050
15,000 3,750
1500 1,500
SUBTOTAL 32,400.00
MANO DE OBRA 15,000.00
SUBTOTAL 47,400.00
A.I.U 15% 7,110.00
TOTAL 54,510.00
A.P.U SALIDA DE TOMACORRIENTE
ITEM DESCRIPCION UNIDAD CANTIDAD V/UNITARIO
1 CABLE THHN AWG #12 90°C M 10 1400
2 TUBO CONDUIT PVC 1/2" M 1 2,300
3 CAJA CONDUIT 2X4 PVC U 1 1,000
4 TOMA DOBLE 120 U 1 5000
5 SOLDADURA PVC 1/4 GL 0.25 15,000
6 ADAPTADOR TERMINAL CONDUIT PVC 1/2 U 2 500
7 UNIONES CONDUIT PVC 1/2 U 2 200
8
9
10
SUBTOTAL
MANO DE OBRA
SUBTOTAL
A.I.U 15%
TOTAL
V/TOTAL
14,000.00
2,300.00
1,000.00
5,000.00
3,750.00
1,000.00
400.00

27,450.00
15,000.00
42,450.00
6,367.50
48,817.50
A.P.U INTERRUPTOR
ITEM DESCRIPCION UNIDAD CANTIDAD V/UNITARIO V/TOTAL
1 INTERRUPTOR DOBLE UND 1 5,000 5,000.00
2
3
4
5
6
7
8
9
10
SUBTOTAL 5,000.00
MANO DE OBRA 10,000.00
SUBTOTAL 15,000.00
A.I.U 15% 2,250.00
TOTAL 17,250.00
A.P.U TABLERO DE DISTRIBUCION
ITEM DESCRIPCION UNIDAD CANTIDAD
1 TABLERO DE DISTRIBUCION BIFASICO DE 6 CTOS ENCHUFABLE UND 1
2 MONTAJE DE TABLERO UND 1
3 ARAMADO DE TABLERO UND 1
4 BREAKERS ENCHUFABLE MONOPOLAR 15A UND 2
5 BREAKERS ENCHUFABLE MONOPOLAR 20A UND 4
6
7
8
9
10
V/UNITARIO V/TOTAL
62,900 62,900.00
70,000 70,000.00
50000 50,000.00
8000 16,000.00
9000 36,000.00

SUBTOTAL 234,900.00
MANO DE OBRA 46,980.00
SUBTOTAL 281,880.00
A.I.U 15% 42,282.00
TOTAL 324,162.00
A.P.U SPT
ITEM DESCRIPCION UNIDAD CANTIDAD
1 CABLE THHN AWG #8 DESNUDO M 10
2 VARILLA COBRE-COBRE 5/8"X2.4M U 1
3 TUBO CONDUIT PVC 1/2" U 1
4 SOLDADURA EXOTERMICA GROUNDING 90° U 1
5
6
7
8
9
10
V/UNITARIO V/TOTAL
2200 22,000.00
109,900 109,900.00
2,500 2,500.00
11850 11,850.00

SUBTOTAL 146,250.00
MANO DE OBRA 80,000.00
SUBTOTAL 226,250.00
A.I.U 15% 33,937.50
TOTAL 260,187.50