Está en la página 1de 12

CUADRO C-1: RESULTADO DE LA SIMULACION HIDRAULICA EN EL RIO CABANILLAS - BOCATOMA CANTERIA - CON DISEÑO NUEVO

River Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
Reach Profile
Sta
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Canteria 590 T = 2 años 162.23 3838.87 3841.52 3840.09 3841.53 0.00008 0.37 445.26 269.95 0.09
Canteria 590 T = 5 años 306.09 3838.87 3841.9 3840.3 3841.92 0.00015 0.57 549.01 277.47 0.13
Canteria 590 T = 10 años 397.98 3838.87 3842.13 3840.41 3842.15 0.00018 0.67 612.01 278.08 0.14
Canteria 590 T = 25 años 501.31 3838.87 3842.35 3840.52 3842.38 0.00021 0.77 675.32 278.68 0.15
Canteria 590 T = 50 años 600 3838.87 3842.56 3840.61 3842.59 0.00023 0.85 732.69 279.23 0.16
Canteria 590 T = 100 años 639.92 3838.87 3842.63 3840.65 3842.67 0.00024 0.88 752.31 279.42 0.17
Canteria 590 Q=Observado 323.18 3838.87 3841.94 3840.32 3841.96 0.00015 0.59 560.82 277.59 0.13

Canteria 490 T = 2 años 162.23 3838.26 3841.52 3839.75 3841.52 0.00006 0.35 473.49 247.66 0.08
Canteria 490 T = 5 años 306.09 3838.26 3841.89 3839.97 3841.9 0.00012 0.56 565.93 248.85 0.11
Canteria 490 T = 10 años 397.98 3838.26 3842.11 3840.09 3842.14 0.00015 0.66 621.86 249.58 0.13
Canteria 490 T = 25 años 501.31 3838.26 3842.34 3840.22 3842.37 0.00018 0.77 678.03 250.3 0.14
Canteria 490 T = 50 años 600 3838.26 3842.54 3840.35 3842.58 0.0002 0.85 729.06 250.95 0.15
Canteria 490 T = 100 años 639.92 3838.26 3842.61 3840.4 3842.65 0.00021 0.89 746.4 251.17 0.16
Canteria 490 Q=Observado 323.18 3838.26 3841.93 3839.99 3841.95 0.00012 0.58 576.38 248.99 0.12

Canteria 390 T = 2 años 162.23 3838.16 3841.51 3839.44 3841.52 0.00008 0.47 348.86 151 0.1
Canteria 390 T = 5 años 306.09 3838.16 3841.86 3839.77 3841.89 0.00019 0.76 402.52 151 0.15
Canteria 390 T = 10 años 397.98 3838.16 3842.07 3840 3842.12 0.00025 0.92 434.66 151 0.17
Canteria 390 T = 25 años 501.31 3838.16 3842.28 3840.15 3842.34 0.00031 1.08 466.53 151 0.19
Canteria 390 T = 50 años 600 3838.16 3842.47 3840.29 3842.55 0.00037 1.22 495.25 151 0.21
Canteria 390 T = 100 años 639.92 3838.16 3842.54 3840.35 3842.62 0.00039 1.28 504.77 151 0.22
Canteria 390 Q=Observado 323.18 3838.16 3841.9 3839.8 3841.93 0.0002 0.79 408.55 151 0.15

Canteria 340 T = 2 años 162.23 3838.75 3841.48 3840.16 3841.51 0.00025 0.69 242.92 148.77 0.16
Canteria 340 T = 5 años 306.09 3838.75 3841.82 3840.46 3841.87 0.00051 1.09 292.34 150.11 0.23
Canteria 340 T = 10 años 397.98 3838.75 3842.01 3840.63 3842.09 0.00063 1.28 322.26 150.91 0.26
Canteria 340 T = 25 años 501.31 3838.75 3842.21 3840.8 3842.32 0.00075 1.48 351.85 151.71 0.29
Canteria 340 T = 50 años 600 3838.75 3842.39 3840.98 3842.52 0.00086 1.65 378.7 152.42 0.32
Canteria 340 T = 100 años 639.92 3838.75 3842.44 3841.05 3842.59 0.00091 1.72 387.37 152.65 0.33
Canteria 340 Q=Observado 323.18 3838.75 3841.85 3840.49 3841.92 0.00053 1.13 297.93 150.26 0.24

Canteria 290 T = 2 años 162.23 3838.84 3841.47 3840.12 3841.5 0.00025 0.69 238.14 130.78 0.16
Canteria 290 T = 5 años 306.09 3838.84 3841.79 3840.43 3841.85 0.00053 1.11 279.45 131.85 0.24
Canteria 290 T = 10 años 397.98 3838.84 3841.98 3840.6 3842.06 0.00069 1.33 304.4 132.5 0.27
Canteria 290 T = 25 años 501.31 3838.84 3842.16 3840.77 3842.28 0.00085 1.55 328.71 133.13 0.31
Canteria 290 T = 50 años 600 3838.84 3842.32 3840.92 3842.47 0.00098 1.74 350.73 134.76 0.34
Canteria 290 T = 100 años 639.92 3838.84 3842.38 3840.98 3842.54 0.00105 1.82 357.67 136.24 0.35
Canteria 290 Q=Observado 323.18 3838.84 3841.82 3840.47 3841.89 0.00056 1.15 284.12 131.98 0.25

Canteria 240 T = 2 años 162.23 3838.17 3841.46 3839.94 3841.48 0.00019 0.63 258.59 129.86 0.14
Canteria 240 T = 5 años 306.09 3838.17 3841.77 3840.24 3841.82 0.00042 1.04 298.67 137 0.22
Canteria 240 T = 10 años 397.98 3838.17 3841.95 3840.41 3842.03 0.00056 1.25 323.75 137 0.25
Canteria 240 T = 25 años 501.31 3838.17 3842.13 3840.58 3842.24 0.0007 1.46 348.01 137 0.28
Canteria 240 T = 50 años 600 3838.17 3842.29 3840.74 3842.43 0.00083 1.65 369.91 137 0.31
Canteria 240 T = 100 años 639.92 3838.17 3842.34 3840.8 3842.49 0.00089 1.73 376.55 137 0.32
Canteria 240 Q=Observado 323.18 3838.17 3841.8 3840.28 3841.86 0.00045 1.08 303.36 137 0.22

Canteria 215 T = 2 años 162.23 3838.4 3841.46 3840.01 3841.48 0.00022 0.64 252.98 136.39 0.15
Canteria 215 T = 5 años 306.09 3838.4 3841.75 3840.38 3841.81 0.00048 1.05 294.03 143.79 0.23
Canteria 215 T = 10 años 397.98 3838.4 3841.93 3840.54 3842.01 0.00062 1.25 319.79 144.2 0.26
Canteria 215 T = 25 años 501.31 3838.4 3842.11 3840.7 3842.22 0.00078 1.47 344.72 144.58 0.3
Canteria 215 T = 50 años 600 3838.4 3842.26 3840.85 3842.4 0.00091 1.65 367.38 144.94 0.32
Canteria 215 T = 100 años 639.92 3838.4 3842.31 3840.91 3842.46 0.00098 1.73 374.12 145 0.34
Canteria 215 Q=Observado 323.18 3838.4 3841.79 3840.39 3841.85 0.00051 1.09 298.83 143.87 0.23

Canteria 190 T = 2 años 162.23 3838.53 3841.45 3840 3841.47 0.00028 0.69 235.69 137.22 0.17
Canteria 190 T = 5 años 306.09 3838.53 3841.73 3840.47 3841.8 0.00061 1.12 275.03 139.8 0.25
Canteria 190 T = 10 años 397.98 3838.53 3841.9 3840.65 3841.99 0.00078 1.34 299.79 146 0.29
Canteria 190 T = 25 años 501.31 3838.53 3842.07 3840.82 3842.19 0.00097 1.56 323.78 146 0.33
Canteria 190 T = 50 años 600 3838.53 3842.22 3840.97 3842.37 0.00113 1.76 345.5 146 0.35
Canteria 190 T = 100 años 639.92 3838.53 3842.26 3841.02 3842.43 0.00121 1.84 351.72 146 0.37
Canteria 190 Q=Observado 323.18 3838.53 3841.76 3840.52 3841.83 0.00064 1.16 279.49 139.97 0.26

Canteria 172.4 T = 2 años 162.23 3837.72 3841.45 3839.6 3841.47 0.00019 0.64 258.38 125.61 0.14
Canteria 172.4 T = 5 años 306.09 3837.72 3841.72 3840.21 3841.78 0.00046 1.07 293.65 129.31 0.22
Canteria 172.4 T = 10 años 397.98 3837.72 3841.89 3840.39 3841.98 0.00062 1.29 315.7 132.92 0.26
Canteria 172.4 T = 25 años 501.31 3837.72 3842.05 3840.56 3842.17 0.00079 1.53 337.04 133.03 0.3
Canteria 172.4 T = 50 años 600 3837.72 3842.2 3840.7 3842.35 0.00095 1.73 356.29 133.03 0.33
Canteria 172.4 T = 100 años 639.92 3837.72 3842.24 3840.78 3842.4 0.00103 1.82 361.71 133.03 0.34
Canteria 172.4 Q=Observado 323.18 3837.72 3841.76 3840.25 3841.82 0.00049 1.11 297.7 129.98 0.23

Canteria 167.2 Culvert


Canteria 165 T = 2 años 162.23 3837.38 3840.56 3839.53 3840.63 0.00063 1.11 147.1 118.03 0.33
Canteria 165 T = 5 años 306.09 3837.38 3841.03 3840.2 3841.15 0.00079 1.55 202.3 118.95 0.38
Canteria 165 T = 10 años 397.98 3837.38 3841.26 3840.38 3841.42 0.00089 1.77 229.9 119.4 0.41
Canteria 165 T = 25 años 501.31 3837.38 3841.5 3840.55 3841.7 0.00096 1.99 258.6 119.88 0.44
Canteria 165 T = 50 años 600 3837.38 3841.74 3840.71 3841.96 0.00099 2.16 286.89 122.44 0.45
Canteria 165 T = 100 años 639.92 3837.38 3841.83 3840.77 3842.07 0.00099 2.21 298.89 122.63 0.45
Canteria 165 Q=Observado 323.18 3837.38 3841.08 3840.24 3841.2 0.00081 1.59 207.97 119.04 0.39

Canteria 140 T = 2 años 162.23 3837.85 3840.15 3840.15 3840.47 0.01545 2.49 65.15 109.85 1.03
Canteria 140 T = 5 años 306.09 3837.85 3840.47 3840.47 3840.95 0.01319 3.05 100.37 110.65 1.02
Canteria 140 T = 10 años 397.98 3837.85 3840.7 3840.65 3841.21 0.01056 3.16 125.92 111.23 0.95
Canteria 140 T = 25 años 501.31 3837.85 3841.01 3840.84 3841.51 0.00767 3.14 159.78 111.99 0.84
Canteria 140 T = 50 años 600 3837.85 3841.3 3841 3841.79 0.00596 3.11 192.62 112.72 0.76
Canteria 140 T = 100 años 639.92 3837.85 3841.42 3841.07 3841.91 0.00545 3.11 205.92 113.02 0.73
Canteria 140 Q=Observado 323.18 3837.85 3840.51 3840.51 3841 0.01289 3.09 104.45 110.74 1.02

Canteria 0 T = 2 años 162.23 3837.07 3838.83 3838.67 3839.19 0.0082 2.67 60.84 57.36 0.83
Canteria 0 T = 5 años 306.09 3837.07 3839.33 3839.2 3839.91 0.00819 3.38 90.61 59.3 0.87
Canteria 0 T = 10 años 397.98 3837.07 3839.6 3839.48 3840.31 0.00819 3.73 106.72 59.94 0.89
Canteria 0 T = 25 años 501.31 3837.07 3839.88 3839.76 3840.72 0.00819 4.07 123.04 60 0.91
Canteria 0 T = 50 años 600 3837.07 3840.12 3840 3841.09 0.00819 4.36 137.47 60 0.92
Canteria 0 T = 100 años 639.92 3837.07 3840.21 3840.1 3841.23 0.00819 4.47 143.06 60 0.92
Canteria 0 Q=Observado 323.18 3837.07 3839.39 3839.25 3839.99 0.00819 3.45 93.74 59.42 0.88
CUADRO C-1: RESULTADO DE LA SIMULACION HIDRAULICA EN EL RIO CABANILLAS - BOCATO

River Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev


Reach Profile
Sta
(m3/s) (m) (m) (m) (m)
Canteria 590 T = 2 años 162.23 3838.87 3840.91 3840.09 3840.93
Canteria 590 T = 5 años 306.09 3838.87 3841.47 3840.3 3841.5
Canteria 590 T = 10 años 397.98 3838.87 3841.75 3840.41 3841.79
Canteria 590 T = 25 años 501.31 3838.87 3842.04 3840.52 3842.08
Canteria 590 T = 50 años 600 3838.87 3842.31 3840.61 3842.35
Canteria 590 T = 100 años 639.92 3838.87 3842.41 3840.65 3842.46
Canteria 590 Q=Observado 323.18 3838.87 3841.53 3840.32 3841.55

Canteria 490 T = 2 años 162.23 3838.26 3840.9 3839.75 3840.91


Canteria 490 T = 5 años 306.09 3838.26 3841.45 3839.97 3841.47
Canteria 490 T = 10 años 397.98 3838.26 3841.73 3840.09 3841.76
Canteria 490 T = 25 años 501.31 3838.26 3842.02 3840.22 3842.06
Canteria 490 T = 50 años 600 3838.26 3842.29 3840.35 3842.33
Canteria 490 T = 100 años 639.92 3838.26 3842.39 3840.4 3842.44
Canteria 490 Q=Observado 323.18 3838.26 3841.51 3839.99 3841.53

Canteria 390 T = 2 años 162.23 3838.16 3840.87 3839.44 3840.89


Canteria 390 T = 5 años 306.09 3838.16 3841.4 3839.77 3841.45
Canteria 390 T = 10 años 397.98 3838.16 3841.68 3840 3841.73
Canteria 390 T = 25 años 501.31 3838.16 3841.95 3840.15 3842.03
Canteria 390 T = 50 años 600 3838.16 3842.2 3840.29 3842.29
Canteria 390 T = 100 años 639.92 3838.16 3842.3 3840.35 3842.4
Canteria 390 Q=Observado 323.18 3838.16 3841.46 3839.8 3841.5

Canteria 340 T = 2 años 162.23 3838.75 3840.8 3840.16 3840.87


Canteria 340 T = 5 años 306.09 3838.75 3841.31 3840.46 3841.41
Canteria 340 T = 10 años 397.98 3838.75 3841.57 3840.63 3841.7
Canteria 340 T = 25 años 501.31 3838.75 3841.83 3840.8 3841.98
Canteria 340 T = 50 años 600 3838.75 3842.08 3840.98 3842.25
Canteria 340 T = 100 años 639.92 3838.75 3842.17 3841.05 3842.35
Canteria 340 Q=Observado 323.18 3838.75 3841.36 3840.49 3841.47

Canteria 290 T = 2 años 162.23 3838.84 3840.74 3840.12 3840.81


Canteria 290 T = 5 años 306.09 3838.84 3841.24 3840.43 3841.35
Canteria 290 T = 10 años 397.98 3838.84 3841.49 3840.6 3841.63
Canteria 290 T = 25 años 501.31 3838.84 3841.74 3840.77 3841.92
Canteria 290 T = 50 años 600 3838.84 3841.98 3840.92 3842.18
Canteria 290 T = 100 años 639.92 3838.84 3842.08 3840.98 3842.29
Canteria 290 Q=Observado 323.18 3838.84 3841.29 3840.47 3841.4

Canteria 240 T = 2 años 162.23 3838.17 3840.7 3839.94 3840.75


Canteria 240 T = 5 años 306.09 3838.17 3841.19 3840.24 3841.28
Canteria 240 T = 10 años 397.98 3838.17 3841.43 3840.41 3841.56
Canteria 240 T = 25 años 501.31 3838.17 3841.68 3840.58 3841.84
Canteria 240 T = 50 años 600 3838.17 3841.92 3840.74 3842.1
Canteria 240 T = 100 años 639.92 3838.17 3842.02 3840.8 3842.21
Canteria 240 Q=Observado 323.18 3838.17 3841.24 3840.28 3841.34
Canteria 215 T = 2 años 162.23 3838.4 3840.66 3840.01 3840.72
Canteria 215 T = 5 años 306.09 3838.4 3841.14 3840.38 3841.25
Canteria 215 T = 10 años 397.98 3838.4 3841.38 3840.54 3841.52
Canteria 215 T = 25 años 501.31 3838.4 3841.63 3840.7 3841.8
Canteria 215 T = 50 años 600 3838.4 3841.87 3840.85 3842.06
Canteria 215 T = 100 años 639.92 3838.4 3841.97 3840.91 3842.17
Canteria 215 Q=Observado 323.18 3838.4 3841.19 3840.39 3841.3

Canteria 190 T = 2 años 162.23 3838.53 3840.58 3840 3840.67


Canteria 190 T = 5 años 306.09 3838.53 3841.05 3840.47 3841.2
Canteria 190 T = 10 años 397.98 3838.53 3841.29 3840.65 3841.47
Canteria 190 T = 25 años 501.31 3838.53 3841.54 3840.82 3841.75
Canteria 190 T = 50 años 600 3838.53 3841.78 3840.97 3842.01
Canteria 190 T = 100 años 639.92 3838.53 3841.88 3841.02 3842.12
Canteria 190 Q=Observado 323.18 3838.53 3841.1 3840.52 3841.25

Canteria 165 T = 2 años 162.23 3837.38 3840.56 3839.54 3840.63


Canteria 165 T = 5 años 306.09 3837.38 3841.03 3840.2 3841.15
Canteria 165 T = 10 años 397.98 3837.38 3841.26 3840.38 3841.42
Canteria 165 T = 25 años 501.31 3837.38 3841.5 3840.53 3841.7
Canteria 165 T = 50 años 600 3837.38 3841.74 3840.71 3841.96
Canteria 165 T = 100 años 639.92 3837.38 3841.83 3840.77 3842.07
Canteria 165 Q=Observado 323.18 3837.38 3841.08 3840.24 3841.2

Canteria 140 T = 2 años 162.23 3837.85 3840.15 3840.15 3840.47


Canteria 140 T = 5 años 306.09 3837.85 3840.47 3840.47 3840.95
Canteria 140 T = 10 años 397.98 3837.85 3840.7 3840.65 3841.21
Canteria 140 T = 25 años 501.31 3837.85 3841.01 3840.84 3841.51
Canteria 140 T = 50 años 600 3837.85 3841.3 3841 3841.79
Canteria 140 T = 100 años 639.92 3837.85 3841.42 3841.07 3841.91
Canteria 140 Q=Observado 323.18 3837.85 3840.51 3840.51 3841

Canteria 0 T = 2 años 162.23 3837.07 3838.83 3838.67 3839.19


Canteria 0 T = 5 años 306.09 3837.07 3839.33 3839.2 3839.91
Canteria 0 T = 10 años 397.98 3837.07 3839.6 3839.48 3840.31
Canteria 0 T = 25 años 501.31 3837.07 3839.88 3839.76 3840.72
Canteria 0 T = 50 años 600 3837.07 3840.12 3840 3841.09
Canteria 0 T = 100 años 639.92 3837.07 3840.21 3840.1 3841.23
Canteria 0 Q=Observado 323.18 3837.07 3839.39 3839.25 3839.99
EL RIO CABANILLAS - BOCATOMA CANTERIA ACTUAL

E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m/m) (m/s) (m2) (m)
0.00033 0.57 284.22 264.53 0.17
0.00032 0.73 431.17 268.25 0.18
0.00032 0.8 508.98 277.09 0.18
0.00032 0.88 589.26 277.86 0.19
0.00031 0.94 662.79 278.56 0.19
0.00031 0.96 692.08 278.84 0.19
0.00032 0.74 446.39 270.09 0.18

0.00019 0.51 320.85 245.67 0.13


0.00023 0.69 457.06 247.44 0.15
0.00025 0.78 527.45 248.36 0.16
0.00026 0.87 599.15 249.28 0.17
0.00027 0.94 664.92 250.13 0.18
0.00027 0.96 691.15 250.47 0.18
0.00023 0.71 471.06 247.63 0.16

0.00023 0.63 257.35 143.59 0.15


0.00034 0.92 334.22 144.79 0.19
0.0004 1.07 374.7 151 0.21
0.00045 1.21 416.23 151 0.23
0.00049 1.33 454.26 151 0.24
0.0005 1.37 469.4 151 0.24
0.00035 0.95 342.07 144.91 0.2

0.0012 1.12 145.71 123.74 0.32


0.00129 1.46 216.41 148.05 0.36
0.00131 1.62 254.93 149.1 0.37
0.00133 1.77 294.48 150.17 0.38
0.00131 1.88 331.48 151.16 0.38
0.00129 1.92 346.44 151.56 0.38
0.00129 1.49 224.09 148.26 0.36

0.00128 1.14 144.03 126.01 0.33


0.00141 1.5 207.36 129.97 0.37
0.00148 1.68 240.05 130.83 0.39
0.00154 1.86 273.53 131.7 0.4
0.00155 2 305.11 132.52 0.41
0.00154 2.04 317.94 132.85 0.41
0.00142 1.54 213.91 130.14 0.37

0.00086 1.01 161.89 123.75 0.28


0.00108 1.38 222.84 127.64 0.33
0.0012 1.58 254.42 129.6 0.35
0.00129 1.76 287.23 130.91 0.37
0.00132 1.9 319.67 137 0.38
0.00132 1.95 332.96 137 0.39
0.00111 1.42 229.15 128.03 0.33
0.00134 1.12 145.55 132.35 0.34
0.00145 1.46 209.6 134.77 0.37
0.00152 1.65 242.52 136 0.39
0.00157 1.82 276.72 137.26 0.41
0.00155 1.94 310.82 144.06 0.41
0.00153 1.99 324.99 144.28 0.41
0.00146 1.5 216.22 135.02 0.38

0.00251 1.35 119.76 129.3 0.45


0.00229 1.68 181.98 133.56 0.46
0.0023 1.86 213.96 135.75 0.47
0.00228 2.03 247.78 138.03 0.48
0.00217 2.14 281.45 146 0.48
0.00211 2.18 296.09 146 0.47
0.00228 1.72 188.43 134 0.46

0.00063 1.11 147.1 118.03 0.33


0.00079 1.55 202.3 118.95 0.38
0.00089 1.77 229.9 119.4 0.41
0.00096 1.99 258.6 119.88 0.44
0.00099 2.16 286.89 122.44 0.45
0.00099 2.21 298.89 122.63 0.45
0.00081 1.59 207.93 119.04 0.39

0.01545 2.49 65.15 109.85 1.03


0.01319 3.05 100.37 110.65 1.02
0.01056 3.16 125.92 111.23 0.95
0.00767 3.14 159.78 111.99 0.84
0.00596 3.11 192.62 112.72 0.76
0.00545 3.11 205.92 113.02 0.73
0.01289 3.09 104.45 110.74 1.02

0.0082 2.67 60.84 57.36 0.83


0.00819 3.38 90.61 59.3 0.87
0.00819 3.73 106.72 59.94 0.89
0.00819 4.07 123.04 60 0.91
0.00819 4.36 137.47 60 0.92
0.00819 4.47 143.06 60 0.92
0.00819 3.45 93.74 59.42 0.88
Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev
(m3/s) (m) (m) (m) (m)
Canteria 590 T = 2 años 162.23 3838.87 3840.84 3840.09 3840.86
Canteria 590 T = 5 años 306.09 3838.87 3841.24 3840.3 3841.28
Canteria 590 T = 10 años 397.98 3838.87 3841.47 3840.41 3841.52
Canteria 590 T = 25 años 501.31 3838.87 3841.71 3840.52 3841.77
Canteria 590 T = 50 años 600 3838.87 3841.92 3840.61 3841.98
Canteria 590 T = 100 años 639.92 3838.87 3842 3840.65 3842.07
Canteria 590 Q=Observado 323.18 3838.87 3841.29 3840.32 3841.33

Canteria 490 T = 2 años 162.23 3838.26 3840.82 3839.75 3840.83


Canteria 490 T = 5 años 306.09 3838.26 3841.21 3839.97 3841.24
Canteria 490 T = 10 años 397.98 3838.26 3841.44 3840.09 3841.48
Canteria 490 T = 25 años 501.31 3838.26 3841.68 3840.22 3841.73
Canteria 490 T = 50 años 600 3838.26 3841.88 3840.35 3841.94
Canteria 490 T = 100 años 639.92 3838.26 3841.96 3840.4 3842.03
Canteria 490 Q=Observado 323.18 3838.26 3841.27 3839.99 3841.3

Canteria 390 T = 2 años 162.23 3838.8 3840.8 3839.33 3840.81


Canteria 390 T = 5 años 306.09 3838.8 3841.17 3839.6 3841.21
Canteria 390 T = 10 años 397.98 3838.8 3841.38 3839.75 3841.44
Canteria 390 T = 25 años 501.31 3838.8 3841.6 3839.91 3841.68
Canteria 390 T = 50 años 600 3838.8 3841.79 3840.04 3841.89
Canteria 390 T = 100 años 639.92 3838.8 3841.87 3840.1 3841.98
Canteria 390 Q=Observado 323.18 3838.8 3841.22 3839.63 3841.27

Canteria 340 T = 2 años 162.23 3838.8 3840.79 3839.31 3840.81


Canteria 340 T = 5 años 306.09 3838.8 3841.15 3839.58 3841.19
Canteria 340 T = 10 años 397.98 3838.8 3841.36 3839.73 3841.42
Canteria 340 T = 25 años 501.31 3838.8 3841.58 3839.88 3841.66
Canteria 340 T = 50 años 600 3838.8 3841.76 3840.01 3841.86
Canteria 340 T = 100 años 639.92 3838.8 3841.84 3840.07 3841.95
Canteria 340 Q=Observado 323.18 3838.8 3841.2 3839.6 3841.25

Canteria 290 T = 2 años 162.23 3838.78 3840.78 3839.35 3840.8


Canteria 290 T = 5 años 306.09 3838.78 3841.12 3839.64 3841.17
Canteria 290 T = 10 años 397.98 3838.78 3841.32 3839.8 3841.4
Canteria 290 T = 25 años 501.31 3838.78 3841.52 3839.97 3841.63
Canteria 290 T = 50 años 600 3838.78 3841.69 3840.12 3841.83
Canteria 290 T = 100 años 639.92 3838.78 3841.76 3840.18 3841.91
Canteria 290 Q=Observado 323.18 3838.78 3841.17 3839.67 3841.23

Canteria 240 T = 2 años 162.23 3838.75 3840.76 3839.34 3840.79


Canteria 240 T = 5 años 306.09 3838.75 3841.09 3839.63 3841.15
Canteria 240 T = 10 años 397.98 3838.75 3841.28 3839.82 3841.37
Canteria 240 T = 25 años 501.31 3838.75 3841.47 3840 3841.59
Canteria 240 T = 50 años 600 3838.75 3841.63 3840.16 3841.78
Canteria 240 T = 100 años 639.92 3838.75 3841.7 3840.22 3841.86
Canteria 240 Q=Observado 323.18 3838.75 3841.14 3839.67 3841.2

Canteria 215 T = 2 años 162.23 3838.7 3840.76 3839.27 3840.78


Canteria 215 T = 5 años 306.09 3838.7 3841.08 3839.58 3841.13
Canteria 215 T = 10 años 397.98 3838.7 3841.27 3839.73 3841.35
Canteria 215 T = 25 años 501.31 3838.7 3841.46 3839.91 3841.56
Canteria 215 T = 50 años 600 3838.7 3841.62 3840.06 3841.75
Canteria 215 T = 100 años 639.92 3838.7 3841.69 3840.12 3841.83
Canteria 215 Q=Observado 323.18 3838.7 3841.13 3839.6 3841.19

Canteria 190 T = 2 años 162.23 3838.7 3840.76 3839.25 3840.77


Canteria 190 T = 5 años 306.09 3838.7 3841.08 3839.53 3841.12
Canteria 190 T = 10 años 397.98 3838.7 3841.26 3839.68 3841.33
Canteria 190 T = 25 años 501.31 3838.7 3841.45 3839.85 3841.54
Canteria 190 T = 50 años 600 3838.7 3841.61 3839.99 3841.73
Canteria 190 T = 100 años 639.92 3838.7 3841.67 3840.04 3841.8
Canteria 190 Q=Observado 323.18 3838.7 3841.12 3839.56 3841.17

Canteria 167.2308 Culvert

Canteria 140 T = 2 años 162.23 3837.85 3839.34 3838.46 3839.39


Canteria 140 T = 5 años 306.09 3837.85 3840.05 3838.78 3840.13
Canteria 140 T = 10 años 397.98 3837.85 3840.43 3838.95 3840.53
Canteria 140 T = 25 años 501.31 3837.85 3840.84 3839.14 3840.95
Canteria 140 T = 50 años 600 3837.85 3841.19 3839.3 3841.33
Canteria 140 T = 100 años 639.92 3837.85 3841.33 3839.36 3841.47
Canteria 140 Q=Observado 323.18 3837.85 3840.12 3838.81 3840.21

Canteria 0 T = 2 años 162.23 3837.07 3838.83 3838.67 3839.19


Canteria 0 T = 5 años 306.09 3837.07 3839.33 3839.2 3839.91
Canteria 0 T = 10 años 397.98 3837.07 3839.6 3839.48 3840.31
Canteria 0 T = 25 años 501.31 3837.07 3839.88 3839.76 3840.72
Canteria 0 T = 50 años 600 3837.07 3840.12 3840 3841.09
Canteria 0 T = 100 años 639.92 3837.07 3840.21 3840.1 3841.23
Canteria 0 Q=Observado 323.18 3837.07 3839.39 3839.25 3839.99
E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m/m) (m/s) (m2) (m)
0.00042 0.62 264.13 257.53 0.19
0.00052 0.84 370.3 264.69 0.22
0.00053 0.94 432.36 268.39 0.23
0.00054 1.04 497.53 276.18 0.24
0.00055 1.12 554.13 277.52 0.24
0.00055 1.14 577.52 277.75 0.24
0.00051 0.85 384.88 264.72 0.22

0.00023 0.54 301.19 245.41 0.15


0.00036 0.79 397.86 246.67 0.19
0.0004 0.9 454.92 247.42 0.2
0.00043 1.01 513.63 248.18 0.21
0.00046 1.1 563.78 248.83 0.22
0.00046 1.13 584.61 249.1 0.23
0.00036 0.8 411.45 246.85 0.19

0.00017 0.58 281.58 143.65 0.13


0.00034 0.91 334.74 144.38 0.19
0.00042 1.09 365.99 144.78 0.22
0.00051 1.26 398.61 151 0.24
0.00059 1.41 426.56 151 0.26
0.00061 1.47 438.29 151 0.27
0.00035 0.94 342.4 144.48 0.2

0.00016 0.56 287.53 147.13 0.13


0.00033 0.9 340.94 148.31 0.19
0.00041 1.07 372.5 149.03 0.22
0.0005 1.24 404.87 149.76 0.24
0.00058 1.39 432.16 150.37 0.26
0.00061 1.44 443.67 150.63 0.27
0.00034 0.93 348.72 148.49 0.19

0.00022 0.65 249.32 128.91 0.15


0.00046 1.04 293.72 130.25 0.22
0.00058 1.24 319.87 130.82 0.25
0.00071 1.45 346.52 131.39 0.28
0.00083 1.63 368.7 131.87 0.31
0.00087 1.69 378.12 132.07 0.32
0.00047 1.08 300.35 130.39 0.23

0.00023 0.68 239.09 124.39 0.15


0.0005 1.1 280.05 126.95 0.23
0.00065 1.32 304.38 128.44 0.27
0.0008 1.54 329.18 129.95 0.3
0.00094 1.73 349.77 130.8 0.33
0.00099 1.8 358.61 130.95 0.34
0.00052 1.13 286.37 127.34 0.24

0.00019 0.62 261.66 133.32 0.14


0.00041 1.01 305 134.8 0.21
0.00054 1.21 330.6 135.66 0.25
0.00067 1.41 356.65 136.54 0.28
0.00079 1.59 378.16 137.26 0.3
0.00083 1.66 387.42 139.67 0.31
0.00043 1.04 311.7 135.03 0.22

0.00017 0.59 275.9 137.17 0.13


0.00037 0.96 319.85 138.08 0.2
0.00049 1.15 345.8 138.62 0.23
0.00061 1.35 372.09 139.16 0.26
0.00073 1.52 393.75 139.61 0.29
0.00077 1.59 403.06 139.8 0.3
0.00039 0.99 326.68 138.23 0.21

0.00074 1 162.84 110.76 0.26


0.00072 1.27 241.89 111.85 0.27
0.00071 1.39 285.48 112.44 0.28
0.0007 1.52 330.72 113.05 0.28
0.00069 1.62 371.3 113.6 0.29
0.00068 1.65 387.14 113.81 0.29
0.00072 1.29 250.32 111.96 0.28

0.0082 2.67 60.84 57.36 0.83


0.00819 3.38 90.61 59.3 0.87
0.00819 3.73 106.72 59.94 0.89
0.00819 4.07 123.04 60 0.91
0.00819 4.36 137.47 60 0.92
0.00819 4.47 143.06 60 0.92
0.00819 3.45 93.74 59.42 0.88
RESULTADO DE LA SIMULACION HIDRAULICA EN EL RIO CABANILLAS - BOCATOMA CANTERIA - CON DISEÑO NUEVO

River Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
Reach Profile
Sta
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Canteria 590 T = 2 años 162.23 3838.87 3840.84 3840.09 3840.86 0.00042 0.62 264.13 257.53 0.19
Canteria 590 T = 5 años 306.09 3838.87 3841.24 3840.3 3841.28 0.00052 0.84 370.3 264.69 0.22
Canteria 590 T = 10 años 397.98 3838.87 3841.47 3840.41 3841.52 0.00053 0.94 432.36 268.39 0.23
Canteria 590 T = 25 años 501.31 3838.87 3841.71 3840.52 3841.77 0.00054 1.04 497.53 276.18 0.24
Canteria 590 T = 50 años 585 3838.87 3841.89 3840.6 3841.95 0.00055 1.1 546.61 277.45 0.24
Canteria 590 T = 100 años 639.92 3838.87 3842 3840.65 3842.07 0.00055 1.14 577.52 277.75 0.24
Canteria 590 Q=Observado 323.18 3838.87 3841.29 3840.32 3841.33 0.00051 0.85 384.88 264.72 0.22

Canteria 490 T = 2 años 162.23 3838.26 3840.82 3839.75 3840.83 0.00023 0.54 301.19 245.41 0.15
Canteria 490 T = 5 años 306.09 3838.26 3841.21 3839.97 3841.24 0.00036 0.79 397.86 246.67 0.19
Canteria 490 T = 10 años 397.98 3838.26 3841.44 3840.09 3841.48 0.0004 0.9 454.92 247.42 0.2
Canteria 490 T = 25 años 501.31 3838.26 3841.68 3840.22 3841.73 0.00043 1.01 513.63 248.18 0.21
Canteria 490 T = 50 años 585 3838.26 3841.85 3840.33 3841.91 0.00045 1.08 557.19 248.74 0.22
Canteria 490 T = 100 años 639.92 3838.26 3841.96 3840.4 3842.03 0.00046 1.13 584.61 249.1 0.23
Canteria 490 Q=Observado 323.18 3838.26 3841.27 3839.99 3841.3 0.00036 0.8 411.45 246.85 0.19

Canteria 390 T = 2 años 162.23 3838.8 3840.8 3839.33 3840.81 0.00017 0.58 281.58 143.65 0.13
Canteria 390 T = 5 años 306.09 3838.8 3841.17 3839.6 3841.21 0.00034 0.91 334.74 144.38 0.19
Canteria 390 T = 10 años 397.98 3838.8 3841.38 3839.75 3841.44 0.00042 1.09 365.99 144.78 0.22
Canteria 390 T = 25 años 501.31 3838.8 3841.6 3839.91 3841.68 0.00051 1.26 398.61 151 0.24
Canteria 390 T = 50 años 585 3838.8 3841.77 3840.02 3841.86 0.00057 1.39 423.01 151 0.26
Canteria 390 T = 100 años 639.92 3838.8 3841.87 3840.1 3841.98 0.00061 1.47 438.29 151 0.27
Canteria 390 Q=Observado 323.18 3838.8 3841.22 3839.63 3841.27 0.00035 0.94 342.4 144.48 0.2

Canteria 340 T = 2 años 162.23 3838.8 3840.79 3839.31 3840.81 0.00016 0.56 287.53 147.13 0.13
Canteria 340 T = 5 años 306.09 3838.8 3841.15 3839.58 3841.19 0.00033 0.9 340.94 148.31 0.19
Canteria 340 T = 10 años 397.98 3838.8 3841.36 3839.73 3841.42 0.00041 1.07 372.5 149.03 0.22
Canteria 340 T = 25 años 501.31 3838.8 3841.58 3839.88 3841.66 0.0005 1.24 404.87 149.76 0.24
Canteria 340 T = 50 años 585 3838.8 3841.74 3839.99 3841.83 0.00057 1.37 428.72 150.29 0.26
Canteria 340 T = 100 años 639.92 3838.8 3841.84 3840.07 3841.95 0.00061 1.44 443.67 150.63 0.27
Canteria 340 Q=Observado 323.18 3838.8 3841.2 3839.6 3841.25 0.00034 0.93 348.72 148.49 0.19

Canteria 290 T = 2 años 162.23 3838.78 3840.78 3839.35 3840.8 0.00022 0.65 249.32 128.91 0.15
Canteria 290 T = 5 años 306.09 3838.78 3841.12 3839.64 3841.17 0.00046 1.04 293.72 130.25 0.22
Canteria 290 T = 10 años 397.98 3838.78 3841.32 3839.8 3841.4 0.00058 1.24 319.87 130.82 0.25
Canteria 290 T = 25 años 501.31 3838.78 3841.52 3839.97 3841.63 0.00071 1.45 346.52 131.39 0.28
Canteria 290 T = 50 años 585 3838.78 3841.67 3840.1 3841.8 0.00081 1.6 365.99 131.81 0.31
Canteria 290 T = 100 años 639.92 3838.78 3841.76 3840.18 3841.91 0.00087 1.69 378.12 132.07 0.32
Canteria 290 Q=Observado 323.18 3838.78 3841.17 3839.67 3841.23 0.00047 1.08 300.35 130.39 0.23

Canteria 240 T = 2 años 162.23 3838.75 3840.76 3839.34 3840.79 0.00023 0.68 239.09 124.39 0.15
Canteria 240 T = 5 años 306.09 3838.75 3841.09 3839.63 3841.15 0.0005 1.1 280.05 126.95 0.23
Canteria 240 T = 10 años 397.98 3838.75 3841.28 3839.82 3841.37 0.00065 1.32 304.38 128.44 0.27
Canteria 240 T = 25 años 501.31 3838.75 3841.47 3840 3841.59 0.0008 1.54 329.18 129.95 0.3
Canteria 240 T = 50 años 585 3838.75 3841.61 3840.13 3841.76 0.00092 1.7 347.31 130.76 0.33
Canteria 240 T = 100 años 639.92 3838.75 3841.7 3840.22 3841.86 0.00099 1.8 358.61 130.95 0.34
Canteria 240 Q=Observado 323.18 3838.75 3841.14 3839.67 3841.2 0.00052 1.13 286.37 127.34 0.24

Canteria 215 T = 2 años 162.23 3838.7 3840.76 3839.27 3840.78 0.00019 0.62 261.66 133.32 0.14
Canteria 215 T = 5 años 306.09 3838.7 3841.08 3839.58 3841.13 0.00041 1.01 305 134.8 0.21
Canteria 215 T = 10 años 397.98 3838.7 3841.27 3839.73 3841.35 0.00054 1.21 330.6 135.66 0.25
Canteria 215 T = 25 años 501.31 3838.7 3841.46 3839.91 3841.56 0.00067 1.41 356.65 136.54 0.28
Canteria 215 T = 50 años 585 3838.7 3841.6 3840.03 3841.73 0.00077 1.56 375.59 137.17 0.3
Canteria 215 T = 100 años 639.92 3838.7 3841.69 3840.12 3841.83 0.00083 1.66 387.42 139.67 0.31
Canteria 215 Q=Observado 323.18 3838.7 3841.13 3839.6 3841.19 0.00043 1.04 311.7 135.03 0.22

Canteria 190 T = 2 años 162.23 3838.7 3840.76 3839.25 3840.77 0.00017 0.59 275.9 137.17 0.13
Canteria 190 T = 5 años 306.09 3838.7 3841.08 3839.53 3841.12 0.00037 0.96 319.85 138.08 0.2
Canteria 190 T = 10 años 397.98 3838.7 3841.26 3839.68 3841.33 0.00049 1.15 345.8 138.62 0.23
Canteria 190 T = 25 años 501.31 3838.7 3841.45 3839.85 3841.54 0.00061 1.35 372.09 139.16 0.26
Canteria 190 T = 50 años 585 3838.7 3841.59 3839.97 3841.7 0.00071 1.5 391.17 139.55 0.29
Canteria 190 T = 100 años 639.92 3838.7 3841.67 3840.04 3841.8 0.00077 1.59 403.06 139.8 0.3
Canteria 190 Q=Observado 323.18 3838.7 3841.12 3839.56 3841.17 0.00039 0.99 326.68 138.23 0.21

Canteria 140 T = 2 años 162.23 3837.85 3839.34 3838.46 3839.39 0.00074 1 162.84 110.76 0.26
Canteria 140 T = 5 años 306.09 3837.85 3840.05 3838.78 3840.13 0.00072 1.27 241.89 111.85 0.27
Canteria 140 T = 10 años 397.98 3837.85 3840.43 3838.95 3840.53 0.00071 1.39 285.48 112.44 0.28
Canteria 140 T = 25 años 501.31 3837.85 3840.84 3839.14 3840.95 0.0007 1.52 330.72 113.05 0.28
Canteria 140 T = 50 años 585 3837.85 3841.14 3839.28 3841.27 0.00069 1.6 365.28 113.52 0.28
Canteria 140 T = 100 años 639.92 3837.85 3841.33 3839.37 3841.47 0.00068 1.65 387.14 113.81 0.29
Canteria 140 Q=Observado 323.18 3837.85 3840.12 3838.81 3840.21 0.00072 1.29 250.32 111.96 0.28

Canteria 0 T = 2 años 162.23 3837.07 3838.83 3838.67 3839.19 0.0082 2.67 60.84 57.36 0.83
Canteria 0 T = 5 años 306.09 3837.07 3839.33 3839.2 3839.91 0.00819 3.38 90.61 59.3 0.87
Canteria 0 T = 10 años 397.98 3837.07 3839.6 3839.48 3840.31 0.00819 3.73 106.72 59.94 0.89
Canteria 0 T = 25 años 501.31 3837.07 3839.88 3839.76 3840.72 0.00819 4.07 123.04 60 0.91
Canteria 0 T = 50 años 585 3837.07 3840.08 3839.96 3841.03 0.00819 4.32 135.35 60 0.92
Canteria 0 T = 100 años 639.92 3837.07 3840.21 3840.1 3841.23 0.00819 4.47 143.06 60 0.92
Canteria 0 Q=Observado 323.18 3837.07 3839.39 3839.25 3839.99 0.00819 3.45 93.74 59.42 0.88