VOLUMEN TOTAL
PROGRESIVAS PORCENTAJE
(m3)
TRAMO
INICIO FIN CORTE RELLENO M.S. R.S. R.F.
MOVIMIENTO DE TIERRAS
SECTOR 1 0+000 0+180 29,288.90 0.00 0.00 13.00 0.00
SECTOR 2 0+180 1+000 10,533.58 327.53 49.00 3.00 0.00
SECTOR 3 1+000 1+400 8,699.35 400.98 30.00 0.00 0.00
SECTOR 4 1+400 2+180 7,881.98 731.10 53.00 0.00 0.00
SECTOR 5 1+400 0+370 5,413.38 229.88 27.00 0.00 0.00
VOLUMEN TOTAL
AREA
(m3)
PROGRESIVAS
DIST. PARCIAL (m)
(KM)
CORTE RELLENO CORTE
, 202 B2, 202 B1, 202 C, 205 A Excavación de material clasificado, perfilado y relleno - Desco
CONSTRUCTIVAS
TERRAPLEN (m3) PERFILADO (m2)
RELLEN DESCRIP
PLATAF PERFILA CION
O
ORMA DO EN Z.
PRESTA
(m) CORTE
MO
25.31 0.00
0.00 12.00 186.55
0.00 10.15 110.75
0.00 10.15 101.50
0.00 10.15 101.50
0.00 8.29 184.40
0.00 7.67 159.60
0.00 7.72 153.90
0.00 8.15 158.70
0.00 7.81 159.60
0.00 7.67 154.80
0.00 8.25 159.20
0.00 5.79 140.40
0.00 129.11 1770.90
Planilla de Metr
Anexo 200-1. Movimien
202 B3, 202 B2, 202 B1, 202 C, 205 A Excavación
PROYEC
: “ MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR DE LA
TO
OBRA : VIA VECINAL EMPALME TA - 109
FECHA : TACNA, OCTUBRE DEL 2020
00+200
00+210 53.35 0.05 10.00 133.38 0.13 1.00
00+220 59.37 0.00 10.00 563.60 0.13 1.00
00+240 39.15 0.00 20.00 985.20 0.00 1.00
00+250 26.44 0.00 10.00 327.95 0.00 1.00
00+260 23.41 0.00 10.00 249.25 0.00 1.00
00+280 40.05 0.00 20.00 634.60 0.00 1.00
00+290 50.89 0.00 10.00 454.70 0.00 1.00
00+300 52.86 0.00 10.00 518.75 0.00 1.00
00+320 26.91 0.00 20.00 797.70 0.00 1.00
00+330 20.72 0.00 10.00 238.15 0.00 1.00
00+340 36.04 0.00 10.00 283.80 0.00 1.00
00+350 42.02 0.00 10.00 390.30 0.00 1.00
00+360 53.04 0.00 10.00 475.30 0.00 1.00
00+370 42.33 0.00 10.00 476.85 0.00 1.00
00+380 28.70 0.00 10.00 355.15 0.00 1.00
00+400 12.23 0.00 20.00 409.30 0.00 1.00
00+410 10.48 0.00 10.00 113.55 0.00 1.00
00+420 9.99 0.00 10.00 102.35 0.00 1.00
00+440 3.98 0.00 20.00 139.70 0.00 1.00
00+460 15.87 3.28 20.00 198.50 16.40 1.00
00+470 20.09 0.00 10.00 179.80 8.20 1.00
00+480 15.87 0.14 10.00 179.80 0.35 1.00
00+490 11.91 1.29 10.00 138.90 7.15 1.00
00+500 16.13 0.00 10.00 140.20 3.23 1.00
00+510 15.70 0.00 10.00 159.15 0.00 1.00
00+520 19.74 0.00 10.00 177.20 0.00 1.00
00+540 9.94 0.00 20.00 296.80 0.00 1.00
00+560 1.84 0.00 20.00 117.80 0.00 1.00
00+580 1.01 0.00 20.00 28.50 0.00 1.00
00+600 2.80 0.00 20.00 38.10 0.00 1.00
00+620 3.29 0.00 20.00 60.90 0.00 1.00
00+640 5.05 0.00 20.00 83.40 0.00 1.00
00+660 3.88 0.00 20.00 89.30 0.00 1.00
00+680 0.41 2.08 20.00 42.90 10.40 1.00
00+700 0.00 7.09 20.00 2.05 91.70 1.00
00+710 0.00 7.74 10.00 0.00 74.15 1.00
00+720 0.42 4.28 10.00 1.05 60.10 1.00
00+740 0.97 0.02 20.00 13.90 43.00 1.00
00+760 6.17 0.00 20.00 71.40 0.10 1.00
00+780 8.38 0.00 20.00 145.50 0.00 1.00
00+800 6.30 0.00 20.00 146.80 0.00 1.00
00+820 0.99 0.00 20.00 72.90 0.00 1.00
00+840 0.21 0.50 20.00 12.00 2.50 1.00
00+860 0.15 0.33 20.00 3.60 8.30 1.00
00+880 1.59 0.00 20.00 17.40 1.65 1.00
00+900 4.52 0.00 20.00 61.10 0.00
00+920 5.38 0.00 20.00 99.00 0.00
00+940 3.23 0.00 20.00 86.10 0.00
00+960 3.26 0.00 20.00 64.90 0.00 1.00
00+980 5.37 0.00 20.00 86.30 0.00 1.00
00+990 3.24 0.00 10.00 43.05 0.00 1.00
01+000 1.90 0.02 10.00 25.70 0.05 1.00
800.00 10,533.58 327.53 49.00
Planilla de Metrados
Anexo 200-1. Movimiento de Tierras
202 C, 205 A Excavación de material clasificado, perfilado y relleno - Desconsolidado
LIDAD VEHICULAR DE LA VIA VECINAL EMPALME TA-109 A CARUMBRAYA (PROG. 0+000 - 1+9
PARTIDAS CONSTRUCTIVAS
PORCENTAJE
VOLUMEN DE CORTE (m3) TERRAPLEN (m3) PERFILADO (m2)
RELLEN
RELLEN PLATAF
MAT. ROCA ROCA O
R.S. R.F. O ORMA
SUELTO SUELTA FIJA PRESTA
PROPIO (m)
MO
AYA (PROG. 0+000 - 1+965) Y ACCESO A LA PARTE BAJA DE LA ZONA AGRÍCOLA DE ILABAYA A
PERFILADO (m2)
DESCRIP
PERFILA CION
DO EN Z.
CORTE
42.35
88.15
181.60
87.75
82.85
163.90
84.10
84.90
171.80
87.75
88.65
86.40
83.90
82.40
80.90
168.40
89.85
91.60
174.80
172.20
92.75
98.50
95.00
95.60
101.70
101.65
188.30
163.40
115.10
76.80
115.10
153.40
95.90
19.20
0.00
0.00
0.00
0.00
76.70
153.40
153.40
115.10
38.40
0.00
76.70
153.40
153.40
153.40
153.40
155.00
78.95
83.60
5251.50
RÍCOLA DE ILABAYA ALTA DEL DISTRITO DE ILABAYA - PROVINCIA DE JORGE BASADRE - DE
JORGE BASADRE - DEPARTAMENTO DE TACNA"
Planilla de Metra
Anexo 200-1. Movimiento
202 B3, 202 B2, 202 B1, 202 C, 205 A Excavación de
PROYEC
: “ MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR DE LA
TO
OBRA : VIA VECINAL EMPALME TA - 109
FECHA : TACNA, OCTUBRE DEL 2020
VOLUMEN TOTAL
AREA PORCENTAJE
PROGRE DIST. (m3)
SIVAS PARCIAL
(KM) (m) RELLEN
CORTE RELLENO CORTE M.S. R.S.
O
01+000
01+020 0.21 1.34 20.00 1.05 6.70 1.00
01+030 0.00 4.56 10.00 0.53 29.50 1.00
01+040 0.00 9.43 10.00 0.00 69.95 1.00
01+050 14.73 1.98 10.00 36.83 57.05 1.00
01+060 32.03 0.83 10.00 233.80 14.05 1.00
01+080 23.80 0.00 20.00 558.30 4.15 1.00
01+100 21.82 0.06 20.00 456.20 0.30 1.00
01+120 5.04 5.24 20.00 268.60 53.00 1.00
01+130 6.60 1.49 10.00 58.20 33.65 1.00
01+140 14.32 0.00 10.00 104.60 3.73 1.00
01+150 16.32 0.00 10.00 153.20 0.00 1.00
01+160 16.13 0.00 10.00 162.25 0.00 1.00
01+180 22.11 0.00 20.00 382.40 0.00 1.00
01+190 31.04 0.00 10.00 265.75 0.00 1.00
01+200 42.14 0.00 10.00 365.90 0.00 1.00
01+210 51.21 0.00 10.00 466.75 0.00 1.00
01+220 57.24 0.00 10.00 542.25 0.00 1.00
01+230 57.87 0.00 10.00 575.55 0.00 1.00
01+240 55.88 0.00 10.00 568.75 0.00 1.00
01+250 56.04 0.00 10.00 559.60 0.00 1.00
01+260 49.15 0.00 10.00 525.95 0.00 1.00
01+280 43.59 0.00 20.00 927.40 0.00 1.00
01+300 32.59 0.00 20.00 761.80 0.00 1.00
01+310 19.92 0.24 10.00 262.55 0.60 1.00
01+320 9.81 2.81 10.00 148.65 15.25 1.00
01+330 7.40 5.62 10.00 86.05 42.15 1.00
01+340 3.56 3.35 10.00 54.80 44.85 1.00
01+360 5.61 0.00 20.00 91.70 16.75 1.00
01+380 1.59 0.00 20.00 72.00 0.00 1.00
01+400 0.00 1.86 20.00 7.95 9.30 1.00
400.00 8,699.35 400.98 30.00 -
Planilla de Metrados
00-1. Movimiento de Tierras
05 A Excavación de material clasificado, perfilado y relleno - Desconsolidado
PARTIDAS CONSTRUCTIVAS
RCENTAJE
VOLUMEN DE CORTE (m3) TERRAPLEN (m3) PERFILADO (m2)
RELLEN
RELLEN PLATAF PERFILA
MAT. ROCA ROCA O
R.F. O ORMA DO EN Z.
SUELTO SUELTA FIJA PRESTA
PROPIO (m) CORTE
MO
DESCRIP
CION
542.25
575.55
568.75 559.60
1686.55 525.95
927.40
761.80
262.55
148.65
86.05
54.80
3326.80
#REF! 64940.19 #REF!
A DE ILABAYA ALTA DEL DISTRITO DE ILABAYA - PROVINCIA DE JORGE BASADRE - DEPART
E BASADRE - DEPARTAMENTO DE TACNA"
Planilla de Metrad
Anexo 200-1. Movimiento
202 B3, 202 B2, 202 B1, 202 C, 205 A Excavación de m
PROYEC
: “ MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR DE LA
TO
OBRA : VIA VECINAL EMPALME TA - 109
FECHA : TACNA, OCTUBRE DEL 2020
VOLUMEN TOTAL
AREA PORCENTAJE
PROGRE DIST. (m3)
SIVAS PARCIAL
(KM) (m) RELLEN
CORTE RELLENO CORTE M.S. R.S.
O
PARTIDAS CONSTRUCTIVAS
RCENTAJE
VOLUMEN DE CORTE (m3) TERRAPLEN (m3) PERFILADO (m2)
RELLEN
RELLEN PLATAF PERFILA
MAT. ROCA ROCA O
R.F. O ORMA DO EN Z.
SUELTO SUELTA FIJA PRESTA
PROPIO (m) CORTE
MO
DESCRIP
CION
OLA DE ILABAYA ALTA DEL DISTRITO DE ILABAYA - PROVINCIA DE JORGE BASADRE - DEPA
RGE BASADRE - DEPARTAMENTO DE TACNA"
Planilla de Metrad
Anexo 200-1. Movimiento
202 B3, 202 B2, 202 B1, 202 C, 205 A Excavación de m
PROYEC
: “ MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR DE LA
TO
OBRA : VIA VECINAL EMPALME TA - 109
FECHA : TACNA, OCTUBRE DEL 2020
VOLUMEN TOTAL
AREA PORCENTAJE
PROGRE DIST. (m3)
SIVAS PARCIAL
(KM) (m) RELLEN
CORTE RELLENO CORTE M.S. R.S.
O
PARTIDAS CONSTRUCTIVAS
RCENTAJE
VOLUMEN DE CORTE (m3) TERRAPLEN (m3) PERFILADO (m2)
RELLEN
RELLEN PLATAF PERFILA
MAT. ROCA ROCA O
R.F. O ORMA DO EN Z.
SUELTO SUELTA FIJA PRESTA
PROPIO (m) CORTE
MO
0.00 0.00 0.00 0.00 0.00 6.61 0.00
14.13 0.00 0.00 1.00 10.70 0.00 33.05
0.00 0.00 0.00 2.00 58.35 0.00 0.00
49.85 0.00 0.00 3.00 78.40 6.70 67.00
515.30 0.00 0.00 4.00 2.25 7.63 143.30
312.40 0.00 0.00 5.00 0.00 7.63 76.30
110.80 0.00 0.00 6.00 6.38 1.34 44.85
26.15 0.00 0.00 7.00 23.20 1.80 15.70
29.95 0.00 0.00 8.00 21.20 0.95 13.75
120.80 0.00 0.00 9.00 10.75 1.80 27.50
317.90 0.00 0.00 10.00 0.00 6.67 84.70
613.10 0.00 0.00 11.00 0.00 7.60 142.70
357.10 0.00 0.00 12.00 0.00 7.60 76.00
268.30 0.00 0.00 13.00 0.00 7.37 74.85
409.90 0.00 0.00 14.00 0.00 6.64 140.10
392.30 0.00 0.00 15.00 0.00 6.74 133.80
400.30 0.00 0.00 16.00 0.00 7.61 143.50
197.75 0.00 0.00 17.00 0.00 7.61 76.10
187.00 0.00 0.00 18.00 0.00 7.21 74.10
327.40 0.00 0.00 19.00 0.00 6.77 139.80
268.60 0.00 0.00 20.00 0.20 6.85 136.20
113.25 0.00 0.00 21.00 11.85 7.63 72.40
104.10 0.00 0.00 22.00 5.83 7.63 76.30
93.30 0.00 0.00 23.00 0.03 7.63 76.30
72.30 0.00 0.00 24.00 0.40 7.60 76.15
86.80 0.00 0.00 25.00 0.35 6.87 144.70
24.60 0.00 0.00 26.00 0.00 6.64 67.55
0.00 5413.38 0.00 0.00 351.00 229.88 157.13 2156.70
A (PROG. 0+000 - 1+965) Y ACCESO A LA PARTE BAJA DE LA ZONA AGRÍCOLA DE ILABAYA ALT
DESCRIP
CION
OLA DE ILABAYA ALTA DEL DISTRITO DE ILABAYA - PROVINCIA DE JORGE BASADRE - DEPA
RGE BASADRE - DEPARTAMENTO DE TACNA"