SECTORIZACION

: “ MEJORAMIENTO DEL SERVICIO DE


TRANSITABILIDAD VEHICULAR DE LA VIA
VECINAL EMPALME TA-109 A CARUMBRAYA
(PROG. 0+000 - 1+965) Y ACCESO A LA PARTE
PROYECTO
BAJA DE LA ZONA AGRÍCOLA DE ILABAYA
ALTA DEL DISTRITO DE ILABAYA - PROVINCIA
DE JORGE BASADRE - DEPARTAMENTO DE
OBRA :TACNA"
VIA VECINAL EMPALME TA - 109
FECHA : TACNA, OCTUBRE DEL 2020

VOLUMEN TOTAL
PROGRESIVAS PORCENTAJE
(m3)
TRAMO
INICIO FIN CORTE RELLENO M.S. R.S. R.F.

MOVIMIENTO DE TIERRAS
SECTOR 1 0+000 0+180 29,288.90 0.00 0.00 13.00 0.00
SECTOR 2 0+180 1+000 10,533.58 327.53 49.00 3.00 0.00
SECTOR 3 1+000 1+400 8,699.35 400.98 30.00 0.00 0.00
SECTOR 4 1+400 2+180 7,881.98 731.10 53.00 0.00 0.00
SECTOR 5 1+400 0+370 5,413.38 229.88 27.00 0.00 0.00

TOTAL 61,817.18 1,689.48


PARTIDAS CONSTRUCTIVAS
VOLUMEN DE CORTE (m3) TERRAPLEN (m3) ELIMINA
205.A 202.C CION
202.B3 202.B2 202.B1 PERFILAD TOTAL
RELLENO RELLENO
MAT. ROCA ROCA (M3)
PROPIO PRESTAM O (m2)
SUELTO SUELTA FIJA
O

0.00 29,288.90 0.00 0.00 0.00 129.11 1,770.90


10,287.38 246.20 0.00 0.00 327.53 362.42 5,251.50 -
8,699.35 0.00 0.00 0.00 400.98 208.81 2,702.10
7,881.98 0.00 0.00 24.00 731.10 337.08 5,084.45
5,413.38 0.00 0.00 351.00 229.88 157.13 2,156.70

32,282.08 29,535.10 0.00 375.00 1,689.48 1,194.55 16,965.65


Plani
Anexo 200-1.

202 B3, 202 B2, 202 B1, 2

PROYECTO : VIA VECINAL EMPALME TA - 109


OBRA : TACNA, OCTUBRE DEL 2020
SECTOR 1 0

VOLUMEN TOTAL
AREA
(m3)
PROGRESIVAS
DIST. PARCIAL (m)
(KM)
CORTE RELLENO CORTE

00+000 32.27 0.00 0.00 0.00


00+010 139.65 0.00 10.00 859.60
00+020 338.50 0.00 10.00 2390.75
00+030 472.77 0.00 10.00 4056.35
00+040 477.43 0.00 10.00 4751.00
00+060 250.47 0.00 20.00 7279.00
00+080 155.14 0.00 20.00 4056.10
00+100 64.20 0.00 20.00 2193.40
00+120 24.22 0.00 20.00 884.20
00+140 37.47 0.00 20.00 616.90
00+160 57.22 0.00 20.00 946.90
00+180 19.62 0.00 20.00 768.40
00+200 29.01 0.00 20.00 486.30
200.00 29288.90
Planilla de Metrados
Anexo 200-1. Movimiento de Tierras

, 202 B2, 202 B1, 202 C, 205 A Excavación de material clasificado, perfilado y relleno - Desco

VOLUMEN TOTAL PARTIDAS CONSTRUCTIVAS


PORCENTAJE
(m3) VOLUMEN DE CORTE (m3) TERRAPLEN (m3)
RELLEN
RELLEN MAT. ROCA ROCA
M.S. R.S. R.F. O
O SUELTO SUELTA FIJA
PROPIO

0.00 1.00 0.00 0.00


0.00 1.00 0.00 859.60 0.00 0.00
0.00 1.00 0.00 2390.75 0.00 0.00
0.00 1.00 0.00 4056.35 0.00 0.00
0.00 1.00 0.00 4751.00 0.00 0.00
0.00 1.00 0.00 7279.00 0.00 0.00
0.00 1.00 0.00 4056.10 0.00 0.00
0.00 1.00 0.00 2193.40 0.00 0.00
0.00 1.00 0.00 884.20 0.00 0.00
0.00 1.00 0.00 616.90 0.00 0.00
0.00 1.00 0.00 946.90 0.00 0.00
0.00 1.00 0.00 768.40 0.00 0.00
0.00 1.00 0.00 486.30 0.00 0.00
0.00 0.00 13.00 0.00 0.00 29288.90 0.00 0.00
ilado y relleno - Desconsolidado

CONSTRUCTIVAS
TERRAPLEN (m3) PERFILADO (m2)
RELLEN DESCRIP
PLATAF PERFILA CION
O
ORMA DO EN Z.
PRESTA
(m) CORTE
MO

25.31 0.00
0.00 12.00 186.55
0.00 10.15 110.75
0.00 10.15 101.50
0.00 10.15 101.50
0.00 8.29 184.40
0.00 7.67 159.60
0.00 7.72 153.90
0.00 8.15 158.70
0.00 7.81 159.60
0.00 7.67 154.80
0.00 8.25 159.20
0.00 5.79 140.40
0.00 129.11 1770.90
Planilla de Metr
Anexo 200-1. Movimien
202 B3, 202 B2, 202 B1, 202 C, 205 A Excavación

PROYEC
: “ MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR DE LA
TO
OBRA : VIA VECINAL EMPALME TA - 109
FECHA : TACNA, OCTUBRE DEL 2020

AREA VOLUMEN TOTAL (m3) PORCENTAJE


PROGRE DIST.
SIVAS PARCIAL
(KM) (m) RELLEN
CORTE RELLENO CORTE M.S.
O

00+200
00+210 53.35 0.05 10.00 133.38 0.13 1.00
00+220 59.37 0.00 10.00 563.60 0.13 1.00
00+240 39.15 0.00 20.00 985.20 0.00 1.00
00+250 26.44 0.00 10.00 327.95 0.00 1.00
00+260 23.41 0.00 10.00 249.25 0.00 1.00
00+280 40.05 0.00 20.00 634.60 0.00 1.00
00+290 50.89 0.00 10.00 454.70 0.00 1.00
00+300 52.86 0.00 10.00 518.75 0.00 1.00
00+320 26.91 0.00 20.00 797.70 0.00 1.00
00+330 20.72 0.00 10.00 238.15 0.00 1.00
00+340 36.04 0.00 10.00 283.80 0.00 1.00
00+350 42.02 0.00 10.00 390.30 0.00 1.00
00+360 53.04 0.00 10.00 475.30 0.00 1.00
00+370 42.33 0.00 10.00 476.85 0.00 1.00
00+380 28.70 0.00 10.00 355.15 0.00 1.00
00+400 12.23 0.00 20.00 409.30 0.00 1.00
00+410 10.48 0.00 10.00 113.55 0.00 1.00
00+420 9.99 0.00 10.00 102.35 0.00 1.00
00+440 3.98 0.00 20.00 139.70 0.00 1.00
00+460 15.87 3.28 20.00 198.50 16.40 1.00
00+470 20.09 0.00 10.00 179.80 8.20 1.00
00+480 15.87 0.14 10.00 179.80 0.35 1.00
00+490 11.91 1.29 10.00 138.90 7.15 1.00
00+500 16.13 0.00 10.00 140.20 3.23 1.00
00+510 15.70 0.00 10.00 159.15 0.00 1.00
00+520 19.74 0.00 10.00 177.20 0.00 1.00
00+540 9.94 0.00 20.00 296.80 0.00 1.00
00+560 1.84 0.00 20.00 117.80 0.00 1.00
00+580 1.01 0.00 20.00 28.50 0.00 1.00
00+600 2.80 0.00 20.00 38.10 0.00 1.00
00+620 3.29 0.00 20.00 60.90 0.00 1.00
00+640 5.05 0.00 20.00 83.40 0.00 1.00
00+660 3.88 0.00 20.00 89.30 0.00 1.00
00+680 0.41 2.08 20.00 42.90 10.40 1.00
00+700 0.00 7.09 20.00 2.05 91.70 1.00
00+710 0.00 7.74 10.00 0.00 74.15 1.00
00+720 0.42 4.28 10.00 1.05 60.10 1.00
00+740 0.97 0.02 20.00 13.90 43.00 1.00
00+760 6.17 0.00 20.00 71.40 0.10 1.00
00+780 8.38 0.00 20.00 145.50 0.00 1.00
00+800 6.30 0.00 20.00 146.80 0.00 1.00
00+820 0.99 0.00 20.00 72.90 0.00 1.00
00+840 0.21 0.50 20.00 12.00 2.50 1.00
00+860 0.15 0.33 20.00 3.60 8.30 1.00
00+880 1.59 0.00 20.00 17.40 1.65 1.00
00+900 4.52 0.00 20.00 61.10 0.00
00+920 5.38 0.00 20.00 99.00 0.00
00+940 3.23 0.00 20.00 86.10 0.00
00+960 3.26 0.00 20.00 64.90 0.00 1.00
00+980 5.37 0.00 20.00 86.30 0.00 1.00
00+990 3.24 0.00 10.00 43.05 0.00 1.00
01+000 1.90 0.02 10.00 25.70 0.05 1.00
800.00 10,533.58 327.53 49.00
Planilla de Metrados
Anexo 200-1. Movimiento de Tierras
202 C, 205 A Excavación de material clasificado, perfilado y relleno - Desconsolidado

LIDAD VEHICULAR DE LA VIA VECINAL EMPALME TA-109 A CARUMBRAYA (PROG. 0+000 - 1+9

PARTIDAS CONSTRUCTIVAS
PORCENTAJE
VOLUMEN DE CORTE (m3) TERRAPLEN (m3) PERFILADO (m2)
RELLEN
RELLEN PLATAF
MAT. ROCA ROCA O
R.S. R.F. O ORMA
SUELTO SUELTA FIJA PRESTA
PROPIO (m)
MO

133.38 0.00 0.00 0.00 0.13 8.47


563.60 0.00 0.00 0.00 0.13 9.16
985.20 0.00 0.00 0.00 0.00 9.00
327.95 0.00 0.00 0.00 0.00 8.55
249.25 0.00 0.00 0.00 0.00 8.02
634.60 0.00 0.00 0.00 0.00 8.37
454.70 0.00 0.00 0.00 0.00 8.45
518.75 0.00 0.00 0.00 0.00 8.53
797.70 0.00 0.00 0.00 0.00 8.65
238.15 0.00 0.00 0.00 0.00 8.90
283.80 0.00 0.00 0.00 0.00 8.83
390.30 0.00 0.00 0.00 0.00 8.45
475.30 0.00 0.00 0.00 0.00 8.33
476.85 0.00 0.00 0.00 0.00 8.15
355.15 0.00 0.00 0.00 0.00 8.03
409.30 0.00 0.00 0.00 0.00 8.81
113.55 0.00 0.00 0.00 0.00 9.16
102.35 0.00 0.00 0.00 0.00 9.16
139.70 0.00 0.00 0.00 0.00 8.32
198.50 0.00 0.00 0.00 16.40 8.90
179.80 0.00 0.00 0.00 8.20 9.65
179.80 0.00 0.00 0.00 0.35 10.05
138.90 0.00 0.00 0.00 7.15 8.95
140.20 0.00 0.00 0.00 3.23 10.17
159.15 0.00 0.00 0.00 0.00 10.17
177.20 0.00 0.00 0.00 0.00 10.16
296.80 0.00 0.00 0.00 0.00 8.67
117.80 0.00 0.00 0.00 0.00 7.67
28.50 0.00 0.00 0.00 0.00 3.84
38.10 0.00 0.00 0.00 0.00 3.84
60.90 0.00 0.00 0.00 0.00 7.67
83.40 0.00 0.00 0.00 0.00 7.67
89.30 0.00 0.00 0.00 0.00 1.92
42.90 0.00 0.00 0.00 10.40 0.00
2.05 0.00 0.00 0.00 91.70 0.00
0.00 0.00 0.00 0.00 74.15 0.00
1.05 0.00 0.00 0.00 60.10 0.00
13.90 0.00 0.00 0.00 43.00 0.00
71.40 0.00 0.00 0.00 0.10 7.67
145.50 0.00 0.00 0.00 0.00 7.67
146.80 0.00 0.00 0.00 0.00 7.67
72.90 0.00 0.00 0.00 0.00 3.84
12.00 0.00 0.00 0.00 2.50 0.00
3.60 0.00 0.00 0.00 8.30 0.00
17.40 0.00 0.00 0.00 1.65 7.67
1.00 0.00 61.10 0.00 0.00 0.00 7.67
1.00 0.00 99.00 0.00 0.00 0.00 7.67
1.00 0.00 86.10 0.00 0.00 0.00 7.67
64.90 0.00 0.00 0.00 0.00 7.67
86.30 0.00 0.00 0.00 0.00 7.83
43.05 0.00 0.00 0.00 0.00 7.96
25.70 0.00 0.00 0.00 0.05 8.76
3.00 - 10287.38 246.20 0.00 0.00 327.53 362.42
esconsolidado

AYA (PROG. 0+000 - 1+965) Y ACCESO A LA PARTE BAJA DE LA ZONA AGRÍCOLA DE ILABAYA A

PERFILADO (m2)
DESCRIP
PERFILA CION
DO EN Z.
CORTE

42.35
88.15
181.60
87.75
82.85
163.90
84.10
84.90
171.80
87.75
88.65
86.40
83.90
82.40
80.90
168.40
89.85
91.60
174.80
172.20
92.75
98.50
95.00
95.60
101.70
101.65
188.30
163.40
115.10
76.80
115.10
153.40
95.90
19.20
0.00
0.00
0.00
0.00
76.70
153.40
153.40
115.10
38.40
0.00
76.70
153.40
153.40
153.40
153.40
155.00
78.95
83.60
5251.50
RÍCOLA DE ILABAYA ALTA DEL DISTRITO DE ILABAYA - PROVINCIA DE JORGE BASADRE - DE
JORGE BASADRE - DEPARTAMENTO DE TACNA"
Planilla de Metra
Anexo 200-1. Movimiento
202 B3, 202 B2, 202 B1, 202 C, 205 A Excavación de

PROYEC
: “ MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR DE LA
TO
OBRA : VIA VECINAL EMPALME TA - 109
FECHA : TACNA, OCTUBRE DEL 2020

VOLUMEN TOTAL
AREA PORCENTAJE
PROGRE DIST. (m3)
SIVAS PARCIAL
(KM) (m) RELLEN
CORTE RELLENO CORTE M.S. R.S.
O

01+000
01+020 0.21 1.34 20.00 1.05 6.70 1.00
01+030 0.00 4.56 10.00 0.53 29.50 1.00
01+040 0.00 9.43 10.00 0.00 69.95 1.00
01+050 14.73 1.98 10.00 36.83 57.05 1.00
01+060 32.03 0.83 10.00 233.80 14.05 1.00
01+080 23.80 0.00 20.00 558.30 4.15 1.00
01+100 21.82 0.06 20.00 456.20 0.30 1.00
01+120 5.04 5.24 20.00 268.60 53.00 1.00
01+130 6.60 1.49 10.00 58.20 33.65 1.00
01+140 14.32 0.00 10.00 104.60 3.73 1.00
01+150 16.32 0.00 10.00 153.20 0.00 1.00
01+160 16.13 0.00 10.00 162.25 0.00 1.00
01+180 22.11 0.00 20.00 382.40 0.00 1.00
01+190 31.04 0.00 10.00 265.75 0.00 1.00
01+200 42.14 0.00 10.00 365.90 0.00 1.00
01+210 51.21 0.00 10.00 466.75 0.00 1.00
01+220 57.24 0.00 10.00 542.25 0.00 1.00
01+230 57.87 0.00 10.00 575.55 0.00 1.00
01+240 55.88 0.00 10.00 568.75 0.00 1.00
01+250 56.04 0.00 10.00 559.60 0.00 1.00
01+260 49.15 0.00 10.00 525.95 0.00 1.00
01+280 43.59 0.00 20.00 927.40 0.00 1.00
01+300 32.59 0.00 20.00 761.80 0.00 1.00
01+310 19.92 0.24 10.00 262.55 0.60 1.00
01+320 9.81 2.81 10.00 148.65 15.25 1.00
01+330 7.40 5.62 10.00 86.05 42.15 1.00
01+340 3.56 3.35 10.00 54.80 44.85 1.00
01+360 5.61 0.00 20.00 91.70 16.75 1.00
01+380 1.59 0.00 20.00 72.00 0.00 1.00
01+400 0.00 1.86 20.00 7.95 9.30 1.00
400.00 8,699.35 400.98 30.00 -
Planilla de Metrados
00-1. Movimiento de Tierras
05 A Excavación de material clasificado, perfilado y relleno - Desconsolidado

VEHICULAR DE LA VIA VECINAL EMPALME TA-109 A CARUMBRAYA (PROG. 0+000 - 1+965) Y

PARTIDAS CONSTRUCTIVAS
RCENTAJE
VOLUMEN DE CORTE (m3) TERRAPLEN (m3) PERFILADO (m2)
RELLEN
RELLEN PLATAF PERFILA
MAT. ROCA ROCA O
R.F. O ORMA DO EN Z.
SUELTO SUELTA FIJA PRESTA
PROPIO (m) CORTE
MO

1.05 0.00 0.00 0.00 6.70 0.00 0.00


0.53 0.00 0.00 0.00 29.50 0.00 0.00
0.00 0.00 0.00 0.00 69.95 0.00 0.00
36.83 0.00 0.00 0.00 57.05 4.42 22.10
233.80 0.00 0.00 0.00 14.05 4.97 46.95
558.30 0.00 0.00 0.00 4.15 8.35 133.20
456.20 0.00 0.00 0.00 0.30 6.35 147.00
268.60 0.00 0.00 0.00 53.00 2.66 90.10
58.20 0.00 0.00 0.00 33.65 4.29 34.75
104.60 0.00 0.00 0.00 3.73 10.14 72.15
153.20 0.00 0.00 0.00 0.00 10.58 103.60
162.25 0.00 0.00 0.00 0.00 10.61 105.95
382.40 0.00 0.00 0.00 0.00 10.13 207.40
265.75 0.00 0.00 0.00 0.00 10.14 101.35
365.90 0.00 0.00 0.00 0.00 10.14 101.40
466.75 0.00 0.00 0.00 0.00 14.14 121.40
542.25 0.00 0.00 0.00 0.00 9.01 115.75
575.55 0.00 0.00 0.00 0.00 8.82 89.15
568.75 0.00 0.00 0.00 0.00 8.82 88.20
559.60 0.00 0.00 0.00 0.00 8.82 88.20
525.95 0.00 0.00 0.00 0.00 8.82 88.20
927.40 0.00 0.00 0.00 0.00 8.33 171.50
761.80 0.00 0.00 0.00 0.00 9.87 182.00
262.55 0.00 0.00 0.00 0.60 9.76 98.15
148.65 0.00 0.00 0.00 15.25 7.94 88.50
86.05 0.00 0.00 0.00 42.15 5.00 64.70
54.80 0.00 0.00 0.00 44.85 3.72 43.60
91.70 0.00 0.00 0.00 16.75 6.48 102.00
72.00 0.00 0.00 0.00 0.00 6.50 129.80
7.95 0.00 0.00 0.00 9.30 0.00 65.00
- 8,699.35 - - - 400.98 208.81 2,702.10
PROG. 0+000 - 1+965) Y ACCESO A LA PARTE BAJA DE LA ZONA AGRÍCOLA DE ILABAYA ALTA

DESCRIP
CION

542.25
575.55
568.75 559.60
1686.55 525.95
927.40
761.80
262.55
148.65
86.05
54.80
3326.80
#REF! 64940.19 #REF!
A DE ILABAYA ALTA DEL DISTRITO DE ILABAYA - PROVINCIA DE JORGE BASADRE - DEPART
E BASADRE - DEPARTAMENTO DE TACNA"
Planilla de Metrad
Anexo 200-1. Movimiento
202 B3, 202 B2, 202 B1, 202 C, 205 A Excavación de m

PROYEC
: “ MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR DE LA
TO
OBRA : VIA VECINAL EMPALME TA - 109
FECHA : TACNA, OCTUBRE DEL 2020

VOLUMEN TOTAL
AREA PORCENTAJE
PROGRE DIST. (m3)
SIVAS PARCIAL
(KM) (m) RELLEN
CORTE RELLENO CORTE M.S. R.S.
O

01+420 0.00 6.57 1420.00 0.00 84.30 1.00


01+430 0.00 4.40 10.00 0.00 54.85 1.00
01+440 0.00 1.00 10.00 0.00 27.00 1.00
01+460 1.88 0.10 20.00 9.40 11.00 1.00
01+470 2.47 3.14 10.00 21.75 16.20 1.00
01+480 0.38 0.05 10.00 14.25 15.95 1.00
01+490 0.00 1.57 10.00 0.95 8.10 1.00
01+500 2.51 2.65 10.00 6.28 21.10 1.00
01+520 4.91 1.09 20.00 74.20 37.40 1.00
01+540 6.76 1.40 20.00 116.70 24.90 1.00
01+550 6.12 3.31 10.00 64.40 23.55 1.00
01+560 8.95 2.81 10.00 75.35 30.60 1.00
01+580 16.07 0.68 20.00 250.20 34.90 1.00
01+590 12.09 0.20 10.00 140.80 4.40 1.00
01+600 6.77 2.23 10.00 94.30 12.15 1.00
01+610 4.33 0.65 10.00 55.50 14.40 1.00
01+620 4.36 0.02 10.00 43.45 3.35 1.00
01+640 3.16 0.00 20.00 75.20 0.10 1.00
01+660 5.02 0.00 20.00 81.80 0.00 1.00
01+680 4.02 0.00 20.00 90.40 0.00 1.00
01+700 4.46 0.00 20.00 84.80 0.00 1.00
01+720 5.03 0.00 20.00 94.90 0.00 1.00
01+740 3.89 0.00 20.00 89.20 0.00 1.00
01+760 3.05 0.00 20.00 69.40 0.00 1.00
01+770 4.85 0.00 10.00 39.50 0.00 1.00
01+780 6.95 0.00 10.00 59.00 0.00 1.00
01+800 7.75 0.02 20.00 147.00 0.10 1.00
01+820 16.86 0.00 20.00 246.10 0.10 1.00
01+840 26.50 0.00 20.00 433.60 0.00 1.00
01+850 39.14 0.00 10.00 328.20 0.00 1.00
01+860 23.39 0.00 10.00 312.65 0.00 1.00
01+870 22.31 0.00 10.00 228.50 0.00 1.00
01+880 16.09 0.00 10.00 192.00 0.00 1.00
01+890 13.90 0.00 10.00 149.95 0.00 1.00
01+900 30.21 0.00 10.00 220.55 0.00 1.00
01+910 39.89 0.00 10.00 350.50 0.00 1.00
01+920 30.41 0.00 10.00 351.50 0.00 1.00
01+940 21.17 0.00 20.00 515.80 0.00 1.00
01+960 12.69 0.00 20.00 338.60 0.00 1.00
01+980 8.84 0.14 20.00 215.30 0.70 1.00
02+000 15.82 0.00 20.00 246.60 0.70 1.00
02+010 14.10 0.68 10.00 149.60 1.70 1.00
02+020 12.11 1.41 10.00 131.05 10.45 1.00
02+040 5.59 2.82 20.00 177.00 42.30 1.00
02+060 7.38 0.68 20.00 129.70 35.00 1.00
02+080 10.52 1.12 20.00 179.00 18.00 1.00
02+100 18.90 0.42 20.00 294.20 15.40 1.00
02+120 12.38 0.06 20.00 312.80 4.80 1.00
02+140 12.07 4.54 20.00 244.50 46.00 1.00
02+150 12.63 4.74 10.00 123.50 46.40 1.00
02+160 8.96 3.10 10.00 107.95 39.20 1.00
02+170 4.55 3.02 10.00 67.55 30.60 1.00
02+180 2.76 0.06 10.00 36.55 15.40 1.00
2180.00 7881.98 731.10 53.00 0.00
Planilla de Metrados
200-1. Movimiento de Tierras
05 A Excavación de material clasificado, perfilado y relleno - Desconsolidado

AD VEHICULAR DE LA VIA VECINAL EMPALME TA-109 A CARUMBRAYA (PROG. 0+000 - 1+965)

PARTIDAS CONSTRUCTIVAS
RCENTAJE
VOLUMEN DE CORTE (m3) TERRAPLEN (m3) PERFILADO (m2)
RELLEN
RELLEN PLATAF PERFILA
MAT. ROCA ROCA O
R.F. O ORMA DO EN Z.
SUELTO SUELTA FIJA PRESTA
PROPIO (m) CORTE
MO

0.00 0.00 0.00 0.00 84.30 0.00 0.00


0.00 0.00 0.00 0.00 54.85 0.00 0.00
0.00 0.00 0.00 0.00 27.00 0.00 0.00
9.40 0.00 0.00 0.00 11.00 8.00 80.00
21.75 0.00 0.00 0.00 16.20 7.34 76.70
14.25 0.00 0.00 0.00 15.95 0.00 36.70
0.95 0.00 0.00 0.00 8.10 0.00 36.70
6.28 0.00 0.00 0.00 21.10 1.78 8.90
74.20 0.00 0.00 0.00 37.40 2.55 43.30
116.70 0.00 0.00 0.00 24.90 4.08 66.30
64.40 0.00 0.00 0.00 23.55 5.32 47.00
75.35 0.00 0.00 0.00 30.60 6.11 57.15
250.20 0.00 0.00 0.00 34.90 8.72 148.30
140.80 0.00 0.00 0.00 4.40 6.36 75.40
94.30 0.00 0.00 0.00 12.15 4.53 54.45
55.50 0.00 0.00 0.00 14.40 4.29 44.10
43.45 0.00 0.00 0.00 3.35 4.52 44.05
75.20 0.00 0.00 0.00 0.10 1.80 63.20
81.80 0.00 0.00 0.00 0.00 7.62 94.20
90.40 0.00 0.00 0.00 0.00 7.62 152.40
84.80 0.00 0.00 0.00 0.00 7.62 152.40
94.90 0.00 0.00 0.00 0.00 7.62 152.40
89.20 0.00 0.00 0.00 0.00 7.62 152.40
69.40 0.00 0.00 0.00 0.00 7.48 151.00
39.50 0.00 0.00 0.00 0.00 8.34 79.10
59.00 0.00 0.00 0.00 0.00 8.62 84.80
147.00 0.00 0.00 0.00 0.10 7.44 160.60
246.10 0.00 0.00 0.00 0.10 8.57 160.10
433.60 0.00 0.00 0.00 0.00 10.14 187.10
328.20 0.00 0.00 0.00 0.00 10.14 101.40
312.65 0.00 0.00 0.00 0.00 10.14 101.40
228.50 0.00 0.00 0.00 0.00 10.14 101.40
192.00 0.00 0.00 0.00 0.00 10.14 101.40
149.95 0.00 0.00 0.00 0.00 10.14 101.40
220.55 0.00 0.00 0.00 0.00 10.14 101.40
350.50 0.00 0.00 1.00 0.00 10.14 101.40
351.50 0.00 0.00 2.00 0.00 9.67 99.05
515.80 0.00 0.00 3.00 0.00 8.00 176.70
338.60 0.00 0.00 4.00 0.00 7.62 156.20
215.30 0.00 0.00 5.00 0.70 6.87 144.90
246.60 0.00 0.00 6.00 0.70 8.61 154.80
149.60 0.00 0.00 0.00 1.70 7.60 88.70
131.05 0.00 0.00 1.00 10.45 7.19 86.65
177.00 0.00 0.00 2.00 42.30 5.81 159.50
129.70 0.00 0.00 0.00 35.00 6.59 167.30
179.00 0.00 0.00 0.00 18.00 6.33 129.20
294.20 0.00 0.00 0.00 15.40 7.45 137.80
312.80 0.00 0.00 0.00 4.80 8.45 159.00
244.50 0.00 0.00 0.00 46.00 4.51 129.60
123.50 0.00 0.00 0.00 46.40 6.07 52.90
107.95 0.00 0.00 0.00 39.20 4.36 52.15
67.55 0.00 0.00 0.00 30.60 3.05 37.05
36.55 0.00 0.00 0.00 15.40 3.83 34.40
0.00 7881.98 0.00 0.00 24.00 731.10 337.08 5084.45
A (PROG. 0+000 - 1+965) Y ACCESO A LA PARTE BAJA DE LA ZONA AGRÍCOLA DE ILABAYA ALT

DESCRIP
CION
OLA DE ILABAYA ALTA DEL DISTRITO DE ILABAYA - PROVINCIA DE JORGE BASADRE - DEPA
RGE BASADRE - DEPARTAMENTO DE TACNA"
Planilla de Metrad
Anexo 200-1. Movimiento
202 B3, 202 B2, 202 B1, 202 C, 205 A Excavación de m

PROYEC
: “ MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR DE LA
TO
OBRA : VIA VECINAL EMPALME TA - 109
FECHA : TACNA, OCTUBRE DEL 2020

VOLUMEN TOTAL
AREA PORCENTAJE
PROGRE DIST. (m3)
SIVAS PARCIAL
(KM) (m) RELLEN
CORTE RELLENO CORTE M.S. R.S.
O

00+000 5.65 0.00 0.00 0.00 0.00 1.00


00+010 0.00 4.28 10.00 14.13 10.70 1.00
00+020 0.00 7.39 10.00 0.00 58.35 1.00
00+040 9.97 0.45 20.00 49.85 78.40 1.00
00+060 41.56 0.00 20.00 515.30 2.25 1.00
00+070 20.92 0.00 10.00 312.40 0.00 1.00
00+080 1.24 2.55 10.00 110.80 6.38 1.00
00+090 3.99 2.09 10.00 26.15 23.20 1.00
00+100 2.00 2.15 10.00 29.95 21.20 1.00
00+120 10.08 0.00 20.00 120.80 10.75 1.00
00+140 21.71 0.00 20.00 317.90 0.00 1.00
00+160 39.60 0.00 20.00 613.10 0.00 1.00
00+170 31.82 0.00 10.00 357.10 0.00 1.00
00+180 21.84 0.00 10.00 268.30 0.00 1.00
00+200 19.15 0.00 20.00 409.90 0.00 1.00
00+220 20.08 0.00 20.00 392.30 0.00 1.00
00+240 19.95 0.00 20.00 400.30 0.00 1.00
00+250 19.60 0.00 10.00 197.75 0.00 1.00
00+260 17.80 0.00 10.00 187.00 0.00 1.00
00+280 14.94 0.00 20.00 327.40 0.00 1.00
00+300 11.92 0.04 20.00 268.60 0.20 1.00
00+310 10.73 2.33 10.00 113.25 11.85 1.00
00+320 10.09 0.00 10.00 104.10 5.83 1.00
00+330 8.57 0.01 10.00 93.30 0.03 1.00
00+340 5.89 0.07 10.00 72.30 0.40 1.00
00+360 2.79 0.00 20.00 86.80 0.35 1.00
00+370 2.13 0.00 10.00 24.60 0.00 1.00
SUB TOTAL 370.00 5413.38 229.88 27.00 0.00
Planilla de Metrados
200-1. Movimiento de Tierras
05 A Excavación de material clasificado, perfilado y relleno - Desconsolidado

AD VEHICULAR DE LA VIA VECINAL EMPALME TA-109 A CARUMBRAYA (PROG. 0+000 - 1+965)

PARTIDAS CONSTRUCTIVAS
RCENTAJE
VOLUMEN DE CORTE (m3) TERRAPLEN (m3) PERFILADO (m2)
RELLEN
RELLEN PLATAF PERFILA
MAT. ROCA ROCA O
R.F. O ORMA DO EN Z.
SUELTO SUELTA FIJA PRESTA
PROPIO (m) CORTE
MO
0.00 0.00 0.00 0.00 0.00 6.61 0.00
14.13 0.00 0.00 1.00 10.70 0.00 33.05
0.00 0.00 0.00 2.00 58.35 0.00 0.00
49.85 0.00 0.00 3.00 78.40 6.70 67.00
515.30 0.00 0.00 4.00 2.25 7.63 143.30
312.40 0.00 0.00 5.00 0.00 7.63 76.30
110.80 0.00 0.00 6.00 6.38 1.34 44.85
26.15 0.00 0.00 7.00 23.20 1.80 15.70
29.95 0.00 0.00 8.00 21.20 0.95 13.75
120.80 0.00 0.00 9.00 10.75 1.80 27.50
317.90 0.00 0.00 10.00 0.00 6.67 84.70
613.10 0.00 0.00 11.00 0.00 7.60 142.70
357.10 0.00 0.00 12.00 0.00 7.60 76.00
268.30 0.00 0.00 13.00 0.00 7.37 74.85
409.90 0.00 0.00 14.00 0.00 6.64 140.10
392.30 0.00 0.00 15.00 0.00 6.74 133.80
400.30 0.00 0.00 16.00 0.00 7.61 143.50
197.75 0.00 0.00 17.00 0.00 7.61 76.10
187.00 0.00 0.00 18.00 0.00 7.21 74.10
327.40 0.00 0.00 19.00 0.00 6.77 139.80
268.60 0.00 0.00 20.00 0.20 6.85 136.20
113.25 0.00 0.00 21.00 11.85 7.63 72.40
104.10 0.00 0.00 22.00 5.83 7.63 76.30
93.30 0.00 0.00 23.00 0.03 7.63 76.30
72.30 0.00 0.00 24.00 0.40 7.60 76.15
86.80 0.00 0.00 25.00 0.35 6.87 144.70
24.60 0.00 0.00 26.00 0.00 6.64 67.55
0.00 5413.38 0.00 0.00 351.00 229.88 157.13 2156.70
A (PROG. 0+000 - 1+965) Y ACCESO A LA PARTE BAJA DE LA ZONA AGRÍCOLA DE ILABAYA ALT

DESCRIP
CION
OLA DE ILABAYA ALTA DEL DISTRITO DE ILABAYA - PROVINCIA DE JORGE BASADRE - DEPA
RGE BASADRE - DEPARTAMENTO DE TACNA"