LONGITUD TOTA05+830 KM. M3. LONG. M3. LONG. M3. LONG. M3.
Totales de Movimiento de Tierras (m3 84,270.13 #VALUE! 5,882.30 420.00 7,776.70 240.00 131.20
CORTE
PROG. AREA DE AREA DE Tipo MATERIAL SUELTO ROCA SUELTA ROCA FIJA VOLUMEN
METROS CORTE RELLENO Suelo RELLENO
20 #VALUE!
40 9.92 1 99.20 20
60 0.65 1 105.70 20
80 44.00 1 446.50 20
100 30.11 1 741.10 20
120 58.57 1 886.80 20
140 32.36 1 909.30 20
160 27.70 1 600.60 20
180 15.45 1 431.50 20
200 36.78 1 522.30 20
220 47.33 1 841.10 20
240 49.24 1 965.70 20
260 74.23 1 1,234.70 20
280 52.79 1 1,270.20 20
300 12.67 2 654.60 20
320 0.00 2 126.70 20
340 25.58 2 255.80 20
360 35.40 2 609.80 20
380 35.74 2 711.40 20
400 34.87 3 706.10 20
420 55.36 3 902.30 20
440 53.21 3 1,085.70 20
460 53.06 3 1,062.70 20
480 32.66 3 857.20 20
500 32.63 3 652.90 20
520 30.92 3 635.50 20
540 13.41 1 443.30 20
560 17.47 1 308.80 20
580 16.72 1 341.90 20
600 15.40 2 321.20 20
620 12.05 1 274.50 20 20
640 16.05 1 281.00 20
660 22.13 1 381.80 20
680 10.76 1 328.90 20
700 17.13 1 278.90 20
720 19.66 1 367.90 20
740 24.31 1 439.70 20
760 17.20 1 415.10 20
780 24.89 1 420.90 20
800 11.08 1 359.70 20
820 15.49 1 265.70 20
840 27.60 1 430.90 20
860 48.22 1 758.20 20
880 10.54 1 587.60 20
900 8.78 1 193.20 20
920 11.22 1 200.00 20
METRADO DE EXPLANACIONES
TIPO DE SUELO PROYECTO :CONST. CARRETERA PANTI - ROCCHAC-HUACHICNA-CEDRUYO " II ETAPA
MATERIAL SUEL 1
ROCA SUELTA 2
ROCA FIJA 3
LONGITUD TOTA05+830 KM. M3. LONG. M3. LONG. M3. LONG. M3.
Totales de Movimiento de Tierras (m3 84,270.13 #VALUE! 5,882.30 420.00 7,776.70 240.00 131.20
CORTE
PROG. AREA DE AREA DE Tipo MATERIAL SUELTO ROCA SUELTA ROCA FIJA VOLUMEN
METROS CORTE RELLENO Suelo RELLENO
LONGITUD TOTA05+830 KM. M3. LONG. M3. LONG. M3. LONG. M3.
Totales de Movimiento de Tierras (m3 84,270.13 #VALUE! 5,882.30 420.00 7,776.70 240.00 131.20
CORTE
PROG. AREA DE AREA DE Tipo MATERIAL SUELTO ROCA SUELTA ROCA FIJA VOLUMEN
METROS CORTE RELLENO Suelo RELLENO
LONGITUD TOTA05+830 KM. M3. LONG. M3. LONG. M3. LONG. M3.
Totales de Movimiento de Tierras (m3 84,270.13 #VALUE! 5,882.30 420.00 7,776.70 240.00 131.20
CORTE
PROG. AREA DE AREA DE Tipo MATERIAL SUELTO ROCA SUELTA ROCA FIJA VOLUMEN
METROS CORTE RELLENO Suelo RELLENO
LONGITUD TOTA05+830 KM. M3. LONG. M3. LONG. M3. LONG. M3.
Totales de Movimiento de Tierras (m3 84,270.13 #VALUE! 5,882.30 420.00 7,776.70 240.00 131.20
CORTE
PROG. AREA DE AREA DE Tipo MATERIAL SUELTO ROCA SUELTA ROCA FIJA VOLUMEN
METROS CORTE RELLENO Suelo RELLENO
LONGITUD TOTA05+830 KM. M3. LONG. M3. LONG. M3. LONG. M3.
Totales de Movimiento de Tierras (m3 84,270.13 #VALUE! 5,882.30 420.00 7,776.70 240.00 131.20
CORTE
PROG. AREA DE AREA DE Tipo MATERIAL SUELTO ROCA SUELTA ROCA FIJA VOLUMEN
METROS CORTE RELLENO Suelo RELLENO
LONGITUD TOTA05+830 KM. M3. LONG. M3. LONG. M3. LONG. M3.
Totales de Movimiento de Tierras (m3 84,270.13 #VALUE! 5,882.30 420.00 7,776.70 240.00 131.20
CORTE
PROG. AREA DE AREA DE Tipo MATERIAL SUELTO ROCA SUELTA ROCA FIJA VOLUMEN
METROS CORTE RELLENO Suelo RELLENO
RESUMEN SEGÚN EXPEDIENTE TECNICO REFORMULADO, EL SALDO DE ROCAS FIJA Y SUELTA HA CONVOCAR