CÁLCULO DE CONCRETO
OBRA (PROYECTO): CASA BIFAMILIAR CARLOS JULIO
FECHA: 10/8/2020 CALCULÓ: LINA CALLEJAS CUEVAS

DIMENSIONES
# VALOR
No. ELEMENTO ESTRUCTURAL SUBTOTAL TOTAL UND VALOR TOTAL
ELEMENTOS UNITARIO
ANCHO LARGO ALTO

1.00 CIMENTACION

1.1 1.1 EXCAVACION ZAPATA TIPO 1 (1,40x1.40) 3.00 1.40 1.40 1.00 5.88
EXCAVACION ZAPATA TIPO 2 (0,80x1,30) 6.00 0.80 1.30 1.00 6.24

TOTAL EXCAVACION CIMENTACION 12.12 M3

1.2 CONCRETO VIGAS CIMENTACION (40x40) VC-101 1.00 0.40 4.04 0.40 0.65
TOTAL CONCRETO VIGAS CIMENTACION 0.65 M3

1.3 CONCRETO ZAPATAS

TOTAL CONCRETO ZAPATAS - M3


TOTAL CONCRETO CIMENTACION 3000 PSI 0.65 M3
VALOR TOTAL CONCRETO CIMENTACION 400,000.00 258,560.00

RENDIMIENT
CANTIDAD DE MATERIALES O
CEMENTO GRIS 7.00 BUL 25,000.00 -
ARENA LAVADA 0.55 M3 60,000.00 -
GRAVILLA 3/4 0.83 M3 90,000.00 -
AGUA 180.00 LTS 20.00 -
VALOR TOTAL MATERIALES -

1.4 PLACA DE CONTRAPISO 1.00 13.79 12.05 0.35 M3

TOTAL CONCRETO PLACA CONTRAPISO - 1 PISO - M3


VALOR TOTAL CONCRETO 2000 PSI 200,000.00 -

C. MATERIALES PLACA DE CONTRAPISO


CEMENTO 5.25 - BUL 25,000.00 -
ARENA LAVADA 0.63 - M3 60,000.00 -
GRAVILLA 3/4 0.83 - M3 90,000.00 -
AGUA 180.00 - LTS 20.00 -
VALOR TOTAL MATERIALES -

2.00 2.00 SUPERESTRUCTURA

2.00 COLUMNAS

TOTAL CONCRETO COLUMNAS - M3


2.00 MUROS PANTALLA

TOTAL CONCRETO MUROS PANTALLA - M3


TOTAL CONCRETO SUPERESTRUCTURA - M3
VALOR TOTAL CONCRETO 400,000.00 -
C. MATERIALES
CEMENTO 7.00 - BUL 25,000.00 -
ARENA LAVADA 0.55 - M3 60,000.00 -
GRAVILLA 3/4 0.83 - M3 90,000.00 -
AGUA 180.00 - LTS 20.00 -
-

3.00 ENTREPISOS

3.1 ENTREPISO 2 PLANTA

TOTAL CONCRETO ENTREPISO 1 - M3

3.2 ENTREPISO 3 Y 4 PLANTA

V-201 (0.35X0.35) 2.00 0.35 11.07 0.35 2.71

V-BORDE (0.15X.035) 1.00 0.15 64.17 0.30 2.89

TOTAL CONCRETO ENTREPISO 2 Y 3 5.60 M3

3.4 ENTREPISO 4 (N=11.60) CUBIERTA


VIGAS CANALES
PLACA CANAL 1.00 29.07 0.10 2.91
CANAL BORDE 1 1.00 0.15 56.49 0.35 2.97
CANAL BORDE 2 1.00 0.15 53.24 0.35 2.79
TOTAL CONCRETO ENTREPISO 4 CUBIERTA 8.67 M3

3.5 VIGUETAS

TOTAL CONCRETO VIGUETAS - M3

3.6 PLACA DE TANQUES Y VIGAS

PLACAS DE TANQUES 1.00 3.05 5.69 0.13 2.26


2.26 M3
3.7 RIOSTRAS

- M3
3.80 PLACAS DE ENTREPISOS

- M3

TOTAL CONCRETO ENTREPISOS 16.52 M3


VALOR TOTAL CONCRETO ENTREPISOS 400,000.00 6,609,480.00
C. MATERIALES
CEMENTO 7.00 BUL 25,000.00 -
ARENA LAVADA 0.55 M3 60,000.00 -
GRAVILLA 3/4 0.83 M3 90,000.00 -
AGUA 180.00 LTS 20.00 -
VALOR TOTAL MATERIALES -

4.00 ELEMENTOS ESPECIALES

4.1 ESCALERAS
4.1.1 PLACA TIPO 1 - 1 TRAMO 1.00 1.82 1.10 1.65 3.30
4.1.2 PASOS 7.00 0.26 1.10 0.17 0.34
3.64
4.2.1 PLACA TIPO 2 - 2TRAMOS 1.00 1.10 2.35 0.45 1.16
4.2.2 PASOS 1.00 0.26 2.35 0.17 0.10
1.27
4.3.1 PLACA TIPO 3 3 TRAMOS 1.00 1.10 1.10 0.45 0.54
4.3.2 PASOS 1.00 0.26 1.10 0.17 0.05
0.59
4.41 PLACA TIPO 4 4 TRAMOS 1.00 0.15 1.10 0.45 0.07
PASOS 1.00 0.26 1.10 0.17 0.05
0.12
4.41 PLACA TIPO 4 4 TRAMOS 1.00 1.10 1.10 0.45 0.54
PASOS 1.00 0.26 1.10 0.17 0.05
0.59
TOTAL CONCRETO ELEMENTOS ESPECIALES M3

VALOR TOTAL CONCRETO ELEMNETOS ESPECIALES 400,000.00 -


C. MATERIALES
CEMENTO 7.00 - BUL 25,000.00 -
ARENA LAVADA 0.55 - M3 60,000.00 -
GRAVILLA 3/4 0.83 - M3 90,000.00 -
AGUA 180.00 - LTS 20.00 -
-

TOTAL CONCRETO 2000 PSI - M3 200,000.00 -


TOTAL TOTAL CEMENTO - BUL 25,000.00 -
CANTIDDES
DE OBRA Y TOTAL ARENA LAVADA - M3 60,000.00 -
COSTOS
TOTAL GRAVILLA - M3 90,000.00 -
AGUA - LTS 20.00 -

TOTAL CONCRETO 3000 PSI M3 400,000.00 -


TOTAL TOTAL CEMENTO - BUL 25,000.00 -
CANTIDDES
DE OBRA Y TOTAL ARENA LAVADA - M3 60,000.00 -
COSTOS
TOTAL GRAVILLA - M3 90,000.00 -
AGUA - LTS 20.00 -

VALOR TOTAL CONCRETO 2000 - 3000 -


TOTAL CEMENTO -
TOTAL
CANTIDADE TOTAL ARENA LAVADA -
S DE
MATERIAL Y TOTAL GRAVILLA -
COSTOS
AGUA -

VALOR TOTAL MATERIALES CONCRETO ESTRUCTURA -

NOTA: EL VALOR DEL CONCRETO PARA LA ESTRUCTURA SE TOMA DE LOS PRECIOS DE LA EMPRESA COLCONCRETOS DE SOGAMOSO Y ES PUESTO EN LA OBRE Y CON BOMBA, EL PRECIO DE LOS MATERIALES COMO CEMENTO,
GRAVILLA Y ARENA LAVADA DEPENDE DEL PROVEEDOR