OBRA CREACION DEL ESPACIO DEPORTIVO EN EL C.P. TACASAYA DEL DISTRITO DE CHUCUITO - PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO COLLAO" ILAVE
MAESTRO DE OBRA 1.0 MAYO DEL 2016 578.66 578.66 0.00 578.66 91.92 670.58 670.58
OPERARIO 0.0 MAYO DEL 2016 0.00 5,245.51 0.00 0.00 0.00 0.00 0.00
OFICIAL 0.0 MAYO DEL 2016 0.00 5,173.98 0.00 0.00 0.00 0.00 0.00
PEON I 2.0 MAYO DEL 2016 Err:509 Err:509 0.00 Err:509 Err:509 Err:509 Err:509
PEON II 0.0 MAYO DEL 2016 0.00 8,303.15 0.00 0.00 0.00
GUARDIAN II 0.0 MAYO DEL 2016 0.00 1,389.85 0.00 0.00 0.00
TOTAL Err:509 Err:509 0.00 Err:509 Err:509 Err:509 Err:509
A.
TACASAYA DEL DISTRITO DE CHUCUITO -
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
R0-01
1
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
MEMORIA DESCRIPTIVA
2
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
HOJA DE TAREO R0 - 02
3
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
HOJA DE ASISTENCIA DIARIA R0 - 03
4
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
PLANILLAS DE PAGO DEL PERSONAL TECNICO Y
MUNICIPALIDAD DISTRITAL DE
OBRERO Y/O PAGOS POR SERVICIOS (COPIAS)
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
RESDIENCIA DE OBRA
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
TACASAYA DEL DISTRITO DE CHUCUITO -
5
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
R0 - 04
MUNICIPALIDAD DISTRITAL DE
MOVIMIENTO DIARIO DE EQUIPO Y MAQUINARIA
CHUCUITO
UTILIZADA CON COPIAS DE PARTES DIARIOS
6
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
VALORIZACION MENSUAL ACUMULADO - PRESUPUESTO
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
BASE R0 - 05
RESDIENCIA DE OBRA
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
TACASAYA DEL DISTRITO DE CHUCUITO -
7
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
VALORIZACION MENSUAL DE MAYORES METRADOS
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
RESDIENCIA DE OBRA
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
TACASAYA DEL DISTRITO DE CHUCUITO -
8
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
VALORIZACION MENSUAL DE PARTIDAS NUEVAS
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
RESDIENCIA DE OBRA
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
TACASAYA DEL DISTRITO DE CHUCUITO -
9
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
RESUMEN DE VALORIZACIONES R0 - 06
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
RESDIENCIA DE OBRA
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
10
TACASAYA DEL DISTRITO DE CHUCUITO -
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
CONSOLIDADO DE VALORIZACION FISICA - DICIEMBRE
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
RESDIENCIA DE OBRA
2021
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
10.01
TACASAYA DEL DISTRITO DE CHUCUITO -
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
RESUMEN DE METRADOS REALES DIARIOS ACUMULADO
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
RESDIENCIA DE OBRA
R0 - 07
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
TACASAYA DEL DISTRITO DE CHUCUITO -
11
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
METRADOS REALES DIARIOS R0 - 08
12
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
MOVIMIENTO DIARIO DE ALMACEN R0 - 09
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
RESDIENCIA DE OBRA
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
TACASAYA DEL DISTRITO DE CHUCUITO -
13
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
KARDEX VALORADO Y BINCARD (FOTOCOPIA)
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
RESDIENCIA DE OBRA
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
TACASAYA DEL DISTRITO DE CHUCUITO -
14
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
CERTIFICADO DE CONTROL DE CALIDAD (FOTOCOPIA)
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
RESDIENCIA DE OBRA
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
TACASAYA DEL DISTRITO DE CHUCUITO -
15
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
COPIA DE CUADERNO DE OBRA
16
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
PANEL FOTOGRAFICO
17
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
INFORME FINANCIERO
B.
TACASAYA DEL DISTRITO DE CHUCUITO -
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
ESTRUCTURA DE COSTOS DE ACUERDO AL EXPEDIENTE
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
TECNICO R0 - 10
RESDIENCIA DE OBRA
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
TACASAYA DEL DISTRITO DE CHUCUITO -
1
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
ESTRUCTURA DE COSTOS DE ACUERDO AL
CHUCUITO
PRESUPUESTO ASIGNADO
2
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
DESAGREGADO ANALITICO DE OBRA R0 - 11
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
RESDIENCIA DE OBRA
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
TACASAYA DEL DISTRITO DE CHUCUITO -
3
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
R0
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
CUADRO ANALITICO DE EJECUCION FINANCIERA
4
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
ORDENES DE COMPRA Y GUIA DE INTERNAMIENTO
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
RESDIENCIA DE OBRA
(COPIA)
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
TACASAYA DEL DISTRITO DE CHUCUITO -
5
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
ORDENES DE SERVICIO (COPIA)
6
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
COPIA DE PECOSAS
RESDIENCIA DE OBRA
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
TACASAYA DEL DISTRITO DE CHUCUITO -
7
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
RESDIENCIA DE OBRA
ANEXOS
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
C.
TACASAYA DEL DISTRITO DE CHUCUITO -
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
CUADRO DE AVANCE FISICO Y FINANCIERO CURVA "S"
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
RESDIENCIA DE OBRA
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
TACASAYA DEL DISTRITO DE CHUCUITO -
1
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
RELACION DE PERSONAL
2
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
CHUCUITO
CRONOGRAMA VALORIZADO
3
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
MUNICIPALIDAD DISTRITAL DE
OTRO DOCUMENTOS CERTIFICACIONES Y
CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
RESOLUCIONES
RESDIENCIA DE OBRA
OBRA:
CREACION DEL ESPACIO DEPORTIVO EN EL C.P.
TACASAYA DEL DISTRITO DE CHUCUITO -
4
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACION DE OBRA N°001 - DICIEMBRE 2021
INFORME DE CONTROL DE DOCUMENTOS
INFORME MENSUAL Nº 001
Proyecto CREACION DEL ESPACIO DEPORTIVO EN EL C.P. TACASAYA DEL DISTRITO DE CHUCUITO -
PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
Fecha DEL 20 AL 31 DE DICIEMBRE DEL 2021
FORMATO R0-01
MUNICIPALIDAD DISTRITAL DE CHUCUITO
SUB GERENCIA DE INFRAESTRUCTURA
RESIDENCIA DE OBRA
FICHA TÉCNICA
INFORME MENSUAL N° 01 Mes: DICIEMBRE DE 2021
OBRA CREACION DEL ESPACIO DEPORTIVO EN EL C.P. TACASAYA DEL DISTRITO DE CHUCUITO - PROVINCIA DE PUNO -
DEPARTAMENTO DE PUNO
LOCALIDAD: CENTRO POBLADO DE TACASAYA DISTRITO: CHUCUITO PROVINCIA: PUNO REGION: PUNO
Supervisor de Obra Ing°. ING. EBERTH SABINO GOMEZ CRUZ C.I.P. 203071 Documento de Designación: MEMORANDUM N°027-MDCH/SGI/WOMQ
Residente de Obra Ing°. ING. PAUL ESLEYTER CUEVA ALANGUIA C.I.P. 227486 Documento de Designación: MEMORANDUM N°023-MDCH/SGI/WOMQ
Ingeniero de Seguridad Ing°. No Corresponde Documento de Designación: No Corresponde
Asistente Tecnico Bach°. No Corresponde Documento de Designación: No Corresponde
Asistente Administrativo Lic°. No Corresponde Documento de Designación: No Corresponde
DESCRIPCION DE LA OBRA
El campo deportivo con tiene dimensiones 30.00 m de largo por 50.00 m de ancho, el area total de construccion del sisterma de gras natural es de 1,500.00 m2 y de futbol 8 y el campo deportivo con tiene
dimensiones 15.00 m de largo por 25.00 m de ancho el area total de construccion de fulbito deportivo es de 375.00 m2.
METAS
El proyecto contempla las siguientes metas
1) Construccion de Espacio Deportivo 01
2) Construccion de Espacio Deportivo 02
3) Construccion de Cerco Perimetrico 4) Construccion de
Suministro de Energia Electrica
5) Construccion de Servicios Higienicos
6) Construccion de Veredas 7) Plan
COVID-19
SITUACION ACTUAL
Se viene realizando la ejecucion de obra con la META de CONSTRUCCION DE CERCO PERIMETRICO, en donde las partidas que se ejecutaron fueron EXCAVACION CON MAQUINARIA PARA ZANJAS
CIMIENTOS CORRIDOS, de igual manera de estan ejecutando la partida de EXACAVACION MANUAL PARA ZAPATAS AISLADAS (Terreno Normal), de igual ,manera se ejecuto EL CARTEL DE OBRA
IMPRESION DE BANNER DE 3.60M X 2.40M (SOPORTE DE MADERA),
75de113
DESCRIPCION DESCRIPCION
En la foto se muestra, Los trabajos realizados de la Excavacion con maquinariapara zanjas cimientos
En la foto se muestra, Trabajos de la instalacion y colocacion de Cartel de Obra impresión de banner de
corridos (Terreno Normal), de igual manera sse observa la Excavacion manual para zapatas aisladas
3.60m x 2.40m (SOPORTE DE MADERA)
(Terreno Normal)
GRAFICO DE AVANCE DE OBRA (MONTS EJECUTADOS FISICOS VS MONTOS FINANCIEROS)
VALORIZACIÓN DE OBRA
Programado Fisico Ejecutado Financiero Ejecutado
N° de Mes del Monto % Ejecución % Monto Porcentaje % Monto Porcentaje %
Informe Informe S/. Programada Acumulado S/. de Ejecución Acumulado S/. de Ejecución Acumulado
0 INICIO 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00%
1 OCTUBRE 2020 244,711.96 22.06% 22.06% 0.00 0.00% 0.00% 16,080.10 2.54% 2.54%
2 NOVIMEBRE 2020 389,367.97 35.10% 57.16% 0.00 0.00% 0.00% 0.00 0.00% 2.54%
3 DICIEMBRE 2020 251,786.60 22.70% 79.85% 0.00 0.00% 0.00% 0.00 0.00% 2.54%
4 ENERO 2021 197,566.80 17.81% 97.66% 0.00 0.00% 0.00% 0.00 0.00% 2.54%
5 FEBRERO 2021 25,964.61 2.34% 100.00% 0.00 0.00% 0.00% 0.00 0.00% 2.54%
Total Costo Directo 1,109,397.94 100.00% 0.00 0.00% 16,080.10 2.54%
Total Presupuesto Aprobado 631,896.26
100 100.00 %
97.66 %
90
80 79.85 %
70
60
57.16 %
50
40
30
20
22.06 %
10
0.00 % 0.00 %
2.54 %
0
INICIO
OCTUBRE 2020
NOVIMEBRE 2020
DICIEMBRE 2020
ENERO 2021
FEBRERO 2021
CREACION DEL ESPACIO DEPORTIVO EN EL C.P. TACASAYA DEL DISTRITO DE CHUCUITO - PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
OBRA
CLAVE
ENTIDAD EJECUTORA MUNICIPALIDAD DISTRITAL DE CHUCUITO DIAS TRABAJ. :X
MODALIDAD DE EJECUCION ADMINISTRACION DIRECTA DIAS NO TRABAJ. :O
RESIDENTE ING. PAUL ESLEYTER CUEVA ALANGUIA DOMINGOS :D
SUPERVISOR ING. EBERTH SABINO GOMEZ CRUZ FERIADO :FR
INFORME 001
VºBº - ASISTENTE ADMINISTRATIVO VºBº - RESIDENTE DE OBRA VºBº - SUPERVISOR DE OBRA VºBº - SUB. GERENCIA DE INFRAESTRUCTURA
FORMATO RO - 03
HOJA DE ASISTENCIA DIARIA
SUB GERENCIA DE INFRAESTRUCTURA
HORA HORA
Nº NOMBRES Y APELLIDOS CARGO D.N.I FIRMA FIRMA
INGRESO SALIDA
1 GOMEZ CRUZ Eberth Sabino Supervisor 44813497
OBRA
CREACION DEL ESPACIO DEPORTIVO EN EL C.P. TACASAYA DEL DISTRITO DE CHUCUITO - PROVINCIA DE PUNO - PLAZO DE EJECUCION : 120 DIAS CALENDARIO DEPARTAMENTO PUNO
DEPARTAMENTO DE PUNO
COSTO TOTAL DEL PROYECTO (S/.) 631,896.26 FECHA DE INICIO : 20/12/2021 PROVINCIA PUNO
PRESUOUESTO ASIGNADO (S/.) 92,534.00 FECHA DE TERMINO : 18/04/2022 DISTRITO CHUCUITO
CREACION DEL ESPACIO DEPORTIVO EN EL CP
1.0 TACASAYA DEL DISTRITO DE CHUCUITO - PROVINCIA DE 512,601.18 - 0.00% - 0.00% - - 0.00% - 0.00%
PUNO - DEPARTAMENTO DE PUNO
1.1.1.2 ALQUILER DE LOCAL PARA LA OBRA mes 4.00 500.00 2,000.00 - 0.00% - 0.00% - - 0.00% 4.00 2,000.00 100.00%
1.1.1.3 AGUA PARA LA OBRA GLB 1.00 200.00 200.00 - 0.00% - 0.00% - - 0.00% 1.00 200.00 100.00%
1.1.1.4 EQUIPOS DE PROTECCION INDIVIDUAL GLB 1.00 5,725.00 5,725.00 - 0.00% - 0.00% - - 0.00% 1.00 5,725.00 100.00%
1.1.1.5 EQUIPOS DE PROTECCION COLECTIVA GLB 1.00 2,080.00 2,080.00 - 0.00% - 0.00% - - 0.00% 1.00 2,080.00 100.00%
1.1.1.6 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 300.00 300.00 - 0.00% - 0.00% - - 0.00% 1.00 300.00 100.00%
1.1.2 TRABAJOS PRELIMINARES
1.1.2.1 TRAZO NIVELES Y REPLANTEO PRELIMINAR m² 1,728.00 0.57 984.96 - 0.00% - 0.00% - - 0.00% 1,728.00 984.96 100.00%
1.1.2.2 TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO m² 1,728.00 0.59 1,019.52 - 0.00% - 0.00% - - 0.00% 1,728.00 1,019.52 100.00%
1.1.3 MOVIMIENTO DE TIERRAS
1.1.3.1 EXTRACCION Y ACOPIO DE MATERIAL DE RELLENO EN CANTERA m³ 622.08 7.33 4,559.85 - 0.00% - 0.00% - - 0.00% 622.08 4,559.85 100.00%
1.1.3.2 CARGUIO Y TRANSPORTE DE MATERIAL DE PRESTAMO A OBRA m³ 622.08 25.95 16,142.98 - 0.00% - 0.00% - - 0.00% 622.08 16,142.98 100.00%
1.1.3.3 ACARREO DE MATERIAL PARA RELLENO DENTRO DE OBRA m³ 622.08 3.99 2,482.10 - 0.00% - 0.00% - - 0.00% 622.08 2,482.10 100.00%
1.1.3.4 NIVELACION Y COMPACTADO DE RELLENO CON EQUIPO LIVIANO m² 1,728.00 1.71 2,954.88 - 0.00% - 0.00% - - 0.00% 1,728.00 2,954.88 100.00%
1.1.3.5 DESBROCE Y LIMPIEZA DE TERRENO m² 1,728.00 1.49 2,574.72 - 0.00% - 0.00% - - 0.00% 1,728.00 2,574.72 100.00%
1.1.3.6 EXCAVACION MANUAL DE ZANJAS PARA SARDINELES Y OTROS m³ 12.95 23.90 309.51 - 0.00% - 0.00% - - 0.00% 12.95 309.51 100.00%
1.1.3.7 ACARREO DE MATERIAL EXCEDENTE, D=30m m³ 222.89 5.97 1,330.65 - 0.00% - 0.00% - - 0.00% 222.89 1,330.65 100.00%
1.1.3.8 ELIMINACION DE MATERIAL EXCEDENTE DE EXCAVACIONES m³ 222.89 8.43 1,878.96 - 0.00% - 0.00% - - 0.00% 222.89 1,878.96 100.00%
1.1.4 OBRAS DE CONCRETO ARMADO
1.1.4.1 SARDINELES: ENCOFRADO Y DESENCOFRADO m² 173.20 44.90 7,776.68 - 0.00% - 0.00% - - 0.00% 173.20 7,776.68 100.00%
1.1.4.2 SARDINELES: CONCRETO F'C=175 KG/CM2 m³ 12.95 338.04 4,377.62 - 0.00% - 0.00% - - 0.00% 12.95 4,377.62 100.00%
1.1.4.3 SARDINELES: ACERO GRADO 60 FY=4200 Kg/cm2 kg 462.34 5.97 2,760.17 - 0.00% - 0.00% - - 0.00% 462.34 2,760.17 100.00%
1.1.5 COLOCACION DE RELLENOS PARA CESPED DEPORTIVO (GRASS NATURAL)
1.1.5.1 RELLENO PARA CAPA DE ENRAIZAMIENTO m³ 345.60 62.91 21,741.70 - 0.00% - 0.00% - - 0.00% 345.60 21,741.70 100.00%
1.1.5.2 SEMBRADO DE GRASS PARA CAMPO DEPORTIVO m² 1,728.00 5.31 9,175.68 - 0.00% - 0.00% - - 0.00% 1,728.00 9,175.68 100.00%
1.1.6 VARIOS
1.1.6.1 CASTILLO PARA FUTBOL Y MALLA und 2.00 769.63 1,539.26 - 0.00% - 0.00% - - 0.00% 2.00 1,539.26 100.00%
1.2 CONSTRUCCION DE ESPACIO DEPORTIVO 02
1.2.1 TRABAJOS PRELIMINARES
1.2.1.1 TRAZO NIVELES Y REPLANTEO PRELIMINAR m² 424.44 0.57 241.93 - 0.00% - 0.00% - - 0.00% 424.44 241.93 100.00%
1.2.1.2 TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO m² 424.44 0.59 250.42 - 0.00% - 0.00% - - 0.00% 424.44 250.42 100.00%
1.2.2 MOVIMIENTO DE TIERRAS
1.2.2.1 EXTRACCION Y ACOPIO DE MATERIAL DE RELLENO EN CANTERA m³ 152.80 7.33 1,120.02 - 0.00% - 0.00% - - 0.00% 152.80 1,120.02 100.00%
1.2.2.2 CARGUIO Y TRANSPORTE DE MATERIAL DE PRESTAMO A OBRA m³ 152.80 25.95 3,965.16 - 0.00% - 0.00% - - 0.00% 152.80 3,965.16 100.00%
1.2.2.3 ACARREO DE MATERIAL PARA RELLENO DENTRO DE OBRA m³ 152.80 3.99 609.67 - 0.00% - 0.00% - - 0.00% 152.80 609.67 100.00%
1.2.2.4 NIVELACION Y COMPACTADO DE RELLENO CON EQUIPO LIVIANO m² 424.44 1.71 725.79 - 0.00% - 0.00% - - 0.00% 424.44 725.79 100.00%
1.2.2.5 DESBROCE Y LIMPIEZA DE TERRENO m² 424.44 1.49 632.42 - 0.00% - 0.00% - - 0.00% 424.44 632.42 100.00%
1.2.2.6 EXCAVACION MANUAL DE ZANJAS PARA SARDINELES Y OTROS m³ 6.41 23.90 153.20 - 0.00% - 0.00% - - 0.00% 6.41 153.20 100.00%
1.2.2.7 ACARREO DE MATERIAL EXCEDENTE, D=30m m³ 58.62 5.97 349.96 - 0.00% - 0.00% - - 0.00% 58.62 349.96 100.00%
COSTO ANTERIOR ACTUAL ACUMULADO SALDO
UNITARIO COSTO PARCIAL
ITEM PARTIDAS UND. METRADO METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACI % METRADO SALDO %
(S/.) (S/.)
TOTAL TOTAL ON TOTAL
1.2.2.8 ELIMINACION DE MATERIAL EXCEDENTE DE EXCAVACIONES m³ 58.62 8.43 494.17 - 0.00% - 0.00% - - 0.00% 58.62 494.17 100.00%
1.2.3 OBRAS DE CONCRETO ARMADO
1.2.3.1 SARDINELES: ENCOFRADO Y DESENCOFRADO m² 86.00 44.90 3,861.40 - 0.00% - 0.00% - - 0.00% 86.00 3,861.40 100.00%
1.2.3.2 SARDINELES: CONCRETO F'C=175 KG/CM2 m³ 6.41 338.04 2,166.84 - 0.00% - 0.00% - - 0.00% 6.41 2,166.84 100.00%
1.2.3.3 SARDINELES: ACERO GRADO 60 FY=4200 Kg/cm2 kg 156.16 5.97 932.28 - 0.00% - 0.00% - - 0.00% 156.16 932.28 100.00%
1.2.4
COLOCACION DE RELLENOS PARA CESPED DEPORTIVO (GRASS NATURAL)
1.2.4.1 RELLENO PARA CAPA DE ENRAIZAMIENTO m³ 84.89 62.91 5,340.43 - 0.00% - 0.00% - - 0.00% 84.89 5,340.43 100.00%
1.2.4.2 SEMBRADO DE GRASS PARA CAMPO DEPORTIVO m² 424.44 5.31 2,253.78 - 0.00% - 0.00% - - 0.00% 424.44 2,253.78 100.00%
1.2.5 VARIOS
1.2.5.1 CASTILLO PARA FUTBOL Y MALLA und 2.00 769.63 1,539.26 - 0.00% - 0.00% - - 0.00% 2.00 1,539.26 100.00%
1.3 CONSTRUCCION DE CERCO PERIMETRICO
1.3.1 TRABAJOS PRELIMINARES
1.3.1.1 LIMPIEZA DEL TERRENO m² 380.40 1.19 452.68 - 0.00% - 0.00% - - 0.00% 380.40 452.68 100.00%
1.3.1.2 TRAZO NIVELES Y REPLANTEO PRELIMINAR m² 380.40 0.57 216.83 - 0.00% - 0.00% - - 0.00% 380.40 216.83 100.00%
1.3.1.3 TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO m² 380.40 0.59 224.44 - 0.00% - 0.00% - - 0.00% 380.40 224.44 100.00%
1.3.2 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL PARA ZAPATAS AISLADAS (Terreno
1.3.2.1
Normal)
m³ 213.42 23.90 5,100.74 - 0.00% - 0.00% - - 0.00% 213.42 5,100.74 100.00%
EXCAVACION CON MAQUINARIA PARA ZANJAS
1.3.2.2
CIMIENTOS CORRIDOS (Terreno Normal)
m³ 95.92 11.64 1,116.51 - 0.00% - 0.00% - - 0.00% 95.92 1,116.51 100.00%
1.3.2.3 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m³ 152.16 55.46 8,438.79 - 0.00% - 0.00% - - 0.00% 152.16 8,438.79 100.00%
1.3.2.4 ACARREO DE MATERIAL PROVENIENTE DE EXCAVACIONES, D=30m m³ 371.21 9.96 3,697.25 - 0.00% - 0.00% - - 0.00% 371.21 3,697.25 100.00%
1.3.2.5 ELIMINACION DE MATERIAL EXCEDENTE DE EXCAVACIONES m³ 371.21 8.43 3,129.30 - 0.00% - 0.00% - - 0.00% 371.21 3,129.30 100.00%
1.3.3 OBRAS DE CONCRETO SIMPLE
1.3.3.1 ZAPATAS
1.3.3.1.1 SUBAZAPATA: F'C=175KG/CM2 + 30% P.M (MAX DE 6") m³ 74.23 284.74 21,136.25 - 0.00% - 0.00% - - 0.00% 74.23 21,136.25 100.00%
1.3.3.1.2 SOLADO PARA ZAPATAS AISLADAS C:H, 1:10 E=4" m² 92.79 31.70 2,941.44 - 0.00% - 0.00% - - 0.00% 92.79 2,941.44 100.00%
1.3.3.2 CIMIENTOS CORRIDOS
1.3.3.2.1 CIMIENTO CORRIDO: MEZCLA 1:10 + 30%PG m³ 76.74 163.04 12,511.69 - 0.00% - 0.00% - - 0.00% 76.74 12,511.69 100.00%
1.3.3.3 SOBRECIMIENTOS
SOBRECIMIENTOS : MEZCLA DE CONCRETO 1:8 (C:H) + 25
1.3.3.3.1
% PIEDRA MEDIANA
m³ 19.71 185.02 3,646.74 - 0.00% - 0.00% - - 0.00% 19.71 3,646.74 100.00%
1.3.3.3.2 SOBRECIMIENTOS: ENCOFRADO Y DESENCOFRADO m² 262.80 42.39 11,140.09 - 0.00% - 0.00% - - 0.00% 262.80 11,140.09 100.00%
1.3.4 OBRAS DE CONCRETO ARMADO
1.3.4.1 ZAPATAS AISLADAS
1.3.4.1.1 ZAPATAS AISLADAS: CONCRETO F'C=210 Kg/cm2 m³ 37.12 356.59 13,236.62 - 0.00% - 0.00% - - 0.00% 37.12 13,236.62 100.00%
1.3.4.1.2 ZAPATAS AISLADAS: ACERO GRADO 60 FY=4200 Kg/cm2 kg 905.26 5.97 5,404.40 - 0.00% - 0.00% - - 0.00% 905.26 5,404.40 100.00%
1.3.4.2 COLUMNAS RECTAS
1.3.4.2.1 COLUMNAS RECTAS: CONCRETO F'C=210 KG/CM2 m³ 26.45 410.06 10,846.09 - 0.00% - 0.00% - - 0.00% 26.45 10,846.09 100.00%
1.3.4.2.2 COLUMNAS RECTAS: ENCOFRADO Y DESENCOFRADO m² 296.38 43.12 12,779.91 - 0.00% - 0.00% - - 0.00% 296.38 12,779.91 100.00%
1.3.4.2.3 COLUMNAS: ACERO GRADO 60 Fy= 4200 Kg/cm2 kg 3,208.14 5.97 19,152.60 - 0.00% - 0.00% - - 0.00% 3,208.14 19,152.60 100.00%
1.3.4.3 VIGAS RECTAS
1.3.4.3.1 VIGAS RECTAS: CONCRETO F'C= 210 KG/CM2 m³ 20.45 370.98 7,586.54 - 0.00% - 0.00% - - 0.00% 20.45 7,586.54 100.00%
1.3.4.3.2 VIGAS RECTAS: ENCOFRADO Y DESENCOFRADO m² 270.30 55.31 14,950.29 - 0.00% - 0.00% - - 0.00% 270.30 14,950.29 100.00%
1.3.4.3.3 VIGAS RECTAS: ACERO GRADO 60 FY= 4200 KG/CM2 kg 792.81 6.00 4,756.86 - 0.00% - 0.00% - - 0.00% 792.81 4,756.86 100.00%
1.3.5 MUROS Y TABIQUES DE ALBAÑILERIA
1.3.5.1 MURO DE LADRILLO KING KONG MECANIZADO - CARAVISTA (SOGA) J=1 CM m² 332.20 90.36 30,017.59 - 0.00% - 0.00% - - 0.00% 332.20 30,017.59 100.00%
1.3.6 REVOQUES, ENLUCIDOS Y MOLDURAS
COLUMNAS: TARRAJEO DE SUPERFICIES ( Mezcla C:A 1:5,
1.3.6.1
E=2cm)
m² 247.55 25.49 6,310.05 - 0.00% - 0.00% - - 0.00% 247.55 6,310.05 100.00%
1.3.6.2 COLUMNAS RECTAS: VESTIDURA DE ARISTAS m 700.00 4.42 3,094.00 - 0.00% - 0.00% - - 0.00% 700.00 3,094.00 100.00%
1.3.6.3 VIGAS RECTAS: TARRAJEO DE SUPERFICIES (Mezcla C:A 1:5, E=2cm) m² 7.50 26.02 195.15 - 0.00% - 0.00% - - 0.00% 7.50 195.15 100.00%
1.3.6.4 VIGAS RECTAS: VESTIDURA DE ARISTAS m 22.70 4.82 109.41 - 0.00% - 0.00% - - 0.00% 22.70 109.41 100.00%
1.3.6.5 BRUÑAS DE 1 CM X 1CM m 185.30 2.48 459.54 - 0.00% - 0.00% - - 0.00% 185.30 459.54 100.00%
1.3.6.6 TARRAJEO EN MUROS (Mezcla C:A 1:4, E=2cm) m² 475.04 21.55 10,237.11 - 0.00% - 0.00% - - 0.00% 475.04 10,237.11 100.00%
1.3.6.7 CARPINTERIA METALICA Y HERRERIA
PANELES DE MALLA CRIPADA CON MARCO DE TUBO (T-1)
1.3.6.7.1
, SEGUN DISEÑO
und 26.00 1,074.35 27,933.10 - 0.00% - 0.00% - - 0.00% 26.00 27,933.10 100.00%
PANELES DE MALLA CRIPADA CON MARCO DE TUBO (T-2)
1.3.6.7.2
, SEGUN DISEÑO
und 8.00 974.35 7,794.80 - 0.00% - 0.00% - - 0.00% 8.00 7,794.80 100.00%
COSTO ANTERIOR ACTUAL ACUMULADO SALDO
UNITARIO COSTO PARCIAL
ITEM PARTIDAS UND. METRADO METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACI % METRADO SALDO %
(S/.) (S/.)
TOTAL TOTAL ON TOTAL
1.3.6.7.3 PUERTA METALICA (T-1), SEGUN DISEÑO und 1.00 1,615.82 1,615.82 - 0.00% - 0.00% - - 0.00% 1.00 1,615.82 100.00%
1.3.6.7.4 PUERTA METALICA (T-2), SEGUN DISEÑO und 1.00 874.35 874.35 - 0.00% - 0.00% - - 0.00% 1.00 874.35 100.00%
1.3.6.7.5 PUERTA METALICA (T-3), SEGUN DISEÑO und 1.00 774.35 774.35 - 0.00% - 0.00% - - 0.00% 1.00 774.35 100.00%
1.3.6.8 PINTURA
1.3.6.8.1 PINTURA BARNIZ EN MUROS CARAVISTA m² 523.24 10.89 5,698.08 - 0.00% - 0.00% - - 0.00% 523.24 5,698.08 100.00%
1.3.6.8.2 PINTADO ESMALTE EN COLUMNAS Y VIGAS m² 730.08 15.67 11,440.35 - 0.00% - 0.00% - - 0.00% 730.08 11,440.35 100.00%
1.3.6.8.3 DIBUJO Y PINTADO DE MURAL CON MOTIVOS DEPORTIVOS m² 52.80 72.05 3,804.24 - 0.00% - 0.00% - - 0.00% 52.80 3,804.24 100.00%
1.3.6.9 VARIOS
1.3.6.9.1 TRANSPORTE INTERNO DE MATERIALES vje 100.00 0.75 75.00 - 0.00% - 0.00% - - 0.00% 100.00 75.00 100.00%
CONSTRUCCION DE SUMINISTRO DE ENERGIA ELECTRICA
1.4
1.4.1 OBRAS DE CONCRETO SIMPLE
1.4.1.1 DADOS DE CONCRETO: CONCRETO F'C=175 KG/CM2 m³ 1.08 307.81 332.43 - 0.00% - 0.00% - - 0.00% 1.08 332.43 100.00%
1.4.1.2 DADOS DE CONCRETO: ENCOFRADO Y DESENCOFRADO m² 7.20 36.10 259.92 - 0.00% - 0.00% - - 0.00% 7.20 259.92 100.00%
1.4.2 CAJAS DE PASO
1.4.2.1 INSTALACION CAJA GALVANIZADA DE 6"x6"x4" und 6.00 29.29 175.74 - 0.00% - 0.00% - - 0.00% 6.00 175.74 100.00%
1.4.3 TABLEROS E INTERRUPTORES TERMOMAGNETICOS
1.4.3.1 TABLERO GENERAL TG und 1.00 529.43 529.43 - 0.00% - 0.00% - - 0.00% 1.00 529.43 100.00%
1.4.4 CANALIZACIONES Y/O TUBERIAS
1.4.4.1 INSTALACION DE DUCTOS PVC SAP D=2" m 200.00 5.50 1,100.00 - 0.00% - 0.00% - - 0.00% 200.00 1,100.00 100.00%
1.4.4.2 INSTALACION DE CURVAS PVC SAP D=2" und 30.00 4.23 126.90 - 0.00% - 0.00% - - 0.00% 30.00 126.90 100.00%
1.4.5 CONDUCTORES Y/O CABLES
EXCAVACION MANUAL PARA CABLE SUBTERRANEO
1.4.5.1
(Terreno normal)
m³ 9.00 21.33 191.97 - 0.00% - 0.00% - - 0.00% 9.00 191.97 100.00%
1.4.5.2 CAMA DE APOYO PARA TUBERIA DE 2" CON ARENA GRUESA m 200.00 34.87 6,974.00 - 0.00% - 0.00% - - 0.00% 200.00 6,974.00 100.00%
1.4.5.3 RELLENO Y COMPACTADO DE ZANJA CON MATERIAL PROPIO m³ 9.00 11.95 107.55 - 0.00% - 0.00% - - 0.00% 9.00 107.55 100.00%
1.4.5.4 CABLEADO CONDUCTOR DE Cu. TIPO NYY DE 1X10 mm2 CABLEADO DE 7 HILOS m 250.00 11.37 2,842.50 - 0.00% - 0.00% - - 0.00% 250.00 2,842.50 100.00%
1.4.5.5 CABLEADO CONDUCTOR DE Cu. TIPO NYY DE 1X4.0 mm2 CABLEADO DE 7 HILOS m 57.00 13.47 767.79 - 0.00% - 0.00% - - 0.00% 57.00 767.79 100.00%
1.4.5.6 CABLEADO CONDUCTOR DE Cu. TIPO NYY DE 1X2.5 mm2 CABLEADO DE 7 HILOS m 307.00 11.37 3,490.59 - 0.00% - 0.00% - - 0.00% 307.00 3,490.59 100.00%
1.4.6 POZO DE PUESTA A TIERRA
EXCAVACION PARA POZO PUESTA A TIERRA (Terreno
1.4.6.1
Normal)
m³ 0.48 19.91 9.56 - 0.00% - 0.00% - - 0.00% 0.48 9.56 100.00%
COSTO ANTERIOR ACTUAL ACUMULADO SALDO
UNITARIO COSTO PARCIAL
ITEM PARTIDAS UND. METRADO METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACI % METRADO SALDO %
(S/.) (S/.)
TOTAL TOTAL ON TOTAL
1.4.6.2 POZO DE PUESTA A TIERRA GLB 1.00 3,336.89 3,336.89 - 0.00% - 0.00% - - 0.00% 1.00 3,336.89 100.00%
1.4.6.3 CAJA DE REGISTRO PARA POZO PUESTA A TIERRA pza 1.00 73.80 73.80 - 0.00% - 0.00% - - 0.00% 1.00 73.80 100.00%
1.4.6.4 INSTALACION DE CONDUCTOR DE PUESTA A TIERRA m 50.00 25.93 1,296.50 - 0.00% - 0.00% - - 0.00% 50.00 1,296.50 100.00%
1.4.7 POSTE PEDESTAL
1.4.7.1 POSTE PEDESTAL PARA REFLECTORES und 6.00 452.80 2,716.80 - 0.00% - 0.00% - - 0.00% 6.00 2,716.80 100.00%
1.4.8 ARTEFACTOS DE ILUMINACION
1.4.8.1 REFLECTOR DE 400W und 6.00 569.63 3,417.78 - 0.00% - 0.00% - - 0.00% 6.00 3,417.78 100.00%
1.4.9 INSPECCION Y PRUEBAS ELECTRICAS
1.4.9.1 PRUEBAS EN INSTALACIONES ELECTRICAS GLB 1.00 871.10 871.10 - 0.00% - 0.00% - - 0.00% 1.00 871.10 100.00%
1.5 CONSTRUCCION DE SERVICIOS HIGIENICOS
1.5.1 ESTRUCTURAS SS.HH.
1.5.1.1 TRABAJOS PRELIMINARES
1.5.1.1.1 LIMPIEZA DEL TERRENO m² 21.55 1.19 25.64 - 0.00% - 0.00% - - 0.00% 21.55 25.64 100.00%
1.5.1.1.2 TRAZO NIVELES Y REPLANTEO PRELIMINAR m² 21.55 0.57 12.28 - 0.00% - 0.00% - - 0.00% 21.55 12.28 100.00%
1.5.1.1.3 TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO m² 21.55 0.59 12.71 - 0.00% - 0.00% - - 0.00% 21.55 12.71 100.00%
1.5.1.2 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL PARA ZAPATAS AISLADAS (Terreno
1.5.1.2.1
Normal)
m³ 13.80 23.90 329.82 - 0.00% - 0.00% - - 0.00% 13.80 329.82 100.00%
EXCAVACION CON MAQUINARIA PARA CIMIENTOS
1.5.1.2.2
(Terreno Normal)
m³ 6.44 11.64 74.96 - 0.00% - 0.00% - - 0.00% 6.44 74.96 100.00%
1.5.1.2.3 RELLENO Y COMPACTADO DE FUNDACIONES CON MATERIAL DE PRESTAMO m³ 8.97 55.46 497.48 - 0.00% - 0.00% - - 0.00% 8.97 497.48 100.00%
1.5.1.2.4 ACARREO DE MATERIAL PROVENIENTE DE EXCAVACIONES, D=30m m³ 24.28 9.96 241.83 - 0.00% - 0.00% - - 0.00% 24.28 241.83 100.00%
1.5.1.2.5 ELIMINACION DE MATERIAL EXCEDENTE DE EXCAVACIONES m³ 24.28 8.43 204.68 - 0.00% - 0.00% - - 0.00% 24.28 204.68 100.00%
1.5.1.3 OBRAS DE CONCRETO SIMPLE
1.5.1.3.1 ZAPATAS
1.5.1.3.1.1 SUBAZAPATA: F'C=175KG/CM2 + 30% P.M (MAX DE 6") m³ 4.80 284.74 1,366.75 - 0.00% - 0.00% - - 0.00% 4.80 1,366.75 100.00%
1.5.1.3.1.2 SOLADO PARA ZAPATAS AISLADAS C:H, 1:10 E=4" m² 6.00 31.70 190.20 - 0.00% - 0.00% - - 0.00% 6.00 190.20 100.00%
1.5.1.3.2 CIMIENTOS CORRIDOS
1.5.1.3.2.1 CIMIENTO CORRIDO: MEZCLA 1:10 + 30%PG m³ 5.69 163.04 927.70 - 0.00% - 0.00% - - 0.00% 5.69 927.70 100.00%
1.5.1.3.3 SOBRECIMIENTOS
SOBRECIMIENTOS : MEZCLA DE CONCRETO 1:8 (C:H) + 25
1.5.1.3.3.1
% PIEDRA MEDIANA
m³ 1.70 216.50 368.05 - 0.00% - 0.00% - - 0.00% 1.70 368.05 100.00%
1.5.1.3.3.2 SOBRECIMIENTOS: ENCOFRADO Y DESENCOFRADO m² 15.26 42.39 646.87 - 0.00% - 0.00% - - 0.00% 15.26 646.87 100.00%
1.5.1.3.4 FALSO PISO
1.5.1.3.4.1 FALSO PISO DE 4" MEZCLA 1:8 C.H m² 16.74 37.10 621.05 - 0.00% - 0.00% - - 0.00% 16.74 621.05 100.00%
1.5.1.4 OBRAS DE CONCRETO ARMADO
1.5.1.4.1 ZAPATAS AISLADAS
1.5.1.4.1.1 ZAPATAS AISLADAS: CONCRETO F'C=210 Kg/cm2 m³ 2.40 353.09 847.42 - 0.00% - 0.00% - - 0.00% 2.40 847.42 100.00%
1.5.1.4.1.2 ZAPATAS AISLADAS: ACERO GRADO 60 FY=4200 Kg/cm2 kg 71.52 5.97 426.97 - 0.00% - 0.00% - - 0.00% 71.52 426.97 100.00%
1.5.1.4.2 COLUMNAS RECTAS
1.5.1.4.2.1 COLUMNAS RECTAS: CONCRETO F'C=210 KG/CM2 m³ 1.69 406.56 687.09 - 0.00% - 0.00% - - 0.00% 1.69 687.09 100.00%
1.5.1.4.2.2 COLUMNAS RECTAS: ENCOFRADO Y DESENCOFRADO m² 27.00 43.12 1,164.24 - 0.00% - 0.00% - - 0.00% 27.00 1,164.24 100.00%
1.5.1.4.2.3 COLUMNAS: ACERO GRADO 60 Fy= 4200 Kg/cm2 kg 244.50 5.97 1,459.67 - 0.00% - 0.00% - - 0.00% 244.50 1,459.67 100.00%
1.5.1.4.3 VIGAS RECTAS
1.5.1.4.3.1 VIGAS RECTAS: CONCRETO F'C= 210 KG/CM2 m³ 1.71 367.48 628.39 - 0.00% - 0.00% - - 0.00% 1.71 628.39 100.00%
1.5.1.4.3.2 VIGAS RECTAS: ENCOFRADO Y DESENCOFRADO m² 9.95 55.31 550.33 - 0.00% - 0.00% - - 0.00% 9.95 550.33 100.00%
1.5.1.4.3.3 VIGAS RECTAS: ACERO GRADO 60 FY= 4200 KG/CM2 kg 227.05 6.00 1,362.30 - 0.00% - 0.00% - - 0.00% 227.05 1,362.30 100.00%
1.5.1.4.4 LOSA ALIGERADA
1.5.1.4.4.1 LOSA ALIGERADA HORIZONTAL: CONCRETO F'C=210 KG/CM2 m³ 3.43 344.03 1,180.02 - 0.00% - 0.00% - - 0.00% 3.43 1,180.02 100.00%
1.5.1.4.4.2 LOSA ALIGERADA HORIZONTAL: ENCOFRADO Y DESENCOFRADO m² 19.53 43.75 854.44 - 0.00% - 0.00% - - 0.00% 19.53 854.44 100.00%
1.5.1.4.4.3 LOSAS ALIGERADAS: ACERO FY=4200 KG/CM2 kg 98.32 5.97 586.97 - 0.00% - 0.00% - - 0.00% 98.32 586.97 100.00%
1.5.1.4.4.4 LOSAS ALIGERADAS: LADRILLO HUECO 30x30x15 cm und 35.15 4.03 141.65 - 0.00% - 0.00% - - 0.00% 35.15 141.65 100.00%
1.5.1.4.5 LAVATORIO DE CONCRETO
1.5.1.4.5.1 LAVATORIO DE CONCRETO: CONCRETO F'C=175 KG/CM2 m³ 0.34 355.92 121.01 - 0.00% - 0.00% - - 0.00% 0.34 121.01 100.00%
1.5.1.4.5.2 MESAS DE CONCRETO: ENCOFRADO Y DESENCOFRADO m² 2.76 42.74 117.96 - 0.00% - 0.00% - - 0.00% 2.76 117.96 100.00%
1.5.1.4.5.3 MESA DE CONCRETO: ACERO FY=4200 KG/CM2 kg 17.25 5.97 102.98 - 0.00% - 0.00% - - 0.00% 17.25 102.98 100.00%
1.5.1.4.6 VIGUETAS RECTAS
1.5.1.4.6.1 VIGUETAS RECTAS: CONCRETO F'C= 175 KG/CM2 m³ 0.43 335.08 144.08 - 0.00% - 0.00% - - 0.00% 0.43 144.08 100.00%
1.5.1.4.6.2 VIGUETAS RECTAS: ENCOFRADO Y DESENCOFRADO m² 5.67 55.31 313.61 - 0.00% - 0.00% - - 0.00% 5.67 313.61 100.00%
1.5.1.4.6.3 VIGUETAS RECTAS: ACERO GRADO 60 FY= 4200 KG/CM2 kg 32.78 6.00 196.68 - 0.00% - 0.00% - - 0.00% 32.78 196.68 100.00%
COSTO ANTERIOR ACTUAL ACUMULADO SALDO
UNITARIO COSTO PARCIAL
ITEM PARTIDAS UND. METRADO METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACI % METRADO SALDO %
(S/.) (S/.)
TOTAL TOTAL ON TOTAL
1.5.1.5 ESTRUCTURAS METALICAS
1.5.1.5.1 ESCALERA DE GATO, SEGUN DISEÑO und 1.00 574.35 574.35 - 0.00% - 0.00% - - 0.00% 1.00 574.35 100.00%
1.5.1.6 VARIOS
1.5.1.6.1 PRUEBAS DE CONTROL DE CALIDAD GLB 1.00 1,465.00 1,465.00 - 0.00% - 0.00% - - 0.00% 1.00 1,465.00 100.00%
1.5.1.6.2 TRANSPORTE INTERNO DE MATERIALES vje 200.00 0.40 80.00 - 0.00% - 0.00% - - 0.00% 200.00 80.00 100.00%
1.5.2 ARQUITECTURA SS.HH.
1.5.2.1 MUROS Y TABIQUES DE ALBAÑILERIA
1.5.2.1.1 MURO DE LADRILLO KING KONG MECANIZADO (CABEZA) J=2 CM m² 35.16 122.32 4,300.77 - 0.00% - 0.00% - - 0.00% 35.16 4,300.77 100.00%
1.5.2.1.2 MURO DE LADRILLO KING KONG MECANIZADO (SOGA) J=2 CM m² 20.33 72.50 1,473.93 - 0.00% - 0.00% - - 0.00% 20.33 1,473.93 100.00%
1.5.2.2 REVOQUES, ENLUCIDOS Y MOLDURAS
1.5.2.2.1 TARRAJEO DE COLUMNAS Y PLACAS
COLUMNAS RECTAS: TARRAJEO DE SUPERFICIES (
1.5.2.2.1.1
Mezcla C:A 1:5, E=2cm)
m² 8.48 25.49 216.16 - 0.00% - 0.00% - - 0.00% 8.48 216.16 100.00%
1.5.2.2.1.2 COLUMNAS RECTAS: VESTIDURA DE ARISTAS m 10.60 4.42 46.85 - 0.00% - 0.00% - - 0.00% 10.60 46.85 100.00%
1.5.2.2.2 TARRAJEO DE VIGAS
1.5.2.2.2.1 VIGAS RECTAS: TARRAJEO DE SUPERFICIES (Mezcla C:A 1:5, E=2cm) m² 11.32 26.02 294.55 - 0.00% - 0.00% - - 0.00% 11.32 294.55 100.00%
1.5.2.2.2.2 VIGAS RECTAS: VESTIDURA DE ARISTAS m 12.40 4.82 59.77 - 0.00% - 0.00% - - 0.00% 12.40 59.77 100.00%
1.5.2.2.3 VESTIDURA DE DERRAMES
1.5.2.2.3.1 VESTIDURA DE DERRAMES EN VANOS (Mezcla C:A, 1:5, E=2 CM, A=15 CM) m 23.00 7.00 161.00 - 0.00% - 0.00% - - 0.00% 23.00 161.00 100.00%
1.5.2.2.3.2 BRUÑAS DE 1 CM X 1CM m 54.20 2.48 134.42 - 0.00% - 0.00% - - 0.00% 54.20 134.42 100.00%
1.5.2.2.4 TARRAJEO PRIMARIO O RAYADO (Mezcla C:A 1:5, E=1.5cm) m² 33.45 12.98 434.18 - 0.00% - 0.00% - - 0.00% 33.45 434.18 100.00%
TARRAJEO EN MUROS INTERIORES (Mezcla C:A 1:4,
1.5.2.2.5
E=2cm)
m² 25.65 15.34 393.47 - 0.00% - 0.00% - - 0.00% 25.65 393.47 100.00%
TARRAJEO EN MUROS EXTERIORES (Mezcla C:A 1:4,
1.5.2.2.6
E=2cm)
m² 36.89 21.55 794.98 - 0.00% - 0.00% - - 0.00% 36.89 794.98 100.00%
1.5.2.3 CIELORRASOS
1.5.2.3.1 CIELO RASO HORIZONTAL (Mezcla C:A 1:4, E=2.5cm) m² 20.84 40.24 838.60 - 0.00% - 0.00% - - 0.00% 20.84 838.60 100.00%
1.5.2.4 PISOS Y PAVIMENTOS
1.5.2.4.1 PISO CERAMICO PARA SS HH DE 0.30x0.30m m² 17.02 51.50 876.53 - 0.00% - 0.00% - - 0.00% 17.02 876.53 100.00%
1.5.2.5 ZOCALOS
1.5.2.5.1 ZOCALOS DE CERAMICO DE 20x30cm EN SS. HH. m² 33.45 51.50 1,722.68 - 0.00% - 0.00% - - 0.00% 33.45 1,722.68 100.00%
1.5.2.5.2 TERMINAL PLÁSTICO PARA CERAMICOS m 22.30 6.72 149.86 - 0.00% - 0.00% - - 0.00% 22.30 149.86 100.00%
1.5.2.6 REVESTIMIENTOS DE LAVATORIO DE CONCRETO
1.5.2.6.1 REVESTIMIENTO DE LAVATORIO EN SS. HH D CON PORCELANATO PULIDO BEIGE DE 60x60CM m² 5.65 86.15 486.75 - 0.00% - 0.00% - - 0.00% 5.65 486.75 100.00%
TERMINAL PLASTICO PARA LAVATORIO DE Cª CON REVESTIMIENTO PORCELANATO COLOR
1.5.2.6.2
NEGRO
m 3.90 6.90 26.91 - 0.00% - 0.00% - - 0.00% 3.90 26.91 100.00%
1.5.2.7 CARPINTERIA DE MADERA
1.5.2.7.1 PUERTAS DE TABLERO REBAJADO SEGUN DISEÑO INC. MARCO Y ACCESORIOS und 2.00 1,051.62 2,103.24 - 0.00% - 0.00% - - 0.00% 2.00 2,103.24 100.00%
1.5.2.8 CARPINTERIA DE MELAMINA
1.5.2.8.1 PUERTA MILAMINE COLOR GRIS SS. HH.V.(INCLUYE BISAGRAS, CERRADURA Y TIRADOR m² 5.46 102.00 556.92 - 0.00% - 0.00% - - 0.00% 5.46 556.92 100.00%
DIVISION MILAMINE COLOR GRIS PARA SS. HH. VARONES (INCLUYE INSTALACION Y
1.5.2.8.2
ACCESORIOS)
m² 9.75 102.00 994.50 - 0.00% - 0.00% - - 0.00% 9.75 994.50 100.00%
1.5.2.9 VIDRIOS, CRISTALES Y SIMILARES
VIDRIO SISTEMA MODUGLASS TRANSPARENTE E=6 MM (INCLUYE ACCESORIOS E
1.5.2.9.1
INSTALACION)
p² 30.78 7.88 242.55 - 0.00% - 0.00% - - 0.00% 30.78 242.55 100.00%
1.5.2.10 PINTURA
PINTURA LATEX EN CIELO RASO HORIZONTAL (Incluye
1.5.2.10.1
Vigas)
m² 20.84 9.07 189.02 - 0.00% - 0.00% - - 0.00% 20.84 189.02 100.00%
1.5.2.10.3 PINTURA EN MUROS EXTERIORES (Incluye Columnas y Derrames) m² 60.14 15.11 908.72 - 0.00% - 0.00% - - 0.00% 60.14 908.72 100.00%
1.5.2.10.4 PINTURA BARNIZ EN PUERTAS DE MADERA m² 4.41 8.84 38.98 - 0.00% - 0.00% - - 0.00% 4.41 38.98 100.00%
1.5.2.11 VARIOS, LIMPIEZA Y JARDINERIA
1.5.2.11.1 TRANSPORTE INTERNO DE MATERIALES vje 100.00 0.40 40.00 - 0.00% - 0.00% - - 0.00% 100.00 40.00 100.00%
1.5.2.11.2 LIMPIEZA FINAL DE OBRA m² 21.55 0.60 12.93 - 0.00% - 0.00% - - 0.00% 21.55 12.93 100.00%
1.5.3 INSTALACIONES SANITARIAS SS.HH.
1.5.3.1 APARATOS SANITARIOS Y ACCESORIOS
1.5.3.1.1 INODORO DOS PIEZAS pza 4.00 250.00 1,000.00 - 0.00% - 0.00% - - 0.00% 4.00 1,000.00 100.00%
1.5.3.1.2 ACCESORIOS PARA INODORO pza 4.00 36.00 144.00 - 0.00% - 0.00% - - 0.00% 4.00 144.00 100.00%
1.5.3.1.3 TUBERIA GALVANIZADA PARA URINARIO pza 1.00 16.00 16.00 - 0.00% - 0.00% - - 0.00% 1.00 16.00 100.00%
1.5.3.1.4 COLOCACION DE APARATOS SANITARIOS pza 4.00 27.47 109.88 - 0.00% - 0.00% - - 0.00% 4.00 109.88 100.00%
COSTO ANTERIOR ACTUAL ACUMULADO SALDO
UNITARIO COSTO PARCIAL
ITEM PARTIDAS UND. METRADO METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACI % METRADO SALDO %
(S/.) (S/.)
TOTAL TOTAL ON TOTAL
1.5.3.1.5 COLOCACION DE ACCESORIOS SANITARIOS pza 4.00 13.80 55.20 - 0.00% - 0.00% - - 0.00% 4.00 55.20 100.00%
1.5.3.2 INSTALACIONES SANITARIAS
1.5.3.2.1 REDES DE DISTRIBUCIÓN
1.5.3.2.1.1 RED DE DISTRIBUCION TUBERIA PVC SAL Ø 2" m 20.00 10.20 204.00 - 0.00% - 0.00% - - 0.00% 20.00 204.00 100.00%
COSTO ANTERIOR ACTUAL ACUMULADO SALDO
UNITARIO COSTO PARCIAL
ITEM PARTIDAS UND. METRADO METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACI % METRADO SALDO %
(S/.) (S/.)
TOTAL TOTAL ON TOTAL
1.5.3.2.1.2 REDES DE DISTRIBUCION: TUBERIA PVC SAL 4" m 15.00 10.90 163.50 - 0.00% - 0.00% - - 0.00% 15.00 163.50 100.00%
1.5.3.2.2 INSTALACION DE BIODIGESTOR
1.5.3.2.2.1 EXCAVACION MANUAL EN TERRENO NATURAL m³ 2.88 19.91 57.34 - 0.00% - 0.00% - - 0.00% 2.88 57.34 100.00%
1.5.3.2.2.2 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO m³ 1.58 15.40 24.33 - 0.00% - 0.00% - - 0.00% 1.58 24.33 100.00%
1.5.3.2.2.3 CAJA DE REGISTRO DESAGUE und 2.00 56.96 113.92 - 0.00% - 0.00% - - 0.00% 2.00 113.92 100.00%
1.5.3.2.2.4 CONCRETO F'C=140 KG/CM2 m³ 0.18 257.46 46.34 - 0.00% - 0.00% - - 0.00% 0.18 46.34 100.00%
1.5.3.2.2.5 ACERO FY=4200 KG/CM2 kg 4.60 5.97 27.46 - 0.00% - 0.00% - - 0.00% 4.60 27.46 100.00%
1.5.3.2.2.6 ENCOFRADO Y DESENCOFRADO m² 2.40 43.75 105.00 - 0.00% - 0.00% - - 0.00% 2.40 105.00 100.00%
1.5.3.2.2.7 TUBERIA PVC SAL 4" m 10.00 10.90 109.00 - 0.00% - 0.00% - - 0.00% 10.00 109.00 100.00%
1.5.3.2.2.8 TUBERIA PVC SAL Ø 2" m 25.00 10.20 255.00 - 0.00% - 0.00% - - 0.00% 25.00 255.00 100.00%
1.5.3.2.2.9 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 1300L und 1.00 2,589.49 2,589.49 - 0.00% - 0.00% - - 0.00% 1.00 2,589.49 100.00%
1.5.3.2.3 INSTALACION DE ZANJAS DE INFILTRACION
1.5.3.2.3.1 EXCAVACION MANUAL EN TERRENO NATURAL m³ 6.72 19.91 133.80 - 0.00% - 0.00% - - 0.00% 6.72 133.80 100.00%
1.5.3.2.3.2 RELLENO CON MATERIAL CLASIFICADO m³ 4.20 43.04 180.77 - 0.00% - 0.00% - - 0.00% 4.20 180.77 100.00%
1.5.3.2.3.3 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO m³ 2.52 15.40 38.81 - 0.00% - 0.00% - - 0.00% 2.52 38.81 100.00%
1.5.3.2.3.4 TUBERIA PVC SAL Ø 2" m 14.00 10.20 142.80 - 0.00% - 0.00% - - 0.00% 14.00 142.80 100.00%
1.5.3.2.3.5 CODO DE 90 PVC SAL D=2" und 2.00 19.77 39.54 - 0.00% - 0.00% - - 0.00% 2.00 39.54 100.00%
1.5.3.2.3.6 TEE PVC SAL D=2" und 1.00 9.77 9.77 - 0.00% - 0.00% - - 0.00% 1.00 9.77 100.00%
1.5.3.2.4 ACCESORIOS DE REDES
1.5.3.2.4.1 ACCESORIOS DE REDES CODOS PVC SAL 2"x45 pza 10.00 1.80 18.00 - 0.00% - 0.00% - - 0.00% 10.00 18.00 100.00%
1.5.3.2.4.2 ACCESORIOS DE REDES CODOS PVC SAL 2"x90 pza 15.00 1.40 21.00 - 0.00% - 0.00% - - 0.00% 15.00 21.00 100.00%
1.5.3.2.4.3 ACCESORIOS DE REDES: CODOS PVC SAL 4"x45 pza 5.00 5.20 26.00 - 0.00% - 0.00% - - 0.00% 5.00 26.00 100.00%
1.5.3.2.4.4 ACCESORIOS DE REDES CODOS PVC SAL 4"x90º pza 2.00 5.20 10.40 - 0.00% - 0.00% - - 0.00% 2.00 10.40 100.00%
1.5.3.2.4.5 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 2" pza 3.00 2.20 6.60 - 0.00% - 0.00% - - 0.00% 3.00 6.60 100.00%
1.5.3.2.4.6 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 4" pza 4.00 5.20 20.80 - 0.00% - 0.00% - - 0.00% 4.00 20.80 100.00%
1.5.3.2.4.7 ACCESORIOS DE REDES: YEES PVC SAL 2" pza 4.00 2.90 11.60 - 0.00% - 0.00% - - 0.00% 4.00 11.60 100.00%
1.5.3.2.4.8 ACCESORIOS DE REDES: YEES PVC SAL 4" pza 2.00 7.70 15.40 - 0.00% - 0.00% - - 0.00% 2.00 15.40 100.00%
1.5.3.2.4.9 ACCESORIOS DE REDES: YEES PVC SAL 4"x2" pza 4.00 7.70 30.80 - 0.00% - 0.00% - - 0.00% 4.00 30.80 100.00%
1.5.3.2.4.10 ACCESORIOS DE REDES: REDUCCION PVC SAL DE 4" a 2" pza 4.00 5.26 21.04 - 0.00% - 0.00% - - 0.00% 4.00 21.04 100.00%
1.5.3.2.5 ADITAMENTOS VARIOS
1.5.3.2.5.1 ADITAMIENTOS VARIOS:SUMEDIRO DE BRONCE DE 2" pza 6.00 20.60 123.60 - 0.00% - 0.00% - - 0.00% 6.00 123.60 100.00%
1.5.3.2.5.2 ADITAMIENTOS VARIOS:REGISTRO ROSCADO DE BRONCE DE 4" pza 2.00 24.20 48.40 - 0.00% - 0.00% - - 0.00% 2.00 48.40 100.00%
1.5.3.2.5.3 ADITAMIENTOS VARIOS: VENTILACION EN PARED PVC DE 2" pza 2.00 20.60 41.20 - 0.00% - 0.00% - - 0.00% 2.00 41.20 100.00%
1.5.3.2.6 CAJAS DE REGISTRO
1.5.3.2.6.1 CAJAS DE REGISTRO DE CONCRETO INC. TAPA und 3.00 64.10 192.30 - 0.00% - 0.00% - - 0.00% 3.00 192.30 100.00%
1.5.3.2.7 SALIDA DE VENTILACION PVC SAL 2" pto 2.00 12.22 24.44 - 0.00% - 0.00% - - 0.00% 2.00 24.44 100.00%
1.5.3.2.8 SALIDA DE DESAGUE PVC SAL 2" pto 2.00 31.42 62.84 - 0.00% - 0.00% - - 0.00% 2.00 62.84 100.00%
1.5.3.2.9 SALIDA DE DESAGUE PVC SAL 4" pto 4.00 34.39 137.56 - 0.00% - 0.00% - - 0.00% 4.00 137.56 100.00%
1.5.3.3 SISTEMA DE AGUA FRIA
1.5.3.3.1 REDES DE DISTRIBUCIÓN
1.5.3.3.1.1 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 DE 1/2"x5M C/ROSCA m 150.00 8.82 1,323.00 - 0.00% - 0.00% - - 0.00% 150.00 1,323.00 100.00%
1.5.3.3.2 ACCESORIOS DE REDES
1.5.3.3.2.1 ACCESORIOS DE REDES: UNION UNIVERSAL HIDRO 3 DE 1/2" pza 4.00 10.02 40.08 - 0.00% - 0.00% - - 0.00% 4.00 40.08 100.00%
1.5.3.3.2.2 ACCESORIOS DE REDES: UNION SIMPLE HIDRO 3 DE 1/2" C/ROSCA pza 16.00 1.32 21.12 - 0.00% - 0.00% - - 0.00% 16.00 21.12 100.00%
1.5.3.3.2.3 ACCESORIOS DE REDES: CODOS HIDRO 3 DE 1/2" x 90° C/ROSCA pza 35.00 1.52 53.20 - 0.00% - 0.00% - - 0.00% 35.00 53.20 100.00%
1.5.3.3.2.4 ACCESORIOS DE REDES: TEES HIDRO 3 DE 1/2" C/ROSCA pza 30.00 2.42 72.60 - 0.00% - 0.00% - - 0.00% 30.00 72.60 100.00%
1.5.3.3.3 LLAVES VÁLVULAS
1.5.3.3.3.1 VALVULA DE COMPUERTA DE BRONCE DE 1/2" M/ITALY pza 2.00 43.24 86.48 - 0.00% - 0.00% - - 0.00% 2.00 86.48 100.00%
1.5.3.3.4 SALIDA DE AGUA FRIA DE 1/2" (INCLUYE TUBERIA PVC Y ACCESORIOS PVC C-10 pto 9.00 28.67 258.03 - 0.00% - 0.00% - - 0.00% 9.00 258.03 100.00%
1.5.3.4 SISTEMA DE AGUA DE LLUVIA
1.5.3.4.1 ACCESORIOS DE REDES
1.5.3.4.1.1 ACCESORIOS DE REDES: CODOS PVC DE 3" x 90º pza 4.00 2.90 11.60 - 0.00% - 0.00% - - 0.00% 4.00 11.60 100.00%
1.5.3.4.2 TUBERIA DE BAJADA Y DISTRIBUCION: TUBERIA PVC SAL 3" m 8.00 12.16 97.28 - 0.00% - 0.00% - - 0.00% 8.00 97.28 100.00%
1.5.3.5 TANQUE ELEVADO (POLIETILENO)
1.5.3.5.1 REDES DE ALIMENMTACION Y DISTRIBUCION
1.5.3.5.1.1 RED DE ALIMENTACION: TUBERIA PVC SAP DIAM= 1/2" C- 10 m 30.00 8.82 264.60 - 0.00% - 0.00% - - 0.00% 30.00 264.60 100.00%
1.5.3.5.1.2 RED DE DISTRIBUCION: TUBERIA PVC SAP DIAM=1/2" C-10 m 10.00 8.82 88.20 - 0.00% - 0.00% - - 0.00% 10.00 88.20 100.00%
1.5.3.5.2 ACCESORIOS DE REDES
COSTO ANTERIOR ACTUAL ACUMULADO SALDO
UNITARIO COSTO PARCIAL
ITEM PARTIDAS UND. METRADO METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACI % METRADO SALDO %
(S/.) (S/.)
TOTAL TOTAL ON TOTAL
1.5.3.5.2.1 ACCESORIOS DE REDES: UNION UNIVERSAL HIDRO 3 DE 1/2" pza 4.00 10.02 40.08 - 0.00% - 0.00% - - 0.00% 4.00 40.08 100.00%
1.5.3.5.2.2 ACCESORIOS DE REDES: UNION SIMPLE HIDRO 3 DE 1/2" C/ROSCA pza 6.00 1.32 7.92 - 0.00% - 0.00% - - 0.00% 6.00 7.92 100.00%
COSTO ANTERIOR ACTUAL ACUMULADO SALDO
UNITARIO COSTO PARCIAL
ITEM PARTIDAS UND. METRADO METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACI % METRADO SALDO %
(S/.) (S/.)
TOTAL TOTAL ON TOTAL
1.5.3.5.2.3 ACCESORIOS DE REDES: CODOS HIDRO 3 DE 1/2" x 90° C/ROSCA pza 10.00 1.52 15.20 - 0.00% - 0.00% - - 0.00% 10.00 15.20 100.00%
1.5.3.5.2.4 TANQUE POLIETILENO ROTOPLAS CAP. 1100 LITROS INC. ACCESORIOS pza 1.00 711.36 711.36 - 0.00% - 0.00% - - 0.00% 1.00 711.36 100.00%
1.5.3.5.2.5 BASE METALICO PARA TANQUE POLIETILENO GLB 1.00 600.00 600.00 - 0.00% - 0.00% - - 0.00% 1.00 600.00 100.00%
1.5.3.5.3 LLAVES VÁLVULAS
1.5.3.5.3.1 VALVULA DE COMPUERTA DE BRONCE DE 1/2" M/ITALY pza 1.00 43.24 43.24 - 0.00% - 0.00% - - 0.00% 1.00 43.24 100.00%
1.5.3.5.3.2 VALVULA CHECK DE BRONCE DE 1/2" M/ITALY pza 1.00 73.24 73.24 - 0.00% - 0.00% - - 0.00% 1.00 73.24 100.00%
1.5.3.6 OBRAS DE CONCRETO ARMADO
1.5.3.6.1 COLUMNAS SANITARIAS
1.5.3.6.1.1 COLUMNAS SANITARIAS: CONCRETO F'C=175 KG/CM m³ 0.07 372.41 26.07 - 0.00% - 0.00% - - 0.00% 0.07 26.07 100.00%
1.5.3.6.1.2 COLUMNAS SANITARIAS : ENCOFRADO Y DESENCOFRADO m² 1.44 43.95 63.29 - 0.00% - 0.00% - - 0.00% 1.44 63.29 100.00%
1.5.3.6.1.3 COLUMNAS SANITARIAS: ACERO GRADO FY=4200 KG/CM2 kg 6.23 5.97 37.19 - 0.00% - 0.00% - - 0.00% 6.23 37.19 100.00%
1.5.3.6.1.4 COLUMNAS SANITARIAS:TARRAJEO DE SUPERFICIE (MEZCLA C:A 1:5, E=1.5 CM) m² 1.44 20.81 29.97 - 0.00% - 0.00% - - 0.00% 1.44 29.97 100.00%
1.5.3.6.1.5 COLUMNAS SANITARIAS: VISTIDURA DE ARISTAS m 3.20 4.42 14.14 - 0.00% - 0.00% - - 0.00% 3.20 14.14 100.00%
1.5.4 INSTALACIONES ELECTRICAS SS.HH.
1.5.4.1 INSTALACION ELECTRICA
1.5.4.1.1 INSTALACION CAJA OCTOGONALES DE 100mm x 50mm und 2.00 5.98 11.96 - 0.00% - 0.00% - - 0.00% 2.00 11.96 100.00%
1.5.4.1.2 INSTALACION CAJA RECTANGULARES DE 100x 50x55mm und 4.00 5.98 23.92 - 0.00% - 0.00% - - 0.00% 4.00 23.92 100.00%
1.5.4.1.3 INSTALACION DE INTERRUPTOR SIMPLE und 2.00 10.48 20.96 - 0.00% - 0.00% - - 0.00% 2.00 20.96 100.00%
1.5.4.1.4 INSTALACION DE TOMACORRIENTE DOBLE CON TOMA A TIERRA und 2.00 27.42 54.84 - 0.00% - 0.00% - - 0.00% 2.00 54.84 100.00%
1.5.4.2 CANALIZACIONES Y/O TUBERIAS
1.5.4.2.1 INSTALACION DE DUCTOS PVC SEL Ø 3/4" m 55.00 4.95 272.25 - 0.00% - 0.00% - - 0.00% 55.00 272.25 100.00%
1.5.4.3 CONDUCTORES Y/O CABLES
1.5.4.3.1 CABLEADO CONDUCTOR DE Cu. DE 1x2.5mm2 TW-70 CABLEADO 7 HILOS m 150.00 2.45 367.50 - 0.00% - 0.00% - - 0.00% 150.00 367.50 100.00%
1.5.4.3.2 CABLEADO CONDUCTOR Cu. DE 1x4.0mm2 TW-70 CABLEADO 7 HILOS m 40.00 3.50 140.00 - 0.00% - 0.00% - - 0.00% 40.00 140.00 100.00%
1.5.4.4 TABLEROS E INTERRUPTORES TERMOMAGNETICOS
1.5.4.4.1 TABLERO DE DISTRIBUCION TD1 (8 POLOS) und 1.00 169.81 169.81 - 0.00% - 0.00% - - 0.00% 1.00 169.81 100.00%
1.5.4.5 ARTEFACTOS DE ILUMINACION
LUMINARIA PLASTICA CUADRADA COLOR BLANCO C/LAMAPARA FLUORESCENTE CIRCULAR
1.5.4.5.1
DE 32W C/EQUIPO Y PANTALLA
EQ 2.00 87.41 174.82 - 0.00% - 0.00% - - 0.00% 2.00 174.82 100.00%
1.6.4 ESTRUCTURAS METALICAS
1.6.4.1 PANELES DE MALLA DE F.G. CON MARCO DE TUBO (T-3), SEGUN DISEÑO und 9.00 811.60 7,304.40 - 0.00% - 0.00% - - 0.00% 9.00 7,304.40 100.00%
1.6.4.2 POSTE PEDESTAL DE FIERRO GALVANIZADO DE 3" und 10.00 68.48 684.80 - 0.00% - 0.00% - - 0.00% 10.00 684.80 100.00%
1.6.5 PINTURA
1.6.5.1 PINTADO ESMALTE EN GRADERIOS m² 30.14 15.67 472.29 - 0.00% - 0.00% - - 0.00% 30.14 472.29 100.00%
1.6.5.2 PINTADO ESMALTE EN ESTRUCTURAS METALICAS m² 6.07 14.57 88.44 - 0.00% - 0.00% - - 0.00% 6.07 88.44 100.00%
1.7 PLAN COVID19
1.7.1 PLAN DE VIGILANCIA, PREVENCION Y CONTROL DEL COVID 19 und 1.00 4,000.00 4,000.00 - 0.00% - 0.00% - - 0.00% 1.00 4,000.00 100.00%
COSTO DIRECTO S/. 512,601.18 0.00 0.00% 0.00 0.00% 0.00 0.00% 512,601.18 100.00%
9.01% GASTOS GENERALES 16.76% S/. 85,924.83 0.00 0.00 0.00 85,924.83
GASTOS DE SUPERVISION 3.20% S/. 16,396.83 0.00 0.00 0.00 16,396.83
GASTOS DE LIQUIDACION 1.36% S/. 6,973.42 0.00 0.00 0.00 6,973.42
0.00% GASTOS DE EXP.TECNICO 1.95% S/. 10,000.00 0.00 0.00 0.00 10,000.00
COSTO ANTERIOR ACTUAL ACUMULADO SALDO
UNITARIO COSTO PARCIAL
ITEM PARTIDAS UND. METRADO METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACI % METRADO SALDO %
(S/.) (S/.)
TOTAL TOTAL ON TOTAL
PRESUPUESTO TOTAL S/. 631,896.26 0.00 0.00 0.00 631,896.26
ADCIONAL N° 01 -
0.00 0.00 0.00
PARTIDAS NUEVAS
PRESUPUESTO
631,896.26 0.00 0.00 631,896.26
CONSOLIDADO
COSTO TOTAL ACUMULADO (A) + (D) 631,896.26 0.00 0.00 0.00 631,896.26
PORCENTAJE ACUMULADO 100.00% 0.00% 0.00% 0.00% 100.00%
CUADRO DE RESUMEN
COSTO REFERENCIAL DEL EXPEDIENTE (A) 631,896.26
COSTO ADICIONAL EJECUTADO POR OBRAS NECESARIAS (D) 0.00
COSTO TOTAL DE OBRA ACUMULADO (A)+(D) 631,896.26
PORCENTAJE DE ADICIONAL EJECUTADO (D)/(A) 0.00%
VALORIZACIÓN ACUMULADA AL MES (D) 0.00
% AVANCE FISICO ACTUAL ACUMULADO (C)/(A)*100 0.00%
FORMATO RO - 07
RESUMEN DE METRADOS REALES DIARIOS ACUMULADO
CREACION DEL ESPACIO DEPORTIVO EN EL C.P. TACASAYA DEL DISTRITO DE CHUCUITO - PROVINCIA DE PUNO -
OBRA
DEPARTAMENTO DE PUNO
ENTIDAD EJECUTOR MUNICIPALIDAD DISTRITAL DE CHUCUITO
MODALIDAD DE EJECUCION ADMINISTRACION DIRECTA
RESIDENTE DE OBRA ING. PAUL ESLEYTER CUEVA ALANGUIA
INSPECTOR DE OBRA ING. EBERTH SABINO GOMEZ CRUZ
INFORME 001
CREACION DEL ESPACIO DEPORTIVO EN EL CP
1.0 TACASAYA DEL DISTRITO DE CHUCUITO - PROVINCIA DE
PUNO - DEPARTAMENTO DE PUNO
1.1 CONSTRUCCION DE ESPACIO DEPORTIVO 01
1.1.1 OBRAS PROVISIONALES, SEGURIDAD Y SALUD EN OBRA
1.3.6.8.3 DIBUJO Y PINTADO DE MURAL CON MOTIVOS DEPORTIVOS m² 52.80 72.05 3,804.24 0 0
1.3.6.9 VARIOS
1.3.6.9.1 TRANSPORTE INTERNO DE MATERIALES vje 100.00 0.75 75.00 0 0
CONSTRUCCION DE SUMINISTRO DE ENERGIA ELECTRICA
1.4
1.4.1 OBRAS DE CONCRETO SIMPLE
1.4.1.1 DADOS DE CONCRETO: CONCRETO F'C=175 KG/CM2 m³ 1.08 307.81 332.43 0 0
1.4.1.2 DADOS DE CONCRETO: ENCOFRADO Y DESENCOFRADO m² 7.20 36.10 259.92 0 0
1.4.2 CAJAS DE PASO
1.4.2.1 INSTALACION CAJA GALVANIZADA DE 6"x6"x4" und 6.00 29.29 175.74 0 0
1.4.3 TABLEROS E INTERRUPTORES TERMOMAGNETICOS
1.4.3.1 TABLERO GENERAL TG und 1.00 529.43 529.43 0 0
1.4.4 CANALIZACIONES Y/O TUBERIAS
1.4.4.1 INSTALACION DE DUCTOS PVC SAP D=2" m 200.00 5.50 1,100.00 0 0
1.4.4.2 INSTALACION DE CURVAS PVC SAP D=2" und 30.00 4.23 126.90 0 0
1.4.5 CONDUCTORES Y/O CABLES
EXCAVACION MANUAL PARA CABLE SUBTERRANEO 191.97
1.4.5.1
(Terreno normal)
m³ 9.00 21.33 0 0
1.4.5.2 CAMA DE APOYO PARA TUBERIA DE 2" CON ARENA GRUESA m 200.00 34.87 6,974.00 0 0
1.4.5.3 RELLENO Y COMPACTADO DE ZANJA CON MATERIAL PROPIO m³ 9.00 11.95 107.55 0 0
1.4.5.4 CABLEADO CONDUCTOR DE Cu. TIPO NYY DE 1X10 mm2 CABLEADO DE 7 HILOS m 250.00 11.37 2,842.50 0 0
1.4.5.5 CABLEADO CONDUCTOR DE Cu. TIPO NYY DE 1X4.0 mm2 CABLEADO DE 7 HILOS m 57.00 13.47 767.79 0 0
1.4.5.6 CABLEADO CONDUCTOR DE Cu. TIPO NYY DE 1X2.5 mm2 CABLEADO DE 7 HILOS m 307.00 11.37 3,490.59 0 0
1.4.6 POZO DE PUESTA A TIERRA
EXCAVACION PARA POZO PUESTA A TIERRA (Terreno 9.56
1.4.6.1
Normal)
m³ 0.48 19.91 0 0
1.4.6.2 POZO DE PUESTA A TIERRA GLB 1.00 3,336.89 3,336.89 0 0
1.4.6.3 CAJA DE REGISTRO PARA POZO PUESTA A TIERRA pza 1.00 73.80 73.80 0 0
1.4.6.4 INSTALACION DE CONDUCTOR DE PUESTA A TIERRA m 50.00 25.93 1,296.50 0 0
1.4.7 POSTE PEDESTAL
1.4.7.1 POSTE PEDESTAL PARA REFLECTORES und 6.00 452.80 2,716.80 0 0
1.4.8 ARTEFACTOS DE ILUMINACION
1.4.8.1 REFLECTOR DE 400W und 6.00 569.63 3,417.78 0 0
1.4.9 INSPECCION Y PRUEBAS ELECTRICAS
1.4.9.1 PRUEBAS EN INSTALACIONES ELECTRICAS GLB 1.00 871.10 871.10 0 0
1.5 CONSTRUCCION DE SERVICIOS HIGIENICOS
1.5.1 ESTRUCTURAS SS.HH.
1.5.1.1 TRABAJOS PRELIMINARES
1.5.1.1.1 LIMPIEZA DEL TERRENO m² 21.55 1.19 25.64 0 0
1.5.1.1.2 TRAZO NIVELES Y REPLANTEO PRELIMINAR m² 21.55 0.57 12.28 0 0
1.5.1.1.3 TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO m² 21.55 0.59 12.71 0 0
1.5.1.2 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL PARA ZAPATAS AISLADAS (Terreno 329.82
1.5.1.2.1
Normal)
m³ 13.80 23.90 0 0
EXCAVACION CON MAQUINARIA PARA CIMIENTOS 74.96
1.5.1.2.2
(Terreno Normal)
m³ 6.44 11.64 0 0
1.5.1.2.3 RELLENO Y COMPACTADO DE FUNDACIONES CON MATERIAL DE PRESTAMO m³ 8.97 55.46 497.48 0 0
1.5.1.2.4 ACARREO DE MATERIAL PROVENIENTE DE EXCAVACIONES, D=30m m³ 24.28 9.96 241.83 0 0
1.5.1.2.5 ELIMINACION DE MATERIAL EXCEDENTE DE EXCAVACIONES m³ 24.28 8.43 204.68 0 0
1.5.1.3 OBRAS DE CONCRETO SIMPLE
1.5.1.3.1 ZAPATAS
1.5.1.3.1.1 SUBAZAPATA: F'C=175KG/CM2 + 30% P.M (MAX DE 6") m³ 4.80 284.74 1,366.75 0 0
1.5.1.3.1.2 SOLADO PARA ZAPATAS AISLADAS C:H, 1:10 E=4" m² 6.00 31.70 190.20 0 0
1.5.1.3.2 CIMIENTOS CORRIDOS
1.5.1.3.2.1 CIMIENTO CORRIDO: MEZCLA 1:10 + 30%PG m³ 5.69 163.04 927.70 0 0
1.5.1.3.3 SOBRECIMIENTOS
SOBRECIMIENTOS : MEZCLA DE CONCRETO 1:8 (C:H) + 25 368.05
1.5.1.3.3.1
% PIEDRA MEDIANA
m³ 1.70 216.50 0 0
1.5.1.3.3.2 SOBRECIMIENTOS: ENCOFRADO Y DESENCOFRADO m² 15.26 42.39 646.87 0 0
1.5.1.3.4 FALSO PISO
1.5.1.3.4.1 FALSO PISO DE 4" MEZCLA 1:8 C.H m² 16.74 37.10 621.05 0 0
1.5.1.4 OBRAS DE CONCRETO ARMADO
1.5.1.4.1 ZAPATAS AISLADAS
1.5.1.4.1.1 ZAPATAS AISLADAS: CONCRETO F'C=210 Kg/cm2 m³ 2.40 353.09 847.42 0 0
1.5.1.4.1.2 ZAPATAS AISLADAS: ACERO GRADO 60 FY=4200 Kg/cm2 kg 71.52 5.97 426.97 0 0
1.5.1.4.2 COLUMNAS RECTAS
1.5.1.4.2.1 COLUMNAS RECTAS: CONCRETO F'C=210 KG/CM2 m³ 1.69 406.56 687.09 0 0
1.5.1.4.2.2 COLUMNAS RECTAS: ENCOFRADO Y DESENCOFRADO m² 27.00 43.12 1,164.24 0 0
1.5.1.4.2.3 COLUMNAS: ACERO GRADO 60 Fy= 4200 Kg/cm2 kg 244.50 5.97 1,459.67 0 0
1.5.1.4.3 VIGAS RECTAS
1.5.1.4.3.1 VIGAS RECTAS: CONCRETO F'C= 210 KG/CM2 m³ 1.71 367.48 628.39 0 0
1.5.1.4.3.2 VIGAS RECTAS: ENCOFRADO Y DESENCOFRADO m² 9.95 55.31 550.33 0 0
1.5.1.4.3.3 VIGAS RECTAS: ACERO GRADO 60 FY= 4200 KG/CM2 kg 227.05 6.00 1,362.30 0 0
1.5.1.4.4 LOSA ALIGERADA
1.5.1.4.4.1 LOSA ALIGERADA HORIZONTAL: CONCRETO F'C=210 KG/CM2 m³ 3.43 344.03 1,180.02 0 0
1.5.1.4.4.2 LOSA ALIGERADA HORIZONTAL: ENCOFRADO Y DESENCOFRADO m² 19.53 43.75 854.44 0 0
1.5.1.4.4.3 LOSAS ALIGERADAS: ACERO FY=4200 KG/CM2 kg 98.32 5.97 586.97 0 0
1.5.1.4.4.4 LOSAS ALIGERADAS: LADRILLO HUECO 30x30x15 cm und 35.15 4.03 141.65 0 0
1.5.1.4.5 LAVATORIO DE CONCRETO
1.5.1.4.5.1 LAVATORIO DE CONCRETO: CONCRETO F'C=175 KG/CM2 m³ 0.34 355.92 121.01 0 0
1.5.1.4.5.2 MESAS DE CONCRETO: ENCOFRADO Y DESENCOFRADO m² 2.76 42.74 117.96 0 0
1.5.1.4.5.3 MESA DE CONCRETO: ACERO FY=4200 KG/CM2 kg 17.25 5.97 102.98 0 0
1.5.1.4.6 VIGUETAS RECTAS
1.5.1.4.6.1 VIGUETAS RECTAS: CONCRETO F'C= 175 KG/CM2 m³ 0.43 335.08 144.08 0 0
1.5.1.4.6.2 VIGUETAS RECTAS: ENCOFRADO Y DESENCOFRADO m² 5.67 55.31 313.61 0 0
1.5.1.4.6.3 VIGUETAS RECTAS: ACERO GRADO 60 FY= 4200 KG/CM2 kg 32.78 6.00 196.68 0 0
1.5.1.5 ESTRUCTURAS METALICAS
1.5.1.5.1 ESCALERA DE GATO, SEGUN DISEÑO und 1.00 574.35 574.35 0 0
1.5.1.6 VARIOS
1.5.1.6.1 PRUEBAS DE CONTROL DE CALIDAD GLB 1.00 1,465.00 1,465.00 0 0
1.5.1.6.2 TRANSPORTE INTERNO DE MATERIALES vje 200.00 0.40 80.00 0 0
1.5.2 ARQUITECTURA SS.HH.
1.5.2.1 MUROS Y TABIQUES DE ALBAÑILERIA
1.5.2.1.1 MURO DE LADRILLO KING KONG MECANIZADO (CABEZA) J=2 CM m² 35.16 122.32 4,300.77 0 0
1.5.2.1.2 MURO DE LADRILLO KING KONG MECANIZADO (SOGA) J=2 CM m² 20.33 72.50 1,473.93 0 0
1.5.2.2 REVOQUES, ENLUCIDOS Y MOLDURAS
1.5.2.2.1 TARRAJEO DE COLUMNAS Y PLACAS
COLUMNAS RECTAS: TARRAJEO DE SUPERFICIES ( 216.16
1.5.2.2.1.1
Mezcla C:A 1:5, E=2cm)
m² 8.48 25.49 0 0
1.5.2.2.1.2 COLUMNAS RECTAS: VESTIDURA DE ARISTAS m 10.60 4.42 46.85 0 0
1.5.2.2.2 TARRAJEO DE VIGAS
1.5.2.2.2.1 VIGAS RECTAS: TARRAJEO DE SUPERFICIES (Mezcla C:A 1:5, E=2cm) m² 11.32 26.02 294.55 0 0
1.5.2.2.2.2 VIGAS RECTAS: VESTIDURA DE ARISTAS m 12.40 4.82 59.77 0 0
1.5.2.2.3 VESTIDURA DE DERRAMES
1.5.2.2.3.1 VESTIDURA DE DERRAMES EN VANOS (Mezcla C:A, 1:5, E=2 CM, A=15 CM) m 23.00 7.00 161.00 0 0
1.5.2.2.3.2 BRUÑAS DE 1 CM X 1CM m 54.20 2.48 134.42 0 0
1.5.2.2.4 TARRAJEO PRIMARIO O RAYADO (Mezcla C:A 1:5, E=1.5cm) m² 33.45 12.98 434.18 0 0
TARRAJEO EN MUROS INTERIORES (Mezcla C:A 1:4, 393.47
1.5.2.2.5
E=2cm)
m² 25.65 15.34 0 0
TARRAJEO EN MUROS EXTERIORES (Mezcla C:A 1:4, 794.98
1.5.2.2.6
E=2cm)
m² 36.89 21.55 0 0
1.5.2.3 CIELORRASOS
1.5.2.3.1 CIELO RASO HORIZONTAL (Mezcla C:A 1:4, E=2.5cm) m² 20.84 40.24 838.60 0 0
1.5.2.4 PISOS Y PAVIMENTOS
1.5.2.4.1 PISO CERAMICO PARA SS HH DE 0.30x0.30m m² 17.02 51.50 876.53 0 0
1.5.2.5 ZOCALOS
1.5.2.5.1 ZOCALOS DE CERAMICO DE 20x30cm EN SS. HH. m² 33.45 51.50 1,722.68 0 0
1.5.2.5.2 TERMINAL PLÁSTICO PARA CERAMICOS m 22.30 6.72 149.86 0 0
1.5.2.6 REVESTIMIENTOS DE LAVATORIO DE CONCRETO
REVESTIMIENTO DE LAVATORIO EN SS. HH D CON PORCELANATO PULIDO BEIGE DE 486.75
1.5.2.6.1
60x60CM
m² 5.65 86.15 0 0
TERMINAL PLASTICO PARA LAVATORIO DE Cª CON REVESTIMIENTO PORCELANATO 26.91
1.5.2.6.2
COLOR NEGRO
m 3.90 6.90 0 0
1.5.2.7 CARPINTERIA DE MADERA
1.5.2.7.1 PUERTAS DE TABLERO REBAJADO SEGUN DISEÑO INC. MARCO Y ACCESORIOS und 2.00 1,051.62 2,103.24 0 0
1.5.2.8 CARPINTERIA DE MELAMINA
PRESUPUESTO (S/.) Dec-21
L M M J V S D L M M J V
AVANCE
AVANCE AVANCE
ACUMULA
ITEM PARTIDAS UNIDA COSTO ACTUAL ACUMULAD
METRADO P. U. DO
D PARCIAL 20 21 22 23 24 25 26 27 28 29 30 31 MENSUAL O ACTUAL
ANTERIOR
1.5.2.8.1 PUERTA MILAMINE COLOR GRIS SS. HH.V.(INCLUYE BISAGRAS, CERRADURA Y TIRADOR m² 5.46 102.00 556.92 0 0
DIVISION MILAMINE COLOR GRIS PARA SS. HH. VARONES (INCLUYE INSTALACION Y 994.50
1.5.2.8.2
ACCESORIOS)
m² 9.75 102.00 0 0
1.5.2.9 VIDRIOS, CRISTALES Y SIMILARES
VIDRIO SISTEMA MODUGLASS TRANSPARENTE E=6 MM (INCLUYE ACCESORIOS E 242.55
1.5.2.9.1
INSTALACION)
p² 30.78 7.88 0 0
1.5.2.10 PINTURA
PINTURA LATEX EN CIELO RASO HORIZONTAL (Incluye 189.02
1.5.2.10.1
Vigas)
m² 20.84 9.07 0 0
PINTURA LATEX EN MUROS INTERIORES (Incluye 220.85
1.5.2.10.2
Columnas y Derrames)
m² 25.65 8.61 0 0
1.5.2.10.3 PINTURA EN MUROS EXTERIORES (Incluye Columnas y Derrames) m² 60.14 15.11 908.72 0 0
1.5.2.10.4 PINTURA BARNIZ EN PUERTAS DE MADERA m² 4.41 8.84 38.98 0 0
1.5.2.11 VARIOS, LIMPIEZA Y JARDINERIA
1.5.2.11.1 TRANSPORTE INTERNO DE MATERIALES vje 100.00 0.40 40.00 0 0
1.5.2.11.2 LIMPIEZA FINAL DE OBRA m² 21.55 0.60 12.93 0 0
1.5.3 INSTALACIONES SANITARIAS SS.HH.
1.5.3.1 APARATOS SANITARIOS Y ACCESORIOS
1.5.3.1.1 INODORO DOS PIEZAS pza 4.00 250.00 1,000.00 0 0
1.5.3.1.2 ACCESORIOS PARA INODORO pza 4.00 36.00 144.00 0 0
1.5.3.1.3 TUBERIA GALVANIZADA PARA URINARIO pza 1.00 16.00 16.00 0 0
1.5.3.1.4 COLOCACION DE APARATOS SANITARIOS pza 4.00 27.47 109.88 0 0
1.5.3.1.5 COLOCACION DE ACCESORIOS SANITARIOS pza 4.00 13.80 55.20 0 0
1.5.3.2 INSTALACIONES SANITARIAS
1.5.3.2.1 REDES DE DISTRIBUCIÓN
1.5.3.2.1.1 RED DE DISTRIBUCION TUBERIA PVC SAL Ø 2" m 20.00 10.20 204.00 0 0
1.5.3.2.1.2 REDES DE DISTRIBUCION: TUBERIA PVC SAL 4" m 15.00 10.90 163.50 0 0
1.5.3.2.2 INSTALACION DE BIODIGESTOR
1.5.3.2.2.1 EXCAVACION MANUAL EN TERRENO NATURAL m³ 2.88 19.91 57.34 0 0
1.5.3.2.2.2 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO m³ 1.58 15.40 24.33 0 0
1.5.3.2.2.3 CAJA DE REGISTRO DESAGUE und 2.00 56.96 113.92 0 0
1.5.3.2.2.4 CONCRETO F'C=140 KG/CM2 m³ 0.18 257.46 46.34 0 0
1.5.3.2.2.5 ACERO FY=4200 KG/CM2 kg 4.60 5.97 27.46 0 0
1.5.3.2.2.6 ENCOFRADO Y DESENCOFRADO m² 2.40 43.75 105.00 0 0
1.5.3.2.2.7 TUBERIA PVC SAL 4" m 10.00 10.90 109.00 0 0
1.5.3.2.2.8 TUBERIA PVC SAL Ø 2" m 25.00 10.20 255.00 0 0
1.5.3.2.2.9 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 1300L und 1.00 2,589.49 2,589.49 0 0
1.5.3.2.3 INSTALACION DE ZANJAS DE INFILTRACION
1.5.3.2.3.1 EXCAVACION MANUAL EN TERRENO NATURAL m³ 6.72 19.91 133.80 0 0
1.5.3.2.3.2 RELLENO CON MATERIAL CLASIFICADO m³ 4.20 43.04 180.77 0 0
1.5.3.2.3.3 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO m³ 2.52 15.40 38.81 0 0
1.5.3.2.3.4 TUBERIA PVC SAL Ø 2" m 14.00 10.20 142.80 0 0
1.5.3.2.3.5 CODO DE 90 PVC SAL D=2" und 2.00 19.77 39.54 0 0
1.5.3.2.3.6 TEE PVC SAL D=2" und 1.00 9.77 9.77 0 0
1.5.3.2.4 ACCESORIOS DE REDES
1.5.3.2.4.1 ACCESORIOS DE REDES CODOS PVC SAL 2"x45 pza 10.00 1.80 18.00 0 0
1.5.3.2.4.2 ACCESORIOS DE REDES CODOS PVC SAL 2"x90 pza 15.00 1.40 21.00 0 0
1.5.3.2.4.3 ACCESORIOS DE REDES: CODOS PVC SAL 4"x45 pza 5.00 5.20 26.00 0 0
1.5.3.2.4.4 ACCESORIOS DE REDES CODOS PVC SAL 4"x90º pza 2.00 5.20 10.40 0 0
1.5.3.2.4.5 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 2" pza 3.00 2.20 6.60 0 0
1.5.3.2.4.6 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 4" pza 4.00 5.20 20.80 0 0
1.5.3.2.4.7 ACCESORIOS DE REDES: YEES PVC SAL 2" pza 4.00 2.90 11.60 0 0
1.5.3.2.4.8 ACCESORIOS DE REDES: YEES PVC SAL 4" pza 2.00 7.70 15.40 0 0
1.5.3.2.4.9 ACCESORIOS DE REDES: YEES PVC SAL 4"x2" pza 4.00 7.70 30.80 0 0
1.5.3.2.4.10 ACCESORIOS DE REDES: REDUCCION PVC SAL DE 4" a 2" pza 4.00 5.26 21.04 0 0
1.5.3.2.5 ADITAMENTOS VARIOS
1.5.3.2.5.1 ADITAMIENTOS VARIOS:SUMEDIRO DE BRONCE DE 2" pza 6.00 20.60 123.60 0 0
1.5.3.2.5.2 ADITAMIENTOS VARIOS:REGISTRO ROSCADO DE BRONCE DE 4" pza 2.00 24.20 48.40 0 0
1.5.3.2.5.3 ADITAMIENTOS VARIOS: VENTILACION EN PARED PVC DE 2" pza 2.00 20.60 41.20 0 0
1.5.3.2.6 CAJAS DE REGISTRO
1.5.3.2.6.1 CAJAS DE REGISTRO DE CONCRETO INC. TAPA und 3.00 64.10 192.30 0 0
1.5.3.2.7 SALIDA DE VENTILACION PVC SAL 2" pto 2.00 12.22 24.44 0 0
1.5.3.2.8 SALIDA DE DESAGUE PVC SAL 2" pto 2.00 31.42 62.84 0 0
1.5.3.2.9 SALIDA DE DESAGUE PVC SAL 4" pto 4.00 34.39 137.56 0 0
1.5.3.3 SISTEMA DE AGUA FRIA
1.5.3.3.1 REDES DE DISTRIBUCIÓN
1.5.3.3.1.1 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 DE 1/2"x5M C/ROSCA m 150.00 8.82 1,323.00 0 0
1.5.3.3.2 ACCESORIOS DE REDES
1.5.3.3.2.1 ACCESORIOS DE REDES: UNION UNIVERSAL HIDRO 3 DE 1/2" pza 4.00 10.02 40.08 0 0
1.5.3.3.2.2 ACCESORIOS DE REDES: UNION SIMPLE HIDRO 3 DE 1/2" C/ROSCA pza 16.00 1.32 21.12 0 0
1.5.3.3.2.3 ACCESORIOS DE REDES: CODOS HIDRO 3 DE 1/2" x 90° C/ROSCA pza 35.00 1.52 53.20 0 0
1.5.3.3.2.4 ACCESORIOS DE REDES: TEES HIDRO 3 DE 1/2" C/ROSCA pza 30.00 2.42 72.60 0 0
1.5.3.3.3 LLAVES VÁLVULAS
1.5.3.3.3.1 VALVULA DE COMPUERTA DE BRONCE DE 1/2" M/ITALY pza 2.00 43.24 86.48 0 0
1.5.3.3.4 SALIDA DE AGUA FRIA DE 1/2" (INCLUYE TUBERIA PVC Y ACCESORIOS PVC C-10 pto 9.00 28.67 258.03 0 0
1.5.3.4 SISTEMA DE AGUA DE LLUVIA
1.5.3.4.1 ACCESORIOS DE REDES
1.5.3.4.1.1 ACCESORIOS DE REDES: CODOS PVC DE 3" x 90º pza 4.00 2.90 11.60 0 0
1.5.3.4.2 TUBERIA DE BAJADA Y DISTRIBUCION: TUBERIA PVC SAL 3" m 8.00 12.16 97.28 0 0
1.5.3.5 TANQUE ELEVADO (POLIETILENO)
1.5.3.5.1 REDES DE ALIMENMTACION Y DISTRIBUCION
1.5.3.5.1.1 RED DE ALIMENTACION: TUBERIA PVC SAP DIAM= 1/2" C- 10 m 30.00 8.82 264.60 0 0
1.5.3.5.1.2 RED DE DISTRIBUCION: TUBERIA PVC SAP DIAM=1/2" C-10 m 10.00 8.82 88.20 0 0
1.5.3.5.2 ACCESORIOS DE REDES
1.5.3.5.2.1 ACCESORIOS DE REDES: UNION UNIVERSAL HIDRO 3 DE 1/2" pza 4.00 10.02 40.08 0 0
1.5.3.5.2.2 ACCESORIOS DE REDES: UNION SIMPLE HIDRO 3 DE 1/2" C/ROSCA pza 6.00 1.32 7.92 0 0
1.5.3.5.2.3 ACCESORIOS DE REDES: CODOS HIDRO 3 DE 1/2" x 90° C/ROSCA pza 10.00 1.52 15.20 0 0
1.5.3.5.2.4 TANQUE POLIETILENO ROTOPLAS CAP. 1100 LITROS INC. ACCESORIOS pza 1.00 711.36 711.36 0 0
1.5.3.5.2.5 BASE METALICO PARA TANQUE POLIETILENO GLB 1.00 600.00 600.00 0 0
1.5.3.5.3 LLAVES VÁLVULAS
1.5.3.5.3.1 VALVULA DE COMPUERTA DE BRONCE DE 1/2" M/ITALY pza 1.00 43.24 43.24 0 0
1.5.3.5.3.2 VALVULA CHECK DE BRONCE DE 1/2" M/ITALY pza 1.00 73.24 73.24 0 0
1.5.3.6 OBRAS DE CONCRETO ARMADO
1.5.3.6.1 COLUMNAS SANITARIAS
1.5.3.6.1.1 COLUMNAS SANITARIAS: CONCRETO F'C=175 KG/CM m³ 0.07 372.41 26.07 0 0
1.5.3.6.1.2 COLUMNAS SANITARIAS : ENCOFRADO Y DESENCOFRADO m² 1.44 43.95 63.29 0 0
1.5.3.6.1.3 COLUMNAS SANITARIAS: ACERO GRADO FY=4200 KG/CM2 kg 6.23 5.97 37.19 0 0
1.5.3.6.1.4 COLUMNAS SANITARIAS:TARRAJEO DE SUPERFICIE (MEZCLA C:A 1:5, E=1.5 CM) m² 1.44 20.81 29.97 0 0
1.5.3.6.1.5 COLUMNAS SANITARIAS: VISTIDURA DE ARISTAS m 3.20 4.42 14.14 0 0
1.5.4 INSTALACIONES ELECTRICAS SS.HH.
1.5.4.1 INSTALACION ELECTRICA
1.5.4.1.1 INSTALACION CAJA OCTOGONALES DE 100mm x 50mm und 2.00 5.98 11.96 0 0
1.5.4.1.2 INSTALACION CAJA RECTANGULARES DE 100x 50x55mm und 4.00 5.98 23.92 0 0
1.5.4.1.3 INSTALACION DE INTERRUPTOR SIMPLE und 2.00 10.48 20.96 0 0
1.5.4.1.4 INSTALACION DE TOMACORRIENTE DOBLE CON TOMA A TIERRA und 2.00 27.42 54.84 0 0
1.5.4.2 CANALIZACIONES Y/O TUBERIAS
1.5.4.2.1 INSTALACION DE DUCTOS PVC SEL Ø 3/4" m 55.00 4.95 272.25 0 0
1.5.4.3 CONDUCTORES Y/O CABLES
1.5.4.3.1 CABLEADO CONDUCTOR DE Cu. DE 1x2.5mm2 TW-70 CABLEADO 7 HILOS m 150.00 2.45 367.50 0 0
1.5.4.3.2 CABLEADO CONDUCTOR Cu. DE 1x4.0mm2 TW-70 CABLEADO 7 HILOS m 40.00 3.50 140.00 0 0
1.5.4.4 TABLEROS E INTERRUPTORES TERMOMAGNETICOS
1.5.4.4.1 TABLERO DE DISTRIBUCION TD1 (8 POLOS) und 1.00 169.81 169.81 0 0
1.5.4.5 ARTEFACTOS DE ILUMINACION
LUMINARIA PLASTICA CUADRADA COLOR BLANCO C/LAMAPARA FLUORESCENTE 174.82
1.5.4.5.1
CIRCULAR DE 32W C/EQUIPO Y PANTALLA
EQ 2.00 87.41 0 0
1.6 CONSTRUCCION DE VEREDAS
1.6.1 VEREDAS
1.6.1.1 EMPEDRADO PARA VEREDAS m³ 38.34 67.56 2,590.25 0 0
1.6.1.2 VEREDAS: CONCRETO F'C=175 KG/CM2 m² 191.72 45.20 8,665.74 0 0
1.6.1.3 VEREDAS: ENCOFRADO Y DESENCOFRADO m² 7.40 36.10 267.14 0 0
1.6.1.4 VEREDAS: JUNTAS ASFALTICAS m 74.00 5.99 443.26 0 0
1.6.2 SARDINELES DE CONCRETO SIMPLE
1.6.2.1 SARDINELES: CONCRETO F'C=175 KG/CM2 m³ 4.12 339.28 1,397.83 0 0
PRESUPUESTO (S/.) Dec-21
L M M J V S D L M M J V
AVANCE
AVANCE AVANCE
ACUMULA
ITEM PARTIDAS UNIDA COSTO ACTUAL ACUMULAD
METRADO P. U. DO
D PARCIAL 20 21 22 23 24 25 26 27 28 29 30 31 MENSUAL O ACTUAL
ANTERIOR
OBRA CREACION DEL ESPACIO DEPORTIVO EN EL C.P. TACASAYA DEL DISTRITO DE CHUCUITO - PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
ENTIDAD EJECUTOR MUNICIPALIDAD DISTRITAL DE CHUCUITO
MODALIDAD DE EJECUCION ADMINISTRACION DIRECTA
RESIDENTE DE OBRA ING. PAUL ESLEYTER CUEVA ALANGUIA
SUPERVISOR DE OBRA ING. EBERTH SABINO GOMEZ CRUZ
INFORME 001
01.00 COSTO DIRECTO 512,601.17 81.12% - 0.00% 512,601.17 81.12% - 0.00% - 0.00% - 0.00% 512,601.17 100.00%
01.01 Mano de Obra 140,263.65 22.20% - 0.00% 140,263.65 22.20% - 0.00% - 0.00% - 0.00% 140,263.65 100.00%
01.02 Materiales 337,299.72 53.38% - 0.00% 337,299.72 53.38% - 0.00% - 0.00% - 0.00% 337,299.72 100.00%
01.03 Equipos Y Herramientas 33,037.80 5.23% - 0.00% 33,037.80 5.23% - 0.00% - 0.00% - 0.00% 33,037.80 100.00%
01.04 Sub - Contratos 2,000.00 0.32% - 0.00% 2,000.00 0.32% - 0.00% - 0.00% - 0.00% 2,000.00 100.00%
02.00 COSTOS INDIRECTOS 119,295.08 18.88% - 0.00% 119,295.08 18.88% - 0.00% 1,653.17 1.39% 1,653.17 1.39% 117,641.91 98.61%
02.01 GASTOS GENERALES 85,924.83 13.60% - 0.00% 85,924.83 13.60% - 0.00% - 0.00% - 0.00% 85,924.83 100.00%
02.02 GASTOS DE SUPERVISION 16,396.83 2.59% - 0.00% 16,396.83 2.59% - 0.00% 1,653.17 10.08% 1,653.17 10.08% 14,743.66 89.92%
02.03 GASTOS DE LIQUIDACION 6,973.42 1.10% - 0.00% 6,973.42 1.10% - 0.00% 0.00% 0.00% 6,973.42 100.00%
02.04 GASTOS DE EXPEDIENTE TECNICO 10,000.00 1.58% - 0.00% 10,000.00 1.58% - 0.00% - 0.00% - 0.00% 10,000.00 100.00%
MONTO TOTAL EXPEDENTE TECNICO 631,896.25 100.00% 0.00 0.00% 631,896.25 100.00% 0.00 0.00% 1,653.17 0.26% 1,653.17 0.26% 630,243.08 99.74%
OBRA CREACION DEL ESPACIO DEPORTIVO EN EL C.P. TACASAYA DEL DISTRITO DE CHUCUITO - PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
ENTIDAD EJECUTOR MUNICIPALIDAD DISTRITAL DE CHUCUITO
MODALIDAD DE EJECUCION : Administración Directa.
RESIDENTE DE OBRA ING. PAUL ESLEYTER CUEVA ALANGUIA
SUPERVISOR DE OBRA ING. EBERTH SABINO GOMEZ CRUZ
FECHA MES: DICIEMBRE
EJECUCION DE GASTOS
PRIMERA ASIGNACION SEGUNDA ASIGNACION TOTAL ASIGNADO
ITEM DESCRIPCION ANTERIOR ACTUAL ACUMULADO SALDO
COSTO (S/.) % COSTO (S/.) % COSTO (S/.) % COSTO (S/.) % COSTO (S/.) % COSTO (S/.) % COSTO (S/.) %
01.00 COSTO DIRECTO 25,000.00 83.33% - 0.00% 25,000.00 83.33% - 0.00% 93,974.60 375.90% 93,974.60 375.90% - 68,974.60 -275.90%
01.01 Mano de Obra 7,000.00 28.00% - 0.00% 7,000.00 28.00% - 0.00% - 0.00% - 0.00% 7,000.00 100.00%
01.02 Materiales 14,150.00 56.60% - 0.00% 14,150.00 56.60% - 0.00% 93,974.60 664.13% 93,974.60 664.13% - 79,824.60 -564.13%
01.03 Equipos Y Herramientas 3,850.00 15.40% - 0.00% 3,850.00 15.40% - 0.00% - 0.00% - 0.00% 3,850.00 100.00%
02.00 COSTOS INDIRECTOS 5,000.00 16.67% - 0.00% 5,000.00 16.67% - 0.00% - 0.00% - 0.00% 5,000.00 100.00%
02.01 GASTOS GENERALES 5,000.00 100.00% - 0.00% 5,000.00 100.00% - 0.00% - 0.00% - 0.00% 5,000.00 100.00%
02.02 GASTOS DE SUPERVISION - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00%
02.03 GASTOS DE LIQUIDACION - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00%
02.04 GASTOS DE EXPENIENTE TECNICO 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00%
MONTO TOTAL ASIGNADO 30,000.00 100.00% 0.00 0.00% 30,000.00 100.00% 0.00 0.00% 93,974.60 313.25% 93,974.60 313.25% 63,974.60 -213.25%
FECHA 12/30/1899
Municipalidad Distrital de Chucuito Residente de Obra Glb 1.00 1,386.67 124.80 1,511.47
Municipalidad Distrital de Chucuito Maestro de obra Glb 1.00 780.00 83.70 863.70
MANO DE OBRA GASTOS SUPERVISION 1,653.17
Municipalidad Distrital de Chucuito Supervisor de Obra Glb 1.00 1,516.67 136.50 1,653.17
MANO DE OBRA GASTOS DE LIQUIDACION 0.00
9.0 289 12/15/2021 TACCA CACERES LUZ MARINA LAPICERO TINTA LIQUIDA COLOR AZUL - PILOT G-1 UND 6.00 4.50 27.00 27.00
10.0 289 12/15/2021 TACCA CACERES LUZ MARINA PAPEL BOND A4 C/ BLANCO - SURCO MILLAR 10.00 28.00 280.00 280.00
11.0 289 12/15/2021 TACCA CACERES LUZ MARINA PAPEL BOND A4 C/ NARANJA - CHAMEX MILLAR 2.00 48.00 96.00 96.00
12.0 289 12/15/2021 TACCA CACERES LUZ MARINA PAPEL LUSTRE C/GRANATE - UNIVERSAL UND 10.00 0.50 5.00 5.00
CORRECTOR LIQUIDO TIPO LAPICERO CON PUNTA FINA
UND
13.0 289 12/15/2021 TACCA CACERES LUZ MARINA DE METAL - ARTESCO 3.00 3.00 9.00 9.00
14.0 289 12/15/2021 TACCA CACERES LUZ MARINA CINTA DE EMBALAJE 2" X 110 YDS TRANSPARENTE- UND 3.00 6.00 18.00 18.00
FORRO DE PLASTICO T/OFICIO TRANSPARENTE -
ROLLO
15.0 289 12/15/2021 TACCA CACERES LUZ MARINA ARTESCO 2.00 11.00 22.00 22.00
PERFORADOR DE METAL T/GRANDE PARA 60 HOJAS -
UND
16.0 289 12/15/2021 TACCA CACERES LUZ MARINA ARTESCO 1.00 32.00 32.00 32.00
52.0 303 12/17/2021 CONTRATISTAS GENERALES FERRECONT E.I.R.L. BIDON DE PLASTICO X 5 GAL - PVC UND 5.00 14.00 70.00 70.00
LADRILLO KK MECANIZADO DE 10X14X24 CM -
MILLAR
53.0 296 12/16/2021 CONTRATISTAS GENERALES FERRECONT E.I.R.L. INCERRAZ 3.00 1450.00 4,350.00 4,350.00
FIERRO CORRUGADO 1/2" GRADO 60 F'Y=4,200 KG/CM2 -
VARILLA
54.0 299 12/16/2021 CORPORACION COMATSUR E.I.R.L. SIDER 76.00 46.40 3,526.40 3,526.40
FIERRO CORRUGADO 3/8" GRADO 60 F'Y=4,200 KG/CM2 -
VARILLA
55.0 299 12/16/2021 CORPORACION COMATSUR E.I.R.L. SIDER 90.00 27.80 2,502.00 2,502.00
FIERRO CORRUGADO 1/4" GRADO 60 F'Y=4,200 KG/CM2 -
VARILLA
56.0 299 12/16/2021 CORPORACION COMATSUR E.I.R.L. SIDER 17.00 11.50 195.50 195.50
57.0 299 12/16/2021 CORPORACION COMATSUR E.I.R.L. ALAMBRE NEGRO RECOCIDO N° 8 - PRODAC KG 125.00 7.50 937.50 937.50
58.0 299 12/16/2021 CORPORACION COMATSUR E.I.R.L. ALAMBRE NEGRO RECOCIDO N° 16 - PRODAC KG 66.00 7.50 495.00 495.00
OBRA CREACION DEL ESPACIO DEPORTIVO EN EL C.P. TACASAYA DEL DISTRITO DE CHUCUITO - PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
ENTIDAD EJECUTOR MUNICIPALIDAD DISTRITAL DE CHUCUITO
MODALIDAD DE EJECUCION : Administración Directa.
RESIDENTE DE OBRA ING. PAUL ESLEYTER CUEVA ALANGUIA
SUPERVISOR DE OBRA ING. EBERTH SABINO GOMEZ CRUZ
INFORME : 01
FECHA
TOTAL PLAZO DE FECHA DE
PRES. EXP. TEC. PRESUPUESTO ASIGNADO N° 01 PRESUPUESTO ASIGNADO N° 02
ASIGNADDO
% AVANCE AL 31/11/2021 EJECUCION INICIO
TERMINO
PROGRAMADO
598,858.46 70,000.00 0.00 70,000.00 100.00% 1.0 MESES 10/20/2021 11/18/2021
EJECUTADO - 2021
PROGRAMADO PROGRAMADO PROGRAMADO MODIFICADO
PRESUPUESTO TOTAL
PARTIDA DESCRIPCION ASIGNADO N° ASIGNADO N° ASIGNADO ASIGNACION % ANTERIOR ACTUAL ACUMULADO %
SEGÚN EL EXP. EJECUTADO
01 02 TOTAL TOTAL
MONTO % MONTO % MONTO %
2,6,2,3,99,3 COSTO POR CONSTRUCCION POR ADMINISTRACION DIRECTA -PERSONAL 140,263.65 10,000.00 - 1,277.60 8,722.40 8,722.40 9.28% - 0.00% 8,722.40 100.00% 8,722.40 100.00% 8,722.40 100.00%
2,6,2,3,99,4 COSTO POR CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES 339,299.72 55,000.00 28,332.20 83,332.20 83,332.20 88.68% - 0.00% 83,332.20 100.00% 83,332.20 100.00% 83,332.20 100.00%
2,6,2,3,99,5 COSTO POR CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS 119,295.09 5,000.00 - 3,080.00 1,920.00 1,920.00 2.04% - 0.00% 1,920.00 100.00% 1,920.00 100.00% 1,920.00 100.00%
598,858.46 70,000.00 23,974.60 93,974.60 93,974.60 100.00% 0.00 0.00% 93,974.60 100.00% 93,974.60 100.00% 93,974.60 100.00%
TOTALES 70,000.00 0.00 93,974.60 93,974.60
NOTA: EL PORCENTAJE DE EJECUCION ES DE ACUERDO AL PRESUPUESTO ASIGNADO
: CREACIÓN DEL ESPACIO DEPORTIVO EN EL BARRIO NUEVA INTEGRACIÓN SAN PABLO DE LA CIUDAD DE ILAVE, DISTRITO DE ILAVE, PROVINCIA DE EL MUNICIPALIDAD DISTRITAL
OBRA DE QUICACHA
COLLAO - PUNO
ENTIDAD EJECUTOR MUNICIPALIDAD DISTRITAL DE CHUCUITO
MODALIDAD DE EJECU: Administración Directa.
SUPERVISOR DE OBRA ING. EBERTH SABINO GOMEZ CRUZ
RESIDENTE DE OBRA ING. PAUL ESLEYTER CUEVA ALANGUIA
INFORME : 01
PROYECTO CREACION DEL ESPACIO DEPORTIVO EN EL C.P. TACASAYA DEL DISTRITO DE CHUCUITO - PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
CREACION DEL ESPACIO DEPORTIVO EN EL C.P. TACASAYA DEL DISTRITO DE CHUCUITO - PROVINCIA DE PUNO -
S/. 38,952.74 10.24% 3,989.97 89.76% 34,962.76
DEPARTAMENTO DE PUNO
PROYECTO CREACION DEL ESPACIO DEPORTIVO EN EL C.P. TACASAYA DEL DISTRITO DE CHUCUITO - PROVINCIA DE PUNO - DEPARTAMENTO DE PUNO
VALORIZACIÓN DE OBRA
Programado Físico Ejecutado Financiero Ejecutado
N° de Mes del Monto % Ejecución % Monto Porcentaje % Monto Porcentaje %
Informe Informe S/. Programada Acumulado S/. de Ejecución Acumulado S/. de Ejecución Acumulado
Inicio 0.00% 0.00% 0.00%
### 1 October - 2021 3,989.97 10.24% 10.24% 0.00 0.00% 0.00% 10,558.90 1.83% 1.83%
### 2 November - 2021 34,962.76 89.76% 100.00%
### 3
###
Total Costo Presupuesto 38,952.73 100.00% 0.00 0.00% 10,558.90 1.83%
90% 90.00%
80% 80.00%
% de Avances Acumulados
Financiero Ejecutado
70% 70.00%
Programado
60% 60.00%
Físico Ejecutado
50% 50.00%
40% 40.00%
30% 30.00%
20% 20.00%
10.24%
10% 10.00%
0.00% 0.00%
0% 0.00% 1.83% 0.00%
Inicio0.00% 44470 44501
Meses Valorizados
AVANCE DE OBRA
100.00%
90.00%
80.00%
70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
October - 2021 November - 2021
°V° B °V° B
INSPECTOR RESIDENCIA
MPCI
Nº
Articulo:
Codigo:
Unidad de Medida:
COMPROBANTE MOVIMIENTOS
FECHA
Clase Nro. ENTRADA SALIDA SALDO
MPCI
Nº
Articulo:
Codigo:
Unidad de Medida:
COMPROBANTE MOVIMIENTOS
FECHA
Clase Nro. ENTRADA SALIDA SALDO
EXISTENCIAS VALORADAS DE ALMACEN