VALORIZACION DE AVA NCE DE OBRA Nº 01

CORRESPONDIENTE AL MES DE MARZO DE 2015

INSTALACION SEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNIFICADO EN LA COMUNIDAD DE ROCCHAS, DISTRITO
PROYECTO: DE SAN MIGUEL, PROVINCIA DE LA MAR, DEPARTAMENTO DE AYACUCHO FECHA DE PRESENTACION 4/5/2015

AVANCES
PRESUPUESTO ANTERIOR ACTUAL Acumulado
ITEM DESCRIPCION PARTIDA
UNID. METRADO P.UNIT. S/. PRESUP. METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO %
S/. S/. S/.
INSTALACION DE SERVICIO DE AGUA PARA RIEGO TECNIFICADO EN LA COMUNIDAD DE ROCCHAS DISTRITO 526,334.23
01.00.00 OBRAS PRELIMINARES 4,298.39
01.01.00 CAMPAMENTO DE ALMACEN TECHO CALAMINA m2 1.00 2,759.57 2759.57 1.00 2759.57 100% 1.00 2759.57 100%
01.02.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X4.20M und 1.00 900.00 900.00 1.00 900.00 100% 2.00 900.00 100%
01.03.00 PLACA RECORDATORIA DE BAJO RELIEVE und 1.00 638.82 638.82 0.00 0.00 0% 0.00 0 0%
02.00.00 TOMA LATERAL (01 UNIDAD) 655.82
02.01.00 TRABAJOS PRELIMINARES 3.82
02.01.01 LIMPIEZA DE TERRENO MANUAL m2 0.50 0.97 0.49 0.50 0.49 100% 0.50 0.49 100%
01.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 1.38 2.42 3.34 1.38 3.34 100% 1.38 3.34 100%
02.02.00 MOVIMIENTO DE TIERRAS 6.88
02.02.01 DEMOLICION DE OBRAS DE CONCRETO m3 0.06 38.81 2.33 0.06 2.33 100% 0.06 2.33 100%
02.02.02 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURA m3 0.41 11.09 4.55 0.41 4.55 100% 0.41 4.55 100%
02.03.00 OBRAS DE CONCRETO SIMPLE 290.87
02.03.01 ENCOFRADO DE ESTRUCTURA m2 4.38 22.80 99.86 0.00 0.00 0% 0.00 0.00 0%
02.03.02 CONCRETO FC=175 KG/CM2 m3 0.47 384.04 180.50 0.00 0.00 0% 0.00 0.00 0%
02.03.03 DESENCOFRADO DE ESTRUCTURA m2 4.38 2.40 10.51 0.00 0.00 0% 0.00 0.00 0%
02.04.00 REVOQUES Y ENLUCIDOS 150.25
02.04.01 TARRAJEO EN INTERIORES CEMENTO ARENA Y IMPERMEABILIZANTE m2 7.29 20.61 150.25 0.00 0.00 0% 0.00 0.00 0%
02.05.00 INSTALACION DE COMPUERTA METALICA 204.00
02.05.01 INSTALACION COMPUERTA METALICA DE 0.90X 0.35M E1/8 und 1.00 204.00 204.00 0.00 0.00 0% 0.00 0.00 0%
03.00.00 RESERVORIO DE CONCRETO ARMADO (CAP 317M3) 145,027.81
03.01.00 TRABAJOS PRELIMINARES 1,008.81
03.01.01 LIMPIEZA DE TERRENO MANUAL ML 376.42 0.26 97.87 376.42 97.87 100% 376.42 97.87 100%
03.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 376.42 2.42 910.94 376.42 910.94 100% 376.42 910.94 100%
03.02.00 MOVIMIENTO DE TIERRAS 28,849.66
03.02.01 EXCAVACION DE MASIVA CON MAQUINARIA EN TERRENO COMPACTO m3 843.00 13.23 11,152.89 843.00 11,152.89 100% 843.00 11,152.89 100%
03.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 256.00 1.63 417.28 256.00 417.28 100% 256.00 417.28 100%
03.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 153.60 68.25 10,483.20 90.51 6,177.58 59% 90.51 6,177.58 59%
03.02.04 RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO m3 230.40 18.72 4,313.09 0.00 0.00 0% 0.00 0.00 0%
03.02.05 ELIMINACION MATERIAL EXCEDENTE m3 320.00 7.76 2,483.20 320.00 2,483.20 100% 320.00 2,483.20 100%
03.03.00 CONCRETO SIMPLE 2,454.30
03.03.01 CONCRETO1:10 PARA SOLADO m3 11.25 218.16 2,454.30 0.00 0.00 0% 0.00 0.00 0%
03.04.00 CONCRETO ARMADO 102,044.41
03.04.01 ENCOFRADO DE MUROS CARAVISTA DE RESERVORIO m2 324.60 54.13 17,570.60 0.00 0.00 0% 0.00 0.00 0%
03.04.02 ACERO FY=4200 KG/CM2 kg 8,736.40 4.80 41,934.72 0.00 0.00 0% 0.00 0.00 0%
03.04.03 CONCRETO FC=210 KG/CM2 m3 93.63 443.55 41,529.59 0.00 0.00 0% 0.00 0.00 0%
03.04.04 DESENCOFRADO DE DE MUROS CARAVISTA DE RESERVORIO m2 324.60 3.11 1,009.51 0.00 0.00 0% 0.00 0.00 0%
03.05.00 JUNTA DE DILATACION 1,692.08
03.05.01 PROVISION DE Y COLOCADO DE JUNTA WATER STOP DE PVC DE 6" ML 52.00 32.54 1,692.08 0.00 0.00 0% 0.00 0.00 0%
03.06.00 REVOQUES Y ENLUCIDOS 8,138.50
03.06.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 137.50 12.35 1,698.13 0.00 0.00 0% 0.00 0.00 0%
03.06.02 TARRAJEO EN INTERIORES CON CEMENTO-ARENA E IMPERMEABILIZANTE m2 115.20 20.61 2,374.27 0.00 0.00 0% 0.00 0.00 0%
03.06.03 ACABADO SEMIPULIDO DE PISO C/MORTERO 1:2 X 5CM DE ESPESOR m2 144.00 22.37 3,221.28 0.00 0.00 0% 0.00 0.00 0%
03.06.04 CURADO DE ESTRUCTURA DE CONCRETO m2 252.70 1.55 391.69 0.00 0.00 0% 0.00 0.00 0%
03.06.05 ESCALERA METALICA DE TUBO DE 1"FG und 2.00 226.57 453.14 0.00 0.00 0% 0.00 0.00 0%
03.07.00 PINTURA 840.05
03.07.01 PINTURA DE EXTERIORES m2 132.50 6.34 840.05 0.00 0.00 0% 0.00 0.00 0%
03.00.00 CAJA DE SALIDA, EXEDENCIAS Y LIMPIA 11,979.94 ok
03.01.00 TRABAJOS PRELIMINARES 22.05
03.01.01 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 9.11 2.42 22.05 9.11 22.05 100% 9.11 22.05 100%
03.02.00 MOVIMIENTO DE TIERRAS 112.21
03.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 2.22 11.09 24.62 2.22 24.62 100% 2.22 24.62 100%
03.02.02 EXCAVACION MANUAL PARA ZANJA DE TUBERIA m3 2.59 11.09 28.72 2.59 28.72 100% 2.59 28.72 100%
03.02.03 REFINE Y NEVELACION FONDO DE ZANJA m2 8.10 0.32 2.59 8.10 2.59 100% 8.10 2.59 100%
03.02.04 PREPARACION DE CAMA CON MATERIAL PROPIO m3 0.97 9.55 9.26 0.97 9.26 100% 0.97 9.26 100%
03.02.05 TENDIDO DE CAMA DE FONDO DE TUBERIA h=0.10m m3 0.32 9.55 3.06 0.00 0.00 0% 0.00 0.00 0%
03.02.06 TENDIDO DE CAMA ENCIMA DE TUBERIA h=0.20M m3 0.65 15.92 10.35 0.00 0.00 0% 0.00 0.00 0%
03.02.07 RELLENO DE ZANJA CON MATERIAL PROPIO m3 3.53 9.52 33.61 0.00 0.00 0% 0.00 0.00 0%
03.03.00 CONCRETO ARMADO 1,560.44
03.03.01 ENCOFRADO DE ESTRUCTURA m2 22.16 24.80 549.57 0.00 0.00 0% 0.00 0.00 0%
03.03.02 ACERO FY=4200 KG/CM2 kg 42.45 5.91 250.88 0.00 0.00 0% 0.00 0.00 0%
03.03.03 CONCRETO FC=175 KG/CM2 m3 1.93 366.22 706.80 0.00 0.00 0% 0.00 0.00 0%
03.03.04 DESENCOFRADO DE ESTRUCTURA m2 22.16 2.40 53.18 0.00 0.00 0% 0.00 0.00 0%
03.04.00 REVOQUES Y ENLUCIDOS 216.64
03.04.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 11.36 19.07 216.64 0.00 0.00 0% 0.00 0.00 0%
03.05.00 INSTALACION DE ACCESORIOS (VC-1 A VC17) 7,571.58
03.05.01 ACCESORIOS EN ESTRUCTURA DE SALIDA DE RESERVORIO und 1.00 3,500.72 3,500.72 0.00 0.00 0% 0.00 0.00 0%
03.05.02 ACCESORIO EN ESTRUCTURA DE REBOSE DE RESERVORIO und 1.00 454.72 454.72 0.00 0.00 0% 0.00 0.00 0%
03.05.03 INSTALACION DE TUBERIA PVC SAP D=8" C-7.5 NTP 399.002 m 5.00 38.12 190.60 0.00 0.00 0% 0.00 0.00 0%
03.05.04 INSTALACION DE TUBERIA PVC SAP D=4" C-7.5 NTP 399.002 m 20.00 20.01 400.20 0.00 0.00 0% 0.00 0.00 0%
03.05.05 INSTALACION DE TUBERIA PVC UF D=200mm ISO 4435 m 70.00 39.21 2,744.70 0.00 0.00 0% 0.00 0.00 0%
03.05.06 INSTALACION DE ACCESORIOS PVC UF D=200mm ISO 4435 und 1.00 93.68 93.68 0.00 0.00 0% 0.00 0.00 0%
03.05.07 COLOCACION DE TAPA METALICA 0.60M X0.60M e=1/8" und 1.00 186.96 186.96 0.00 0.00 0% 0.00 0.00 0%
03.06.00 CERCO PERIMETRICO C/ROLLIZOS-ALAMBRE PUAS 2,497.04
03.06.01 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 48.08 2.42 116.35 48.08 116.35 100% 48.08 116.35 100%
03.06.02 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 3.94 11.09 43.69 3.94 43.69 100% 3.94 43.69 100%
03.06.03 CONCRETO FC=140 KG/CM2 m3 2.21 314.44 694.91 0.00 0.00 0% 0.00 0.00 0%
03.06.04 COLOCACION DE ROLLIZOS und 41.00 17.76 728.16 0.00 0.00 0% 0.00 0.00 0%
03.06.05 CERCO ALAMBRE PUAS m 459.60 1.68 772.13 0.00 0.00 0% 0.00 0.00 0%
03.06.06 COLOCCION DE PUERTA DE MADERA RUSTICA und 1.00 141.79 141.79 0.00 0.00 0% 0.00 0.00 0%
04.00.00 CAJA DE DISTRIBUCION DE CAUDALES (01 UNIDAD) 8,528.10
04.01.01 TRABAJOS PRELIMINARES 18.10
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 5.34 0.97 5.18 5.34 5.18 100% 5.34 5.18 100%
04.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 5.34 2.42 12.92 5.34 12.92 100% 5.34 12.92 100%
04.02.00 MOVIMIENTO DE TIERRAS 502.98
04.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 31.85 11.09 353.22 31.85 353.22 100% 31.85 353.22 100%
04.02.02 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO m3 8.00 18.72 149.76 8.00 149.76 100% 8.00 149.76 100%
04.03.00 CONCRETO ARMADO 1,985.84
04.03.01 CONCRETO1:10 PARA SOLADO m3 0.30 218.16 65.45 0.00 0.00 0% 0.00 0.00 0%
04.03.02 ENCOFRADO DE ESTRUCTURA m2 8.43 24.80 209.06 0.00 0.00 0% 0.00 0.00 0%
04.03.03 ACERO FY=4200 KG/CM2 kg 84.05 5.91 496.74 0.00 0.00 0% 0.00 0.00 0%
04.03.04 CONCRETO FC=175 KG/CM2 m3 3.11 384.04 1,194.36 0.00 0.00 0% 0.00 0.00 0%
04.03.05 DESENCOFRADO DE ESTRUCTURA m2 8.43 2.40 20.23 0.00 0.00 0% 0.00 0.00 0%
04.04.00 INSTALACION DE ACCESORIOS (VC-1 A VC17) 5,322.89
04.04.01 COLOCACION DE TAPA METALICA 0.60M X0.60M e=1/8" und 1.00 186.96 186.96 0.00 0.00 0% 0.00 0.00 0%
04.04.02 COLOCACION DE TAPA METALICA 0.50M X0.50M e=1/8" und 5.00 166.96 834.80 0.00 0.00 0% 0.00 0.00 0%
04.04.03 SUMINISTRO Y COLOCCION DE TUBO DE VENTILACION und 1.00 64.68 64.68 0.00 0.00 0% 0.00 0.00 0%
04.04.04 INSTALACION DE ACCESORIOS DE REGULACION und 1.00 1,809.49 1,809.49 0.00 0.00 0% 0.00 0.00 0%
04.04.05 INSTALACION DE ACCESORIOS EN CAMARA DE CARGA und 1.00 449.49 449.49 0.00 0.00 0% 0.00 0.00 0%
04.04.06 SUMINISTRO Y COLOCCION DE ACCESORIOS C. VALVULA 1 und 1.00 619.49 619.49 0.00 0.00 0% 0.00 0.00 0%
04.04.07 SUMINISTRO Y COLOCCION DE ACCESORIOS C. VALVULA 2 und 1.00 897.49 897.49 0.00 0.00 0% 0.00 0.00 0%
04.04.08 SUMINISTRO Y COLOCCION DE ACCESORIOS C. VALVULA 3 und 1.00 460.49 460.49 0.00 0.00 0% 0.00 0.00 0%
04.05.00 REVOQUES Y ENLUCIDOS 612.76
04.05.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 13.49 12.35 166.60 0.00 0.00 0% 0.00 0.00 0%
04.05.02 TARRAJEO EN INTERIORES CON CEMENTO-ARENA E IMPERMEABILIZANTE m2 19.19 20.61 395.51 0.00 0.00 0% 0.00 0.00 0%
04.05.03 CURADO DE ESTRUCTURA DE CONCRETO m2 32.68 1.55 50.65 0.00 0.00 0% 0.00 0.00 0%
04.06.00 PINTURA 85.53 0.00 0.00 0% 0.00 0.00 0%
04.06.01 PINTURA DE EXTERIORES m2 13.49 6.34 85.53 0.00 0.00 0% 0.00 0.00 0%
05.00.00 CAMARA REDUCTORA DE PRESION (04 UNIDADES) 13,440.54
05.01.00 TRABAJOS PRELIMINARES 3,402.12
05.01.01 LIMPIEZA DE TERRENO MANUAL ML 6.76 0.26 1.76 6.76 1.76 100% 6.76 1.76 100%
05.01.02 TRAZO Y REPLANTEO PAR ESTRUCTURA m2 6.76 2.42 16.36 6.76 16.36 100% 6.76 16.36 100%
05.01.03 ACARREO DE AGREGADO A UBICACION DE CRP VJE 1,398.35 2.42 3,384.01 0.00 0.00 0% 0.00 0.00 0%
05.02.00 MOVIMIENTO DE TIERRAS 191.78
05.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 6.76 11.09 74.97 0.00 0.00 0% 0.00 0.00 0%
05.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 6.24 18.72 116.81 0.00 0.00 0% 0.00 0.00 0%
05.03.00 CONCRETO SIMPLE 74.17
05.03.01 CONCRETO1:10 PARA SOLADO m3 0.34 218.16 74.17 0.00 0.00 0% 0.00 0.00 0%
05.04.00 CONCRETO ARMADO 4,288.55
05.04.01 ENCOFRADO DE ESTRUCTURA m2 60.36 24.80 1,496.93 0.00 0.00 0% 0.00 0.00 0%
05.04.02 ACERO FY=4200 KG/CM2 kg 43.01 5.91 254.19 0.00 0.00 0% 0.00 0.00 0%
05.04.03 CONCRETO FC=175 KG/CM2 m3 6.23 384.04 2,392.57 0.00 0.00 0% 0.00 0.00 0%
05.04.04 DESENCOFRADO DE ESTRUCTURA m2 60.36 2.40 144.86 0.00 0.00 0% 0.00 0.00 0%
05.05.00 REVOQUES Y ENLUCIDOS 687.06
05.05.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 33.32 19.07 635.41 0.00 0.00 0% 0.00 0.00 0%
05.05.02 CURADO DE ESTRUCTURA DE CONCRETO m2 33.32 1.55 51.65 0.00 0.00 0% 0.00 0.00 0%
05.06.00 INSTALACION DE ACCESORIOS (VC-1 A VC17) 4,585.60
05.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CRP D=21/2" und 1.00 916.94 916.94 0.00 0.00 0% 0.00 0.00 0%
05.06.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN CRP D=3" und 1.00 966.94 966.94 0.00 0.00 0% 0.00 0.00 0%
05.06.03 SUMINISTRO E INSTALACION DE ACCESORIOS EN CRP D=4" und 2.00 976.94 1,953.88 0.00 0.00 0% 0.00 0.00 0%
05.06.04 COLOCACION DE TAPA METALICA 0.60M X0.60M e=1/8" und 4.00 186.96 747.84 0.00 0.00 0% 0.00 0.00 0%
05.06.00 PINTURA 211.25
05.06.01 PINTURA DE EXTERIORES m2 33.32 6.34 211.25 0.00 0.00 0% 0.00 0.00 0%
06.00.00 LATERAL DE RIEGO FIJO (7,947.00M) 248,770.95
06.01.00 TRABAJOS PRELIMINARES 10,172.16
06.01.01 LIMPIEZA DE TERRENO MANUAL ML 7,947.00 0.26 2,066.22 7,947.00 2,066.22 100% 7,947.00 2,066.22 100%
06.01.02 TRAZO Y REPLANTEO PARA ZANJA DE TUBERIA m2 7,947.00 1.02 8,105.94 7,947.00 8,105.94 100% 7,947.00 8,105.94 100%
06.02.00 MOVIMIENTO DE TIERRAS 105,377.78
06.02.01 EXCAVACION MANUAL PARA ZANJA DE TUBERIA m3 2,543.04 15.52 39,467.98 762.91 11,840.39 30% 762.91 11,840.39 30%
06.02.02 RETIRO Y REPOSICION DE CERCOS PERIMETRICOS DE PARCELA (MURO SECO) m3 24.00 15.52 372.48 0.00 0.00 0% 0.00 0.00 0%
06.02.03 REFINE Y NEVELACION FONDO DE ZANJA m2 7,947.00 0.32 2,543.04 1,703.13 545.00 21% 1,703.13 545.00 21%
06.02.04 PREPARACION DE CAMA CON MATERIAL PROPIO m3 953.64 9.55 9,107.26 0.00 0.00 0% 0.00 0.00 0%
06.02.05 TENDIDO DE CAMA DE FONDO DE TUBERIA h=10m m3 317.88 15.92 5,060.65 0.00 0.00 0% 0.00 0.00 0%
06.02.06 TENDIDO DE CAMA ENCIMA DE TUBERIA h=0.20M m3 635.76 15.92 10,121.30 0.00 0.00 0% 0.00 0.00 0%
06.02.07 RELLENO DE ZANJA CON MATERIAL PROPIO m3 2,543.04 15.22 38,705.07 0.00 0.00 0% 0.00 0.00 0%
06.03.00 INSTALACION DE TUBERIA NTP 399.002 SP 5M 122,902.19
06.03.01 INSTALACION DE TUBERIA PVC SAP D=4" C-10 NTP 399.002 m 110.00 21.12 2,323.20 0.00 0.00 0% 0.00 0.00 0%
06.03.02 INSTALACION DE TUBERIA PVC SAP D=4" C-7.5 NTP 399.002 m 570.00 20.01 11,405.70 0.00 0.00 0% 0.00 0.00 0%
06.03.03 INSTALACION DE TUBERIA PVC SAP D=4" C-5 NTP 399.002 m 779.00 19.01 14,808.79 0.00 0.00 0% 0.00 0.00 0%
06.03.04 INSTALACION DE TUBERIA PVC SAP D=3" C-10 NTP 399.002 m 1,331.50 18.12 24,126.78 0.00 0.00 0% 0.00 0.00 0%
06.03.05 INSTALACION DE TUBERIA PVC SAP D=3" C-7.5 NTP 399.002 m 673.00 17.12 11,521.76 0.00 0.00 0% 0.00 0.00 0%
06.03.06 INSTALACION DE TUBERIA PVC SAP D=3" C-5 NTP 399.002 m 173.00 16.12 2,788.76 0.00 0.00 0% 0.00 0.00 0%
06.03.07 INSTALACION DE TUBERIA PVC SAP D=21/2" C-10 NTP 399.002 m 1,720.00 15.12 26,006.40 0.00 0.00 0% 0.00 0.00 0%
06.03.08 INSTALACION DE TUBERIA PVC SAP D=21/2" C-7.5 NTP 399.002 m 370.00 14.12 5,224.40 0.00 0.00 0% 0.00 0.00 0%
06.03.09 INSTALACION DE TUBERIA PVC SAP D=21/2" C-5 NTP 399.002 m 78.00 13.12 1,023.36 0.00 0.00 0% 0.00 0.00 0%
06.03.10 INSTALACION DE TUBERIA PVC SAP D=2" C-10 NTP 399.002 m 803.00 12.12 9,732.36 0.00 0.00 0% 0.00 0.00 0%
06.03.11 INSTALACION DE TUBERIA PVC SAP D=2" C-7.5 NTP 399.002 m 390.00 11.12 4,336.80 0.00 0.00 0% 0.00 0.00 0%
06.03.12 INSTALACION DE TUBERIA PVC SAP D=11/2" C-10 NTP 399.002 m 949.00 10.12 9,603.88 0.00 0.00 0% 0.00 0.00 0%
06.04.00 INSTALACION DE ACCESORIOS 1,063.12
06.04.01 SUMINISTRO E INSTALACION DE ACCCESORIOS EN LINEA FIJA und 1.00 1,063.12 1,063.12 0.00 0.00 0% 0.00 0.00 0%
06.05.00 PRUEBA HIDRAULICA 9,255.70
06.05.01 PRUEBA HIDRAULICA EN TUBERIA EN LINEA FIJA m 7,947.00 0.41 3,258.27 0.00 0.00 0% 0.00 0.00 0%
06.05.02 ACCESORIOS PVC SAP PARA PRUEBA HIDRAULICA EN LINE FIJA und 1.00 50.35 50.35 0.00 0.00 0% 0.00 0.00 0%
06.05.03 PRUEBA DE ESTANCAMIENTO DE AGUA EN EL SISTEMA und 3.00 351.70 1,055.10 0.00 0.00 0% 0.00 0.00 0%
06.05.04 REPARACION Y PUESTA EN OPERACION DEL SISTEMA POST ESTANCAMIENTO und 3.00 1,630.66 4,891.98 0.00 0.00 0% 0.00 0.00 0%
07.00.00 CAJA VALVULA DE CONTROL EN LINEA FIJA (17 UNIDADES) 15,606.61
07.01.00 TRABAJOS PRELIMINARES 713.57
07.01.01 LIMPIEZA DE TERRENO MANUAL ML 14.00 0.26 3.64 14.00 3.64 100% 14.00 3.64 100%
07.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 14.00 2.42 33.88 14.00 33.88 100% 14.00 33.88 100%
07.01.03 ACARREO DE AGREGADO A UBICACION DE C. VALVULA DE CONTROL VJE 279.36 2.42 676.05 0.00 0.00 0% 0.00 0.00 0%
07.02.00 MOVIMIENTO DE TIERRAS 139.93
07.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 11.20 11.09 124.21 0.00 0.00 0% 0.00 0.00 0%
07.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.84 18.72 15.72 0.00 0.00 0% 0.00 0.00 0%
07.03.00 CONCRETO SIMPLE 3,133.54
07.03.01 ENCOFRADO DE ESTRUCTURA m2 62.72 24.80 1,555.46 0.00 0.00 0% 0.00 0.00 0%
07.03.02 CONCRETO FC=140 KG/CM2 m3 4.54 314.44 1,427.56 0.00 0.00 0% 0.00 0.00 0%
07.03.03 DESENCOFRADO DE ESTRUCTURA m2 62.72 2.40 150.53 0.00 0.00 0% 0.00 0.00 0%
07.04.00 REVOQUES Y ENLUCIDOS 780.68
07.04.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 35.84 19.07 683.47 0.00 0.00 0% 0.00 0.00 0%
07.04.02 CURADO DE ESTRUCTURA DE CONCRETO m2 62.72 1.55 97.22 0.00 0.00 0% 0.00 0.00 0%
07.05.00 INSTALACION DE ACCESORIOS (VC-1 A VC17) 10,838.88
07.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN VALVULA DE CONTROL 4" und 11.00 454.72 5,001.92 0.00 0.00 0% 0.00 0.00 0%
07.05.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN VALVULA DE CONTROL 3" und 8.00 397.72 3,181.76 0.00 0.00 0% 0.00 0.00 0%
07.05.03 SUMINISTRO E INSTALACION DE ACCESORIOS EN VALVULA DE CONTROL 2 1/2" und 2.00 260.94 521.88 0.00 0.00 0% 0.00 0.00 0%
07.05.04 SUMINISTRO E INSTALACION DE ACCESORIOS EN VALVULA DE CONTROL 2" und 2.00 317.94 635.88 0.00 0.00 0% 0.00 0.00 0%
07.05.05 COLOCACION DE TAPA METALICA 0.40M X0.40M e=1/8" und 14.00 106.96 1,497.44 0.00 0.00 0% 0.00 0.00 0%
08.00.00 CAJA DE HIDRANTE EN LINEA FIJA (101 UNIDAD) 37,690.31
08.01.00 TRABAJOS PRELIMINARES 3,078.15
08.01.01 LIMPIEZA DE TERRENO MANUAL ML 101.00 0.26 26.26 101.00 26.26 100% 101.00 26.26 100%
08.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 101.00 2.42 244.42 101.00 244.42 100% 101.00 244.42 100%
08.01.03 ACARREO DE AGREGADO A UBICACION DE C. HIDRANTE VJE 1,160.11 2.42 2,807.47 0.00 0.00 0% 0.00 0.00 0%
08.02.00 MOVIMIENTO DE TIERRAS 492.77
08.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 29.09 11.09 322.61 0.00 0.00 0% 0.00 0.00 0%
08.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 9.09 18.72 170.16 0.00 0.00 0% 0.00 0.00 0%
08.03.00 CONCRETO SIMPLE 14,292.23
08.03.01 ENCOFRADO DE ESTRUCTURA m2 258.56 24.80 6,412.29 0.00 0.00 0% 0.00 0.00 0%
08.03.02 CONCRETO FC=140 KG/CM2 m3 17.88 314.44 5,622.19 0.00 0.00 0% 0.00 0.00 0%
08.03.03 COLOCACION DE ANILLOS DE SUJECION und 101.00 16.21 1,637.21 0.00 0.00 0% 0.00 0.00 0%
08.03.04 DESENCOFRADO DE ESTRUCTURA m2 258.56 2.40 620.54 0.00 0.00 0% 0.00 0.00 0%
08.04.00 REVOQUES Y ENLUCIDOS 2,254.56
08.04.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 97.21 19.07 1,853.79 0.00 0.00 0% 0.00 0.00 0%
08.04.02 CURADO DE ESTRUCTURA DE CONCRETO m2 258.56 1.55 400.77 0.00 0.00 0% 0.00 0.00 0%
08.05.00 INSTALACION DE ACCESORIOS 17,572.60
08.05.01 SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTE DE 4" und 2.00 106.72 213.44 0.00 0.00 0% 0.00 0.00 0%
08.05.02 SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTE DE 3" und 24.00 171.72 4,121.28 0.00 0.00 0% 0.00 0.00 0%
08.05.03 SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTE DE 21/2" und 32.00 125.72 4,023.04 0.00 0.00 0% 0.00 0.00 0%
08.05.04 SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTE DE 2" und 25.00 114.72 2,868.00 0.00 0.00 0% 0.00 0.00 0%
08.05.05 SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTE DE 11/2" und 18.00 72.72 1,308.96 0.00 0.00 0% 0.00 0.00 0%
08.05.06 COLOCACION DE TAPA METALICA 0.25M X0.35M e=1/8" und 101.00 49.88 5,037.88 0.00 0.00 0% 0.00 0.00 0%
09.00.00 CAJA VALVULA DE PURGA EN LINEA FIJA (13 UNIDADES) 6,008.80
09.01.00 TRABAJOS PRELIMINARES 414.25
09.01.01 LIMPIEZA DE TERRENO MANUAL ML 13.00 0.26 3.38 13.00 3.38 100% 13.00 3.38 100%
09.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 13.00 2.42 31.46 13.00 31.46 100% 13.00 31.46 100%
09.01.03 ACARREO DE AGREGADO A UBICACION DE VALVULA DE PURGA VJE 156.78 2.42 379.41 0.00 0.00 0% 0.00 0.00 0%
09.02.00 MOVIMIENTO DE TIERRAS 166.07
09.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 13.00 11.09 144.17 0.00 0.00 0% 0.00 0.00 0%
09.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 1.17 18.72 21.90 0.00 0.00 0% 0.00 0.00 0%
09.03.00 CONCRETO SIMPLE 1,628.43
09.03.01 ENCOFRADO DE ESTRUCTURA m2 33.28 24.80 825.34 0.00 0.00 0% 0.00 0.00 0%
09.03.02 CONCRETO FC=140 KG/CM2 m3 2.30 314.44 723.21 0.00 0.00 0% 0.00 0.00 0%
09.03.03 DESENCOFRADO DE ESTRUCTURA m2 33.28 2.40 79.87 0.00 0.00 0% 0.00 0.00 0%
09.04.00 REVOQUES Y ENLUCIDOS 448.24
09.04.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 20.80 19.07 396.66 0.00 0.00 0% 0.00 0.00 0%
09.04.02 CURADO DE ESTRUCTURA DE CONCRETO m2 33.28 1.55 51.58 0.00 0.00 0% 0.00 0.00 0%
09.05.00 INSTALACION DE ACCESORIOS 3,351.81
09.05.01 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE PURGA DE 2" und 3.00 299.49 898.47 0.00 0.00 0% 0.00 0.00 0%
09.05.02 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE PURGA DE 11/2 " und 10.00 180.49 1,804.90 0.00 0.00 0% 0.00 0.00 0%
09.05.03 COLOCACION DE TAPA METALICA 0.25M X0.35M e=1/8" und 13.00 49.88 648.44 0.00 0.00 0% 0.00 0.00 0%
10.00.00 CAJA DE VALVULA DE AIRE EN LINEA FIJA (08 UNIDADES) 28,218.36
10.01.00 TRABAJOS PRELIMINARES 21.44
10.01.01 LIMPIEZA DE TERRENO MANUAL ML 8.00 0.26 2.08 8.00 2.08 100% 8.00 2.08 100%
10.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 8.00 2.42 19.36 8.00 19.36 100% 8.00 19.36 100%
10.02.00 MOVIMIENTO DE TIERRAS 102.20
10.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 8.00 11.09 88.72 0.00 0.00 0% 0.00 0.00 0%
10.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.72 18.72 13.48 0.00 0.00 0% 0.00 0.00 0%
10.03.00 CONCRETO SIMPLE 1,189.99
10.03.01 ENCOFRADO DE ESTRUCTURA m2 25.60 24.80 634.88 0.00 0.00 0% 0.00 0.00 0%
10.03.02 CONCRETO FC=140 KG/CM2 m3 1.57 314.44 493.67 0.00 0.00 0% 0.00 0.00 0%
10.03.03 DESENCOFRADO DE ESTRUCTURA m2 25.60 2.40 61.44 0.00 0.00 0% 0.00 0.00 0%
10.04.00 REVOQUES Y ENLUCIDOS 332.60
10.04.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 15.36 19.07 292.92 0.00 0.00 0% 0.00 0.00 0%
10.04.02 CURADO DE ESTRUCTURA DE CONCRETO m2 25.60 1.55 39.68 0.00 0.00 0% 0.00 0.00 0%
10.05.00 INSTALACION DE ACCESORIOS 2,022.44
10.05.01 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE AIRE DE 4" und 4.00 151.72 606.88 0.00 0.00 0% 0.00 0.00 0%
10.05.02 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE AIRE DE 3" und 2.00 143.72 287.44 0.00 0.00 0% 0.00 0.00 0%
10.05.03 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE AIRE DE 21/2" und 1.00 138.72 138.72 0.00 0.00 0% 0.00 0.00 0%
10.05.04 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE AIRE DE 2" und 1.00 133.72 133.72 0.00 0.00 0% 0.00 0.00 0%
10.05.05 COLOCACION DE TAPA METALICA 0.40M X0.40M e=1/8" und 8.00 106.96 855.68 0.00 0.00 0% 0.00 0.00 0%
10.06.00 LINEA DE RIEGO MOVIL (15 MODULOS DE RIEGO) 20,552.70
10.06.01 SUMINISTRO E INSTALACION DE LINEA DE RIEGO MOVIL und 15.00 1,333.24 19,998.60 0.00 0.00 0% 0.00 0.00 0%
10.06.02 PRUEBA DE FUNCIONAMIENTO LINEA MOVIL und 15.00 36.94 554.10 0.00 0.00 0% 0.00 0.00 0%
10.07.00 CAPACITACION PARA LOS BENEFICIARIOS 1,747.00
10.07.01 FORMALIZACION DEL COMITE DE USUARIOS und 1.00 682.00 682.00 0.00 0.00 0% 0.00 0.00 0%
10.07.02 GESTION DE AGUA PARA RIEGO und 1.00 280.00 280.00 0.00 0.00 0% 0.00 0.00 0%
10.07.03 OPERACION Y MANTENIMIENTO DE SISTEMA DE RIEGO TECNIFICADO und 1.00 505.00 505.00 0.00 0.00 0% 0.00 0.00 0%
10.07.04 CADENAS PRODUCTIVAS Y COMERCIALIZACION und 1.00 280.00 280.00 0.00 0.00 0% 0.00 0.00 0%
10.08.00 REGULARIZACION TRAMITES DE ESTUDIO Y EJECUCION DE OBRA 2,250.00
10.08.01 AUTORIZACION DEAPROBACION DE ESTUDIO Y EJECUCION DE OBRA und 1.00 350.00 350.00 0.00 0.00 0% 0.00 0.00 0%
10.08.02 CERTIFICADO DE INEXISTENCIA DE RESTOS ARQUEOLOGICOS und 1.00 1,900.00 1,900.00 1.00 1,900.00 100% 1.00 1,900.00 100%
11.00.00 MITIGACIÓN DEL IMPACTO AMBIENTAL 6,108.60
11.01.00 INSTALACION DE LETRINAS SANITARIAS (01 UND) 441.56
11.01.01 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 1.00 2.42 2.42 1.00 2.42 100% 1.00 2.42 100%
11.01.02 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 1.28 11.09 14.20 1.28 14.20 100% 1.28 14.20 100%
11.01.03 INSTALACION DE CUARTONES, MURO PUERTA, TECHO DE CALAMINA C/MARCO und 1.00 313.28 313.28 1.00 313.28 100% 1.00 313.28 100%
11.01.04 SUMINISTRO Y COLOCACION DE TUBO DE VENTILACION LETRINA und 1.00 47.08 47.08 1.00 47.08 100% 1.00 47.08 100%
11.01.05 INSTALACION DE BAñO TURCO PRE FABRICADO und 1.00 64.58 64.58 1.00 64.58 100% 1.00 64.58 100%
11.02.00 INSTALACION DE DE HOYO SANITARIO P/ DEPOSITO DE BASURA 62.04
11.02.01 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 1.00 2.42 2.42 1.00 2.42 100% 1.00 2.42 100%
11.02.02 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 2.00 11.09 22.18 2.00 22.18 100% 2.00 22.18 100%
11.02.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 2.00 18.72 37.44 2.00 37.44 100% 2.00 37.44 100%
11.03.00 PRUEBAS DE CALIDAD 5,605.00
11.03.01 PRUEBA DE CALIDAD DEL CONCRETO ( PRUEBA DE COMPRESION) und 15.00 25.00 375.00 0.00 0.00 0%
11.03.02 DISEñO DE MEZCLA und 1.00 430.00 430.00 0.00 0.00 0%
11.03.03 VERIFICACION PORTANTE DEL SUELO RESERVORIO und 1.00 2,300.00 2,300.00 1.00 2,300.00 100% 1.00 2,300.00 100%
11.03.04 VERIFICACION DE ANALISIS ESTRUCTURAL RESERVORIO und 1.00 2,500.00 2,500.00 1.00 2,500.00 100% 1.00 2,500.00 100%
COSTO DIRECTO TOTAL 526,334.23 55,822.14 10.61% 55,822.14 10.61%

RESIDENTE SUPERVISOR DE PROYECTOS


SALDO

METRADO VALORIZADO S/. %

1500
0.00 0.00 0% 170
1.00 0.00 0%
-1.00 -638.82 -100%
0.00 -655.82 -100%
0.00 -3.82 -100%
0.00 0.00 0%
0.00 0.00 0%

0.00 0.00 0%
0.00 0.00 0%

-4.38 -99.86 -100%


-0.47 -180.50 -100%
-4.38 -10.51 -100%
930
-7.29 -150.25 -100% 930
170
-1.00 -204.00 -100% 400

360
0.00 0.00 0% 930
0.00 0.00 0% 1290
300
0.00 0.00 0% 990.00 0.35 346.5
0.00 0.00 0% 0.35 346.5
-63.09 -4,305.62 -41% 0.3 297.0
-230.40 -4,313.09 -100%
0.00 0.00 0%

-11.25 -2,454.30 -100%

-324.60 -17,570.60 -100%


-8736.40 -41,934.72 -100%
-93.63 -41,529.59 -100%
-324.60 -1,009.51 -100%

-52.00 -1,692.08 -100%


-137.50 -1,698.13 -100%
-115.20 -2,374.27 -100%
-144.00 -3,221.28 -100%
-252.70 -391.69 -100%
-2.00 -453.14 -100%

-132.50 -840.05 -100%

0.00 0.00 0%

0.00 0.00 0%
0.00 0.00 0%
0.00 0.00 0%
0.00 0.00 0%
-0.32 -3.06 -100%
-0.65 -10.35 -100%
-3.53 -33.61 -100%

-22.16 -549.57 -100%


-42.45 -250.88 -100%
-1.93 -706.80 -100%
-22.16 -53.18 -100%

-11.36 -216.64 -100%

-1.00 -3,500.72 -100%


-1.00 -454.72 -100%
-5.00 -190.60 -100%
-20.00 -400.20 -100%
-70.00 -2,744.70 -100%
-1.00 -93.68 -100%
-1.00 -186.96 -100%

0.00 0.00 0%
0.00 0.00 0%
-2.21 -694.91 -100%
-41.00 -728.16 -100%
-459.60 -772.13 -100%
-1.00 -141.79 -100%

0.00 0.00 0%
0.00 0.00 0%

0.00 0.00 0%
0.00 0.00 0%

-0.30 -65.45 -100%


-8.43 -209.06 -100%
-84.05 -496.74 -100%
-3.11 -1,194.36 -100%
-8.43 -20.23 -100%

-1.00 -186.96 -100%


-5.00 -834.80 -100%
-1.00 -64.68 -100%
-1.00 -1,809.49 -100%
-1.00 -449.49 -100%
-1.00 -619.49 -100%
-1.00 -897.49 -100%
-1.00 -460.49 -100%

-13.49 -166.60 -100%


-19.19 -395.51 -100%
-32.68 -50.65 -100%
0.00 -85.53 -100%
-13.49 -85.53 -100%

0.00 0.00 0%
0.00 0.00 0%
-1398.35 -3,384.01 -100%

-6.76 -74.97 -100%


-6.24 -116.81 -100%

-0.34 -74.17 -100%

-60.36 -1,496.93 -100%


-43.01 -254.19 -100%
-6.23 -2,392.57 -100%
-60.36 -144.86 -100%

-33.32 -635.41 -100%


-33.32 -51.65 -100%

-1.00 -916.94 -100%


-1.00 -966.94 -100%
-2.00 -1,953.88 -100%
-4.00 -747.84 -100%

-33.32 -211.25 -100%

0.00 0.00 0%
0.00 0.00 0%

-1780.13 -27,627.59 -70%


-24.00 -372.48 -100%
-6243.88 -1,998.04 -79%
-953.64 -9,107.26 -100%
-317.88 -5,060.65 -100%
-635.76 -10,121.30 -100%
-2543.04 -38,705.07 -100%

-110.00 -2,323.20 -100%


-570.00 -11,405.70 -100%
-779.00 -14,808.79 -100%
-1331.50 -24,126.78 -100%
-673.00 -11,521.76 -100%
-173.00 -2,788.76 -100%
-1720.00 -26,006.40 -100%
-370.00 -5,224.40 -100%
-78.00 -1,023.36 -100%
-803.00 -9,732.36 -100%
-390.00 -4,336.80 -100%
-949.00 -9,603.88 -100%

-1.00 -1,063.12 -100%

-7947.00 -3,258.27 -100%


-1.00 -50.35 -100%
-3.00 -1,055.10 -100%
-3.00 -4,891.98 -100%

0.00 0.00 0%
0.00 0.00 0%
-279.36 -676.05 -100%

-11.20 -124.21 -100%


-0.84 -15.72 -100%

-62.72 -1,555.46 -100%


-4.54 -1,427.56 -100%
-62.72 -150.53 -100%

-35.84 -683.47 -100%


-62.72 -97.22 -100%

-11.00 -5,001.92 -100%


-8.00 -3,181.76 -100%
-2.00 -521.88 -100%
-2.00 -635.88 -100%
-14.00 -1,497.44 -100%

0.00 0.00 0%
0.00 0.00 0%
-1160.11 -2,807.47 -100%

-29.09 -322.61 -100%


-9.09 -170.16 -100%

-258.56 -6,412.29 -100%


-17.88 -5,622.19 -100%
-101.00 -1,637.21 -100%
-258.56 -620.54 -100%

-97.21 -1,853.79 -100%


-258.56 -400.77 -100%

-2.00 -213.44 -100%


-24.00 -4,121.28 -100%
-32.00 -4,023.04 -100%
-25.00 -2,868.00 -100%
-18.00 -1,308.96 -100%
-101.00 -5,037.88 -100%

0.00 0.00 0%
0.00 0.00 0%
-156.78 -379.41 -100%

-13.00 -144.17 -100%


-1.17 -21.90 -100%

-33.28 -825.34 -100%


-2.30 -723.21 -100%
-33.28 -79.87 -100%

-20.80 -396.66 -100%


-33.28 -51.58 -100%

-3.00 -898.47 -100%


-10.00 -1,804.90 -100%
-13.00 -648.44 -100%

0.00 0.00 0%
0.00 0.00 0%

-8.00 -88.72 -100%


-0.72 -13.48 -100%

-25.60 -634.88 -100%


-1.57 -493.67 -100%
-25.60 -61.44 -100%
-15.36 -292.92 -100%
-25.60 -39.68 -100%

-4.00 -606.88 -100%


-2.00 -287.44 -100%
-1.00 -138.72 -100%
-1.00 -133.72 -100%
-8.00 -855.68 -100%

-15.00 -19,998.60 -100%


-15.00 -554.10 -100%

-1.00 -682.00 -100%


-1.00 -280.00 -100%
-1.00 -505.00 -100%
-1.00 -280.00 -100%

-1.00 -350.00 -100%


0.00 0.00 0%

0.00 0.00 0%
0.00 0.00 0%
0.00 0.00 0%
0.00 0.00 0%
0.00 0.00 0%

0.00 0.00 0%
0.00 0.00 0%
0.00 0.00 0%

-15.00 -375.00 -100%


-1.00 -430.00 -100%
0.00 0.00 0%
0.00 0.00 0%
-471,257.26

UPERVISOR DE PROYECTOS
VALORIZACION DE AVANCE DE OBRA Nº 01
CORRESPONDIENTE AL MES DE JUNIO DE 2015

INSTALACION SEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNIFICADO EN LA COMUNIDAD DE ROCCHAS, DISTRITO DE SAN MIGUEL,
PROYECTO: PROVINCIA DE LA MAR, DEPARTAMENTO DE AYACUCHO FECHA DE PRESENTACION 7/1/2015

AVANCES
SALDO
PRESUPUESTO ANTERIOR ACTUAL Acumulado
ITEM DESCRIPCION PARTIDA
UNID. METRADO P.UNIT. S/. PRESUP. METRADO VALORIZADO % METRADO VALORIZADO S/. % METRADO VALORIZADO S/. % METRADO VALORIZADO S/. %
S/.
INSTALACION DE SERVICIO DE AGUA PARA RIEGO TECNIFICADO EN LA COMUNIDAD DE ROCCHAS DISTRITO DE SAN 526,334.23
01.00.00 OBRAS PRELIMINARES 4,298.39
01.01.00 CAMPAMENTO DE ALMACEN TECHO CALAMINA m2 1.00 2,759.57 2759.57 1.00 2759.57 100% 0.00 0.00 0% 1.00 2759.57 100% 0.00 0.00 0%
01.02.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X4.20M und 1.00 900.00 900.00 1.00 900.00 100% 0.00 0.00 0% 1.00 900.00 100% 0.00 0.00 0%
01.03.00 PLACA RECORDATORIA DE BAJO RELIEVE und 1.00 638.82 638.82 0.00 0.00 0% 1.00 638.82 100% 1.00 638.82 100% 0.00 0.00 0%
02.00.00 TOMA LATERAL (01 UNIDAD) 655.82 0%
02.01.00 TRABAJOS PRELIMINARES 3.82 0%
02.01.01 LIMPIEZA DE TERRENO MANUAL m2 0.50 0.97 0.49 0.50 0.49 100% 0.00 0.00 0% 0.50 0.49 100% 0.00 0.00 0%
01.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 1.38 2.42 3.34 1.38 3.34 100% 0.00 0.00 0% 1.38 3.34 100% 0.00 0.00 0%
02.02.00 MOVIMIENTO DE TIERRAS 6.88
02.02.01 DEMOLICION DE OBRAS DE CONCRETO m3 0.06 38.81 2.33 0.06 2.33 100% 0.00 0.00 0% 0.06 2.33 100% 0.00 0.00 0%
02.02.02 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURA m3 0.41 11.09 4.55 0.41 4.55 100% 0.00 0.00 0% 0.41 4.55 100% 0.00 0.00 0%
02.03.00 OBRAS DE CONCRETO SIMPLE 290.87
02.03.01 ENCOFRADO DE ESTRUCTURA m2 4.38 22.80 99.86 0.00 0.00 0% 4.38 99.86 100% 4.38 99.86 100% 0.00 0.00 0%
02.03.02 CONCRETO FC=175 KG/CM2 m3 0.47 384.04 180.50 0.00 0.00 0% 0.47 180.50 100% 0.47 180.50 100% 0.00 0.00 0%
02.03.03 DESENCOFRADO DE ESTRUCTURA m2 4.38 2.40 10.51 0.00 0.00 0% 4.38 10.51 100% 4.38 10.51 100% 0.00 0.00 0%
02.04.00 REVOQUES Y ENLUCIDOS 150.25
02.04.01 TARRAJEO EN INTERIORES CEMENTO ARENA Y IMPERMEABILIZANTE m2 7.29 20.61 150.25 0.00 0.00 0% 7.29 150.25 100% 7.29 150.25 100% 0.00 0.00 0%
02.05.00 INSTALACION DE COMPUERTA METALICA 204.00 0%
02.05.01 INSTALACION COMPUERTA METALICA DE 0.90X 0.35M E1/8 und 1.00 204.00 204.00 0.00 0.00 0% 1.00 204.00 100% 1.00 204.00 100% 0.00 0.00 0%
03.00.00 RESERVORIO DE CONCRETO ARMADO (CAP 317M3) 145,027.81
03.01.00 TRABAJOS PRELIMINARES 1,008.81
03.01.01 LIMPIEZA DE TERRENO MANUAL ML 376.42 0.26 97.87 376.42 97.87 100% 0.00 0.00 0% 376.42 97.87 100% 0.00 0.00 0%
03.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 376.42 2.42 910.94 376.42 910.94 100% 0.00 0.00 0% 376.42 910.94 100% 0.00 0.00 0%
03.02.00 MOVIMIENTO DE TIERRAS 28,849.66
03.02.01 EXCAVACION DE MASIVA CON MAQUINARIA EN TERRENO COMPACTO m3 843.00 13.23 11,152.89 843.00 11152.89 100% 0.00 0.00 0% 843.00 11,152.89 100% 0.00 0.00 0%
03.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 256.00 1.63 417.28 256.00 417.28 100% 0.00 0.00 0% 256.00 417.28 100% 0.00 0.00 0%
03.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 153.60 68.25 10,483.20 153.60 10483.20 100% 0.00 0.00 0% 153.60 10,483.20 100% 0.00 0.00 0%
03.02.04 RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO m3 230.40 18.72 4,313.09 230.40 4313.09 100% 0.00 0.00 0% 230.40 4,313.09 100% 0.00 0.00 0%
03.02.05 ELIMINACION MATERIAL EXCEDENTE m3 320.00 7.76 2,483.20 320.00 2483.20 100% 0.00 0.00 0% 320.00 2,483.20 100% 0.00 0.00 0%
03.03.00 CONCRETO SIMPLE 2,454.30
03.03.01 CONCRETO1:10 PARA SOLADO m3 11.25 218.16 2,454.30 11.25 2454.30 100% 0.00 0.00 0% 11.25 2,454.30 100% 0.00 0.00 0%
03.04.00 CONCRETO ARMADO 102,044.41
03.04.01 ENCOFRADO DE MUROS CARAVISTA DE RESERVORIO m2 324.60 54.13 17,570.60 324.60 17570.60 100% 0.00 0.00 0% 324.60 17,570.60 100% 0.00 0.00 0%
03.04.02 ACERO FY=4200 KG/CM2 kg 8,736.40 4.80 41,934.72 8736.40 41934.72 100% 0.00 0.00 0% 8,736.40 41,934.72 100% 0.00 0.00 0%
03.04.03 CONCRETO FC=210 KG/CM2 m3 93.63 443.55 41,529.59 93.63 41529.59 100% 0.00 0.00 0% 93.63 41,529.59 100% 0.00 0.00 0%
03.04.04 DESENCOFRADO DE DE MUROS CARAVISTA DE RESERVORIO m2 324.60 3.11 1,009.51 324.60 1009.51 100% 0.00 0.00 0% 324.60 1,009.51 100% 0.00 0.00 0%
03.05.00 JUNTA DE DILATACION 1,692.08
03.05.01 PROVISION DE Y COLOCADO DE JUNTA WATER STOP DE PVC DE 6" ML 52.00 32.54 1,692.08 52.00 1692.08 100% 0.00 0.00 0% 52.00 1,692.08 100% 0.00 0.00 0%
03.06.00 REVOQUES Y ENLUCIDOS 8,138.50
03.06.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 137.50 12.35 1,698.13 137.50 1,698.13 100% 0.00 0.00 0% 137.50 1,698.13 100% 0.00 0.00 0%
03.06.02 TARRAJEO EN INTERIORES CON CEMENTO-ARENA E IMPERMEABILIZANTE m2 115.20 20.61 2,374.27 115.20 2,374.27 100% 0.00 0.00 0% 115.20 2,374.27 100% 0.00 0.00 0%
03.06.03 ACABADO SEMIPULIDO DE PISO C/MORTERO 1:2 X 5CM DE ESPESOR m2 144.00 22.37 3,221.28 144.00 3,221.28 100% 0.00 0.00 0% 144.00 3,221.28 100% 0.00 0.00 0%
03.06.04 CURADO DE ESTRUCTURA DE CONCRETO m2 252.70 1.55 391.69 252.70 391.69 100% 0.00 0.00 0% 252.70 391.69 100% 0.00 0.00 0%
03.06.05 ESCALERA METALICA DE TUBO DE 1"FG und 2.00 226.57 453.14 0.00 0.00 0% 2.00 453.14 100% 2.00 453.14 100% 0.00 0.00 0%
03.07.00 PINTURA 840.05
03.07.01 PINTURA DE EXTERIORES m2 132.50 6.34 840.05 0.00 0.00 0% 132.50 840.05 100% 132.50 840.05 100% 0.00 0.00 0%
03.00.00 CAJA DE SALIDA, EXEDENCIAS Y LIMPIA 11,979.94
03.01.00 TRABAJOS PRELIMINARES 22.05
03.01.01 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 9.11 2.42 22.05 9.11 22.05 100% 0.00 0.00 0% 9.11 22.05 100% 0.00 0.00 0%
03.02.00 MOVIMIENTO DE TIERRAS 112.21
03.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 2.22 11.09 24.62 2.22 24.62 100% 0.00 0.00 0% 2.22 24.62 100% 0.00 0.00 0%
03.02.02 EXCAVACION MANUAL PARA ZANJA DE TUBERIA m3 2.59 11.09 28.72 2.59 28.72 100% 0.00 0.00 0% 2.59 28.72 100% 0.00 0.00 0%
03.02.03 REFINE Y NEVELACION FONDO DE ZANJA m2 8.10 0.32 2.59 8.10 2.59 100% 0.00 0.00 0% 8.10 2.59 100% 0.00 0.00 0%
03.02.04 PREPARACION DE CAMA CON MATERIAL PROPIO m3 0.97 9.55 9.26 0.97 9.26 100% 0.00 0.00 0% 0.97 9.26 100% 0.00 0.00 0%
03.02.05 TENDIDO DE CAMA DE FONDO DE TUBERIA h=0.10m m3 0.32 9.55 3.06 0.32 3.06 100% 0.00 0.00 0% 0.32 3.06 100% 0.00 0.00 0%
03.02.06 TENDIDO DE CAMA ENCIMA DE TUBERIA h=0.20M m3 0.65 15.92 10.35 0.65 10.35 100% 0.00 0.00 0% 0.65 10.35 100% 0.00 0.00 0%
03.02.07 RELLENO DE ZANJA CON MATERIAL PROPIO m3 3.53 9.52 33.61 3.53 33.61 100% 0.00 0.00 0% 3.53 33.61 100% 0.00 0.00 0%
03.03.00 CONCRETO ARMADO 1,560.44
03.03.01 ENCOFRADO DE ESTRUCTURA m2 22.16 24.80 549.57 22.16 549.57 100% 0.00 0.00 0% 22.16 549.57 100% 0.00 0.00 0%
03.03.02 ACERO FY=4200 KG/CM2 kg 42.45 5.91 250.88 42.45 250.88 100% 0.00 0.00 0% 42.45 250.88 100% 0.00 0.00 0%
03.03.03 CONCRETO FC=175 KG/CM2 m3 1.93 366.22 706.80 1.93 706.80 100% 0.00 0.00 0% 1.93 706.80 100% 0.00 0.00 0%
03.03.04 DESENCOFRADO DE ESTRUCTURA m2 22.16 2.40 53.18 22.16 53.18 100% 0.00 0.00 0% 22.16 53.18 100% 0.00 0.00 0%
03.04.00 REVOQUES Y ENLUCIDOS 216.64
03.04.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 11.36 19.07 216.64 11.36 216.64 100% 0.00 0.00 0% 11.36 216.64 100% 0.00 0.00 0%
03.05.00 INSTALACION DE ACCESORIOS (VC-1 A VC17) 7,571.58
03.05.01 ACCESORIOS EN ESTRUCTURA DE SALIDA DE RESERVORIO und 1.00 3,500.72 3,500.72 0.00 0.00 0% 1.00 3,500.72 100% 1.00 3,500.72 100% 0.00 0.00 0%
03.05.02 ACCESORIO EN ESTRUCTURA DE REBOSE DE RESERVORIO und 1.00 454.72 454.72 0.00 0.00 0% 1.00 454.72 100% 1.00 454.72 100% 0.00 0.00 0%
03.05.03 INSTALACION DE TUBERIA PVC SAP D=8" C-7.5 NTP 399.002 m 5.00 38.12 190.60 5.00 190.60 100% 0.00 0.00 0% 5.00 190.60 100% 0.00 0.00 0%
03.05.04 INSTALACION DE TUBERIA PVC SAP D=4" C-7.5 NTP 399.002 m 20.00 20.01 400.20 20.00 400.20 100% 0.00 0.00 0% 20.00 400.20 100% 0.00 0.00 0%
03.05.05 INSTALACION DE TUBERIA PVC UF D=200mm ISO 4435 m 70.00 39.21 2,744.70 70.00 2744.70 100% 0.00 0.00 0% 70.00 2,744.70 100% 0.00 0.00 0%
03.05.06 INSTALACION DE ACCESORIOS PVC UF D=200mm ISO 4435 und 1.00 93.68 93.68 0.00 0.00 0% 1.00 93.68 100% 1.00 93.68 100% 0.00 0.00 0%
03.05.07 COLOCACION DE TAPA METALICA 0.60M X0.60M e=1/8" und 1.00 186.96 186.96 1.00 186.96 100% 0.00 0.00 0% 1.00 186.96 100% 0.00 0.00 0%
03.06.00 CERCO PERIMETRICO C/ROLLIZOS-ALAMBRE PUAS 2,497.04
03.06.01 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 48.08 2.42 116.35 48.08 116.35 100% 0.00 0.00 0% 48.08 116.35 100% 0.00 0.00 0%
03.06.02 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 3.94 11.09 43.69 3.94 43.69 100% 0.00 0.00 0% 3.94 43.69 100% 0.00 0.00 0%
03.06.03 CONCRETO FC=140 KG/CM2 m3 2.21 314.44 694.91 0.00 0.00 0% 2.21 694.91 100% 2.21 694.91 100% 0.00 0.00 0%
03.06.04 COLOCACION DE ROLLIZOS und 41.00 17.76 728.16 0.00 0.00 0% 41.00 728.16 100% 41.00 728.16 100% 0.00 0.00 0%
03.06.05 CERCO ALAMBRE PUAS m 459.60 1.68 772.13 0.00 0.00 0% 459.60 772.13 100% 459.60 772.13 100% 0.00 0.00 0%
03.06.06 COLOCACION DE PUERTA DE MADERA RUSTICA und 1.00 141.79 141.79 0.00 0.00 0% 1.00 141.79 100% 1.00 141.79 100% 0.00 0.00 0%
04.00.00 CAJA DE DISTRIBUCION DE CAUDALES (01 UNIDAD) 8,528.10
04.01.01 TRABAJOS PRELIMINARES 18.10
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 5.34 0.97 5.18 5.34 5.18 100% 0.00 0.00 0% 5.34 5.18 100% 0.00 0.00 0%
04.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 5.34 2.42 12.92 5.34 12.92 100% 0.00 0.00 0% 5.34 12.92 100% 0.00 0.00 0%
04.02.00 MOVIMIENTO DE TIERRAS 502.98
04.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 31.85 11.09 353.22 31.85 353.22 100% 0.00 0.00 0% 31.85 353.22 100% 0.00 0.00 0%
04.02.02 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO m3 8.00 18.72 149.76 8.00 149.76 100% 0.00 0.00 0% 8.00 149.76 100% 0.00 0.00 0%
04.03.00 CONCRETO ARMADO 1,985.84
04.03.01 CONCRETO1:10 PARA SOLADO m3 0.30 218.16 65.45 0.30 65.45 100% 0.00 0.00 0% 0.30 65.45 100% 0.00 0.00 0%
04.03.02 ENCOFRADO DE ESTRUCTURA m2 8.43 24.80 209.06 8.43 209.06 100% 0.00 0.00 0% 8.43 209.06 100% 0.00 0.00 0%
04.03.03 ACERO FY=4200 KG/CM2 kg 84.05 5.91 496.74 84.05 496.74 100% 0.00 0.00 0% 84.05 496.74 100% 0.00 0.00 0%
04.03.04 CONCRETO FC=175 KG/CM2 m3 3.11 384.04 1,194.36 3.11 1194.36 100% 0.00 0.00 0% 3.11 1,194.36 100% 0.00 0.00 0%
04.03.05 DESENCOFRADO DE ESTRUCTURA m2 8.43 2.40 20.23 8.43 20.23 100% 0.00 0.00 0% 8.43 20.23 100% 0.00 0.00 0%
04.04.00 INSTALACION DE ACCESORIOS (VC-1 A VC17) 5,322.89
04.04.01 COLOCACION DE TAPA METALICA 0.60M X0.60M e=1/8" und 1.00 186.96 186.96 1.00 186.96 100% 0.00 0.00 0% 1.00 186.96 100% 0.00 0.00 0%
04.04.02 COLOCACION DE TAPA METALICA 0.50M X0.50M e=1/8" und 5.00 166.96 834.80 5.00 834.80 100% 0.00 0.00 0% 5.00 834.80 100% 0.00 0.00 0%
04.04.03 SUMINISTRO Y COLOCCION DE TUBO DE VENTILACION und 1.00 64.68 64.68 1.00 64.68 100% 0.00 0.00 0% 1.00 64.68 100% 0.00 0.00 0%
04.04.04 INSTALACION DE ACCESORIOS DE REGULACION und 1.00 1,809.49 1,809.49 1.00 1809.49 100% 0.00 0.00 0% 1.00 1,809.49 100% 0.00 0.00 0%
04.04.05 INSTALACION DE ACCESORIOS EN CAMARA DE CARGA und 1.00 449.49 449.49 1.00 449.49 100% 0.00 0.00 0% 1.00 449.49 100% 0.00 0.00 0%
04.04.06 SUMINISTRO Y COLOCCION DE ACCESORIOS C. VALVULA 1 und 1.00 619.49 619.49 1.00 619.49 100% 0.00 0.00 0% 1.00 619.49 100% 0.00 0.00 0%
04.04.07 SUMINISTRO Y COLOCCION DE ACCESORIOS C. VALVULA 2 und 1.00 897.49 897.49 1.00 897.49 100% 0.00 0.00 0% 1.00 897.49 100% 0.00 0.00 0%
04.04.08 SUMINISTRO Y COLOCCION DE ACCESORIOS C. VALVULA 3 und 1.00 460.49 460.49 1.00 460.49 100% 0.00 0.00 0% 1.00 460.49 100% 0.00 0.00 0%
04.05.00 REVOQUES Y ENLUCIDOS 612.76
04.05.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 13.49 12.35 166.60 13.49 166.60 100% 0.00 0.00 0% 13.49 166.60 100% 0.00 0.00 0%
04.05.02 TARRAJEO EN INTERIORES CON CEMENTO-ARENA E IMPERMEABILIZANTE m2 19.19 20.61 395.51 19.19 395.51 100% 0.00 0.00 0% 19.19 395.51 100% 0.00 0.00 0%
04.05.03 CURADO DE ESTRUCTURA DE CONCRETO m2 32.68 1.55 50.65 32.68 50.65 100% 0.00 0.00 0% 32.68 50.65 100% 0.00 0.00 0%
04.06.00 PINTURA 85.53
04.06.01 PINTURA DE EXTERIORES m2 13.49 6.34 85.53 0.00 0.00 0% 13.49 85.53 100% 13.49 85.53 100% 0.00 0.00 0%
05.00.00 CAMARA REDUCTORA DE PRESION (04 UNIDADES) 13,440.54
05.01.00 TRABAJOS PRELIMINARES 3,402.12
05.01.01 LIMPIEZA DE TERRENO MANUAL ML 6.76 0.26 1.76 6.76 1.76 100% 0.00 0.00 0% 6.76 1.76 100% 0.00 0.00 0%
05.01.02 TRAZO Y REPLANTEO PAR ESTRUCTURA m2 6.76 2.42 16.36 6.76 16.36 100% 0.00 0.00 0% 6.76 16.36 100% 0.00 0.00 0%
05.01.03 ACARREO DE AGREGADO A UBICACION DE CRP VJE 1,398.35 2.42 3,384.01 935.00 2262.70 67% 463.35 1,121.31 33% 1,398.35 3,384.01 100% 0.00 0.00 0%
05.02.00 MOVIMIENTO DE TIERRAS 191.78
05.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 6.76 11.09 74.97 6.76 74.97 100% 0.00 0.00 0% 6.76 74.97 100% 0.00 0.00 0%
05.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 6.24 18.72 116.81 6.24 116.81 100% 0.00 0.00 0% 6.24 116.81 100% 0.00 0.00 0%
05.03.00 CONCRETO SIMPLE 74.17
05.03.01 CONCRETO1:10 PARA SOLADO m3 0.34 218.16 74.17 0.00 0.00 0% 0.34 74.17 100% 0.34 74.17 100% 0.00 0.00 0%
05.04.00 CONCRETO ARMADO 4,288.55
05.04.01 ENCOFRADO DE ESTRUCTURA m2 60.36 24.80 1,496.93 30.18 748.46 50% 30.18 748.46 50% 60.36 1,496.93 100% 0.00 0.00 0%
05.04.02 ACERO FY=4200 KG/CM2 kg 43.01 5.91 254.19 43.01 254.19 100% 0.00 0.00 0% 43.01 254.19 100% 0.00 0.00 0%
05.04.03 CONCRETO FC=175 KG/CM2 m3 6.23 384.04 2,392.57 0.00 0.00 0% 6.23 2,392.57 100% 6.23 2,392.57 100% 0.00 0.00 0%
05.04.04 DESENCOFRADO DE ESTRUCTURA m2 60.36 2.40 144.86 0.00 0.00 0% 60.36 144.86 100% 60.36 144.86 100% 0.00 0.00 0%
05.05.00 REVOQUES Y ENLUCIDOS 687.06
05.05.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 33.32 19.07 635.41 0.00 0.00 0% 33.32 635.41 100% 33.32 635.41 100% 0.00 0.00 0%
05.05.02 CURADO DE ESTRUCTURA DE CONCRETO m2 33.32 1.55 51.65 0.00 0.00 0% 33.32 51.65 100% 33.32 51.65 100% 0.00 0.00 0%
05.06.00 INSTALACION DE ACCESORIOS (VC-1 A VC17) 4,585.60
05.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CRP D=21/2" und 1.00 916.94 916.94 0.00 0.00 0% 1.00 916.94 100% 1.00 916.94 100% 0.00 0.00 0%
05.06.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN CRP D=3" und 1.00 966.94 966.94 0.00 0.00 0% 1.00 966.94 100% 1.00 966.94 100% 0.00 0.00 0%
05.06.03 SUMINISTRO E INSTALACION DE ACCESORIOS EN CRP D=4" und 2.00 976.94 1,953.88 0.00 0.00 0% 2.00 1,953.88 100% 2.00 1,953.88 100% 0.00 0.00 0%
05.06.04 COLOCACION DE TAPA METALICA 0.60M X0.60M e=1/8" und 4.00 186.96 747.84 0.00 0.00 0% 4.00 747.84 100% 4.00 747.84 100% 0.00 0.00 0%
05.06.00 PINTURA 211.25
05.06.01 PINTURA DE EXTERIORES m2 33.32 6.34 211.25 0.00 0.00 0% 33.32 211.25 100% 33.32 211.25 100% 0.00 0.00 0%
06.00.00 LATERAL DE RIEGO FIJO (7,947.00M) 248,770.95
06.01.00 TRABAJOS PRELIMINARES 10,172.16
06.01.01 LIMPIEZA DE TERRENO MANUAL ML 7,947.00 0.26 2,066.22 7947.00 2066.22 100% 0.00 0.00 0% 7,947.00 2,066.22 100% 0.00 0.00 0%
06.01.02 TRAZO Y REPLANTEO PARA ZANJA DE TUBERIA m2 7,947.00 1.02 8,105.94 7947.00 8105.94 100% 0.00 0.00 0% 7,947.00 8,105.94 100% 0.00 0.00 0%
06.02.00 MOVIMIENTO DE TIERRAS 105,377.78
06.02.01 EXCAVACION MANUAL PARA ZANJA DE TUBERIA m3 2,543.04 15.52 39,467.98 2543.04 39467.98 100% 0.00 0.00 0% 2,543.04 39,467.98 100% 0.00 0.00 0%
06.02.02 RETIRO Y REPOSICION DE CERCOS PERIMETRICOS DE PARCELA (MURO SECO) m3 24.00 15.52 372.48 24.00 372.48 100% 0.00 0.00 0% 24.00 372.48 100% 0.00 0.00 0%
06.02.03 REFINE Y NEVELACION FONDO DE ZANJA m2 7,947.00 0.32 2,543.04 7947.00 2543.04 100% 0.00 0.00 0% 7,947.00 2,543.04 100% 0.00 0.00 0%
06.02.04 PREPARACION DE CAMA CON MATERIAL PROPIO m3 953.64 9.55 9,107.26 953.64 9107.26 100% 0.00 0.00 0% 953.64 9,107.26 100% 0.00 0.00 0%
06.02.05 TENDIDO DE CAMA DE FONDO DE TUBERIA h=10m m3 317.88 15.92 5,060.65 317.88 5060.65 100% 0.00 0.00 0% 317.88 5,060.65 100% 0.00 0.00 0%
06.02.06 TENDIDO DE CAMA ENCIMA DE TUBERIA h=0.20M m3 635.76 15.92 10,121.30 635.76 10121.30 100% 0.00 0.00 0% 635.76 10,121.30 100% 0.00 0.00 0%
06.02.07 RELLENO DE ZANJA CON MATERIAL PROPIO m3 2,543.04 15.22 38,705.07 1225.60 18653.63 48% 1,317.44 20,051.44 52% 2,543.04 38,705.07 100% 0.00 0.00 0%
06.03.00 INSTALACION DE TUBERIA NTP 399.002 SP 5M 122,902.19
06.03.01 INSTALACION DE TUBERIA PVC SAP D=4" C-10 NTP 399.002 m 110.00 21.12 2,323.20 110.00 2323.20 100% 0.00 0.00 0% 110.00 2,323.20 100% 0.00 0.00 0%
06.03.02 INSTALACION DE TUBERIA PVC SAP D=4" C-7.5 NTP 399.002 m 570.00 20.01 11,405.70 570.00 11405.70 100% 0.00 0.00 0% 570.00 11,405.70 100% 0.00 0.00 0%
06.03.03 INSTALACION DE TUBERIA PVC SAP D=4" C-5 NTP 399.002 m 779.00 19.01 14,808.79 779.00 14808.79 100% 0.00 0.00 0% 779.00 14,808.79 100% 0.00 0.00 0%
06.03.04 INSTALACION DE TUBERIA PVC SAP D=3" C-10 NTP 399.002 m 1,331.50 18.12 24,126.78 1331.50 24126.78 100% 0.00 0.00 0% 1,331.50 24,126.78 100% 0.00 0.00 0%
06.03.05 INSTALACION DE TUBERIA PVC SAP D=3" C-7.5 NTP 399.002 m 673.00 17.12 11,521.76 673.00 11521.76 100% 0.00 0.00 0% 673.00 11,521.76 100% 0.00 0.00 0%
06.03.06 INSTALACION DE TUBERIA PVC SAP D=3" C-5 NTP 399.002 m 173.00 16.12 2,788.76 173.00 2788.76 100% 0.00 0.00 0% 173.00 2,788.76 100% 0.00 0.00 0%
06.03.07 INSTALACION DE TUBERIA PVC SAP D=21/2" C-10 NTP 399.002 m 1,720.00 15.12 26,006.40 1720.00 26006.40 100% 0.00 0.00 0% 1,720.00 26,006.40 100% 0.00 0.00 0%
06.03.08 INSTALACION DE TUBERIA PVC SAP D=21/2" C-7.5 NTP 399.002 m 370.00 14.12 5,224.40 370.00 5224.40 100% 0.00 0.00 0% 370.00 5,224.40 100% 0.00 0.00 0%
06.03.09 INSTALACION DE TUBERIA PVC SAP D=21/2" C-5 NTP 399.002 m 78.00 13.12 1,023.36 78.00 1023.36 100% 0.00 0.00 0% 78.00 1,023.36 100% 0.00 0.00 0%
06.03.10 INSTALACION DE TUBERIA PVC SAP D=2" C-10 NTP 399.002 m 803.00 12.12 9,732.36 803.00 9732.36 100% 0.00 0.00 0% 803.00 9,732.36 100% 0.00 0.00 0%
06.03.11 INSTALACION DE TUBERIA PVC SAP D=2" C-7.5 NTP 399.002 m 390.00 11.12 4,336.80 390.00 4336.80 100% 0.00 0.00 0% 390.00 4,336.80 100% 0.00 0.00 0%
06.03.12 INSTALACION DE TUBERIA PVC SAP D=11/2" C-10 NTP 399.002 m 949.00 10.12 9,603.88 949.00 9603.88 100% 0.00 0.00 0% 949.00 9,603.88 100% 0.00 0.00 0%
06.04.00 INSTALACION DE ACCESORIOS 1,063.12
06.04.01 SUMINISTRO E INSTALACION DE ACCCESORIOS EN LINEA FIJA und 1.00 1,063.12 1,063.12 1.00 1063.12 100% 0.00 0.00 0% 1.00 1,063.12 100% 0.00 0.00 0%
06.05.00 PRUEBA HIDRAULICA 9,255.70
06.05.01 PRUEBA HIDRAULICA EN TUBERIA EN LINEA FIJA m 7,947.00 0.41 3,258.27 0.00 0.00 0% 7,947.00 3,258.27 100% 7,947.00 3,258.27 100% 0.00 0.00 0%
06.05.02 ACCESORIOS PVC SAP PARA PRUEBA HIDRAULICA EN LINE FIJA und 1.00 50.35 50.35 0.00 0.00 0% 1.00 50.35 100% 1.00 50.35 100% 0.00 0.00 0%
06.05.03 PRUEBA DE ESTANCAMIENTO DE AGUA EN EL SISTEMA und 3.00 351.70 1,055.10 0.00 0.00 0% 3.00 1,055.10 100% 3.00 1,055.10 100% 0.00 0.00 0%
06.05.04 REPARACION Y PUESTA EN OPERACION DEL SISTEMA POST ESTANCAMIENTO und 3.00 1,630.66 4,891.98 0.00 0.00 0% 3.00 4,891.98 100% 3.00 4,891.98 100% 0.00 0.00 0%
07.00.00 CAJA VALVULA DE CONTROL EN LINEA FIJA (17 UNIDADES) 15,606.61
07.01.00 TRABAJOS PRELIMINARES 713.57
07.01.01 LIMPIEZA DE TERRENO MANUAL ML 14.00 0.26 3.64 14.00 3.64 100% 0.00 0.00 0% 14.00 3.64 100% 0.00 0.00 0%
07.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 14.00 2.42 33.88 14.00 33.88 100% 0.00 0.00 0% 14.00 33.88 100% 0.00 0.00 0%
07.01.03 ACARREO DE AGREGADO A UBICACION DE C. VALVULA DE CONTROL VJE 279.36 2.42 676.05 279.36 676.05 100% 0.00 0.00 0% 279.36 676.05 100% 0.00 0.00 0%
07.02.00 MOVIMIENTO DE TIERRAS 139.93
07.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 11.20 11.09 124.21 11.20 124.21 100% 0.00 0.00 0% 11.20 124.21 100% 0.00 0.00 0%
07.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.84 18.72 15.72 0.84 15.72 100% 0.00 0.00 0% 0.84 15.72 100% 0.00 0.00 0%
07.03.00 CONCRETO SIMPLE 3,133.54 0%
07.03.01 ENCOFRADO DE ESTRUCTURA m2 62.72 24.80 1,555.46 0.00 0.00 0% 62.72 1,555.46 100% 62.72 1,555.46 100% 0.00 0.00 0%
07.03.02 CONCRETO FC=140 KG/CM2 m3 4.54 314.44 1,427.56 0.00 0.00 0% 4.54 1,427.56 100% 4.54 1,427.56 100% 0.00 0.00 0%
07.03.03 DESENCOFRADO DE ESTRUCTURA m2 62.72 2.40 150.53 0.00 0.00 0% 62.72 150.53 100% 62.72 150.53 100% 0.00 0.00 0%
07.04.00 REVOQUES Y ENLUCIDOS 780.68
07.04.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 35.84 19.07 683.47 0.00 0.00 0% 35.84 683.47 100% 35.84 683.47 100% 0.00 0.00 0%
07.04.02 CURADO DE ESTRUCTURA DE CONCRETO m2 62.72 1.55 97.22 0.00 0.00 0% 62.72 97.22 100% 62.72 97.22 100% 0.00 0.00 0%
07.05.00 INSTALACION DE ACCESORIOS (VC-1 A VC17) 10,838.88
07.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN VALVULA DE CONTROL 4" und 11.00 454.72 5,001.92 11.00 5001.92 100% 0.00 0.00 0% 0.00 5,001.92 100% 0.00 0.00 0%
07.05.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN VALVULA DE CONTROL 3" und 8.00 397.72 3,181.76 8.00 3181.76 100% 0.00 0.00 0% 8.00 3,181.76 100% 0.00 0.00 0%
07.05.03 SUMINISTRO E INSTALACION DE ACCESORIOS EN VALVULA DE CONTROL 2 1/2" und 2.00 260.94 521.88 1.00 260.94 50% 1.00 260.94 50% 2.00 521.88 100% 0.00 0.00 0%
07.05.04 SUMINISTRO E INSTALACION DE ACCESORIOS EN VALVULA DE CONTROL 2" und 2.00 317.94 635.88 0.00 0.00 0% 2.00 635.88 100% 2.00 635.88 100% 0.00 0.00 0%
07.05.05 COLOCACION DE TAPA METALICA 0.40M X0.40M e=1/8" und 14.00 106.96 1,497.44 0.00 0.00 0% 14.00 1,497.44 100% 14.00 1,497.44 100% 0.00 0.00 0%
08.00.00 CAJA DE HIDRANTE EN LINEA FIJA (101 UNIDAD) 37,690.31
08.01.00 TRABAJOS PRELIMINARES 3,078.15
08.01.01 LIMPIEZA DE TERRENO MANUAL ML 101.00 0.26 26.26 101.00 26.26 100% 0.00 0.00 0% 101.00 26.26 100% 0.00 0.00 0%
08.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 101.00 2.42 244.42 101.00 244.42 100% 0.00 0.00 0% 101.00 244.42 100% 0.00 0.00 0%
08.01.03 ACARREO DE AGREGADO A UBICACION DE C. HIDRANTE VJE 1,160.11 2.42 2,807.47 853.00 2064.26 74% 307.11 743.21 26% 1,160.11 2,807.47 100% 0.00 0.00 0%
08.02.00 MOVIMIENTO DE TIERRAS 492.77
08.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 29.09 11.09 322.61 29.09 322.61 100% 0.00 0.00 0% 29.09 322.61 100% 0.00 0.00 0%
08.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 9.09 18.72 170.16 9.09 170.16 100% 0.00 0.00 0% 9.09 170.16 100% 0.00 0.00 0%
08.03.00 CONCRETO SIMPLE 14,292.23
08.03.01 ENCOFRADO DE ESTRUCTURA m2 258.56 24.80 6,412.29 181.76 4507.65 70% 76.80 1,904.64 30% 258.56 6,412.29 100% 0.00 0.00 0%
08.03.02 CONCRETO FC=140 KG/CM2 m3 17.88 314.44 5,622.19 12.57 3952.51 70% 5.31 1,669.68 30% 17.88 5,622.19 100% 0.00 0.00 0%
08.03.03 COLOCACION DE ANILLOS DE SUJECION und 101.00 16.21 1,637.21 6.00 97.26 6% 95.00 1,539.95 94% 101.00 1,637.21 100% 0.00 0.00 0%
08.03.04 DESENCOFRADO DE ESTRUCTURA m2 258.56 2.40 620.54 181.76 436.22 70% 76.80 184.32 30% 258.56 620.54 100% 0.00 0.00 0%
08.04.00 REVOQUES Y ENLUCIDOS 2,254.56
08.04.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 97.21 19.07 1,853.79 5.77 110.03 6% 91.44 1,743.76 94% 97.21 1,853.79 100% 0.00 0.00 0%
08.04.02 CURADO DE ESTRUCTURA DE CONCRETO m2 258.56 1.55 400.77 15.36 23.81 6% 243.20 376.96 94% 258.56 400.77 100% 0.00 0.00 0%
08.05.00 INSTALACION DE ACCESORIOS 17,572.60
08.05.01 SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTE DE 4" und 2.00 106.72 213.44 0.00 0.00 0% 2.00 213.44 100% 2.00 213.44 100% 0.00 0.00 0%
08.05.02 SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTE DE 3" und 24.00 171.72 4,121.28 0.00 0.00 0% 24.00 4,121.28 100% 24.00 4,121.28 100% 0.00 0.00 0%
08.05.03 SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTE DE 21/2" und 32.00 125.72 4,023.04 0.00 0.00 0% 32.00 4,023.04 100% 32.00 4,023.04 100% 0.00 0.00 0%
08.05.04 SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTE DE 2" und 25.00 114.72 2,868.00 0.00 0.00 0% 25.00 2,868.00 100% 25.00 2,868.00 100% 0.00 0.00 0%
08.05.05 SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTE DE 11/2" und 18.00 72.72 1,308.96 0.00 0.00 0% 18.00 1,308.96 100% 18.00 1,308.96 100% 0.00 0.00 0%
08.05.06 COLOCACION DE TAPA METALICA 0.25M X0.35M e=1/8" und 101.00 49.88 5,037.88 0.00 0.00 0% 101.00 5,037.88 100% 101.00 5,037.88 100% 0.00 0.00 0%
09.00.00 CAJA VALVULA DE PURGA EN LINEA FIJA (13 UNIDADES) 6,008.80
09.01.00 TRABAJOS PRELIMINARES 414.25
09.01.01 LIMPIEZA DE TERRENO MANUAL ML 13.00 0.26 3.38 13.00 3.38 100% 0.00 0.00 0% 13.00 3.38 100% 0.00 0.00 0%
09.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 13.00 2.42 31.46 13.00 31.46 100% 0.00 0.00 0% 13.00 31.46 100% 0.00 0.00 0%
09.01.03 ACARREO DE AGREGADO A UBICACION DE VALVULA DE PURGA VJE 156.78 2.42 379.41 0.00 0.00 0% 156.78 379.41 100% 156.78 379.41 100% 0.00 0.00 0%
09.02.00 MOVIMIENTO DE TIERRAS 166.07
09.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 13.00 11.09 144.17 13.00 144.17 100% 0.00 0.00 0% 13.00 144.17 100% 0.00 0.00 0%
09.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 1.17 18.72 21.90 1.17 21.90 100% 0.00 0.00 0% 1.17 21.90 100% 0.00 0.00 0%
09.03.00 CONCRETO SIMPLE 1,628.43
09.03.01 ENCOFRADO DE ESTRUCTURA m2 33.28 24.80 825.34 0.00 0.00 0% 33.28 825.34 100% 33.28 825.34 100% 0.00 0.00 0%
09.03.02 CONCRETO FC=140 KG/CM2 m3 2.30 314.44 723.21 0.00 0.00 0% 2.30 723.21 100% 2.30 723.21 100% 0.00 0.00 0%
09.03.03 DESENCOFRADO DE ESTRUCTURA m2 33.28 2.40 79.87 0.00 0.00 0% 33.28 79.87 100% 33.28 79.87 100% 0.00 0.00 0%
09.04.00 REVOQUES Y ENLUCIDOS 448.24
09.04.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 20.80 19.07 396.66 0.00 0.00 0% 20.80 396.66 100% 20.80 396.66 100% 0.00 0.00 0%
09.04.02 CURADO DE ESTRUCTURA DE CONCRETO m2 33.28 1.55 51.58 0.00 0.00 0% 33.28 51.58 100% 33.28 51.58 100% 0.00 0.00 0%
09.05.00 INSTALACION DE ACCESORIOS 3,351.81
09.05.01 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE PURGA DE 2" und 3.00 299.49 898.47 3.00 898.47 100% 0.00 0.00 0% 3.00 898.47 100% 0.00 0.00 0%
09.05.02 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE PURGA DE 11/2 " und 10.00 180.49 1,804.90 0.00 0.00 0% 10.00 1,804.90 100% 10.00 1,804.90 100% 0.00 0.00 0%
09.05.03 COLOCACION DE TAPA METALICA 0.25M X0.35M e=1/8" und 13.00 49.88 648.44 0.00 0.00 0% 13.00 648.44 100% 13.00 648.44 100% 0.00 0.00 0%
10.00.00 CAJA DE VALVULA DE AIRE EN LINEA FIJA (08 UNIDADES) 28,218.36
10.01.00 TRABAJOS PRELIMINARES 21.44
10.01.01 LIMPIEZA DE TERRENO MANUAL ML 8.00 0.26 2.08 8.00 2.08 100% 0.00 0.00 0% 8.00 2.08 100% 0.00 0.00 0%
10.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 8.00 2.42 19.36 8.00 19.36 100% 0.00 0.00 0% 8.00 19.36 100% 0.00 0.00 0%
10.02.00 MOVIMIENTO DE TIERRAS 102.20
10.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 8.00 11.09 88.72 8.00 88.72 100% 0.00 0.00 0% 8.00 88.72 100% 0.00 0.00 0%
10.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.72 18.72 13.48 0.72 13.48 100% 0.00 0.00 0% 0.72 13.48 100% 0.00 0.00 0%
10.03.00 CONCRETO SIMPLE 1,189.99
10.03.01 ENCOFRADO DE ESTRUCTURA m2 25.60 24.80 634.88 0.00 0.00 0% 25.60 634.88 100% 25.60 634.88 100% 0.00 0.00 0%
10.03.02 CONCRETO FC=140 KG/CM2 m3 1.57 314.44 493.67 0.00 0.00 0% 1.57 493.67 100% 1.57 493.67 100% 0.00 0.00 0%
10.03.03 DESENCOFRADO DE ESTRUCTURA m2 25.60 2.40 61.44 0.00 0.00 0% 25.60 61.44 100% 25.60 61.44 100% 0.00 0.00 0%
10.04.00 REVOQUES Y ENLUCIDOS 332.60
10.04.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 15.36 19.07 292.92 0.00 0.00 0% 15.36 292.92 100% 15.36 292.92 100% 0.00 0.00 0%
10.04.02 CURADO DE ESTRUCTURA DE CONCRETO m2 25.60 1.55 39.68 0.00 0.00 0% 25.60 39.68 100% 25.60 39.68 100% 0.00 0.00 0%
10.05.00 INSTALACION DE ACCESORIOS 2,022.44
10.05.01 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE AIRE DE 4" und 4.00 151.72 606.88 0.00 0.00 0% 4.00 606.88 100% 4.00 606.88 100% 0.00 0.00 0%
10.05.02 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE AIRE DE 3" und 2.00 143.72 287.44 0.00 0.00 0% 2.00 287.44 100% 2.00 287.44 100% 0.00 0.00 0%
10.05.03 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE AIRE DE 21/2" und 1.00 138.72 138.72 0.00 0.00 0% 1.00 138.72 100% 1.00 138.72 100% 0.00 0.00 0%
10.05.04 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE AIRE DE 2" und 1.00 133.72 133.72 0.00 0.00 0% 1.00 133.72 100% 1.00 133.72 100% 0.00 0.00 0%
10.05.05 COLOCACION DE TAPA METALICA 0.40M X0.40M e=1/8" und 8.00 106.96 855.68 0.00 0.00 0% 8.00 855.68 100% 8.00 855.68 100% 0.00 0.00 0%
10.06.00 LINEA DE RIEGO MOVIL (15 MODULOS DE RIEGO) 20,552.70
10.06.01 SUMINISTRO E INSTALACION DE LINEA DE RIEGO MOVIL und 15.00 1,333.24 19,998.60 0.00 0.00 0% 15.00 19,998.60 100% 15.00 19,998.60 100% 0.00 0.00 0%
10.06.02 PRUEBA DE FUNCIONAMIENTO LINEA MOVIL und 15.00 36.94 554.10 0.00 0.00 0% 15.00 554.10 100% 15.00 554.10 100% 0.00 0.00 0%
10.07.00 CAPACITACION PARA LOS BENEFICIARIOS 1,747.00
10.07.01 FORMALIZACION DEL COMITE DE USUARIOS und 1.00 682.00 682.00 0.00 0.00 0% 1.00 682.00 100% 1.00 682.00 100% 0.00 0.00 0%
10.07.02 GESTION DE AGUA PARA RIEGO und 1.00 280.00 280.00 0.00 0.00 0% 1.00 280.00 100% 1.00 280.00 100% 0.00 0.00 0%
10.07.03 OPERACION Y MANTENIMIENTO DE SISTEMA DE RIEGO TECNIFICADO und 1.00 505.00 505.00 0.00 0.00 0% 1.00 505.00 100% 1.00 505.00 100% 0.00 0.00 0%
10.07.04 CADENAS PRODUCTIVAS Y COMERCIALIZACION und 1.00 280.00 280.00 0.00 0.00 0% 1.00 280.00 100% 1.00 280.00 100% 0.00 0.00 0%
10.08.00 REGULARIZACION TRAMITES DE ESTUDIO Y EJECUCION DE OBRA 2,250.00
10.08.01 AUTORIZACION DEAPROBACION DE ESTUDIO Y EJECUCION DE OBRA und 1.00 350.00 350.00 0.00 0.00 0% 1.00 350.00 100% 1.00 350.00 100% 0.00 0.00 0%
10.08.02 CERTIFICADO DE INEXISTENCIA DE RESTOS ARQUEOLOGICOS und 1.00 1,900.00 1,900.00 1.00 1900.00 100% 0.00 0.00 0% 1.00 1,900.00 100% 0.00 0.00 0%
11.00.00 MITIGACIÓN DEL IMPACTO AMBIENTAL 6,108.60
11.01.00 INSTALACION DE LETRINAS SANITARIAS (01 UND) 441.56
11.01.01 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 1.00 2.42 2.42 1.00 2.42 100% 0.00 0.00 0% 1.00 2.42 100% 0.00 0.00 0%
11.01.02 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 1.28 11.09 14.20 1.28 14.20 100% 0.00 0.00 0% 1.28 14.20 100% 0.00 0.00 0%
11.01.03 INSTALACION DE CUARTONES, MURO PUERTA, TECHO DE CALAMINA C/MARCO und 1.00 313.28 313.28 1.00 313.28 100% 0.00 0.00 0% 1.00 313.28 100% 0.00 0.00 0%
11.01.04 SUMINISTRO Y COLOCACION DE TUBO DE VENTILACION LETRINA und 1.00 47.08 47.08 1.00 47.08 100% 0.00 0.00 0% 1.00 47.08 100% 0.00 0.00 0%
11.01.05 INSTALACION DE BAñO TURCO PRE FABRICADO und 1.00 64.58 64.58 1.00 64.58 100% 0.00 0.00 0% 1.00 64.58 100% 0.00 0.00 0%
11.02.00 INSTALACION DE DE HOYO SANITARIO P/ DEPOSITO DE BASURA 62.04 0.00 0.00
11.02.01 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 1.00 2.42 2.42 1.00 2.42 100% 0.00 0.00 0% 1.00 2.42 100% 0.00 0.00 0%
11.02.02 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 2.00 11.09 22.18 2.00 22.18 100% 0.00 0.00 0% 2.00 22.18 100% 0.00 0.00 0%
11.02.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 2.00 18.72 37.44 2.00 37.44 100% 0.00 0.00 0% 2.00 37.44 100% 0.00 0.00 0%
11.03.00 PRUEBAS DE CALIDAD 5,605.00
11.03.01 PRUEBA DE CALIDAD DEL CONCRETO ( PRUEBA DE COMPRESION) und 15.00 25.00 375.00 15.00 375.00 100% 0.00 0.00 0% 15.00 375.00 100% 0.00 0.00 0%
11.03.02 DISEñO DE MEZCLA und 1.00 430.00 430.00 1.00 430.00 100% 0.00 0.00 0% 1.00 430.00 100% 0.00 0.00 0%
11.03.03 VERIFICACION PORTANTE DEL SUELO RESERVORIO und 1.00 2,300.00 2,300.00 1.00 2300.00 100% 0.00 0.00 0% 1.00 2,300.00 100% 0.00 0.00 0%
11.03.04 VERIFICACION DE ANALISIS ESTRUCTURAL RESERVORIO und 1.00 2,500.00 2,500.00 1.00 2500.00 100% 0.00 0.00 0% 1.00 2,500.00 100% 0.00 0.00 0%
COSTO DIRECTO TOTAL 526,334.23 414865.30 78.82% 111,468.93 21.18% 526,334.23 100.00% 0.00 0.00%

RESIDENTE SUPERVISOR DE PROYECTOS


526,334.23
520534.271 57041.5 18010 595585.771
VALORIZACION DE AVANCE DE OBRA Nº 01
CORRESPONDIENTE AL MES DE JUNIO DE 2015

INSTALACION SEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNIFICADO EN LA COMUNIDAD DE ROCCHAS, DISTRITO
PROYECTO: DE SAN MIGUEL, PROVINCIA DE LA MAR, DEPARTAMENTO DE AYACUCHO FECHA DE PRESENTACION 7/1/2015

AVANCES
SALDO
PRESUPUESTO ANTERIOR ACTUAL Acumulado
ITEM DESCRIPCION PARTIDA
VALORIZADO
UNID. METRADO P.UNIT. S/. PRESUP. METRADO S/. % METRADO VALORIZADO S/. % METRADO VALORIZADO S/. % METRADO VALORIZADO S/. %

INSTALACION DE SERVICIO DE AGUA PARA RIEGO TECNIFICADO EN LA COMUNIDAD DE ROCCHAS DISTRITO 526,334.23
01.00.00 OBRAS PRELIMINARES 4,298.39
01.01.00 CAMPAMENTO DE ALMACEN TECHO CALAMINA m2 1.00 2,759.57 2759.57 1.00 2759.57 100% 0.00 0.00 0% 1.00 2759.57 100% 0.00 0.00 0%
01.02.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X4.20M und 1.00 900.00 900.00 2.00 900.00 100% 0.00 0.00 0% 1.00 900.00 100% 0.00 0.00 0%
01.03.00 PLACA RECORDATORIA DE BAJO RELIEVE und 1.00 638.82 638.82 0.00 0.00 0% 0.00 0.00 0% 0.00 0 0% 1.00 638.82 100%
02.00.00 TOMA LATERAL (01 UNIDAD) 655.82 0%
02.01.00 TRABAJOS PRELIMINARES 3.82 0%
02.01.01 LIMPIEZA DE TERRENO MANUAL m2 0.50 0.97 0.49 0.50 0.49 100% 0.00 0.00 0% 0.50 0.49 100% 0.00 0.00 0%
01.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 1.38 2.42 3.34 1.38 3.34 100% 0.00 0.00 0% 1.38 3.34 100% 0.00 0.00 0%
02.02.00 MOVIMIENTO DE TIERRAS 6.88
02.02.01 DEMOLICION DE OBRAS DE CONCRETO m3 0.06 38.81 2.33 0.06 2.33 100% 0.00 0.00 0% 0.06 2.33 100% 0.00 0.00 0%
02.02.02 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURA m3 0.41 11.09 4.55 0.41 4.55 100% 0.00 0.00 0% 0.41 4.55 100% 0.00 0.00 0%
02.03.00 OBRAS DE CONCRETO SIMPLE 290.87
02.03.01 ENCOFRADO DE ESTRUCTURA m2 4.38 22.80 99.86 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 4.38 99.86 100%
02.03.02 CONCRETO FC=175 KG/CM2 m3 0.47 384.04 180.50 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 0.47 180.50 100%
02.03.03 DESENCOFRADO DE ESTRUCTURA m2 4.38 2.40 10.51 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 4.38 10.51 100%
02.04.00 REVOQUES Y ENLUCIDOS 150.25
02.04.01 TARRAJEO EN INTERIORES CEMENTO ARENA Y IMPERMEABILIZANTE m2 7.29 20.61 150.25 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 7.29 150.25 100%
02.05.00 INSTALACION DE COMPUERTA METALICA 204.00 0%
02.05.01 INSTALACION COMPUERTA METALICA DE 0.90X 0.35M E1/8 und 1.00 204.00 204.00 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 1.00 204.00 100%
03.00.00 RESERVORIO DE CONCRETO ARMADO (CAP 317M3) 145,027.81
03.01.00 TRABAJOS PRELIMINARES 1,008.81
03.01.01 LIMPIEZA DE TERRENO MANUAL ML 376.42 0.26 97.87 376.42 97.87 100% 0.00 0.00 0% 376.42 97.87 100% 0.00 0.00 0%
03.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 376.42 2.42 910.94 376.42 910.94 100% 0.00 0.00 0% 376.42 910.94 100% 0.00 0.00 0%
03.02.00 MOVIMIENTO DE TIERRAS 28,849.66
03.02.01 EXCAVACION DE MASIVA CON MAQUINARIA EN TERRENO COMPACTO m3 843.00 13.23 11,152.89 843.00 11152.89 100% 0.00 0.00 0% 843.00 11,152.89 100% 0.00 0.00 0%
03.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 256.00 1.63 417.28 256.00 417.28 100% 0.00 0.00 0% 256.00 417.28 100% 0.00 0.00 0%
03.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 153.60 68.25 10,483.20 153.60 10483.47 100% 0.00 0.00 0% 153.60 10,483.47 100% 0.00 -0.27 0%
03.02.04 RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO m3 230.40 18.72 4,313.09 230.40 4313.09 100% 0.00 0.00 0% 230.40 4,313.09 100% 0.00 0.00 0%
03.02.05 ELIMINACION MATERIAL EXCEDENTE m3 320.00 7.76 2,483.20 320.00 2483.20 100% 0.00 0.00 0% 320.00 2,483.20 100% 0.00 0.00 0%
03.03.00 CONCRETO SIMPLE 2,454.30
03.03.01 CONCRETO1:10 PARA SOLADO m3 11.25 218.16 2,454.30 11.25 2454.30 100% 0.00 0.00 0% 11.25 2,454.30 100% 0.00 0.00 0%
03.04.00 CONCRETO ARMADO 102,044.41
03.04.01 ENCOFRADO DE MUROS CARAVISTA DE RESERVORIO m2 324.60 54.13 17,570.60 324.60 17570.60 100% 0.00 0.00 0% 324.60 17,570.60 100% 0.00 0.00 0%
03.04.02 ACERO FY=4200 KG/CM2 kg 8,736.40 4.80 41,934.72 8736.40 41934.72 100% 0.00 0.00 0% 8,736.40 41,934.72 100% 0.00 0.00 0%
03.04.03 CONCRETO FC=210 KG/CM2 m3 93.63 443.55 41,529.59 93.63 41529.59 100% 0.00 0.00 0% 93.63 41,529.59 100% 0.00 0.00 0%
03.04.04 DESENCOFRADO DE DE MUROS CARAVISTA DE RESERVORIO m2 324.60 3.11 1,009.51 324.60 1009.51 100% 0.00 0.00 0% 324.60 1,009.51 100% 0.00 0.00 0%
03.05.00 JUNTA DE DILATACION 1,692.08
03.05.01 PROVISION DE Y COLOCADO DE JUNTA WATER STOP DE PVC DE 6" ML 52.00 32.54 1,692.08 52.00 1692.08 100% 0.00 0.00 0% 52.00 1,692.08 100% 0.00 0.00 0%
03.06.00 REVOQUES Y ENLUCIDOS 8,138.50
03.06.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 137.50 12.35 1,698.13 31.25 385.94 23% 106.25 1,312.19 77% 137.50 1,698.13 100% 0.00 0.00 0%
03.06.02 TARRAJEO EN INTERIORES CON CEMENTO-ARENA E IMPERMEABILIZANTE m2 115.20 20.61 2,374.27 115.20 2,374.27 100% 0.00 0.00 0% 115.20 2,374.27 100% 0.00 0.00 0%
03.06.03 ACABADO SEMIPULIDO DE PISO C/MORTERO 1:2 X 5CM DE ESPESOR m2 144.00 22.37 3,221.28 0.00 0.00 0% 144.00 3,221.28 100% 144.00 3,221.28 100% 0.00 0.00 0%
03.06.04 CURADO DE ESTRUCTURA DE CONCRETO m2 252.70 1.55 391.69 185.00 286.75 370% 67.70 104.94 27% 252.70 391.69 397% 0.00 0.00 0%
03.06.05 ESCALERA METALICA DE TUBO DE 1"FG und 2.00 226.57 453.14 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 2.00 453.14 100%
03.07.00 PINTURA 840.05
03.07.01 PINTURA DE EXTERIORES m2 132.50 6.34 840.05 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 132.50 840.05 100%
03.00.00 CAJA DE SALIDA, EXEDENCIAS Y LIMPIA 11,979.94
03.01.00 TRABAJOS PRELIMINARES 22.05
03.01.01 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 9.11 2.42 22.05 9.11 22.05 100% 0.00 0.00 0% 9.11 22.05 100% 0.00 0.00 0%
03.02.00 MOVIMIENTO DE TIERRAS 112.21
03.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 2.22 11.09 24.62 2.22 24.62 100% 0.00 0.00 0% 2.22 24.62 100% 0.00 0.00 0%
03.02.02 EXCAVACION MANUAL PARA ZANJA DE TUBERIA m3 2.59 11.09 28.72 2.59 28.72 100% 0.00 0.00 0% 2.59 28.72 100% 0.00 0.00 0%
03.02.03 REFINE Y NEVELACION FONDO DE ZANJA m2 8.10 0.32 2.59 8.10 2.59 100% 0.00 0.00 0% 8.10 2.59 100% 0.00 0.00 0%
03.02.04 PREPARACION DE CAMA CON MATERIAL PROPIO m3 0.97 9.55 9.26 0.97 9.26 100% 0.00 0.00 0% 0.97 9.26 100% 0.00 0.00 0%
03.02.05 TENDIDO DE CAMA DE FONDO DE TUBERIA h=0.10m m3 0.32 9.55 3.06 0.32 3.06 100% 0.00 0.00 0% 0.32 3.06 100% 0.00 0.00 0%
03.02.06 TENDIDO DE CAMA ENCIMA DE TUBERIA h=0.20M m3 0.65 15.92 10.35 0.00 0.00 0% 0.65 10.35 100% 0.65 10.35 100% 0.00 0.00 0%
03.02.07 RELLENO DE ZANJA CON MATERIAL PROPIO m3 3.53 9.52 33.61 0.00 0.00 0% 3.53 33.61 100% 3.53 33.61 100% 0.00 0.00 0%
03.03.00 CONCRETO ARMADO 1,560.44
03.03.01 ENCOFRADO DE ESTRUCTURA m2 22.16 24.80 549.57 22.16 549.57 100% 0.00 0.00 0% 22.16 549.57 100% 0.00 0.00 0%
03.03.02 ACERO FY=4200 KG/CM2 kg 42.45 5.91 250.88 42.45 250.88 100% 0.00 0.00 0% 42.45 250.88 100% 0.00 0.00 0%
03.03.03 CONCRETO FC=175 KG/CM2 m3 1.93 366.22 706.80 1.93 706.80 100% 0.00 0.00 0% 1.93 706.80 100% 0.00 0.00 0%
03.03.04 DESENCOFRADO DE ESTRUCTURA m2 22.16 2.40 53.18 22.16 53.18 100% 0.00 0.00 0% 22.16 53.18 100% 0.00 0.00 0%
03.04.00 REVOQUES Y ENLUCIDOS 216.64
03.04.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 11.36 19.07 216.64 0.00 0.00 0% 11.36 216.64 100% 11.36 216.64 100% 0.00 0.00 0%
03.05.00 INSTALACION DE ACCESORIOS (VC-1 A VC17) 7,571.58
03.05.01 ACCESORIOS EN ESTRUCTURA DE SALIDA DE RESERVORIO und 1.00 3,500.72 3,500.72 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 1.00 3,500.72 100%
03.05.02 ACCESORIO EN ESTRUCTURA DE REBOSE DE RESERVORIO und 1.00 454.72 454.72 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 1.00 454.72 100%
03.05.03 INSTALACION DE TUBERIA PVC SAP D=8" C-7.5 NTP 399.002 m 5.00 38.12 190.60 5.00 190.60 100% 0.00 0.00 0% 5.00 190.60 100% 0.00 0.00 0%
03.05.04 INSTALACION DE TUBERIA PVC SAP D=4" C-7.5 NTP 399.002 m 20.00 20.01 400.20 20.00 400.20 100% 0.00 0.00 0% 20.00 400.20 100% 0.00 0.00 0%
03.05.05 INSTALACION DE TUBERIA PVC UF D=200mm ISO 4435 m 70.00 39.21 2,744.70 70.00 2744.70 100% 0.00 0.00 0% 70.00 2,744.70 100% 0.00 0.00 0%
03.05.06 INSTALACION DE ACCESORIOS PVC UF D=200mm ISO 4435 und 1.00 93.68 93.68 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 1.00 93.68 100%
03.05.07 COLOCACION DE TAPA METALICA 0.60M X0.60M e=1/8" und 1.00 186.96 186.96 0.00 0.00 0% 1.00 186.96 100% 1.00 186.96 100% 0.00 0.00 0%
03.06.00 CERCO PERIMETRICO C/ROLLIZOS-ALAMBRE PUAS 2,497.04
03.06.01 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 48.08 2.42 116.35 48.08 116.35 100% 0.00 0.00 0% 48.08 116.35 100% 0.00 0.00 0%
03.06.02 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 3.94 11.09 43.69 3.94 43.69 100% 0.00 0.00 0% 3.94 43.69 100% 0.00 0.00 0%
03.06.03 CONCRETO FC=140 KG/CM2 m3 2.21 314.44 694.91 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 2.21 694.91 100%
03.06.04 COLOCACION DE ROLLIZOS und 41.00 17.76 728.16 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 41.00 728.16 100%
03.06.05 CERCO ALAMBRE PUAS m 459.60 1.68 772.13 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 459.60 772.13 100%
03.06.06 COLOCACION DE PUERTA DE MADERA RUSTICA und 1.00 141.79 141.79 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 1.00 141.79 100%
04.00.00 CAJA DE DISTRIBUCION DE CAUDALES (01 UNIDAD) 8,528.10
04.01.01 TRABAJOS PRELIMINARES 18.10 0.00 18.10
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 5.34 0.97 5.18 5.34 5.18 100% 0.00 0.00 0% 5.34 5.18 100% 0.00 0.00 0%
04.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 5.34 2.42 12.92 5.34 12.92 100% 0.00 0.00 0% 5.34 12.92 100% 0.00 0.00 0%
04.02.00 MOVIMIENTO DE TIERRAS 502.98 0.00 502.98
04.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 31.85 11.09 353.22 31.85 353.22 100% 0.00 0.00 0% 31.85 353.22 100% 0.00 0.00 0%
04.02.02 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO m3 8.00 18.72 149.76 8.00 149.76 100% 0.00 0.00 0% 8.00 149.76 100% 0.00 0.00 0%
04.03.00 CONCRETO ARMADO 1,985.84
04.03.01 CONCRETO1:10 PARA SOLADO m3 0.30 218.16 65.45 0.30 65.45 100% 0.00 0.00 0% 0.30 65.45 100% 0.00 0.00 0%
04.03.02 ENCOFRADO DE ESTRUCTURA m2 8.43 24.80 209.06 8.43 209.06 100% 0.00 0.00 0% 8.43 209.06 100% 0.00 0.00 0%
04.03.03 ACERO FY=4200 KG/CM2 kg 84.05 5.91 496.74 84.05 496.74 100% 0.00 0.00 0% 84.05 496.74 100% 0.00 0.00 0%
04.03.04 CONCRETO FC=175 KG/CM2 m3 3.11 384.04 1,194.36 3.11 384.04 32% 0.00 0.00 0% 3.11 384.04 32% 0.00 810.32 68%
04.03.05 DESENCOFRADO DE ESTRUCTURA m2 8.43 2.40 20.23 8.43 20.23 100% 0.00 0.00 0% 8.43 20.23 100% 0.00 0.00 0%
04.04.00 INSTALACION DE ACCESORIOS (VC-1 A VC17) 5,322.89
04.04.01 COLOCACION DE TAPA METALICA 0.60M X0.60M e=1/8" und 1.00 186.96 186.96 0.00 0.00 0% 1.00 186.96 100% 1.00 186.96 100% 0.00 0.00 0%
04.04.02 COLOCACION DE TAPA METALICA 0.50M X0.50M e=1/8" und 5.00 166.96 834.80 0.00 0.00 0% 5.00 834.80 100% 5.00 834.80 100% 0.00 0.00 0%
04.04.03 SUMINISTRO Y COLOCCION DE TUBO DE VENTILACION und 1.00 64.68 64.68 0.00 0.00 0% 1.00 64.68 100% 1.00 64.68 100% 0.00 0.00 0%
04.04.04 INSTALACION DE ACCESORIOS DE REGULACION und 1.00 1,809.49 1,809.49 0.00 0.00 0% 1.00 1,809.49 100% 1.00 1,809.49 100% 0.00 0.00 0%
04.04.05 INSTALACION DE ACCESORIOS EN CAMARA DE CARGA und 1.00 449.49 449.49 0.00 0.00 0% 1.00 449.49 100% 1.00 449.49 100% 0.00 0.00 0%
04.04.06 SUMINISTRO Y COLOCCION DE ACCESORIOS C. VALVULA 1 und 1.00 619.49 619.49 0.00 0.00 0% 1.00 619.49 100% 1.00 619.49 100% 0.00 0.00 0%
04.04.07 SUMINISTRO Y COLOCCION DE ACCESORIOS C. VALVULA 2 und 1.00 897.49 897.49 0.00 0.00 0% 1.00 897.49 100% 1.00 897.49 100% 0.00 0.00 0%
04.04.08 SUMINISTRO Y COLOCCION DE ACCESORIOS C. VALVULA 3 und 1.00 460.49 460.49 0.00 0.00 0% 1.00 460.49 100% 1.00 460.49 100% 0.00 0.00 0%
04.05.00 REVOQUES Y ENLUCIDOS 612.76
04.05.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 13.49 12.35 166.60 0.00 0.00 0% 13.49 166.60 100% 13.49 166.60 100% 0.00 0.00 0%
04.05.02 TARRAJEO EN INTERIORES CON CEMENTO-ARENA E IMPERMEABILIZANTE m2 19.19 20.61 395.51 0.00 0.00 0% 19.19 395.51 100% 19.19 395.51 100% 0.00 0.00 0%
04.05.03 CURADO DE ESTRUCTURA DE CONCRETO m2 32.68 1.55 50.65 0.00 0.00 0% 32.68 50.65 100% 32.68 50.65 100% 0.00 0.00 0%
04.06.00 PINTURA 85.53
04.06.01 PINTURA DE EXTERIORES m2 13.49 6.34 85.53 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 13.49 85.53 100%
05.00.00 CAMARA REDUCTORA DE PRESION (04 UNIDADES) 13,440.54
05.01.00 TRABAJOS PRELIMINARES 3,402.12
05.01.01 LIMPIEZA DE TERRENO MANUAL ML 6.76 0.26 1.76 6.76 1.76 100% 0.00 0.00 0% 6.76 1.76 100% 0.00 0.00 0%
05.01.02 TRAZO Y REPLANTEO PAR ESTRUCTURA m2 6.76 2.42 16.36 6.76 16.36 100% 0.00 0.00 0% 6.76 16.36 100% 0.00 0.00 0%
05.01.03 ACARREO DE AGREGADO A UBICACION DE CRP VJE 1,398.35 2.42 3,384.01 510.00 1234.20 36% 0.00 0.00 0% 510.00 1,234.20 36% 888.35 2,149.81 64%
05.02.00 MOVIMIENTO DE TIERRAS 191.78
05.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 6.76 11.09 74.97 6.76 74.97 100% 0.00 0.00 0% 6.76 74.97 100% 0.00 0.00 0%
05.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 6.24 18.72 116.81 6.24 116.81 100% 0.00 0.00 0% 6.24 116.81 100% 0.00 0.00 0%
05.03.00 CONCRETO SIMPLE 74.17 0.00 74.17
05.03.01 CONCRETO1:10 PARA SOLADO m3 0.34 218.16 74.17 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 0.34 74.17 100%
05.04.00 CONCRETO ARMADO 4,288.55
05.04.01 ENCOFRADO DE ESTRUCTURA m2 60.36 24.80 1,496.93 0.00 0.00 0% 30.18 748.46 50% 30.18 748.46 50% 30.18 748.46 50%
05.04.02 ACERO FY=4200 KG/CM2 kg 43.01 5.91 254.19 43.01 254.19 100% 0.00 0.00 0% 43.01 254.19 100% 0.00 0.00 0%
05.04.03 CONCRETO FC=175 KG/CM2 m3 6.23 384.04 2,392.57 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 6.23 2,392.57 100%
05.04.04 DESENCOFRADO DE ESTRUCTURA m2 60.36 2.40 144.86 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 60.36 144.86 100%
05.05.00 REVOQUES Y ENLUCIDOS 687.06
05.05.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 33.32 19.07 635.41 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 33.32 635.41 100%
05.05.02 CURADO DE ESTRUCTURA DE CONCRETO m2 33.32 1.55 51.65 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 33.32 51.65 100%
05.06.00 INSTALACION DE ACCESORIOS (VC-1 A VC17) 4,585.60
05.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CRP D=21/2" und 1.00 916.94 916.94 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 1.00 916.94 100%
05.06.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN CRP D=3" und 1.00 966.94 966.94 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 1.00 966.94 100%
05.06.03 SUMINISTRO E INSTALACION DE ACCESORIOS EN CRP D=4" und 2.00 976.94 1,953.88 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 2.00 1,953.88 100%
05.06.04 COLOCACION DE TAPA METALICA 0.60M X0.60M e=1/8" und 4.00 186.96 747.84 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 4.00 747.84 100%
05.06.00 PINTURA 211.25
05.06.01 PINTURA DE EXTERIORES m2 33.32 6.34 211.25 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 33.32 211.25 100%
06.00.00 LATERAL DE RIEGO FIJO (7,947.00M) 248,770.95
06.01.00 TRABAJOS PRELIMINARES 10,172.16
06.01.01 LIMPIEZA DE TERRENO MANUAL ML 7,947.00 0.26 2,066.22 7947.00 2066.22 100% 0.00 0.00 0% 7,947.00 2,066.22 100% 0.00 0.00 0%
06.01.02 TRAZO Y REPLANTEO PARA ZANJA DE TUBERIA m2 7,947.00 1.02 8,105.94 7947.00 8105.94 100% 0.00 0.00 0% 7,947.00 8,105.94 100% 0.00 0.00 0%
06.02.00 MOVIMIENTO DE TIERRAS 105,377.78
06.02.01 EXCAVACION MANUAL PARA ZANJA DE TUBERIA m3 2,543.04 15.52 39,467.98 2543.04 39467.98 100% 0.00 0.00 0% 2,543.04 39,467.98 100% 0.00 0.00 0%
06.02.02 RETIRO Y REPOSICION DE CERCOS PERIMETRICOS DE PARCELA (MURO SECO) m3 24.00 15.52 372.48 24.00 372.48 100% 0.00 0.00 0% 24.00 372.48 100% 0.00 0.00 0%
06.02.03 REFINE Y NEVELACION FONDO DE ZANJA m2 7,947.00 0.32 2,543.04 7947.00 2543.04 100% 0.00 0.00 0% 7,947.00 2,543.04 100% 0.00 0.00 0%
06.02.04 PREPARACION DE CAMA CON MATERIAL PROPIO m3 953.64 9.55 9,107.26 953.64 9107.26 100% 0.00 0.00 0% 953.64 9,107.26 100% 0.00 0.00 0%
06.02.05 TENDIDO DE CAMA DE FONDO DE TUBERIA h=10m m3 317.88 15.92 5,060.65 221.00 3518.32 70% 96.88 1,542.33 30% 317.88 5,060.65 100% 0.00 0.00 0%
06.02.06 TENDIDO DE CAMA ENCIMA DE TUBERIA h=0.20M m3 635.76 15.92 10,121.30 154.00 2451.68 24% 481.76 7,669.62 76% 635.76 10,121.30 100% 0.00 0.00 0%
06.02.07 RELLENO DE ZANJA CON MATERIAL PROPIO m3 2,543.04 15.22 38,705.07 0.00 0.00 0% 1,225.60 18,653.63 48% 1,225.60 18,653.63 48% 1317.44 20,051.44 52%
06.03.00 INSTALACION DE TUBERIA NTP 399.002 SP 5M 122,902.19 0% 0% 0%
06.03.01 INSTALACION DE TUBERIA PVC SAP D=4" C-10 NTP 399.002 m 110.00 21.12 2,323.20 60.00 1267.20 55% 50.00 1,056.00 45% 110.00 2,323.20 100% 0.00 0.00 0%
06.03.02 INSTALACION DE TUBERIA PVC SAP D=4" C-7.5 NTP 399.002 m 570.00 20.01 11,405.70 455.00 9104.55 80% 115.00 2,301.15 20% 570.00 11,405.70 100% 0.00 0.00 0%
06.03.03 INSTALACION DE TUBERIA PVC SAP D=4" C-5 NTP 399.002 m 779.00 19.01 14,808.79 435.00 8269.35 56% 344.00 6,539.44 44% 779.00 14,808.79 100% 0.00 0.00 0%
06.03.04 INSTALACION DE TUBERIA PVC SAP D=3" C-10 NTP 399.002 m 1,331.50 18.12 24,126.78 1116.00 20221.92 84% 215.50 3,904.86 16% 1,331.50 24,126.78 100% 0.00 0.00 0%
06.03.05 INSTALACION DE TUBERIA PVC SAP D=3" C-7.5 NTP 399.002 m 673.00 17.12 11,521.76 378.00 6471.36 56% 295.00 5,050.40 44% 673.00 11,521.76 100% 0.00 0.00 0%
06.03.06 INSTALACION DE TUBERIA PVC SAP D=3" C-5 NTP 399.002 m 173.00 16.12 2,788.76 173.00 2788.76 100% 0.00 0.00 0% 173.00 2,788.76 100% 0.00 0.00 0%
06.03.07 INSTALACION DE TUBERIA PVC SAP D=21/2" C-10 NTP 399.002 m 1,720.00 15.12 26,006.40 905.00 13683.60 53% 815.00 12,322.80 47% 1,720.00 26,006.40 100% 0.00 0.00 0%
06.03.08 INSTALACION DE TUBERIA PVC SAP D=21/2" C-7.5 NTP 399.002 m 370.00 14.12 5,224.40 330.00 4659.60 89% 40.00 564.80 11% 370.00 5,224.40 100% 0.00 0.00 0%
06.03.09 INSTALACION DE TUBERIA PVC SAP D=21/2" C-5 NTP 399.002 m 78.00 13.12 1,023.36 78.00 1023.36 100% 0.00 0.00 0% 78.00 1,023.36 100% 0.00 0.00 0%
06.03.10 INSTALACION DE TUBERIA PVC SAP D=2" C-10 NTP 399.002 m 803.00 12.12 9,732.36 653.00 7914.36 81% 150.00 1,818.00 19% 803.00 9,732.36 100% 0.00 0.00 0%
06.03.11 INSTALACION DE TUBERIA PVC SAP D=2" C-7.5 NTP 399.002 m 390.00 11.12 4,336.80 390.00 4336.80 100% 0.00 0.00 0% 390.00 4,336.80 100% 0.00 0.00 0%
06.03.12 INSTALACION DE TUBERIA PVC SAP D=11/2" C-10 NTP 399.002 m 949.00 10.12 9,603.88 702.00 7104.24 74% 247.00 2,499.64 26% 949.00 9,603.88 100% 0.00 0.00 0%
06.04.00 INSTALACION DE ACCESORIOS 1,063.12
06.04.01 SUMINISTRO E INSTALACION DE ACCCESORIOS EN LINEA FIJA und 1.00 1,063.12 1,063.12 0.00 0.00 0% 1.00 1,063.12 100% 1.00 1,063.12 100% 0.00 0.00 0%
06.05.00 PRUEBA HIDRAULICA 9,255.70
06.05.01 PRUEBA HIDRAULICA EN TUBERIA EN LINEA FIJA m 7,947.00 0.41 3,258.27 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 7947.00 3,258.27 100%
06.05.02 ACCESORIOS PVC SAP PARA PRUEBA HIDRAULICA EN LINE FIJA und 1.00 50.35 50.35 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 1.00 50.35 100%
06.05.03 PRUEBA DE ESTANCAMIENTO DE AGUA EN EL SISTEMA und 3.00 351.70 1,055.10 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 3.00 1,055.10 100%
06.05.04 REPARACION Y PUESTA EN OPERACION DEL SISTEMA POST ESTANCAMIENTO und 3.00 1,630.66 4,891.98 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 3.00 4,891.98 100%
07.00.00 CAJA VALVULA DE CONTROL EN LINEA FIJA (17 UNIDADES) 15,606.61
07.01.00 TRABAJOS PRELIMINARES 713.57
07.01.01 LIMPIEZA DE TERRENO MANUAL ML 14.00 0.26 3.64 14.00 3.64 100% 0.00 0.00 0% 14.00 3.64 100% 0.00 0.00 0%
07.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 14.00 2.42 33.88 14.00 33.88 100% 0.00 0.00 0% 14.00 33.88 100% 0.00 0.00 0%
07.01.03 ACARREO DE AGREGADO A UBICACION DE C. VALVULA DE CONTROL VJE 279.36 2.42 676.05 279.36 676.05 100% 0.00 0.00 0% 279.36 676.05 100% 0.00 0.00 0%
07.02.00 MOVIMIENTO DE TIERRAS 139.93
07.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 11.20 11.09 124.21 11.20 124.21 100% 0.00 0.00 0% 11.20 124.21 100% 0.00 0.00 0%
07.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.84 18.72 15.72 0.84 15.72 100% 0.00 0.00 0% 0.84 15.72 100% 0.00 0.00 0%
07.03.00 CONCRETO SIMPLE 3,133.54 0%
07.03.01 ENCOFRADO DE ESTRUCTURA m2 62.72 24.80 1,555.46 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 62.72 1,555.46 100%
07.03.02 CONCRETO FC=140 KG/CM2 m3 4.54 314.44 1,427.56 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 4.54 1,427.56 100%
07.03.03 DESENCOFRADO DE ESTRUCTURA m2 62.72 2.40 150.53 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 62.72 150.53 100%
07.04.00 REVOQUES Y ENLUCIDOS 780.68
07.04.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 35.84 19.07 683.47 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 35.84 683.47 100%
07.04.02 CURADO DE ESTRUCTURA DE CONCRETO m2 62.72 1.55 97.22 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 62.72 97.22 100%
07.05.00 INSTALACION DE ACCESORIOS (VC-1 A VC17) 10,838.88
07.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN VALVULA DE CONTROL 4" und 11.00 454.72 5,001.92 0.00 0.00 0% 11.00 5,001.92 100% 0.00 5,001.92 100% 0.00 0.00 0%
07.05.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN VALVULA DE CONTROL 3" und 8.00 397.72 3,181.76 0.00 0.00 0% 8.00 3,181.76 100% 8.00 3,181.76 100% 0.00 0.00 0%
07.05.03 SUMINISTRO E INSTALACION DE ACCESORIOS EN VALVULA DE CONTROL 2 1/2" und 2.00 260.94 521.88 0.00 0.00 0% 1.00 260.94 50% 1.00 260.94 50% 1.00 260.94 50%
07.05.04 SUMINISTRO E INSTALACION DE ACCESORIOS EN VALVULA DE CONTROL 2" und 2.00 317.94 635.88 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 2.00 635.88 100%
07.05.05 COLOCACION DE TAPA METALICA 0.40M X0.40M e=1/8" und 14.00 106.96 1,497.44 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 14.00 1,497.44 100%
08.00.00 CAJA DE HIDRANTE EN LINEA FIJA (101 UNIDAD) 37,690.31
08.01.00 TRABAJOS PRELIMINARES 3,078.15
08.01.01 LIMPIEZA DE TERRENO MANUAL ML 101.00 0.26 26.26 101.00 26.26 100% 0.00 0.00 0% 101.00 26.26 100% 0.00 0.00 0%
08.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 101.00 2.42 244.42 101.00 244.42 100% 0.00 0.00 0% 101.00 244.42 100% 0.00 0.00 0%
08.01.03 ACARREO DE AGREGADO A UBICACION DE C. HIDRANTE VJE 1,160.11 2.42 2,807.47 507.00 1226.94 44% 0.00 0.00 0% 507.00 1,226.94 44% 653.11 1,580.53 56%
08.02.00 MOVIMIENTO DE TIERRAS 492.77
08.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 29.09 11.09 322.61 29.09 322.61 100% 0.00 0.00 0% 29.09 322.61 100% 0.00 0.00 0%
08.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 9.09 18.72 170.16 9.09 170.16 100% 0.00 0.00 0% 9.09 170.16 100% 0.00 0.00 0%
08.03.00 CONCRETO SIMPLE 14,292.23
08.03.01 ENCOFRADO DE ESTRUCTURA m2 258.56 24.80 6,412.29 0.00 0.00 0% 181.76 4,507.65 70% 181.76 4,507.65 70% 76.80 1,904.64 30%
08.03.02 CONCRETO FC=140 KG/CM2 m3 17.88 314.44 5,622.19 0.00 0.00 0% 17.88 5,622.19 100% 12.57 5,622.19 100% 5.31 0.00 0%
08.03.03 COLOCACION DE ANILLOS DE SUJECION und 101.00 16.21 1,637.21 0.00 0.00 0% 0.00 0.00 0% 71.00 0.00 0% 30.00 1,637.21 100%
08.03.04 DESENCOFRADO DE ESTRUCTURA m2 258.56 2.40 620.54 0.00 0.00 0% 181.76 436.22 70% 181.76 436.22 70% 76.80 184.32 30%
08.04.00 REVOQUES Y ENLUCIDOS 2,254.56
08.04.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 97.21 19.07 1,853.79 0.00 0.00 0% 5.77 110.03 6% 5.77 110.03 6% 91.44 1,743.76 94%
08.04.02 CURADO DE ESTRUCTURA DE CONCRETO m2 258.56 1.55 400.77 0.00 0.00 0% 15.36 23.81 6% 15.36 23.81 6% 243.20 376.96 94%
08.05.00 INSTALACION DE ACCESORIOS 17,572.60
08.05.01 SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTE DE 4" und 2.00 106.72 213.44 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 2.00 213.44 100%
08.05.02 SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTE DE 3" und 24.00 171.72 4,121.28 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 24.00 4,121.28 100%
08.05.03 SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTE DE 21/2" und 32.00 125.72 4,023.04 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 32.00 4,023.04 100%
08.05.04 SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTE DE 2" und 25.00 114.72 2,868.00 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 25.00 2,868.00 100%
08.05.05 SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTE DE 11/2" und 18.00 72.72 1,308.96 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 18.00 1,308.96 100%
08.05.06 COLOCACION DE TAPA METALICA 0.25M X0.35M e=1/8" und 101.00 49.88 5,037.88 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 101.00 5,037.88 100%
09.00.00 CAJA VALVULA DE PURGA EN LINEA FIJA (13 UNIDADES) 6,008.80
09.01.00 TRABAJOS PRELIMINARES 414.25
09.01.01 LIMPIEZA DE TERRENO MANUAL ML 13.00 0.26 3.38 13.00 3.38 100% 0.00 0.00 0% 13.00 3.38 100% 0.00 0.00 0%
09.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 13.00 2.42 31.46 13.00 31.46 100% 0.00 0.00 0% 13.00 31.46 100% 0.00 0.00 0%
09.01.03 ACARREO DE AGREGADO A UBICACION DE VALVULA DE PURGA VJE 156.78 2.42 379.41 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 156.78 379.41 100%
09.02.00 MOVIMIENTO DE TIERRAS 166.07
09.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 13.00 11.09 144.17 13.00 144.17 100% 0.00 0.00 0% 13.00 144.17 100% 0.00 0.00 0%
09.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 1.17 18.72 21.90 1.17 21.90 100% 0.00 0.00 0% 1.17 21.90 100% 0.00 0.00 0%
09.03.00 CONCRETO SIMPLE 1,628.43
09.03.01 ENCOFRADO DE ESTRUCTURA m2 33.28 24.80 825.34 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 33.28 825.34 100%
09.03.02 CONCRETO FC=140 KG/CM2 m3 2.30 314.44 723.21 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 2.30 723.21 100%
09.03.03 DESENCOFRADO DE ESTRUCTURA m2 33.28 2.40 79.87 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 33.28 79.87 100%
09.04.00 REVOQUES Y ENLUCIDOS 448.24
09.04.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 20.80 19.07 396.66 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 20.80 396.66 100%
09.04.02 CURADO DE ESTRUCTURA DE CONCRETO m2 33.28 1.55 51.58 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 33.28 51.58 100%
09.05.00 INSTALACION DE ACCESORIOS 3,351.81
09.05.01 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE PURGA DE 2" und 3.00 299.49 898.47 0.00 0.00 0% 3.00 898.47 100% 3.00 898.47 100% 0.00 0.00 0%
09.05.02 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE PURGA DE 11/2 " und 10.00 180.49 1,804.90 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 10.00 1,804.90 100%
09.05.03 COLOCACION DE TAPA METALICA 0.25M X0.35M e=1/8" und 13.00 49.88 648.44 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 13.00 648.44 100%
10.00.00 CAJA DE VALVULA DE AIRE EN LINEA FIJA (08 UNIDADES) 28,218.36
10.01.00 TRABAJOS PRELIMINARES 21.44
10.01.01 LIMPIEZA DE TERRENO MANUAL ML 8.00 0.26 2.08 8.00 2.08 100% 0.00 0.00 0% 8.00 2.08 100% 0.00 0.00 0%
10.01.02 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 8.00 2.42 19.36 8.00 19.36 100% 0.00 0.00 0% 8.00 19.36 100% 0.00 0.00 0%
10.02.00 MOVIMIENTO DE TIERRAS 102.20
10.02.01 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 8.00 11.09 88.72 8.00 88.72 100% 0.00 0.00 0% 8.00 88.72 100% 0.00 0.00 0%
10.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.72 18.72 13.48 0.72 13.48 100% 0.00 0.00 0% 0.72 13.48 100% 0.00 0.00 0%
10.03.00 CONCRETO SIMPLE 1,189.99
10.03.01 ENCOFRADO DE ESTRUCTURA m2 25.60 24.80 634.88 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 25.60 634.88 100%
10.03.02 CONCRETO FC=140 KG/CM2 m3 1.57 314.44 493.67 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 1.57 493.67 100%
10.03.03 DESENCOFRADO DE ESTRUCTURA m2 25.60 2.40 61.44 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 25.60 61.44 100%
10.04.00 REVOQUES Y ENLUCIDOS 332.60
10.04.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 15.36 19.07 292.92 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 15.36 292.92 100%
10.04.02 CURADO DE ESTRUCTURA DE CONCRETO m2 25.60 1.55 39.68 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 25.60 39.68 100%
10.05.00 INSTALACION DE ACCESORIOS 2,022.44
10.05.01 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE AIRE DE 4" und 4.00 151.72 606.88 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 4.00 606.88 100%
10.05.02 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE AIRE DE 3" und 2.00 143.72 287.44 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 2.00 287.44 100%
10.05.03 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE AIRE DE 21/2" und 1.00 138.72 138.72 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 1.00 138.72 100%
10.05.04 SUMINISTRO Y COLOCCION DE ACCESORIOS DE VALVULA DE AIRE DE 2" und 1.00 133.72 133.72 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 1.00 133.72 100%
10.05.05 COLOCACION DE TAPA METALICA 0.40M X0.40M e=1/8" und 8.00 106.96 855.68 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 8.00 855.68 100%
10.06.00 LINEA DE RIEGO MOVIL (15 MODULOS DE RIEGO) 20,552.70
10.06.01 SUMINISTRO E INSTALACION DE LINEA DE RIEGO MOVIL und 15.00 1,333.24 19,998.60 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 15.00 19,998.60 100%
10.06.02 PRUEBA DE FUNCIONAMIENTO LINEA MOVIL und 15.00 36.94 554.10 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 15.00 554.10 100%
10.07.00 CAPACITACION PARA LOS BENEFICIARIOS 1,747.00
10.07.01 FORMALIZACION DEL COMITE DE USUARIOS und 1.00 682.00 682.00 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 1.00 682.00 100%
10.07.02 GESTION DE AGUA PARA RIEGO und 1.00 280.00 280.00 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 1.00 280.00 100%
10.07.03 OPERACION Y MANTENIMIENTO DE SISTEMA DE RIEGO TECNIFICADO und 1.00 505.00 505.00 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 1.00 505.00 100%
10.07.04 CADENAS PRODUCTIVAS Y COMERCIALIZACION und 1.00 280.00 280.00 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 1.00 280.00 100%
10.08.00 REGULARIZACION TRAMITES DE ESTUDIO Y EJECUCION DE OBRA 2,250.00
10.08.01 AUTORIZACION DEAPROBACION DE ESTUDIO Y EJECUCION DE OBRA und 1.00 350.00 350.00 0.00 0.00 0% 0.00 0.00 0% 0.00 0.00 0% 1.00 350.00 100%
10.08.02 CERTIFICADO DE INEXISTENCIA DE RESTOS ARQUEOLOGICOS und 1.00 1,900.00 1,900.00 1.00 1900.00 100% 0.00 0.00 0% 1.00 1,900.00 100% 0.00 0.00 0%
11.00.00 MITIGACIÓN DEL IMPACTO AMBIENTAL 6,108.60
11.01.00 INSTALACION DE LETRINAS SANITARIAS (01 UND) 441.56
11.01.01 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 1.00 2.42 2.42 1.00 2.42 100% 0.00 0.00 0% 1.00 2.42 100% 0.00 0.00 0%
11.01.02 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 1.28 11.09 14.20 1.28 14.20 100% 0.00 0.00 0% 1.28 14.20 100% 0.00 0.00 0%
11.01.03 INSTALACION DE CUARTONES, MURO PUERTA, TECHO DE CALAMINA C/MARCO und 1.00 313.28 313.28 1.00 313.28 100% 0.00 0.00 0% 1.00 313.28 100% 0.00 0.00 0%
11.01.04 SUMINISTRO Y COLOCACION DE TUBO DE VENTILACION LETRINA und 1.00 47.08 47.08 1.00 47.08 100% 0.00 0.00 0% 1.00 47.08 100% 0.00 0.00 0%
11.01.05 INSTALACION DE BAñO TURCO PRE FABRICADO und 1.00 64.58 64.58 1.00 64.58 100% 0.00 0.00 0% 1.00 64.58 100% 0.00 0.00 0%
11.02.00 INSTALACION DE DE HOYO SANITARIO P/ DEPOSITO DE BASURA 62.04 0.00
11.02.01 TRAZO Y REPLANTEO PARA ESTRUCTURA m2 1.00 2.42 2.42 1.00 2.42 100% 0.00 0.00 0% 1.00 2.42 100% 0.00 0.00 0%
11.02.02 EXCAVACION MANUAL EN TIERRA SUELTA PARA ESTRUCTURAS m3 2.00 11.09 22.18 2.00 22.18 100% 0.00 0.00 0% 2.00 22.18 100% 0.00 0.00 0%
11.02.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 2.00 18.72 37.44 2.00 37.44 100% 0.00 0.00 0% 2.00 37.44 100% 0.00 0.00 0%
11.03.00 PRUEBAS DE CALIDAD 5,605.00
11.03.01 PRUEBA DE CALIDAD DEL CONCRETO ( PRUEBA DE COMPRESION) und 15.00 25.00 375.00 15.00 375.00 100% 0.00 0.00 0% 15.00 375.00 100% 0.00 0.00 0%
11.03.02 DISEñO DE MEZCLA und 1.00 430.00 430.00 1.00 430.00 100% 0.00 0.00 0% 1.00 430.00 100% 0.00 0.00 0%
11.03.03 VERIFICACION PORTANTE DEL SUELO RESERVORIO und 1.00 2,300.00 2,300.00 1.00 2300.00 100% 0.00 0.00 0% 1.00 2,300.00 100% 0.00 0.00 0%
11.03.04 VERIFICACION DE ANALISIS ESTRUCTURAL RESERVORIO und 1.00 2,500.00 2,500.00 1.00 2500.00 100% 0.00 0.00 0% 1.00 2,500.00 100% 0.00 0.00 0%
COSTO DIRECTO TOTAL 526,334.23 316962.997 60.22% 96,798.85 18.39% 413,761.85 78.61% 112,572.38 21.39%
113,167.64

100%
RESIDENTE SUPERVISOR DE PROYECTOS

100%
1500
170

930
930
170
400

360
930
1290
300
990.00 0.35 346.5
0.35 346.5
0.3 297.0
2543.04 100
60
1525.824
762.91
2288.734 -254.306

7947.00 100
5165.55 65

10 2.25 0.4 9 2 18
14 2.25 0.4 12.6 2 25.2
43.2
115
455.00 300
649.00

96 20 1920
258.56 101
6 15.36
21.39%