www . quoizel . com 1. Before beginning the installation, carefully unpack and
identify all parts, referring to the illustration.
JUNCTION BOX 10.Install bulbs referring to fixture markings and/or labels for
maximum wattage.
FINIAL 11. Restore power to the installation point ON. Retain this
SUPPORTARM sheet for future reference.
IS- YU5149
Page 2 of 3
Revised 2008- 01- 28
FIGURE 2: CRAWL SPACE / ATTIC CUT-AWAY
WASHER
CEILING JOISTS
COTTER
PIN (installed above 3/8-18 NIPPLE (INCLUDED)
HEX NUT)
JUNCTION BOX
CEILING CANOPY
FIXTURE CHAIN