Plastic Formwork

WHY PLASTIC?
Nilkamal
www.nilkamal.com
Columns:
Geoplast
the GEOPLAST formwork system

Walls: Slabs:
round, square or modular wall full and
rectangular panels ribbed slabs

GEOTUB GEOPANEL GEOSKY & SKYRAIL


dia 25 – 100 cm
Sq. 20 to 60 cm

Nilkamal www.nilkamal.com
plastic formwork
why plastic formwork?

why plastic
formwork?

Nilkamal www.nilkamal.com
why plastic?
the history: wood formwork

Wood was the material traditionally used to


form concrete.
It has some disadvantages:

it is slow to erect and dismantle;

not more than 20 or 30 usages;

skilled labour required;

suffers moisture;

job-site waste is high;

environmental issues (deforestation).

Nilkamal www.nilkamal.com
why plastic?
the history: steel-frame formwork

- Speed of erection and dismantling;

- Lifetime longer than wood;

- The concrete finish superior to wood.

The biggest issues with steel?


Very heavy and expensive

High maintenance cost

High logistic cost


Nilkamal www.nilkamal.com
Geoplast Plastic formwork

Geoplast chose a special plastic for its formwork system:


ABS (Acrylonitrile butadiene styrene):

- resistant and tough, very good shock absorbance

- mechanically stable under loads

- very smooth and impervious surface

- temperature tolerant

- recyclable

Nilkamal www.nilkamal.com
Geoplast
the GEOPLAST formwork system

Principles common to the Geoplast formwork system:

- Very low weight

- Reusability – 100 pours at least

- Simplicity – “what ain’t there can’t break”

- Few, common accessories –


one single pin/handle works
for all systems

Nilkamal www.nilkamal.com
Geoplast
Independent testing
plastic does the job

-0,22
Horizontal displaceme nt at the centerline of the pane l - Northern Side

300
0,05
instrume nts n° 1-2-3-4-5

instrument

measured that
-0,16

250
t=10'

vertical position of the instrument [cm]


t=15'
0,89 instrum ent no.4
200 0,89
0,65 t=30'

150

Geoplast formwork resists 100


instrument 0,95
1,80
1,94
2,22 instrum ent no.3

to a concrete pressure of 72
0,92 1,15 instrument no.
50
2,88 3,02 3,54

kN/m2. -1,00 -0,50 0,00 0,50 1,00 1,50


horizontal displaceme nt [m m]
2,00 2,50 3,00 3,50 4,00

Horizontal displacement at the centreline of the panel - Eastern Side


instruments no. 6-7-8-9-10

300 instrument no. 9 1,30 1,33 1,87


t=10'
vert ical p o sitio n o f th e in stru m en ts [c m ] 250
t=15'
instrument 2,00
200 1,67 2,03
t=30'

150

2,12 2,45 2,74 instrument


100 no.7

instrument
1,03 1,21 instrument
50 no.10 1,42

2,86 3,16 3,65

0
-1,00 -0,50 0,00 0,50 1,00 1,50 2,00 2,50 3,00 3,50 4,00
horizontal displacement [mm ]

Spostamenti orizzontali alla distanza L=135cm dall'angolo


strum enti n° 5-6-7

300

250 t=10'
quota verticale strumento [cm]

t=25'
200
-3,56-3,33
strum ento
-4,11 t=180'
150
-2,74 -1,71
strumento -2,49
100

50 2,96
strumento 5,62 5,21

0
-6,00 -4,00 -2,00 0,00 2,00 4,00 6,00
spostamento orizzontale [m m]

Nilkamal www.nilkamal.com
why plastic?
Independent testing
Tensile strenght

Laboratory testing of the handles measured an


average tensile strenght (rupture) of 1,178.2 kg

Nilkamal www.nilkamal.com
why plastic?
the ADVANTAGES of plastic

Weight: plastic formwork (Geopanel) weighs 18 kg/m2


wood = ca. 18 kg/m2 (±0%)
aluminium = ca. 30 kg/m2 (+67%)
steel frame + plywood = ca. 40 kg/m2 (+220%)

Speed: plastic formwork does not need heavy equipment, so


it is not necessary to wait for cranes, trucks or other
machinery.
GEOTUB WOOD STEEL
Forming time: 15 to 20 min. 4h 25 min
Stripping time: 5 min. 30 min. 20 min.
Total time: 25 min. max 4h 30 min. 45 min.

Cost: - Long lifetime (lower amortisation per pour)


- lower operating cost (no crane time, less labour)
- lower maintenance cost (less cleaning, no or little oiling,
simple storage).
Nilkamal www.nilkamal.com
why plastic? GEOTUB job sites

Port Laoise, Ireland M7 Motorway extension


120 km of new highway, 45 new bridges, middle of the countryside

dia 900 mm

Nilkamal www.nilkamal.com
why plastic?
GEOTUB PANEL Square and rectangular

45° integrated chamfer

Nilkamal www.nilkamal.com
why plastic?
GEOTUB PANEL job sites

San Fior, Italy


residential project

Light and handy, the ease of use


is extreme.

One man
20 minutes total time

Excellent temperature
tolerance: -30°C / +70°C
Nilkamal www.nilkamal.com
why plastic?
GEOTUB job sites - India

Adani port - Mundra

IVRCL- Bangalore

AHURA - Pune B . G Shirke- Mumbai


Nilkamal www.nilkamal.com
why plastic?
The characteristics of GEOPANEL

Technical characteristics:

Panel dimensions:
120 x 60 cm 11 kg weight

smaller compensation panels:


40 x 60 cm 3.68 kg
30 x 60 cm 2.90 kg
25 x 60 cm 2.30 kg
20 x 60 cm 2.25 kg

walls thickness of 10 to 45 cm - thicker walls are


possible under certain conditions (foundations).

Nilkamal www.nilkamal.com
Geoplast
Gangform with GEOPANEL
GEOPANEL job sites

3 m high x 12 m long
50 pcs. total
36 m2 surface

Total weight 650 kg

Nilkamal www.nilkamal.com
Geoplast
GEOPANEL job sites

San José, Costarica


Industrial building

Nilkamal www.nilkamal.com
Geoplast
GEOPANEL job sites - India

Ahura - Pune
Pratibha - Mumbai
Mumbai

Pratibha - Mumbai

Ahura - Pune IVRCL - Mumbai

Nilkamal www.nilkamal.com
Geoplast
The GEOSKY slab system

GEOSKY® is a system of plastic


formworks for the realization of
concrete slabs.

Thanks to the sliding wedge on


main beam, this new and
innovative system makes
installation and stripping quick,
reduces casting time and increases
equipment turnaround.
No special panels are needed with
GEOSKY® because it uses the same
panels (Geopanel) needed to pour
walls.

Nilkamal www.nilkamal.com
Geoplast
The AVANTAGES of Geosky

Wood and steel slab formwork are the traditional systems.


The are time-proven, but they have some shortcomings:

- main and secondary beams are necessary

- the forming and stripping time is high:

GEOSKY Wood Steel

0,35-0,40 0,9 0,8


h/man/m2 h/man/m2 h/man/m2
(traditional systems)

Nilkamal www.nilkamal.com
why plastic?
GEOSKY job sites

Belgorod, Russia
Apartement block.

Quick, easy and safe.


No crane, no sweat.

Nilkamal www.nilkamal.com
Buyges
Paris,
France Dakspol
St. Petersburg,
Laing – O’Rourke Russia
London, UK Anemon
Moskow,
M50 Highway Russia
Dublin, Ireland

Da Vinci Mall
Rome,
Italy
Nilkamal
India

Cap Cana project


Dominican Rep.

Fibrex
Abu Dhabi

Waiwera highway
Santiago
New Zealand
Chile
Geoplast

thank you for your attention!


Nilkamal www.nilkamal.com

También podría gustarte