PLANE

MINA: ESPERANZA I
TITULO: 1845T

LABOR HT/día Turnos m/día m/mes

medicion de gases y novedades y estado del equipo de trabajo 1

SUBTOTAL 1 0 0 0

LABOR HT/día Turnos m/día m/mes

Inclinado principal - Mantenimineto -- adecuacion y lineamiento de


la direccion, seccion y linea de riel 2 1
Caseta de herramientas 2 1

SUBTOTAL 4 2 0 0

LABOR HT/día Turnos m/día m/mes

2 1

SUBTOTAL 2 1 0 0
LABOR HT/día Turnos m/día m/mes

Tambor I 1 1 1 0
Tambor II 2 1 1.5 19.5
Tambor II Tecla 1 1 1 6

SUBTOTAL 4 3 3.5 25.5

dias faltantes para tambor II tecla


dias faltantes julio 13
seccion 1.7
densidad 1.3
PLANEAMIENTO MINERO OPERATIVO Y TECNICO PROYECTADO
NZA I MES: JULIO
T AÑO: 2019

1. SEGURIDAD MINERA
SEMANA 1 SEMANA 2 SEMANA 3
Ton/día Ton/mes 2--6 8--13 15--19
Ton/Sem m/Sem Ton/Sem m/Sem Ton/Sem m/Sem
X X X X X X

0 0 0 0 0 0 0 0

2. LABORES DE DESARROLLO
SEMANA 1 SEMANA 2 SEMANA 3
2--6 8--13 15--19
Ton/día Ton/mes
Ton/Sem m/Sem Ton/Sem m/Sem Ton/Sem m/Sem

4 4 0 0 0 0

X X X X 0 0

0 0 4 4 0 0 0 0

3. LABORES DE PREPARACIÓN
SEMANA 1 SEMANA 2 SEMANA 3
2--6 8--13 15--19
Ton/día Ton/mes
Ton/Sem m/Sem Ton/Sem m/Sem Ton/Sem m/Sem

0 0 0 0 0 0 0 0

4. LABORES DE EXPLOTACIÓN
SEMANA 1 SEMANA 2 SEMANA 3
2--6 8--13 15--19
Ton/día Ton/mes
Ton/Sem m/Sem Ton/Sem m/Sem Ton/Sem m/Sem
2.21 0 X X X X X X
3.315 43.095 7 4 0 0 0 0
2.21 13.26

7.735 56.355 7 4 0 0 0 0
ECTADO
ELABORO: ING. DE MINAS JOEL YESID GARRIDO BLANCO
REBISO:

SEMANA 4 SEMANA 5
22--27 29--31 OBSEVACIONES
Ton/Sem m/Sem Ton/Sem m/Sem
X X X X

0 0 0 0 SUBTOTAL MES ALCANSADO TON-M


0

SEMANA 4 SEMANA 5
22--27 29--31
OBSEVACIONES
Ton/Sem m/Sem Ton/Sem m/Sem

0 0 0 0

0 0 0 0 SUBTOTAL MES ALCANSADO TON-M


4

SEMANA 4 SEMANA 5
22--27 29--31
OBSEVACIONES
Ton/Sem m/Sem Ton/Sem m/Sem

0 0 0 0 SUBTOTAL MES ALCANSADO TON-M


0
SEMANA 4 SEMANA 5
22--27 29--31
OBSEVACIONES
Ton/Sem m/Sem Ton/Sem m/Sem
X X X X
0 0 0 0

0 0 0 0 SUBTOTAL MES ALCANSADO TON-M


7
RIDO BLANCO

BALANCE GENERAL DEL MES


TONELADAS METROS DE AVA
CONTRATIEMPOS PROYECTADAS (TALCANZADAS (TOBALANCE (TON) PROYECTADOS (m
56.355 25.5
45.355
100% 100%
11
50.7195 22.95
39.7195
90% 90%

OTAL MES ALCANSADO TON-M


0

CONTRATIEMPOS

OTAL MES ALCANSADO TON-M


4

CONTRATIEMPOS

OTAL MES ALCANSADO TON-M


0
CONTRATIEMPOS

OTAL MES ALCANSADO TON-M


4
DEL MES
METROS DE AVANCE
ALCANASADOS BALANCE
17.5
8
14.95
PLANEAMIENTO MINERO OPERATIVO Y TECNICO PROYECTADO
MINA: ESPERANZA I ELABORO: ING. DE MINAS JOEL YESID GARRIDO BLANCO
TITULO: 1845T ING. DE MINAS JHON CARDENAS

1. SEGURIDAD MINERA
T
u AGOSTO SEPTIEMBRE OCTUBRE NOVIENBRE DICIEMBRE
r Dias para m/Labor 22 DIAS (TD-MD) 23 DIAS (TD-MD) 24 DIAS (TD-MD) 21 DIAS (TD-MD) 23 DIAS (TD-MD)
LABOR HT/día m/día m/Labor Ton/día
n la labor ejecutado
o D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D24 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23
s
medicion de gases y novedades y estado del eq 1

SUBTOTAL 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2. LABORES DE DESARROLLO
T
u AGOSTO SEPTIEMBRE OCTUBRE NOVIENBRE DICIEMBRE
r Dias para m/Labor Ton/día 22 DIAS (TD-MD) 23 DIAS (TD-MD) 24 DIAS (TD-MD) 21 DIAS (TD-MD) 23 DIAS (TD-MD)
LABOR HT/día m/día m/Labor
n la labor ejecutado
o D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D24 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23
s
Inclinado principal - Mantenimineto -- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64
adecuacion y lineamiento de la direccion,
seccion y linea de riel 2 1 0.8 230 175 90 0.8

SUBTOTAL 2 1 0.8 0.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64
###

3. LABORES DE PREPARACION
T
u AGOSTO SEPTIEMBRE OCTUBRE NOVIENBRE DICIEMBRE
r Dias para m/Labor Ton/día 22 DIAS (TD-MD) 23 DIAS (TD-MD) 24 DIAS (TD-MD) 21 DIAS (TD-MD) 23 DIAS (TD-MD)
LABOR HT/día n m/día m/Labor la labor ejecutado
o D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D24 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23
s
m 1.5 1.5 1.5 1.5 1.5
Tambor III Tecla 1 1 1.5 7 5 2.55
ton 2.6 2.6 2.6 2.6 2.6
m 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
Tambor III 2 1 1.5 72 48 2.55
ton 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6
m 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Sobreguia I T1 1 1 2 20 10 5.7 ton 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7
m 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Tambor II 1 2 2 100 50
26
6.8 ton 6.8 6.8 6.8 6.8 6.8 6.8 6.8 6.8 6.8 6.8 6.8 6.8 6.8 6.8 6.8 6.8 6.8 6.8
m 2
Tambor I 1 2 2 100 50 6.8 ton 6.8
m 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Sobreguia I T2 N 2 1 2 35 18 3.4 ton 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7
m 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Sobreguia I T2 S 2 1 2 20 10 3.4 ton 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7
m 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Sobreguia I T3 S 2 1 2 50 25 3.4 ton 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7
m 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Sobreguia I T3 N 2 1 2 20 10 3.4 ton 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7
metros 1.5 1.5 1.5 1.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 6.8 ### ### 96.0 6.8 6.0 6.0 6.0 6.0 6.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.6 4.6 4.6 4.6 4.6 4.6 4.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 4.6 4.6 4.6 4.6 4.6 4.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6
SUBTOTAL 12 10 15 404 215.16667 34.6 ton 2.6 2.6 2.6 2.6 16.2 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 19.7 19.7 19.7 19.7 19.7 19.7 19.7 19.7 19.7 19.7 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 8.3 8.3 8.3 8.3 8.3 8.3 8.3 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 8.3 8.3 8.3 8.3 8.3 8.3 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0
m-total 105.0 m-total 608.6 m-total 92.2 m-total 135.4 m-total 152.7
4. LABORES DE EXPLOTACION
T
u AGOSTO SEPTIEMBRE OCTUBRE NOVIENBRE DICIEMBRE
r Dias para m/Labor Ton/día 22 DIAS (TD-MD) 23 DIAS (TD-MD) 24 DIAS (TD-MD) 21 DIAS (TD-MD) 23 DIAS (TD-MD)
LABOR HT/día m/día m/Labor la labor ejecutado
n
o D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D24 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23
s
5.4 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
EXPLOTACION SOBREGUIA 1 TAMBOR 1 2 1 2 100 50 0 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4
5.4 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
EXPLOTACION SOBREGUIA 1 TAMBOR 2 2 1 2 100 50 0 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4

1.5 1.5 1.5 1.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 6.8 ### ### 96.0 6.8 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 8.6 8.6 8.6 8.6 8.6 8.6 8.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 8.6 8.6 8.6 8.6 8.6 8.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6
SUBTOTAL 20 14 23 674 350.16667 45.4 2.6 2.6 2.6 2.6 16.2 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 19.7 19.7 19.7 19.7 19.7 19.7 19.7 19.7 19.7 19.7 19.4 19.4 19.4 19.4 19.4 19.4 19.4 19.4 19.4 19.4 19.4 19.4 19.4 19.4 19.4 19.4 19.4 19.4 19.1 19.1 19.1 19.1 19.1 19.1 19.1 13.4 13.4 13.4 13.4 13.4 13.4 13.4 13.4 19.1 19.1 19.1 19.1 19.1 19.1 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8 24.8
PRODUCCION Y AVANCE TOTAL 616 ton-total 282.2 ton-total 379.9 ton-total 183.1 ton-total 283.4 ton-total 322.9

TOTALES

dias faltantes para tambor II tecla


dias faltantes julio 13
seccion tambor 1.7
densidad 1
seccion desorrilo inclinado 3.3
seccion sobreguia 2.85

AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE


CONCEPTO MEDIDA VALOR
CANTIDAD COSTO CANTIDAD COSTO CANTIDAD COSTO CANTIDAD COSTO CANTIDAD COSTO
AVANCE TAMBOR METRO $ 60,000 69 $ 4,196,812 0 $0 0 $ - 0 $ - 0 $ -
AVANCE SOBREGUIA O NIVEL METRO $ 110,000 34.0 $ 3,803,188 0 $0 0 $ - 0 $ - 0 $ -
METRO $0 0 $0 0 $ - 0 $ - 0 $ -
MALACATERO UNIDAD $ 1,000,000 1 $ 1,000,000 1 $ 1,000,000 1 $ 1,000,000 1 $ 1,000,000 1 $ 1,000,000
COSTO POR DIA C/D INCLINADO PRINCIPAL METRO $ 53,333 22 $ 3,200,000 23 $ 3,200,000 24 $ 3,200,000 21 $ 3,200,000 23 $ 3,200,000
ADMINISTRACION MES $ 800,000 1 $ 800,000 1 $ 800,000 1 $ 800,000 1 $ 800,000 1 $ 800,000
COSTO DE PESOR/METROS METRO $ 350,000 0 $0 0 $0 0 $ - 0 $ - 0 $ -
PUNTILLAS BARETA #6 KL $ 6,000 0 $0 0 $0 0 $ - 0 $ - 0 $ -
PUNTILLAS CORRIENTES #2 #3,#4 #5 KL $ 5,500 0 $0 0 $0 0 $ - 0 $ - 0 $ -
ALAMBRE KL KL $ 5,000 0 $0 0 $0 0 $ - 0 $ - 0 $ -
CINTA DE ENMASCARAR ROLLO $ 3,000 4 $ 12,000 0 $0 0 $ - 0 $ - 0 $ -
CINTA ANCHA ROLLO 0 $0 0 $0 0 $ - 0 $ - 0 $ -
CINTA AISLANTE ROLLO $ 2,000 0 $0 0 $0 0 $ - 0 $ - 0 $ -
TEFLON INDUSTRIAL ROLLO $ 2,000 0 $0 0 $0 0 $ - 0 $ - 0 $ -
BOLSA DE 3" KL 0 $0 0 $0 0 $ - 0 $ - 0 $ -
CABLE DUPLEX 2X18 MT $ 800 0 $0 0 $0 0 $ - 0 $ - 0 $ -
CABLE ALAMBRE 2X20 MT $ 750 0 $0 0 $0 0 $ - 0 $ - 0 $ -
ACOPLES NIXON 3/4 UNIDAD $ 7,500 0 $0 0 $0 0 $ - 0 $ - 0 $ -
UNION EN ALUMINIO DE 3/4 $ 2,500 0 $0 0 $0 0 $ - 0 $ - 0 $ -
EMPAQUES PARA ACOPLE NIXON $ 500 0 $0 0 $0 0 $ - 0 $ - 0 $ -
PALA CARBONERA $ 38,000 1 $ 38,000 0 $0 0 $ - 0 $ - 0 $ -
PICOS $ 25,000 1 $ 25,000 0 $0 0 $ - 0 $ - 0 $ -
AZUELAS $ 25,000 1 $ 25,000 0 $0 0 $ - 0 $ - 0 $ -
EMPATES PARA PICOS 1 $0 0 $0 0 $ - 0 $ - 0 $ -
EMPATES PARA AZUELAS $ 3,800 1 $ 3,800 0 $0 0 $ - 0 $ - 0 $ -
CARRETILLA CARBONERA $ 300,000 0 $0 0 $0 0 $ - 0 $ - 0 $ -
VALINERAS RUEDA CARRETILLA $ 3,000 2 $ 6,000 0 $0 0 $ - 0 $ - 0 $ -
MASCARILLAS $ 45,000 3 $ 135,000 0 $0 0 $ - 0 $ - 0 $ -
BOTAS $ 38,000 7 $ 266,000 0 $0 0 $ - 0 $ - 11 $ 418,000
TAPA OIDOS $ 20,000 11 $ 220,000 0 $0 0 $ - 0 $ - 0 $ -
CAMISA CON REFLECTIVO $ 15,000 8 $ 120,000 0 $0 $ - 0 $ - 8 $ 120,000
PANTALON CON REFLECTIVO $ 25,000 8 $ 200,000 0 $0 0 $ - 0 $ - 8 $ 200,000
CASCO $ 25,000 1 $ 25,000 0 $0 0 $ - 0 $ - 0 $ -
GUANTES $ 7,000 1 $ 7,000 7 $ 49,000 7 $ 49,000 7 $ 49,000 11 $ 77,000
MANGUERA DE 2" 0 $0 0 $0 0 $ - 0 $ - 0 $ -
ABRAZADERAS DE 2" 0 $0 0 $0 0 $ - 0 $ - 0 $ -
ABRAZADERAS T501 0 $0 0 $0 0 $ - 0 $ - 0 $ -
ABRAZADERAS T506 0 $0 0 $0 0 $ - 0 $ - 0 $ -
VARILLA DE 1"X6 MT $ 68,000 0 $0 0 $0 0 $ - 0 $ - 0 $ -
MANGERA DE 3/4 CAUCHOLONA MT 0 $0 0 $0 0 $ - 0 $ - 0 $ -
MANGUERA DE 3/4 REVESTIDA ROLLO 0 $0 0 $0 0 $ - 0 $ - 0 $ -
MANGUERA DE 1/2 REVESTIDA ROLLO 0 $0 0 $0 0 $ - 0 $ - 0 $ -
MANGERA DE 1/2 CAUCHOLONA MT 0 $0 0 $0 0 $ - 0 $ - 0 $ -
CARRETILLA 0 $0 0 $0 0 $ - 0 $ - 0 $ -
PALA CORRIENTE 0 $0 0 $0 0 $ - 0 $ - 0 $ -
PICA 0 $0 0 $0 0 $ - 0 $ - 0 $ -
LAMPARA DE MINERIA $ 90,000 1 $ 90,000 0 $0 0 $ - 0 $ - 0 $ -
FILTROS 7093 3M $ 38,000 3 $ 114,000 0 $0 0 $ - 0 $ - 11 $ 418,000
TROCERO $ 65,000 1 $ 65,000 0 $0 0 $ - 0 $ - 0 $ -
LLAVES 0 $0 0 $0 0 $ - 0 $ - 0 $ -
DESTORNILLADORES 0 $0 0 $0 0 $ - 0 $ - 0 $ -
PINZAS 0 $0 0 $0 0 $ - 0 $ - 0 $ -
ALICATES 0 $0 0 $0 0 $ - 0 $ - 0 $ -
SEGUETA 0 $0 0 $0 0 $ - 0 $ - 0 $ -
PULIDORA PEQUEÑA $ 300,000 1 $ 300,000 0 $0 0 $ - 0 $ - 0 $ -
MOTO SIERRA $ 1,000,000 0 $0 0 $0 0 $ - 0 $ - 0 $ -
TALADRO 0 $0 0 $0 0 $ - 0 $ - 0 $ -
MARTILLO 0 $0 0 $0 0 $ - 0 $ - 0 $ -
MARTILLO NEUMATICO $ 2,200,000 0 $0 0 $0 0 $ - 0 $ - 0 $ -
MADERA 0 $0 0 $0 0 $ - 0 $ - 0 $ -
PALANCAS ESPECIALES $ 12,000 66 $ 792,000 60 $ 720,000 72 $ 864,000 63 $ 756,000 69 $ 828,000
PALANCAS PAREJAS $ 9,000 102.0 $ 918,000 300 $ 2,700,000 72 $ 648,000 123 $ 1,107,000 190 $ 1,710,000
TACOS $ 4,000 276 $ 1,104,000 50 $ 200,000 284 $ 1,136,000 140 $ 560,000 140 $ 560,000
TAPAS TAMBOR $ 4,000 345 $ 1,380,000 200 $ 800,000 355 $ 1,420,000 175 $ 700,000 175 $ 700,000
TAPAS NIVEL O INCLINADO $ 4,000 448 $ 1,792,000 400 $ 1,600,000 384 $ 1,536,000 496 $ 1,984,000 690.66667 $ 2,762,667
PINTURA NEGRA GALON $ 40,000 2 $ 80,000 0 $0 0 $ - 0 $ - 0 $ -
PINTURA AMARILLA GALON $ 40,000 2 $ 80,000 0 $0 0 $ - 0 $ - 0 $ -
TINER GALON $ 16,000 2 $ 32,000 0 $0 0 $ - 0 $ - 0 $ -
BRACHA 3´´ UNIDAD $ 7,000 2 $ 14,000 0 $0 0 $ - 0 $ - 0 $ -
FLEXOMETRO UNIDAD $ 12,000 2 $ 24,000 0 $0 0 $ - 0 $ - 0 $ -
CABLE DUPLEX #10 ROJO METRO $ 2,000 20 $ 40,000 0 $0 0 $ - 0 $ - 0 $ -
CABLE DUPLEX #10 BLANCO METRO $ 2,000 20 $ 40,000 0 $0 0 $ - 0 $ - 0 $ -
TOMA CORRIENTE UNIDAD $ 2,500 2 $ 5,000 0 $0 0 $ - 0 $ - 0 $ -
GASOLINA GALON $ 9,800 22 $ 215,600 22 $ 215,600 22 $ 215,600 22 $ 215,600 22 $ 215,600
DIESEL GALON $ 9,800 0 $0 0 $0 0 $ - 0 $ - 0 $ -
BOMBA DE GASOLINA UNIDAD $ 70,000 1 $ 70,000 0 $0 0 $ - 0 $ - 0 $ -
ACEITE 15W40 $ 56,000 1 $ 56,000 1 $ 56,000 1 $ 56,000 1 $ 56,000 1 $ 56,000
AUTORESCATADOR UNIDAD $ 2,000,000 7 $ 14,000,000 0 $0 0 $0 0 $0 0 $0
OVEROL UNIDAD $ 45,000 4 $ 180,000 0 $0 0 $0 0 $0 4 $ 180,000
CASETA MALACATE UNIDAD $ 1,560,200 1 $ 1,560,200
CASETA COMPRESOR UNIDAD $ 1,733,900 1 $ 1,733,900
AIRE COMPRIMIDO UNIDAD $ 44,699,000 1 $ 44,699,000

SUMA 1 DE EGRESOS PARA LA PRODUCCION $ 83,467,500 $ 11,340,600 $ 10,924,600 $ 10,427,600 $ 13,245,267


PRESTACIONES Y SALARIO GRUPO DE TRABAJO $ 5,072,254 $ 5,072,254 $ 5,072,254 $ 5,072,254 $ 5,072,254
PRES-SOCIAL MINEROS $ 2,492,629 $ 2,492,629 $ 2,492,629 $ 2,492,629 $ 2,492,629
PRES-SOCIAL GRUPO DE TRABAJO $ 890,225 $ 890,225 $ 890,225 $ 890,225 $ 890,225

TOTAL GASTOS $ 91,922,608 $ 19,795,708 $ 19,379,708 $ 18,882,708 $ 21,700,374


TON-MES 282.2 379.9 183.1 283.4 322.9
$/TON $ 120,000 $ 120,000 $ 120,000 $ 120,000 $ 120,000
INGRESOS BRUTO $ 33,864,000 $ 45,590,400 $ 21,967,200 $ 34,012,800 $ 38,750,400
UTILIDAD -$ 58,058,608 $ 25,794,692 $ 2,587,492 $ 15,130,092 $ 17,050,026
PAGOS DE SALARIO Y SEGURIDAD SOCIAL
TRABAJADORES # PERSONAL SALARIO PRES-SOCIAL COMPLEMENTO
MINEROS 7 $ 5,796,812 $ 2,492,629.16 $ 5,403,188 ###
INGENIEROS 4 $ 4,140,580 $ 1,780,449.40 $ 5,787,536
APOYO LOGISTICO 1 $ 828,116 $ 356,089.88 $ 171,884
SOLDADOR 1 $ 828,116 $ 356,089.88 $ 771,884
ADMINISTRATIVO 1 $ 828,116 $ 356,089.88 $ 371,884
TECNICO EN MINAS 1 $ 828,116 $ 356,089.88 $ 671,884
TECNICO ELECTROMECANICO 1 $ 828,116 $ 356,089.88 $ 671,884

$ 8,281,160 $ 3,560,899 $ 8,446,956 ###


SUB-TOTAL SUB-TOTAL SUB-TOTAL

$ 890,224.70 $ 5,072,254
SALARIO MIN
828116

TOTAL

PROYECTO AIRE COMPRIMIDO (DIESEL)


INSUMOS MEDIDA CANTIDAD COSTO COSTO/UNIDAD
COMPRESOR Unidad 1 $ 30,000,000 $ 30,000,000
MARTILLO NEUMATICO Unidad 3 $ 2,200,000 $ 6,600,000
ACOPLES NIXON 3/4 Unidad 12 $ 7,500 $ 90,000
UNION EN ALUMINIO DE 3/4 Unidad 12 $ 2,500 $ 30,000
EMPAQUES PARA ACOPLE NIXON Unidad 20 $ 500 $ 10,000
MANGUERA DE 2" caucholona de 300 psi METRO 6 $ 53,000 $ 318,000
ABRAZADERAS T501 Unidad 20 $ 6,400 $ 128,000
ABRAZADERAS T506 Unidad 30 $ 6,600 $ 198,000
MANGERA DE 3/4 CAUCHOLONA Rollo 20 $ 18,000 $ 360,000
MANGUERA DE 3/4 REVESTIDA CALIBRE 80 Rollo 2 $ 160,000 $ 320,000
MANGUERA DE 2' REVESTIDA CALIBRE 60 Rollo 4 $ 440,000 $ 1,760,000
LUBRICADOR DE MARTILLO Unidad 3 $ 75,000 $ 225,000
REGISTRO 3-4 Unidad 5 $ 18,000 $ 90,000
UNION EN T 2" Unidad 5 $ 14,000 $ 70,000
TANQUE UNIDAD 1 $ 4,500,000 $ 4,500,000

$ 44,699,000
COSTO/UNIDAD
$ 30,000,000
$ 6,600,000
$ 90,000
$ 30,000
$ 10,000
$ 318,000
$ 128,000
$ 198,000
$ 360,000
$ 320,000
$ 1,760,000
$ 225,000
$ 90,000
$ 70,000
$ 4,500,000

$ 44,699,000
SUMINISTROS E INSUMOS PARA LA EJECUCION DE LA
1. SEGURIDAD MINERA PERSONAL HERRAMINETAS
Medicion de gases y novedades y estado del equipo de trabajo 1 Multidetector
2. LABORES DE DESARROLLO
Malacate, Polea de la tolva,
Inclinado principal - Mantenimineto, darle seccion a toda la labor, cambio de Motocierra, Martillo Neum
4
puertas e instalacion de la linea del riel. Barrilas de desabombe, Pico
Hilo, Plomada, Pala Carbo

Asadon, Coche, Martillo Neu


Cruzada del inclinado pricipal - Mantenimineto, darle seccion a la toda la 2 Barilla de desabombe, Pico
labor en su totalidad, sostenimineto acorde y limpieza.
carbonera.

Inclinado de Reyes - Mantenimiento, evacuacion del esteril acumulado en el


piso en toda la labor, darle seccion. 4 -

Tambor de ventilacion - Mantenimineto, darle seccion a la union con el Nivel


- -
3.
3. LABORES DE PREPARACIÓN
Nivel 1 - Mantenimineto, cambio de puertas, dar seccion minima de la
4 -
abscisa 0 a la 100, limpieza y forro de las palancas.
Nivel 2 - Mantenimineto, cambio de puertas y sello de labor en derrumbe al - -
final del Nivel.
Nivel 3 - Mantenimineto, dar seccion a toda la labor, limpieza. 4 -
Nivel 4 - Mantenimineto, dar seccion minima a la labor desde la abscisa 0 a la
4 -
80, forro en todo el trayecto de la labor.

Nivel 5 - Mantenimiento, colocar forro a toda y limpieza a toda la labor,


aumentar la densidad del sostenimineto en el descuñe de la labor que se 4 -
venia realizando.
4. LABORES DE EXPLOTACIÓN
Tambor 5 - Mantenimineto, colocar la estructura a nivel techo en el Nivel 1
- -
para evitar obstruccion.
CUCION DE LAS TAREAS DE LA MINA
HERRAMINETAS INSUMOS
Multidetector -
ESARROLLO
Malacate, Polea de la tolva, Coche,
Riel de Cubil, Polines, Tornillos para empate de la
Motocierra, Martillo Neumatico,
linea, Abrazaderas plasticas, Palancas especiales,
Barrilas de desabombe, Pico, Nivel,
Hilo, Plomada, Pala Carbonera. Tapa de forro, Manila, Clavos para linea del riel.

Asadon, Coche, Martillo Neumatico,


Barilla de desabombe, Picos, Pala Palancas especiales, Tapas de forro.
carbonera.

- Palancas especiales, Tapas de forro.

REPARACIÓN
- Palancas especiales, Tapas de forro.

- -

- Palancas especiales, Tapas de forro.

- -

- -

XPLOTACIÓN
- -