Está en la página 1de 4

C1 C2 C3 C4

C1 1 1 3 5
C2 1 1 5 5
C3 1/3 1/5 1 3
C4 1/5 1/5 1/3 1
Pi 2.533 2.4 9.333 14

Ci 0.090
Ri 0.99
CRi 0.091 Consistente

ANALIZANDO C1: COSTO MP

P1 P2 P3 Suma
P1 1 1/3 3 4.333
P2 3 1 5 9
P3 1/3 1/5 1 1.533
14.867

ANALIZANDO C2: Calidad

P1 P2 P3 Suma
P1 1 5 1 7
P2 1/5 1 1/5 1.4
P3 1 5 1 7
15.4

ANALIZANDO C3: Costo de Transporte

P1 P2 P3 Suma
P1 1 1/7 1/3 1.476
P2 7 1 3 11
P3 3 1/3 1 4.333
16.81

ANALIZANDO C4: Tiempo de entrega

P1 P2 P3 Suma
P1 1 1/3 3 4.333
P2 3 1 5 9
P3 1/3 1/5 1 1.533
14.87
C1 C2 C3 C4
P1 0.291 0.455 0.088 0.291
P2 0.605 0.091 0.654 0.605
P3 0.103 0.455 0.258 0.103
0.354 0.425 0.160 0.06

1.000

35.3773584906
0
Suma Ponderacion λi
10 0.354 0.896
12 0.425 1.019
4.533 0.160 1.497
1.733 0.061 0.858
28.267 1 4.270 λmax

Ponderacion
0.291
0.605
0.103

Ponderacion
0.455
0.091 )
0.455 416.65598975

61.943

Ponderacion
0.088
0.654
0.258

Ponderacion
0.291
0.605
0.103
% Prioridad
1.125 33% 2
1.95606235759185 39% 1
0.918613849723239 28% 3
4.000

28.1330948171228
48.9015589397962

También podría gustarte