Diseño de Cimentaciones
Diseño de Cimentaciones
EJE A
SOBRECIMIENTO
DATOS:
tmuro= 25 cms
f'c= 145 kg/cm2 CONCRETO ARMADO
fy= 4200 kg/cm2
DETERMINACION DE "σn"
P (TN)
1ER PISO 2DO PISO 3ER PISO CT (TN)
CM 1.973 1.973 1.09 5.036
CV 0.558 0.35 0.175 1.083
6.12
DETERMINACION DE Pn (Pn)
PARA :
t= 25 cms
L= 100 cms
A= 2500 cms2
f'c= 145 kg/cm2
Pn= 362.5 tn
AREA DE ACERO
р= рmin= 0.0033333
Asmin= 3.3333333 cm2
As1= 1.42 cm2 2 ф 3/8''
As2= 3.96 cm2 2 ф 5/8''
CIMIENTO
DATOS:
1 - 10%
0.80 - 10.4%
4 - 4%
PESO ZAPATA:
Pz= 0.52 tn/m
AREA DE CIMIENTO
b= 83.03 cm
b= 85 cm
L= 100 cm
PERALTE
Pu= 9624.74 kg
b= 85 cm
muro= 25 cms
φ= 0.7
2X= 60 cm
h= 60 cm
SECCION TIPICA
25
2 ф 3/8''
40 NTN+0.00
2 ф 5/8''
POR NORMA
Df>=80cms
60
85
EJE A'
SOBRECIMIENTO
DATOS:
tmuro= 25 cms
f'c= 145 kg/cm2 CONCRETO ARMADO
fy= 4200 kg/cm2
DETERMINACION DE "σn"
P (TN)
1ER PISO 2DO PISO 3ER PISO CT (TN)
CM 2.111 2.111 1.456 5.678
CV 0.948 0.948 0.319 2.215
7.89
DETERMINACION DE Pn (Pn)
PARA :
t= 25 cms
L= 100 cms
A= 2500 cms2
f'c= 145 kg/cm2
Pn= 362.5 tn
AREA DE ACERO
р= рmin= 0.0033333
Asmin= 3.3333333 cm2
As1= 1.42 cm2 2 ф 3/8''
As2= 3.96 cm2 2 ф 5/8''
CIMIENTO
DATOS:
1 - 10%
0.80 - 10.4%
4 - 4%
PESO ZAPATA:
Pz= 0.59 tn/m
AREA DE CIMIENTO
b= 106.04 cm
b= 110 cm
L= 100 cm
PERALTE
Pu= 12541.42 kg
b= 110 cm
muro= 25 cms
φ= 0.7
h= 29.55 cm
h min= 60 cm
2X= 85 cm
h= 85 cm
SECCION TIPICA
25
2 ф 3/8''
40 NTN+0.00
2 ф 5/8''
POR NORMA
Df>=80cms
85
110
EJE C
SOBRECIMIENTO
DATOS:
tmuro= 25 cms
f'c= 145 kg/cm2 CONCRETO ARMADO
fy= 4200 kg/cm2
DETERMINACION DE "σn"
P (TN)
1ER PISO 2DO PISO 3ER PISO CT (TN)
CM 2.106 2.106 1.45 5.662
CV 0.635 0.635 0.318 1.588
7.25
DETERMINACION DE Pn (Pn)
PARA :
t= 25 cms
L= 100 cms
A= 2500 cms2
f'c= 145 kg/cm2
Pn= 362.5 tn
AREA DE ACERO
р= рmin= 0.0033333
Asmin= 3.3333333 cm2
As1= 1.42 cm2 2 ф 3/8''
As2= 3.96 cm2 2 ф 5/8''
CIMIENTO
DATOS:
1 - 10%
0.80 - 10.4%
4 - 4%
PESO ZAPATA:
Pz= 0.59 tn/m
AREA DE CIMIENTO
b= 97.99 cm
b= 100 cm
L= 100 cm
PERALTE
Pu= 11450.79 kg
b= 100 cm
muro= 25 cms
φ= 0.7
h= 26.58 cm
h min= 60 cm
2X= 75 cm
h= 75 cm
SECCION TIPICA
25
2 ф 3/8''
40 NTN+0.00
2 ф 5/8''
POR NORMA
Df>=80cms
75
100
EJE D
SOBRECIMIENTO
DATOS:
tmuro= 25 cms
f'c= 145 kg/cm2 CONCRETO ARMADO
fy= 4200 kg/cm2
DETERMINACION DE "σn"
P (TN)
1ER PISO 2DO PISO 3ER PISO CT (TN)
CM 2.248 2.248 1.22 5.716
CV 0.928 0.298 0.208 1.434
7.15
DETERMINACION DE Pn (Pn)
PARA :
t= 25 cms
L= 100 cms
A= 2500 cms2
f'c= 145 kg/cm2
Pn= 362.5 tn
AREA DE ACERO
р= рmin= 0.0033333
Asmin= 3.3333333 cm2
As1= 1.42 cm2 2 ф 3/8''
As2= 3.96 cm2 2 ф 5/8''
CIMIENTO
DATOS:
1 - 10%
0.80 - 10.4%
4 - 4%
PESO ZAPATA:
Pz= 0.59 tn/m
AREA DE CIMIENTO
b= 96.81 cm
b= 100 cm
L= 100 cm
PERALTE
Pu= 11272.45 kg
b= 100 cm
muro= 25 cms
φ= 0.7
h= 48.97 cm
h min= 60 cm
2X= 75 cm
h= 75 cm
SECCION TIPICA
25
2 ф 3/8''
40 NTN+0.00
2 ф 5/8''
POR NORMA
Df>=80cms
75
100
EJE 1
SOBRECIMIENTO
DATOS:
tmuro= 25 cms
f'c= 145 kg/cm2 CONCRETO ARMADO
fy= 4200 kg/cm2
DETERMINACION DE "σn"
P (TN)
1ER PISO 2DO PISO 3ER PISO CT (TN)
CM 1.861 1.861 2.288 6.01
CV 0.79 0.79 0.79 2.37
8.38
DETERMINACION DE Pn (Pn)
PARA :
t= 25 cms
L= 100 cms
A= 2500 cms2
f'c= 145 kg/cm2
Pn= 362.5 tn
р= рmin= 0.0033333
Asmin= 3.3333333 cm2
As1= 1.42 cm2 2 ф 3/8''
As2= 3.96 cm2 2 ф 5/8''
CIMIENTO
DATOS:
1 - 10%
0.80 - 10.4%
4 - 4%
PESO ZAPATA:
Pz= 0.63 tn/m
AREA DE CIMIENTO
b= 112.56 cm
b= 115 cm
L= 100 cm
PERALTE
Pu= 13318.06 kg
b= 115 cm
muro= 25 cms
φ= 0.7
h= 58.80 cm
h min= 60 cm
2X= 90 cm
h= 90 cm
SECCION TIPICA
25
2 ф 3/8''
40 NTN+0.00
2 ф 5/8''
POR NORMA
Df>=80cms
90
115
EJE 2
SOBRECIMIENTO
DATOS:
tmuro= 25 cms
f'c= 145 kg/cm2 CONCRETO ARMADO
fy= 4200 kg/cm2
DETERMINACION DE "σn"
σn= 0.80 kg/cm2
σn= 8 tn/m2
P (TN)
1ER PISO 2DO PISO 3ER PISO CT (TN)
CM 1.558 1.558 1.908 5.024
CV 0.95 0.95 0.87 2.77
7.79
DETERMINACION DE Pn (Pn)
PARA :
t= 25 cms
L= 100 cms
A= 2500 cms2
f'c= 145 kg/cm2
Pn= 362.5 tn
AREA DE ACERO
р= рmin= 0.0033333
Asmin= 3.3333333 cm2
As1= 1.42 cm2 2 ф 3/8''
As2= 3.96 cm2 2 ф 5/8''
CIMIENTO
DATOS:
PESO ZAPATA:
Pz= 0.52 tn/m
AREA DE CIMIENTO
b= 103.96 cm
b= 105 cm
L= 100 cm
PERALTE
Pu= 12474.09 kg
b= 105 cm
muro= 25 cms
φ= 0.7
h= 28.62 cm
h min= 60 cm
2X= 80 cm
h= 80 cm
SECCION TIPICA
25
2 ф 3/8''
40 NTN+0.00
2 ф 5/8''
POR NORMA
Df>=80cms
80
105
EJE 3
SOBRECIMIENTO
DATOS:
tmuro= 15 cms
f'c= 145 kg/cm2 CONCRETO ARMADO
fy= 4200 kg/cm2
DETERMINACION DE "σn"
P (TN)
1ER PISO 2DO PISO 3ER PISO CT (TN)
CM 1.524 1.524 1.908 4.956
CV 0.52 0.52 0.16 1.2
6.16
DETERMINACION DE Pn (Pn)
PARA :
t= 15 cms
L= 100 cms
A= 1500 cms2
f'c= 145 kg/cm2
Pn= 217.5 tn
AREA DE ACERO
р= рmin= 0.0033333
Asmin= 2 cm2
As1= 1.42 cm2 2 ф 3/8''
As2= 3.96 cm2 2 ф 5/8''
CIMIENTO
DATOS:
1 - 10%
0.80 - 10.4%
4 - 4%
PESO ZAPATA:
Pz= 0.52 tn/m
AREA DE CIMIENTO
b= 83.39 cm
b= 85 cm
L= 100 cm
PERALTE
Pu= 9699.99 kg
b= 85 cm
muro= 15 cms
φ= 0.7
h= 23.50 cm
h min= 60 cm
2X= 70 cm
h= 70 cm
SECCION TIPICA
15
2 ф 3/8''
40 NTN+0.00
2 ф 5/8''
POR NORMA
Df>=80cms
70
85
EJE 4
SOBRECIMIENTO
DATOS:
tmuro= 25 cms
f'c= 145 kg/cm2 CONCRETO ARMADO
fy= 4200 kg/cm2
DETERMINACION DE "σn"
P (TN)
1ER PISO 2DO PISO 3ER PISO CT (TN)
CM 1.524 1.524 0.76 3.808
CV 0.36 0.36 0.16 0.88
4.69
DETERMINACION DE Pn (Pn)
PARA :
t= 25 cms
L= 100 cms
A= 2500 cms2
f'c= 145 kg/cm2
Pn= 362.5 tn
AREA DE ACERO
р= рmin= 0.0033333
Asmin= 3.3333333 cm2
As1= 1.42 cm2 2 ф 3/8''
As2= 3.96 cm2 2 ф 5/8''
CIMIENTO
DATOS:
1 - 10%
0.80 - 10.4%
4 - 4%
PESO ZAPATA:
Pz= 0.40 tn/m
AREA DE CIMIENTO
b= 63.55 cm
b= 65 cm
L= 100 cm
PERALTE
Pu= 7381.64 kg
b= 65 cm
muro= 25 cms
φ= 0.7
h= 15.88 cm
h min= 60 cm
2X= 40 cm
h= 60 cm
SECCION TIPICA
25
2 ф 3/8''
40 NTN+0.00
2 ф 5/8''
POR NORMA
Df>=80cms
60
65
EJE 5
SOBRECIMIENTO
DATOS:
tmuro= 25 cms
f'c= 145 kg/cm2 CONCRETO ARMADO
fy= 4200 kg/cm2
DETERMINACION DE "σn"
P (TN)
1ER PISO 2DO PISO 3ER PISO CT (TN)
CM 0.697 0.697 0.65 2.044
CV 0.16 0.16 0.08 0.4
2.44
DETERMINACION DE Pn (Pn)
PARA :
t= 25 cms
L= 100 cms
A= 2500 cms2
f'c= 145 kg/cm2
Pn= 362.5 tn
AREA DE ACERO
р= рmin= 0.0033333
Asmin= 3.3333333 cm2
As1= 1.42 cm2 2 ф 3/8''
As2= 3.96 cm2 2 ф 5/8''
CIMIENTO
DATOS:
1 - 10%
0.80 - 10.4%
4 - 4%
PESO ZAPATA:
Pz= 0.21 tn/m
AREA DE CIMIENTO
b= 33.21 cm
b= 40 cm
L= 100 cm
PERALTE
Pu= 3839.21 kg
b= 40 cm
muro= 25 cms
φ= 0.7
h= 7.65 cm
h min= 60 cm
2X= 15 cm
h= 60 cm
SECCION TIPICA
25
2 ф 3/8''
40 NTN+0.00
2 ф 5/8''
POR NORMA
Df>=80cms
60
40
EJE 6
SOBRECIMIENTO
DATOS:
tmuro= 15 cms
f'c= 145 kg/cm2 CONCRETO ARMADO
fy= 4200 kg/cm2
DETERMINACION DE "σn"
P (TN)
1ER PISO 2DO PISO 3ER PISO CT (TN)
CM 1.124 1.124 0.65 2.898
CV 0.16 0.16 0.08 0.4
3.3
DETERMINACION DE Pn (Pn)
PARA :
t= 15 cms
L= 100 cms
A= 1500 cms2
f'c= 145 kg/cm2
Pn= 217.5 tn
AREA DE ACERO
р= рmin= 0.0033333
Asmin= 2 cm2
As1= 1.42 cm2 2 ф 3/8''
As2= 3.96 cm2 2 ф 5/8''
CIMIENTO
DATOS:
1 - 10%
0.80 - 10.4%
4 - 4%
PESO ZAPATA:
Pz= 0.30 tn/m
AREA DE CIMIENTO
b= 44.99 cm
b= 45 cm
L= 100 cm
PERALTE
Pu= 5159.15 kg
b= 45 cm
muro= 15 cms
φ= 0.7
h= 20.51 cm
h min= 60 cm
2X= 30 cm
h= 60 cm
SECCION TIPICA
15
2 ф 3/8''
40 NTN+0.00
2 ф 5/8''
POR NORMA
Df>=80cms
60
45