Está en la página 1de 12

1 2 3 4 5 6 7

30.00

5.00 5.00 5.00 5.00 5.00 5.00

VC101 VC101 VC101 VC101 VC101 VC101


(30X35) (30X35) (30X35) (30X35) (30X35) (30X35)
1.50 1.50 2.00 2.00 2.00 1.50 1.50

.25

.25

.25

.25

.25

.25

.25
A A

1.50

1.50

1.50

1.50

1.50

1.50

1.50
1.25

1.25

1.25

1.25

1.25

1.25

1.25
ZP-2 ZP-2 ZP-3 ZP-3 ZP-3 ZP-2 ZP-2
.25 1.25 .75 .75 1.00 1.00 1.00 1.00 1.00 1.00 .75 .75 1.25 .25

VC104 VC104
(30X35) (30X35)

6.00

6.00
3.00
VC104 3.00
(30X35)
VC102 Contrapeso en concreto ciclópeo VC103 VC103 Contrapeso en concreto ciclópeo VC102
(30X35) 60% Concreto 3000 PSI 40% Rajón (30X35) (30X35) 60% Concreto 3000 PSI 40% Rajón (30X35)
2.00 2.00 2.00
1.50 e=0.50m 1.50 1.50 e=0.50m 1.50

ZP-1

1.00

1.00

1.00
2.00

2.00

2.00
1.50

1.50

1.50

1.50
B B
CP-1 CP-1 CP-1 CP-1

1.00

1.00

1.00
ZP-1 ZP-1
.25 1.75 Contrapeso en concreto ciclópeo 1.00 1.00 Contrapeso en concreto ciclópeo 1.75 .25
60% Concreto 3000 PSI 40% Rajón 60% Concreto 3000 PSI 40% Rajón
e=0.50m e=0.50m
VC104 VC104 VC104
(30X35) (30X35) (30X35)

6.00

6.00
3.00 3.00

VC102 Contrapeso en concreto ciclópeo VC103 VC103 Contrapeso en concreto ciclópeo VC102
(30X35) 60% Concreto 3000 PSI 40% Rajón (30X35) (30X35) 60% Concreto 3000 PSI 40% Rajón (30X35)
2.00 2.00 2.00
1.50 e=0.50m 1.50 1.50 e=0.50m 1.50

ZP-1

1.00

1.00
1.00

2.00

2.00
2.00

1.50

1.50

1.50

1.50
C C
CP-1 CP-1 CP-1 CP-1

1.00

1.00
1.00
ZP-1 ZP-1
.25 1.75 Contrapeso en concreto ciclópeo 1.00 1.00 Contrapeso en concreto ciclópeo 1.75 .25
60% Concreto 3000 PSI 40% Rajón 60% Concreto 3000 PSI 40% Rajón
e=0.50m e=0.50m
28.59

28.59
VC104 VC104 VC104
(30X35) (30X35) (30X35)

6.00

6.00
3.00 3.00

VC102 Contrapeso en concreto ciclópeo VC103 VC103 Contrapeso en concreto ciclópeo VC102
(30X35) 60% Concreto 3000 PSI 40% Rajón (30X35) (30X35) 60% Concreto 3000 PSI 40% Rajón (30X35)
2.00 2.00 2.00
1.50 e=0.50m 1.50 1.50 e=0.50m 1.50

ZP-1

1.00

1.00
1.00

2.00

2.00
2.00

1.50

1.50

1.50

1.50
D D
CP-1 CP-1 CP-1 CP-1

1.00

1.00
1.00
ZP-1 ZP-1
.25 1.75 Contrapeso en concreto ciclópeo 1.00 1.00 Contrapeso en concreto ciclópeo 1.75 .25
60% Concreto 3000 PSI 40% Rajón 60% Concreto 3000 PSI 40% Rajón
e=0.50m e=0.50m
VC104 VC104 VC104
(30X35) (30X35) (30X35)
6.00

6.00
3.00 3.00

VC102 Contrapeso en concreto ciclópeo VC103 VC103 Contrapeso en concreto ciclópeo VC102
(30X35) 60% Concreto 3000 PSI 40% Rajón (30X35) (30X35) 60% Concreto 3000 PSI 40% Rajón (30X35)
2.00 2.00 2.00
1.50 e=0.50m 1.50 1.50 e=0.50m 1.50

ZP-1

1.00

1.00
1.00

2.00

2.00
2.00

1.50

1.50

1.50

1.50
E E
CP-1 CP-1 CP-1 CP-1

1.00

1.00
1.00

ZP-1 ZP-1
.25 1.75 Contrapeso en concreto ciclópeo 1.00 1.00 Contrapeso en concreto ciclópeo 1.75 .25

VC104 60% Concreto 3000 PSI 40% Rajón VC104 60% Concreto 3000 PSI 40% Rajón VC104
(30X35) e=0.50m (30X35) e=0.50m (30X35)
4.59

4.59
VC101 VC101
1.50 1.50 2.00 2.00 2.00
(30X35) 1.50 1.50
(30X35)

1.75
ZP-2 ZP-2 ZP-2 ZP-2
2.00

1.25

1.25

1.25

1.25

1.25

1.25
ZP-3 ZP-3 ZP-3
1.50

1.50

1.50

1.50

1.50

1.50
Junta de dilatación 0.07m

F F
.25

.25

.25

.25

.25

.25

.25
.50

.50
.83 .17
.82 .18

.17

.17
1.00 1.00 1.00 1.00 1.00 1.00
F´ F´
1.00
1.00

1.00

1.00
.82

.83
Junta de dilatación 7.5cm. Junta de dilatación 7.5cm.

ZP-4 ZP-4 ZP-4 ZP-4 Junta de dilatación 7.5cm. ZP-4


.17 .82 .50 .50 .50 .50 .50 .50 .83 .17
2.71

2.71

2.80

2.80
VC105(30X35) 1.00 VC108(30X35)
1.00 1.00
VC103(30X30)
.50 .50

.50 .50

.50 .50

ZP-4 ZP-4

.50

.50
1.00

G G

1.00

1.00
G G

.50

.50
ZP-4 ZP-4 ZP-4
.18 .82 .50 .50 .50 .50 .50 .50 .83 .17

VC107(30X35) VC107(30X35) VC104(30X30)


3.77

3.77

3.64

3.64
VC104(30X30)
VC106(30X35)
1.00 1.00 1.00 1.00
VC103(30X30)

ZP-4 ZP-4

.50

.50
.50 .50

.50 .50
1.00

1.00

1.00

1.00
H H H H

.50

.50
ZP-4 ZP-4
.50 .50 .83 .17
.50 .50
.18 .82

VC107(30X35) VC107(30X35)

VC104(30X30)

VC104(30X30)
3.77

3.77

4.88

4.88
18.20

18.20

18.28

18.28
1.20 VC106(30X30) 1.20

ZP-5 ZP-5
.60

.60
1.20

1.20

I I 1.00 1.00
.60

.60

VC103(30X30)

ZP-4 ZP-4

.50

.50
.18 1.03 .60 .60

1.00

1.00
I I

.50

.50
VC107(30X35) VC107(30X35) .50 .50 .83 .17
4.50

4.50

VC104(30X30)
Vo. Bo. Ingeniero de Suelos
3.35

3.35
.17 1.02 VC106(30X35) VC104(30X30)
1.20
1.00 1.00
VC103(30X30)
ZP-5 ZP-5 ZP-4 ZP-4
.60

.60

.50

.50
1.00

1.00
J J
1.20

1.20

J J
.50

.50
.60

.60

.50 .50 .83 .17


.18 1.03 .60 .60
VC107(30X35) VC107(30X35) VC104(30X30)
3.61

3.61
3.45

3.45

.17 1.03 .60 .60


VC104(30X30)
1.00 1.00
ZP-5 ZP-5
ZP-4 ZP-4
.98

.98

1.20
1.20

.82

.82
1.00

1.00

K K K K
.23

.23

.18

.18
.50 .50 .82 .18

VC106(30X35) VC103(30X30)

4.58 1.42

4.00

1 1´ 2 6´ 7

PLANTA GENERAL DE LOCALIZACIÓN


Escala 1:100
1 2 3 4 5 6 7 1 2 3 4 5 6 7

30.00 30.00

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
VC101 VC101 VC101 VC101 VC101 VC101
(30X35) (30X35) (30X35) (30X35) (30X35) (30X35)
1.50 1.50 2.00 2.00 2.00 1.50 1.50 C6 .50 C6 .50 C6 .50 C6 .50 C6 .50 C6 .50 C6 .50

.25 .25

.25 .25

.25 .25

.25 .25

.25 .25

.25 .25

.25 .25
.25

.25

.25

.25

.25

.25

.25
A A

.50

.50

.50

.50

.50

.50

.50
A A
.25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25
1.50

1.50

1.50

1.50

1.50

1.50

1.50
1.25

1.25

1.25

1.25

1.25

1.25

1.25
ZP-2 ZP-2 ZP-3 ZP-3 ZP-3 ZP-2 ZP-2
.25 1.25 .75 .75 1.00 1.00 1.00 1.00 1.00 1.00 .75 .75 1.25 .25

VC104 VC104 VC104


(30X35) (30X35) (30X35)

6.00

6.00
6.00

6.00
3.00 3.00
3.00 3.00
VC102 Contrapeso en concreto ciclópeo VC103 VC103 Contrapeso en concreto ciclópeo VC102
(30X35) 60% Concreto 3000 PSI 40% Rajón (30X35) (30X35) 60% Concreto 3000 PSI 40% Rajón (30X35)
2.00 2.00 2.00
1.50 e=0.50m 1.50 1.50 e=0.50m 1.50

ZP-1 C5 .50 C5 .50 C5 .50


1.00

1.00

1.00

.25 .25

.25 .25

.25 .25
B B

.50

.50

.50
2.00

2.00

2.00
1.50

1.50

1.50

1.50
B B
CP-1 CP-1 CP-1 CP-1 .25 .25 .25 .25 .25 .25
1.00

1.00

1.00
ZP-1 ZP-1
.25 1.75 Contrapeso en concreto ciclópeo 1.00 1.00 Contrapeso en concreto ciclópeo 1.75 .25
60% Concreto 3000 PSI 40% Rajón 60% Concreto 3000 PSI 40% Rajón
e=0.50m e=0.50m
VC104 VC104 VC104
(30X35) (30X35) (30X35)

6.00

6.00
6.00

6.00
3.00 3.00
3.00 3.00
VC102 Contrapeso en concreto ciclópeo VC103 VC103 Contrapeso en concreto ciclópeo VC102
(30X35) 60% Concreto 3000 PSI 40% Rajón (30X35) (30X35) 60% Concreto 3000 PSI 40% Rajón (30X35)
2.00 2.00 2.00
1.50 e=0.50m 1.50 1.50 e=0.50m 1.50

ZP-1 C4 .50 C4 .50 C4 .50

1.00

1.00
1.00

.25 .25

.25 .25

.25 .25
C C

.50

.50

.50
2.00

2.00
2.00

1.50

1.50

1.50

1.50
C C
CP-1 CP-1 CP-1 CP-1 .25 .25 .25 .25 .25 .25

1.00

1.00
1.00

ZP-1 ZP-1
.25 1.75 Contrapeso en concreto ciclópeo 1.00 1.00 Contrapeso en concreto ciclópeo 1.75 .25
60% Concreto 3000 PSI 40% Rajón 60% Concreto 3000 PSI 40% Rajón
e=0.50m e=0.50m

28.59

28.59
28.59

28.59
VC104 VC104 VC104
(30X35) (30X35) (30X35)

6.00

6.00
6.00

6.00
3.00 3.00
3.00 3.00
VC102 Contrapeso en concreto ciclópeo VC103 VC103 Contrapeso en concreto ciclópeo VC102
(30X35) 60% Concreto 3000 PSI 40% Rajón (30X35) (30X35) 60% Concreto 3000 PSI 40% Rajón (30X35)
2.00 2.00 2.00
1.50 e=0.50m 1.50 1.50 e=0.50m 1.50

ZP-1 C3 .50 C3 .50 C3 .50


1.00

1.00
1.00

.25 .25

.25 .25

.25 .25
D D

.50

.50

.50
2.00

2.00
2.00

1.50

1.50

1.50

1.50
D D
CP-1 CP-1 CP-1 CP-1 .25 .25 .25 .25 .25 .25
1.00

1.00
1.00

ZP-1 ZP-1
.25 1.75 Contrapeso en concreto ciclópeo 1.00 1.00 Contrapeso en concreto ciclópeo 1.75 .25
60% Concreto 3000 PSI 40% Rajón 60% Concreto 3000 PSI 40% Rajón
e=0.50m e=0.50m
VC104 VC104 VC104
(30X35) (30X35) (30X35)

6.00

6.00
6.00

6.00
3.00 3.00
3.00 3.00
VC102 Contrapeso en concreto ciclópeo VC103 VC103 Contrapeso en concreto ciclópeo VC102
(30X35) 60% Concreto 3000 PSI 40% Rajón (30X35) (30X35) 60% Concreto 3000 PSI 40% Rajón (30X35)
2.00 2.00 2.00
1.50 e=0.50m 1.50 1.50 e=0.50m 1.50

ZP-1 C2 .50 C2 .50 C2 .50


1.00

1.00
1.00

.25 .25

.25 .25

.25 .25
E E

.50

.50

.50
2.00

2.00
2.00

1.50

1.50

1.50

1.50
E E
CP-1 CP-1 CP-1 CP-1 .25 .25 .25 .25 .25 .25
1.00

1.00
1.00

ZP-1 ZP-1
.25 1.75 Contrapeso en concreto ciclópeo 1.00 1.00 Contrapeso en concreto ciclópeo 1.75 .25

VC104 60% Concreto 3000 PSI 40% Rajón VC104 60% Concreto 3000 PSI 40% Rajón VC104
(30X35) e=0.50m (30X35) e=0.50m (30X35)

4.59

4.59
4.59

4.59
VC101 VC101
1.50 1.50 2.00 2.00 2.00
(30X35) (30X35) 1.50 1.50

1.75
ZP-2 ZP-2 ZP-2 ZP-2
2.00

C1 C1 C1 C1 C1 C1 C1
1.25

1.25

1.25

1.25

1.25

1.25

ZP-3 ZP-3 ZP-3 .50 .50 .50 .50 .50 .50 .50
1.50

1.50

1.50

1.50

1.50

1.50

.25 .25

.25 .25

.25 .25

.25 .25

.25 .25

.25 .25

.25 .25
F F

.50

.50

.50

.50

.50

.50

.50
F F
.25

.25

.25

.25

.25

.25

.25
.25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25

5.00 5.00 5.00 5.00 5.00 5.00

5.00 5.00 5.00 5.00 5.00 5.00


30.00
30.00

1 2 3 4 5 6 7 1 2 3 4 5 6 7

PLANTA DE CIMENTACIÓN PLANTA DE LOCALIZACIÓN DE COLUMNAS


Cubierta #1 Cubierta #1
Escala 1:100 Escala 1:100

CUADRO DE ZAPATAS CUBIERTA #1 F E D C B A F E D C B A


28.59 28.59
ZAPATA CANTIDAD L1 x L2 h1(m) REFUERZO
ZP-1 16 2.00x2.00 0.40 14 4 22.5 + 14 4 22.5 c/0.15
4.59 6.00 6.00 6.00 6.00 4.59 6.00 6.00 6.00 6.00
CP-1 16 1.50x1.50 0.50 N.A.
ZP-2 8 1.50x1.50 0.40 10 4 17.5 + 10 4 17.5 c/0.15 VIGA Cercha VIGA Cercha
VIGA 150X100X3.0mm (Ver detalle) VIGA 150X100X3.0mm (Ver detalle)
Cercha Cercha
ZP-3 6 1.50x2.00 0.40 10 4 17.5 + 14 4 22.5 c/0.15 VIGA Cercha
150X100X3.0mm (Ver detalle) VIGA Cercha
150X100X3.0mm (Ver detalle)
N+10.50m N+10.50m
VIGA VIGA 150X100X3.0mm (Ver detalle) 6.03 1.53 VIGA VIGA 150X100X3.0mm (Ver detalle) 6.03 1.53
Cercha Cercha
150X100X3.0mm 150X100X3.0mm 1.53 150X100X3.0mm 150X100X3.0mm 1.53
Cercha (Ver detalle) 6.04 1.53 Cercha (Ver detalle) 6.04 1.53
1.53 1.53 1.53 1.53
Cercha (Ver detalle) 6.03 1.53 (Ver detalle) 6.03 1.53
1.53 1.53 1.53 1.53
Correa (Ver detalle) 1.53 Correa N+9.08m Correa 1.53 Correa N+9.08m
6.03 1.53 6.03 1.53
.42

1.53 1.53 100x100x3.0mm 1.53 1.53 100x100x3.0mm


100x100x3.0mm 1.53 100x100x3.0mm 1.53
4.64 1.19 4.64 1.19
1.53 1.53
1.19 1.53 1.19 1.53
1.19 1.53 Correa 1.19 1.53 Correa
1.58

Correa Ver detalle Correa


1.16

1.19 Correa 100x100x3.0mm VIGA 1.19 Correa 100x100x3.0mm VIGA


de conexión 01. N+7.50m N+7.50m
.74

100x100x3.0mm 100x100x3.0mm 30X40 100x100x3.0mm 100x100x3.0mm 30X40


.32

Dilatación en icopor 0.01 Placa de contrapiso.

VIGA VIGA VIGA VIGA VIGA VIGA VIGA VIGA VIGA VIGA
.15

30X40 30X40 30X40 30X40 30X40 30X40 30X40 30X40 30X40 30X40

N+4.50m N+4.50m
COLUMNA
COLUMNA 50X50
Relleno en material seleccionado. COLUMNA 50X50
COLUMNA 50X50
COLUMNA
1.10

COLUMNA 50X50
VIGA 50X50 VIGA VIGA VIGA VIGA VIGA VIGA
50X50
30X40 30X40 30X40 30X40 30X40 30X40 30X40
COLUMNA COLUMNA COLUMNA COLUMNA COLUMNA COLUMNA
2.00

50X50 50X50 50X50 50X50 50X50 50X50

Losa de Losa de Losa de Losa de


.35

contrapiso contrapiso contrapiso contrapiso


0.15m 0.15m N+0.00m 0.15m 0.15m N+0.00m

VC(30X35) VC(30X35) VC(30X35) VC(30X35) VC(30X35)


.40

.075
.075

Viga de cimentación.

N-2.00m N-2.00m
.05

L1xL2
ZAPATA ZAPATA ZAPATA ZAPATA ZAPATA ZAPATA ZAPATA ZAPATA ZAPATA ZAPATA ZAPATA ZAPATA
Refuerzo Concreto de 1.50X2.00X0.40m 2.00X2.00X0.40m 2.00X2.00X0.40m 2.00X2.00X0.40m 2.00X2.00X0.40m 1.50X2.00X0.40m 1.50X1.50X0.40m 2.00X2.00X0.40m 2.00X2.00X0.40m 2.00X2.00X0.40m 2.00X2.00X0.40m 1.50X1.50X0.40m
(Ver cuadro) limpieza

CORTE TÍPICO DE ZAPATA CONCÉNTRICA


Cubierta #1
Escala 1:25 CORTE LONGITUDINAL DE CUBIERTA EJE 4 CORTE LONGITUDINAL DE CUBIERTA EJES 1 Y 7
Cubierta #1 Cubierta #1
Escala 1:100 Escala 1:100
1 2 3 4 5 6 7

1 2 3 4 5 6 7
30.00
30.00

5.00 5.00 5.00 5.00 5.00 5.00


5.00 5.00 5.00 5.00 5.00 5.00
Cercha Cercha Cercha
(Ver detalle) (Ver detalle) (Ver detalle)
N+8.50m

.70 .30
V101(30X40) V101(30X40) V101(30X40) V101(30X40) V101(30X40) V101(30X40)

.70 .30
A A N+7.50m
IPE200 IPE200

.75
.75

.30.25 .85 3.60 .50 4.50 .50 4.50 .50 4.50 .50 4.50 .50 3.60 .85 .25.30 Ver detalle Ver detalle Ver detalle Ver detalle Ver detalle
de conexión 01. de conexión 01. de conexión 01. de conexión 01. de conexión 01.
.75

.75
V104(30X40)

V104(30X40)
7TUBOS 38X76X2.0mm 7TUBOS 38X76X2.0mm
.75

.75
6.00

6.00
N+4.50m
.75

.75
Lámina de Lámina de
alfajor 3.0mm alfajor 3.0mm
.75

.75
VIGA VIGA VIGA VIGA VIGA VIGA
30X40 30X40 30X40 30X40 30X40 30X40
.73

.75
COLUMNA COLUMNA COLUMNA COLUMNA COLUMNA COLUMNA COLUMNA
IPE240 IPE240 50X50 50X50 50X50 50X50 50X50 50X50 50X50
.77

.75
B B
.75

.75
IPE200 IPE200
Losa de Losa de Losa de
.75

.75
contrapiso contrapiso contrapiso
0.15m 0.15m 0.15m N+0.00m
.75

.75
V104(30X40)

V104(30X40)
7TUBOS 38X76X2.0mm 7TUBOS 38X76X2.0mm
.75

.75
6.00

6.00
.75

.75
Lámina de Lámina de N-2.00m
alfajor 3.0mm alfajor 3.0mm
.75

.75
ZAPATA ZAPATA ZAPATA ZAPATA ZAPATA ZAPATA ZAPATA
1.50X1.50X0.40m 1.50X1.50X0.40m 1.50X2.00X0.40m 1.50X2.00X0.40m 1.50X2.00X0.40m 1.50X1.50X0.40m 1.50X1.50X0.40m
.75

.75
IPE240 IPE240
.75

.75
C C
CORTE TRANSVERSAL DE CUBIERTA EJE F
.75

.75
IPE200 IPE200
.75

.75
Cubierta #1
Escala 1:100
.75

.75
V104(30X40)

V104(30X40)
28.59

28.59
7TUBOS 38X76X2.0mm 7TUBOS 38X76X2.0mm
.75

.75
6.00

6.00
.75

.75
Lámina de Lámina de
alfajor 3.0mm alfajor 3.0mm
.75

.75
.75

.75
IPE240 IPE240
.75

.75
D D 1 4 7
.75

.75
IPE200 IPE200
30.00
.75

.75
.75

15.00 15.00

.75
V104(30X40)

V104(30X40)
7TUBOS 38X76X2.0mm 7TUBOS 38X76X2.0mm Cercha Cercha Cercha
.75

.75
6.00

6.00
(Ver detalle) (Ver detalle) (Ver detalle)
N+8.82m
.75

.75
Lámina de Lámina de
alfajor 3.0mm alfajor 3.0mm
N+7.82m
.75

.75
.75

.75
Ménsula Ménsula Ménsula Ménsula
IPE240 IPE240 Ver detalle concreto concreto concreto concreto N+6.50m
.75

.75
de conexión 01.
E E
.66

.66
IPE200 IPE200
.66

.66
IPE240 IPE240
V104(30X40)

V104(30X40)
7TUBOS 38X76X2.0mm 7TUBOS 38X76X2.0mm N+4.50m
.66

.66
4.59

4.59
Lámina de Lámina de
.66

.66
COLUMNA
alfajor 3.0mm alfajor 3.0mm
50X50

6.50

6.50

6.50
.66

.66
COLUMNA COLUMNA
.66

.66

4.50

4.50
50X50 50X50
.30 .61

.30 .61
V102(30X40) V102(30X40) V102(30X40) V102(30X40) V102(30X40) V102(30X40)
F F
1.50

1.50
V105(30X40) V105(30X40) V105(30X40) V105(30X40) V105(30X40)
1.05

1.05

Losa maciza e=0.10m Losa maciza e=0.10m Losa maciza e=0.10m Losa de contrapiso 0.15m Losa de contrapiso 0.15m
N+0.00m
.20

.20

A V103(20X40) V103(20X40) V103(20X40) V103(20X40) V103(20X40) V103(20X40) A


5.00 5.00 5.00 5.00 5.00 5.00

30.00 N-2.00m

CONTRAPESO CONTRAPESO CONTRAPESO CONTRAPESO


ZAPATA 1.50X1.50X0.50m 1.50X1.50X0.50m ZAPATA 1.50X1.50X0.50m 1.50X1.50X0.50m ZAPATA
2.00X2.00X0.40m 2.00X2.00X0.40m 2.00X2.00X0.40m
1 2 3 4 5 6 7

CORTE TRANSVERSAL DE CUBIERTA EJE E


PLANTA N+4.50m Cubierta #1
Escala 1:100
Cubierta #1
Escala 1:100

F E D C B A
28.59
1 4 7
4.59 6.00 6.00 6.00 6.00 30.00

VIGA Cercha 15.00 15.00


VIGA 150X100X3.0mm (Ver detalle)
Cercha
VIGA 150X100X3.0mm (Ver detalle) Cercha Cercha Cercha
Cercha N+10.50m
VIGA 150X100X3.0mm (Ver detalle) 6.03 1.53 (Ver detalle) (Ver detalle) (Ver detalle)
Cercha N+9.24m
150X100X3.0mm 1.53 1.53
Cercha (Ver detalle) 6.04
1.53 1.53
(Ver detalle) 6.03 1.53
1.53 1.53
VIGA 1.53
1.53 N+9.08m N+8.24m
6.03 1.53
1.53
150X100X3.0mm 1.19 1.53
4.64 1.53 Correa
1.19 1.53 Correa
1.19 1.53 100x100x3.0mm 100x100x3.0mm
Correa Ver detalle Ver detalle
1.19 Ménsula Ménsula Ménsula Ménsula
Correa 100x100x3.0mm de conexión 05. N+7.50m de conexión 01. concreto concreto concreto concreto N+6.50m
100x100x3.0mm
Correa Ver detalle
100x100x3.0mm de conexión 06.
VIGA
30X40
IPE240 IPE240
N+4.50m

N+4.50m COLUMNA
50X50
6.50

6.50

6.50
COLUMNA COLUMNA COLUMNA
VIGA 50X50
4.50

4.50
30X40 50X50 50X50

Losa de contrapiso 0.15m Losa de contrapiso 0.15m


N+0.00m
Losa de contrapiso 0.15m
N+0.00m

N-2.00m

CONTRAPESO CONTRAPESO CONTRAPESO CONTRAPESO


N-2.00m ZAPATA 1.50X1.50X0.50m 1.50X1.50X0.50m ZAPATA 1.50X1.50X0.50m 1.50X1.50X0.50m ZAPATA
2.00X2.00X0.40m 2.00X2.00X0.40m 2.00X2.00X0.40m

ZAPATA ZAPATA
1.50X2.00X0.40m 1.50X2.00X0.40m

CORTE TRANSVERSAL DE CUBIERTA EJE D


Cubierta #1
CORTE LONGITUDINAL DE CUBIERTA EJES 2,3,5 Y6 Escala 1:100

Cubierta #1
Escala 1:100
1 2 3 4 5 6 7
1 4 7
30.00
30.00

15.00 15.00
5.00 5.00 5.00 5.00 5.00 5.00
Cercha Cercha Cercha
(Ver detalle) (Ver detalle) (Ver detalle)
N+9.66m
V201(30X40) V201(30X40) V201(30X40) V201(30X40) V201(30X40) V201(30X40)
N+8.66m
.30
A A

Ver detalle
de conexión 01.
Ménsula Ménsula Ménsula Ménsula
concreto concreto concreto concreto N+6.50m
5.70
6.00

6.00
IPE240 IPE240
N+4.50m
COLUMNA
50X50

6.50

6.50

6.50
B B
.50

COLUMNA COLUMNA
.30 14.80 .30 14.80 .30

4.50

4.50
50X50 50X50
V203(30X40)

V204(30X40)

V203(30X40)
Losa de Losa de
contrapiso contrapiso
0.15m 0.15m N+0.00m
6.00

6.00
5.50

N-2.00m

CONTRAPESO CONTRAPESO CONTRAPESO CONTRAPESO


ZAPATA 1.50X1.50X0.50m 1.50X1.50X0.50m ZAPATA 1.50X1.50X0.50m 1.50X1.50X0.50m ZAPATA
2.00X2.00X0.40m 2.00X2.00X0.40m 2.00X2.00X0.40m
C C
.50

CORTE TRANSVERSAL DE CUBIERTA EJE C


V204(30X40)
V203(30X40)

V203(30X40)
28.59

28.59
Cubierta #1
Escala 1:100
6.00

6.00
5.50

1 4 7
D D
.50

30.00

15.00 15.00
V203(30X40)

V204(30X40)

V203(30X40)
Cercha Cercha Cercha
(Ver detalle) (Ver detalle) (Ver detalle)
N+10.08m
6.00

6.00
5.50

N+9.08m

Ver detalle Ver detalle Ver detalle


de conexión 01. de conexión 01. de conexión 01.

Ménsula Ménsula Ménsula Ménsula


E E
.50

concreto concreto concreto concreto N+6.50m


V203(30X40)

V204(30X40)

V203(30X40)
IPE240 IPE240
4.59

4.59
N+4.50m
4.09

COLUMNA
50X50

6.50

6.50

6.50
COLUMNA COLUMNA
F F
.50

4.50

4.50
50X50 50X50
1.50

1.50
V205(30X40) V205(30X40) V205(30X40) V205(30X40)
1.05
.20

Losa de Losa de
V202(20X40) V202(20X40) V202(20X40) V202(20X40) V202(20X40) V202(20X40) contrapiso contrapiso
0.15m 0.15m N+0.00m
5.00 5.00 5.00 5.00 5.00 5.00

30.00

N-2.00m

CONTRAPESO CONTRAPESO CONTRAPESO CONTRAPESO


1 2 3 4 5 6 7 ZAPATA 1.50X1.50X0.50m 1.50X1.50X0.50m ZAPATA 1.50X1.50X0.50m 1.50X1.50X0.50m ZAPATA
2.00X2.00X0.40m 2.00X2.00X0.40m 2.00X2.00X0.40m

PLANTA N+7.50m CORTE TRANSVERSAL DE CUBIERTA EJE B


Cubierta #1
Cubierta #1
Escala 1:100
Escala 1:100

CURADO DEL CONCRETO: NOTAS: NOTAS ESTRUCTURA METÁLICA: 3 4 5 6 7


1 2
Todos los curados recomendados serán mediante agua, las 24 horas del día, - Seguir las recomendaciones del estudio de suelos. 30.00
durante los primeros siete (7) dias de edad de los elementos estructurales. El - El Ingeniero de suelos aprobará el fondo de las excavaciones. - Verificar medidas en el sitio antes de iniciar la fabricación y el montaje
agua de curado se debe aplicar tan pronto sea posible, antes que la superficie - Antes de iniciar la construcción, se deben verificar cotas con - El fabricante elaborará los planos de taller con base en los presentes
5.00 5.00 5.00 5.00 5.00 5.00
llegue al punto de color mate y antes que se presenten fisuras en el concreto. planos arquitectónicos. planos de diseño. Los planos de taller deberán tener el visto bueno del
- La localización de ejes se debe realizar con planos arquitectónicos. interventor. Cercha Cercha Cercha
(Ver detalle) (Ver detalle) (Ver detalle)
Zapatas y vigas de amarre: Se debe mantener encharcada la superficie del - No realizar cambios sin consultar a los diseñadores de la - Aplicar pintura anticorrosiva y pintura de acabado, aplicadas en talleres bajo N+10.50m
concreto expuesta, mediante una lámina de agua de al menos 5mm de espesor; estructura.
rigurosos controles de calidad.
durante los primeros siete dias de edad. El agua se debe aplicar por aspersión - Seguir todas las recomendaciones de construcción contenidas
Espesor en mils según especificación del fabricante del producto
muy lenta antes que se llegue al punto de color mate o se presenten fisuras por en el Reglamento NSR-10.
- Colocar tapa en platina e= 1/4", para evitar elementos abiertos en N+9.08m
retracción plástica. - El refuerzo debe estar limpio y libre de grasas u otros productos
que puedan alterar la adherencia con el concreto o mortero. los extremos.
Ver detalle
Columnas: Tan pronto se retire el encofrado, se deben curar mediante envoltura - Durante la construcción, se requiere ensayos de verificación de - Tomar todas las medidas de precaución para que ni la estructura de acero de conexión 01.
en poliétileno, debidamente adherido al concreto para evitar efecto invernadero. resistencia. ni sus componentes ni conexiones, queden en contacto con el suelo, la N+7.50m
La superficie expuesta se debe mantener encharcada con una lámina de agua de - No se permiten tuberías embebidas en vigas y columnas. humedad y demás agentes que puedan afectar su durabilidad.
5mm de espesor mínimo, incluso desde antes de retirar el encofrado de la - Retocar pintura anticorrosiva y de acabado, por soldaduras en obra,
columna. Mantener durante los primeros siete dias de edad. PARÁMETROS DE DISEÑO SISMO RESISTENTE: de idénticas características a las aplicadas en taller. VIGA VIGA VIGA VIGA VIGA VIGA
30X40 30X40 30X40 30X40 30X40 30X40
Losas: Se debe mantaner encharcada la superficie del concreto expuesta, Localización: Palermo - Huila
mediante una lámina de agua de 5mm despesor mínimo; durante los primeros Amenaza Sísmica: Alta ACERO ESTRUCTURAL:
siete dias de edad. El agua se debe aplicar por aspersión muy lenta antes que se Aa=0.25 Av=0.25 N+4.50m
llegue al punto de color mate o se presenten fisuras por retracción plástica y Fa=1.30 Fv=1.90
evitando que el agua haga lavado de pasta de cemento. fy=351.5 MPa grado 50 para perfiles tubulares y correas.
Grupo de uso II I =1.10
fy=253 MPa grado A-36 para platinas y pernos.
Escaleras: Se deben curar similar a las losas. VIGA VIGA VIGA VIGA VIGA VIGA
MATERIALES: Soldadura E70XX 30X40 30X40 30X40 30X40 30X40 30X40
COLUMNA COLUMNA COLUMNA COLUMNA COLUMNA COLUMNA COLUMNA
Tanques y vigas canales: Se deben mantener inundadas las losas de fondo y de - CONCRETOS: 50X50 50X50 50X50 50X50 50X50 50X50 50X50
cubierta, con una lámina de 10 cm para la losa de fondo y 5 mm para la losa de
cubierta. Las superficies expuestas se deben mantener completamente húmedas, Concreto de limpieza f'c= 14 MPa (2000 PSI).
durante los siete primeros días de edad. Se debe realizar la prueba de Concreto estructural f'c= 21 MPa (3000 PSI) para vigas
estanqueidad antes de poner en servicio el tanque. Tan pronto sea posible, los Concreto estructural f'c= 28 MPa (4000 PSI) para columnas Losa de Losa de Losa de
contrapiso contrapiso contrapiso
tanques y vigas canales se deben llenar con agua potable para completar su N+0.00m
0.15m 0.15m 0.15m
curado. - ACERO DE REFUERZO:

Otros elementos: En general, todos los concretos se deben curar mediante agua fy = 420 MPa (60.000 PSI) para barras y mallas electrosoldadas
durante los primeros siete dias de edad del concreto, comenzando muy temprano,
antes de que se evapore la lámina superficial de agua de exudación. N-2.00m

DURABILIDAD DEL CONCRETO: El diseño de la mezcla debe incluir los ZAPATA ZAPATA ZAPATA ZAPATA ZAPATA ZAPATA ZAPATA
requisitos de durabilidad de acuerdo con las categorías y clases de exposición de 1.50X1.50X0.40m 1.50X1.50X0.40m 1.50X2.00X0.40m 1.50X2.00X0.40m 1.50X2.00X0.40m 1.50X1.50X0.40m 1.50X1.50X0.40m
acuerdo con los artículos C.4.2.1 Y C.4.3.1 de NSR-10.

Todos los concretos que se localicen por debajo de la superficie del terreno,
deben tener impermeabilizante integral. CORTE TRANSVERSAL DE CUBIERTA EJE A
Cubierta #1
Escala 1:100
1 2 3 4 5 6 7 1 2 3 4 5 6 7

30.00 5.00 5.00 5.00 5.00 5.00 5.00

5.00 5.00 5.00 5.00 5.00 5.00 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50

Cercha Cercha
Platina 3/8" Platina 3/8" Platina 3/8" Platina 3/8" Platina 3/8" Platina 3/8" Platina 3/8"
(Ver detalle) (Ver detalle)

A A A A

TEMPLETE

TEMPLETE
1.50

1.50
.30 4.70 .50 4.50 .50 4.60 .30 4.60 .50 4.50 .50 4.70 .30

VIGA 100X150X3.0mm

VIGA 100X150X3.0mm

VIGA 100X150X3.0mm
VIGA 100X150X3.0mm

VIGA 100X150X3.0mm

VIGA 100X150X3.0mm
CORREA 100X100X3.0mm
V301(30X40)

V302(30X40)

V301(30X40)

TEMPLETE

TEMPLETE
1.50

1.50
CORREA 100X100X3.0mm

6.00

6.00
6.00

6.00

CO

CO

CO

CO
TO
TO

TO
TEMPLETE

TEMPLETE
1.50

1.50
NT
N
EN

EN
NT

NT

NT

NT
IE

IE
VI

VI
RA

RA

RA

RA
V

AV
RA
RA

RA
VI

VI

VI

VI
TR
NT
NT

NT
EN

EN

EN

EN
Cercha Cercha

1.50

1.50
N
(Ver detalle) (Ver detalle)

CO
CO

CO

CO
Platina 3/8" Platina 3/8"

TO

TO

TO

TO
B B B B

TEMPLETE

TEMPLETE
1.50

1.50
Platina 3/8"

VIGA 100X150X3.0mm

VIGA 100X150X3.0mm

VIGA 100X150X3.0mm
VIGA 100X150X3.0mm

VIGA 100X150X3.0mm

VIGA 100X150X3.0mm
CORREA 100X100X3.0mm

TEMPLETE

TEMPLETE
1.50

1.50
CORREA 100X100X3.0mm

6.00

6.00
6.00

6.00

CO

CO

CO

CO
TO

TO

TO

TO
TEMPLETE

TEMPLETE
1.50

1.50
EN

EN

EN

EN
NT

NT

NT

NT
VI

VI

VI

VI
RA

RA

RA

RA
RA

RA

RA

RA
VI

VI

VI

VI
NT

NT

NT

NT
EN

EN

EN

EN
Cercha Cercha

1.50

1.50
(Ver detalle) (Ver detalle)

CO

CO

CO

CO
Platina 3/8" Platina 3/8"

TO

TO

TO

TO
C C C C

TEMPLETE

TEMPLETE

1.50
1.50
Platina 3/8"

VIGA 100X150X3.0mm

VIGA 100X150X3.0mm

VIGA 100X150X3.0mm
VIGA 100X150X3.0mm

VIGA 100X150X3.0mm

VIGA 100X150X3.0mm
CORREA 100X100X3.0mm

TEMPLETE

TEMPLETE
1.50

1.50
28.59

28.59
CORREA 100X100X3.0mm

6.00

6.00
6.00

6.00

CO

CO

CO

CO
TO

TO

TO

TO
TEMPLETE

TEMPLETE
1.50

1.50
EN

EN

EN

EN
NT

NT

NT

NT
VI

VI

VI

VI
RA

RA

RA

RA
RA

RA

RA

RA
VI

VI

VI

VI
NT

NT

NT

NT
EN

EN

EN

EN
Cercha Cercha

1.50

1.50
(Ver detalle) (Ver detalle)

CO

CO

CO

CO
Platina 3/8" Platina 3/8"

TO

TO

TO

TO
D D D D

TEMPLETE

TEMPLETE
1.50

1.50
Platina 3/8"

VIGA 100X150X3.0mm

VIGA 100X150X3.0mm

VIGA 100X150X3.0mm
VIGA 100X150X3.0mm

VIGA 100X150X3.0mm

VIGA 100X150X3.0mm
CORREA 100X100X3.0mm

TEMPLETE

TEMPLETE
1.50

1.50
CORREA 100X100X3.0mm

6.00

6.00
6.00

6.00

CO

CO

CO

CO
TO

TO

TO

TO
TEMPLETE

TEMPLETE
1.50

1.50
EN

EN

EN

EN
NT

NT

NT

NT
VI

VI

VI

VI
RA

RA

RA

RA
RA

RA

RA
VI

VI

VI

VI
TR
NT

NT

NT
EN

EN

EN

EN
Cercha Cercha

1.50

1.50
N
(Ver detalle) (Ver detalle)

CO

CO

CO

CO
Platina 3/8" Platina 3/8"

TO

TO

TO

TO
TEMPLETE

TEMPLETE
E E
E E TO

VIGA 100X150X3.0mm

VIGA 100X150X3.0mm
VIGA 100X150X3.0mm

VIGA 100X150X3.0mm

VIGA 100X150X3.0mm
VIGA 100X150X3.0mm
1.15
Platina 3/8" E N
CORREA 100X100X3.0mm A VI
R

TEMPLETE

TEMPLETE
NT

1.15
C O

4.59

4.59

4.59
C C C
4.59

4.59
T O ON T O ON O
NT TO ON

1.15
IE
N TR
IE
N TR R EN TR

TEMPLETE

TEMPLETE
AV AV AV I AV
R A V
IE R A V
IE IE RAV IE
T N NT NT NT NT NT

1.15
N Platina 3/8" TO O O O
F CO CO CO F
F F

1.50

1.50
Cercha Cercha
Platina 3/8" (Ver detalle) Platina 3/8" Platina 3/8" Platina 3/8" (Ver detalle) Platina 3/8"

5.00 5.00 5.00 5.00 5.00 5.00

5.00 5.00 5.00 5.00 5.00 5.00

30.00 30.00

1 2 3 4 5 6 7 1 2 3 4 5 6 7

PLANTA N+9.08m PLANTA DE CUBIERTA


Cubierta #1 Cubierta #1
Escala 1:100 Escala 1:100

COLUMNAS C6
COLUMNAS C5 Son: 7
COLUMNAS C4 N+9.08m Son: 3 N+9.08m
COLUMNAS C3

.40 .42

5
Son: 3

.40
COLUMNAS C2

5
COLUMNAS C1 Son: 3

c/.095

c/.095
c/.095

1.18

1.18
13

13
13
Son: 3
c/.095

N+7.50m N+7.50m N+7.50m N+7.50m N+7.50m N+7.50m


.74

Son: 7
.40 .32

4
.40

.40

.40

.40

.40
5

5
4 5 114.6

2 6 115.6

2 6 1120
6 6 112.4

4 5 119
0.50x0.50
c/.095

c/.095

c/.095

c/.095

c/.095

c/.095
2.60

2.60

2.60

2.60

2.60

2.60
28

28

28

28

28

28
0.50x0.50
0.50x0.50 125E 3 18.0
N+4.50m N+4.50m N+4.50m 0.50x0.50 N+4.50m N+4.50m 120E 3 18.0 N+4.50m 0.40x0.40x0.10
0.50x0.50 115E 3 18.0 0.40x0.40x0.10
.40

.40

.40

.40

.40

.40
250E 3 13.4
5

5
0.50x0.50 110E 3 18.0 0.40x0.40x0.10 240E 3 13.4
6 6 108.2

6 6 108.2

0.17x0.40x0.10
106E 3 18.0 0.40x0.40x0.10 230E 3 13.4 0.17x0.40x0.10
2 6 103

4 5 102

4 5 102

2 6 102
2 6 99.8

4 5 98.8

4 5 98.8

2 6 99.8

102E 3 18.0 0.40x0.40x0.10 220E 3 13.4 0.17x0.40x0.10


0.40x0.40x0.10
6 112.4

6 115.6

5 114.6
212E 3 13.4 0.17x0.40x0.10

6 120

5 119
204E 3 13.4
c/.095

c/.095

c/.095

c/.095

c/.095

c/.095
0.17x0.40x0.10
4.10

4.10

4.10

4.10

4.10

4.10
43

43

43

43

43

43
0.17x0.40x0.10
6

4
N+0.00m N+0.00m N+0.00m N+0.00m N+0.00m N+0.00m
c/.095

c/.095

c/.095

c/.095

c/.095

c/.095
2.00

2.00

2.00

2.00

2.00

2.00
21

21

21

21

21

21
N-2.00m N-2.00m N-2.00m N-2.00m N-2.00m N-2.00m

.50

Malla M-1.88 Ø6mm c/.15 Malla M-1.88 Ø6mm c/.15 Malla M-1.88 Ø6mm c/.15 Malla M-1.88 Ø6mm c/.15 Malla M-1.88 Ø6mm c/.15 Malla M-1.88 Ø6mm c/.15
ambas direcciones ambas direcciones ambas direcciones ambas direcciones ambas direcciones ambas direcciones
.30 .10

.10

.50
.40
.40 .40
VIGA 30X40 VIGA 30X40 VIGA 30X40 VIGA 30X40 VIGA 30X40 VIGA 30X40 VIGA 30X40
.30 4.80 .30 4.70 .30 4.70 .30 4.70 .30 4.70 .30 4.80 .30

.40 .17
E#318.0 E#313.4
DETALLE DE LOSA MACIZA CORTE A-A
Cubierta #1 SECCIÓN COLUMNA 0.50x0.50
Escala 1:50 Escala 1:20
VIGAS DE CIMENTACIÓN CUADRO DE GANCHOS CUADRO DE TRASLAPOS
Escala 1:100
VIGAS NIVEL N+7.50m VARILLA No. 90° 180° VIGAS AÉREAS VIGAS DE COLUMNAS
1 2 3 4 5 6 7 Escala 1:100 2 0.10 0.10 INFERIOR SUPERIOR CIMENTACIÓN
3 0.15 0.15 0.50 0.50 0.50 1.00
.60
VC101 3 4 120 3 4 106
.60
3 4 94
1
.70
2 3 4 5 6 7
4 0.20 0.15 0.50 0.50 0.60 1.00
3 5 29.5 .70 .70 5 0.25 0.20 0.70 0.70 0.80 1.00
0.30x0.35 V201 3 5 60 3 5 104 3 5 110
.70
3 5 33.5 6 0.30 0.20 0.70 0.70 0.90 1.00
7 0.35 0.25 1.10 1.00 1.10 1.10
0.30x0.40
280E 3 09.0 11 7 8 10 11 11 10 8 7 11 19 16 11 11 6 8 11 11 19 16 11 11 10 8 7 11 8 0.40 0.25 1.40 1.40 1.20 1.20
0.15x0.20x0.10 c/.075 c/.15 c/.075 c/.15 c/.075 c/.075 c/.15 c/.075 c/.15 c/.075 c/.075 c/.15 c/.075 c/.075 c/.15 c/.075 c/.15 c/.075 c/.075 c/.15 c/.075 c/.075 c/.15 c/.075 c/.15 c/.075 Nota:
257E 3 12.8 11 4 8 8 11 11 6 31 11 16 11 27 8 11 11 16 11 11 6 12 5 11
0.22x0.32x0.10 Utilizar los traslapos mínimos de este cuadro, a menos
c/.085 c/.17 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.17 c/.085 que el despiece indique algo diferente.
.60 .60
.60 .60 3 4 112 3 4 30
3 4 100
3 4 30
.70 .70
3 5 30
NOMENCLATURA REFUERZO
.70 3 5 120
Son: 2 3 5 90 3 5 90

Es: 1
1-7 4 A=Cantidad de barras. Ejemplo: 5
5 # 475 B=Número de la barra. Ejemplo: #4
3 4 50.5 3 4 93 C=Longitud de la barra en decímetros
VC102 VC103 1
.70
2 3 4 5 6 7
A B C Ejemplo: 75
2 5 29 .70 .70 Son 5 barras N°4 Longitud 7.50m
0.30x0.35 0.30x0.35 V202 2 5 60 2 5 105 2 5 110
.70
2 5 33

0.20x0.40
41E 3 09.0 11 19 11 82E 3 09.0 11 19 11 11 19 11 DETALLE TRASLAPO MALLAS
0.15x0.20x0.10 0.15x0.20x0.10
c/.075 c/.15 c/.075 c/.075 c/.15 c/.075 c/.075 c/.15 c/.075 266E 3 10.8 11 5 8 9 11 11 6 32 11 17 11 28 9 11 11 17 11 11 7 12 6 11 ELECTROSOLDADAS
0.12x0.32x0.10 c/.085 c/.17 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.085 c/.085 c/.085 c/.085 .05 mínimo

3 4 50.5 3 4 93
.70 .70
.70 2 5 120 2 5 30
Son: 8 Son: 4 2 5 90 2 5 90
.25 mínimo
Es: 1
F E D C B A ESQUEMA GANCHOS A 90°
.60 .60
3 4 40.4 .60
VC104 3 4 97 3 4 120 3 4 54.5
F E
.70
D C B F

3 5 90 3 5 77 .70 .70 3 5 21.5


0.30x0.35 V203 3 5 60 3 5 41.4 V205
0.30x0.40 0.30x0.40
264E 3 09.0 11 8 29 11 27 11 26 6 8 10 11 11 27 11 18 6 8 14 11
0.15x0.20x0.10 Nota: La longitud de corte debe ser menor que y , para
c/.075 c/.15 c/.075 c/.075 c/.15 c/.075 c/.075 c/.15 c/.075 c/.15 c/.075 c/.075 c/.15 c/.075 c/.075 c/.15 c/.075 c/.15 c/.075 203E 3 12.8 12 11 10 19 11 6 8 13 11 11 11 32 11 7 8 11 11 12E 3 12.8 12 que se respete la medida .
0.22x0.32x0.10 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.17 c/.085 c/.085 c/.085 c/.085 c/.085 c/.17 c/.085 c/.17 c/.085
0.22x0.32x0.10 c/.085
.60 .60
3 4 120
.60
3 4 40 ESQUEMA GANCHOS A 180°
3 4 31.9 3 4 120
.70 .70
3 5 90
Son: 3 3 5 51.4 3 5 120 3 5 21.5

Son: 2 Son: 4

F E D C B Nota: La longitud de corte debe ser ligeramente mayor que y


VIGAS NIVEL N+4.50m .70 , para que se respete la medida .
2 6 90 2 6 77 .70 .70
Escala 1:100 V204 2 6 60 2 6 42.4
1 2 3 4 5 6 7
2 5 35 2 5 40 2 5 40 2 5 40 2 5 25
.70 .70
0.30x0.40
3 5 29.5 .70
V101 3 5 60 3 5 104 3 5 110
.70
3 5 33.5 RECUBRIMIENTOS
257E 3 12.8 12 11 10 19 11 6 8 13 11 11 11 32 11 7 8 11 11
0.30x0.40 0.22x0.32x0.10 Se deben prever los recubrimientos indicados en los detalles
c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.17 c/.085 c/.085 c/.085 c/.085 c/.085 c/.17 c/.085 c/.17 c/.085
y según tamaño de estribos. En caso de no estar especificado,
257E 3 12.8 11 4 8 8 11 11 6 31 11 16 11 27 8 11 11 16 11 11 6 12 5 11 usar los siguientes recubrimientos
0.22x0.32x0.10 c/.085 c/.17 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.17 c/.085 .70 .70
3 5 90 Elemento Recubrimiento (mm)
3 5 51.4 3 5 120

Es: 1 Concreto colocado directamente sobre


.70 75
.70 .70 3 5 30 el suelo y en contacto con la tierra
3 5 90 3 5 120
3 5 90
Concreto expuesto a la intemperie o
Es: 1 50
en contacto con suelo de rellenos

VIGAS NIVEL N+9.08m Losas. muros y viguetas 20


1 2 3 4 5 6 7
.70 Escala 1:100 Estribos y espirales de vigas y columnas 40
3 5 29.5 .70 .70
V102 3 5 60 3 5 104 3 5 110
.70
3 5 33.5 A B A B
Refuerzo principal de vigas y columnas 40
0.30x0.40 1 5 40 1 5 40 3 5 69
V301 3 5 69 V302
2 4 68
257E 3 12.8 11 4 8 8 11 11 6 31 11 16 11 27 8 11 11 16 11 11 6 12 5 11 0.30x0.40 0.30x0.40
0.22x0.32x0.10 c/.085 c/.17 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.17 c/.085 .50 .40 .50
44E 3 12.8 11 22 11 44E 3 12.8 11 22 11
.70
0.22x0.32x0.10 c/.085 c/.17 c/.085
0.22x0.32x0.10 c/.085 c/.17 c/.085
.70 .70 3 5 30
3 5 90 3 5 120
3 5 90
5#5 L=2.42
Es: 1 3 5 69 3 5 69 N+6.50m .79

Son: 2 Es: 2

.11 .11 .11 .11 .11 .10


1 2 3 4 5 6 7

.30

.23
.70 .70
2 5 29 .70
V103 2 5 60 2 5 105 2 5 110
.70
2 5 33

.60
.65
0.20x0.40

.30
266E 3 10.8 11 5 8 9 11 11 6 32 11 17 11 28 9 11 11 17 11 11 7 12 6 11 .75
0.12x0.32x0.10 c/.085 c/.17 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.085 c/.085 c/.085 c/.085 c/.085
DETALLE DE CONEXIÓN 01 - CONEXIÓN COLUMNA DE CONCRETO CON CERCHA METÁLICA
.70 .70
.70 2 5 120 2 5 30
2 5 90 2 5 90
.40
Es: 1
400

0
Variable
Pedestal en concreto

.1
F E D C B A 50 150 150 50
.70 Platina 400x400x19.05(3/4")
3 5 90 3 5 77 .70 .70
V104 3 5 120 3 5 41.4
1 5 30 1 5 40 1 5 40 1 5 40 1 5 40 1 5 25

50
0.30x0.40 Columna 100x100x3.0mm 2E #3 c/0.11 L=2.58
.90 1E #3 c/0.11 L=2.49
253E 3 12.8 12 11 10 19 11 6 8 13 11 11 11 32 11 22 11 32 11 11 1E #3 c/0.11 L=2.19
0.22x0.32x0.10 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085 c/.17 c/.085 c/.085 c/.085 c/.085 c/.085 c/.17 c/.085 c/.085 c/.17 c/.085
400 1E #3 c/0.11 L=1.90

300
1E #3 c/0.11 L=1.60 VISTA FRONTAL
Escala 1:20
.70 .70
.70 3 5 90 3 5 54
3 5 51.4 3 5 120
Viga 100x100x3.0mm
50

Son: 2 DETALLE MÉNSULA DE CONCRETO REFORZADO


Escala 1:20
F
.30 Cartela e=1/4" 6 Ø5/8"
3 5 21.5
V205 .30 .20

0.30x0.40 DETALLE DE PLATINA 35 Columna.


.20
.35

.10 Cubierta #1
.10 .10
.40

12E 3 12.8 Escala 1:10


.40

12 .32 .32 Pedestal


.15 Viga de cimentación.

100
0.22x0.32x0.10 c/.085 E#3 09.0
Refuerzo longitudinal Estribos
.05

.22 .12 70
Concreto de limpieza
E#312.8 E#310.8
.05 .05
3 5 21.5
VIGA DE CIMENTACIÓN SECCIÓN 0.30x0.40 SECCIÓN 0.20x0.40 DETALLE CARTELA

.50
Son: 5 Escala 1:20
SECCIÓN 0.30x0.35 Escala 1:20 Cubierta #1

.05

.15
Escala 1:20 Escala 1:10
VAR. 1.50

Columna 100x100x3.0mm
Zapata.
5/16" BxL
Típ.
Viga 100x100x3.0mm
Dilatación en icopor 0.01
DETALLE DE ARMADURA DE CONTRAPESO
Cubierta #1
.15

Platina 400x400x19.05(3/4") Escala 1:25

Placa de contrapiso.
2 Mallas M-1.88 Ø6.5mm c.15
Relleno en material seleccionado. ambas direcciones 6 Ø5/8"
350
1.10

120
100 100
.15

100 100
2.00

9.8
8.5
Rellenos en sub-base granular 3

150
5.6 6.2 3 2.5

200

240

100

100
.40

150 150
Arandela y doble tuerca
.35

Pedestal en concreto
PT1 PT2 PT3
IPE-200 IPE-240 100X100X3.0mm 100X100X3.0mm 100X100X3.0mm
LOSA DE CONTRAPISO h=0.15m
.40

.075 500
.075

Viga de cimentación.
Cubierta #1
Escala 1:20 ANCLAJE DE PLACA BASE
.05

L1xL2

Refuerzo
(Ver cuadro)
Concreto de
limpieza
A COLUMNA
Cubierta #1
DETALLE DE PERFILES METÁLICOS
Escala 1:10
CORTE TÍPICO DE ZAPATA EXCÉNTRICA Cubierta #1
Cubierta #1
Escala 1:25
Escala 1:10
REFERENCIAS Y SIMBOLOGÍA
Ver detalle Para la representación de los símbolos de soldaduras se consideran las indicaciones de la norma
Ver detalle 30.05 de conexión. ANSI/AWS A2.4-98 'STANDARD SYMBOLS FOR WELDING, BRAZING, AND NONDESTRUCTIVE
EXAMINATION'.
de conexión 02.
MÉTODO DE REPRESENTACIÓN DE SOLDADURAS
PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1
1. 1. 1. 1. 1. 1. Conforme a la figura 2 de ANSI/AWS A2.4-98 y a los tipos de soldaduras empleadas en este proyecto,
27 27 27 27 27 27 27 27 27 27 27 se desarrolla el siguiente esquema de representación de una soldadura:

1.

1.

1.

1.

1.

1.

1.

1.

1.

7
1. 1. 1. 1. 1.

2
27

27

27

27

27

27

27

27

27

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.
PT PT PT

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2

PT2
PT1

PT1
.90

.90
PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

2
2

2
2 2 2

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT
PT

PT

PT
Referencias:

2
1: flecha (conexión entre 2 y 6)
2: línea de referencia
PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 PT1 5 3: símbolo de soldadura
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 4: símbolo soldadura perimetral.
2
4 5: símbolo de soldadura en el lugar de montaje.
1 D 6: línea del dibujo que identifica la unión propuesta.
Ver detalle Ver detalle S(E) L S: profundidad del bisel. En soldaduras en ángulo, es el lado del
de conexión 04. de conexión 03. 3 cordón de soldadura.
6 (E): tamaño del cordón en soldaduras a tope.
DETALLE DE CERCHA L: longitud efectiva del cordón de soldadura
D: dato suplementario. En general, la serie de electrodo a utilizar
Escala 1:50 y el proceso precualificado de soldeo.
La información relacionada con el lado de la unión soldada a la que apunta la flecha, se coloca por
debajo de la línea de referencia, mientras que para el lado opuesto, se indica por encima de la línea de
referencia:

OS OS OS
AS AS AS

AS OS AS AS

OS

OS

Donde:

DETALLE DE CONEXIÓN 02 DETALLE DE CONEXIÓN 03 DETALLE DE CONEXIÓN 04 OS(Other Side): es el otro lado de la flecha
AS(Arrow Side): es el lado de la flecha

Referencia 3
.10
.10 Designación Ilustración Símbolo

2.5

.10
4/16' Soldadura de filete
4/16' 3 0

.1
SMAW

.1
0
.1

.10

.1
SMAW .10

0
E70XX E70XX

2. Soldadura a tope en 'V' simple (con chaflán)


Cordón 3 5

5
Montante

.10

2.
100x100x3.0mm 100x100x3.0mm
Montante
100x100x3.0mm Soldadura a tope en bisel simple
E70XX Diagonal Diagonal
SMAW 100x100x2.5mm 100x100x2.5mm
4/16'
4/16'
Diagonal SMAW Soldadura a tope en bisel doble
E70XX

45°

45°
.10
100x100x2.5mm
Montante .10

.1
100x100x3.0mm

.1

0
Cordón 3 Soldadura a tope en bisel simple con talón de raíz amplio

.10
100x100x3.0mm
.10 Cordón 3

.10
DETALLE DE SOLDADURA: 100x100x3.0mm

5
2.
Soldadura combinada a tope en bisel simple y en ángulo
3
MONTANTE A CORDÓN 4/16' 4/16'
.10

ALZADO SMAW
4/16'
E70XX
4/16'
E70XX
SMAW
SMAW
E70XX E70XX
SMAW

Escala 1:10 Escala 1:10


Soldadura a tope en bisel simple con lado curvo

SMAW
4/16' 4/16'
SMAW
DETALLE DE SOLDADURA:
ALZADO E70XX E70XX
DIAGONALES A CORDÓN
Escala 1:10 ALZADO NORMA:
UNIONES SOLDADAS ENTRE PERFILES TUBULARES

Escala 1:10
Escala 1:10 ANSI/AISC 360-10. Chapter K - K2. HSS to HSS truss connections.

MATERIALES:
- Perfiles (Material base): ASTM A 572 50 ksi .
- Material de aportación (soldaduras): Electrodos de la serie E70XX. Para los materiales empleados
y el procedimiento de soldadura SMAW (Arco eléctrico con electrodo revestido), se cumplen las
condiciones de compatibilidad entre materiales exigidas por el artículo J.2.6.

DISPOSICIONES CONSTRUCTIVAS:
1) Cada tubo se soldará en todo su perímetro de contacto con los otros tubos.

2) Se define como ángulo diedro el ángulo medido en el plano perpendicular a la línea de soldadura,
formado por las tangentes a las superficies externas de los tubos que se sueldan entre sí.

3) Para ángulos diedros mayores que 100 grados se deberá realizar soldadura a tope,
PT2 independientemente del espesor del tubo que se suelda.

4) Los tubos de espesor igual o superior a 8 mm se soldarán a tope, excepto en las zonas en las que
DETALLE DE CONEXIÓN 05 DETALLE DE CONEXIÓN 06 el ángulo diedro es agudo y pueda realizarse correctamente la soldadura en ángulo.

5) Los tubos de espesor inferior a 8 mm se pueden soldar con cordones de soldadura en ángulo.

6) En soldaduras a tope, el ángulo del bisel mínimo es de 45 grados.


.10
Montante cercha
4/16'
100x100x3.0mm SMAW 7) En los detalles se indican los distintos tipos de cordones necesarios en el perímetro de soldadura
E70XX
de los tubos.
.10

3.0 COMPROBACIONES:
30mm 30mm VARIABLE. Los cordones de soldadura se han dimensionado de tal manera que su resistencia sea igual o
CORREA
.10 superior a la de la más débil de las piezas unidas. Para ello, se han tenido en cuenta las
Viga ROSCA DE LA VARILLA prescripciones y detalles indicados en la parte D de la norma AWS D1.1/D1.1M:2002.

30mm
100x150x3.0mm

30mm
Correa
.15

100x100x3.0mm
3.0

TUERCA Y ARANDELA TEMPLETE TIPO TUERCA


4/16'
SMAW
E70XX
Viga VARILLA ARANDELA
100x150x3.0mm Columna en concreto
4/16'
E70XX
SMAW DETALLE DE SOLDADURA: TEMPLETE TIPO
400
60mm 60mm Platina 400x600x12.7(5/8")
VIGA A CERCHA VARILLA
70 260 70

DETALLE DE SOLDADURA: Escala 1:10

50
EXTREMO ROSCADO
Viga IPE240
CORREA A VIGA PT1

DETALLE TEMPLETE EN Ø3/8

167
Escala 1:10
Sin escala DETALLE TÍPICO CONEXIÓN DE
PERFILES CERCHA

600

167
Platina e=3/8"
Sin escala

167
8 Ø5/8"
CERCHA CERCHA

50
Arriostramiento lateral Contraviento 1/2" SMAW
Arriostramiento lateral 3/16" 937
Ángulo 121 "x121 "x16
3
" Platina 3/8" Contraviento 1/2"
Ángulo 121 "x121 "x16
3
" 2PT1 E70XX

2PT1
E70XX 3/16"
SMAW E70XX

250
3/16"
500
SMAW
E70XX 3/16" Platina e=3/8"
SMAW
Perforación 9/16"

ANCLAJE DE VIGA IPE


PLANTA CONEXIÓN DE ISOMETRICO CONEXIÓN DE
CORTAVIENTOS DETALLE DE CARTELA COLUMNA EN CONCRETO
DETALLE ARRIOSTRAMIENTO LATERAL CERCHA Escala 1:20 CORTAVIENTOS Escala 1:10
Escala 1:20 Escala 1:10
Escala 1:25

DETALLE DE CONEXIÓN 09 Platina 400x600x12.7(5/8")


DETALLE DE CONEXIÓN 08
Columna en concreto 350 5/16"
Típ.

PERFIL PTE

167
Platina e=3/8"
70 5/16"
Viga PTE 100x200x2.5mm E70XX
100

167
4.76 Perfil Angular 2.5"x2.5"x3/16"
64

64
Cartela e=1/4" Platina e=3/8"
100
100

167
SECCIÓN DIAGONALES Platina e=3/8"
ANGULO L 2.5"x2.5"x3/16"
150

Escala 1:5
Perfil Angular 2.5"x2.5"x3/16"
PERFIL PTE 5/16"
150 Típ.
Viga PTE 100x100x2.5mm 5/16" E70XX 100

PL e= 3/8" Arandela y doble tuerca


21

Cartela e=1/4" 5/16" 70


DETALLE DE CARTELA
2

E70XX 8 Ø5/8"
250

Escala 1:10 Columna PTE 100x100x3.0mm 100


100

250 5/16" 70 500 950


E70XX
DETALLE DE CARTELA
Escala 1:10
PERFIL PTE DETALLE DE SOLDADURA
CONEXIÓN VIGA - COLUMNA DETALLE DE CONEXIÓN
Escala 1:10
Escala: 1:25
CONEXIÓN VIGA - DIAGONAL COLUMNA EN CONCRETO A IPE
Escala 1:10
Escala 1:20
5´ 5´ 6
5´ 6 6
5´ 6
4.00 4.00 1.20 4.00 1.20 4.00

1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30


VC103(30X30) .35 .35
1.00 1.00

F´ F´

.35

.35
PHR C 203X67X19X2.0mm
N+3.80m

.17

.17
F´ F´ Pedestal Pedestal F´ F´ PTE100X100X2.5mm N+3.50m
1.00

1.00

PTE 100X100X2.5
0.35x0.35m 0.35x0.35m

.82

.83

PTE 100X100X2.5
ZP-4 ZP-4 (ver detalle) (ver detalle)

2.80

2.80
.50 .50 .83 .17
TEMPLETE Angulo 2.5X2.5X3/16"
2.80

2.80

2.80

2.80
O CO
NT N TR
1.00 1.00 A VIE AV
VC103(30X30) .35 .35
TR IEN
ON
PTE100X100X3mm

C TO
ZP-4 ZP-4 G G

.35

.35
.50

.50
1.00

1.00
G G Pedestal Pedestal G G
.50

.50
0.35x0.35m 0.35x0.35m PHR C 203X67X19X2.0mm PTE 100X100X3mm
Detalle
.50 .50 .83 .17 (ver detalle) (ver detalle) N+0.05m de conexión 08
N+0.05m
VC104(30X30)

3.64

3.64
TEMPLETE
3.64

3.64

3.64

3.64
N-1.00m N-1.00m
VC104(30X30)
Zapata Aislada Zapata Aislada
1.00 1.00 1.00X1.00X0.30m 1.00X1.00X0.30m
VC103(30X30) .35 .35

ZP-4 ZP-4 H H 4.00

.35

.35
.50

.50
1.00

1.00

H H Pedestal Pedestal H H
.50

.50

0.35x0.35m 0.35x0.35m PHR C 203X67X19X2.0mm


.50 .50 .83 .17 (ver detalle) (ver detalle)
5´ 6

PTE 100X100X2.5

PTE 100X100X2.5
VC104(30X30)

VC104(30X30)

CORTE TRANSVERSAL EJES F´,K

4.88

4.88
TEMPLETE

18.28

18.28
4.88

4.88

4.88

4.88
Cubierta # 2
18.28

18.28

18.28

18.28
CO Escala 1:75
T O NT
IEN RA
A V VI
EN
1.00 1.00 N TR TO
VC103(30X30) .35 .35
CO 5´ 6
ZP-4 ZP-4 I I

.35

.35
.50

.50
1.00

1.00

I I Pedestal Pedestal I I
.50

.50

0.35x0.35m 0.35x0.35m PHR C 203X67X19X2.0mm

.50 .50 .83 .17 (ver detalle) (ver detalle)


1.20 4.00
VC104(30X30)

3.35

3.35
TEMPLETE
3.35

3.35

1.30 1.30 1.30 1.30

3.35

3.35
VC104(30X30)
PHR C 203X67X19X2.0mm
1.00
VC103(30X30)
1.00
.35 .35 N+3.80m
PTE100X100X2.5mm N+3.50m
ZP-4 ZP-4 J J

.35

.35
.50

.50
1.00

1.00

J J Pedestal Pedestal J J
.50

.50

0.35x0.35m 0.35x0.35m PHR C 203X67X19X2.0mm

.50 .50 .83 .17 (ver detalle) (ver detalle) Detalle

PTE 100X100X2.5

PTE 100X100X2.5
de conexión 09.

VC104(30X30)
3.61

3.61
TEMPLETE PTE100X100X3mm
3.61

3.61

3.61

3.61
CO
T O NT
VC104(30X30)
EN R
1.00 1.00
A VI AV PTE 100X100X3mm
IE
ZP-4 ZP-4 .35 .35
N TR NT N+0.05m N+0.05m
O
CO
.82

.82
1.00

1.00

K K
.35

.35
K K Pedestal Pedestal K K
.18

.18

.50 .50 .82 .18 0.35x0.35m 0.35x0.35m N-1.00m N-1.00m


VC103(30X30) (ver detalle) (ver detalle) Cubierta liviana tipo teja
4.00 termoacustica 1.20 4.00 Zapata Aislada Zapata Aislada
1.00X1.00X0.30m 1.00X1.00X0.30m

4.00 5.30
4.00

5´ 6
5´ 6 5´ 6 5´ 6

PLANTA DE CIMENTACIÓN PLANTA DE LOCALIZACIÓN DE PEDESTALES PLANTA DE CUBIERTA CORTE TRANSVERSAL EJES G,H,I,J
Cubierta #2
Cubierta #2 Escala 1:75 Cubierta #2 Cubierta # 4
Escala 1:75 Escala 1:75 Escala 1:75

F´ G H I J K F´ G H I J K

18.48 18.48

2.80 3.64 4.88 3.55 3.61 2.80 3.64 4.88 3.55 3.61

N+3.73m PTE100X100X2.5mm PTE100X100X2.5mm PTE100X100X2.5mm PTE100X100X2.5mm PTE100X100X2.5mm N+3.73m N+3.73m PTE100X100X2.5mm PTE100X100X2.5mm PTE100X100X2.5mm PTE100X100X2.5mm PTE100X100X2.5mm N+3.73m

Angulo 2.5X2.5X3/16" Angulo 2.5X2.5X3/16" Detalle Angulo 2.5X2.5X3/16" Angulo 2.5X2.5X3/16" Detalle
de conexión 09. de conexión 09.

PTE 100X100X3mm PTE 100X100X3mm PTE 100X100X3mm PTE 100X100X3mm PTE 100X100X3mm
PTE 100X100X3mm PTE 100X100X3mm PTE 100X100X3mm PTE 100X100X3mm PTE 100X100X3mm PTE 100X100X3mm
PTE 100X100X3mm
Detalle de Detalle de Detalle de Detalle de
conexión 08. conexión 08. conexión 08. conexión 08.

N+0.05m N+0.05m N+0.05m N+0.05m

N-1.00m N-1.00m N-1.00m N-1.00m


Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada
1.00X1.00X0.30m 1.00X1.00X0.30m 1.00X1.00X0.30m 1.00X1.00X0.30m 1.00X1.00X0.30m 1.00X1.00X0.30m 1.00X1.00X0.30m 1.00X1.00X0.30m 1.00X1.00X0.30m 1.00X1.00X0.30m 1.00X1.00X0.30m 1.00X1.00X0.30m

2.80 3.64 4.88 3.55 3.61 2.80 3.64 4.88 3.55 3.61

F´ G H I J K F´ G H I J K

CORTE LONGITUDINAL EJE 5´ CORTE LONGITUDINAL EJE 5´


Cubierta # 2 Cubierta # 2
Escala 1:75 Escala 1:75

.35
0.10
0.10 0.25
0.25
Dilatación en icopor 0.01 Placa de contrapiso.
.35

0.10
0.25
.35
E#3 12 G#3 4.5 5' 6 K J I H G F'
NE+0.00m 0.25
.10

Malla M-1.88 Ø6mm c.15 .60


.05

.60
ambas direcciones 2 4 47 2 4 21.4 2 4 120
CORTE A-A VC103 VC103 2 4 60
.30

8 #5 14.0 Escala 1:25


.15
8 #5 14.0

A A
0.90
1.00

0.30x0.30 0.30x0.30
.70
.30

Rellenos en material seleccionado


1.05

11 19 11 11 4 19 4 11 11 14 11 11 26 11 28 8 11 11 10 11
10 E#3 12+10 G#3 4.5
.40

.075 .30 41E 3 08.0 c/.06 c/.12 c/.06 212E 3 08.0 c/.06 c/.12 c/.06 c/.12 c/.06 c/.06 c/.12 c/.06 c/.06 c/.12 c/.06 c/.06 c/.12 c/.06 c/.06 c/.12 c/.06
+10 G#3 4.5 c/.10
.075

Viga de amarre. 0.15x0.15x0.10 0.15x0.15x0.10


.30

.075 .60
.60
.30

.15 2 4 120 2 4 55
.075 2 4 47 2 4 26.3
.30

0.25 .10
.075
.05

L1xL2 .15
Refuerzo
E#3 8.0 Son: 6 Son: 2
(ver cuadro)
Concreto de LOSA DE CONTRAPISO
.05

limpieza Cubierta #2
Concreto de limpieza
CORTE TÍPICO DE PEDESTAL Escala 1:20
CORTE TÍPICO DE ZAPATA Cubierta #2
Cubierta #2 Escala 1:25 VIGA DE CIMENTACIÓN
Escala 1:25 SECCIÓN 0.30x0.30
Escala 1:20
1 1´ 2 1 1´ 2 1 1´ 2 1 1´ 2
6.00
6.00 6.00

4.58 1.42
4.58 1.42 4.58 1.42
4.58 1.42

IPE 180 IPE 180

.82 .18

.83 .17
F´ F´ F´ F´

.45

.45

.45
F´ F´ F´ F´

1.00

1.00
4.58 1.42
.35 .35 .35
ZP-4 ZP-4 ZP-4

1.40

1.40
.17 .82 .50 .50 .50 .50

IPE 200

IPE 200

IPE 200
IPE 180
2.71

2.71

2.71

2.71

2.71

2.71

2.71

2.71
VC105(30X35) 1.00

1.31
1.40
.50 .50

.50 .50

.50 .50
1.00

IPE 180
G G G G

.45

.45

.45
ZP-4 ZP-4 ZP-4 .35 .35 .35
G G G G
IPE 180
.18 .82 .50 .50 .50 .50

1.89

1.89
VC107(30X35) VC107(30X35)

IPE 200

IPE 200
IPE 180
3.77

3.77

3.77

3.77

3.77

3.77

3.77

3.77
VC106(30X35)
1.00 1.00

1.89

1.89
.50 .50

.50 .50

IPE 180
1.00

1.00
H H H H

.45

.45
ZP-4 ZP-4
H H H H
.35 .35
.50 .50
.18 .82

1.89

1.89
VC107(30X35) VC107(30X35)

IPE 200

IPE 200
IPE 180
3.77

3.77

3.77

3.77

3.77

3.77

3.77

3.77
18.20

18.20

18.20

18.20
VC106(30X30) 1.20

18.20

18.20

18.20

18.20
1.20

1.89

1.88
1.46 1.46 1.46

ZP-5 ZP-5
.60

.60

IPE 180
1.20

1.20

I I IPE 180
I I

.45

.45
I I I I
.60

.60

.35 .35 .10 1.46 1.46 1.46 .10

1.50

1.50

PHR 203X67X19X2.0mm
203X67X19X2.0mm

PHR 203X67X19X2.0mm
.18 1.03 .60 .60

PHR 203X67X19X2.0mm
2.25
IPE 180

IPE 200

IPE 200
VC107(30X35) VC107(30X35)

IPE 200

IPE 200
4.50

4.50

4.50

4.50

4.50

4.50
1.50
TEMPLETE

4.50

4.50
1.50
IPE 180
.17 1.02 VC106(30X35)
1.20

PHR
2.25
Detalle de

1.50

1.50
ZP-5 ZP-5 conexión 11.
.60

.60

IPE 180 IPE 180


1.20

1.20

J J J J

.45

.45
J J J J
.60

.60

PHR 203X67X19X2.0mm

PHR 203X67X19X2.0mm

PHR 203X67X19X2.0mm
.35 .35

1.73
.18 1.03 .60 .60

1.72

1.72
VC107(30X35) VC107(30X35)

IPE 200

IPE 200
IPE 180

IPE 200

IPE 200
3.45

3.45

3.45

3.53

3.45
TEMPLETE

3.53

3.45

3.45
.17 1.03 .60 .60

1.73
ZP-5 ZP-5

1.73

1.73
.98

.98

1.20
1.20

IPE 180
K K K
.45
K

.45
.23

.23

K K K K
.35 .35 IPE 180
VC106(30X35) Losa Colaborante e=2" Cubierta liviana tipo teja
calibre 22 (0.75mm) h=10cm termoacustica
4.58 1.42 4.58 1.42 4.58 1.42 4.58 1.42

1 1´ 2 1 1´ 2 1 1´ 2 1 1´ 2

PLANTA DE CIMENTACIÓN PLANTA DE LOCALIZACIÓN DE PEDESTALES PLANTA DE DE SEGUNDO PISO N+3.00m PLANTA DE CUBIERTA
Pórtico Metálico Pórtico Metálico Pórtico Metálico Pórtico Metálico
Escala 1:75 Escala 1:75 Escala 1:75 Escala 1:75

F´ G H I J K
F´ G H I J K
18.20
18.20

2.71 3.77 3.77 4.50 3.45


2.71 3.77 3.77 4.50 3.45

Viga metálica Viga metálica


IPE 200 IPE 200 N+5.75m
Viga metálica Viga metálica
IPE 200 IPE 200 N+5.50m
2.75

Viga metálica Viga metálica Viga metálica


2.50

IPE 200 IPE 200 IPE 200

2.50
Viga metálica Viga metálica
N+3.00m IPE 200 IPE 200 N+3.00m Viga metálica Viga metálica Viga metálica Viga metálica Viga metálica
N+3.00m IPE 200 IPE 200 IPE 200 IPE 200 IPE 200 N+3.00m
Detalle de Detalle de Detalle de Detalle de Detalle de
conexión 13 conexión 13 conexión 13 conexión 13 conexión 13 Detalle de
Columna metálica Columna metálica Columna metálica Columna metálica Columna metálica Columna metálica conexión 13
3.0

3.0

IPE 220 IPE 220 IPE 220 IPE 220 IPE 220 IPE 220 Columna metálica 3.0 Columna metálica Columna metálica Columna metálica Columna metálica Columna metálica

3.0
IPE 220 IPE 220 IPE 220 IPE 220 IPE 220 IPE 220

N+0.05m N+0.05m
N+0.05m N+0.05m

Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada
1.00X1.00X0.40m 1.00X1.00X0.40m 1.00X1.00X0.40m 1.20X1.20X0.40m 1.20X1.20X0.40m 1.20X1.20X0.40m Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada
1.00X1.00X0.40m 1.00X1.00X0.40m 1.00X1.00X0.40m 1.20X1.20X0.40m 1.20X1.20X0.40m 1.20X1.20X0.40m
N-2.00m N-2.00m
N-2.00m N-2.00m

F´ G H I J K
F´ G H I J K
CORTE LONGITUDINAL EJE 1´ CORTE LONGITUDINAL EJE 1´
Pórtico Metálico
Escala 1:75 Pórtico Metálico
Escala 1:75

K J I H G F' 1 1' 2 1 1' G F' .30


.60
.60 3 4 66.5 3 4 52.3 3 4 34.1
3 4 74
VC107 3 4 69
VC105 VC106 VC108 .075 .15
100 100
67

.30
.10 3 2.5

100

100
1.5

203
.15
0.30x0.35 0.30x0.35 0.30x0.35 0.30x0.35 E#3 8.0 PT1 PT2
9 5 22 9 14 18 9 13 9 23 6 9 9 5 9 9 19 9 14 9 37 9 9 5 9 100X100X3 100X100X2.5 PHR C

.05
203X67X2
169E 3 09.0 c/.075 c/.15 c/.075 c/.075 c/.15 c/.075 c/.075 c/.15 c/.075 c/.075 c/.15 c/.075 c/.075 c/.15 c/.075 51E 3 09.0 c/.075 c/.15 c/.075 c/.075 51E 3 09.0 c/.075 c/.15 c/.075 23E 3 09.0 c/.075 c/.15 c/.075 Concreto de limpieza
0.15x0.20x0.10 0.15x0.20x0.10 0.15x0.20x0.10 0.15x0.20x0.10
PERFILES METALICOS
.60
3 4 120
.60
3 4 55
3 4 66.5 3 4 52.3 3 4 34.1
VIGA DE CIMENTACIÓN Cubierta #2
3 4 26
SECCIÓN 0.30x0.30 Escala 1:20
Son: 2 Son: 2 Son: 4 Son: 2 Escala 1:20
1 1´ 2 1 1´ 2 1 1´ 2

4.58 4.58
4.58

1.46 1.46 1.46 1.46 1.46 1.46


1.46 1.46 1.46

Viga metálica Correa PHR C Correa PHR C Viga metálica Correa PHR C
Viga metálica
N+5.75m IPE 180 203X67X19 (2.0mm)
N+5.75m IPE 180 203X67X19 (2.0mm) N+5.75m IPE 180 203X67X19 (2.0mm)
N+5.50m N+5.50m N+5.50m

Diagonal metálica Diagonal metálica


2.75

2.75
PTE100X100X3mm

2.50

2.75
PTE100X100X3mm

2.50
2.50
Viga metálica Viga metálica Viga metálica
N+3.00m IPE 180 N+3.00m N+3.00m N+3.00m N+3.00m IPE 180 N+3.00m
IPE 180

Columna metálica Columna metálica Columna metálica Columna metálica Columna metálica Columna metálica
IPE 220 IPE 220 IPE 220 IPE 220 IPE 220 IPE 220
Detalle de
Detalle de conexión 12 Detalle de
3.0

3.0

3.0

3.0
3.0

3.0
conexión 14 conexión 14
Detalle de Diagonal metálica Detalle de Diagonal metálica
N+0.05m conexión 15 PTE100X100X3mm N+0.05m N+0.05m conexión 15 PTE100X100X3mm N+0.05m
N+0.05m N+0.05m

Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada
1.20X1.20X0.40m 1.20X1.20X0.40m 1.20X1.20X0.40m 1.20X1.20X0.40m 1.20X1.20X0.40m 1.50X1.50X0.40m

N-2.00m N-2.00m N-2.00m N-2.00m N-2.00m N-2.00m

1 1´ 2 1 1´ 2 1 1´ 2

CORTE TRANSVERSAL EJE K CORTE TRANSVERSAL EJE J CORTE TRANSVERSAL EJE I


Pórtico Metálico Pórtico Metátlico
Pórtico Metálico
Escala 1:75 Escala 1:75
Escala 1:75

1 1´ 2 1 1´ 2 1 1´ 2

4.58 1.42 4.58 1.42


4.58
Detalle de
conexión 12
Viga metálica Viga metálica Viga metálica Viga metálica Viga metálica
N+3.00m N+3.00m N+3.00m N+3.00m N+3.00m IPE 180 IPE 180 N+3.00m
IPE 180 IPE 180 IPE 180

Columna metálica Columna metálica Detalle de Columna metálica Columna metálica Columna metálica Columna metálica Columna metálica Columna metálica
IPE 220 IPE 220 conexión 12 IPE 220 IPE 220 IPE 220 IPE 220 IPE 220 IPE 220

3.0

3.0
3.0

3.0
3.0

3.0

N+0.05m N+0.05m N+0.05m N+0.05m N+0.05m N+0.05m

Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada Zapata Aislada
1.00X1.00X0.40m 1.00X1.00X0.40m 1.00X1.00X0.40m 1.00X1.00X0.40m 1.00X1.00X0.40m 1.00X1.00X0.40m 1.00X1.00X0.40m 1.00X1.00X0.40m

N-2.00m N-2.00m N-2.00m N-2.00m N-2.00m N-2.00m

1 1´ 2 1 1´ 2 1 1´ 2

CORTE TRANSVERSAL EJE H CORTE TRANSVERSAL EJE G CORTE TRANSVERSAL EJE F´


Pórtico Metálico Pórtico Metálico
Pórtico Metálico
Escala 1:75 Escala 1:75 Escala 1:75

F´ G H .45
NE+0.00m
0.35
.05

Concreto 21 MPa (3000 PSI)


Relleno Seleccionado
2.71 3.77 Compactado

.35 Malla M-1.88 Ø6mm c.15


ambas direcciones
8 #5 26.0

A A
1.60

1.90

Viga metálica
N+3.00m N+3.00m 20 E#3 14+20 E#3 10.6 c/.10

.10
0.10
2.05

IPE 200
.45

0.35
0.10 0.18 Rellenos en material seleccionado
Viga metálica IPE
8 #5 21.2 0.25 0.25

.40
Detalle de
conexión 13 E#3 14 E#3 10.6
Malla electrosoldada 5.0mm cada 15cm
Columna metálica Columna metálica Conector de cortante Tipo Nelson
IPE 220 IPE 220 Lámina colaborante calibre 22 acero galvanizado, e=2". Stud 3/4" cada 45cm
Apuntalar en el centro de la luz durante la construcción
.075
CORTE A-A LOSA DE CONTRAPISO
en las vigas metálicas
.40

Apuntalar vigas metálicas durante


N+0.05m N+0.05m Escala 1:25 el fraguado (al menos 21 días)
.075

Pórtico Metálico
0.35
Escala 1:20

Zapata Aislada Zapata Aislada


1.00X1.00X0.40m 1.00X1.00X0.40m CORTE TÍPICO DE PEDESTAL DETALLE APOYO LOSA
Pórtico Metálico
Escala 1:25
SOBRE VIGAS METÁLICAS
N-2.00m N-2.00m Sin Escala

CUADRO DE ZAPATAS PÓRTICO METALICO


F´ G H ZAPATA CANTIDAD L1 x L2 h1(m) REFUERZO
ZP-4 8 1.00x1.00 0.40 6 4 12.5 + 6 4 12.5 c/0.15
CORTE LONGITUDINAL EJE 2 ZP-5 6 1.20x1.20 0.40 8 4 14.5 + 8 4 14.5 c/0.15
Pórtico Metálico
Escala 1:100
DETALLE DE CONEXIÓN 11 - CORTANTE VIGA IPE200-VIGUETA IPE180 DETALLE DE CONEXIÓN 12- CORTANTE VIGA IPE180 COLUMNA IPE220 DETALLE DE CONEXIÓN 13- CORTANTE Y MOMENTO VIGA IPE200 - COLUMNA IPE220

5/16"
SMAW
30

E7018
50 40

30
98

50 25
L 3X3X1/4"
30

50 50

50 50
L 3X3X1/4" VISTA SUPERIOR
Escala 1:10
Tipo de hueco (viga):Standard (STD)
Tipo de hueco (conector):Standard (STD)
VISTA SUPERIOR 4 Pernos:1/2"

Escala 1:10 VISTA SUPERIOR VISTA INFERIOR


Escala 1:10 Escala 1:10
DETALLE VISTA SUPERIOR
PL10x14x1.27mm
50 76 Escala 1:10
20

50 65

50 65
40

40
65 50 65

50 65
40

130
130
40

5/16"

20
Tipo de hueco (viga):Standard (STD) Tipo de hueco (viga):Standard (STD) SMAW 40
50 E7018
76 IPE 180 IPE 180 Tipo de hueco (conector):Standard (STD) Tipo de hueco (conector):Standard (STD)
IPE 200 2 Pernos:1/2" 2 Pernos:1/2" 5/16"

13
Tipo de hueco (viga):Standard (STD) Tipo de hueco (viga):Standard (STD) SMAW
E7018
Tipo de hueco (conector):Standard (STD) Tipo de hueco (conector):Standard (STD) 50 40 202
VISTA LATERAL 2 Pernos:1/2" 2 Pernos:1/2" IPE 220
SMAW
5/16"
Escala 1:10 E7018

50 25
VISTA FRONTAL
VISTA FRONTAL VISTA LATERAL Escala 1:10

13
Escala 1:10 Escala 1:10 202
40 IPE 200
Tipo de hueco (viga):Standard (STD)
Tipo de hueco (conector):Standard (STD)
4 Pernos:1/2" IPE 220

DETALLE VISTA SUPERIOR VISTA LATERAL VISTA FRONTAL


PL10x14x1.27mm Escala 1:10 Escala 1:10
Escala 1:10

DETALLE DE CONEXIÓN 14 - DOBLE DIAGONAL EN VIGA IPE180 DETALLE DE CONEXIÓN 15 - PEDESTAL CON DIAGONAL
188 188 188
5/16"
SMAW
E7018 IPE 220
4 Atiesadores e=3/8"
w.p.
574

IPE 180
114

114

Platina e=4/8"
5/16"

20
SMAW 5/16"
SMAW
11

E7018
7

70
11

E7018
7

408 L 3X2X1/4"
PTE100X100X3.0mm PTE100X100X3.0mm 82
VISTA SUPERIOR
PTE100X100X3.0mm Escala 1:10

21
Platina e=4/8"
5/16"

9
SMAW 70
E7018
Platina e=4/8"
5/16"

300
SMAW
VISTA LATERAL E7018

200
Escala 1:10

6
23
30
Platina 26x36x19mm
w.p.

75

75
40

50 40

50 40
130
Platina e=4/8"
164

Tipo de hueco (viga):Standard (STD) Tipo de hueco (viga):Standard (STD)


IPE 200 Tipo de hueco (conector):Standard (STD) Tipo de hueco (conector):Standard (STD)
2 Pernos:1/2" 2 Pernos:1/2"

DETALLE ATIESADOR IPE 220


Escala 1:10
VISTA FRONTAL
VISTA LATERAL VISTA LATERAL Escala 1:10
Escala 1:10 Escala 1:10

DETALLE DE CONEXIÓN PLACA BASE 10 DETALLE DE CONEXIÓN PLACA BASE 07

Columna IPE220 Columna IPE220


Columna 100x100x3.0mm

Cartela e=3/8" Cartela e=3/8"


Cartela e=3/8"
40
5/16" 5/16" 5/16" 5/16"
Típ. Típ. Típ. Típ. 5/16"
Típ. 5/16" PL e=3/8"
Típ.

200
Platina 260x360x19(3/8") Platina 260x360x19(3/8")
Platina 280x280x19(5/8")
50

50

70
50

6 Pernos Ø6/8" 6 Pernos Ø6/8"


350

350

8 Pernos Ø5/8"
DETALLE DE CARTELA
350

Escala 1:10

130 130 Arandela y doble tuerca 160 Arandela y doble tuerca


90 Arandela y doble tuerca

Pedestal en concreto Pedestal en concreto


Pedestal en concreto
450 350
100
350

3.0

100
ANCLAJE DE COLUMNA A ANCLAJE DE COLUMNA A
ANCLAJE DE COLUMNA A
PEDESTAL 35X45cm PEDESTAL 35X45cm
PEDESTAL 35X35cm DETALLE DE COLUMNA
Escala 1:10 Escala 1:10
Escala 1:10 35X35X3.0mm
Escala 1:10
40

PL e=3/8"
200

360
280
Pedestal en concreto
45 50 130 130 50 45 Pedestal en concreto
Cartela e=3/8"
70 35 50 90 90 50 35
Cartela e=3/8"
45

35
130

DETALLE DE CARTELA Columna 100x100x3.0mm


90
90
260

Columna IPE220 Escala 1:10


280
130

90
35 50
45

Platina 260x360x19(6/8")
6 Pernos Ø6/8" Platina 280x280x15(5/8")
8 Pernos Ø5/8"

DETALLE DE PLATINA
DETALLE DE PLATINA
PEDESTAL 35X45cm DETALLE IPE220 PEDESTAL 35X35cm
Escala 1:10 Escala 1:10
Escala 1:10
ALAMBRE
NEGRO No 18

VAR. Ver detalle 2


.06

e=VARIABLE
SEGUN USO
e

Junta de Construcción Junta de contracción profundidad 3cm


Junta de contracción Polietileno rellenar con SIKAFLEX TW68
.06 Junta de aislamiento Junta de aislamiento debe realizarse con disco LUZ
DETALLE 1 LUZ
DETALLE DISTANCIADOR EN DETALLE JUNTA DE CONSTRUCCION COLUMNA 1/3 L 1/3 L 1/3 L COLUMNA
VIGA 1/3 L 1/3 L 1/3 L VIGA

DE VIGUETA
FORMA DE PANELA (EN CONCRETO)

ANCHO
DE VIGA
6 6

ANCHO
ESC 1:500
Junta de construcción ESC:1.25 5 5

Junta de contracción
e=6mm TUBERIA TUBERIA
.1 0.20 TUBERIA TUBERIA PASE HORIZONTAL PARA
5 Esta ranura se hace 6 horas después de

VAR.
PASE HORIZONTAL PARA TUBERIAS EN VIGUETAS (PLANTA)
fundida, rellenar con SIKAFLEX TW68
REFUERZO MAMPOSTERIA TUBERIAS EN VIGAS (PLANTA)

0.25
DE MURO

.1
5
.1

5
PARA PASES < Ø 4" COLOCAR 2
4#3 Traslapos Alternados DIAGONALES Ø 3/8" Y
Junta de construcción e=6mm PARA PASES = Ø 4" COLOCAR 2
R2 Lmin=0 40cm. PARA PASES < Ø 4" COLOCAR 4 COLOCAR 2 ESTRIBOS DE
DIAGONALES Ø 1/2" SECCION TIPICA EN Ø 3/8"

VAR.
Esta junta se ejecuta DIAGONALES Ø 3/8" EN CADA CARA Y COLOCAR 2 ESTRIBOS DE

8
A CADA LADO DEL CRUCE

ALTURA DE VIGUETA
.14

Junta de contracción
PARA PASES = Ø 4" COLOCAR 4 SECCION TIPICA EN Ø 3/8"
con formaleta

7
DIAGONALES Ø 1/2" EN CADA CARA A CADA LADO DEL CRUCE

H/4
.20

ALTURA DE VIGA
.10 VIGA DE CIMENTACION

H/4
.19 .19
Sikaflex TW68 NO ESTRUCTURAL

H/2
FORRAR TUBO EN POLIETILENO

H
.20 .20

H/2
4 E Ø 1/4" A .10 .14 FORRAR TUBO EN POLIETILENO ZONA UNICA ACEPTABLE

H
R1
CONCRETO PARA EL CRUCE DE TUBERIA
RESTO E Ø 1/4" A .15 E#2(14x19)c/0.30m ZONA UNICA ACEPTABLE

VAR.

H/4
L = 0.86m CICLOPEO 30X30 PARA EL CRUCE DE TUBERIA

H/4

8
.40 MAX .20 .40 REFUERZO ADICIONAL
LUZ Junta de construcción

7
DETALLE DINTEL (ALZADA) Junta de construcción
SIKA ROD. CIMENTACIÓN DE MUROS SOBRE VIGA DE .40 MAX .20 .40 REFUERZO ADICIONAL
PASE HORIZONTAL PARA
DETALLE 2 PASE HORIZONTAL PARA

5
TUBERIAS EN VIGUETAS (CORTE 6-6)

.1
ESTA JUNTA DEBE EXISTIR
.115 .115
CONTRA ESCALERAS Y SARDINELES CIMENTACIÓN NO ESTRUCTURAL Y CONCRETO TUBERIAS EN VIGAS (CORTE 5-5)
NOTA:
EL PASE VERTICAL EN
MURO MURO
Junta de aislamiento Junta de contracción c/2.00m
Rellenar con Sika flex-T68W
Junta de contracción
profundidad 3cm c/2.00m
CICLÓPEO VIGAS ESTA PROHIBIDO

Ver detalle 1 e=4mm REFUERZO ADICIONAL ANCHO


R2 R2
JUNTA DE AISLAMIENTO ESC 1:50 REFUERZO DE LA VIGA ANCHO VIGA
AL DE LA VIGA, 4 Ø 1/2" REFUERZO DE LA VIGUETA VIGUETA REFUERZO ADICIONAL
AL DE LA VIGUETA, 2 Ø 1/2"
CORTE A - A L=1.10 MAXIMO

ZONA CRUCE
DINTEL DINTEL VAR. VAR. L=1.10 MAXIMO

DE TUBERIA

ZONA CRUCE
DE TUBERIA
Max 3.0m Max 3.0m
Polietileno
.20

.20

Esta ranura se hace 6 a 12 horas


después de terminado el vaciado
4 DIAGONALES Ø3/8" o Ø1/2" DIAGONALES
R1 .115 R1 EN CADA CARA Ø 3/8" o Ø 1/2"
ESTRIBO ADICIONAL
DINTEL CON BLOQUE VIGA DINTEL EN CONCRETO
PUEDE PREFABRICARSE
MODULO TIPICO CORTE 7-7
A CADA LADO DEL CRUCE
ESTRIBO ADICIONAL

LOCALIZACION JUNTAS EN PLACA DE CONTRAPISO A CADA LADO DEL CRUCE


CORTE 8-8
ESC 1:100 Concreto f'c=210 con cemento tipo 1 y
TABLA PARA DINTELES en relación agua-cemento 0.45 MALLA D2 DILATAR MAXIMO
Sellante flexible DILATACION ELECTROSOLDADA CADA 4x4 MTS
LUZ (cm) R1 R2 ESTRIBOS Sika flex - T68W

RECEBO SEGUN
ALTURA VIGA DE
Endurecedor superficial NEOPRENO

CIMENTACION

ESPESOR DE

ESTUDIO DE

.05
MAXIMO 2.00 1 Ø1/2" 1 Ø3/8" Ø1/4: 4 a .10 RESTO a .15

SUELOS
MALLA
MAXIMO 3.00 1 Ø5/8" 1 Ø1/2" Ø1/4: 4 a .10 RESTO a .15 DILATACION DILATAR MAXIMO
ELECTROSOLDADA D2
CADA 4x4 MTS BACK-ROD

NEOPRENO Junta de construcción RECEBO COMPACTADO DETALLE D-2

RECEBO SEGUN

.05
DETALLE DE PLACA DE CONTRAPISO
ALTURA VIGA DE

ESPESOR DE

ESTUDIO DE
CIMENTACION

SUELOS
Y VIGA DE CIMENTACION
En lo posible la superficie original debe ser lisa
BACK-ROD
LUZ DE LA VIGA

RECEBO COMPACTADO
DETALLE D-2
PASE DE TUBERÍAS
1/3 DE LUZ 1/3 DE LUZ 1/3 DE LUZ
CORTE 1 - 1 ESC 1:100
ESC 1:75
45°

PUENTE DE ADHERENCIA
EN CASO DE REQUERIRSE

PRIMER FUNDIDA
DE VIGA O VIGUETA
SEGUNDA FUNDIDA
DE VIGA O VIGUETA DETALLE DE PLACA DE CONTRAPISO
SUPERFICIE
RUGOSA REFUERZO DE VIGA O
VIGUETA A LA VISTA
Y VIGA DE CIMENTACION
ESC 1:50
COLUMNA COLUMNA

FUNDICION EN DOS ETAPAS


ESC 1:1000

Lámina de icopor o similar


L M
Junta 1cm Bloque de Icopor E F
Detalle 1

.12
d1
Placa de Entrepiso R2 R2 R2

.10
d1
R1 R2 R2 R2
Bloque N°5 R2 R2 R2
L Ganchos Ø1/4"
Detalle 1 Detalle 1
E
R1 B .09
DINTEL Detalle 2 Detalle 2
VENTANA M R1
1Ø5mm 1Ø5mm A A C1 K Enchape Detalle 2
c/2 hiladas c/2 hiladas
F
4cm
D D
d2 d2

.15
1Ø3/8" c/1.00 1#3 Corrida
DETALLE 1 d2 d2

C1 C1 C1 Detalle superior de columneta


.10

Ventana R3 R3 R3
con bloque de icopor 2#2 Corridas
h=10cm
d1=1cm sellar
con silicona
R1
Ventana
R3 R3 R3 Lámina de icopor
1#3 Corrida
R1 R3 R3 R3
R1 de 1cm
R4
R4
Bloque N°5 Tolete fino perforado R4 R1
.10

R4 R4 .10 R4 R4
R4 R4

.15
.15
1Ø5mm R3
ANTEPECHO c/2 hiladas
VENTANA R2 R2 R2 CORTE L - L
COLUMNETA C1
S S
1Ø3/8" c/1.00 R3
1Ø5mm
c/2 hiladas
S S Las dos últimas
S S R2 hiladas no llevan mortero
S 2.20 m separacion maxima entre columnetas
Placa de Entrepiso
R1 Son 2Ø 4mm c / 4 Hiladas R4
R2 1 Ø 1/2" L=50 cm anclada 12cm con resina epóxica S 2.20 m separacion maxima entre columnetas
R3 1 Ø 1/2" L=luz libre -5cm R1 Son 2Ø 4mm c / 4 Hiladas
R3
R4 1 Ø 1/2" L=30cm anclados 10c con resina epóxica R2 1 Ø 1/2" L=50 cm anclada 12cm con resina epóxica 4cm S 2.20 separacion maxima entre columnetas
d1 Dilatacion 1cm (dejar icopor o similar de 1cm) R3 1 Ø 1/2" L=luz libre -5cm R1 Son 2Ø 4mm c / 10 Hiladas
Corte fachada ventanas d2 Dilatacion 1.5cm (dejar icopor o similar de 1.5cm) R4 1 Ø 1/2" L=30cm anclados 10c con resina epóxica R2 1 Ø 1/2" L=50 cm anclada 12cm con resina epóxica
ESC 1:15 d1 = 1cm
d1 Dilatacion 1cm (dejar icopor o similar de 1cm) R3 1 Ø 1/2 L=luz libre -5cm
Sellar con d1=1cm sellar
silicona d2 Dilatacion 1.5cm (dejar icopor o similar de 1.5cm) Lámina de icopor R4 1 Ø 1/2" L=30cm anclados 10cm con resina epóxica
con silicona
de 1cm d1 Dilatacion 1cm (dejar icopor o similar de 1cm)
Lámina de icopor
d2 Dilatacion 1.5cm (dejar icopor o similar de 1.5cm)
o similar No rellenar las últimas
Lámina de icopor DETALLE 2
.10 dos hiladas Tolete fino
ó similar perforado
Tolete fino R2
Dilatar con polietileno para
BARANDA TUBO garantizar la junta perforado
.15

Ø2" t=2.00 mm Bloque N°5 Tolete fino perforado


R3
ASTM A-500 GRADO B Lámina de icopor
R3 ó similar
TUBO Ø4" t: 2 mm Junta 1.5cm .15

.15
Sellar con silicona Enchape 4cm
.36

.15
BARANDA TUBO .15
CORTE B - B
Ø2" t=2.00 mm CORTE A - A CORTE K - K
ASTM A-500 GRADO B CORTE M - M
Junta 1.5cm
P3/8"x280x220 4 ANCLAJES Ø3/8" L=0.70m
Sellar con silicona
.36

mmASTMA-36
ELEMENTOS DE FACHADA PAÑETADOS EN BLOQUE N°5 Enchape 4cm
.18 .02

VER:
DETALLE 1, CORTE A - A CORTE B - B ELEMENTOS DE FACHADA A LA VISTA EN TOLETE PERO
.22

CON UNIDAD COMPLETA EN PLACA Y COLUMNA NOTA: Si no se quieren mostrar las juntas verticales
.28

.05

CORTE K - K, CORTE L - L, CORTE M -M alrededor de las columnas, las juntas pueden hacerse
.02

B B en cremallera.
.06 .17 .06
CORTE D - D
.35

.28
R3
.15

R4
.15
CORTE B-B
R5
4 ANCLAJE Ø3/8" .15
L= 0.70 m I 2Ø3/8" 4cm
Anclaje c/1.0m

.10
V2
¼"x2¼ Avellanado
4cm FS - 1420
V2
Anclaje c/1.0m
.15

Angulo de 1¼"x1¼"x3/16" Angulo 1¼"x1¼"x3/16"


PASAMANOS TUBO Ø2"t=2.50mm ¼"x2¼ Avellanado

.12
J J corrido
ASTM A-500 GRADO B
FS - 1420 corrido
Máximo 2.00 m 2Ø3/8"

CORTE J - J d1=1cm sellar


d1=1cm sellar Lámina de icopor
con silicona
R7 R7 Tolete fino perforado Lámina de icopor con silicona de 1cm
de 1cm
.25

.25
.25

No llenar las últimas


BARANDA TUBO
Gancho Ø1/4"c/.30 dos hiladas Tolete fino perforado
Ø2" t=2.00 mm
ASTM A-500 GRADO B Tolete fino
R2
0.25
.25

perforado
1.10

.20

.20

I V2

R3
2Ø1/4"
.34
.24

S=1.0m
.24

Ø1/4" c/.20 .15


R5 2 Ø 1/4" CORTE I - I
.15
R7 2 Ø 3/8" CORTE F - F
TUBO Ø4" t: 2 mm
CORTE E - E
(EN ZONA DE DOVELA)

PLACA
NOTA: ENTREPISO
ABRAZAR GANCHO A LA BARRA PARAPETOS
LONGITUDINAL DE LA CARA CORTE I-I , CORTE J-J ELEMENTOS DE FACHADA EN TOLETE A LA VISTA CON
INFERIOR MAS CERCANA. ENCHAPE EN COLUMNAS Y VIGAS
BARANDA VER: DETALLE 2, CORTE D-D, CORTE E-E, CORTE F-F
Escala 1:25

También podría gustarte