Está en la página 1de 5

EMPRESA XYZ, C.A.

FOLIO: 1

FECHA DESCRIPCION REF DEBE HABER


1
1/1/2002 PRODUCTOS EN PROCESO MATERIALES Y SUMINISTROS 1 1,500,000.00
PRODUCTOS EN PROCESO MANO DE OBRA 2 900,000.00
PRODUCTOS EN PROCESO GASTOS DE FABRICACION 3 600,000.00
INVENTARIO DE MATERIALES Y SUMINISTROS 4 1,500,000.00
MANO DE OBRA DIRECTA 5 900,000.00
GASTOS DE FABRICACION 6 600,000.00
2
9/27/2021 INVENTARIO DE MATERIALES Y SUMINISTROS 4 1,200,000.00
CAJA 7 1,200,000.00 [1]
3
1/10/2002 CAJA 7 600,000.00
INVENTARIO DE MATERIALES Y SUMINISTROS 4 600,000.00 [2]
4
1/12/2002 INVENTARIO DE MATERIALES Y SUMINISTROS 4 450,000.00
CAJA 7 450,000.00 [3]
5
1/12/2002 MANO DE OBRA DIRECTA 5 1,200,000.00
NOMINA POR PAGAR 8 1,200,000.00
6
1/12/2002 GASTOS DE FABRICACION 6 800,000.00
CUENTAS POR PAGAR PROVEEDORES 9 800,000.00
7
1/31/2002 COSTO DE PRODUCCION ESTIMADO 10 3,000,000.00
PRODUCTOS EN PROCESO MATERIALES Y SUMINISTROS 1 1,500,000.00
PRODUCTOS EN PROCESO MANO DE OBRA 2 900,000.00
PRODUCTOS EN PROCESO GASTOS DE FABRICACION 3 600,000.00
8
1/31/2002 VARIACION DE MATERIALES 11 550,000.00
INVENTARIO DE MATERIALES Y SUMINISTROS 4 550,000.00
9
1/31/2002 VARIACION MANO DE OBRA DIRECTA 12 300,000.00
MANO DE OBRA DIRECTA 5 300,000.00
10
1/31/2002 VARIACION GASTOS DE FABRICACION 13 200,000.00
GASTOS DE FABRICACION 6 200,000.00
11
1/31/2002 COSTO DE PRODUCCION ESTIMADO 10 550,000.00
VARIACION DE MATERIALES 11 550,000.00
12
1/31/2002 COSTO DE PRODUCCION ESTIMADO 10 300,000.00
VARIACION MANO DE OBRA DIRECTA 12 300,000.00
13
1/31/2002 COSTO DE PRODUCCION ESTIMADO 10 200,000.00
VARIACION GASTOS DE FABRICACION 13 200,000.00
14
31/02/02 PRODUCTOS TERMINADOS 14 4,050,000.00
COSTO DE PRODUCCION ESTIMADO 10 4,050,000.00
15
31/02/02 NOMINA PAGAR 8 1,200,000.00
CAJA 7 1,200,000.00
16A
31/02/02 COSTO DE VENTAS 15 4,050,000.00
PRODUCTOS TERMINADOS 14 4,050,000.00
16B
1/31/2002 CAJA 7 6,075,000.00
VENTAS 16 6,075,000.00
van… 27,725,000.00 27,725,000.00
PRODUCTOS EN PROCESO PRODUCTOS EN PROCESO PRODUCTOS EN PROCESO
1 2 3
MATERIALES Y SUMINISTROS MANO DE OBRA GASTOS DE FABRICACION

1 1,500,000.00 1,500,000.00 7 1 900,000.00 900,000.00 7 1 600,000.00 600,000.00 7

INVENTARIO DE MATERIALES Y
4 5 MANO DE OBRA DIRECTA 6 GASTOS DE FABRICACION
SUMINISTROS
1,000,000.00 1,500,000.00 1 5 1,200,000.00 900,000.00 1 800,000.00 600,000.00 1
2 1,200,000.00 600,000.00 3 300,000.00 9 200,000.00 10
4 450,000.00 550,000.00 8 1,200,000.00 1,200,000.00 800,000.00 800,000.00
2,650,000.00 2,650,000.00
-  

CUENTAS POR PAGAR


7 CAJA 8 NOMINA POR PAGAR 9
PROVEEDORES
600,000.00 1,200,000.00 2 15 1,200,000.00 1,200,000.00 5 800,000.00 6
16b 6,075,000.00 450,000.00 4 -  
1,200,000.00 15
6,675,000.00 2,850,000.00
3,825,000.00

COSTO DE PRODUCCION VARIACION MANO DE OBRA


10 11 VARIACION DE MATERIALES 12
ESTIMADO DIRECTA
7 3,000,000.00 4,050,000.00 14 8 550,000.00 550,000.00 11 9 300,000.00 300,000.00 12
11 550,000.00
12 300,000.00
13 200,000.00
4,050,000.00 4,050,000.00
-  

VARIACION GASTOS DE
13 14 PRODUCTOS TERMINADOS 15 COSTO DE VENTAS
FABRICACION

10 200,000.00 200,000.00 13 14 4,050,000.00 4,050,000.00 16A 16A 4,050,000.00


-  

16 VENTAS
6,075,000.00 16b

PV = PC + G

PRECIO DE VENTA = PRECIO DE COSTO + GANANCIA


6.075.000 = 4.050.000 + 2.025.000
PC 4,050,000.00 100%
PV 6,075,000.00 150%
G 2,025,000.00 50%
[1] COMPRA DE 100 PARES A BS 12.000

[2] DEVOLUCION DE 50 PARES A BS 12.000

[3] COMPRA 50 PARES A BS. 9.000

También podría gustarte