Metrados Modulo Vi Cerco Perimetrico - Boris
Metrados Modulo Vi Cerco Perimetrico - Boris
06.01.04.03 COLUMNAS
06.01.04.03.01 CONCRETO PARA COLUMNAS F'C=210 KG/CM2 m3 20.98
EJE 1-1 0.25 0.25 4.50 8.00 2.25
EJE 2-2 0.25 0.25 4.50 3.00 0.84
EJE 3-3 0.25 0.25 4.50 22.00 6.19
EJE A-A 0.25 0.25 4.50 3.00 0.84
EJE B-B 0.25 0.25 4.50 7.00 1.97
EJE C-C 0.25 0.25 4.50 11.00 3.09
EJE D-D 0.25 0.25 4.50 10.00 2.81
EJE E-E 0.25 0.25 4.50 5.00 1.41
Columnas en Portada de Ingreso C-1 0.25 0.25 4.50 1.00 0.28
C-2 0.25 0.15 4.50 1.00 0.17
C-3 0.50 0.15 4.50 1.00 0.34
C-4 0.50 0.35 4.50 1.00 0.79
06.01.04.04 VIGAS
06.01.04.04.01 CONCRETO F'C=210 KG/CM2. PARA VIGAS m3 20.21
EJE 1-1 VC - 1 (20X 20) 6.33 0.20 0.20 2.00 0.51
EJE 2-2 2.61 0.20 0.20 1.00 0.10
EJE 3-3 27.75 0.20 0.20 9.00 9.99
EJE A-A 2.80 0.20 0.20 1.00 0.11
EJE B-B 10.65 0.20 0.20 4.00 1.70
EJE C-C 21.39 0.20 0.20 6.00 5.13
EJE D-D 12.62 0.20 0.20 4.00 2.02
EJE E-E 6.46 0.20 0.20 2.00 0.52
VIiga en Portada de Ingreso 3.00 0.20 0.20 1.00 0.12
EJE 2-2 VC - 1 (20X 20) 4.10 3/8" 4.00 1.02 1.00 16.73
Estribos 0.80 3/8" 25.00 0.56 1.00 11.20
EJE 3-3 VC - 1 (20X 20) 4.10 3/8" 4.00 1.02 36.00 602.21
Estribos 0.80 3/8" 25.00 0.56 1.00 11.20
EJE A-A VC - 1 (20X 20) 4.10 3/8" 4.00 1.02 1.00 16.73
Estribos 0.80 3/8" 25.00 0.56 1.00 11.20
EJE B-B VC - 1 (20X 20) 4.10 3/8" 4.00 1.02 16.00 267.65
Estribos 0.80 3/8" 25.00 0.56 1.00 11.20
EJE C-C VC - 1 (20X 20) 4.10 3/8" 4.00 1.02 24.00 401.47
Estribos 0.80 3/8" 25.00 0.56 1.00 11.20
EJE D-D VC - 1 (20X 20) 4.10 3/8" 4.00 1.02 16.00 267.65
Estribos 0.80 3/8" 25.00 0.56 1.00 11.20
EJE E-E VC - 1 (20X 20) 4.10 3/8" 4.00 1.02 8.00 133.82
Estribos 0.80 3/8" 25.00 0.56 1.00 11.20
06.02 ARQUITECTURA
06.02.01 MUROS Y TABIQUES DE ALBAÑILERIA
06.02.01.01 MURO DE SOGA C/LADRILLO (9X12X24CM) ASENTADO CON MORTERO m2 230.97
EJE 1-1 6.33 2.50 1.00 15.83
EJE 2-2 2.61 2.50 1.00 6.53
EJE 3-3 27.75 2.50 1.00 69.38
EJE A-A 2.80 2.50 1.00 7.00
EJE B-B 10.65 2.50 1.00 26.63
EJE C-C 21.39 2.50 1.00 53.48
EJE D-D 12.62 2.50 1.00 31.55
EJE E-E 6.46 2.50 1.00 16.15
Muro en Portada de Ingreso 1.20 3.70 1.00 4.44
06.02.04 CERRAJERIA
06.02.04.01 CERRADURA PARA PUERTA PRINCIPAL PESADA und 3.00
cantidad 3.00
1.00 3.00
06.02.05 PINTURA
06.02.05.01 PINTURA SUPERMATE DOS MANOS EN MURO DE CONTENCION m2 82.14
EJE A-A 13.69 3.00 2.00 82.14
06.02.06 OTROS
06.02.06.01 JUNTAS DECONSTRUCCION DE TEKNOPOR 1! EN MUROS m 105.00
3.00 35.00 105.00