Cronograma-Valorizado Estdio Gica
Cronograma-Valorizado Estdio Gica
01 INSTALACIONES EXTERIORES
01.01.01 ESTRUCTURAS
01.01.01.01.01 CAMPAMENTO PROVISIONAL DE OBRA glb 4.00 1,872.42 7,489.68 100.00% 7489.68
01.01.01.01.02 CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO m2 20.00 164.38 3,287.60 100.00% 3287.60
01.01.01.01.03 CARTEL DE IDENTIFICACION DE OBRA DE 3.60x2.40 m und 3.00 1,051.40 3,154.20 100.00% 3154.20
01.01.01.01.04 CONSUMOS DE AGUA Y ENERGIA DURANTE LA CONSTRUCCION mes 1.00 6,000.00 6,000.00 100.00% 6000.00
01.01.01.01.05 SERVICIOS HIGIENICOS DURANTE LA CONSTRUCCION glb 1.00 6,500.00 6,500.00 100.00% 6500.00
01.01.01.01.06 CERCO DE OBRA CON POSTES DE MADERA Y CALAMINA m 820.00 16.65 13,653.00 100.00% 13653.00
01.01.01.01.07 TRANSPORTE DE EQUIPO Y MAQUINARIA A OBRA glb 1.00 10,000.00 10,000.00 100.00% 10000.00
01.01.01.01.08 ELABORACION IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD EN EL TRABAJO glb 1.00 8,000.00 8,000.00 100.00% 8000.00
01.01.01.01.09 SEÑALIZACION TEMPORAL DE SEGURIDAD und 1.00 2,000.00 2,000.00 100.00% 2000.00
01.01.01.02.06 DEMOLICION DE COLUMNAS Y VIGAS DE CONCRETO m3 13.84 109.88 1,520.74 100.00% 1520.74
01.01.01.02.08 DEMOLICION DE MUROS DE LADRILLO KK SOGA m2 125.00 4.87 608.75 100.00% 608.75
01.01.01.02.09 DEMOLICION DE MUROS DE LADRILLO KK CABEZA m2 2,019.50 4.87 9,834.97 25.49% 2506.55
01.01.01.02.10 LIMPIEZA DEL TERRENO MANUAL m2 805.74 2.32 1,869.32 100.00% 1869.32
01.01.01.02.12 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 805.74 1.24 999.12 100.00% 999.12
01.01.01.03.01 EXCAVACION PARA ZAPATAS DE 1.00 m A 1.40 m DE PROFUNDIDAD m3 1,048.73 31.00 32,510.63
01.01.01.03.02 EXCAVACION PARA CIMIENTOS HASTA 1.00 m TERRENO NORMAL m3 371.90 31.00 11,528.90
01.01.01.03.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL PROPIO m3 475.28 32.55 15,470.36
01.01.01.03.04 NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA m2 475.28 3.37 1,601.69
01.01.01.03.05 ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m m3 1,420.63 30.41 43,201.36
01.01.01.03.06 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES m3 1,420.63 44.02 62,536.13
01.01.01.04.01 SUBCIMIENTOS Y SUBZAPTAS CONCRETO 1:10 C:H + 30% P. G. m3 209.75 160.70 33,706.83
01.01.01.04.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G. m3 203.05 208.43 42,321.71
01.01.01.04.03 SOBRECIMIENTOS MEZCLA 1:8 C:H + 25% P.M. m3 3.59 282.43 1,013.92
01.01.01.05.01 ZAPATAS
01.01.01.05.01.02 ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,945.07 3.62 7,041.15
01.01.01.05.02.03 SOBRECIMIENTOS REFORZADOS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 2,508.06 3.52 8,828.37
01.01.01.05.03 COLUMNAS
01.01.01.05.03.03 COLUMNAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 15,411.75 3.78 58,256.42
01.01.01.05.04 VIGAS
01.01.01.05.04.03 VIGAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4,003.02 3.62 14,490.93
Pág. 1
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
01.01.01.05.05.03 LOSAS ALIGERADAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 36.15 3.60 130.14
01.01.01.05.05.04 LOSAS ALIGERADAS: LADRILLO HUECO DE ARCILLA DE 15 x 30 x 30 cm PARA TECHO und 161.00 3.51 565.11
01.01.02 ARQUITECTURA
01.01.02.01.01 MURO DE LADRILLO KK TIPO IV SOGA M 1:1:4 e=1.50 cm m2 1,854.51 65.36 121,210.77
01.01.02.02.01 TARRAJEO PRIMARIO O RAYADO, MORTERO C:A 1:5 m2 223.15 14.14 3,155.34
01.01.02.02.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA m2 869.43 26.96 23,439.83
01.01.02.02.04 TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO - ARENA m2 228.49 31.94 7,297.97
01.01.02.03 ZOCALOS
01.01.02.04.01 PUERTA METALICA T-01 2.50 X 2.80 M. und 17.00 1,800.00 30,600.00
01.01.02.04.02 PUERTA METALICA T-02 4.00 X 2.80 M. und 4.00 3,800.00 15,200.00
01.01.02.05 PINTURA
01.01.02.05.01 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES (SUPERLATEX O SIM.) m2 4,523.87 8.09 36,598.11
01.01.02.05.02 PINTURA LATEX 2 MANOS EN COLUMNAS (VINILATEX O SIM.) m2 869.43 8.09 7,033.69
01.01.02.05.03 PINTURA LATEX 2 MANOS EN VIGAS (VINILATEX O SIM.) m2 228.49 13.43 3,068.62
01.01.02.05.04 PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS m2 595.70 13.48 8,030.04
01.02.01 ESTRUCTURAS
01.02.01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 98.04 2.32 227.45 100.00% 227.45
01.02.01.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 11.83 1.24 14.67 100.00% 14.67
01.02.01.02.01 EXCAVACION PARA ZAPATAS DE 1.00 m A 1.40 m DE PROFUNDIDAD m3 24.62 31.00 763.22 100.00% 763.22
01.02.01.02.02 EXCAVACION PARA CIMIENTOS HASTA 1.50 m TERRENO NORMAL m3 24.11 31.00 747.41 100.00% 747.41
01.02.01.02.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL SELECCIONADO m3 19.25 32.55 626.59 100.00% 626.59
01.02.01.02.04 NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA m2 79.79 3.37 268.89 100.00% 268.89
01.02.01.02.05 ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m m3 33.45 30.41 1,017.21 99.93% 1016.50
01.02.01.02.06 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES m3 33.45 44.02 1,472.47
01.02.01.03.01 FALSO PISO DE 4" MEZCLA 1:8 (C:H) m2 67.31 39.02 2,626.44 100.00% 2626.44
01.02.01.03.02 SUBCIMIENTOS Y SUBZAPTAS CONCRETO 1:10 C:H + 30% P. G. m3 3.89 160.70 625.12 100.00% 625.12
01.02.01.03.03 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G. m3 22.13 208.43 4,612.56 100.00% 4612.56
01.02.01.03.04 SOBRECIMIENTOS MEZCLA 1:8 C:H + 25% P.M. m3 5.55 278.25 1,544.29
01.02.01.03.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HASTA 0.30 m m2 60.00 30.81 1,848.60 88.74% 1640.49
01.02.01.04.01 ZAPATAS
01.02.01.04.01.01 ZAPATAS: CONCRETO f'c=175 kg/cm2 m3 5.18 289.90 1,501.68 100.00% 1501.68
01.02.01.04.01.02 ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 117.61 3.62 425.75 100.00% 425.75
01.02.01.04.02 COLUMNAS
01.02.01.04.02.03 COLUMNAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 378.95 3.78 1,432.43 100.00% 1432.43
01.02.01.04.03 VIGAS
01.02.01.04.03.03 VIGAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 871.37 3.62 3,154.36
01.02.01.04.04.03 LOSAS ALIGERADAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 850.10 3.60 3,060.36
01.02.01.04.04.04 LOSAS ALIGERADAS: LADRILLO HUECO DE ARCILLA DE 15 x 30 x 30 cm PARA TECHO und 551.00 3.51 1,934.01
Pág. 2
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
01.02.02 ARQUITECTURA
01.02.02.01.01 MURO DE LADRILLO KK TIPO IV SOGA M 1:1:4 e=1.50 cm m2 121.98 65.36 7,972.61
01.02.02.01.02 JUNTA DE DILATACION CON ESPUMA PLASTICA MAS JEBE MICROPOROSO m 57.20 12.58 719.58
01.02.02.02.01 TARRAJEO PRIMARIO O RAYADO, MORTERO C:A 1:5 m2 17.45 10.09 176.07
01.02.02.02.04 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA m2 20.16 26.96 543.51
01.02.02.02.05 TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO - ARENA m2 22.32 31.94 712.90
01.02.02.04.01 CONTRAPISO DE 40 mm (MEZCLA C:A BASE 1:5, ACABADO 1:2) m2 68.46 22.48 1,538.98
01.02.02.04.02 PISO DE CEMENTO COLOREADO (OCRE ROJO): ACABADO PULIDO m2 42.91 30.81 1,322.06
01.02.02.05 ZOCALOS
01.02.02.06 CONTRAZOCALOS
01.02.02.09 CERRAJERIA
01.02.02.09.02 CERRADURA DE TRES GOLPES PUERTAS INTERIORES und 2.00 85.01 170.02
01.02.02.09.04 MANIJA DE 3" ALUMINIZADA PARA PUERTA pza 2.00 43.00 86.00
01.02.02.11 PINTURA
01.02.02.11.01 PINTURA LATEX 2 MANOS EN MUROS INTERIORES (VINILATEX O SIM.) m2 200.90 7.90 1,587.11
01.02.02.11.02 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES (SUPERLATEX O SIM.) m2 37.71 8.09 305.07
01.02.02.11.03 PINTURA LATEX 2 MANOS EN COLUMNAS (VINILATEX O SIM.) m2 20.16 8.09 163.09
01.02.02.11.04 PINTURA LATEX 2 MANOS EN VIGAS (VINILATEX O SIM.) m2 22.32 13.43 299.76
01.02.02.11.05 PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS m2 2.07 13.48 27.90
01.03.01 ESTRUCTURAS
01.03.01.02.01 EXCAVACION PARA ZAPATAS DE 1.00 m A 1.40 m DE PROFUNDIDAD m3 27.20 37.19 1,011.57
01.03.01.02.02 EXCAVACION PARA CIMIENTOS HASTA 1.00 m TERRENO NORMAL m3 2.84 37.19 105.62
01.03.01.02.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL SELECCIONADO m3 11.20 32.55 364.56
01.03.01.02.04 NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA m2 43.68 3.37 147.20
01.03.01.02.05 ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m m3 21.49 30.41 653.51
01.03.01.02.06 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES m3 21.49 44.02 945.99
Pág. 3
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
01.03.01.03.01 FALSO PISO DE 4" MEZCLA 1:8 (C:H) m2 17.80 39.02 694.56
01.03.01.03.02 SUBCIMIENTOS Y SUBZAPTAS CONCRETO 1:10 C:H + 30% P. G. m3 6.12 160.70 983.48
01.03.01.03.03 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G. m3 5.19 208.43 1,081.75
01.03.01.03.04 SOBRECIMIENTOS MEZCLA 1:8 C:H + 25% P.M. m3 2.23 278.25 620.50
01.03.01.04.01 ZAPATAS
01.03.01.04.01.02 ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 139.39 3.62 504.59
01.03.01.04.02 COLUMNAS
01.03.01.04.02.03 COLUMNAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 838.04 3.78 3,167.79
01.03.01.04.03 VIGAS
01.03.01.04.03.03 VIGAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 351.70 3.62 1,273.15
01.03.01.04.04.03 LOSAS MACIZAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 118.25 3.78 446.99
01.03.02 ARQUITECTURA
01.03.02.01.01 MURO DE LADRILLO KK TIPO IV SOGA M 1:1:4 e=1.50 cm m2 123.94 65.36 8,100.72
01.03.02.01.02 JUNTA DE DILATACION CON ESPUMA PLASTICA MAS JEBE MICROPOROSO m 40.00 12.58 503.20
01.03.02.02.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA m2 60.64 26.96 1,634.85
01.03.02.02.04 TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO - ARENA m2 25.76 31.94 822.77
01.03.02.03.01 CIELORASO CON MEZCLA DE CEMENTO - ARENA 1:5 m2 19.82 31.61 626.51
01.03.02.04.01 CONTRAPISO DE 40 mm (MEZCLA C:A BASE 1:5, ACABADO 1:2) m2 21.24 22.48 477.48
01.03.02.04.02 PISO DE CEMENTO COLOREADO (OCRE ROJO): ACABADO PULIDO m2 21.24 30.81 654.40
01.03.02.05 ZOCALOS
01.03.02.06 CONTRAZOCALOS
01.03.02.09 CERRAJERIA
01.03.02.09.02 CERRADURA DE TRES GOLPES PUERTAS INTERIORES und 8.00 85.01 680.08
01.03.02.09.03 MANIJA DE 3" ALUMINIZADA PARA PUERTA pza 8.00 43.00 344.00
01.03.02.11 PINTURA
01.03.02.11.01 PINTURA LATEX 2 MANOS EN MUROS INTERIORES (VINILATEX O SIM.) m2 137.26 7.90 1,084.35
01.03.02.11.02 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES (SUPERLATEX O SIM.) m2 30.90 8.09 249.98
01.03.02.11.03 PINTURA LATEX 2 MANOS EN COLUMNAS (VINILATEX O SIM.) m2 60.64 8.09 490.58
Pág. 4
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
01.03.02.11.04 PINTURA LATEX 2 MANOS EN VIGAS (VINILATEX O SIM.) m2 25.76 13.43 345.96
01.03.02.11.05 PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS m2 32.40 13.48 436.75
01.04.01.01.01 SALIDA DE A.F. PVC C/R - 1/2" C-10 pto 4.00 16.14 64.56
01.04.01.01.02 SALIDA DE A.F. PVC C/R - 1.1/4" C-10 pto 8.00 29.84 238.72
01.04.01.02.01 SUM. E INST. TUB. PVC C-10 - D=1.1/4" m 16.94 12.80 216.83
01.04.01.03 VALVULAS
01.04.01.03.01 SUM. E INST. VALV. ESFERICA DE BRONCE C150 - D=1.1/4" (INC. UU, NIPLES DE F°G° Y CAJUELA DE CONCRETO) m 4.00 92.66 370.64
01.04.02.01.01 SALIDA DE DESAGUE PVC SAL 2" pto 4.00 78.96 315.84
01.04.02.01.02 SALIDA DE DESAGUE PVC SAL 4" pto 8.00 92.75 742.00
01.04.02.03.01 CAJA DE REGISTRO 18"x24" und 1.00 192.96 192.96 100.00% 192.96
01.04.02.03.02 CAJA DE REGISTRO 10"x20" und 2.00 184.96 369.92 100.00% 369.92
01.04.02.04.01 CONEXION DOMICILIARIA PVC SAL 6" und 1.00 52.82 52.82 100.00% 52.82
01.04.02.05.01 INODORO CON VALVULA SEMIAUTOMATICA INC/ACCESORIO und 2.00 115.00 230.00
01.04.02.05.04 LAVADERO DE ACERO INOXIDABLE UNA POZA und 2.00 250.00 500.00
01.05.04.01 EXTRACCION Y APILAMIENTO DE MATERIAL DE SUB BASE EN CANTERA m3 2,816.53 3.79 10,674.65
01.05.05 SARDINELES
Pág. 5
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
01.05.06.02 RAMPAS DE CONCRETO: f´c=175 kg/cm2 ACAB. 1:2 FROTACH. Y PULIDO m2 4.25 43.03 182.88
01.05.07.01 FALSO PISO DE 4" MEZCLA 1:8 (C:H) m2 10,287.44 42.01 432,175.35
01.06.02.01 EXCAVACION PARA ZAPATAS DE 2.00 M. A 2.50 M. DE PROFUNDIDAD m3 98.29 36.48 3,585.62
01.06.02.02 NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA m2 121.00 5.03 608.63
01.06.02.03 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES m3 113.03 8.03 907.63
01.06.04.03 TANQUE CISTERNA: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 7,987.14 3.52 28,114.73
01.08.07 ARQUITECTURA
01.08.07.01 SARDINELES
Pág. 6
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
01.08.07.02.01 BANCAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 2,511.99 3.60 9,043.16
01.08.07.03.02 RAMPAS DE CONCRETO: f´c=175 kg/cm2 ACAB. 1:2 FROTACH. Y PULIDO m2 3.42 43.03 147.16
01.08.07.04.02 FALSO PISO DE 4" MEZCLA 1:8 (C:H) m2 2,831.74 42.01 118,961.40
01.09.03.01 EXTRACCION Y APILAMIENTO DE PIEDRA CANTO RODADO EN CANTERA m3 302.56 5.21 1,576.34
01.09.05 GEOTEXTIL
01.09.07.01 CESPED DE GRASS ARTIFICIAL PARA CAMPO DEPORTIVO m2 1,052.39 178.50 187,851.62
01.09.08.02.01 RETIRO DE MATERIAL SELECCIONADO DE SUB DRENES m 156.80 3.28 514.30 100.00% 514.30
01.09.08.02.02 SUMINISTRO Y COLOCACION DE TUBERIA CRIBADA PARA DRENAJE m 280.00 20.50 5,740.00 100.00% 5740.00
01.09.08.02.03 RELLENO CON MATERIAL CLASIFICADO POR CAPAS m3 156.80 55.01 8,625.57 76.45% 6594.16
01.09.08.03.02 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP D=6" m 88.00 13.31 1,171.28
01.09.08.03.03 RELLENO CON MATERIAL CLASIFICADO POR CAPAS m3 61.60 51.26 3,157.62
Pág. 7
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
01.10.03 IMPRIMADO
01.10.04.01 SUMINISTRO Y COLOCACION DE CARPETA ASFALT. EN CALIENTE E=3" (DOS CAPAS DE 1.5") m2 1,057.92 67.52 71,430.76
01.12.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.00 m TERRENO NORMAL m3 88.67 31.00 2,748.77
01.12.02.02 RELLENO COMPACTADO CON EQUIPO Y MATERIAL SELECCIONADO m3 103.15 34.72 3,581.37
01.12.02.03 NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA m2 50.43 5.03 253.66
01.12.02.04 ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m m3 101.97 30.41 3,100.91
01.12.03 ESTRUCTURAS
01.12.03.01.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G. m3 42.49 241.75 10,271.96
01.12.03.02 SARDINELES
01.12.03.04 ZAPATAS
01.12.03.04.02 ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 650.70 3.78 2,459.65
Pág. 8
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
01.12.03.05.03 GRADERIOS: ACERO CORRUGADO FY=4200 kg/cm2 GRADO60 kg 2,789.89 3.78 10,545.78
01.12.03.06.01 ESTRUCTURA METALICA PARA COBERTURA DE GRADERIOS und 28.00 320.00 8,960.00
01.12.04 ARQUITECTURA
01.12.04.03.02 TUBO METALICO DE 4" EN MALLA OLIMPICA 2 und 55.00 358.72 19,729.60
01.12.04.04 PINTURA
01.12.04.04.01 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES (SUPERLATEX O SIM.) m2 406.94 5.09 2,071.32
01.12.04.04.02 PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS m2 357.60 13.48 4,820.45
01.12.05.01.01.01.0 EXCAVACION MANUAL T.S.R. - H MENOR 1.00 M - P/TUB. 1" - 1 1/2" m 222.64 6.97 1,551.80 100.00% 1551.80
01.12.05.01.01.01.0 EXCAVACION MANUAL T.S.R. - H MENOR 1.00 M - P/TUB. 2" - 3" m 263.02 6.97 1,833.25 42.83% 785.13
01.12.05.01.01.01.0 EXCAVACION MANUAL T.S.R. - H MENOR 1.50 M - P/TUB. 4" - 6" m 894.09 7.97 7,125.90
01.12.05.01.01.01.0 EXCAVACION MANUAL T.S.R. - H MENOR 1.50 M - P/TUB. 8" m 45.86 7.97 365.50
01.12.05.01.01.02.0 REFINE Y NIVELACION DE ZANJAS T.S.R. P/TUB 1" - 1 1/2" m 222.64 2.28 507.62
01.12.05.01.01.02.0 REFINE Y NIVELACION DE ZANJAS T.S.R. P/TUB 2" - 3" m 263.02 2.28 599.69
01.12.05.01.01.02.0 REFINE Y NIVELACION DE ZANJAS T.S.R. P/TUB 4" - 6" m 894.09 2.76 2,467.69
01.12.05.01.01.02.0 REFINE Y NIVELACION DE ZANJAS T.S.R. P/TUB 8" m 45.86 2.76 126.57
01.12.05.01.01.03.0 SUM. Y COLOC. CAMA DE ARENA PARA APOYO TUBERIA E=0.10 - P/TUB. 1" - 1 1/2" m 222.64 1.97 438.60
01.12.05.01.01.03.0 SUM. Y COLOC. CAMA DE ARENA PARA APOYO E=0.10 - CM - P/TUB. 2" - 3" m 263.02 1.97 518.15
01.12.05.01.01.03.0 SUM. Y COLOC. CAMA DE ARENA PARA APOYO E=0.10 - CM - P/TUB. 4" - 6" m 894.09 2.02 1,806.06
01.12.05.01.01.03.0 SUM. Y COLOC. CAMA DE ARENA PARA APOYO E=0.10 - CM - P/TUB. 8" m 45.86 2.02 92.64
01.12.05.01.01.04.0 RELLENO Y COMP DE ZANJA T.S.R. - H MENOR 1.00 M - P/TUB. 1" - 1 1/2" m 239.58 27.83 6,667.51
01.12.05.01.01.04.0 RELLENO Y COMP DE ZANJA T.S.R. - H MENOR 1.00 M - P/TUB. 2" - 3" m 263.02 27.83 7,319.85
01.12.05.01.01.04.0 RELLENO Y COMP DE ZANJA T.S.R. - H MENOR 1.00 M - P/TUB. 4" - 6" m 894.09 28.25 25,258.04
01.12.05.01.01.04.0 RELLENO Y COMP DE ZANJA T.S.R. - H MENOR 1.00 M - P/TUB. 8" m 45.86 28.25 1,295.55
01.12.05.01.02.01 TUBERIAS
01.12.05.01.02.01.0 SUM. E INST. TUB. PVC-CP-D=4" (INC. EXCAV. - RELLENO Y COMPACT.) m 126.01 24.10 3,036.84
01.12.05.01.02.01.0 SUM. E INST. TUB. PVC-CP-D=6" (INC. EXCAV. - RELLENO Y COMPACT.) m 4.39 49.10 215.55
01.12.05.01.02.01.0 SUM. E INST. TUB. PVC-UU-S.20 , D=110 MM (INC. EXCAV. - RELLENO Y COMPACT.) m 56.19 78.31 4,400.24
01.12.05.01.02.01.0 SUM. E INST. TUB. PVC-UU-S.20 , D=160 MM (INC. EXCAV. - RELLENO Y COMPACT.) m 337.18 99.11 33,417.91
01.12.05.01.02.01.0 SUM. Y COLOCACION TUB PVC - UF - P/DES. D=200 MM - INC. DESP Y ACCES m 45.86 172.83 7,925.98
01.12.05.01.02.02.0 CAJAS DE REGISTRO DE DESAGUE 12" x 24" und 40.00 168.84 6,753.60
01.12.05.01.02.02.0 CAJAS DE REGISTRO DE DESAGUE 24" x 24" und 2.00 256.40 512.80
01.12.05.02.01.01 TUBERIAS
01.12.05.02.01.01.0 SUM. E INST. TUB. PVC C-10 - D=1.1/4" m 5.33 19.98 106.49
01.12.05.02.01.01.0 SUM. E INST. TUB. PVC C-10 - D=1.1/2" (INC. EXCAV. RELLENO Y COMPACT.) m 61.49 31.02 1,907.42
01.12.05.02.01.01.0 SUM. E INST. TUB. PVC C-10 - D=2" (INC. EXCAV. RELLENO Y COMPACT.) m 50.26 23.16 1,164.02
01.12.05.02.01.01.0 SUM. E INST. TUB. PVC C-10 - D=2.1/2" (INC. EXCAV. RELLENO Y COMPACT.) m 41.10 25.05 1,029.56
Pág. 9
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
01.12.05.02.01.01.0 SUM. E INST. TUB. PVC C-10 - D=4" (INC. EXCAV. RELLENO Y COMPACT.) m 614.12 37.88 23,262.87
01.12.05.02.01.01.0 SUM. E INST. TUB. PVC C-10 - D=6" (INC. ACCES. Y SOPORT.) m 13.14 77.76 1,021.77
01.12.05.02.01.02 VALVULAS
01.12.05.02.01.02.0 SUM. E INST. VALV. ESFERICA DE BRONCE C150 - D=1.1/4" (INC. UU, NIPLES DE F°G° Y CAJUELA DE CONCRETO) m 1.00 93.41 93.41
01.12.05.02.01.02.0 SUM. E INST. VALV. ESFERICA DE BRONCE C150 - D=1.1/2" (INC. UU, NIPLES DE F°G° Y CAJUELA DE CONCRETO) m 5.00 103.41 517.05
01.12.05.02.01.02.0 SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=2" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA) und 11.00 123.41 1,357.51
01.12.05.02.01.02.0 SUM. E INST. VALV. ESFERICA DE BRONCE C150 - D=2 1/2" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA) m 5.00 155.41 777.05
01.12.05.02.01.03.0 CAJA DE REGISTRO DE CONCRETO DE 10"x20" INC. TAPA DE CONCRETO Y JALADOR und 153.00 80.25 12,278.25
01.12.05.02.02.01 ELECTROBOMBA EJE VERTICAL DE VELOCIDAD VARIABLE Y PRESION CONSTANTE PARA AGUA POTABLE Q=8.75 LPS - 65 M - und 3.00 2,500.00 7,500.00
01.12.05.02.02.02 ELECTROBOMBA SUMIDERO Q=3 LPS - 10 M, - INC. TABLERO DE CONTROL und 1.00 1,400.00 1,400.00
01.12.05.02.02.03 MOTOBOMBA DIESEL Q=350 GPM - 175 PSI INC. ELECTROBOMBA JOCKEY 15 GPM PSI INC. TABLERO DE CONTROL und 1.00 2,550.00 2,550.00
01.12.05.02.02.04 SUM. E INST. VALVULAS - NIPLERIA Y ACCES. EN CISTERNA Y CTO BOMBAS glb 1.00 2,500.00 2,500.00
01.12.06.02.01 SALIDA DE TECHO C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2, CAJAS PESADAS pto 14.00 97.17 1,360.38
01.12.06.02.02 SALIDA DE PARED C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2, CAJAS PESADAS pto 4.00 89.42 357.68
01.12.06.02.03 SALIDA PARA LUZ DE CONMUTACION SIMPLE C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2 CAJAS PESADAS pto 4.00 106.22 424.88
01.12.06.02.04 SALIDA P/INTERRUPTOR SIMPLE, TUB. PVC-P (1/2) CABLE THW 2.5mm2, CAJAS PESADAS pto 14.00 81.72 1,144.08
01.12.06.02.05 SALIDA P/TOMACORRIENTE BIPOLAR DOBLE TUB. PVC-P (1/2) CABLE LSOH 4mm2 CAJAS PESADAS pto 18.00 92.69 1,668.42
01.12.06.03 TUBERIAS/ALIMENTADORES
01.12.06.04.01 CAJA DE PASO FºGº DE 100x100x50mm, PESADO pza 2.00 38.92 77.84
01.12.06.04.02 CAJA DE PASO FºGº DE 200x200x100mm, PESADO pza 12.00 55.69 668.28
01.12.06.06 ARTEFACTOS/LUMINARIAS
01.12.06.06.01 REJILLA DE ALUMINIO P/EMPOTRAR CON LAMPARA LED 3X22W, ALTA EFICIENCIA und 2.00 400.71 801.42
01.12.06.06.02 LUMINARIA CIRCULAR P/EMPOTRAR C/LAMPARA LED DE 20W P/TECHO und 6.00 295.77 1,774.62
01.12.06.06.03 ARTEFACTO FLURESCENTE CON LAMPARA COMPACTO DE 1x18W P/TECHO pza 6.00 55.77 334.62
01.12.06.06.04 LUMINARIA TIPO BRAQUET C/2 LAMP. COMP. DE 18W E27 und 4.00 69.20 276.80
01.12.06.06.07 REFLECTOR CON LAMPARA LED DE 500W und 20.00 3,826.47 76,529.40
01.12.06.06.08 LUMINARIA DE ALUMBRADO PUBLICO CON LAMPARA LED DE 80W und 40.00 2,292.31 91,692.40
01.12.06.07.01 TABLERO DE DISTRIBUCION TRIFASICA DE 1ITM + 24POLOS + 12ID und 2.00 840.22 1,680.44
01.12.06.07.03 TABLERO DE CONTROL DE ENCENDIDO Y APAGADO TC-EA und 5.00 965.38 4,826.90
01.12.06.07.04 TABLERO DE CONTROL PARA ESPECTACULOS 32A und 4.00 857.69 3,430.76
Pág. 10
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
01.12.06.08.07 INTERRUPTOR TERMOMAGNETICO TRIFASICA 3x75A, 380 V und 1.00 125.71 125.71
01.12.06.09.01 EXCAVACION DE HOYO PARA PUESTA A TIERRA und 2.00 72.98 145.96
01.12.06.11 VARIOS
01.12.06.11.01 POSTE METALICO P/ILUMINACION EXTERIOR PLATAFORMA und 10.00 699.14 6,991.40
01.12.06.11.02 PASTORAL P/ILUMINACION EXTERIOR INCLUYE ACC. FIJ. und 40.00 395.87 15,834.80
01.12.06.11.03 POSTE DE CONCRETO ARMADO CENTRIFUGADO 9/300 und 20.00 1,298.39 25,967.80
01.12.06.12.02.01 POSTE DE CONCRETO ARMADO CENTRIFUGADO 13/400/2/180/355 und 1.00 2,024.08 2,024.08
01.12.06.12.05 ARMADOS
01.12.06.12.06 SUBESTACION
01.12.06.12.07.01 EXCAVACION DE HOYOS EN TERRENO TERRENO NORMAL POSTES Y PAT und 2.00 37.19 74.38
02.01.01 ESTRUCTURAS
02.01.01.01.01 CAMPAMENTO PROVISIONAL DE OBRA glb 1.00 1,872.42 1,872.42 100.00% 1872.42
02.01.01.01.02 CARTEL DE IDENTIFICACION DE OBRA DE 3.60x2.40 m und 3.00 1,248.26 3,744.78 100.00% 3744.78
Pág. 11
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
02.01.01.03.04 EXCAVACION PARA ZAPATAS DE 2.00 M. A 2.50 M. DE PROFUNDIDAD m3 5,875.25 30.41 178,666.35
02.01.01.03.05 EXCAVACION PARA CIMIENTOS HASTA 1.50 m TERRENO NORMAL m3 115.20 31.00 3,571.20
02.01.01.03.06 EXCAVACION PARA VIGAS DE CIMENTACION HASTA 1.50 M EN TERRENO NORMAL m3 247.00 309.96 76,560.12
02.01.01.03.08 RELLENO COMPACTADO CON EQUIPO Y MATERIAL SELECCIONADO m3 1,320.76 31.80 42,000.17
02.01.01.03.09 NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA m2 2,973.74 3.37 10,021.50
02.01.01.03.10 ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m m3 6,237.45 30.41 189,680.85
02.01.01.03.11 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES m3 5,253.69 8.03 42,187.13
02.01.01.04.01 FALSO PISO DE 4" MEZCLA 1:8 (C:H) m2 2,943.38 42.01 123,651.39
02.01.01.04.02 SUBCIMIENTOS Y SUBZAPTAS CONCRETO 1:10 C:H + 30% P. G. m3 650.87 160.70 104,594.81
02.01.01.04.03 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G. m3 58.71 241.75 14,193.14
02.01.01.04.04 SOBRECIMIENTOS MEZCLA 1:8 C:H + 25% P.M. m3 31.15 282.43 8,797.69
02.01.01.04.06 RAMPAS DE CONCRETO: f´c=175 kg/cm2 ACAB. 1:2 FROTACH. Y PULIDO m2 7.18 43.03 308.96
02.01.01.05.01.03 SOBRECIMIENTOS REFORZADOS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 2,036.43 3.52 7,168.23
02.01.01.05.02 ZAPATAS
02.01.01.05.02.02 ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 36,987.03 3.78 139,810.97
02.01.01.05.03.01 VIGAS DE CIMENTACION: CONCRETO PREMEZCLADO f'c=210 kg/cm2 m3 207.32 440.91 91,409.46
02.01.01.05.03.03 VIGAS DE CIMENTACION: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 23,738.10 3.78 89,730.02
02.01.01.05.04 COLUMNAS
02.01.01.05.04.04 COLUMNAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 110,589.31 3.78 418,027.59
02.01.01.05.05 VIGAS
Pág. 12
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
02.01.01.05.05.04 VIGAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 71,239.05 3.78 269,283.61
02.01.01.05.06 GRADERIOS
02.01.01.05.06.03 GRADERIOS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 33,407.30 3.78 126,279.59
02.01.01.05.07 PLACAS
02.01.01.05.07.03 PLACAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 11,256.91 3.54 39,849.46
02.01.01.05.08 ESCALERAS
02.01.01.05.08.03 ESCALERAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 6,423.10 3.78 24,279.32
02.01.01.05.09.03 LOSAS MACIZAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 662.26 3.78 2,503.34
02.01.01.05.10.03 LOSAS ALIGERADAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 8,403.41 3.60 30,252.28
02.01.01.05.10.04 LOSAS ALIGERADAS: LADRILLO HUECO DE ARCILLA DE 15 x 30 x 30 cm PARA TECHO und 8,763.00 3.51 30,758.13
02.01.01.05.11.03 DRENAJE: ACERO CORRUGADO FY=4200 kg/cm2 GRADO 60 kg 408.45 3.78 1,543.94
02.01.01.05.12.03 MESADA: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 670.04 3.54 2,371.94
02.01.01.05.14.01 REHABILITACION DE ESTRUCTURAS (SELLADO CON CONCRETO) glb 1.00 90,000.00 90,000.00
02.01.02 ARQUITECTURA
02.01.02.01.01 MURO DE LADRILLO KK TIPO IV CABEZA M 1:1:4 e=1.50 cm m2 1,738.10 109.52 190,356.71
02.01.02.01.02 MURO DE LADRILLO KK TIPO IV SOGA M 1:1:4 e=1.50 cm m2 6,700.77 65.90 441,580.74
02.01.02.01.04 TABIQUE DE MELAMINE CON ESTRUCTURA DE ALUMINIO EN CUBICULOS DE SSHH m2 743.78 80.72 60,037.92
02.01.02.01.05 JUNTA DE DILATACION CON ESPUMA PLASTICA MAS JEBE MICROPOROSO m 1,247.50 12.58 15,693.55
02.01.02.02.01 TARRAJEO PRIMARIO O RAYADO, MORTERO C:A 1:5 m2 2,451.82 10.09 24,738.86
02.01.02.02.04 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA m2 6,484.35 26.17 169,695.44
02.01.02.02.05 TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO - ARENA m2 3,307.95 33.30 110,154.74
02.01.02.03.01 CIELORASO CON MEZCLA DE CEMENTO - ARENA 1:5 m2 4,025.18 26.47 106,546.51
Pág. 13
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
02.01.02.04.01 FALSO PISO DE 4" MEZCLA 1:8 (C:H) m2 6,347.84 29.57 187,705.63
02.01.02.04.02 CONTRAPISO DE 40 mm (MEZCLA C:A BASE 1:5, ACABADO 1:2) m2 7,305.37 22.69 165,758.85
02.01.02.04.03 PISO DE CEMENTO SIN COLOREAR: ACABADO PULIDO e=2" m2 803.59 32.95 26,478.29
02.01.02.04.04 PISO DE CEMENTO COLOREADO (OCRE AZUL): ACABADO PULIDO m2 2,827.24 35.19 99,490.58
02.01.02.05 ZOCALOS
02.01.02.06 CONTRAZOCALOS
02.01.02.06.03 CONTRAZOCALO DE MADERA CEDRO DE 3/4" X 4" CON RODON DE 3/4" m 163.57 11.81 1,931.76
02.01.02.10 CERRAJERIA
02.01.02.10.02 BISAGRAS CAPUCHINA ALUMINIZADA DE 3" PESADA EN PUERTAS und 1,471.00 15.00 22,065.00
02.01.02.10.03 CERRADURA DE TRES GOLPES PUERTAS INTERIORES und 44.00 85.01 3,740.44
02.01.02.10.05 MANIJA DE 3" ALUMINIZADA PARA PUERTA pza 44.00 47.01 2,068.44
02.01.02.11.04 MAMPARA EN CRISTAL TEMPLADO DE 8 mm CON ESTRUCTURA DE ALUMINIO m2 198.56 198.36 39,386.36
02.01.02.12 PINTURA
02.01.02.12.02 PINTURA LATEX 2 MANOS EN MUROS INTERIORES (VINILATEX O SIM.) m2 8,114.57 8.09 65,646.87
02.01.02.12.03 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES (SUPERLATEX O SIM.) m2 3,885.70 8.09 31,435.31
02.01.02.12.04 PINTURA LATEX 2 MANOS EN COLUMNAS (VINILATEX O SIM.) m2 6,484.35 13.21 85,658.26
02.01.02.12.05 PINTURA LATEX 2 MANOS EN VIGAS (VINILATEX O SIM.) m2 3,307.95 13.43 44,425.77
02.01.02.12.07 PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS m2 2,258.21 13.48 30,440.67
02.02 SEÑALIZACION
Pág. 14
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
02.02.01 PINTURA
02.02.02 VARIOS
02.02.04 LETREROS DE ZONA DE SEGURIDAD EN CASO DE SISMOS und 330.00 32.60 10,758.00
02.03.01.01.01 SALIDA DE A.F. PVC C/R - 1/2" C-10 pto 217.00 16.14 3,502.38
02.03.01.01.02 SALIDA DE A.F. PVC C/R - 1" C-10 pto 261.00 14.99 3,912.39
02.03.01.01.03 SALIDA DE A.F. PVC C/R - 1.1/4" C-10 pto 154.00 29.84 4,595.36
02.03.01.02.01 SUM. E INST. TUB. PVC C-10 - D=1.1/4" m 145.49 12.80 1,862.27
02.03.01.02.02 SUM. E INST. TUB. PVC C-10 - D=1.1/2" m 153.22 13.18 2,019.44
02.03.01.02.03 SUM. E INST. TUB. PVC C-10 - D=2" m 76.32 14.44 1,102.06
02.03.01.02.04 SUM. E INST. TUB. PVC C-10 - D=2.1/2" m 95.34 16.75 1,596.95
02.03.01.03 VALVULAS
02.03.01.03.01 SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1/2" und 6.00 40.66 243.96
02.03.01.03.02 SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=3/4" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA) und 28.00 71.66 2,006.48
02.03.01.03.03 SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA) und 11.00 74.66 821.26
02.03.01.03.04 SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1.1/4" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA) und 56.00 92.66 5,188.96
02.03.01.03.05 SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1.1/2" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA) und 27.00 102.66 2,771.82
02.03.01.03.06 SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=2" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA) und 3.00 122.66 367.98
02.03.02.01.01 SALIDA AGUA CALIENTE TUBERIA CPVC O 1/2" pto 69.00 86.31 5,955.39
02.03.02.01.02 SALIDA AGUA CALIENTE TUBERIA CPVC O 3/4" pto 11.00 89.41 983.51
02.03.02.02.01 SUM. Y COLOC. TUB. CPVC D=3/4 ENTERRADA INC. DESP Y ACCES m 10.33 16.54 170.86
02.03.02.03.01 SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1/2" und 4.00 55.41 221.64
02.03.02.04.01 SUM Y COLOC. THERMAS 100 LT INCL. TIMER Y ACCES P/INST pto 1.00 750.00 750.00
02.03.02.04.02 SUM Y COLOC. THERMAS 150 LT INCL. TIMER Y ACCES P/INST pto 15.00 1,050.00 15,750.00
02.03.03.01.01 TUBERIA HDPE PN15 2 1/2" PARA AGUA POTABLE CON UNIONES TERMOFUSIONADAS m 125.00 18.27 2,283.75
02.03.03.01.02 TUBERIA HDPE PN15 4" PARA AGUA POTABLE CON UNIONES TERMOFUSIONADAS m 685.00 19.58 13,412.30
02.03.03.01.03 TUBERIA HDPE PN15 6" PARA AGUA POTABLE CON UNIONES TERMOFUSIONADAS m 35.00 22.72 795.20
02.03.03.02.01 TUBERIA ACERO SCH 40 2 1/2" INC. PINTURA 8 MILS - INCL SOPORTE m 87.50 132.02 11,551.75
02.03.03.02.02 TUBERIA ACERO SCH 40 4" INC. PINTURA 8 MILS - INCL SOPORTE m 26.00 177.04 4,603.04
02.03.03.03 GABINETE
02.03.04.01.04 SALIDA DE VENTILACION PROMEDIO PVC CP - 2" pto 531.00 81.99 43,536.69
02.03.04.02.01 SUM. E INST. TUB. PVC CP - D=4" (INC. EXCAV. RELLENO Y COMPACT.) m 74.10 24.10 1,785.81
02.03.04.02.02 SUM. E INST. TUB. PVC CP - D=6" (INC. EXCAV. RELLENO Y COMPACT.) m 6.14 49.10 301.47
02.03.04.02.03 SUM. Y COLOC. TUB. PVC-CP D=3" COLGADAS INCL. DESP Y ACCES - COLG Y SOPORTE m 364.00 22.96 8,357.44
Pág. 15
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
02.03.04.02.04 SUM. Y COLOC. TUB. PVC-CP D=4" COLGADAS INCL. DESP Y ACCES - COLG Y SOPORTE m 434.80 26.86 11,678.73
02.03.04.02.05 SUM. Y COLOC. TUB. PVC-CP D=3" ADOSADAS INCL. DESP Y ACCES - COLG Y SOPORTE m 644.00 22.96 14,786.24
02.03.04.02.06 SUM. Y COLOC. TUB. PVC-CP D=4" ADOSADAS INCL. DESP Y ACCES - COLG Y SOPORTE m 462.00 26.86 12,409.32
02.03.04.03.01 SUM. E INST. REGISTRO ROSCADO A RAS DE PISO - BRONCE CROMADO PESADO 2" pza 51.00 42.24 2,154.24
02.03.04.03.02 SUM. E INST. SUMIDERO BRONCE CROMADO PESADO - 3" pza 52.00 33.01 1,716.52
02.03.04.03.04 SUM. E INST. REGISTRO ROSCADO A RAS DE PISO - BRONCE CROMADO PESADO 3" pza 45.00 48.24 2,170.80
02.03.04.03.05 SUM. E INST. REGISTRO ROSCADO A RAS DE PISO - BRONCE CROMADO PESADO 4" pza 95.00 52.74 5,010.30
02.03.04.03.06 SUM. E INST. REGISTRO ROSCADO A RAS DE PISO - BRONCE CROMADO PESADO 6" und 33.00 108.74 3,588.42
02.03.04.04.01 CAJAS DE REGISTRO DE DESAGUE 12" x 24" und 41.00 168.84 6,922.44
02.03.04.05.01 INODORO CON VALVULA SEMIAUTOMATICA INC/ACCESORIO und 165.00 115.00 18,975.00
02.03.04.05.04 LAVADERO DE ACERO INOXIDABLE UNA POZA und 2.00 250.00 500.00
02.04.02.01 SALIDA DE TECHO C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2, CAJAS PESADA pto 527.00 88.52 46,650.04
02.04.02.02 SALIDA DE PARED C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2, CAJAS PESADAS pto 68.00 89.42 6,080.56
02.04.02.03 SALIDA PARA LUZ DE CONMUTACION SIMPLE C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2 CAJAS PESADAS pto 82.00 106.22 8,710.04
02.04.02.04 SALIDA P/INTERRUPTOR SIMPLE, TUB. PVC-P (1/2) CABLE LS0H 2.5mm2, CAJAS PESADAS pto 118.00 76.52 9,029.36
02.04.02.05 SALIDA P/INTERRUPTOR DOBLE, TUB. PVC-P (1/2) CABLE LS0H 2.5mm2, CAJAS PESADAS pto 36.00 84.52 3,042.72
02.04.02.06 SALIDA P/TOMACORRIENTE BIPOLAR DOBLE TUB. PVC-P (1/2) CABLE LSOH 4mm2 CAJAS PESADAS pto 373.00 90.72 33,838.56
02.04.02.07 SALIDA P/SECADORA DE MANOS, TUB. PVC-P (1/2) CABLE LSOH 4mm2 CAJAS PESADAS pto 22.00 50.32 1,107.04
02.04.02.08 SALIDA PARA ILUMINACION DE EMERGENCIA, TUB. PVC-P (1/2) CABLE LSOH 4mm2, CAJA PESADA pto 118.00 43.81 5,169.58
02.04.02.09 SALIDA DE FUERZA PARA EXTRACTOR DE AIRE, TUB. PVC-P (1/2) CABLE LSOH 4mm2, CAJA PESADA pto 53.00 43.81 2,321.93
02.04.03 TUBERIAS/ALIMENTADORES
02.04.04.01 CAJA DE PASO FºGº DE 100x100x50 mm, PESADO pza 14.00 40.19 562.66
02.04.04.02 CAJA DE PASO FºGº DE 150x150x100 mm, PESADO pza 3.00 41.09 123.27
02.04.04.03 CAJA DE PASO FºGº DE 200x200x100 mm, PESADO pza 9.00 43.69 393.21
02.04.04.04 BUZON DE CONCRETO DE 1.00x1.00x1.00m, PARA INSTALACIONES ELECTRICAS und 12.00 1,000.00 12,000.00
Pág. 16
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
02.04.06 ARTEFACTOS/LUMINARIAS
02.04.06.01 REJILLA DE ALUMINIO P/ADOSAR CON LAMPARA DE LED 3X24W, ALTA EFICIENCIA und 101.00 400.71 40,471.71
02.04.06.02 LUMINARIA CIRCULAR P/EMPOTRAR C/LAMPARA LED DE 20W P/TECHO und 309.00 295.77 91,392.93
02.04.06.03 LUMINARIA C/LAMPARA FLUORESCENTE COMPACTA DE 2X18W, 2X1200 LUMENES P/TECHO und 49.00 95.71 4,689.79
02.04.06.04 LUMINARIA DE EMERGENCIA C/LAMPARA LED DE 2x10W und 118.00 141.57 16,705.26
02.04.06.05 LUMINARIA TIPO BRAQUET C/2 LAMP. COMP. DE 18W E27 und 68.00 69.20 4,705.60
02.04.06.06 REFLECTOR CON LAMPARA HM DE 2000W, 230000 LUMENES und 132.00 3,905.64 515,544.48
02.04.06.07 REFLECTOR TIPO CAMPANA C/LAMPARA LED DE 100W, 10000 LUMENES und 56.00 1,085.64 60,795.84
02.04.06.08 LUMINARIA C/SOCKET, E27, C/LAMP. FC 65W, 4000 LUMENES und 28.00 105.61 2,957.08
02.04.06.10 LUMINARIA CINTA LED, TIPO MANGUERA DE 30M und 6.00 641.42 3,848.52
02.04.07.01 TABLERO TRIFASICO TPN, AUTOSOPORTADO 630A und 1.00 15,165.67 15,165.67
02.04.07.02 TABLERO TRIFASICO TPE, AUTOSOPORTADO 400A und 1.00 12,165.67 12,165.67
02.04.07.03 TABLERO TRIFASICO P/EMPOTRAR DE 18 POLOS + 6ID und 14.00 477.61 6,686.54
02.04.07.04 TABLERO TRIFASICO P/EMPOTRAR DE 24 POLOS + 8ID und 5.00 632.83 3,164.15
02.04.07.05 TABLERO TRIFASICO P/EMPOTRAR DE 24 POLOS + 10ID und 1.00 682.83 682.83
02.04.07.06 TABLERO TRIFASICO P/EMPOTRAR DE 1 ITMG+36 POLOS+12ID, 100A und 1.00 3,165.67 3,165.67
02.04.07.08 TABLERO GENERAL NORMAL TGN, AUTOSOPORTADO 800A. und 1.00 16,657.25 16,657.25
02.04.07.09 TABLERO GENERAL DE EMERGENCIA TGE 500A. und 1.00 9,657.25 9,657.25
02.04.07.10 TABLERO DE CONTROL DE ENCENDIDO Y APAGADO TC-EA und 4.00 965.38 3,861.52
02.04.07.11 TABLERO DE CONTROL DE BOMBEO DE CONTRAINCENDIO TBCI und 1.00 3,715.38 3,715.38
02.04.09.01 EXCAVACION DE HOYO PARA PUESTA A TIERRA und 6.00 364.87 2,189.22
02.04.11 VARIOS
02.04.11.03 TABLERO ELECTRONICO CON PANTALLA DIGITAL glb 1.00 100,000.00 100,000.00
Pág. 17
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
02.04.11.05 PARARRAYOS TIPO DESIONIZANTE PDCE SENIOR R=120m, INC. ACC. jgo 1.00 16,000.00 16,000.00
02.04.11.06 SUM Y COLOC. THERMAS 110 LT INCL. TIMER Y ACCES. P/INST. 2000 W und 4.00 750.00 3,000.00
02.05.01.02 LOSAS MACIZAS PARA EL MONTAJE DEL GRUPO ELECTROGENO m2 1.00 450.00 450.00
02.05.01.04 SUMINISTRO Y MONTAJE DE SILENCIADOR Y DUCT. DE ESCAPE und 1.00 12,000.00 12,000.00
02.05.02.01.01 TANQUE DIARIO DE PETROLEO DE 100 GALONES (INCLUYE SOPORTE) und 1.00 950.00 950.00
02.05.02.01.02 TANQUE DE ALMACENAMIENTO DE 500 GALONES (INCLUYE SOPORTE) und 1.00 15,004.00 15,004.00
02.05.02.03 TUBERIAS
02.05.02.04.01 UNION FLEXIBLE DE 1" (SIST. PETROLEO) und 4.00 9.80 39.20
02.05.02.04.02 UNION FLEXIBLE DE 1 1/4" (SIST. PETROLEO) und 4.00 11.80 47.20
02.05.02.04.03 UNION FLEXIBLE DE 1 1/2" (SIST. PETROLEO) und 4.00 12.80 51.20
02.05.02.04.16 REDUCCION DE ACERO CEDULA 40 DE 1 1/4" A 1/2" pza 4.00 11.21 44.84
02.05.02.04.17 REDUCCION DE ACERO CEDULA 40 DE 1 1/4" A 3/4" pza 2.00 11.21 22.42
02.05.02.04.18 REDUCCION DE ACERO CEDULA 40 DE 1 1/4" A 1" pza 2.00 11.21 22.42
02.05.02.04.19 REDUCCION DE ACERO CEDULA 40 DE 1 1/2" A 1/2" pza 2.00 13.21 26.42
02.05.02.04.20 REDUCCION DE ACERO CEDULA 40 DE 1 1/2" A 1 1/4" pza 4.00 13.21 52.84
02.05.02.04.21 REDUCCION DE ACERO CEDULA 40 DE 2" A 1 1/2" pza 5.00 18.21 91.05
02.05.02.04.22 REDUCCION DE ACERO CEDULA 40 DE 2" A 1/2" pza 2.00 18.21 36.42
02.05.02.05 VALVULAS
Pág. 18
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
02.05.02.06.08 CONTROL DE NIVEL VARILLA+FLOTADOR (ACERO INOXIDABLE) und 2.00 4,310.97 8,621.94
02.05.02.06.11 POZO DE PUESTA A TIERRA (15 OMH) und 1.00 1,430.54 1,430.54
02.05.02.06.12 CABLE DE COBRE DESNUDO DE 10 mm2 - TUB. 20 mm. m 16.00 7.61 121.76
02.05.02.07.01 ELECTROBOMBA DE Q=12.5 GPM, H=17.3M,P=1 HP (PETROLEO), INC. TAB. DE CONTROL glb 2.00 1,200.00 2,400.00
02.05.02.08 PRUEBAS
02.05.02.09 PRUEBA DE INSTALAC. DEL SISTEMA DE PETROLEO glb 1.00 951.00 951.00
02.06.02.01 TABLERO CENTRAL PARA CONTROL DE INCENDIOS 1 pto 14.00 5,138.38 71,937.32
02.06.02.04 SALIDA PARA DIFUSOR DE SONIDO O SIRENA pto 14.00 69.58 974.12
02.06.03.02 SALIDA PARA PARLANTES DE ALTA POTENCIA pto 39.00 539.26 21,031.14
02.06.04.02 UNIDAD DE ADMINISTRACION DE CCTV, GRAVADOR DVR glb 1.00 21,934.25 21,934.25
02.06.08.04 CAJA DE PASO FºGº DE 250x250x150 mm, PESADO pza 65.00 82.69 5,374.85
Pág. 19
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
02.06.10 OTROS
02.06.10.01 SERVICIO DE INSTALACION Y CONFIGURACION DE EQUIPOS DE COMUNICACIONES glb 1.00 1,000.00 1,000.00
02.06.10.02 SERVICIO DE INSTALACION Y CONFIGURACION DE EQUIPOS DE SEGURIDAD glb 1.00 1,000.00 1,000.00
03.01.02.01 DEMOLICIONES
03.01.02.02 DESMONTAJES
03.01.03.06 ACARREO DE MATERIAL PROVENIENTE DE LA DEMOLICION DEL CONCRETO m3 303.79 26.06 7,916.77
03.01.04.01 EXTRACCION Y APILAMIENTO DE MATERIAL DE SUB BASE EN CANTERA m3 4,083.62 3.79 15,476.92
03.01.05.02 PREPARACION Y BATIDO DE TIERRA AGRICOLA + ARENA FINA + ABONO NATURAL m3 2,880.23 14.55 41,907.35
03.01.05.03 ESPARCIDO Y COMPACTADO DE BATIDO DE TIERRA AGRICOLA + ARENA FINA + ABONO NATURAL m3 7,891.05 22.96 181,178.51
03.01.06 GRAMADO
03.02.02.02 SUMINISTRO Y COLOCACION DE TUBERIA APANELADA PARA DRENAJE m3 1,827.84 76.80 140,378.11
03.02.02.03 ACCESORIOS PARA INSTALACION DETUBERIA - TAPONES und 56.00 250.01 14,000.56
03.02.02.04 ACCESORIOS PARA INSTALACION DETUBERIA - CODOS und 56.00 137.87 7,720.72
03.02.02.05 ACCESORIOS PARA INSTALACION DETUBERIA - ACOPLES und 56.00 112.99 6,327.44
03.02.02.06 ACCESORIOS PARA INSTALACION DETUBERIA - EMPALMES und 56.00 136.36 7,636.16
03.02.02.07 ACCESORIOS PARA INSTALACION DETUBERIA - GEOTEXTIL und 1,462.27 30.36 44,394.52
03.02.03.01 SUMINISTRO Y COLOCACION DE TUBERIA HDPE ADS D=10" m 220.00 66.90 14,718.00
03.02.04.01 EXCAVACION MANUAL DE ZANJAS PARA TUBERIA COLECTOR m 197.50 6.97 1,376.58
Pág. 20
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
03.02.04.04 RELLENO CON MATERIAL CLASIFICADO POR CAPAS m3 197.50 14.50 2,863.75
03.02.04.06 SUMINISTRO Y COLOCACION DE TUBERIA PVC S-20 D=250 MM m 83.40 82.53 6,883.00
03.02.04.07 SUMINISTRO Y COLOCACION DE TUBERIA PVC S-20 D=315 MM m 33.10 104.80 3,468.88
03.02.04.08 SUMINISTRO Y COLOCACION DE TUBERIA PVC S-20 D=355 MM m 81.00 134.39 10,885.59
03.02.06.02 CANAL: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,808.80 3.52 6,366.98
03.02.06.05 TAPA: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 628.32 3.52 2,211.69
03.03.02.02 RELLENO CON MATERIAL CLASIFICADO POR CAPAS m3 126.67 14.50 1,836.72
03.03.03.01 TUBERIAS
03.03.03.02 ASPERSORES
03.03.03.03.03 ACCESORIOS VARIOS EN INSTALACION DE TUBERIA HDPE glb 1.00 3,500.00 3,500.00
03.03.05.02 TABLERO ELECTRICO DE CONTROL AUTOMATICO DE ELECTROBOMBA und 1.00 1,500.00 1,500.00
03.03.07 OTROS
03.03.07.02 PRUEBA HIDRAULICA DEL SISTEMA DE DRENAJE glb 2.00 4,500.00 9,000.00
03.04.01 ESTRUCTURAS
Pág. 21
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
03.04.01.02.01 EXCAVACION PARA ZAPATAS DE 1.00 m A 1.40 m DE PROFUNDIDAD m3 46.97 37.19 1,746.81
03.04.01.02.02 EXCAVACION PARA CIMIENTOS HASTA 1.00 m TERRENO NORMAL m3 93.79 31.00 2,907.49
03.04.01.02.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL SELECCIONADO m3 26.54 40.22 1,067.44
03.04.01.02.04 NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA m2 126.75 5.03 637.55
03.04.01.02.05 ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m m3 134.40 30.41 4,087.10
03.04.01.02.06 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES m3 134.40 44.02 5,916.29
03.04.01.03.01 SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 C:H m2 49.44 26.17 1,293.84
03.04.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G. m3 65.65 241.75 15,870.89
03.04.01.04.01 ZAPATAS
03.04.01.04.01.02 ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 232.79 3.78 879.95
03.04.01.04.02 DADOS
03.04.01.04.02.03 DADOS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 620.33 3.52 2,183.56
03.04.01.05 ARQUITECTURA
03.04.01.05.02.02 TUBO METALICO DE 4" EN MALLA OLIMPICA 1 und 170.00 338.60 57,562.00
03.04.01.05.03 PINTURA
03.04.01.05.03.01 PINTURA LATEX 2 MANOS EN SARDINEL DE CONCRETO (SUPERLATEX O SIM.) m2 451.15 8.09 3,649.80
03.04.01.05.03.02 PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS m2 1,414.64 13.48 19,069.35
RENOVACION DE CAMPO DEPORTIVO DE FUTBOL, PISTA ATLETICA,PLATAFORMAS DEPORTIVAS, MEJORAMIENTO Y AMPLIACION DE LAS
04
TRIBUNAS Y OBRAS COMPLEMENTARIAS
04.01 TRATAMIENTO DE PISTA ATLETICA
04.01.02.01.01 EXCAVACION A NIVEL DE SUBRASANTE AREA DE LA PISTA ATLETICA m3 1,165.01 9.49 11,055.94
04.01.02.02 GEOTEXTIL
04.01.02.03 SARDINELES
04.01.02.03.08 COBERTURA DE CAUCHO DE FOSA DE SALTO LARGO Y TRIPLE m 42.00 23.00 966.00
04.01.02.04 IMPRIMADO
04.01.02.05.01 SUMINISTRO Y COLOCACION DE CARPETA ASFALT. EN CALIENTE E=3" (DOS CAPAS DE 1.5") m2 5,825.06 67.60 393,774.06
Pág. 22
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
04.01.02.08 RIA
04.01.02.08.09 EXCAVACION MANUAL DE ZANJAS (PARA TUBERIA DE DESAGUE DE RIA) m 55.00 18.60 1,023.00
04.01.02.08.11 RELLENO, COMPACTACION DE ZANJA CON MATERIAL PROPIO m 55.00 3.65 200.75
Pág. 23
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
04.04.01 DEMOLICIONES
04.04.01.01 DEMOLICION DE PAVIMENTO RIGIDO (LOSA Y VEREDAS DE CONCRETO) m2 1.60 7.29 11.66
04.04.02 CAJA DE SALIDA DE VALVULA DE RIEGO (05 UND DE 0.60 x 0.40 m.)
04.04.02.05 SUMINISTRO E INSTALACION DE CAJAS DE CONCRETO PREFABRICADA DE 0.60 x 0.40 M. und 5.00 394.14 1,970.70
04.04.03 HIDRANTE
04.04.03.01 VALVULA ESFERICA DOBLE UNIVERSAL DESMONTABLE DE DIAM. 1" und 4.00 90.19 360.76
04.04.03.02 VALVULA ESFERICA DOBLE UNIVERSAL DESMONTABLE DE DIAM. 1 1/2" und 1.00 110.19 110.19
04.04.04.03 ABRAZADERAS DE FIJACION PARA TUBERIA DE 1 1/2" und 123.00 10.41 1,280.43
04.04.04.04 ABRAZADERAS DE FIJACION PARA TUBERIA DE 1" und 117.00 15.41 1,802.97
04.05.01.02 EXCAVACION A NIVEL DE SUBRASANTE AREA DE LA PISTA ATLETICA m3 316.90 9.49 3,007.38
04.05.02 GEOTEXTIL
04.06.03.01 BORDILLO INTERNO DE ALUMINIO DE LA PISTA ATLETICA glb 1.00 31,360.00 31,360.00
04.06.03.02 CAJETINES DE PERDIGA, ACERO CONFORME A NORMA IAAF, CO NTAPA und 2.00 3,706.00 7,412.00
04.06.03.03 TABLA DE BATIDA PARA SALTO LARGO Y TRIPLE, CONFORME A NORMA IAAF und 6.00 5,930.00 35,580.00
04.06.03.04 OBSTACULO DE RIA MOVIBLE/STEPLECHASE CON CALZOS und 1.00 2,870.00 2,870.00
04.06.03.06 CIRCULO DE LANZAMIENTO CON CONTENEDOR, REFUERZOS RADIALES, ALUMINIO, und 1.00 3,800.00 3,800.00
04.06.03.07 CIRCULO DE LANZAMIENTO DEL DISCO, PVC, CONFORME A NORMA IAAF und 1.00 3,000.00 3,000.00
Pág. 24
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)
04.06.03.08 REDUCTOR DEL DISCO A MARTILLO, PVC, CONFORME A NORMA IAAF Y ACCESORIOS und 1.00 3,000.00 3,000.00
04.06.03.09 JAULA PARA LANZAMIENTO DE DISCO Y MARTILLO und 1.00 40,000.00 40,000.00
06 PROTECCION AMBIENTAL
06.01.01 SUB PROGRAMA DE EDUCACION Y CAPACITACION AMBIENTAL und 8.00 275.00 2,200.00
06.03.01 COORDINACION ADMINISTRACION LOCAL DEL AGUA glb 1.00 680.00 680.00
07 INFRAESTRUCTURA DE PROTECCION
07.01.01 ARMADURA METALICA 01 L=21 m H=VARIABLE, INCLUYE ANCLAJE und 42.00 19,381.87 814,038.54
8 COBERTURAS Y CERRAMIENTOS
Pág. 26
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
9.53% 1562.12
25.01% 938.77
100.00% 1601.69
100.00% 62536.13
100.00%
100.00%
100.00%
75.67%
84.70%
Pág. 27
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
0.07% 0.71
100.00% 1472.47
100.00% 1544.29
11.26% 208.11
100.00% 1835.74
41.23% 1468.26
100.00% 1724.39
100.00% 2067.16
100.00% 3154.36
100.00% 9578.65
100.00% 2121.83
100.00% 3060.36
100.00% 1934.01
Pág. 28
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
100.00% 7972.61
100.00% 719.58
100.00% 176.07
100.00% 918.62
100.00% 543.51
100.00% 712.90
100.00% 562.70
100.00% 1538.98
100.00% 1322.06
100.00% 1732.55
100.00% 131.71
100.00% 2252.04
100.00% 14.28
100.00% 2177.22
100.00% 883.49
100.00% 377.86
100.00% 1360.00
100.00% 270.00
100.00% 170.02
100.00% 240.06
100.00% 86.00
100.00% 684.25
100.00% 1587.11
100.00% 305.07
100.00% 163.09
100.00% 299.76
100.00% 27.90
100.00% 80.06
100.00% 29.19
100.00% 120.18
100.00% 52.16
100.00% 9.52
100.00% 105.62
100.00% 364.56
100.00% 147.20
100.00% 653.51
100.00% 945.99
Pág. 29
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
100.00% 694.56
100.00% 983.48
100.00% 1081.75
100.00% 653.17
100.00% 2783.04
100.00% 504.59
100.00% 2067.85
100.00% 4650.43
100.00% 1029.13
100.00% 1753.19
100.00% 1273.15
100.00% 959.19
100.00% 991.03
100.00% 446.99
100.00% 8100.72
100.00% 503.20
100.00% 3019.18
100.00% 822.77
100.00% 820.51
100.00% 522.72
100.00% 626.51
100.00% 477.48
100.00% 654.40
100.00% 12724.15
100.00% 389.66
100.00% 381.92
100.00% 2008.74
100.00% 729.00
100.00% 4400.00
100.00% 680.08
100.00% 344.00
100.00% 241.80
100.00% 1084.35
100.00% 249.98
100.00% 490.58
Pág. 30
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
100.00% 345.96
100.00% 436.75
100.00% 92.99
100.00% 43.38
100.00% 64.56
100.00% 238.72
100.00% 216.83
100.00% 370.64
100.00% 315.84
100.00% 742.00
100.00% 655.92
100.00% 363.32
100.00% 210.96
100.00% 95.52
100.00% 230.00
100.00% 110.00
100.00% 110.00
100.00% 500.00
100.00% 50.00
100.00% 60.00
100.00% 64.00
100.00% 253.50
100.00% 32671.79
100.00% 39361.09
100.00% 23940.54
100.00% 24021.92
100.00%
100.00%
100.00%
5.26%
28.35%
55.30%
Pág. 31
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
100.00% 394.63
100.00% 157.30
100.00% 150.04
100.00% 608.63
100.00% 907.63
100.00% 2614.81
Pág. 32
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
100.00% 1836.56
100.00% 2646.47
100.00% 1403.31
100.00% 2352.82
100.00% 1620.98
100.00% 13520.91
100.00% 1576.34
100.00% 830.20
100.00% 757.59
100.00% 1804.49
100.00% 2855.00
100.00% 798.76
100.00% 10361.93
100.00% 6997.41
100.00% 338.86
100.00% 8219.34
100.00% 3501.34
100.00% 3934.02
100.00% 187851.62
23.55% 2031.41
100.00% 2500.00
100.00% 202.05
100.00% 1171.28
100.00% 3157.62
100.00% 412.34
Pág. 33
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
100.00% 559.06
100.00% 360.95
100.00% 4500.00
100.00%
100.00%
99.98%
Pág. 34
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
57.17% 1048.12
100.00% 7125.90
100.00% 507.62
100.00% 599.69
100.00% 126.57
100.00% 438.60
100.00% 518.15
100.00% 1806.06
100.00% 92.64
100.00% 6667.51
100.00% 7319.85
100.00% 1295.55
100.00% 3036.84
100.00% 215.55
100.00% 4400.24
100.00% 7925.98
100.00%
100.00%
100.00% 106.49
100.00% 1907.42
100.00% 1164.02
100.00% 1029.56
Pág. 35
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
100.00% 1021.77
100.00% 93.41
100.00% 517.05
100.00% 777.05
100.00% 12278.25
100.00% 7500.00
100.00% 1400.00
100.00% 2550.00
100.00% 2500.00
100.00% 2000.00
100.00% 357.68
100.00% 424.88
100.00% 1144.08
100.00% 1668.42
100.00% 4462.80
100.00% 579.60
100.00%
100.00%
100.00% 77.84
100.00% 668.28
100.00% 7892.52
100.00% 6942.60
100.00% 4566.60
100.00% 18221.25
100.00%
100.00%
Pág. 36
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
100.00% 180.94
100.00% 2024.08
100.00% 150.96
100.00% 771.36
100.00% 500.00
100.00% 205.50
100.00% 13564.80
100.00% 2587.36
100.00% 20147.69
100.00% 35000.00
100.00% 20000.00
100.00% 74.38
100.00% 3134.20
100.00% 2231.77
100.00% 14.45
100.00% 894.18
100.00% 309.78
100.00% 118.14
Pág. 37
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
44.47% 1794.93
100.00% 3392.40
100.00% 259.92
100.00% 660.10
100.00% 279.81
100.00% 8037.16
100.00% 4279.83
100.00% 14.13
100.00% 1085.77
100.00%
100.00%
100.00% 4822.70
100.00%
100.00%
100.00%
100.00%
81.55%
64.53%
100.00%
100.00%
100.00%
91.57%
97.80%
100.00%
100.00%
99.99%
100.00%
Pág. 38
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Pág. 39
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
Pág. 40
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
54.93%
78.24%
100.00%
100.00%
95.98%
Pág. 41
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
74.31%
97.10%
100.00% 2000.00
100.00% 2500.00
100.00% 18042.40
100.00% 6080.56
73.98%
100.00%
100.00%
81.61%
100.00%
100.00%
96.31%
97.99%
85.98%
100.00%
100.00%
100.00%
100.00%
73.17%
73.71%
Pág. 42
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
Pág. 43
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
100.00% 36.48
100.00% 450.00
100.00% 293959.00
100.00% 12000.00
100.00% 950.00
100.00% 15004.00
100.00% 336.48
100.00% 557.85
100.00% 558.72
100.00% 1111.20
100.00% 511.20
100.00% 195.30
100.00% 200.60
100.00% 160.08
100.00% 1101.60
100.00% 39.20
100.00% 47.20
100.00% 51.20
100.00% 33.76
100.00% 41.76
100.00% 549.45
100.00% 71.05
100.00% 85.26
100.00% 64.84
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00% 412.92
100.00% 409.10
100.00% 387.28
100.00% 524.10
100.00% 545.72
100.00% 138.04
100.00% 475.20
100.00%
100.00%
Pág. 44
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Pág. 45
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
5.11% 523.87
100.00% 25803.73
100.00% 4413.13
100.00% 497.70
100.00% 1750.01
100.00% 13233.32
100.00% 27946.51
100.00% 13414.79
100.00% 2478.93
100.00% 15476.92
100.00% 17314.55
100.00% 24379.21
100.00% 5680.76
100.00% 6116.35
100.00% 15209.20
100.00% 7731.64
100.00% 10835.19
100.00% 181178.51
100.00% 4641.23
100.00% 140378.11
100.00% 7636.16
100.00% 14718.00
100.00% 1376.58
100.00% 405.38
100.00% 450.30
Pág. 46
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
100.00% 2863.75
100.00% 389.08
100.00% 3468.88
100.00% 10885.59
100.00% 4241.03
100.00% 1859.81
100.00% 697.68
100.00% 29.00
100.00% 180.24
100.00% 3621.64
100.00% 1601.59
100.00% 3915.69
100.00% 13316.77
100.00% 6366.98
100.00% 12681.87
100.00%
100.00%
100.00%
100.00% 1836.72
100.00% 3335.87
100.00% 7862.52
100.00% 1254.64
100.00% 3136.60
100.00% 3215.88
100.00% 1321.85
100.00% 220.05
100.00% 3500.00
100.00% 1200.00
100.00% 5000.00
100.00% 1500.00
100.00% 80000.00
100.00% 78910.50
100.00% 9000.00
100.00% 206.01
100.00%
100.00%
Pág. 47
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
100.00%
40.62%
100.00%
100.00%
8.32%
Pág. 48
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
Pág. 49
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
Pág. 50
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
1.08% 15,685.50 2.20% 31,870.71 4.41% 64,019.38 5.37% 77,847.64 8.48%
1.08% 6,903.93 2.20% 14,027.81 4.41% 28,177.96 5.37% 34,264.43 8.48%
1.08% 3,033.11 2.20% 6,162.85 4.41% 12,379.44 5.37% 15,053.41 8.48%
1.08% 577.73 2.20% 1,173.88 4.41% 2,357.99 5.37% 2,867.32 8.48%
1.08% 317.75 2.20% 645.63 4.41% 1,296.89 5.37% 1,577.02 8.48%
Pág. 51
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"
02° MES 03° MES 04° MES 05° MES 06° MES
1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
Pág. 52
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
2210.27
42321.71
1013.92
1738.51
3544.75
202.83
100.00% 25096.78
100.00% 59406.32
100.00% 10108.86
100.00% 27420.99
100.00% 14490.93
100.00% 521.91
100.00% 614.91
Pág. 53
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
100.00% 130.14
100.00% 565.11
100.00% 89753.58
100.00% 15200.00
100.00% 94764.14
100.00% 8030.04
Pág. 54
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
Pág. 55
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
Pág. 56
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
25539.08
6724.19
10674.65
33206.89
100.00% 14703.55
100.00% 12448.92
Pág. 57
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
100.00% 182.88
100.00% 341318.62
100.00% 10422.16
100.00% 700.00
100.00% 55411.21
4515.18
100.00% 212.43
100.00% 1430.78
100.00% 488.34
100.00% 82.08
100.00% 133.76
100.00% 2307.06
100.00% 4993.77
100.00% 5237.05
100.00% 20719.09
100.00% 12512.14
100.00% 14961.27
100.00% 19538.23
100.00% 1635.57
100.00% 1937.00
Pág. 58
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
100.00% 30774.31
100.00% 11218.95
100.00% 9824.63
100.00% 9304.33
100.00% 19900.57
100.00% 2239.42
100.00% 147.16
100.00% 3249.94
100.00% 95401.32
Pág. 59
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
1276.17
2501.47
140.95
100.00% 14178.00
100.00% 10042.92
100.00% 4229.61
100.00% 53381.29
100.00% 3565.19
100.00% 71430.76
100.00% 122189.76
100.00% 1323.24
100.00% 1066.01
100.00% 66.20
100.00% 6380.10
100.00% 4519.31
100.00% 1804.00
100.00% 686.34
100.00% 714.56
100.00% 320.12
100.00% 2748.77
100.00% 3581.37
100.00% 253.66
100.00% 583.47
100.00% 10271.96
100.00% 7795.67
100.00% 13899.45
100.00% 6049.89
100.00% 2459.65
100.00% 19049.68
Pág. 60
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
100.00% 4388.15
100.00% 8960.00
100.00% 13216.65
100.00% 565.95
100.00% 19729.60
100.00% 21570.19
100.00% 2071.32
2256.66
2315.52
512.80
Pág. 61
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
812.98
4798.56
5509.35
764.15
6189.10
100.00% 801.42
100.00% 1774.62
100.00% 276.80
100.00% 129963.12
100.00% 26822.56
100.00% 76529.40
100.00% 91692.40
100.00% 1680.44
100.00% 357.68
100.00% 4826.90
100.00% 3430.76
Pág. 62
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
100.00% 50.01
100.00% 100.02
100.00% 650.13
100.00% 140.01
100.00% 575.15
100.00% 132.01
100.00% 125.71
100.00% 2430.15
100.00% 117.01
100.00% 324.02
100.00% 145.96
100.00% 1726.36
100.00% 700.00
100.00% 800.00
100.00% 800.00
100.00% 500.00
100.00% 6991.40
100.00% 15834.80
100.00% 25967.80
Pág. 63
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
3960.35
4274.23
3990.35
3806.18
65916.20
4657.25
178666.35
3571.20
76560.12
51883.50
189680.85
42187.13
123651.39
100.00% 14193.14
100.00% 8797.69
100.00% 8960.72
100.00% 308.96
100.00% 371.27
100.00% 16955.41
100.00% 18914.11
100.00% 7168.23
139810.97
89730.02
100.00% 75615.75
100.00% 298865.58
100.00% 359690.87
100.00% 418027.59
100.00% 41395.73
Pág. 64
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
100.00% 234899.31
100.00% 269283.61
100.00% 140948.19
100.00% 126279.59
100.00% 48208.18
100.00% 65875.80
100.00% 39849.46
100.00% 71450.61
100.00% 11724.63
100.00% 11160.15
100.00% 2503.34
100.00% 31400.10
100.00% 33778.44
1136.98
747.51
1543.94
1695.63
3652.57
2371.94
100.00% 90000.00
100.00% 441580.74
100.00% 60037.92
100.00% 15693.55
100.00% 100561.92
100.00% 169695.44
100.00% 110154.74
100.00% 365833.23
100.00% 63444.69
100.00% 106546.51
Pág. 65
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
100.00% 187705.63
100.00% 99490.58
100.00% 45009.47
100.00% 157930.45
100.00% 111047.29
100.00% 12314.22
100.00% 13312.61
100.00% 1931.76
100.00% 27084.33
100.00% 1031.80
100.00% 72120.59
100.00% 8957.52
100.00% 17417.40
100.00% 11253.25
100.00% 12640.00
100.00% 46170.00
100.00% 46789.63
100.00% 6433.35
100.00% 15431.51
100.00% 5000.00
100.00% 4500.00
100.00% 7000.00
100.00% 22065.00
100.00% 3740.44
100.00% 4788.00
100.00% 2068.44
100.00% 39386.36
100.00% 39245.51
100.00% 65646.87
100.00% 31435.31
100.00% 30440.67
100.00% 1900.41
100.00% 1532.65
100.00% 8523.69
Pág. 66
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
100.00% 9310.00
100.00% 3430.00
100.00% 3996.00
100.00% 2262.00
100.00% 406.80
100.00% 3502.38
100.00% 4595.36
100.00% 1862.27
100.00% 2019.44
100.00% 1102.06
100.00% 1596.95
100.00% 243.96
100.00% 821.26
100.00% 5188.96
100.00% 2771.82
100.00% 367.98
100.00% 983.51
100.00% 170.86
100.00% 221.64
100.00% 750.00
100.00% 15750.00
100.00% 2283.75
100.00% 13412.30
100.00% 795.20
100.00% 11551.75
100.00% 4603.04
100.00% 4850.25
1785.81
301.47
Pág. 67
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
100.00% 14786.24
100.00% 12409.32
100.00% 2154.24
100.00% 1716.52
100.00% 253.44
100.00% 5010.30
100.00% 3588.42
100.00% 20.74
100.00% 223.20
100.00% 225.90
100.00% 4015.00
100.00% 500.00
100.00% 2190.00
100.00% 41547.80
100.00% 9252.75
11852.93
1650.43
4077.84
1131.27
1107.04
5169.58
21316.48
299.98
100.00% 4965.30
562.66
123.27
393.21
12000.00
Pág. 68
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
100.00% 657.72
100.00% 165.59
100.00% 847.76
100.00% 1288.16
100.00% 3444.44
100.00% 91392.93
100.00% 4689.79
100.00% 4705.60
100.00% 60795.84
100.00% 2957.08
100.00% 3092.96
100.00% 3848.52
100.00% 15165.67
100.00% 12165.67
100.00% 6686.54
100.00% 682.83
100.00% 3165.67
100.00% 16657.25
100.00% 9657.25
100.00% 3861.52
100.00% 3715.38
100.00% 3715.38
100.00% 282.25
100.00% 26314.50
100.00% 537.25
100.00% 55.71
100.00% 3900.78
100.00% 100.02
100.00% 1375.56
100.00% 2800.20
100.00% 1725.45
100.00% 170.03
100.00% 460.12
100.00% 2189.22
100.00% 350.00
100.00% 400.00
100.00% 400.00
100.00% 250.00
100.00% 45422.55
100.00% 100000.00
100.00% 7920.00
Pág. 69
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
100.00% 16000.00
100.00% 3000.00
16.88
20.88
22.88
85.26
85.26
36.42
44.84
22.42
22.42
26.42
52.84
91.05
36.42
0.05
55.26
83.30
Pág. 70
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
2424.74
1111.28
3397.56
1170.36
8621.94
734.60
1612.28
1430.54
121.76
2400.00
951.00
728.22
55943.09
53.88
934.77
100.00% 5448.56
100.00% 25336.14
100.00% 6500.00
100.00% 71937.32
100.00% 1128.96
100.00% 974.12
100.00% 10314.72
100.00% 7353.76
100.00% 4356.00
100.00% 21031.14
100.00% 7543.05
100.00% 21934.25
100.00% 1571.55
100.00% 17101.15
100.00% 124101.32
100.00% 1957.22
100.00% 77563.56
100.00% 3405.78
100.00% 26505.47
100.00% 5374.85
100.00% 1192.80
100.00% 2478.60
Pág. 71
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
100.00% 11880.00
100.00% 1000.00
100.00% 1000.00
5610.07
Pág. 72
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
3095.21
2211.69
7393.16
243.88
244.95
308.11
124.33
Pág. 73
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
1746.81
1067.44
637.55
100.00% 5916.29
100.00% 1293.84
100.00% 15870.89
100.00% 15214.87
100.00% 11076.53
100.00% 879.95
100.00% 1101.81
100.00% 2442.32
100.00% 2183.56
100.00% 3649.80
100.00% 19069.35
100.00% 7492.44
100.00% 12000.00
100.00% 53415.80
100.00% 78521.81
100.00% 43603.03
100.00% 20975.80
100.00% 32604.46
100.00% 929.23
100.00% 393774.06
Pág. 74
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
100.00% 59.50
100.00% 15.68
100.00% 621.30
100.00% 82.44
100.00% 4.54
100.00% 236.92
100.00% 1036.70
100.00% 743.30
100.00% 2485.71
100.00% 1023.00
100.00% 125.40
100.00% 200.75
100.00% 108.35
100.00% 1321.65
100.00% 302.71
100.00% 948.96
100.00% 20.74
100.00% 248.95
100.00% 265.78
100.00% 993.58
100.00% 21.88
100.00% 248.95
100.00% 272.51
100.00% 30230.65
100.00% 30.71
100.00% 29.87
100.00% 5.75
100.00% 17.85
100.00% 245.04
100.00% 388.66
100.00% 595.52
100.00% 14715.70
100.00% 79.12
100.00% 4760.10
100.00% 10747.21
100.00% 1524.16
100.00% 79.07
100.00% 77.06
100.00% 7.41
100.00% 46.05
Pág. 75
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
100.00% 725.69
100.00% 789.79
100.00% 1369.94
100.00% 11.66
100.00% 12.31
100.00% 18.25
100.00% 17.78
100.00% 5.47
100.00% 17.00
100.00% 1970.70
100.00% 360.76
100.00% 110.19
100.00% 2472.40
100.00% 1420.54
100.00% 1280.43
100.00% 707.51
100.00% 68.68
100.00% 22024.55
100.00% 3007.38
100.00% 16114.37
100.00% 14529.87
100.00% 22753.42
100.00% 13658.39
100.00% 221830.00
100.00% 341.00
100.00% 104.42
100.00% 25.08
100.00% 747.68
100.00% 725.56
100.00% 69.94
100.00% 68.40
100.00% 9.12
100.00% 28.34
100.00% 295.30
100.00% 243.02
100.00% 476.14
100.00% 137.79
100.00% 31360.00
100.00% 7412.00
100.00% 35580.00
100.00% 2870.00
100.00% 11250.00
100.00% 3800.00
100.00% 3000.00
Pág. 76
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
100.00% 3000.00
100.00% 40000.00
100.00% 10000.00
100.00% 601771.00
100.00% 284086.00
100.00% 2200.00
100.00% 5362.50
100.00% 360.00
100.00% 1602.40
100.00% 896.00
100.00% 1120.00
100.00% 3600.00
100.00% 3600.00
100.00% 680.00
100.00% 2525.00
100.00% 1165.00
100.00% 3494.40
100.00% 70882.62
100.00% 9639.00
100.00% 15426.56
100.00% 62808.00
100.00% 5556.97
100.00% 4084.92
100.00% 391.24
100.00% 4734.00
100.00% 70073.98
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
122,931.48 17.71% 256,820.54 18.98% 275,248.84 33.82% 490,418.68 7.41% 107,401.01
54,107.96 17.71% 113,038.87 18.98% 121,150.04 33.82% 215,856.47 7.41% 47,272.27
23,771.28 17.71% 49,661.43 18.98% 53,224.91 33.82% 94,832.34 7.41% 20,768.15
4,527.86 17.71% 9,459.32 18.98% 10,138.08 33.82% 18,063.30 7.41% 3,955.84
2,490.32 17.71% 5,202.63 18.98% 5,575.94 33.82% 9,934.82 7.41% 2,175.71
Pág. 77
BRA
06° MES 07° MES 08° MES 09° MES 10° MES
Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.
S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
Pág. 78
### ### ### ### ### ### ### ### ### ###
S/.90,531.42 S/.8,479.01 S/.39,381.73 S/.57,638.24 ### S/.81,359.30 ### ### ### ###
S/.90,531.42 S/.8,479.01 S/.39,381.73 S/.57,638.24 ### S/.81,359.30 ### S/.95,398.16 S/.53,852.85
S/.60,084.48
S/.7,489.68
S/.3,287.60
S/.3,154.20
S/.6,000.00
S/.6,500.00
S/.13,653.00
S/.10,000.00
S/.8,000.00
S/.2,000.00
S/.30,446.94 S/.8,479.01 S/.1,350.30
S/.505.41
S/.143.46
S/.14,823.07 S/.1,562.12
S/.2,963.70
S/.2,814.76 S/.938.77
S/.1,520.74
S/.644.60
S/.608.75
S/.2,506.55 S/.5,978.12 S/.1,350.30
S/.1,869.32
S/.1,047.46
S/.999.12
S/.38,031.43 S/.57,638.24 S/.71,179.40
S/.16,615.04 S/.15,895.59
S/.8,838.02 S/.2,690.88
S/.12,578.37 S/.2,891.99
S/.1,601.69
S/.34,558.09 S/.8,643.27
S/.62,536.13
S/.31,496.56 S/.47,284.41
S/.31,496.56 S/.2,210.27
S/.42,321.71
S/.1,013.92
S/.1,738.51
S/.69,121.16 S/.34,074.89 ### S/.95,398.16 S/.53,852.85
S/.69,121.16 S/.3,747.58
S/.62,282.84 S/.3,544.75
S/.6,838.32 S/.202.83
S/.30,327.31 S/.33,795.07
S/.25,096.78
S/.22,849.39 S/.7,347.84
S/.7,477.92 S/.1,350.45
### S/.95,398.16
S/.59,406.32
S/.62,914.35 S/.29,334.63
S/.51,599.21 S/.6,657.21
S/.52,020.78
S/.10,108.86
S/.27,420.99
S/.14,490.93
S/.1,832.07
S/.521.91
S/.614.91
S/.130.14
S/.565.11
### ### ###
### S/.17,218.24
### S/.17,218.24
### S/.24,330.18 S/.324.59
S/.2,432.61 S/.722.73
S/.89,753.58
S/.9,220.40 S/.14,219.43
S/.1,947.46 S/.5,025.92 S/.324.59
S/.1,292.04 S/.4,362.10
S/.7,890.12 S/.8,892.99
S/.7,890.12 S/.8,892.99
S/.30,600.00 ###
S/.30,600.00 S/.0.00
S/.15,200.00
S/.94,764.14
S/.43,470.36 S/.11,260.10
S/.34,011.61 S/.2,586.50
S/.6,705.89 S/.327.80
S/.2,752.86 S/.315.76
S/.8,030.04
S/.18,666.49 S/.58,146.66 S/.16,528.98
S/.18,666.49 S/.30,170.34
S/.286.49
S/.227.45
S/.44.37
S/.14.67
S/.3,422.61 S/.1,473.18
S/.763.22
S/.747.41
S/.626.59
S/.268.89
S/.1,016.50 S/.0.71
S/.1,472.47
S/.9,504.61 S/.1,752.40
S/.2,626.44
S/.625.12
S/.4,612.56
S/.1,544.29
S/.1,640.49 S/.208.11
S/.5,452.78 S/.26,944.76
S/.1,927.43
S/.1,501.68
S/.425.75
S/.3,525.35 S/.3,304.00
S/.1,835.74
S/.2,092.92 S/.1,468.26
S/.1,432.43
S/.6,945.91
S/.1,724.39
S/.2,067.16
S/.3,154.36
S/.16,694.85
S/.9,578.65
S/.2,121.83
S/.3,060.36
S/.1,934.01
S/.27,976.32 S/.16,528.98
S/.8,692.19
S/.7,972.61
S/.719.58
S/.5,242.10 S/.3,016.54
S/.176.07
S/.2,771.83 S/.1,827.34
S/.918.62
S/.543.51
S/.712.90
S/.475.09 S/.270.58
S/.562.70
S/.8,984.60 S/.531.88
S/.8,984.60 S/.531.88
S/.6,991.62
S/.1,538.98
S/.1,322.06
S/.1,732.55
S/.131.71
S/.2,252.04
S/.14.28
S/.3,060.71
S/.2,177.22
S/.883.49
S/.377.86
S/.377.86
S/.1,618.86 S/.686.43
S/.1,618.86 S/.686.43
S/.1,360.00
S/.1,360.00
S/.766.08
S/.270.00
S/.170.02
S/.240.06
S/.86.00
S/.684.25
S/.684.25
S/.2,492.18
S/.1,587.11
S/.305.07
S/.163.09
S/.299.76
S/.27.90
S/.80.06
S/.29.19
S/.11,221.47 S/.41,039.26 S/.15,884.16 S/.4,130.12
S/.11,221.47 S/.15,848.68
S/.181.86
S/.120.18
S/.52.16
S/.9.52
S/.551.57 S/.2,676.88
S/.551.57 S/.460.00
S/.105.62
S/.364.56
S/.147.20
S/.653.51
S/.945.99
S/.4,032.98 S/.0.48
S/.694.56
S/.983.48
S/.1,081.75
S/.620.02 S/.0.48
S/.653.17
S/.6,455.06 S/.13,171.32
S/.3,287.63
S/.2,783.04
S/.504.59
S/.3,167.43 S/.6,718.64
S/.2,067.85
S/.4,650.43
S/.3,167.43 S/.0.36
S/.4,055.47
S/.1,029.13
S/.1,753.19
S/.1,273.15
S/.2,397.21
S/.959.19
S/.991.03
S/.446.99
S/.25,190.58 S/.15,884.16 S/.4,130.12
S/.8,603.92
S/.8,100.72
S/.503.20
S/.1,959.05 S/.7,880.16
S/.1,219.81 S/.1,799.37
S/.3,019.18
S/.739.24 S/.895.61
S/.822.77
S/.820.51
S/.522.72
S/.626.51
S/.626.51
S/.1,131.88
S/.477.48
S/.654.40
S/.12,724.15
S/.12,724.15
S/.771.58
S/.389.66
S/.381.92
S/.2,737.74
S/.2,008.74
S/.729.00
S/.4,400.00
S/.4,400.00
S/.239.75 S/.1,144.33
S/.239.75 S/.120.25
S/.680.08
S/.344.00
S/.241.80
S/.241.80
S/.2,743.99
S/.1,084.35
S/.249.98
S/.490.58
S/.345.96
S/.436.75
S/.92.99
S/.43.38
S/.615.70 S/.4,609.13 S/.465.20
S/.890.75
S/.303.28
S/.64.56
S/.238.72
S/.216.83
S/.216.83
S/.370.64
S/.370.64
S/.615.70 S/.3,718.38 S/.465.20
S/.1,713.76
S/.315.84
S/.742.00
S/.655.92
S/.669.80
S/.363.32
S/.210.96
S/.95.52
S/.562.88
S/.192.96
S/.369.92
S/.52.82
S/.52.82
S/.1,334.82 S/.465.20
S/.230.00
S/.110.00
S/.110.00
S/.500.00
S/.50.00
S/.60.00
S/.64.00
S/.210.82 S/.211.70
S/.253.50
### S/.94,195.05 S/.95,112.86 ### S/.61,990.41 ### S/.4,339.14
S/.32,671.79
S/.32,671.79
S/.68,047.09 S/.43,047.69
S/.39,361.09
S/.28,686.00 S/.43,047.69
S/.51,147.36 S/.32,263.27
S/.23,940.54
S/.24,021.92
S/.3,184.90 S/.25,539.08
S/.6,724.19
S/.51,224.40 ### S/.18,383.94
S/.10,674.65
S/.33,206.89
S/.7,342.86 ### S/.18,383.94
S/.10,086.93 S/.52,646.79
S/.10,086.93 S/.25,494.32
S/.14,703.55
S/.12,448.92
S/.1,538.26 S/.1,426.21
S/.1,538.26 S/.1,243.33
S/.182.88
### S/.43,606.47 ### S/.4,339.14
### S/.30,135.94
S/.9,843.86 S/.9,770.07 S/.1,629.02
###
S/.20,100.73 S/.3,700.46 S/.3,454.02
S/.3,262.89 S/.271.11
S/.10,422.16
### S/.3,368.03
S/.700.00
S/.2,584.23 S/.34,133.47 S/.10,642.99 S/.93,391.45 S/.26,599.41
S/.701.97
S/.394.63
S/.157.30
S/.150.04
S/.1,882.26 S/.3,219.62
S/.1,882.26 S/.1,703.36
S/.608.63
S/.907.63
S/.2,614.81
S/.2,614.81
S/.28,299.04 S/.10,642.99 S/.59,350.97
S/.55,411.21
S/.4,699.49 S/.6,127.81 S/.3,939.76
S/.23,599.55 S/.4,515.18
S/.34,040.48 S/.26,599.41
S/.34,040.48 S/.26,599.41
S/.4,654.45
S/.2,131.55
S/.212.43
S/.1,430.78
S/.488.34
S/.2,522.90
S/.82.08
S/.133.76
S/.2,307.06
S/.77,625.24 ### ### S/.19,299.10
S/.4,993.77
S/.4,993.77
S/.9,336.38 S/.5,246.79
S/.9,336.38 S/.9.74
S/.5,237.05
S/.20,719.09
S/.20,719.09
S/.27,473.41
S/.12,512.14
S/.14,961.27
S/.21,173.80
S/.19,538.23
S/.1,635.57
### S/.49,392.26 S/.19,299.10
### S/.35,940.36 S/.16,233.54
S/.9,858.06 S/.10,833.95
S/.680.95 S/.3,065.56
S/.1,937.00
S/.63,295.09 ### S/.95,940.24
S/.51,630.84 S/.55,279.61
S/.51,630.84 S/.13,286.35
S/.30,774.31
S/.11,218.95
S/.8,838.64 S/.39,234.05
S/.8,838.64 S/.204.52
S/.9,824.63
S/.9,304.33
S/.19,900.57
S/.2,386.58
S/.2,239.42
S/.147.16
S/.63,295.09 ### S/.1,426.58
S/.3,249.94
S/.60,045.15 S/.58,916.25
S/.95,401.32
S/.486.12 S/.1,426.58
S/.15,026.77 S/.14,894.71 S/.53,815.93 ###
S/.4,483.03
S/.1,836.56
S/.2,646.47
S/.18,898.02
S/.1,403.31
S/.2,352.82
S/.1,620.98
S/.13,520.91
S/.7,823.62
S/.1,576.34
S/.830.20
S/.757.59
S/.1,804.49
S/.2,855.00
S/.22,611.26 S/.339.46
S/.798.76
S/.10,361.93
S/.6,997.41
S/.4,453.16 S/.0.60
S/.338.86
S/.8,219.34
S/.8,219.34
S/.7,435.36
S/.7,435.36
S/.3,501.34
S/.3,934.02
###
###
S/.15,026.77 S/.14,894.71
S/.2,178.31
S/.2,178.31
S/.12,848.46 S/.4,531.41
S/.514.30
S/.5,740.00
S/.6,594.16 S/.2,031.41
S/.2,500.00
S/.4,530.95
S/.202.05
S/.1,171.28
S/.3,157.62
S/.1,332.35
S/.412.34
S/.559.06
S/.360.95
S/.4,500.00
S/.4,500.00
S/.1,640.35 S/.49,096.20 ### S/.1,083.20
S/.1,640.35 S/.49,096.20 S/.28,459.94
S/.1,640.35 S/.1,276.17
S/.2,501.47
S/.140.95
S/.45,177.61 S/.9.41
S/.14,178.00
S/.10,042.92
S/.4,229.61
S/.53,834.45 S/.1,083.20
S/.53,381.29
S/.453.16 S/.1,083.20
S/.3,565.19
S/.3,565.19
S/.71,430.76
S/.71,430.76
###
###
S/.5,842.12 S/.50,599.49 S/.3,888.09
S/.1,323.24
S/.1,323.24
S/.4,518.88 S/.29,650.90
S/.1,066.01
S/.66.20
S/.3,386.67 S/.16,947.49
S/.6,380.10
S/.4,519.31
S/.1,804.00
S/.20,948.59 S/.3,888.09
S/.20,948.59 S/.3,201.75
S/.686.34
S/.2,336.93 S/.28,274.31 S/.53,321.93 ### ### S/.95,757.19 ### ### S/.54,492.73 S/.1,895.61
S/.1,336.50 S/.0.40
S/.714.56
S/.320.12
S/.301.82 S/.0.40
S/.6,927.63 S/.2,757.08
S/.2,748.77
S/.3,581.37
S/.253.66
S/.343.83 S/.2,757.08
S/.17,784.21 S/.79,436.14
S/.10,855.43
S/.583.47
S/.10,271.96
S/.21,695.12
S/.7,795.67
S/.13,899.45
S/.8,509.54
S/.6,049.89
S/.2,459.65
S/.9,274.67 S/.24,708.94
S/.19,049.68
S/.4,388.15
S/.9,274.67 S/.1,271.11
S/.22,176.65
S/.8,960.00
S/.13,216.65
S/.13,882.91 S/.51,735.65 S/.1,895.61
S/.3,618.77 S/.2,422.17
S/.3,618.77 S/.2,422.17
S/.10,264.14 S/.2,451.58
S/.10,264.14 S/.2,451.58
S/.41,865.74
S/.565.95
S/.19,729.60
S/.21,570.19
S/.4,996.16 S/.1,895.61
S/.2,071.32
S/.2,924.84 S/.1,895.61
S/.2,336.93 S/.28,274.31 S/.49,961.89 S/.73,209.23 S/.15,150.92 S/.5,084.98
S/.2,336.93 S/.8,356.39 S/.39,420.01 S/.46,203.63 S/.15,150.92 S/.5,084.98
S/.2,336.93 S/.8,356.39 S/.39,420.01 S/.7,861.09
S/.2,336.93 S/.8,356.39 S/.183.13
S/.1,551.80
S/.785.13 S/.1,048.12
S/.7,125.90
S/.182.37 S/.183.13
S/.2,517.23 S/.1,184.34
S/.507.62
S/.599.69
S/.1,409.92 S/.1,057.77
S/.126.57
S/.2,855.45
S/.438.60
S/.518.15
S/.1,806.06
S/.92.64
S/.36,719.65 S/.3,821.30
S/.6,667.51
S/.7,319.85
S/.22,732.29 S/.2,525.75
S/.1,295.55
S/.38,342.54 S/.15,150.92 S/.5,084.98
S/.38,342.54 S/.10,653.98
S/.3,036.84
S/.215.55
S/.4,400.24
S/.30,689.91 S/.2,728.00
S/.7,925.98
S/.4,496.94 S/.5,084.98
S/.4,496.94 S/.2,256.66
S/.2,315.52
S/.512.80
S/.19,917.92 S/.10,541.88 S/.27,005.60
S/.19,917.92 S/.10,541.88 S/.13,055.60
S/.19,917.92 S/.8,574.21
S/.106.49
S/.1,907.42
S/.1,164.02
S/.1,029.56
S/.15,710.43 S/.7,552.44
S/.1,021.77
S/.1,967.67 S/.777.35
S/.93.41
S/.517.05
S/.1,357.21 S/.0.30
S/.777.05
S/.12,278.25
S/.12,278.25
S/.13,950.00
S/.7,500.00
S/.1,400.00
S/.2,550.00
S/.2,500.00
S/.3,360.04 S/.46,664.00 ### S/.90,672.21 ### S/.2,576.30
S/.2,000.00
S/.2,000.00
S/.1,360.04 S/.3,595.40
S/.1,360.04 S/.0.34
S/.357.68
S/.424.88
S/.1,144.08
S/.1,668.42
S/.7,154.94 S/.8,817.16 S/.11,120.89
S/.4,462.80
S/.579.60
S/.2,112.54 S/.1,614.54
S/.7,202.62 S/.812.98
S/.4,798.56
S/.5,509.35
S/.746.12
S/.77.84
S/.668.28
S/.34,824.67 S/.53,474.61 S/.79,551.32 S/.0.43
S/.7,892.52
S/.18,969.25 S/.3,204.11
S/.7,962.90 S/.1,193.20
S/.6,942.60
S/.4,566.60
S/.18,221.25
S/.19,346.85 S/.764.15
S/.72,598.07 S/.0.43
S/.6,189.10
### S/.2,576.30
S/.801.42
S/.1,774.62
S/.334.36 S/.0.26
S/.276.80
###
S/.26,822.56
S/.76,529.40
S/.91,692.40
S/.10,295.78
S/.1,680.44
S/.357.68
S/.4,826.90
S/.3,430.76
S/.4,644.22
S/.50.01
S/.100.02
S/.650.13
S/.140.01
S/.575.15
S/.132.01
S/.125.71
S/.2,430.15
S/.117.01
S/.324.02
S/.1,872.32
S/.145.96
S/.1,726.36
S/.2,800.00
S/.700.00
S/.800.00
S/.800.00
S/.500.00
S/.48,794.00
S/.6,991.40
S/.15,834.80
S/.25,967.80
S/.342.87 ###
S/.342.87 S/.243.31
S/.180.94
S/.161.93 S/.243.31
S/.2,024.08
S/.2,024.08
S/.1,422.32
S/.150.96
S/.771.36
S/.500.00
S/.13,770.30
S/.205.50
S/.13,564.80
S/.22,735.05
S/.2,587.36
S/.20,147.69
S/.55,000.00
S/.35,000.00
S/.20,000.00
S/.3,208.58
S/.74.38
S/.3,134.20
S/.3,568.32
S/.2,231.77
S/.14.45
S/.894.18
S/.309.78
S/.118.14
S/.9,184.71 S/.14,221.36 S/.57,902.43 S/.62,502.72 ### ### ### ### ### ###
S/.9,184.71 S/.14,221.36 S/.57,902.43 S/.62,502.72 S/.50,987.75 ### ### ### ### ###
S/.9,184.71 S/.14,221.36 S/.57,902.43 S/.62,502.72 S/.50,987.75 ### ### ### ### ###
S/.5,617.20
S/.1,872.42
S/.3,744.78
S/.3,567.51 S/.14,221.36 S/.57,902.43 S/.62,502.72 S/.19,783.27 S/.16,031.11
S/.1,325.94
S/.2,241.57 S/.1,794.93
S/.3,392.40
S/.259.92
S/.660.10
S/.279.81
S/.6,279.76 S/.11,779.24
S/.1,554.44 S/.5,830.69 S/.777.83
S/.28,333.87 S/.12,146.10
S/.11,958.63 S/.32,897.92
S/.8,037.16
S/.4,279.83
S/.4,363.88 S/.1.82
S/.14.13
S/.1,085.77
S/.15,834.54 S/.3,960.35
S/.2,847.01 S/.4,274.23
S/.3,990.35
S/.3,806.18
S/.31,204.48 ### S/.11,304.08
S/.23,952.51 S/.65,916.20
S/.4,822.70
S/.2,429.27 S/.4,657.25
###
S/.3,571.20
S/.76,560.12
S/.51,883.50
S/.34,251.13 S/.7,749.04
S/.6,466.46 S/.3,555.04
###
S/.42,187.13
### S/.41,445.43
###
S/.95,781.16 S/.8,813.65
S/.14,193.14
S/.8,797.69
S/.8,960.72
S/.308.96
S/.371.27
### ### ### ### ###
S/.43,037.75
S/.16,955.41
S/.18,914.11
S/.7,168.23
### S/.7,256.14
### S/.7,256.14
###
### S/.7.00
S/.91,407.78 S/.1.68
S/.53,370.13 S/.5.32
S/.89,730.02
###
S/.75,615.75
###
###
###
### S/.45,818.44
S/.41,395.73
### S/.4,422.71
###
###
### S/.10,742.12
### S/.10,742.12
###
###
###
S/.48,208.18
S/.65,875.80
S/.39,849.46
S/.37,518.22 S/.78,765.58
S/.71,450.61
S/.14,955.60 S/.5,598.27
S/.22,562.62 S/.1,716.70
S/.25,388.12
S/.11,724.63
S/.11,160.15
S/.2,503.34
S/.84,486.45 S/.8,576.69 S/.33,125.80
S/.31,400.10
S/.33,778.44
S/.24,490.90 S/.5,761.38
S/.26,217.11 S/.2,815.31 S/.1,725.70
S/.3,428.43
S/.1,136.98
S/.747.51
S/.1,543.94
S/.7,720.14
S/.1,695.63
S/.3,652.57
S/.2,371.94
S/.43,516.16 ### S/.10,313.76
S/.33,517.09 S/.42,942.31 S/.2,773.36
S/.9,999.07 S/.8,940.97
S/.62,794.71 S/.7,540.40
S/.90,000.00
S/.90,000.00
### ### ###
### S/.43,380.64
### S/.7,298.31
###
### S/.20,388.78
S/.60,037.92
S/.15,693.55
### ### S/.68,369.95
S/.8,800.03 S/.15,938.83
### S/.336.48
###
###
###
###
S/.20,086.97 S/.2,144.33
S/.27,596.61 S/.2,780.93
S/.63,444.69
### S/.3,841.75
###
### S/.3,841.75
### ###
###
### S/.35,618.67
S/.25,969.53 S/.508.76
S/.99,490.58
### S/.7,250.83
S/.45,009.47
###
###
###
S/.27,558.59
S/.12,314.22
S/.13,312.61
S/.1,931.76
S/.28,116.13
S/.27,084.33
S/.1,031.80
S/.72,120.59
S/.72,120.59
S/.85,154.49 ### ###
S/.6,360.00 S/.0.00
S/.3,520.00 S/.0.00
S/.8,957.52
S/.17,417.40
S/.11,253.25
S/.12,640.00
S/.46,170.00
S/.6,840.00 S/.0.00
S/.6,431.96 S/.6,604.84
S/.67,573.04 S/.51,055.05
S/.46,789.63
S/.6,433.35
S/.15,431.51
S/.5,000.00
S/.4,500.00
S/.7,000.00
S/.34,447.67 S/.615.41
S/.1,785.79 S/.615.41
S/.22,065.00
S/.3,740.44
S/.4,788.00
S/.2,068.44
S/.12,188.34 ### S/.41,228.18
S/.12,188.34 S/.840.25
### S/.332.64
### S/.1,509.18
S/.39,386.36
### ###
S/.39,245.51
S/.65,646.87
S/.31,435.31
S/.55,576.26 S/.30,082.00
S/.23,599.68 S/.20,826.09
S/.18,014.15 S/.18,567.51
S/.30,440.67
S/.1,900.41
S/.1,532.65
S/.8,523.69
S/.20,182.80 S/.19,404.80
S/.9,424.80 S/.0.00
S/.10,758.00 S/.0.00
S/.9,310.00
S/.3,430.00
S/.3,996.00
S/.2,262.00
S/.406.80
S/.50,083.96 ### S/.64,734.54 S/.93,591.46 S/.55,519.50
S/.25,588.16 S/.4,403.15
S/.8,036.20 S/.3,973.93
S/.3,502.38
S/.3,440.84 S/.471.55
S/.4,595.36
S/.6,580.72
S/.1,862.27
S/.2,019.44
S/.1,102.06
S/.1,596.95
S/.10,971.24 S/.429.22
S/.243.96
S/.1,821.22 S/.185.26
S/.821.26
S/.5,188.96
S/.2,771.82
S/.367.98
S/.20,902.37 S/.2,929.03
S/.4,231.51 S/.2,707.39
S/.3,248.00 S/.2,707.39
S/.983.51
S/.170.86
S/.170.86
S/.221.64
S/.221.64
S/.16,500.00
S/.750.00
S/.15,750.00
S/.32,646.04 S/.4,850.25
S/.16,491.25
S/.2,283.75
S/.13,412.30
S/.795.20
S/.16,154.79
S/.11,551.75
S/.4,603.04
S/.4,850.25
S/.4,850.25
S/.50,083.96 S/.95,713.75 S/.36,217.35 S/.84,338.06 S/.55,519.50
S/.24,575.12 S/.36,326.14 S/.29,877.35 S/.3,123.45
S/.8,101.49 S/.3,584.59
S/.13,399.52 S/.5,087.67 S/.4,923.55 S/.985.05
S/.11,175.60 S/.3,107.90
S/.20,029.08 S/.21,369.21 S/.2,138.40
S/.18,787.05 S/.30,531.96
S/.1,785.81
S/.301.47
S/.8,021.86 S/.335.58
S/.8,677.91 S/.3,000.82
S/.14,786.24
S/.12,409.32
S/.10,644.61 S/.4,718.95
S/.2,154.24
S/.1,716.52
S/.253.44
S/.1,576.05 S/.594.75
S/.5,010.30
S/.3,588.42
S/.20.74
S/.223.20
S/.225.90
S/.6,721.79 S/.200.65
S/.6,721.79 S/.200.65
S/.28,655.00 S/.6,340.00 S/.70,570.00 S/.50,800.55
S/.18,975.00 S/.0.00 S/.0.00
S/.9,680.00 S/.0.00
S/.4,015.00
S/.500.00
S/.1,825.00 S/.0.00
S/.2,190.00
S/.5,632.00 S/.0.00
S/.62,748.00 S/.0.00
S/.41,547.80
S/.9,252.75
S/.77,342.65 ### ### ### ### S/.2,398.64
S/.22,542.40
S/.2,000.00
S/.2,500.00
S/.18,042.40
S/.54,800.25 S/.51,918.77 S/.9,230.81
S/.34,797.11 S/.11,852.93
S/.6,080.56
S/.7,059.61 S/.1,650.43
S/.4,951.52 S/.4,077.84
S/.1,911.45 S/.1,131.27
S/.25,034.73 S/.8,803.83
S/.1,107.04
S/.5,169.58
S/.1,894.95 S/.426.98
S/.59,374.76 S/.24,659.57 S/.5,693.06
S/.21,316.48
S/.299.98
S/.10,674.11 S/.408.77
S/.10,242.83 S/.209.84
S/.16,841.36 S/.2,746.92
S/.4,965.30
S/.7,874.73 S/.2,094.57
S/.8,454.01 S/.3,598.49
S/.13,079.14
S/.562.66
S/.123.27
S/.393.21
S/.12,000.00
S/.51,753.81 ### S/.6,678.04
S/.14,260.46 S/.5,228.31
S/.37,493.35 S/.12,954.55 S/.418.76
S/.59,876.17 S/.416.08
S/.86,486.44 S/.5,843.20
S/.657.72
S/.165.59
S/.847.76
S/.1,288.16
S/.3,444.44
S/.39,345.07 ### S/.86,877.61
S/.39,345.07 S/.1,126.64
S/.91,392.93
S/.4,689.79
S/.15,792.53 S/.912.73
S/.4,705.60
### S/.10,564.88
S/.60,795.84
S/.2,957.08
S/.3,092.96
S/.3,848.52
S/.50,885.34 S/.64,741.19
S/.15,165.67
S/.12,165.67
S/.6,686.54
S/.3,163.86 S/.0.29
S/.682.83
S/.3,165.67
S/.9,855.10 S/.0.12
S/.16,657.25
S/.9,657.25
S/.3,861.52
S/.3,715.38
S/.3,715.38
S/.282.25
S/.26,314.50
S/.537.25
S/.2,356.24 S/.29,186.26 S/.1,063.13
S/.2,356.24 S/.544.34
S/.55.71
S/.3,900.78
S/.100.02
S/.1,375.56
S/.2,800.20
S/.1,725.45
S/.170.03
S/.460.12
S/.18,054.05 S/.1,063.13
S/.10,593.18 S/.998.64
S/.2,189.22
S/.8,403.96 S/.998.64
S/.1,400.00
S/.350.00
S/.400.00
S/.400.00
S/.250.00
S/.55,133.38 ###
S/.45,422.55
S/.9,710.83 S/.211.72
###
S/.7,920.00
S/.16,000.00
S/.3,000.00
### S/.82,338.62
###
S/.36.48
S/.450.00
###
S/.12,000.00
S/.24,916.40 S/.24,678.66
S/.15,954.00
S/.950.00
S/.15,004.00
S/.1,453.05
S/.336.48
S/.557.85
S/.558.72
S/.3,279.98
S/.1,111.20
S/.511.20
S/.195.30
S/.200.60
S/.160.08
S/.1,101.60
S/.983.72 S/.563.99
S/.39.20
S/.47.20
S/.51.20
S/.33.76
S/.41.76
S/.549.45
S/.71.05
S/.85.26
S/.64.84
S/.16.88
S/.20.88
S/.22.88
S/.85.26
S/.85.26
S/.36.42
S/.44.84
S/.22.42
S/.22.42
S/.26.42
S/.52.84
S/.91.05
S/.36.42
S/.2,892.36
S/.412.92
S/.409.10
S/.387.28
S/.524.10
S/.545.72
S/.138.04
S/.475.20
S/.353.29 S/.20,763.67
S/.353.29 S/.0.05
S/.55.26
S/.83.30
S/.2,424.74
S/.1,111.28
S/.3,397.56
S/.1,170.36
S/.8,621.94
S/.734.60
S/.1,612.28
S/.1,430.54
S/.121.76
S/.2,400.00
S/.2,400.00
S/.951.00
S/.57,659.96
S/.728.22
S/.55,943.09
S/.53.88
S/.934.77
### ### ### S/.22,212.77
S/.3,086.87 S/.38,884.07
S/.3,086.87 S/.1,599.37
S/.5,448.56
S/.25,336.14
S/.6,500.00
### S/.4,355.15
S/.71,937.32
S/.1,128.96
S/.54,057.69 S/.3,381.03
S/.974.12
S/.10,314.72
S/.7,353.76
S/.75,389.83 S/.236.27 S/.7.64
S/.4,356.00
S/.21,031.14
S/.7,543.05
S/.42,459.64 S/.236.27 S/.7.64
### S/.25,647.07
### S/.3,712.82
S/.21,934.25
S/.4,611.91 S/.19,341.34
S/.4,611.91 S/.17,769.79
S/.1,571.55
S/.62,081.21 ###
S/.17,101.15
S/.44,980.06 S/.676.22
###
S/.79,520.78
S/.1,957.22
S/.77,563.56
S/.69,365.09 S/.1,308.05
S/.3,405.78
S/.26,505.47
S/.34,078.99 S/.1,308.05
S/.5,374.85
S/.26,708.68
S/.18,897.08
S/.26,708.68
S/.3,345.68
S/.1,192.80
S/.2,478.60
S/.11,880.00
S/.2,000.00
S/.1,000.00
S/.1,000.00
S/.9,734.50 ### ### ### ### S/.25,891.30 S/.85,646.49 ### S/.35,145.16 S/.25,831.69
S/.9,734.50 ### ### ### S/.6,440.69 S/.5,610.07
S/.9,734.50 S/.26,327.60
S/.9,734.50 S/.523.87
S/.25,803.73
S/.6,660.84
S/.4,413.13
S/.4,413.13
S/.2,247.71
S/.497.70
S/.1,750.01
S/.82,364.67 S/.12,237.74
S/.13,233.32
S/.10,858.37 S/.572.75
S/.27,946.51
S/.13,414.79
S/.14,537.20 S/.3,643.77
S/.2,374.48 S/.5,542.29
S/.2,478.93
S/.33,770.02 ### S/.4.32
S/.15,476.92
S/.10,037.81 S/.34,146.96
S/.17,314.55
S/.24,379.21
S/.6,220.92 S/.4.32
S/.5,680.76
S/.2,574.53 S/.1,291.29
S/.6,116.35
S/.15,209.20
S/.7,731.64
S/.10,835.19
S/.60,392.27 ###
S/.18,488.77 S/.40,079.34
S/.41,903.50 S/.3.85
###
### S/.6,440.69 S/.5,610.07
### S/.6,440.69 S/.5,610.07
S/.4,506.67 ### S/.76,130.28 S/.69,625.34 S/.14,631.18 S/.301.42
S/.4,506.67 S/.5,751.70
S/.4,506.67 S/.5,751.70
### S/.48,714.92 S/.1,868.01 S/.1,687.24 S/.301.42
S/.4,641.23
###
S/.13,970.46 S/.30.10
S/.7,540.42 S/.180.30
S/.5,996.94 S/.330.50
S/.7,636.16
S/.40,537.86 S/.1,868.01 S/.1,687.24 S/.301.42
S/.14,718.00
S/.14,718.00
S/.11,838.80 S/.20,984.60
S/.1,376.58
S/.405.38
S/.450.30
S/.2,863.75
S/.389.08
S/.6,353.71 S/.529.29
S/.3,468.88
S/.10,885.59
S/.4,241.03
S/.1,859.81
S/.858.56 S/.10,046.02
S/.858.56 S/.0.18
S/.697.68
S/.29.00
S/.180.24
S/.3,621.64
S/.1,601.59
S/.3,915.69
S/.36,726.71 S/.12,943.94
S/.13,316.77
S/.6,366.98
S/.12,681.87
S/.4,361.09 S/.3,095.21
S/.2,211.69
S/.7,393.16
S/.243.88
S/.8,044.39 ###
S/.7,120.59 S/.3,137.78
S/.7,120.59 S/.3,137.78
S/.923.80 S/.5,533.84
S/.923.80 S/.3,697.12
S/.1,836.72
S/.23,847.41
S/.11,198.39
S/.3,335.87
S/.7,862.52
S/.7,607.12
S/.1,254.64
S/.3,136.60
S/.3,215.88
S/.5,041.90
S/.1,321.85
S/.220.05
S/.3,500.00
S/.1,200.00
S/.1,200.00
S/.6,500.00
S/.5,000.00
S/.1,500.00
S/.80,000.00
S/.80,000.00
S/.88,116.51
S/.78,910.50
S/.9,000.00
S/.206.01
S/.407.81 S/.5,650.05 S/.85,345.07 ### S/.35,145.16 S/.25,831.69
S/.407.81 S/.5,650.05 S/.85,345.07 ### S/.35,145.16 S/.25,831.69
S/.407.81 S/.677.39
S/.407.81 S/.244.95
S/.308.11
S/.124.33
S/.4,972.66 S/.11,390.02
S/.1,746.81
S/.1,180.98 S/.1,726.51
S/.1,067.44
S/.637.55
S/.339.88 S/.3,747.22
S/.5,916.29
S/.32,243.02 S/.7,996.26 S/.16,548.13
S/.1,293.84
S/.15,870.89
S/.15,214.87
S/.15,078.29 S/.7,996.26 S/.1,333.26
S/.17,684.17
S/.11,956.48
S/.11,076.53
S/.879.95
S/.5,727.69
S/.1,101.81
S/.2,442.32
S/.2,183.56
S/.24,027.86 ### S/.18,597.03 S/.25,831.69
S/.3,189.65 S/.4,932.37 S/.3,946.24
S/.3,189.65 S/.4,932.37 S/.3,946.24
S/.20,838.21 ### S/.14,650.79 S/.3,112.54
S/.20,838.21 S/.2,982.39
S/.56,691.22 S/.870.78
S/.93,537.70 S/.13,780.01 S/.3,112.54
S/.22,719.15
S/.3,649.80
S/.19,069.35
### ### ###
S/.47,882.72 ### ###
S/.19,492.44
S/.7,492.44
S/.12,000.00
S/.28,390.28 ### ###
S/.28,390.28 ###
S/.8,840.15 S/.2,215.79
S/.19,550.13 S/.39,690.73
S/.53,415.80
S/.78,521.81
S/.43,603.03
S/.45,827.14 S/.4,384.88
S/.45,827.14 S/.4,384.88
S/.12,088.88 S/.56,362.07
S/.1,159.29 S/.356.95
S/.713.54 S/.803.12
S/.720.31 S/.1,621.30
S/.20,975.80
S/.7,600.51 S/.0.44
S/.32,604.46
S/.929.23
S/.966.00 S/.0.00
S/.19,625.84 S/.4.61
S/.19,625.84 S/.4.61
###
###
### S/.0.00
### S/.0.00
S/.75.18
S/.59.50
S/.15.68
S/.272.98 S/.8,657.18
S/.272.98 S/.364.41
S/.621.30
S/.82.44
S/.4.54
S/.236.92
S/.1,036.70
S/.743.30
S/.2,485.71
S/.1,023.00
S/.125.40
S/.200.75
S/.108.35
S/.1,321.65
S/.302.71
S/.1,484.43
S/.948.96
S/.20.74
S/.248.95
S/.265.78
S/.1,536.92
S/.993.58
S/.21.88
S/.248.95
S/.272.51
S/.39,002.84 S/.51,247.87
S/.37,689.44 S/.51,247.87
S/.9,327.82 S/.2,744.95
S/.2,180.05 S/.908.89
S/.633.42 S/.271.74
S/.30,230.65
S/.12,611.23 S/.9,180.10
S/.12,936.92 S/.7,911.54
S/.1,313.40
S/.30.71
S/.29.87
S/.5.75
S/.17.85
S/.245.04
S/.388.66
S/.595.52
S/.17,979.84 S/.18,023.78
S/.14,884.83 S/.18,023.78
S/.14,715.70
S/.79.12
S/.90.01 S/.992.31
S/.4,760.10
S/.10,747.21
S/.1,524.16
S/.3,095.01
S/.79.07
S/.77.06
S/.7.41
S/.46.05
S/.725.69
S/.789.79
S/.1,369.94
S/.9,500.17 S/.776.48
S/.23.97
S/.11.66
S/.12.31
S/.2,029.20
S/.18.25
S/.17.78
S/.5.47
S/.17.00
S/.1,970.70
S/.470.95
S/.360.76
S/.110.19
S/.6,976.05 S/.776.48
S/.2,472.40
S/.1,420.54
S/.1,280.43
S/.1,802.68 S/.0.29
S/.707.51
S/.68.68
###
S/.78,429.59
S/.22,024.55
S/.3,007.38
S/.16,114.37
S/.14,529.87
S/.22,753.42
S/.13,658.39
S/.13,658.39
###
###
###
S/.1,943.74
S/.341.00
S/.104.42
S/.25.08
S/.747.68
S/.725.56
S/.1,328.05
S/.69.94
S/.68.40
S/.9.12
S/.28.34
S/.295.30
S/.243.02
S/.476.14
S/.137.79
###
S/.31,360.00
S/.7,412.00
S/.35,580.00
S/.2,870.00
S/.11,250.00
S/.3,800.00
S/.3,000.00
S/.3,000.00
S/.40,000.00
S/.10,000.00
###
###
###
###
###
S/.90,037.56 ### S/.16,184.40
S/.7,562.50
S/.2,200.00
S/.5,362.50
S/.22,222.40 S/.8,320.00
S/.3,562.40 S/.0.00
S/.360.00
S/.1,602.40
S/.896.00
S/.704.00 S/.0.00
S/.18,660.00 S/.0.00
S/.18,660.00 S/.0.00
S/.1,120.00
S/.1,120.00
S/.7,200.00
S/.3,600.00
S/.3,600.00
S/.3,205.00
S/.680.00
S/.2,525.00
S/.4,659.40
S/.1,165.00
S/.3,494.40
S/.90,037.56 ###
S/.70,882.62
S/.19,154.94 S/.15,984.77
S/.9,639.00
S/.15,426.56
S/.62,808.00
S/.10,033.13
S/.5,556.97
S/.4,084.92
S/.391.24
S/.4,734.00
S/.4,734.00
730874.74 1387316.08 2673629.12 5105151.04 6398964.38 11662290.3 24112534.28 23308263.52 33781208.56 9424359.32
S/.0.00
S/.0.00
S/.0.00
### ### ### ###
Costo S/.90,531.42 S/.8,479.01 S/.39,381.73 S/.57,638.24
592,640.35 S/.90,531.42 S/.8,479.01 S/.39,381.73 S/.57,638.24
4,000.00 S/.60,084.48
1,000.00 S/.7,489.68
3,000.00 S/.3,287.60
15,045.10 S/.3,154.20
29.34 S/.6,000.00
12.21 S/.6,500.00
17.13 S/.13,653.00
201.36 S/.10,000.00
83.04 S/.8,000.00
3.91 S/.2,000.00
60.48 S/.30,446.94 S/.8,479.01 S/.1,350.30
53.93 S/.505.41
1,752.76 S/.143.46
219.77 S/.14,823.07 S/.1,562.12
660.74 S/.2,963.70
235.26 S/.2,814.76 S/.938.77
636.99 S/.1,520.74
6,661.11 S/.644.60
3,119.42 S/.608.75
649.29 S/.2,506.55 S/.5,978.12 S/.1,350.30
2,651.90 S/.1,869.32
240.5 S/.1,047.46
360.57 S/.999.12
169.5 S/.38,031.43 S/.57,638.24
191.07 S/.16,615.04 S/.15,895.59
158.09 S/.8,838.02 S/.2,690.88
158.09 S/.12,578.37 S/.2,891.99
93.42 S/.1,601.69
47.4 S/.34,558.09
46.02
5,788.45
2,028.30
927.8
677.8
1,954.55
200
22,770.45
1,204.78
2,119.99
3,056.59
442.57
479.45
2,129.87
1,906.81
3,777.52
44.81
577.8
1,720.14
1.33
1.87
34.38
0.74
13.74
34.48
375.79
291.43
47.89
169.89
37.79
47.69
39.45
302.55
185.56
135.56
2,728.70
4.2
1.75
2.45
36.7
25.2
1
10.5
45.3
45.3
1,100.35
404.07
521.08 S/.18,666.49 S/.58,146.66 S/.16,528.98
175.2 S/.18,666.49 S/.30,170.34
136.67 S/.286.49
66.6 S/.227.45
70.07 S/.44.37
57.97 S/.14.67
57.97 S/.3,422.61 S/.1,473.18
1,347.51 S/.763.22
244.81 S/.747.41
269.61 S/.626.59
276.41 S/.268.89
556.68 S/.1,016.50 S/.0.71
2,278.80 S/.1,472.47
2.81 S/.9,504.61 S/.1,752.40
1.17 S/.2,626.44
1.64 S/.625.12
41.46 S/.4,612.56
29.16 S/.1,544.29
0.66 S/.1,640.49 S/.208.11
11.64 S/.5,452.78 S/.26,944.76
30.2 S/.1,927.43
30.2 S/.1,501.68
1,081.68 S/.425.75
480.84 S/.3,525.35 S/.3,304.00
383.47 S/.1,835.74
47.89 S/.2,092.92 S/.1,468.26
169.48 S/.1,432.43
108.31 S/.6,945.91
55.59 S/.1,724.39
52.72 S/.2,067.16
47.91 S/.3,154.36
47.91 S/.16,694.85
645.31 S/.9,578.65
645.31 S/.2,121.83
321.12 S/.3,060.36
185.56 S/.1,934.01
135.56 S/.27,976.32 S/.16,528.98
302.62 S/.8,692.19
5.88 S/.7,972.61
5.88 S/.719.58
21.66 S/.5,242.10 S/.3,016.54
21.66 S/.176.07
131.47 S/.2,771.83 S/.1,827.34
131.47 S/.918.62
49.92 S/.543.51
49.92 S/.712.90
93.69 S/.475.09 S/.270.58
93.69 S/.562.70
15,693.40 S/.8,984.60 S/.531.88
29.86 S/.8,984.60 S/.531.88
12.43 S/.6,991.62
17.43 S/.1,538.98
209.04 S/.1,322.06
209.04 S/.1,732.55
586.03 S/.131.71
321.73 S/.2,252.04
264.3 S/.14.28
7,728.22 S/.3,060.71
3,678.06 S/.2,177.22
2,032.35 S/.883.49
540.52 S/.377.86
1,477.29 S/.377.86
677.36 S/.1,618.86 S/.686.43
364.56 S/.1,618.86 S/.686.43
312.8 S/.1,360.00
237.47 S/.1,360.00
237.47 S/.766.08
5,080.36 S/.270.00
525.67 S/.170.02
865.07 S/.240.06
2,513.08 S/.86.00
213.08 S/.684.25
110.24 S/.684.25
733.6 S/.2,492.18
119.62 S/.1,587.11
1,145.06 S/.305.07
44.24 S/.163.09
1,020.82 S/.299.76
80 S/.27.90
364,964.53 S/.80.06
25,086.00 S/.29.19
79,657.44 S/.11,221.47 S/.41,039.26 S/.15,884.16
40,501.89 S/.11,221.47 S/.15,848.68
9,215.27 S/.181.86
9,983.20 S/.120.18
44,348.47 S/.52.16
23,402.01 S/.9.52
39,078.20 S/.551.57 S/.2,676.88
16,287.17 S/.551.57 S/.460.00
15,123.09 S/.105.62
21,099.96 S/.364.56
6,484.10 S/.147.20
12,031.04 S/.653.51
1,805.76 S/.945.99
1.33 S/.4,032.98 S/.0.48
1.87 S/.694.56
26.82 S/.983.48
0.74 S/.1,081.75
11.16 S/.620.02 S/.0.48
34.48 S/.653.17
375.79 S/.6,455.06 S/.13,171.32
291.43 S/.3,287.63
47.89 S/.2,783.04
169.89 S/.504.59
37.79 S/.3,167.43 S/.6,718.64
47.69 S/.2,067.85
39.45 S/.4,650.43
398.31 S/.3,167.43 S/.0.36
185.56 S/.4,055.47
135.56 S/.1,029.13
10,595.91 S/.1,753.19
296.01 S/.1,273.15
93.15 S/.2,397.21
202.86 S/.959.19
1,713.96 S/.991.03
747.27 S/.446.99
80.73 S/.25,190.58 S/.15,884.16
74.52 S/.8,603.92
811.44 S/.8,100.72
1,273.17 S/.503.20
1,273.17 S/.1,959.05 S/.7,880.16
5,157.90 S/.1,219.81 S/.1,799.37
1,337.31 S/.3,019.18
2,954.88 S/.739.24 S/.895.61
149.76 S/.822.77
389.52 S/.820.51
326.43 S/.522.72
2,154.87 S/.626.51
2,154.87 S/.626.51
2,134.23 S/.1,131.88
41.16 S/.477.48
41.16 S/.654.40
151.62 S/.12,724.15
151.62 S/.12,724.15
909.9 S/.771.58
909.9 S/.389.66
375.72 S/.381.92
99.06 S/.2,737.74
145.92 S/.2,008.74
49.92 S/.729.00
32.46 S/.4,400.00
48.36 S/.4,400.00
655.83 S/.239.75
655.83 S/.239.75
4,192.72
1.26
1.77
9.06
0.72
6.3
314.75
458.09
41.14
73.8
742.44
560.94
542.28 S/.615.70 S/.4,609.13 S/.465.20
437.82 S/.890.75
51.67 S/.303.28
948.92 S/.64.56
1.76 S/.238.72
S 3,938.07 S/.216.83
2.2 S/.216.83
3.09 S/.370.64
12.86 S/.370.64
1.25 S/.615.70 S/.3,718.38 S/.465.20
9 S/.1,713.76
494.6 S/.315.84
561.45 S/.742.00
56.3 S/.655.92
94.89 S/.669.80
493.19 S/.363.32
529.16 S/.210.96
380.36 S/.95.52
78.51 S/.562.88
1,220.04 S/.192.96
1.17 S/.369.92
44,286.12 S/.52.82
2,205.00 S/.52.82
8,122.50 S/.1,334.82 S/.465.20
877.5 S/.230.00
3,118.50 S/.110.00
5,310.00 S/.110.00
3,226.95 S/.500.00
21,425.67 S/.50.00
99,198.36 S/.60.00
99,198.36 S/.64.00
26,682.39 S/.210.82 S/.211.70
17,788.26 S/.253.50
8,894.13 ###
834,885.55 S/.32,671.79
834,885.55 S/.32,671.79
6,882.79 S/.68,047.09
1,407.84 S/.39,361.09
5,474.95 S/.28,686.00
16,873.07
4,621.86
3,276.11
8,975.10
104,772.82
16,744.87
68,194.07
19,833.88
222,728.70
155,837.73
33,271.04
33,619.93
55,113.75
27,508.95
27,604.80
101,409.79
65,420.33
34,479.50
1,509.96
8,401.51
8,401.51
28,527.43
28,527.43
47,458.53
25,585.56
21,872.97 S/.2,584.23
47,519.81 S/.701.97
47,519.81 S/.394.63
93,805.20 S/.157.30
93,805.20 S/.150.04
7,527.42 S/.1,882.26
7,527.42 S/.1,882.26
50,947.47
42,887.55
8,059.92
42,917.26
460.08
1,789.20
1,917.00
2,809.36
434.52
35,507.10
31,860.10
31,860.10
S/.15,026.77 S/.14,894.71 S/.53,815.93
S/.4,483.03
S/.1,836.56
S/.2,646.47
S/.18,898.02
S/.1,403.31
S/.2,352.82
S/.1,620.98
S/.13,520.91
S/.7,823.62
S/.1,576.34
S/.830.20
S/.757.59
S/.1,804.49
S/.2,855.00
S/.22,611.26
S/.798.76
S/.10,361.93
S/.6,997.41
S/.4,453.16
S/.15,026.77 S/.14,894.71
S/.2,178.31
S/.2,178.31
S/.12,848.46 S/.4,531.41
S/.514.30
S/.5,740.00
S/.6,594.16 S/.2,031.41
S/.2,500.00
S/.4,530.95
S/.202.05
S/.1,171.28
S/.3,157.62
S/.1,332.35
S/.412.34
S/.559.06
S/.360.95
S/.4,500.00
S/.4,500.00
S/.2,336.93 S/.28,274.31 S/.53,321.93 ###
S/.2,336.93 S/.28,274.31 S/.49,961.89 S/.73,209.23
S/.2,336.93 S/.8,356.39 S/.39,420.01 S/.46,203.63
S/.2,336.93 S/.8,356.39 S/.39,420.01 S/.7,861.09
S/.2,336.93 S/.8,356.39 S/.183.13
S/.1,551.80
S/.785.13 S/.1,048.12
S/.7,125.90
S/.182.37 S/.183.13
S/.2,517.23 S/.1,184.34
S/.507.62
S/.599.69
S/.1,409.92 S/.1,057.77
S/.126.57
S/.2,855.45
S/.438.60
S/.518.15
S/.1,806.06
S/.92.64
S/.36,719.65 S/.3,821.30
S/.6,667.51
S/.7,319.85
S/.22,732.29 S/.2,525.75
S/.1,295.55
S/.38,342.54
S/.38,342.54
S/.3,036.84
S/.215.55
S/.4,400.24
S/.30,689.91
S/.746.12
S/.77.84
S/.668.28
S/.34,824.67
S/.7,892.52
S/.18,969.25
S/.7,962.90
S/.342.87
S/.342.87
S/.180.94
S/.161.93
S/.858.56
S/.858.56
S/.8,044.39
S/.7,120.59
S/.7,120.59
S/.923.80
S/.923.80
### ### ### ###
### ### S/.1,959,102.21 ### ### S/.147,082.68 01 INSTALACIONES EXTERIORES
### S/.81,359.30 S/.148,308.63 ### ### S/.121,548.83 01.01 CONSTRUCCION DE CERCO PE
### S/.81,359.30 S/.148,308.63 S/.95,398.16 S/.53,852.85 01.01.01 ESTRUCTURAS
01.01.01.01 OBRAS PROVISIONALES
01.01.01.01.0 CAMPAMENTO PROVISION
01.01.01.01.0 CASETA ADICIONAL P/GUA
01.01.01.01.0 CARTEL DE IDENTIFICACIO
01.01.01.01.0 CONSUMOS DE AGUA Y EN
01.01.01.01.0 SERVICIOS HIGIENICOS DU
01.01.01.01.0 CERCO DE OBRA CON POS
01.01.01.01.0 TRANSPORTE DE EQUIPO
01.01.01.01.0 ELABORACION IMPLEMENT
01.01.01.01.0 SEÑALIZACION TEMPORAL
01.01.01.02 TRABAJOS PRELIMINARES
01.01.01.02.0 DESMONTAJE DE PUERTAS
01.01.01.02.0 DESMONTAJE DE VENTANA
01.01.01.02.0 DEMOLICION DE CIMIENTO
01.01.01.02.0 DEMOLICION DE ESTRUCT
01.01.01.02.0 DEMOLICION DE SOBRECIM
01.01.01.02.0 DEMOLICION DE COLUMNA
01.01.01.02.0 DEMOLICION DE LOSAS DE
01.01.01.02.0 DEMOLICION DE MUROS D
01.01.01.02.0 DEMOLICION DE MUROS D
01.01.01.02.1 LIMPIEZA DEL TERRENO M
01.01.01.02.1 TRAZO Y REPLANTEO PRE
01.01.01.02.1 TRAZO Y REPLANTEO DUR
S/.71,179.40 01.01.01.03 MOVIMIENTO DE TIERRAS
01.01.01.03.0 EXCAVACION PARA ZAPAT
01.01.01.03.0 EXCAVACION PARA CIMIEN
01.01.01.03.0 RELLENO COMPACTADO C
01.01.01.03.0 NIVELACION Y APISONADO
S/.8,643.27 01.01.01.03.0 ACARREO MANUAL DE MAT
S/.62,536.13 01.01.01.03.0 CARGUIO Y ELIMINACION D
S/.31,496.56 S/.47,284.41 01.01.01.04 OBRAS DE CONCRETO SIMP
S/.31,496.56 S/.2,210.27 01.01.01.04.0 SUBCIMIENTOS Y SUBZAPT
S/.42,321.71 01.01.01.04.0 CIMIENTOS CORRIDOS ME
S/.1,013.92 01.01.01.04.0 SOBRECIMIENTOS MEZCLA
S/.1,738.51 01.01.01.04.0 ENCOFRADO Y DESENCOF
S/.69,121.16 S/.34,074.89 S/.148,308.63 S/.95,398.16 S/.53,852.85 01.01.01.05 OBRAS DE CONCRETO ARM
S/.69,121.16 S/.3,747.58 01.01.01.05.0 ZAPATAS
S/.62,282.84 S/.3,544.75 01.01.01.05.0 ZAPATAS: CONCRETO f'c
S/.6,838.32 S/.202.83 01.01.01.05.0 ZAPATAS: ACERO CORRU
S/.30,327.31 S/.33,795.07 01.01.01.05.0 SOBRECIMIENTO REFORZA
S/.25,096.78 01.01.01.05.0 SOBRECIMIENTO REFOR
S/.22,849.39 S/.7,347.84 01.01.01.05.0 SOBRECIMEINTO REFOR
S/.7,477.92 S/.1,350.45 01.01.01.05.0 SOBRECIMIENTOS REFO
S/.114,513.56 S/.95,398.16 01.01.01.05.0 COLUMNAS
S/.59,406.32 01.01.01.05.0 COLUMNAS: CONCRETO
S/.62,914.35 S/.29,334.63 01.01.01.05.0 COLUMNAS: ENCOFRADO
S/.51,599.21 S/.6,657.21 01.01.01.05.0 COLUMNAS: ACERO COR
S/.52,020.78 01.01.01.05.0 VIGAS
S/.10,108.86 01.01.01.05.0 VIGAS: CONCRETO f'c=21
S/.27,420.99 01.01.01.05.0 VIGAS: ENCOFRADO Y DE
S/.14,490.93 01.01.01.05.0 VIGAS: ACERO CORRUGA
S/.1,832.07 01.01.01.05.0 LOSA ALIGERADA
S/.521.91 01.01.01.05.0 LOSAS ALIGERADAS: CO
S/.614.91 01.01.01.05.0 LOSAS ALIGERADAS: ENC
S/.130.14 01.01.01.05.0 LOSAS ALIGERADAS: ACE
S/.565.11 01.01.01.05.0 LOSAS ALIGERADAS: LAD
### ### S/.121,548.83 01.01.02 ARQUITECTURA
### S/.17,218.24 01.01.02.01 MUROS Y TABIQUES DE ALB
### S/.17,218.24 01.01.02.01.0 MURO DE LADRILLO KK TIP
### S/.24,330.18 S/.324.59 01.01.02.02 REVOQUES ENLUCIDOS Y M
S/.2,432.61 S/.722.73 01.01.02.02.0 TARRAJEO PRIMARIO O RA
S/.89,753.58 01.01.02.02.0 TARRAJEO EN MURO:EXTE
S/.9,220.40 S/.14,219.43 01.01.02.02.0 TARRAJEO DE SUPERFICIE
S/.1,947.46 S/.5,025.92 S/.324.59 01.01.02.02.0 TARRAJEO DE SUPERFICIE
S/.1,292.04 S/.4,362.10 01.01.02.02.0 BRUÑAS SEGUN DETALLE
S/.7,890.12 S/.8,892.99 01.01.02.03 ZOCALOS
S/.7,890.12 S/.8,892.99 01.01.02.03.0 ENCHAPE PIEDRA IRREGU
S/.30,600.00 S/.109,964.14 01.01.02.04 CARPINTERIA METALICA
S/.30,600.00 S/.0.00 01.01.02.04.0 PUERTA METALICA T-01 2.5
S/.15,200.00 01.01.02.04.0 PUERTA METALICA T-02 4.0
S/.94,764.14 01.01.02.04.0 CERCO METALICO CON TU
S/.43,470.36 S/.11,260.10 01.01.02.05 PINTURA
S/.34,011.61 S/.2,586.50 01.01.02.05.0 PINTURA LATEX 2 MANOS
S/.6,705.89 S/.327.80 01.01.02.05.0 PINTURA LATEX 2 MANOS
S/.2,752.86 S/.315.76 01.01.02.05.0 PINTURA LATEX 2 MANOS
S/.8,030.04 01.01.02.05.0 PIN. ANTICOR. Y ESMALTE
01.02 CONSTRUCCION DE AREA DE G
01.02.01 ESTRUCTURAS
01.02.01.01 TRABAJOS PRELIMINARES
01.02.01.01.0 LIMPIEZA DEL TERRENO M
01.02.01.01.0 TRAZO Y REPLANTEO PRE
01.02.01.01.0 TRAZO Y REPLANTEO DUR
01.02.01.02 MOVIMIENTO DE TIERRAS
01.02.01.02.0 EXCAVACION PARA ZAPAT
01.02.01.02.0 EXCAVACION PARA CIMIEN
01.02.01.02.0 RELLENO COMPACTADO C
01.02.01.02.0 NIVELACION Y APISONADO
01.02.01.02.0 ACARREO MANUAL DE MAT
01.02.01.02.0 CARGUIO Y ELIMINACION D
01.02.01.03 OBRAS DE CONCRETO SIMP
01.02.01.03.0 FALSO PISO DE 4" MEZCLA
01.02.01.03.0 SUBCIMIENTOS Y SUBZAPT
01.02.01.03.0 CIMIENTOS CORRIDOS ME
01.02.01.03.0 SOBRECIMIENTOS MEZCLA
01.02.01.03.0 ENCOFRADO Y DESENCOF
01.02.01.04 OBRAS DE CONCRETO ARM
01.02.01.04.0 ZAPATAS
01.02.01.04.0 ZAPATAS: CONCRETO f'c
01.02.01.04.0 ZAPATAS: ACERO CORRU
01.02.01.04.0 COLUMNAS
01.02.01.04.0 COLUMNAS: CONCRETO
01.02.01.04.0 COLUMNAS: ENCOFRADO
01.02.01.04.0 COLUMNAS: ACERO COR
01.02.01.04.0 VIGAS
01.02.01.04.0 VIGAS: CONCRETO f'c=21
01.02.01.04.0 VIGAS: ENCOFRADO Y DE
01.02.01.04.0 VIGAS: ACERO CORRUGA
01.02.01.04.0 LOSA ALIGERADA
01.02.01.04.0 LOSAS ALIGERADAS: CO
01.02.01.04.0 LOSAS ALIGERADAS: ENC
01.02.01.04.0 LOSAS ALIGERADAS: ACE
01.02.01.04.0 LOSAS ALIGERADAS: LAD
01.02.02 ARQUITECTURA
01.02.02.01 MUROS Y TABIQUES DE ALB
01.02.02.01.0 MURO DE LADRILLO KK TIP
01.02.02.01.0 JUNTA DE DILATACION CO
01.02.02.02 REVOQUES ENLUCIDOS Y M
01.02.02.02.0 TARRAJEO PRIMARIO O RA
01.02.02.02.0 TARRAJEO EN MURO:INTE
01.02.02.02.0 TARRAJEO EN MURO:EXTE
01.02.02.02.0 TARRAJEO DE SUPERFICIE
01.02.02.02.0 TARRAJEO DE SUPERFICIE
01.02.02.02.0 VESTIDURA DE DERRAMES
01.02.02.02.0 BRUÑAS SEGUN DETALLE
01.02.02.03 CIELO RASOS
01.02.02.03.0 CIELORASO CON BALDOSA
01.02.02.04 PISOS Y PAVIMENTOS
01.02.02.04.0 CONTRAPISO DE 40 mm (M
01.02.02.04.0 PISO DE CEMENTO COLOR
01.02.02.04.0 PISO CERAMICO ANTIDESL
01.02.02.04.0 VEREDA: ENCOFRADO Y D
01.02.02.04.0 VEREDAS DE CONCRETO f
01.02.02.04.0 VEREDA: JUNTA DE DILATA
01.02.02.05 ZOCALOS
01.02.02.05.0 ENCHAPE FACHALETA RUS
01.02.02.05.0 ZOCALO DE CERAMICO 20
01.02.02.06 CONTRAZOCALOS
01.02.02.06.0 CONTRAZOCALO DE CEME
01.02.02.07 CARPINTERIA DE MADERA
01.02.02.07.0 PUERTAS DE MADERA CON
01.02.02.08 CARPINTERIA METALICA
01.02.02.08.0 PUERTA METALICA 06
01.02.02.09 CERRAJERIA
01.02.02.09.0 BISAGRA CAPUCHINA DE 3
01.02.02.09.0 CERRADURA DE TRES GOL
01.02.02.09.0 CERRADURA DE PERILLA E
01.02.02.09.0 MANIJA DE 3" ALUMINIZAD
01.02.02.10 VIDRIOS, CRISTALES Y SIMIL
01.02.02.10.0 VIDRIO SISTEMA MODUGLA
01.02.02.11 PINTURA
01.02.02.11.0 PINTURA LATEX 2 MANOS
01.02.02.11.0 PINTURA LATEX 2 MANOS
01.02.02.11.0 PINTURA LATEX 2 MANOS
01.02.02.11.0 PINTURA LATEX 2 MANOS
01.02.02.11.0 PIN. ANTICOR. Y ESMALTE
01.02.02.11.0 PINTURA ESMALTE EN CON
01.02.02.11.0 PINTURA EN DERRAMES
S/.4,130.12 01.03 CONSTRUCCION DE AREA DE B
01.03.01 ESTRUCTURAS
01.03.01.01 TRABAJOS PRELIMINARES
01.03.01.01.0 LIMPIEZA DEL TERRENO M
01.03.01.01.0 TRAZO Y REPLANTEO PRE
01.03.01.01.0 TRAZO Y REPLANTEO DUR
01.03.01.02 MOVIMIENTO DE TIERRAS
01.03.01.02.0 EXCAVACION PARA ZAPAT
01.03.01.02.0 EXCAVACION PARA CIMIEN
01.03.01.02.0 RELLENO COMPACTADO C
01.03.01.02.0 NIVELACION Y APISONADO
01.03.01.02.0 ACARREO MANUAL DE MAT
01.03.01.02.0 CARGUIO Y ELIMINACION D
01.03.01.03 OBRAS DE CONCRETO SIMP
01.03.01.03.0 FALSO PISO DE 4" MEZCLA
01.03.01.03.0 SUBCIMIENTOS Y SUBZAPT
01.03.01.03.0 CIMIENTOS CORRIDOS ME
01.03.01.03.0 SOBRECIMIENTOS MEZCLA
01.03.01.03.0 ENCOFRADO Y DESENCOF
01.03.01.04 OBRAS DE CONCRETO ARM
01.03.01.04.0 ZAPATAS
01.03.01.04.0 ZAPATAS: CONCRETO f'c
01.03.01.04.0 ZAPATAS: ACERO CORRU
01.03.01.04.0 COLUMNAS
01.03.01.04.0 COLUMNAS: CONCRETO
01.03.01.04.0 COLUMNAS: ENCOFRADO
01.03.01.04.0 COLUMNAS: ACERO COR
01.03.01.04.0 VIGAS
01.03.01.04.0 VIGAS: CONCRETO f'c=21
01.03.01.04.0 VIGAS: ENCOFRADO Y DE
01.03.01.04.0 VIGAS: ACERO CORRUGA
01.03.01.04.0 LOSAS MACIZAS
01.03.01.04.0 LOSAS MACIZAS: CONCR
01.03.01.04.0 LOSAS MACIZAS: ENCOF
01.03.01.04.0 LOSAS MACIZAS: ACERO
S/.4,130.12 01.03.02 ARQUITECTURA
01.03.02.01 MUROS Y TABIQUES DE ALB
01.03.02.01.0 MURO DE LADRILLO KK TIP
01.03.02.01.0 JUNTA DE DILATACION CO
01.03.02.02 REVOQUES ENLUCIDOS Y M
01.03.02.02.0 TARRAJEO EN MURO:INTE
01.03.02.02.0 TARRAJEO EN MURO:EXTE
01.03.02.02.0 TARRAJEO DE SUPERFICIE
01.03.02.02.0 TARRAJEO DE SUPERFICIE
01.03.02.02.0 VESTIDURA DE DERRAMES
01.03.02.02.0 BRUÑAS SEGUN DETALLE
01.03.02.03 CIELO RASOS
01.03.02.03.0 CIELORASO CON MEZCLA
01.03.02.04 PISOS Y PAVIMENTOS
01.03.02.04.0 CONTRAPISO DE 40 mm (M
01.03.02.04.0 PISO DE CEMENTO COLOR
01.03.02.05 ZOCALOS
01.03.02.05.0 ENCHAPE FACHALETA RUS
01.03.02.06 CONTRAZOCALOS
01.03.02.06.0 CONTRAZOCALO DE CEME
01.03.02.06.0 CONTRAZOCALO DE CEME
01.03.02.07 CUBIERTAS Y CERRAMIENTO
01.03.02.07.0 COBERTURA ONDULINE
01.03.02.07.0 CORREAS DE MADERA
01.03.02.08 CARPINTERIA METALICA
01.03.02.08.0 PUERTA METALICA T-5
S/.1,144.33 01.03.02.09 CERRAJERIA
S/.120.25 01.03.02.09.0 BISAGRA CAPUCHINA DE 3
S/.680.08 01.03.02.09.0 CERRADURA DE TRES GOL
S/.344.00 01.03.02.09.0 MANIJA DE 3" ALUMINIZAD
S/.241.80 01.03.02.10 VIDRIOS, CRISTALES Y SIMIL
S/.241.80 01.03.02.10.0 VIDRIO SISTEMA MODUGLA
S/.2,743.99 01.03.02.11 PINTURA
S/.1,084.35 01.03.02.11.0 PINTURA LATEX 2 MANOS
S/.249.98 01.03.02.11.0 PINTURA LATEX 2 MANOS
S/.490.58 01.03.02.11.0 PINTURA LATEX 2 MANOS
S/.345.96 01.03.02.11.0 PINTURA LATEX 2 MANOS
S/.436.75 01.03.02.11.0 PIN. ANTICOR. Y ESMALTE
S/.92.99 01.03.02.11.0 PINTURA ESMALTE EN CON
S/.43.38 01.03.02.11.0 PINTURA EN DERRAMES
01.04 INSTALACIONES SANITARIAS
01.04.01 SISTEMA DE AGUA FRIA
01.04.01.01 SALIDA DE AGUA FRIA
01.04.01.01.0 SALIDA DE A.F. PVC C/R - 1
01.04.01.01.0 SALIDA DE A.F. PVC C/R - 1
01.04.01.02 REDES DE DISTRIBUCION
01.04.01.02.0 SUM. E INST. TUB. PVC C-1
01.04.01.03 VALVULAS
01.04.01.03.0 SUM. E INST. VALV. ESFER
01.04.02 SISTEMA DE DESAGUE Y VENT
01.04.02.01 SALIDA DE AGUA FRIA
01.04.02.01.0 SALIDA DE DESAGUE PVC
01.04.02.01.0 SALIDA DE DESAGUE PVC
01.04.02.01.0 SALIDA DE VENTILACION D
01.04.02.02 ADITAMENTOS VARIOS
01.04.02.02.0 SUMIDERO DE BRONCE RO
01.04.02.02.0 REGISTRO ROSCADO DE B
01.04.02.02.0 SOMBRERO DE VENTILACI
01.04.02.03 CAJA DE REGISTRO
01.04.02.03.0 CAJA DE REGISTRO 18"x24
01.04.02.03.0 CAJA DE REGISTRO 10"x20
01.04.02.04 CONEXION DOMICILIARIA
01.04.02.04.0 CONEXION DOMICILIARIA P
01.04.02.05 APARATOS SANITARIOS
01.04.02.05.0 INODORO CON VALVULA S
01.04.02.05.0 LAVATORIO INC/ACCESOR
01.04.02.05.0 DUCHA INC/ACCESORIO
01.04.02.05.0 LAVADERO DE ACERO INO
01.04.02.05.0 JABONERA DE LOSA DE 15
01.04.02.05.0 PAPELERA DE BARRA
01.04.02.05.0 ESPEJO
01.04.02.05.0 COLOCACION DE APARATO
01.04.02.05.0 COLOCACION DE ACCESO
S/.94,195.05 S/.95,112.86 S/.941,308.57 S/.61,990.41 ### S/.4,339.14 01.05 JARDINES Y EXTERIORES
01.05.01 TRABAJOS PRELIMINARES
01.05.01.01 LIMPIEZA DEL TERRENO MA
S/.43,047.69 01.05.02 MOVIMIENTO DE TIERRAS
01.05.02.01 CORTE DE MATERIAL SUELT
S/.43,047.69 01.05.02.02 ELIMINACION DE MATERIAL
S/.51,147.36 S/.32,263.27 01.05.03 MEJORAMIENTO DE SUBRASA
S/.23,940.54 01.05.03.01 PERFILADO Y COMPACTADO
S/.24,021.92 01.05.03.02 EXTRACCION Y APILAMIENT
S/.3,184.90 S/.25,539.08 01.05.03.03 CARGUIO Y TRANSPORTE D
S/.6,724.19 01.05.03.04 MEJORAMIENTO DE LA SUB-
S/.51,224.40 S/.113,932.95 S/.18,383.94 01.05.04 SUB BASE
S/.10,674.65 01.05.04.01 EXTRACCION Y APILAMIENT
S/.33,206.89 01.05.04.02 CARGUIO Y TRANSPORTE D
S/.7,342.86 S/.113,932.95 S/.18,383.94 01.05.04.03 CONFORMACION DE SUB BA
S/.10,086.93 S/.52,646.79 01.05.05 SARDINELES
S/.10,086.93 S/.25,494.32 01.05.05.01 SARDINELES: ENCOFRADO Y
S/.14,703.55 01.05.05.02 SARDINELES: CONCRETO f'c
S/.12,448.92 01.05.05.03 TARRAJEO EN SARDINEL DE
S/.1,538.26 S/.1,426.21 01.05.06 RAMPAS PARA DISCAPACITAD
S/.1,538.26 S/.1,243.33 01.05.06.01 RAMPAS: ENCOFRADO Y DE
S/.182.88 01.05.06.02 RAMPAS DE CONCRETO: f´c=
S/.773,302.62 S/.43,606.47 ### S/.4,339.14 01.05.07 PISOS Y VEREDAS
S/.402,039.41 S/.30,135.94 01.05.07.01 FALSO PISO DE 4" MEZCLA 1
S/.9,843.86 S/.9,770.07 S/.1,629.02 01.05.07.02 PISOS: ENCOFRADO Y DESE
S/.341,318.62 01.05.07.03 PISO DE CEMENTO COLORE
S/.20,100.73 S/.3,700.46 S/.3,454.02 01.05.07.04 PISO DE CEMENTO COLORE
S/.3,262.89 S/.271.11 01.05.07.05 PISOS: JUNTA DE DILATACIO
S/.10,422.16 01.05.07.06 VEREDA: ENCOFRADO Y DES
### S/.3,368.03 01.05.07.07 VEREDAS DE CONCRETO f'c
S/.700.00 01.05.07.08 VEREDA: JUNTA DE DILATAC
S/.34,133.47 S/.10,642.99 S/.93,391.45 S/.26,599.41 01.06 TANQUE CISTERNA
01.06.01 TRABAJOS PRELIMINARES
01.06.01.01 LIMPIEZA DEL TERRENO MA
01.06.01.02 TRAZO Y REPLANTEO PRELI
01.06.01.03 TRAZO Y REPLANTEO DURA
S/.3,219.62 01.06.02 MOVIMIENTO DE TIERRAS
S/.1,703.36 01.06.02.01 EXCAVACION PARA ZAPATA
S/.608.63 01.06.02.02 NIVELACION Y APISONADO D
S/.907.63 01.06.02.03 CARGUIO Y ELIMINACION DE
S/.2,614.81 01.06.03 OBRAS DE CONCRETO SIMPLE
S/.2,614.81 01.06.03.01 SOLADO e=3"
S/.28,299.04 S/.10,642.99 S/.59,350.97 01.06.04 OBRAS DE CONCRETO ARMAD
S/.55,411.21 01.06.04.01 TANQUE CISTERNA CONCRE
S/.4,699.49 S/.6,127.81 S/.3,939.76 01.06.04.02 TANQUE CISTERNA: ENCOFR
S/.23,599.55 S/.4,515.18 01.06.04.03 TANQUE CISTERNA: ACERO
S/.34,040.48 S/.26,599.41 01.06.05 TARRAJEO INTERIOR DE TANQ
S/.34,040.48 S/.26,599.41 01.06.05.01 TARRAJEO CON IMPERMEAB
S/.4,654.45 01.07 AREAS VERDES Y EQUIPAMIENT
S/.2,131.55 01.07.01 AREAS VERDES
S/.212.43 01.07.01.01 PREPARACION Y EXTENDIDO
S/.1,430.78 01.07.01.02 SEMBRADO DE GRASS
S/.488.34 01.07.01.03 SEMBRADO DE ARBUSTOS
S/.2,522.90 01.07.02 EQUIPAMIENTO DE ESPACIOS
S/.82.08 01.07.02.01 EXCAVACION MANUAL DE ZA
S/.133.76 01.07.02.02 CONCRETO f'c=175 kg/cm2
S/.2,307.06 01.07.02.03 COLECTOR DE DESHECHOS
S/.77,625.24 ### ### S/.19,299.10 01.08 ESTACIONAMIENTO VEHICULAR
S/.4,993.77 01.08.01 OBRAS PRELIMINARES
S/.4,993.77 01.08.01.01 DEMOLICION DE VEREDAS D
S/.9,336.38 S/.5,246.79 01.08.02 TRABAJOS PRELIMINARES
S/.9,336.38 S/.9.74 01.08.02.01 LIMPIEZA DEL TERRENO MA
S/.5,237.05 01.08.02.02 TRAZO Y REPLANTEO PRELI
S/.20,719.09 01.08.03 MEJORAMIENTO DE SUBRASA
S/.20,719.09 01.08.03.01 CAPA ANTICONTAMINANTE e
S/.27,473.41 01.08.04 SUB BASE
S/.12,512.14 01.08.04.01 EXTRACCION Y APILAMIENT
S/.14,961.27 01.08.04.02 CARGUIO Y TRANSPORTE D
S/.21,173.80 01.08.05 CONFORMACION DE SUB BAS
S/.19,538.23 01.08.05.01 CONFORMACION DE SUB BA
S/.1,635.57 01.08.05.02 RIEGO - AGUA
### S/.49,392.26 S/.19,299.10 01.08.06 PAVIMENTO RIGIDO
### S/.35,940.36 S/.16,233.54 01.08.06.01 PAVIMENTO RIGIDO: CONCR
S/.9,858.06 S/.10,833.95 01.08.06.02 PAVIMENTO RIGIDO: ENCOF
S/.680.95 S/.3,065.56 01.08.06.03 PAVIMENTO RIGIDO: CURAD
S/.1,937.00 01.08.06.04 PAVIMENTO RIGIDO: JUNTA
S/.63,295.09 ### S/.95,940.24 01.08.07 ARQUITECTURA
S/.51,630.84 S/.55,279.61 01.08.07.01 SARDINELES
S/.51,630.84 S/.13,286.35 01.08.07.01.0 SARDINELES: ENCOFRADO
S/.30,774.31 01.08.07.01.0 SARDINELES:CONCRETO f
S/.11,218.95 01.08.07.01.0 TARRAJEO EN SARDINEL D
S/.8,838.64 S/.39,234.05 01.08.07.02 BANCAS DE CONCRETO
S/.8,838.64 S/.204.52 01.08.07.02.0 BANCAS: ACERO CORRUG
S/.9,824.63 01.08.07.02.0 BANCAS: ENCOFRADO Y D
S/.9,304.33 01.08.07.02.0 BANCAS: CONCRETO f'c=21
S/.19,900.57 01.08.07.02.0 ENCHAPE PIEDRA IRREGU
S/.2,386.58 01.08.07.03 RAMPAS PARA DISCAPACITA
S/.2,239.42 01.08.07.03.0 RAMPAS: ENCOFRADO Y D
S/.147.16 01.08.07.03.0 RAMPAS DE CONCRETO: f´
S/.63,295.09 ### S/.1,426.58 01.08.07.04 PISOS Y VEREDAS
S/.3,249.94 01.08.07.04.0 PISOS: ENCOFRADO Y DES
S/.60,045.15 S/.58,916.25 01.08.07.04.0 FALSO PISO DE 4" MEZCLA
S/.95,401.32 01.08.07.04.0 PISO DE CEMENTO COLOR
S/.486.12 S/.1,426.58 01.08.07.04.0 PISOS: JUNTA DE DILATAC
### 01.09 CONSTRUCCION DEL CAMPO D
01.09.01 TRABAJOS PRELIMINARES
01.09.01.01 TRAZO Y REPLANTEO PRELI
01.09.01.02 LIMPIEZA DEL TERRENO MA
01.09.02 MOVIMIENTO DE TIERRAS
01.09.02.01 CORTE DE MATERIAL SUELT
01.09.02.02 ELIMINACION DE MATERIAL
01.09.02.03 PERFILADO Y COMPACTADO
01.09.02.04 CONFORMACION DE SUB-BA
01.09.03 EXTRACCION DE MATERIALES
01.09.03.01 EXTRACCION Y APILAMIENT
01.09.03.02 EXTRACCION Y APILAMIENT
01.09.03.03 ZARANDEO DE ARENA FINA
01.09.03.04 CARGUIO DE MATERIALES E
01.09.03.05 TRANSPORTE DE MATERIAL
S/.339.46 01.09.04 CONFORMACION DE ESTRUCT
01.09.04.01 COLOCADO Y COMPACTADO
01.09.04.02 COLOCADO Y COMPACTADO
01.09.04.03 COLOCADO Y COMPACTADO
S/.0.60 01.09.04.04 COLOCADO Y COMPACTADO
S/.338.86 01.09.04.05 COLOCADO Y COMPACTADO
S/.8,219.34 01.09.05 GEOTEXTIL
S/.8,219.34 01.09.05.01 SUMINISTRO E INSTALACION
S/.7,435.36 01.09.06 CONCRETO SIMPLE
S/.7,435.36 01.09.06.01 SARDINELES Y VEREDAS
S/.3,501.34 01.09.06.01.0 ENCOFRADO Y DESENCOF
S/.3,934.02 01.09.06.01.0 CONCRETO f'c=175 kg/cm2
### 01.09.07 CONFORMACION DE ESTRUCT
### 01.09.07.01 CESPED DE GRASS ARTIFIC
01.09.08 SISTEMA DE DRENAJE CAMPO
01.09.08.01 TRABAJOS PRELIMINARES
01.09.08.01.0 TRAZO Y REPLANTEO PRE
01.09.08.02 INSTALACION SUB DRENES
01.09.08.02.0 RETIRO DE MATERIAL SEL
01.09.08.02.0 SUMINISTRO Y COLOCACIO
01.09.08.02.0 RELLENO CON MATERIAL C
01.09.08.02.0 ACCESORIOS DE INSTALAC
01.09.08.03 INSTALACION DREN COLECT
01.09.08.03.0 RETIRO DE MATERIAL SEL
01.09.08.03.0 SUMINISTRO Y COLOCACIO
01.09.08.03.0 RELLENO CON MATERIAL C
01.09.08.04 CONCRETO ARMADO
01.09.08.04.0 ENCOFRADO Y DESENCOF
01.09.08.04.0 ACERO DE REFUERZO fy=4
01.09.08.04.0 CONCRETO f'c=210 kg/cm2
01.09.08.05 PRUEBAS DE CALIDAD
01.09.08.05.0 PRUEBA HIDRAULICA EN T
S/.1,640.35 S/.49,096.20 S/.279,480.10 S/.1,083.20 01.10 CONSTRUCCION DEL CAMPO D
S/.1,640.35 S/.49,096.20 S/.28,459.94 01.10.01 MOVIMIENTO DE TIERRAS
S/.1,640.35 S/.1,276.17 01.10.01.01 LIMPIEZA DEL TERRENO MA
S/.2,501.47 01.10.01.02 CORTE DE MATERIAL SUELT
S/.140.95 01.10.01.03 EXCAVACION DE ZANJAS
S/.45,177.61 S/.9.41 01.10.01.04 RELLENO CON MATERIAL PR
S/.14,178.00 01.10.01.05 NIVELACION Y COMPACTADO
S/.10,042.92 01.10.01.06 EMPEDRADO DE PLATAFORM
S/.4,229.61 01.10.01.07 ELIMINACION DE MATERIAL
S/.53,834.45 S/.1,083.20 01.10.02 CONCRETO SIMPLE
S/.53,381.29 01.10.02.01 CONCRETO f'c=210 kg/cm2
S/.453.16 S/.1,083.20 01.10.02.02 JUNTA DE CONTRACCION
S/.3,565.19 01.10.03 IMPRIMADO
S/.3,565.19 01.10.03.01 IMPRIMACION RC 250
S/.71,430.76 01.10.04 CARPETA ASFALTICA EN CALI
S/.71,430.76 01.10.04.01 SUMINISTRO Y COLOCACION
S/.122,189.76 01.10.05 GOMA PREFABRICADA
S/.122,189.76 01.10.05.01 SUMINISTRO Y COLOCACION
S/.5,842.12 S/.50,599.49 S/.3,888.09 01.11 CONSTRUCCION DEL CAMPO D
S/.1,323.24 01.11.01 TRABAJOS PRELIMINARES
S/.1,323.24 01.11.01.01 LIMPIEZA DEL TERRENO MA
S/.4,518.88 S/.29,650.90 01.11.02 MOVIMIENTO DE TIERRAS
S/.1,066.01 01.11.02.01 CORTE DE MATERIAL SUELT
S/.66.20 01.11.02.02 EXCAVACION DE ZANJAS
S/.3,386.67 S/.16,947.49 01.11.02.03 RELLENO CON MATERIAL PR
S/.6,380.10 01.11.02.04 NIVELACION Y COMPACTADO
S/.4,519.31 01.11.02.05 EMPEDRADO DE PLATAFORM
S/.1,804.00 01.11.02.06 ELIMINACION DE MATERIAL
S/.20,948.59 S/.3,888.09 01.11.03 CONCRETO SIMPLE
S/.20,948.59 S/.3,201.75 01.11.03.01 CONCRETO f'c=210 kg/cm2
S/.686.34 01.11.03.02 JUNTA DE CONTRACCION
### S/.95,757.19 S/.413,146.10 ### S/.54,492.73 S/.1,895.61 01.12 CONSTRUCCION DE GRADERIO
S/.1,336.50 S/.0.40 01.12.01 TRABAJOS PRELIMINARES
S/.714.56 01.12.01.01 LIMPIEZA DEL TERRENO MA
S/.320.12 01.12.01.02 TRAZO Y REPLANTEO PRELI
S/.301.82 S/.0.40 01.12.01.03 TRAZO Y REPLANTEO DURA
S/.6,927.63 S/.2,757.08 01.12.02 MOVIMIENTO DE TIERRAS
S/.2,748.77 01.12.02.01 EXCAVACION PARA CIMIENT
S/.3,581.37 01.12.02.02 RELLENO COMPACTADO CO
S/.253.66 01.12.02.03 NIVELACION Y APISONADO D
S/.343.83 S/.2,757.08 01.12.02.04 ACARREO MANUAL DE MATE
S/.17,784.21 S/.79,436.14 01.12.03 ESTRUCTURAS
S/.10,855.43 01.12.03.01 OBRAS DE CONCRETO SIMP
S/.583.47 01.12.03.01.0 SOLADO e=3"
S/.10,271.96 01.12.03.01.0 CIMIENTOS CORRIDOS ME
S/.21,695.12 01.12.03.02 SARDINELES
S/.7,795.67 01.12.03.02.0 SARDINELES:CONCRETO f
S/.13,899.45 01.12.03.02.0 SARDINELES: ENCOFRADO
01.12.03.03 OBRAS DE CONCRETO ARM
S/.8,509.54 01.12.03.04 ZAPATAS
S/.6,049.89 01.12.03.04.0 ZAPATAS: CONCRETO f'c=1
S/.2,459.65 01.12.03.04.0 ZAPATAS: ACERO CORRUG
S/.9,274.67 S/.24,708.94 01.12.03.05 GRADERIOS PLATAFORMA
S/.19,049.68 01.12.03.05.0 GRADERIOS: CONCRETO f'
S/.4,388.15 01.12.03.05.0 GRADERIOS: ENCOFRADO
S/.9,274.67 S/.1,271.11 01.12.03.05.0 GRADERIOS: ACERO CORR
S/.22,176.65 01.12.03.06 ESTRUCTURA METALICA
S/.8,960.00 01.12.03.06.0 ESTRUCTURA METALICA P
S/.13,216.65 01.12.03.06.0 CORREA METALICA SECCI
S/.13,882.91 S/.51,735.65 S/.1,895.61 01.12.04 ARQUITECTURA
S/.3,618.77 S/.2,422.17 01.12.04.01 REVOQUES ENLUCIDOS Y M
S/.3,618.77 S/.2,422.17 01.12.04.01.0 TARRAJEO EN MURO:INTE
S/.10,264.14 S/.2,451.58 01.12.04.02 CUBIERTAS Y CERRAMIENTO
S/.10,264.14 S/.2,451.58 01.12.04.02.0 COBERTURA TIPO ONDULI
S/.41,865.74 01.12.04.03 CARPINTERIA METALICA
S/.565.95 01.12.04.03.0 BARANDA METALICA GRAD
S/.19,729.60 01.12.04.03.0 TUBO METALICO DE 4" EN
S/.21,570.19 01.12.04.03.0 MALLA METALICA EN INTER
S/.4,996.16 S/.1,895.61 01.12.04.04 PINTURA
S/.2,071.32 01.12.04.04.0 PINTURA LATEX 2 MANOS
S/.2,924.84 S/.1,895.61 01.12.04.04.0 PIN. ANTICOR. Y ESMALTE
S/.15,150.92 S/.5,084.98 01.12.05 INSTALACIONES SANITARIAS E
S/.15,150.92 S/.5,084.98 01.12.05.01 SISTEMA DE DESAGUE
01.12.05.01.0 MOVIMIENTO DE TIERRAS
01.12.05.01.0 EXCAVACIONES DE ZANJ
01.12.05.01.0 EXCAVACION MANUAL
01.12.05.01.0 EXCAVACION MANUAL
01.12.05.01.0 EXCAVACION MANUAL
01.12.05.01.0 EXCAVACION MANUAL
01.12.05.01.0 REFINE Y NIVELACION DE
01.12.05.01.0 REFINE Y NIVELACION
01.12.05.01.0 REFINE Y NIVELACION
01.12.05.01.0 REFINE Y NIVELACION
01.12.05.01.0 REFINE Y NIVELACION
01.12.05.01.0 SUMINISTRO Y COLOCAC
01.12.05.01.0 SUM. Y COLOC. CAMA D
01.12.05.01.0 SUM. Y COLOC. CAMA D
01.12.05.01.0 SUM. Y COLOC. CAMA D
01.12.05.01.0 SUM. Y COLOC. CAMA D
01.12.05.01.0 RELLENO Y COMPACTO D
01.12.05.01.0 RELLENO Y COMP DE Z
01.12.05.01.0 RELLENO Y COMP DE Z
01.12.05.01.0 RELLENO Y COMP DE Z
01.12.05.01.0 RELLENO Y COMP DE Z
S/.15,150.92 S/.5,084.98 01.12.05.01.0 REDES EXTERIORES DE DE
S/.10,653.98 01.12.05.01.0 TUBERIAS
01.12.05.01.0 SUM. E INST. TUB. PVC-
01.12.05.01.0 SUM. E INST. TUB. PVC-
01.12.05.01.0 SUM. E INST. TUB. PVC-
S/.2,728.00 01.12.05.01.0 SUM. E INST. TUB. PVC-
S/.7,925.98 01.12.05.01.0 SUM. Y COLOCACION T
S/.4,496.94 S/.5,084.98 01.12.05.01.0 CAMARAS DE INSPECCIO
S/.4,496.94 S/.2,256.66 01.12.05.01.0 CAJAS DE REGISTRO D
S/.2,315.52 01.12.05.01.0 CAJAS DE REGISTRO 1
S/.512.80 01.12.05.01.0 CAJAS DE REGISTRO D
01.12.05.02 SISTEMA DE AGUA POTABLE
01.12.05.02.0 REDES EXTERIORES DE AG
01.12.05.02.0 TUBERIAS
01.12.05.02.0 SUM. E INST. TUB. PVC
01.12.05.02.0 SUM. E INST. TUB. PVC
01.12.05.02.0 SUM. E INST. TUB. PVC
01.12.05.02.0 SUM. E INST. TUB. PVC
01.12.05.02.0 SUM. E INST. TUB. PVC
01.12.05.02.0 SUM. E INST. TUB. PVC
01.12.05.02.0 VALVULAS
01.12.05.02.0 SUM. E INST. VALV. ESF
01.12.05.02.0 SUM. E INST. VALV. ESF
01.12.05.02.0 SUM. E INST. VALV. ESF
01.12.05.02.0 SUM. E INST. VALV. ESF
01.12.05.02.0 CAMARAS DE INSPECCIO
01.12.05.02.0 CAJA DE REGISTRO DE
01.12.05.02.0 EQUIPAMIENTO E INSTALA
01.12.05.02.0 ELECTROBOMBA EJE VE
01.12.05.02.0 ELECTROBOMBA SUMIDE
01.12.05.02.0 MOTOBOMBA DIESEL Q=
01.12.05.02.0 SUM. E INST. VALVULAS -
### S/.90,672.21 S/.394,025.39 S/.2,576.30 01.12.06 INSTALACIONES ELECTRICAS
01.12.06.01 TRABAJOS PRELIMINARES
01.12.06.01.0 REPLANTEO DE INSTALAC
01.12.06.02 SALIDAS PARA INST. ELECTR
01.12.06.02.0 SALIDA DE TECHO C/TUB. P
01.12.06.02.0 SALIDA DE PARED C/TUB. P
01.12.06.02.0 SALIDA PARA LUZ DE CON
01.12.06.02.0 SALIDA P/INTERRUPTOR S
01.12.06.02.0 SALIDA P/TOMACORRIENT
S/.8,817.16 S/.11,120.89 01.12.06.03 TUBERIAS/ALIMENTADORES
01.12.06.03.0 EXCAVACION MANUAL DE
01.12.06.03.0 TUBERIA PVC SAP (ELECTR
S/.1,614.54 01.12.06.03.0 TUBERIA PVC SAP (ELECTR
S/.7,202.62 S/.812.98 01.12.06.03.0 TUBERIA PVC SAP (ELECTR
S/.4,798.56 01.12.06.03.0 TUBERIA PVC-P (ELECTRIC
S/.5,509.35 01.12.06.03.0 TUBERIA PVC-P (ELECTRIC
01.12.06.04 CAJAS DE PASO
01.12.06.04.0 CAJA DE PASO FºGº DE 100
01.12.06.04.0 CAJA DE PASO FºGº DE 200
S/.53,474.61 S/.79,551.32 S/.0.43 01.12.06.05 CABLES Y CONDUCTORES
01.12.06.05.0 CABLE ELECTRICO LSOH 6
S/.3,204.11 01.12.06.05.0 CABLE ELECTRICO LSOH 1
S/.1,193.20 01.12.06.05.0 CABLE ELECTRICO LSOH 1
S/.6,942.60 01.12.06.05.0 CABLE ELECTRICO LSOH 2
S/.4,566.60 01.12.06.05.0 CABLE ELECTRICO LSOH 3
S/.18,221.25 01.12.06.05.0 CABLE ELECTRICO LSOH 5
S/.19,346.85 S/.764.15 01.12.06.05.0 CABLE ELECTRICO LSOH 1
S/.72,598.07 S/.0.43 01.12.06.05.0 CABLE ELECTRICO LSOH 1
S/.6,189.10 01.12.06.05.0 CABLE ELECTRICO NLT 3X
S/.325,618.64 S/.2,576.30 01.12.06.06 ARTEFACTOS/LUMINARIAS
S/.801.42 01.12.06.06.0 REJILLA DE ALUMINIO P/EM
S/.1,774.62 01.12.06.06.0 LUMINARIA CIRCULAR P/EM
S/.334.36 S/.0.26 01.12.06.06.0 ARTEFACTO FLURESCENT
S/.276.80 01.12.06.06.0 LUMINARIA TIPO BRAQUET
S/.129,963.12 01.12.06.06.0 REFLECTOR DE 1000W, 130
S/.26,822.56 01.12.06.06.0 REFLECTOR DE 400W, 4800
S/.76,529.40 01.12.06.06.0 REFLECTOR CON LAMPAR
S/.91,692.40 01.12.06.06.0 LUMINARIA DE ALUMBRAD
S/.10,295.78 01.12.06.07 TABLEROS ELECTRICOS
S/.1,680.44 01.12.06.07.0 TABLERO DE DISTRIBUCIO
S/.357.68 01.12.06.07.0 TABLERO DISTRIBUCION, M
S/.4,826.90 01.12.06.07.0 TABLERO DE CONTROL DE
S/.3,430.76 01.12.06.07.0 TABLERO DE CONTROL PA
S/.4,644.22 01.12.06.08 INTERRUPTORES TERMOMA
S/.50.01 01.12.06.08.0 INTERRUPTOR TERMOMAG
S/.100.02 01.12.06.08.0 INTERRUPTOR TERMOMAG
S/.650.13 01.12.06.08.0 INTERRUPTOR TERMOMAG
S/.140.01 01.12.06.08.0 INTERRUPTOR TERMOMAG
S/.575.15 01.12.06.08.0 INTERRUPTOR TERMOMAG
S/.132.01 01.12.06.08.0 INTERRUPTOR TERMOMAG
S/.125.71 01.12.06.08.0 INTERRUPTOR TERMOMAG
S/.2,430.15 01.12.06.08.0 INTERRUPTOR DIFERENCI
S/.117.01 01.12.06.08.0 INTERRUPTOR DIFERENCI
S/.324.02 01.12.06.08.1 INTERRUPTOR RELOJ HOR
S/.1,872.32 01.12.06.09 PUESTA A TIERRA
S/.145.96 01.12.06.09.0 EXCAVACION DE HOYO PA
S/.1,726.36 01.12.06.09.0 INSTALACION DE PUESTA
S/.2,800.00 01.12.06.10 PRUEBAS ELECTRICAS
S/.700.00 01.12.06.10.0 PRUEBA DE CONTINUIDAD
S/.800.00 01.12.06.10.0 PRUEBA DE AISLAMIENTO
S/.800.00 01.12.06.10.0 PRUEBA DE RESISTENCIA
S/.500.00 01.12.06.10.0 PRUEBA DE NIVEL DE ILUM
S/.48,794.00 01.12.06.11 VARIOS
S/.6,991.40 01.12.06.11.0 POSTE METALICO P/ILUMIN
S/.15,834.80 01.12.06.11.0 PASTORAL P/ILUMINACION
S/.25,967.80 01.12.06.11.0 POSTE DE CONCRETO ARM
### 01.12.06.12 RED DE DISTRIBUCION DE M
S/.243.31 01.12.06.12.0 MOVIMIENTO DE TIERRAS
01.12.06.12.0 TRAZO Y REPLANTEO RE
S/.243.31 01.12.06.12.0 EXCAVACION A MANO EN
S/.2,024.08 01.12.06.12.0 POSTES Y CRUCETAS
S/.2,024.08 01.12.06.12.0 POSTE DE CONCRETO AR
S/.1,422.32 01.12.06.12.0 TUBERIAS Y CAJAS DE PAS
S/.150.96 01.12.06.12.0 TUBERIA F°G°, D=80MM
S/.771.36 01.12.06.12.0 TUBERIA PVC-P (ELECTR
S/.500.00 01.12.06.12.0 CAJA DE PASO DE C.A. 1X
S/.13,770.30 01.12.06.12.0 CABLES Y CONDUCTORES
S/.205.50 01.12.06.12.0 CONDUCTOR DE ALEACIO
S/.13,564.80 01.12.06.12.0 CABLE SUBTERRANEO N
S/.22,735.05 01.12.06.12.0 ARMADOS
S/.2,587.36 01.12.06.12.0 ARMADO DT-0
S/.20,147.69 01.12.06.12.0 ARMADO PSEC1
S/.55,000.00 01.12.06.12.0 SUBESTACION
S/.35,000.00 01.12.06.12.0 CELDA DE LLEGADA
S/.20,000.00 01.12.06.12.0 CELDA DE TRANSFORMA
S/.3,208.58 01.12.06.12.0 PUESTA A TIERRA
S/.74.38 01.12.06.12.0 EXCAVACION DE HOYOS
S/.3,134.20 01.12.06.12.0 INSTALACION DE PUESTA
S/.3,568.32 01.12.06.12.0 TRABAJOS COMPLEMENTA
S/.2,231.77 01.12.06.12.0 MEDIDOR EN MEDIA TEN
S/.14.45 01.12.06.12.0 PINTADO DE SEÑALIZACI
S/.894.18 01.12.06.12.0 ELIMINACION DE MATERI
S/.309.78 01.12.06.12.0 MEDICION DE AISLAMIEN
S/.118.14 01.12.06.12.0 MEDICION DE PUESTAS A
RENOVACION DE CAMPO DEPOR
### ### S/.2,684,911.30 ### ### S/.1,151,483.00 02
TRIBUNAS Y OBRAS COMPLEMEN
S/.50,987.75 ### S/.2,099,301.29 ### ### S/.1,051,947.29 02.01 MEJORAMIENTO DE TRIBUNAS
S/.50,987.75 ### S/.2,099,301.29 ### ### S/.133,439.56 02.01.01 ESTRUCTURAS
02.01.01.01 OBRAS PROVISIONALES
02.01.01.01.0 CAMPAMENTO PROVISION
02.01.01.01.0 CARTEL DE IDENTIFICACIO
S/.19,783.27 S/.16,031.11 02.01.01.02 TRABAJOS PRELIMINARES
02.01.01.02.0 DESMONTAJE DE PUERTAS
02.01.01.02.0 DESMONTAJE DE VENTANA
02.01.01.02.0 DESMONTAJE DE TIJERALE
02.01.01.02.0 DESMONTAJE DE CORREA
02.01.01.02.0 DESMONTAJE DE APARATO
02.01.01.02.0 DESMONTAJE DE FALSO C
02.01.01.02.0 DEMOLICION DE CIMIENTO
02.01.01.02.0 DEMOLICION DE SOBRECIM
02.01.01.02.0 DEMOLICION DE PISO DE C
02.01.01.02.1 DEMOLICION DE VEREDAS
02.01.01.02.1 DEMOLICION DE GRADERIO
02.01.01.02.1 DEMOLICION DE COLUMNA
S/.1.82 02.01.01.02.1 DEMOLICION DE LOSAS DE
S/.14.13 02.01.01.02.1 DEMOLICION DE URINARIO
S/.1,085.77 02.01.01.02.1 DEMOLICION DE MUROS D
S/.15,834.54 S/.3,960.35 02.01.01.02.1 DEMOLICION DE MUROS D
S/.2,847.01 S/.4,274.23 02.01.01.02.1 LIMPIEZA DEL TERRENO M
S/.3,990.35 02.01.01.02.1 TRAZO Y REPLANTEO PRE
S/.3,806.18 02.01.01.02.1 TRAZO Y REPLANTEO DUR
S/.31,204.48 ### S/.11,304.08 02.01.01.03 MOVIMIENTO DE TIERRAS
S/.23,952.51 S/.65,916.20 02.01.01.03.0 CORTE SUPERFICIAL MANU
S/.4,822.70 02.01.01.03.0 CORTE DE MATERIAL CON
S/.2,429.27 S/.4,657.25 02.01.01.03.0 PERFILADO Y COMPACTAD
### 02.01.01.03.0 EXCAVACION PARA ZAPAT
S/.3,571.20 02.01.01.03.0 EXCAVACION PARA CIMIEN
S/.76,560.12 02.01.01.03.0 EXCAVACION PARA VIGAS
S/.51,883.50 02.01.01.03.0 RELLENO COMPACTADO C
S/.34,251.13 S/.7,749.04 02.01.01.03.0 RELLENO COMPACTADO C
S/.6,466.46 S/.3,555.04 02.01.01.03.0 NIVELACION Y APISONADO
### 02.01.01.03.1 ACARREO MANUAL DE MAT
S/.42,187.13 02.01.01.03.1 CARGUIO Y ELIMINACION D
### S/.41,445.43 02.01.01.04 OBRAS DE CONCRETO SIMP
### 02.01.01.04.0 FALSO PISO DE 4" MEZCLA
S/.95,781.16 S/.8,813.65 02.01.01.04.0 SUBCIMIENTOS Y SUBZAPT
S/.14,193.14 02.01.01.04.0 CIMIENTOS CORRIDOS ME
S/.8,797.69 02.01.01.04.0 SOBRECIMIENTOS MEZCLA
S/.8,960.72 02.01.01.04.0 ENCOFRADO Y DESENCOF
S/.308.96 02.01.01.04.0 RAMPAS DE CONCRETO: f´
S/.371.27 02.01.01.04.0 RAMPAS: ENCOFRADO Y D
### S/.2,046,551.78 ### ### S/.133,439.56 02.01.01.05 OBRAS DE CONCRETO ARM
S/.43,037.75 02.01.01.05.0 SOBRECIMIENTO REFORZA
S/.16,955.41 02.01.01.05.0 SOBRECIMIENTO REFOR
S/.18,914.11 02.01.01.05.0 SOBRECIMEINTO REFOR
S/.7,168.23 02.01.01.05.0 SOBRECIMIENTOS REFO
### S/.7,256.14 02.01.01.05.0 ZAPATAS
### S/.7,256.14 02.01.01.05.0 ZAPATAS: CONCRETO PR
### 02.01.01.05.0 ZAPATAS: ACERO CORRU
### S/.7.00 02.01.01.05.0 VIGAS DE CIMENTACION
S/.91,407.78 S/.1.68 02.01.01.05.0 VIGAS DE CIMENTACION:
S/.53,370.13 S/.5.32 02.01.01.05.0 VIGAS DE CIMENTACION:
S/.89,730.02 02.01.01.05.0 VIGAS DE CIMENTACION:
S/.1,152,199.79 02.01.01.05.0 COLUMNAS
S/.75,615.75 02.01.01.05.0 COLUMNAS: CONCRETO
S/.298,865.58 02.01.01.05.0 CONCRETO PREMEZCLA
S/.359,690.87 02.01.01.05.0 COLUMNAS: ENCOFRADO
S/.418,027.59 02.01.01.05.0 COLUMNAS: ACERO COR
S/.690,117.66 S/.45,818.44 02.01.01.05.0 VIGAS
S/.41,395.73 02.01.01.05.0 VIGAS: CONCRETO f'c=21
S/.185,934.74 S/.4,422.71 02.01.01.05.0 CONCRETO PREMEZCLA
S/.234,899.31 02.01.01.05.0 VIGAS: ENCOFRADO Y DE
S/.269,283.61 02.01.01.05.0 VIGAS: ACERO CORRUGA
### S/.10,742.12 02.01.01.05.0 GRADERIOS
### S/.10,742.12 02.01.01.05.0 GRADERIOS: CONCRETO
### 02.01.01.05.0 GRADERIOS: ENCOFRAD
### 02.01.01.05.0 GRADERIOS: ACERO COR
S/.153,933.44 02.01.01.05.0 PLACAS
S/.48,208.18 02.01.01.05.0 PLACA:CONCRETO f'c=21
S/.65,875.80 02.01.01.05.0 PLACAS: ENCOFRADO Y
S/.39,849.46 02.01.01.05.0 PLACAS: ACERO CORRUG
S/.37,518.22 S/.78,765.58 02.01.01.05.0 ESCALERAS
S/.71,450.61 02.01.01.05.0 ESCALERAS: CONCRETO
S/.14,955.60 S/.5,598.27 02.01.01.05.0 ESCALERAS: ENCOFRAD
S/.22,562.62 S/.1,716.70 02.01.01.05.0 ESCALERAS: ACERO COR
S/.25,388.12 02.01.01.05.0 LOSAS MACIZAS
S/.11,724.63 02.01.01.05.0 LOSAS MACIZAS: CONCR
S/.11,160.15 02.01.01.05.0 LOSAS MACIZAS: ENCOF
S/.2,503.34 02.01.01.05.0 LOSAS MACIZAS: ACERO
S/.84,486.45 S/.8,576.69 S/.33,125.80 02.01.01.05.1 LOSA ALIGERADA
S/.31,400.10 02.01.01.05.1 LOSAS ALIGERADAS: CO
S/.33,778.44 02.01.01.05.1 LOSAS ALIGERADAS: ENC
S/.24,490.90 S/.5,761.38 02.01.01.05.1 LOSAS ALIGERADAS: ACE
S/.26,217.11 S/.2,815.31 S/.1,725.70 02.01.01.05.1 LOSAS ALIGERADAS: LAD
S/.3,428.43 02.01.01.05.1 DRENAJE EN GRADERIOS
S/.1,136.98 02.01.01.05.1 DRENAJE: CONCRETO f'c
S/.747.51 02.01.01.05.1 DRENAJE: ENCOFRADO Y
S/.1,543.94 02.01.01.05.1 DRENAJE: ACERO CORRU
S/.7,720.14 02.01.01.05.1 MESADA DE CONCRETO
S/.1,695.63 02.01.01.05.1 MESADA: CONCRETO f'c=
S/.3,652.57 02.01.01.05.1 MESADA: ENCOFRADO Y
S/.2,371.94 02.01.01.05.1 MESADA: ACERO CORRU
S/.43,516.16 ### S/.10,313.76 02.01.01.05.1 ESTRUCTURA METALICA
S/.33,517.09 S/.42,942.31 S/.2,773.36 02.01.01.05.1 TUBO RECTANGULAR 100
S/.9,999.07 S/.8,940.97 02.01.01.05.1 TUBO RECTANGULAR 40x
S/.62,794.71 S/.7,540.40 02.01.01.05.1 LAMINA RETICULAR INCL
S/.90,000.00 02.01.01.05.1 REHABILITACION DE ESTR
S/.90,000.00 02.01.01.05.1 REHABILITACION DE EST
### ### S/.918,507.73 02.01.02 ARQUITECTURA
### S/.43,380.64 02.01.02.01 MUROS Y TABIQUES DE ALB
### S/.7,298.31 02.01.02.01.0 MURO DE LADRILLO KK TIP
### 02.01.02.01.0 MURO DE LADRILLO KK TIP
### S/.20,388.78 02.01.02.01.0 TABIQUE SUPERBOARD
S/.60,037.92 02.01.02.01.0 TABIQUE DE MELAMINE CO
S/.15,693.55 02.01.02.01.0 JUNTA DE DILATACION CO
### ### S/.68,369.95 02.01.02.02 REVOQUES ENLUCIDOS Y M
S/.8,800.03 S/.15,938.83 02.01.02.02.0 TARRAJEO PRIMARIO O RA
### S/.336.48 02.01.02.02.0 TARRAJEO EN MURO:INTE
### 02.01.02.02.0 TARRAJEO EN MURO:EXTE
### 02.01.02.02.0 TARRAJEO DE SUPERFICIE
### 02.01.02.02.0 TARRAJEO DE SUPERFICIE
### 02.01.02.02.0 TARRAJEO EN SUPERFICIE
S/.20,086.97 S/.2,144.33 02.01.02.02.0 TARRAJEO EN SUPERFICIE
S/.27,596.61 S/.2,780.93 02.01.02.02.0 VESTIDURA DE DERRAMES
S/.63,444.69 02.01.02.02.0 BRUÑAS SEGUN DETALLE
### S/.3,841.75 02.01.02.03 CIELO RASOS
### 02.01.02.03.0 CIELORASO CON MEZCLA
### S/.3,841.75 02.01.02.03.0 CIELORASO CON BALDOSA
### S/.187,878.31 02.01.02.04 PISOS Y PAVIMENTOS
### 02.01.02.04.0 FALSO PISO DE 4" MEZCLA
### S/.35,618.67 02.01.02.04.0 CONTRAPISO DE 40 mm (M
S/.25,969.53 S/.508.76 02.01.02.04.0 PISO DE CEMENTO SIN CO
S/.99,490.58 02.01.02.04.0 PISO DE CEMENTO COLOR
### S/.7,250.83 02.01.02.04.0 PISO CERAMICO ANTIDESL
S/.45,009.47 02.01.02.04.0 PISO CERAMICO ANTIDESL
S/.268,977.74 02.01.02.05 ZOCALOS
S/.157,930.45 02.01.02.05.0 ENCHAPE FACHALETA RUS
S/.111,047.29 02.01.02.05.0 ZOCALO DE CERAMICO 20
S/.27,558.59 02.01.02.06 CONTRAZOCALOS
S/.12,314.22 02.01.02.06.0 CONTRAZOCALO CERAMIC
S/.13,312.61 02.01.02.06.0 CONTRAZOCALO DE CEME
S/.1,931.76 02.01.02.06.0 CONTRAZOCALO DE MADE
S/.28,116.13 02.01.02.07 CUBIERTAS Y CERRAMIENTO
S/.27,084.33 02.01.02.07.0 COBERTURA TIPO ONDULI
S/.1,031.80 02.01.02.07.0 CUMBRERA DE ONDULINE
S/.72,120.59 02.01.02.08 CARPINTERIA DE MADERA
S/.72,120.59 02.01.02.08.0 PUERTAS DE MADERA CON
S/.85,154.49 ### S/.107,928.06 02.01.02.09 CARPINTERIA METALICA
S/.6,360.00 S/.0.00 02.01.02.09.0 PUERTA METALICA 03
S/.3,520.00 S/.0.00 02.01.02.09.0 PUERTA METALICA 04
S/.8,957.52 02.01.02.09.0 PUERTA METALICA T-5A
S/.17,417.40 02.01.02.09.0 PUERTA METALICA PARA
S/.11,253.25 02.01.02.09.0 PUERTA METALICA EN ESC
S/.12,640.00 02.01.02.09.0 PUERTA METALICA ANTIPA
S/.46,170.00 02.01.02.09.0 TRAMA METALICA EN CAJA
S/.6,840.00 S/.0.00 02.01.02.09.0 BARANDA METALICA CAJA
S/.6,431.96 S/.6,604.84 02.01.02.09.0 MALLA METALICA CON REF
S/.67,573.04 S/.51,055.05 02.01.02.09.1 ESTRUCTURA METALICA P
S/.46,789.63 02.01.02.09.1 BARANDA METALICA GRAD
S/.6,433.35 02.01.02.09.1 BARANDA METALICA ACCE
S/.15,431.51 02.01.02.09.1 BARANDAS METALICAS PA
S/.5,000.00 02.01.02.09.1 ESCALERA METALICA TIPO
S/.4,500.00 02.01.02.09.1 ESCALERA METALICA TIPO
S/.7,000.00 02.01.02.09.1 ESCALERA METALICA TIPO
S/.34,447.67 S/.615.41 02.01.02.10 CERRAJERIA
S/.1,785.79 S/.615.41 02.01.02.10.0 BISAGRAS CAPUCHINA ALU
S/.22,065.00 02.01.02.10.0 BISAGRAS CAPUCHINA ALU
S/.3,740.44 02.01.02.10.0 CERRADURA DE TRES GOL
S/.4,788.00 02.01.02.10.0 CERRADURA TIPO BOLA P/
S/.2,068.44 02.01.02.10.0 MANIJA DE 3" ALUMINIZAD
S/.12,188.34 ### S/.41,228.18 02.01.02.11 VIDRIOS, CRISTALES Y SIMIL
S/.12,188.34 S/.840.25 02.01.02.11.0 VIDRIO SISTEMA MODUGLA
### S/.332.64 02.01.02.11.0 VIDRIO TEMPLADO DE 8 mm
### S/.1,509.18 02.01.02.11.0 VIDRIO E=8 MM INCOLORO
S/.39,386.36 02.01.02.11.0 MAMPARA EN CRISTAL TEM
### S/.111,873.02 02.01.02.12 PINTURA
S/.39,245.51 02.01.02.12.0 PINTURA LATEX EN CIELO
S/.65,646.87 02.01.02.12.0 PINTURA LATEX 2 MANOS
S/.31,435.31 02.01.02.12.0 PINTURA LATEX 2 MANOS
S/.55,576.26 S/.30,082.00 02.01.02.12.0 PINTURA LATEX 2 MANOS
S/.23,599.68 S/.20,826.09 02.01.02.12.0 PINTURA LATEX 2 MANOS
S/.18,014.15 S/.18,567.51 02.01.02.12.0 PINTURA LATEX 2 MANOS
S/.30,440.67 02.01.02.12.0 PIN. ANTICOR. Y ESMALTE
S/.1,900.41 02.01.02.12.0 PINTURA ESMALTE EN CON
S/.1,532.65 02.01.02.12.0 PINTURA BARNIZ EN CONT
S/.8,523.69 02.01.02.12.1 PINTURA EN DERRAMES
S/.20,182.80 S/.19,404.80 02.02 SEÑALIZACION
02.02.01 PINTURA
02.02.02 VARIOS
S/.9,424.80 S/.0.00 02.02.03 LETREROS DE SALIDA
S/.10,758.00 S/.0.00 02.02.04 LETREROS DE ZONA DE SEGU
S/.9,310.00 02.02.05 EXTINTORES
S/.3,430.00 02.02.06 LETREROS DE EXTINTORES
S/.3,996.00 02.02.07 LETREROS DE SALIDA POR ES
S/.2,262.00 02.02.08 ZONA DE SEGURIDAD
S/.406.80 02.02.09 LETREROS DE RIESGO ELECT
S/.50,083.96 S/.149,262.16 S/.64,734.54 S/.93,591.46 S/.55,519.50 02.03 INSTALACIONES SANITARIAS
S/.25,588.16 S/.4,403.15 02.03.01 SISTEMA DE AGUA POTABLE
S/.8,036.20 S/.3,973.93 02.03.01.01 SALIDAS DE AGUA FRIA
S/.3,502.38 02.03.01.01.0 SALIDA DE A.F. PVC C/R - 1
S/.3,440.84 S/.471.55 02.03.01.01.0 SALIDA DE A.F. PVC C/R - 1
S/.4,595.36 02.03.01.01.0 SALIDA DE A.F. PVC C/R - 1
S/.6,580.72 02.03.01.02 REDES DE DISTRIBUCION
S/.1,862.27 02.03.01.02.0 SUM. E INST. TUB. PVC C-1
S/.2,019.44 02.03.01.02.0 SUM. E INST. TUB. PVC C-1
S/.1,102.06 02.03.01.02.0 SUM. E INST. TUB. PVC C-1
S/.1,596.95 02.03.01.02.0 SUM. E INST. TUB. PVC C-1
S/.10,971.24 S/.429.22 02.03.01.03 VALVULAS
S/.243.96 02.03.01.03.0 SUM. E INST. VALV. ESFER
S/.1,821.22 S/.185.26 02.03.01.03.0 SUM. E INST. VALV. ESFER
S/.821.26 02.03.01.03.0 SUM. E INST. VALV. ESFER
S/.5,188.96 02.03.01.03.0 SUM. E INST. VALV. ESFER
S/.2,771.82 02.03.01.03.0 SUM. E INST. VALV. ESFER
S/.367.98 02.03.01.03.0 SUM. E INST. VALV. ESFER
S/.20,902.37 S/.2,929.03 02.03.02 SISTEMA DE AGUA CALIENTE
S/.4,231.51 S/.2,707.39 02.03.02.01 SALIDAS DE AGUA CALIENTE
S/.3,248.00 S/.2,707.39 02.03.02.01.0 SALIDA AGUA CALIENTE TU
S/.983.51 02.03.02.01.0 SALIDA AGUA CALIENTE TU
S/.170.86 02.03.02.02 REDES DE DISTRIBUCION
S/.170.86 02.03.02.02.0 SUM. Y COLOC. TUB. CPVC
S/.221.64 02.03.02.03 LLAVES Y VALVULAS
S/.221.64 02.03.02.03.0 SUM. E INST. VALV. ESFER
S/.16,500.00 02.03.02.04 THERMAS Y VALVULAS
S/.750.00 02.03.02.04.0 SUM Y COLOC. THERMAS 1
S/.15,750.00 02.03.02.04.0 SUM Y COLOC. THERMAS 1
S/.32,646.04 S/.4,850.25 02.03.03 SISTEMA CONTRA INCENDIO
S/.16,491.25 02.03.03.01 TUBERIA ENTERRADA
S/.2,283.75 02.03.03.01.0 TUBERIA HDPE PN15 2 1/2"
S/.13,412.30 02.03.03.01.0 TUBERIA HDPE PN15 4" PA
S/.795.20 02.03.03.01.0 TUBERIA HDPE PN15 6" PA
S/.16,154.79 02.03.03.02 TUBERIA AEREA
S/.11,551.75 02.03.03.02.0 TUBERIA ACERO SCH 40 2
S/.4,603.04 02.03.03.02.0 TUBERIA ACERO SCH 40 4"
S/.4,850.25 02.03.03.03 GABINETE
S/.4,850.25 02.03.03.03.0 GABINETE CONTRA INCEN
S/.50,083.96 S/.95,713.75 S/.36,217.35 S/.84,338.06 S/.55,519.50 02.03.04 SISTEMA DE DESAGUE Y VENT
S/.24,575.12 S/.36,326.14 S/.29,877.35 S/.3,123.45 02.03.04.01 SALIDA DE DESAGUE Y VENT
S/.8,101.49 S/.3,584.59 02.03.04.01.0 SALIDA DE DESAGUE PVC
S/.13,399.52 S/.5,087.67 S/.4,923.55 S/.985.05 02.03.04.01.0 SALIDA DE DESAGUE PVC
S/.11,175.60 S/.3,107.90 02.03.04.01.0 SALIDA DE DESAGUE PVC
S/.20,029.08 S/.21,369.21 S/.2,138.40 02.03.04.01.0 SALIDA DE VENTILACION P
S/.18,787.05 S/.30,531.96 02.03.04.02 REDES DE EVACUACION
S/.1,785.81 02.03.04.02.0 SUM. E INST. TUB. PVC CP
S/.301.47 02.03.04.02.0 SUM. E INST. TUB. PVC CP
S/.8,021.86 S/.335.58 02.03.04.02.0 SUM. Y COLOC. TUB. PVC-C
S/.8,677.91 S/.3,000.82 02.03.04.02.0 SUM. Y COLOC. TUB. PVC-C
S/.14,786.24 02.03.04.02.0 SUM. Y COLOC. TUB. PVC-C
S/.12,409.32 02.03.04.02.0 SUM. Y COLOC. TUB. PVC-C
S/.10,644.61 S/.4,718.95 02.03.04.03 ADITAMENTOS VARIOS
S/.2,154.24 02.03.04.03.0 SUM. E INST. REGISTRO RO
S/.1,716.52 02.03.04.03.0 SUM. E INST. SUMIDERO B
S/.253.44 02.03.04.03.0 REGISTRO ROSCADO DE B
S/.1,576.05 S/.594.75 02.03.04.03.0 SUM. E INST. REGISTRO RO
S/.5,010.30 02.03.04.03.0 SUM. E INST. REGISTRO RO
S/.3,588.42 02.03.04.03.0 SUM. E INST. REGISTRO RO
S/.20.74 02.03.04.03.0 SOMBRERO DE VENTILACI
S/.223.20 02.03.04.03.0 SOMBRERO DE VENTILACI
S/.225.90 02.03.04.03.0 SOMBRERO DE VENTILACI
S/.6,721.79 S/.200.65 02.03.04.04 CAMARAS DE INSPECCION
S/.6,721.79 S/.200.65 02.03.04.04.0 CAJAS DE REGISTRO DE D
S/.28,655.00 S/.6,340.00 S/.70,570.00 S/.50,800.55 02.03.04.05 APARATOS SANITARIOS
S/.18,975.00 S/.0.00 S/.0.00 02.03.04.05.0 INODORO CON VALVULA S
S/.9,680.00 S/.0.00 02.03.04.05.0 LAVATORIO INC/ACCESOR
S/.4,015.00 02.03.04.05.0 DUCHA INC/ACCESORIO
S/.500.00 02.03.04.05.0 LAVADERO DE ACERO INO
S/.1,825.00 S/.0.00 02.03.04.05.0 JABONERA DE LOSA DE 15
S/.2,190.00 02.03.04.05.0 PAPELERA DE BARRA
S/.5,632.00 S/.0.00 02.03.04.05.0 ESPEJO
S/.62,748.00 S/.0.00 02.03.04.05.0 URINARIO DE LOZA DE PIC
S/.41,547.80 02.03.04.05.0 COLOCACION DE APARATO
S/.9,252.75 02.03.04.05.1 COLOCACION DE ACCESO
S/.77,342.65 ### S/.297,426.17 ### ### S/.2,398.64 02.04 INSTALACIONES ELECTRICAS
S/.22,542.40 02.04.01 TRABAJOS PRELIMINARES
S/.2,000.00 02.04.01.01 REPLANTEO DE INSTALACIO
S/.2,500.00 02.04.01.02 DESMONTAJE DE INSTALACI
S/.18,042.40 02.04.01.03 PICADO Y RESANE DE PARE
S/.54,800.25 S/.51,918.77 S/.9,230.81 02.04.02 SALIDAS PARA INST. ELECTRI
S/.34,797.11 S/.11,852.93 02.04.02.01 SALIDA DE TECHO C/TUB. PV
S/.6,080.56 02.04.02.02 SALIDA DE PARED C/TUB. PV
S/.7,059.61 S/.1,650.43 02.04.02.03 SALIDA PARA LUZ DE CONM
S/.4,951.52 S/.4,077.84 02.04.02.04 SALIDA P/INTERRUPTOR SIM
S/.1,911.45 S/.1,131.27 02.04.02.05 SALIDA P/INTERRUPTOR DO
S/.25,034.73 S/.8,803.83 02.04.02.06 SALIDA P/TOMACORRIENTE
S/.1,107.04 02.04.02.07 SALIDA P/SECADORA DE MA
S/.5,169.58 02.04.02.08 SALIDA PARA ILUMINACION D
S/.1,894.95 S/.426.98 02.04.02.09 SALIDA DE FUERZA PARA EX
S/.59,374.76 S/.24,659.57 S/.5,693.06 02.04.03 TUBERIAS/ALIMENTADORES
S/.21,316.48 02.04.03.01 EXCAVACION DE ZANJAS
S/.299.98 02.04.03.02 TUBERIA PVC-P (ELECTRICA
S/.10,674.11 S/.408.77 02.04.03.03 TUBERIA PVC-P (ELECTRICA
S/.10,242.83 S/.209.84 02.04.03.04 TUBERIA PVC-P (ELECTRICA
S/.16,841.36 S/.2,746.92 02.04.03.05 TUBERIA PVC-P (ELECTRICA
S/.4,965.30 02.04.03.06 TUBERIA PVC-P (ELECTRICA
S/.7,874.73 S/.2,094.57 02.04.03.07 TUBERIA PVC-P (ELECTRICA
S/.8,454.01 S/.3,598.49 02.04.03.08 TUBERIA PVC-P (ELECTRICA
S/.13,079.14 02.04.04 CAJAS DE PASO
S/.562.66 02.04.04.01 CAJA DE PASO FºGº DE 100x
S/.123.27 02.04.04.02 CAJA DE PASO FºGº DE 150x
S/.393.21 02.04.04.03 CAJA DE PASO FºGº DE 200x
S/.12,000.00 02.04.04.04 BUZON DE CONCRETO DE 1
S/.51,753.81 S/.170,949.14 S/.6,678.04 02.04.05 CABLES Y CONDUCTORES
S/.14,260.46 S/.5,228.31 02.04.05.01 CABLE ELECTRICO LSOH 10
S/.37,493.35 S/.12,954.55 S/.418.76 02.04.05.02 CABLE ELECTRICO LSOH 16
S/.59,876.17 S/.416.08 02.04.05.03 CABLE ELECTRICO LSOH 25m
S/.86,486.44 S/.5,843.20 02.04.05.04 CABLE ELECTRICO LSOH 35m
S/.657.72 02.04.05.05 CABLE ELECTRICO LSOH 70m
S/.165.59 02.04.05.06 CABLE ELECTRICO LSOH 95m
S/.847.76 02.04.05.07 CABLE ELECTRICO LSOH 120
S/.1,288.16 02.04.05.08 CABLE ELECTRICO LSOH 150
S/.3,444.44 02.04.05.09 CABLE ELECTRICO LSOH 240
S/.39,345.07 ### S/.86,877.61 02.04.06 ARTEFACTOS/LUMINARIAS
S/.39,345.07 S/.1,126.64 02.04.06.01 REJILLA DE ALUMINIO P/ADO
S/.91,392.93 02.04.06.02 LUMINARIA CIRCULAR P/EMP
S/.4,689.79 02.04.06.03 LUMINARIA C/LAMPARA FLUO
S/.15,792.53 S/.912.73 02.04.06.04 LUMINARIA DE EMERGENCIA
S/.4,705.60 02.04.06.05 LUMINARIA TIPO BRAQUET C
### S/.10,564.88 02.04.06.06 REFLECTOR CON LAMPARA
S/.60,795.84 02.04.06.07 REFLECTOR TIPO CAMPANA
S/.2,957.08 02.04.06.08 LUMINARIA C/SOCKET, E27,
S/.3,092.96 02.04.06.09 SECADORA DE MANOS, AUT
S/.3,848.52 02.04.06.10 LUMINARIA CINTA LED, TIPO
S/.50,885.34 S/.64,741.19 02.04.07 TABLEROS ELECTRICOS
S/.15,165.67 02.04.07.01 TABLERO TRIFASICO TPN, A
S/.12,165.67 02.04.07.02 TABLERO TRIFASICO TPE, A
S/.6,686.54 02.04.07.03 TABLERO TRIFASICO P/EMPO
S/.3,163.86 S/.0.29 02.04.07.04 TABLERO TRIFASICO P/EMPO
S/.682.83 02.04.07.05 TABLERO TRIFASICO P/EMPO
S/.3,165.67 02.04.07.06 TABLERO TRIFASICO P/EMPO
S/.9,855.10 S/.0.12 02.04.07.07 TABLERO DE BANCO DE CON
S/.16,657.25 02.04.07.08 TABLERO GENERAL NORMA
S/.9,657.25 02.04.07.09 TABLERO GENERAL DE EME
S/.3,861.52 02.04.07.10 TABLERO DE CONTROL DE E
S/.3,715.38 02.04.07.11 TABLERO DE CONTROL DE B
S/.3,715.38 02.04.07.12 TABLERO DE CONTROL DE B
S/.282.25 02.04.07.13 TABLERO MONOFASICO DE
S/.26,314.50 02.04.07.14 TABLERO DE TRANSFERENC
S/.537.25 02.04.07.15 TABLERO PARA ESPECTACU
S/.2,356.24 S/.29,186.26 S/.1,063.13 02.04.08 INTERRUPTORES TERMOMAG
S/.2,356.24 S/.544.34 02.04.08.01 INTERRUPTOR TERMOMAGN
S/.55.71 02.04.08.02 INTERRUPTOR TERMOMAGN
S/.3,900.78 02.04.08.03 INTERRUPTOR TERMOMAGN
S/.100.02 02.04.08.04 INTERRUPTOR TERMOMAGN
S/.1,375.56 02.04.08.05 INTERRUPTOR TERMOMAGN
S/.2,800.20 02.04.08.06 INTERRUPTOR TERMOMAGN
S/.1,725.45 02.04.08.07 INTERRUPTOR TERMOMAGN
S/.170.03 02.04.08.08 INTERRUPTOR TERMOMAGN
S/.460.12 02.04.08.09 INTERRUPTOR TERMOMAGN
S/.18,054.05 S/.1,063.13 02.04.08.10 INTERRUPTOR DIFERENCIAL
S/.10,593.18 S/.998.64 02.04.09 PUESTA A TIERRA
S/.2,189.22 02.04.09.01 EXCAVACION DE HOYO PAR
S/.8,403.96 S/.998.64 02.04.09.02 INSTALACION DE PUESTA A
S/.1,400.00 02.04.10 PRUEBAS ELECTRICAS
S/.350.00 02.04.10.01 PRUEBA DE CONTINUIDAD
S/.400.00 02.04.10.02 PRUEBA DE AISLAMIENTO
S/.400.00 02.04.10.03 PRUEBA DE RESISTENCIA D
S/.250.00 02.04.10.04 PRUEBA DE NIVEL DE ILUMIN
S/.55,133.38 ### 02.04.11 VARIOS
S/.45,422.55 02.04.11.01 UPS 10 KVA, TRIFASICO
S/.9,710.83 S/.211.72 02.04.11.02 TRANSFORMADOR DE AISLA
### 02.04.11.03 TABLERO ELECTRONICO CO
S/.7,920.00 02.04.11.04 FIJACION ORIENTACION DE
S/.16,000.00 02.04.11.05 PARARRAYOS TIPO DESIONI
S/.3,000.00 02.04.11.06 SUM Y COLOC. THERMAS 11
### S/.82,338.62 02.05 INSTALACIONES MECANICAS
### 02.05.01 SISTEMA DE GRUPO ELECTRO
S/.36.48 02.05.01.01 EXCAVACION MANUAL DE ZA
S/.450.00 02.05.01.02 LOSAS MACIZAS PARA EL MO
### 02.05.01.03 SUMINISTRO Y MONTAJE DE
S/.12,000.00 02.05.01.04 SUMINISTRO Y MONTAJE DE
S/.24,916.40 S/.24,678.66 02.05.02 SISTEMA DE COMBUSTIBLE
S/.15,954.00 02.05.02.01 TANQUE DE PETROLEO
S/.950.00 02.05.02.01.0 TANQUE DIARIO DE PETRO
S/.15,004.00 02.05.02.01.0 TANQUE DE ALMACENAMIE
S/.1,453.05 02.05.02.02 MOVIMIENTO DE TIERRAS
S/.336.48 02.05.02.02.0 TRAZO Y REPLANTEO
S/.557.85 02.05.02.02.0 EXCAVACION MANUAL DE
S/.558.72 02.05.02.02.0 TIERRA CERNIDA Y COMPA
S/.3,279.98 02.05.02.03 TUBERIAS
S/.1,111.20 02.05.02.03.0 TUBERIA DE ACERO NEGR
S/.511.20 02.05.02.03.0 TUBERIA DE ACERO NEGR
S/.195.30 02.05.02.03.0 TUBERIA DE ACERO NEGR
S/.200.60 02.05.02.03.0 TUBERIA DE ACERO NEGR
S/.160.08 02.05.02.03.0 TUBERIA DE ACERO NEGR
S/.1,101.60 02.05.02.03.0 REVESTIMIENTO P/TUBERI
S/.983.72 S/.563.99 02.05.02.04 ACCESORIOS VARIOS
S/.39.20 02.05.02.04.0 UNION FLEXIBLE DE 1" (SIS
S/.47.20 02.05.02.04.0 UNION FLEXIBLE DE 1 1/4"
S/.51.20 02.05.02.04.0 UNION FLEXIBLE DE 1 1/2"
S/.33.76 02.05.02.04.0 CODO DE ACERO NEGRO D
S/.41.76 02.05.02.04.0 CODO DE ACERO NEGRO D
S/.549.45 02.05.02.04.0 CODO DE ACERO NEGRO D
S/.71.05 02.05.02.04.0 CODO DE ACERO NEGRO D
S/.85.26 02.05.02.04.0 CODO DE ACERO NEGRO D
S/.64.84 02.05.02.04.0 CODO DE ACERO NEGRO D
S/.16.88 02.05.02.04.1 TEE DE ACERO NEGRO DE
S/.20.88 02.05.02.04.1 TEE DE ACERO NEGRO DE
S/.22.88 02.05.02.04.1 TEE DE ACERO NEGRO DE
S/.85.26 02.05.02.04.1 TEE DE ACERO NEGRO DE
S/.85.26 02.05.02.04.1 TEE DE ACERO NEGRO DE
S/.36.42 02.05.02.04.1 TEE DE ACERO NEGRO DE
S/.44.84 02.05.02.04.1 REDUCCION DE ACERO CE
S/.22.42 02.05.02.04.1 REDUCCION DE ACERO CE
S/.22.42 02.05.02.04.1 REDUCCION DE ACERO CE
S/.26.42 02.05.02.04.1 REDUCCION DE ACERO CE
S/.52.84 02.05.02.04.2 REDUCCION DE ACERO CE
S/.91.05 02.05.02.04.2 REDUCCION DE ACERO CE
S/.36.42 02.05.02.04.2 REDUCCION DE ACERO CE
S/.2,892.36 02.05.02.05 VALVULAS
S/.412.92 02.05.02.05.0 VALVULA DE BOLA DE 1/2"
S/.409.10 02.05.02.05.0 VALVULA DE BOLA DE 1"
S/.387.28 02.05.02.05.0 VALVULA DE BOLA DE 1 1/4
S/.524.10 02.05.02.05.0 VALVULA DE BOLA DE 1 1/2
S/.545.72 02.05.02.05.0 VALVULA CHECK DE BRON
S/.138.04 02.05.02.05.0 VALVULA DE PIE D=1"
S/.475.20 02.05.02.05.0 VALVULA REGULADORA DE
S/.353.29 S/.20,763.67 02.05.02.06 ACCESORIOS PARA TANQUE
S/.353.29 S/.0.05 02.05.02.06.0 BOQUILLA DE LLENADO DE
S/.55.26 02.05.02.06.0 BOQUILLA DEMEDICION DI
S/.83.30 02.05.02.06.0 BOQUILLA DE VENTILACIO
S/.2,424.74 02.05.02.06.0 FILTRO DE PETROLEO
S/.1,111.28 02.05.02.06.0 FILTRO COLADOR DE PETR
S/.3,397.56 02.05.02.06.0 PREFILTRO DE PETROLEO
S/.1,170.36 02.05.02.06.0 VISOR DE VIDRIO DE 1 1/4"
S/.8,621.94 02.05.02.06.0 CONTROL DE NIVEL VARIL
S/.734.60 02.05.02.06.0 CAJUELA DE LLENADO DE
S/.1,612.28 02.05.02.06.1 MANOMETROS
S/.1,430.54 02.05.02.06.1 POZO DE PUESTA A TIERR
S/.121.76 02.05.02.06.1 CABLE DE COBRE DESNUD
S/.2,400.00 02.05.02.07 BOMBA PARA PETROLEO
S/.2,400.00 02.05.02.07.0 ELECTROBOMBA DE Q=12.
02.05.02.08 PRUEBAS
S/.951.00 02.05.02.09 PRUEBA DE INSTALAC. DEL
S/.57,659.96 02.05.03 SISTEMA DE VENTILACION ME
S/.728.22 02.05.03.01 PERFORACION DE MUROS
S/.55,943.09 02.05.03.02 SUMINISTRO E INSTALACION
S/.53.88 02.05.03.03 DUCTOS FLEXIBLES 1
S/.934.77 02.05.03.04 REJILLAS DE EXTRACCION D
S/.138,921.68 ### ### S/.22,212.77 02.06 INSTALACIONES DE INFORMACI
S/.3,086.87 S/.38,884.07 02.06.01 SALIDA PARA VOZ Y DATOS
S/.3,086.87 S/.1,599.37 02.06.01.01 SALIDA PARA PUNTO DE INT
S/.5,448.56 02.06.01.02 SALIDA PARA TELEFONO
S/.25,336.14 02.06.01.03 CENTRAL IP PARA INTERNET
S/.6,500.00 02.06.01.04 SUMINISTRO DE LINEA EXTE
### S/.4,355.15 02.06.02 SALIDA PARA SISTEMA DE ALA
S/.71,937.32 02.06.02.01 TABLERO CENTRAL PARA CO
S/.1,128.96 02.06.02.02 ESTACION MANUAL DE PROG
S/.54,057.69 S/.3,381.03 02.06.02.03 SALIDA PARA DETECTOR DE
S/.974.12 02.06.02.04 SALIDA PARA DIFUSOR DE S
S/.10,314.72 02.06.02.05 SALIDA PARA SENSOR DE M
S/.7,353.76 02.06.02.06 SALIDA PARA SENSOR MAGN
S/.75,389.83 S/.236.27 S/.7.64 02.06.03 SALIDA PARA SISTEMAS DE SO
S/.4,356.00 02.06.03.01 SALIDA PARA MEGAFONIA E
S/.21,031.14 02.06.03.02 SALIDA PARA PARLANTES D
S/.7,543.05 02.06.03.03 CENTRAL DE DIFUSION Y PE
S/.42,459.64 S/.236.27 S/.7.64 02.06.03.04 AMPLIFICADOR
S/.131,222.90 S/.25,647.07 02.06.04 SALIDA PARA SISTEMAS DE VI
S/.131,222.90 S/.3,712.82 02.06.04.01 SALIDA PARA CAMARA DE V
S/.21,934.25 02.06.04.02 UNIDAD DE ADMINISTRACIO
S/.4,611.91 S/.19,341.34 02.06.05 SALIDA PARA TELEVISION
S/.4,611.91 S/.17,769.79 02.06.05.01 SALIDA PARA PUNTO DE IPT
S/.1,571.55 02.06.05.02 UNIDAD DE RECEPCION Y DI
S/.62,081.21 ### 02.06.06 CENTRAL DE COMUNICACION
S/.17,101.15 02.06.06.01 ESTACION CENTRAL DE COM
S/.44,980.06 S/.676.22 02.06.06.02 REPARTIDOR DE CABLEADO
### 02.06.06.03 REPARTIDOR DE CABLEADO
S/.79,520.78 02.06.07 CONTROL DE ACCESOS
S/.1,957.22 02.06.07.01 ESTACION CENTRAL DE CON
S/.77,563.56 02.06.07.02 BARRERA DE CONTROL DE A
S/.69,365.09 S/.1,308.05 02.06.08 CANALIZACIONES Y/O TUBERI
S/.3,405.78 02.06.08.01 TUBERIA PVC-P, D=15 mm.
S/.26,505.47 02.06.08.02 TUBERIA PVC-P, D=20mm.
S/.34,078.99 S/.1,308.05 02.06.08.03 BANDEJA PORTACABLE DE 2
S/.5,374.85 02.06.08.04 CAJA DE PASO FºGº DE 250x
S/.26,708.68 S/.18,897.08 02.06.09 CABLEADO EN TUBERIAS
S/.26,708.68 S/.3,345.68 02.06.09.01 CABLE DE VOZ Y DATOS
S/.1,192.80 02.06.09.02 CABLE TELEFONICO DE INTE
S/.2,478.60 02.06.09.03 CABLE DE SEÑALES DEBILES
S/.11,880.00 02.06.09.04 CABLE DE FIBRA OPTICA
S/.2,000.00 02.06.10 OTROS
S/.1,000.00 02.06.10.01 SERVICIO DE INSTALACION Y
S/.1,000.00 02.06.10.02 SERVICIO DE INSTALACION Y
### S/.25,891.30 S/.85,646.49 ### S/.35,145.16 S/.25,831.69 03 MEJORAMIENTO DE AREAS DEPO
S/.6,440.69 S/.5,610.07 03.01 CAMPO DEPORTIVO GRASS NAT
03.01.01 TRABAJOS PRELIMINARES
03.01.01.01 TRAZO Y REPLANTEO PRELI
03.01.01.02 LIMPIEZA Y DESBROCE DEL
03.01.02 DEMOLICIONES Y DESMONTA
03.01.02.01 DEMOLICIONES
03.01.02.01.0 DEMOLICION DE ESTRUCT
03.01.02.02 DESMONTAJES
03.01.02.02.0 DESMONTAJE DE SISTEMA
03.01.02.02.0 DESMONTAJE DEL SISTEM
03.01.03 MOVIMIENTO DE TIERRAS
03.01.03.01 CORTE DE MATERIAL SUELT
03.01.03.02 EXCAVACION A MANO EN TE
03.01.03.03 ELIMINACION DE MATERIAL
03.01.03.04 PERFILADO Y COMPACTADO
03.01.03.05 CONFORMACION DE SUB BA
03.01.03.06 ACARREO DE MATERIAL PRO
03.01.03.07 ELIMINACION DE MATERIAL
03.01.04 EXTRACCION DE MATERIALES
03.01.04.01 EXTRACCION Y APILAMIENT
03.01.04.02 ZARANDEO DE MATERIAL SE
03.01.04.03 CARGUIO DE MATERIAL DE S
03.01.04.04 TRANSPORTE DE MATERIAL
03.01.04.05 EXTRACCION Y APILAMIENT
03.01.04.06 ZARANDEO DE ARENA FINA
03.01.04.07 CARGUIO DE ARENA FINA EN
03.01.04.08 TRANSPORTE DE ARENA FIN
03.01.04.09 EXTRACCION Y APILAMIENT
03.01.04.10 CARGUIO DE MATERIALES E
03.01.04.11 TRANSPORTE DE TIERRA AG
03.01.05 CONFORMACION DE ESTRUCT
03.01.05.01 COLOCADO Y COMPACTADO
03.01.05.02 PREPARACION Y BATIDO DE
03.01.05.03 ESPARCIDO Y COMPACTADO
S/.6,440.69 S/.5,610.07 03.01.06 GRAMADO
S/.6,440.69 S/.5,610.07 03.01.06.01 GRASS NATURAL EN CAMPO
S/.69,625.34 S/.14,631.18 S/.301.42 03.02 SISTEMA DE DRENAJE CAMPO D
03.02.01 TRABAJOS PRELIMINARES
03.02.01.01 TRAZO Y REPLANTEO PRELI
S/.1,868.01 S/.1,687.24 S/.301.42 03.02.02 INSTALACION SUB DRENES CO
03.02.02.01 COLOCADO Y COMPACTADO
03.02.02.02 SUMINISTRO Y COLOCACION
03.02.02.03 ACCESORIOS PARA INSTALA
03.02.02.04 ACCESORIOS PARA INSTALA
03.02.02.05 ACCESORIOS PARA INSTALA
03.02.02.06 ACCESORIOS PARA INSTALA
S/.1,868.01 S/.1,687.24 S/.301.42 03.02.02.07 ACCESORIOS PARA INSTALA
03.02.03 INSTALACION DREN COLECTO
03.02.03.01 SUMINISTRO Y COLOCACION
S/.20,984.60 03.02.04 INSTALACION DE COLECTORE
03.02.04.01 EXCAVACION MANUAL DE ZA
03.02.04.02 ACARREO Y ELIMINACION DE
03.02.04.03 REFINE Y NIVELACION DE ZA
03.02.04.04 RELLENO CON MATERIAL CL
03.02.04.05 CAMA DE ARENA PARA APOY
S/.529.29 03.02.04.06 SUMINISTRO Y COLOCACION
S/.3,468.88 03.02.04.07 SUMINISTRO Y COLOCACION
S/.10,885.59 03.02.04.08 SUMINISTRO Y COLOCACION
S/.4,241.03 03.02.04.09 CONCRETO f'c=210 kg/cm2
S/.1,859.81 03.02.04.10 SOLADO e=2"
S/.10,046.02 03.02.05 BUZONES DE CONCRETO HAS
S/.0.18 03.02.05.01 EXCAVACION MANUAL DE ZA
S/.697.68 03.02.05.02 ACARREO Y ELIMINACION DE
S/.29.00 03.02.05.03 REFINE Y NIVELACION EN FO
S/.180.24 03.02.05.04 SOLADO e=2"
S/.3,621.64 03.02.05.05 CONCRETO f'c=210 kg/cm2
S/.1,601.59 03.02.05.06 ACERO DE REFUERZO fy=4,2
S/.3,915.69 03.02.05.07 ENCOFRADO Y DESENCOFR
S/.36,726.71 S/.12,943.94 03.02.06 CONCRETO ARMADO
S/.13,316.77 03.02.06.01 CANAL: ENCOFRADO Y DESE
S/.6,366.98 03.02.06.02 CANAL: ACERO CORRUGADO
S/.12,681.87 03.02.06.03 CANAL: CONCRETO f'c=210 k
S/.4,361.09 S/.3,095.21 03.02.06.04 TAPA: ENCOFRADO Y DESEN
S/.2,211.69 03.02.06.05 TAPA: ACERO CORRUGADO
S/.7,393.16 03.02.06.06 TAPA: CONCRETO f'c=210 kg
S/.243.88 03.02.06.07 TAPA: REJILLA METALICA
### 03.03 SISTEMA DE RIEGO CAMPO DEP
S/.3,137.78 03.03.01 TRABAJOS PRELIMINARES
S/.3,137.78 03.03.01.01 TRAZO Y REPLANTEO PRELI
S/.5,533.84 03.03.02 MOVIMIENTO DE TIERRAS
S/.3,697.12 03.03.02.01 EXCAVACION MANUAL EN TE
S/.1,836.72 03.03.02.02 RELLENO CON MATERIAL CL
S/.23,847.41 03.03.03 INSTALACIONES DE SISTEMA
S/.11,198.39 03.03.03.01 TUBERIAS
S/.3,335.87 03.03.03.01.0 SUMINISTRO Y COLOCACIO
S/.7,862.52 03.03.03.01.0 SUMINISTRO Y COLOCACIO
S/.7,607.12 03.03.03.02 ASPERSORES
S/.1,254.64 03.03.03.02.0 SUMINISTRO E INSTALACIO
S/.3,136.60 03.03.03.02.0 SUMINISTRO E INSTALACIO
S/.3,215.88 03.03.03.02.0 SUMINISTRO E INSTALACIO
S/.5,041.90 03.03.03.03 ACCESORIOS Y VALVULAS
S/.1,321.85 03.03.03.03.0 VALVULA COMPUERTA DE
S/.220.05 03.03.03.03.0 CAJA VALVULA TIPO ARQU
S/.3,500.00 03.03.03.03.0 ACCESORIOS VARIOS EN I
S/.1,200.00 03.03.04 PRUEBAS DE CALIDAD
S/.1,200.00 03.03.04.01 PRUEBA HIDRAULICA EN TU
S/.6,500.00 03.03.05 EQUIPAMIENTO ELECTROMEC
S/.5,000.00 03.03.05.01 ELECTROBOMBA SUMERGIB
S/.1,500.00 03.03.05.02 TABLERO ELECTRICO DE CO
S/.80,000.00 03.03.06 OPERACION Y MANTENIMIENT
S/.80,000.00 03.03.06.01 OPERACION Y MANTENIMIEN
S/.88,116.51 03.03.07 OTROS
S/.78,910.50 03.03.07.01 COBERTURA DE PROTECCIO
S/.9,000.00 03.03.07.02 PRUEBA HIDRAULICA DEL SI
S/.206.01 03.03.07.03 CAJAS DE INSPECCION
S/.407.81 S/.5,650.05 S/.85,345.07 ### S/.35,145.16 S/.25,831.69 03.04 TRATAMIENTO DE MALLA OLIMP
S/.407.81 S/.5,650.05 S/.85,345.07 ### S/.35,145.16 S/.25,831.69 03.04.01 ESTRUCTURAS
S/.407.81 S/.677.39 03.04.01.01 TRABAJOS PRELIMINARES
S/.407.81 S/.244.95 03.04.01.01.0 LIMPIEZA DEL TERRENO M
S/.308.11 03.04.01.01.0 TRAZO Y REPLANTEO PRE
S/.124.33 03.04.01.01.0 TRAZO Y REPLANTEO DUR
S/.4,972.66 S/.11,390.02 03.04.01.02 MOVIMIENTO DE TIERRAS
S/.1,746.81 03.04.01.02.0 EXCAVACION PARA ZAPAT
S/.1,180.98 S/.1,726.51 03.04.01.02.0 EXCAVACION PARA CIMIEN
S/.1,067.44 03.04.01.02.0 RELLENO COMPACTADO C
S/.637.55 03.04.01.02.0 NIVELACION Y APISONADO
S/.339.88 S/.3,747.22 03.04.01.02.0 ACARREO MANUAL DE MAT
S/.5,916.29 03.04.01.02.0 CARGUIO Y ELIMINACION D
S/.32,243.02 S/.7,996.26 S/.16,548.13 03.04.01.03 OBRAS DE CONCRETO SIMP
S/.1,293.84 03.04.01.03.0 SOLADO PARA ZAPATAS D
S/.15,870.89 03.04.01.03.0 CIMIENTOS CORRIDOS ME
S/.15,214.87 03.04.01.03.0 SARDINELES DE CONCRET
S/.15,078.29 S/.7,996.26 S/.1,333.26 03.04.01.03.0 ENCOFRADO Y DESENCOF
S/.17,684.17 03.04.01.04 OBRAS DE CONCRETO ARM
S/.11,956.48 03.04.01.04.0 ZAPATAS
S/.11,076.53 03.04.01.04.0 ZAPATAS: CONCRETO f'c
S/.879.95 03.04.01.04.0 ZAPATAS: ACERO CORRU
S/.5,727.69 03.04.01.04.0 DADOS
S/.1,101.81 03.04.01.04.0 DADOS: CONCRETO f'c=1
S/.2,442.32 03.04.01.04.0 DADOS: ENCOFRADO Y D
S/.2,183.56 03.04.01.04.0 DADOS: ACERO CORRUG
S/.24,027.86 ### S/.18,597.03 S/.25,831.69 03.04.01.05 ARQUITECTURA
S/.3,189.65 S/.4,932.37 S/.3,946.24 03.04.01.05.0 REVOQUES ENLUCIDOS Y
S/.3,189.65 S/.4,932.37 S/.3,946.24 03.04.01.05.0 TARRAJEO EN SARDINEL
S/.20,838.21 ### S/.14,650.79 S/.3,112.54 03.04.01.05.0 CARPINTERIA METALICA
S/.20,838.21 S/.2,982.39 03.04.01.05.0 PUERTA METALICA
S/.56,691.22 S/.870.78 03.04.01.05.0 TUBO METALICO DE 4" EN
S/.93,537.70 S/.13,780.01 S/.3,112.54 03.04.01.05.0 MALLA METALICA EN INT
S/.22,719.15 03.04.01.05.0 PINTURA
S/.3,649.80 03.04.01.05.0 PINTURA LATEX 2 MANOS
S/.19,069.35 03.04.01.05.0 PIN. ANTICOR. Y ESMALT
RENOVACION DE CAMPO DEPOR
### ### S/.466,204.15 04
TRIBUNAS Y OBRAS COMPLEMEN
S/.47,882.72 ### S/.466,204.15 04.01 TRATAMIENTO DE PISTA ATLET
S/.19,492.44 04.01.01 TRABAJOS PRELIMINARES
S/.7,492.44 04.01.01.01 TRAZO Y REPLANTEO DURA
S/.12,000.00 04.01.01.02 TRANSPORTE DE MATERIAL
S/.28,390.28 ### S/.466,204.15 04.01.02 PISTA ATLETICA SON SUPERF
S/.28,390.28 ### 04.01.02.01 MOVIMIENTO DE TIERRAS PA
S/.8,840.15 S/.2,215.79 04.01.02.01.0 EXCAVACION A NIVEL DE S
S/.19,550.13 S/.39,690.73 04.01.02.01.0 SUBRASANTE MEJORADA,
S/.53,415.80 04.01.02.01.0 SUB-BASE GRANULAR e=0
S/.78,521.81 04.01.02.01.0 BASE GRANULAR E=0.36 m
S/.43,603.03 04.01.02.01.0 ELIMINACION DE MATERIA
S/.45,827.14 S/.4,384.88 04.01.02.02 GEOTEXTIL
S/.45,827.14 S/.4,384.88 04.01.02.02.0 SUMINISTRO E INSTALACIO
S/.12,088.88 S/.56,362.07 04.01.02.03 SARDINELES
S/.1,159.29 S/.356.95 04.01.02.03.0 EXCAVACION MANUAL DE
S/.713.54 S/.803.12 04.01.02.03.0 ELIMINACION DE MATERIA
S/.720.31 S/.1,621.30 04.01.02.03.0 REFINE, NIVELACION Y CO
S/.20,975.80 04.01.02.03.0 CONCRETO f'c=210 kg/cm2
S/.7,600.51 S/.0.44 04.01.02.03.0 ACERO FY= 4200 kg/cm2
S/.32,604.46 04.01.02.03.0 ENCOFRADO Y DESENCOF
S/.929.23 04.01.02.03.0 MATERIAL CLASIFICADO E
S/.966.00 S/.0.00 04.01.02.03.0 COBERTURA DE CAUCHO
S/.19,625.84 S/.4.61 04.01.02.04 IMPRIMADO
S/.19,625.84 S/.4.61 04.01.02.04.0 IMPRIMACION RC 250
S/.393,774.06 04.01.02.05 CARPETA ASFALTICA EN CA
S/.393,774.06 04.01.02.05.0 SUMINISTRO Y COLOCACIO
### S/.0.00 04.01.02.06 CAPA DE SINTETICO
### S/.0.00 04.01.02.06.0 SUMINISTRO Y COLOCACIO
S/.75.18 04.01.02.07 LOSA PARA CAFETIN DE PER
S/.59.50 04.01.02.07.0 CONCRETO f'c=210 kg/cm2
S/.15.68 04.01.02.07.0 ENCOFRADO Y DESENCOF
S/.272.98 S/.8,657.18 04.01.02.08 RIA
S/.272.98 S/.364.41 04.01.02.08.0 EXCAVACION MANUAL DE
S/.621.30 04.01.02.08.0 ELIMINACION DE MATERIA
S/.82.44 04.01.02.08.0 REFINE, NIVELACION Y CO
S/.4.54 04.01.02.08.0 BASE GRANULAR E=0.15 m
S/.236.92 04.01.02.08.0 SOLADO e=2"
S/.1,036.70 04.01.02.08.0 CONCRETO f'c=210 kg/cm2
S/.743.30 04.01.02.08.0 ACERO DE REFUERZO fy=4
S/.2,485.71 04.01.02.08.0 ENCOFRADO Y DESENCOF
S/.1,023.00 04.01.02.08.0 EXCAVACION MANUAL DE
S/.125.40 04.01.02.08.1 REFINE Y NIVELACION DE
S/.200.75 04.01.02.08.1 RELLENO, COMPACTACION
S/.108.35 04.01.02.08.1 CAMA DE ARENA PARA AP
S/.1,321.65 04.01.02.08.1 TUBERIA DE PVC SAL 2"
S/.302.71 04.01.02.08.1 TARRAJEO CON IMPERMEA
S/.1,484.43 04.01.02.09 LOSA LANZAMIENTO DE PES
S/.948.96 04.01.02.09.0 CONCRETO f'c=210 kg/cm2
S/.20.74 04.01.02.09.0 BASE GRANULAR e=0.20 m
S/.248.95 04.01.02.09.0 ACERO DE REFUERZO fy=4
S/.265.78 04.01.02.09.0 ENCOFRADO Y DESENCOF
S/.1,536.92 04.01.02.10 LOSA LANZAMIENTO DE DISC
S/.993.58 04.01.02.10.0 CONCRETO f'c=210 kg/cm2
S/.21.88 04.01.02.10.0 BASE GRANULAR e=0.20 m
S/.248.95 04.01.02.10.0 ACERO DE REFUERZO fy=4
S/.272.51 04.01.02.10.0 ENCOFRADO Y DESENCOF
S/.39,002.84 S/.51,247.87 04.02 DRENAJE PISTA ATLETICA
S/.37,689.44 S/.51,247.87 04.02.01 CANAL DE DRENAJE DE LA PIS
S/.9,327.82 S/.2,744.95 04.02.01.01 EXCAVACION MANUAL DE ZA
S/.2,180.05 S/.908.89 04.02.01.02 ACARREO Y ELIMINACION DE
S/.633.42 S/.271.74 04.02.01.03 REFINE Y NIVELACION DE ZA
S/.30,230.65 04.02.01.04 CONCRETO f'c=210 kg/cm2
S/.12,611.23 S/.9,180.10 04.02.01.05 SUMINISTRO E INSTALACION
S/.12,936.92 S/.7,911.54 04.02.01.06 ENCOFRADO Y DESENCOFR
S/.1,313.40 04.02.02 CAJA DE REGISTRO (06 UND)
S/.30.71 04.02.02.01 EXCAVACION MANUAL DE ZA
S/.29.87 04.02.02.02 ACARREO Y ELIMINACION DE
S/.5.75 04.02.02.03 REFINE, NIVELACION Y COM
S/.17.85 04.02.02.04 SOLADO e=2"
S/.245.04 04.02.02.05 CONCRETO f'c=210 kg/cm2
S/.388.66 04.02.02.06 ACERO DE REFUERZO fy=4,2
S/.595.52 04.02.02.07 ENCOFRADO Y DESENCOFR
S/.17,979.84 S/.18,023.78 04.03 DRENAJE DE AREAS VERDES AR
S/.14,884.83 S/.18,023.78 04.03.01 TUBERIA DE DRENAJE DE ARE
S/.14,715.70 04.03.01.01 EXCAVACION MANUAL DE ZA
S/.79.12 04.03.01.02 ACARREO Y ELIMINACION DE
S/.90.01 S/.992.31 04.03.01.03 REFINE Y NIVELACION DE ZA
S/.4,760.10 04.03.01.04 FILTRO DE GRAVA
S/.10,747.21 04.03.01.05 SUMINISTRO E INSTALACION
S/.1,524.16 04.03.01.06 SUMINISTRO E INSTALACION
S/.3,095.01 04.03.02 CAJA DE REGISTRO (13 UND)
S/.79.07 04.03.02.01 EXCAVACION MANUAL DE ZA
S/.77.06 04.03.02.02 ACARREO Y ELIMINACION DE
S/.7.41 04.03.02.03 REFINE Y NIVELACION DE ZA
S/.46.05 04.03.02.04 SOLADO e=2"
S/.725.69 04.03.02.05 CONCRETO f'c=210 kg/cm2
S/.789.79 04.03.02.06 ACERO DE REFUERZO fy=4,2
S/.1,369.94 04.03.02.07 ENCOFRADO Y DESENCOFR
S/.9,500.17 S/.776.48 04.04 SISTEMA DE RIEGO DE PISTA AT
S/.23.97 04.04.01 DEMOLICIONES
S/.11.66 04.04.01.01 DEMOLICION DE PAVIMENTO
S/.12.31 04.04.01.02 ACARREO Y ELIMINACION DE
S/.2,029.20 04.04.02 CAJA DE SALIDA DE VALVULA
S/.18.25 04.04.02.01 EXCAVACION MANUAL DE ZA
S/.17.78 04.04.02.02 ACARREO Y ELIMINACION DE
S/.5.47 04.04.02.03 REFINE, NIVELACION Y COM
S/.17.00 04.04.02.04 SOLADO e=2"
S/.1,970.70 04.04.02.05 SUMINISTRO E INSTALACION
S/.470.95 04.04.03 HIDRANTE
S/.360.76 04.04.03.01 VALVULA ESFERICA DOBLE
S/.110.19 04.04.03.02 VALVULA ESFERICA DOBLE
S/.6,976.05 S/.776.48 04.04.04 TUBERIA Y ACCESORIOS DE F
S/.2,472.40 04.04.04.01 TUBERIA PVC SAP CLASE 10
S/.1,420.54 04.04.04.02 TUBERIA PVC SAP CLASE 10
S/.1,280.43 04.04.04.03 ABRAZADERAS DE FIJACION
S/.1,802.68 S/.0.29 04.04.04.04 ABRAZADERAS DE FIJACION
S/.707.51 04.04.04.05 DOBLE PRUEBA HIDRAULICA
S/.68.68 04.04.04.06 ACCESORIOS VARIOS
### 04.05 AREAS VERDES ARTIFICIALES
S/.78,429.59 04.05.01 MOVIMIENTO DE TIERRAS
S/.22,024.55 04.05.01.01 NIVELACION Y COMPACTADO
S/.3,007.38 04.05.01.02 EXCAVACION A NIVEL DE SU
S/.16,114.37 04.05.01.03 SUBRASANTE MEJORADA, N
S/.14,529.87 04.05.01.04 SUB-BASE GRANULAR e=0.1
S/.22,753.42 04.05.01.05 BASE GRANULAR E=0.40 m
S/.13,658.39 04.05.02 GEOTEXTIL
S/.13,658.39 04.05.02.01 SUMINISTRO E INSTALACION
### 04.05.03 SUMINISTRO Y COLOCACION
### 04.05.03.01 SUMINISTRO Y COLOCACION
### 04.06 INSTALACIONES ELECTRICAS
S/.1,943.74 04.06.01 TUBERIA DE CONEXION
S/.341.00 04.06.01.01 EXCAVACION MANUAL DE ZA
S/.104.42 04.06.01.02 ACARREO Y ELIMINACION DE
S/.25.08 04.06.01.03 REFINE Y NIVELACION DE ZA
S/.747.68 04.06.01.04 CONCRETO f'c=210 kg/cm2 (T
S/.725.56 04.06.01.05 SUMINISTRO E INSTALACION
S/.1,328.05 04.06.02 CAJA DE REGISTRO (02 UND)
S/.69.94 04.06.02.01 EXCAVACION MANUAL DE ZA
S/.68.40 04.06.02.02 ACARREO Y ELIMINACION DE
S/.9.12 04.06.02.03 REFINE, NIVELACION Y COM
S/.28.34 04.06.02.04 SOLADO e=2"
S/.295.30 04.06.02.05 CONCRETO f'c=210 kg/cm2
S/.243.02 04.06.02.06 ACERO DE REFUERZO fy=4,2
S/.476.14 04.06.02.07 ENCOFRADO Y DESENCOFR
S/.137.79 04.06.02.08 TARRAJEO CON IMPERMEAB
### 04.06.03 SUMINISTRO E INSTALACION D
S/.31,360.00 04.06.03.01 BORDILLO INTERNO DE ALU
S/.7,412.00 04.06.03.02 CAJETINES DE PERDIGA, AC
S/.35,580.00 04.06.03.03 TABLA DE BATIDA PARA SAL
S/.2,870.00 04.06.03.04 OBSTACULO DE RIA MOVIBL
S/.11,250.00 04.06.03.05 TAPA CIEGA (BLIND BOARD)
S/.3,800.00 04.06.03.06 CIRCULO DE LANZAMIENTO
S/.3,000.00 04.06.03.07 CIRCULO DE LANZAMIENTO
S/.3,000.00 04.06.03.08 REDUCTOR DEL DISCO A MA
S/.40,000.00 04.06.03.09 JAULA PARA LANZAMIENTO
S/.10,000.00 04.06.03.10 CERTIFICACION IAAF
### 05 IMPLEMENTACION CON MOBILIAR
### 05.01 EQUIPAMIENTO CON IMPLEMEN
### 05.01.01 EQUIPAMIENTO DEPORTIVO
### 05.02 EQUIPAMIENTO ADMINISTRATIV
### 05.02.01 EQUIPAMIENTO ADMINISTRAT
S/.90,037.56 ### S/.16,184.40 06 PROTECCION AMBIENTAL
S/.7,562.50 06.01 PROGRAMA DE EDUCACION AM
S/.2,200.00 06.01.01 SUB PROGRAMA DE EDUCACI
S/.5,362.50 06.01.02 SUB PROGRAMA DE RELACION
S/.22,222.40 S/.8,320.00 06.02 PROGRAMA DE MONITOREO DE
S/.3,562.40 S/.0.00 06.02.01 MONITEREO DE CALIDAD DEL
S/.360.00 06.02.01.01 MUESTREO DE COLIFORMES
S/.1,602.40 06.02.01.02 MUESTRO DE DE METALES T
S/.896.00 06.02.01.03 DEMANDA BIOQUIMICA DE O
S/.704.00 S/.0.00 06.02.01.04 REMISION DE MUESTRAS A L
S/.18,660.00 S/.0.00 06.02.02 MONITEREO DE CALIDAD DEL
S/.18,660.00 S/.0.00 06.02.02.01 MUESTREO DE CALIDAD DE
S/.1,120.00 06.02.03 MONITOREO DE CALIDAD DE S
S/.1,120.00 06.02.03.01 ANALISIS DE SALINIDAD DE S
S/.7,200.00 06.02.04 MONITOREO ARQUEOLOGICO
S/.3,600.00 06.02.04.01 MONITOREO ARQUEOLOGIC
S/.3,600.00 06.02.04.02 PLAN DE MONITOREO ARQU
S/.3,205.00 06.03 PREVISIONES AMBIENTALES
S/.680.00 06.03.01 COORDINACION ADMINISTRAC
S/.2,525.00 06.03.02 COORDINACION AUTORIDAD R
S/.4,659.40 06.04 PROGRAMA DE SEÑALIZACION
S/.1,165.00 06.04.01 SUB PROGRAMA DE SEÑALIZA
S/.3,494.40 06.04.02 SEÑALES TEMPORALES
S/.90,037.56 ### 06.05 PROGRAMA DE RECUPERACION
S/.70,882.62 06.05.01 RECUPERACION DE AREAS AU
S/.19,154.94 S/.15,984.77 06.05.02 SEMBRADO DE GRASS
S/.9,639.00 06.05.03 SEMBRADO DE ARBOLES
S/.15,426.56 06.05.04 SEMBRADO DE ARBUSTOS
S/.62,808.00 06.05.05 RIEGO
S/.10,033.13 06.06 SUB PROGRAMA DE MANEJO DE
S/.5,556.97 06.06.01 MICROCELDA DE SEGURIDAD
S/.4,084.92 06.06.02 MICROCELDA DE RELLENO SA
S/.391.24 06.06.03 CONTENEDORES DE RESIDUO
S/.4,734.00 06.07 PROGRAMA DE CONTINGENCIA
S/.4,734.00 06.07.01 KITT DE EMERGENCIAS
07 INFRAESTRUCTURA DE PROTECC
### ### S/.157,453.88 08 ESTRUCTURAS METALICAS Y CO
### ### 08.01 ARMADURA METALICA 01 L=21 m
S/.95,645.85 S/.99,285.42 08.02 ARMADURA METALICA 02 H=0.4
S/.70,073.98 08.03 ARMADURA METALICA 03 H=0.4
### S/.87,379.90 08.04 ARRIOSTRES DE FIERRO LISO Ø
### S/.13,679.38 09 COBERTURAS Y CERRAMIENTOS
### S/.13,679.38 09.01 COBERTURA DE POLICARBONA
LETREROS DE SALIDA
LETREROS DE ZONA DE SEGURIDAD EN CASO DE SISMOS
EXTINTORES
LETREROS DE EXTINTORES
LETREROS DE SALIDA POR ESCALERA
ZONA DE SEGURIDAD
LETREROS DE RIESGO ELECTRICO
INSTALACIONES SANITARIAS
SISTEMA DE AGUA POTABLE
SALIDAS DE AGUA FRIA
SALIDA DE A.F. PVC C/R - 1/2" C-10
SALIDA DE A.F. PVC C/R - 1" C-10
SALIDA DE A.F. PVC C/R - 1.1/4" C-10
REDES DE DISTRIBUCION
SUM. E INST. TUB. PVC C-10 - D=1.1/4"
SUM. E INST. TUB. PVC C-10 - D=1.1/2"
SUM. E INST. TUB. PVC C-10 - D=2"
SUM. E INST. TUB. PVC C-10 - D=2.1/2"
VALVULAS
SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1/2"
SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=3/4" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA)
SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA)
SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1.1/4" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA)
SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1.1/2" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA)
SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=2" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA)
SISTEMA DE AGUA CALIENTE
SALIDAS DE AGUA CALIENTE
SALIDA AGUA CALIENTE TUBERIA CPVC O 1/2"
SALIDA AGUA CALIENTE TUBERIA CPVC O 3/4"
REDES DE DISTRIBUCION
SUM. Y COLOC. TUB. CPVC D=3/4 ENTERRADA INC. DESP Y ACCES
LLAVES Y VALVULAS
SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1/2"
THERMAS Y VALVULAS
SUM Y COLOC. THERMAS 100 LT INCL. TIMER Y ACCES P/INST
SUM Y COLOC. THERMAS 150 LT INCL. TIMER Y ACCES P/INST
SISTEMA CONTRA INCENDIO
TUBERIA ENTERRADA
TUBERIA HDPE PN15 2 1/2" PARA AGUA POTABLE CON UNIONES TERMOFUSIONADAS
TUBERIA HDPE PN15 4" PARA AGUA POTABLE CON UNIONES TERMOFUSIONADAS
TUBERIA HDPE PN15 6" PARA AGUA POTABLE CON UNIONES TERMOFUSIONADAS
TUBERIA AEREA
TUBERIA ACERO SCH 40 2 1/2" INC. PINTURA 8 MILS - INCL SOPORTE
TUBERIA ACERO SCH 40 4" INC. PINTURA 8 MILS - INCL SOPORTE
GABINETE
GABINETE CONTRA INCENDIO
SISTEMA DE DESAGUE Y VENTILACION
SALIDA DE DESAGUE Y VENTILACION
SALIDA DE DESAGUE PVC CP - 2"
SALIDA DE DESAGUE PVC CP - 3"
SALIDA DE DESAGUE PVC CP - 4"
SALIDA DE VENTILACION PROMEDIO PVC CP - 2"
REDES DE EVACUACION
SUM. E INST. TUB. PVC CP - D=4" (INC. EXCAV. RELLENO Y COMPACT.)
SUM. E INST. TUB. PVC CP - D=6" (INC. EXCAV. RELLENO Y COMPACT.)
SUM. Y COLOC. TUB. PVC-CP D=3" COLGADAS INCL. DESP Y ACCES - COLG Y SOPORTE
SUM. Y COLOC. TUB. PVC-CP D=4" COLGADAS INCL. DESP Y ACCES - COLG Y SOPORTE
SUM. Y COLOC. TUB. PVC-CP D=3" ADOSADAS INCL. DESP Y ACCES - COLG Y SOPORTE
SUM. Y COLOC. TUB. PVC-CP D=4" ADOSADAS INCL. DESP Y ACCES - COLG Y SOPORTE
ADITAMENTOS VARIOS
SUM. E INST. REGISTRO ROSCADO A RAS DE PISO - BRONCE CROMADO PESADO 2"
SUM. E INST. SUMIDERO BRONCE CROMADO PESADO - 3"
REGISTRO ROSCADO DE BRONCE 2"
SUM. E INST. REGISTRO ROSCADO A RAS DE PISO - BRONCE CROMADO PESADO 3"
SUM. E INST. REGISTRO ROSCADO A RAS DE PISO - BRONCE CROMADO PESADO 4"
SUM. E INST. REGISTRO ROSCADO A RAS DE PISO - BRONCE CROMADO PESADO 6"
SOMBRERO DE VENTILACION 2"
SOMBRERO DE VENTILACION 3"
SOMBRERO DE VENTILACION 4"
CAMARAS DE INSPECCION
CAJAS DE REGISTRO DE DESAGUE 12" x 24"
APARATOS SANITARIOS
INODORO CON VALVULA SEMIAUTOMATICA INC/ACCESORIO
LAVATORIO INC/ACCESORIO
DUCHA INC/ACCESORIO
LAVADERO DE ACERO INOXIDABLE UNA POZA
JABONERA DE LOSA DE 15x15 cm
PAPELERA DE BARRA
ESPEJO
URINARIO DE LOZA DE PICO BLANCO
COLOCACION DE APARATOS SANITARIOS
COLOCACION DE ACCESORIOS SANITARIOS
INSTALACIONES ELECTRICAS
TRABAJOS PRELIMINARES
REPLANTEO DE INSTALACIONES ELECTRICAS
DESMONTAJE DE INSTALACIONES ELECTRICAS EXISTENTES
PICADO Y RESANE DE PAREDES DE CONCRETO EXISTENTE
SALIDAS PARA INST. ELECTRICA
SALIDA DE TECHO C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2, CAJAS PESADA
SALIDA DE PARED C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2, CAJAS PESADAS
SALIDA PARA LUZ DE CONMUTACION SIMPLE C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2 CAJAS PESADAS
SALIDA P/INTERRUPTOR SIMPLE, TUB. PVC-P (1/2) CABLE LS0H 2.5mm2, CAJAS PESADAS
SALIDA P/INTERRUPTOR DOBLE, TUB. PVC-P (1/2) CABLE LS0H 2.5mm2, CAJAS PESADAS
SALIDA P/TOMACORRIENTE BIPOLAR DOBLE TUB. PVC-P (1/2) CABLE LSOH 4mm2 CAJAS PESADAS
SALIDA P/SECADORA DE MANOS, TUB. PVC-P (1/2) CABLE LSOH 4mm2 CAJAS PESADAS
SALIDA PARA ILUMINACION DE EMERGENCIA, TUB. PVC-P (1/2) CABLE LSOH 4mm2, CAJA PESADA
SALIDA DE FUERZA PARA EXTRACTOR DE AIRE, TUB. PVC-P (1/2) CABLE LSOH 4mm2, CAJA PESADA
TUBERIAS/ALIMENTADORES
EXCAVACION DE ZANJAS
TUBERIA PVC-P (ELECTRICAS) D=20mm
TUBERIA PVC-P (ELECTRICAS) D=25mm
TUBERIA PVC-P (ELECTRICAS) D=35mm
TUBERIA PVC-P (ELECTRICAS) D=40mm
TUBERIA PVC-P (ELECTRICAS) D=50mm
TUBERIA PVC-P (ELECTRICAS) D=65mm
TUBERIA PVC-P (ELECTRICAS) D=80mm
CAJAS DE PASO
CAJA DE PASO FºGº DE 100x100x50 mm, PESADO
CAJA DE PASO FºGº DE 150x150x100 mm, PESADO
CAJA DE PASO FºGº DE 200x200x100 mm, PESADO
BUZON DE CONCRETO DE 1.00x1.00x1.00m, PARA INSTALACIONES ELECTRICAS
CABLES Y CONDUCTORES
CABLE ELECTRICO LSOH 10 mm2
CABLE ELECTRICO LSOH 16 mm2
CABLE ELECTRICO LSOH 25mm2
CABLE ELECTRICO LSOH 35mm2
CABLE ELECTRICO LSOH 70mm2
CABLE ELECTRICO LSOH 95mm2
CABLE ELECTRICO LSOH 120mm2
CABLE ELECTRICO LSOH 150mm2
CABLE ELECTRICO LSOH 240mm2
ARTEFACTOS/LUMINARIAS
REJILLA DE ALUMINIO P/ADOSAR CON LAMPARA DE LED 3X24W, ALTA EFICIENCIA
LUMINARIA CIRCULAR P/EMPOTRAR C/LAMPARA LED DE 20W P/TECHO
LUMINARIA C/LAMPARA FLUORESCENTE COMPACTA DE 2X18W, 2X1200 LUMENES P/TECHO
LUMINARIA DE EMERGENCIA C/LAMPARA LED DE 2x10W
LUMINARIA TIPO BRAQUET C/2 LAMP. COMP. DE 18W E27
REFLECTOR CON LAMPARA HM DE 2000W, 230000 LUMENES
REFLECTOR TIPO CAMPANA C/LAMPARA LED DE 100W, 10000 LUMENES
LUMINARIA C/SOCKET, E27, C/LAMP. FC 65W, 4000 LUMENES
SECADORA DE MANOS, AUTOMATICO
LUMINARIA CINTA LED, TIPO MANGUERA DE 30M
TABLEROS ELECTRICOS
TABLERO TRIFASICO TPN, AUTOSOPORTADO 630A
TABLERO TRIFASICO TPE, AUTOSOPORTADO 400A
TABLERO TRIFASICO P/EMPOTRAR DE 18 POLOS + 6ID
TABLERO TRIFASICO P/EMPOTRAR DE 24 POLOS + 8ID
TABLERO TRIFASICO P/EMPOTRAR DE 24 POLOS + 10ID
TABLERO TRIFASICO P/EMPOTRAR DE 1 ITMG+36 POLOS+12ID, 100A
TABLERO DE BANCO DE CONDENSADORES, 200A
TABLERO GENERAL NORMAL TGN, AUTOSOPORTADO 800A.
TABLERO GENERAL DE EMERGENCIA TGE 500A.
TABLERO DE CONTROL DE ENCENDIDO Y APAGADO TC-EA
TABLERO DE CONTROL DE BOMBEO DE CONTRAINCENDIO TBCI
TABLERO DE CONTROL DE BOMBEO TBAF
TABLERO MONOFASICO DE 24 POLOS.
TABLERO DE TRANSFERENCIA AUTOMATICA DE 3x630 A
TABLERO PARA ESPECTACU;LO DE 32A
INTERRUPTORES TERMOMAGNETICOS
INTERRUPTOR TERMOMAGNETICO MONOFASICO 2x10A
INTERRUPTOR TERMOMAGNETICO MONOFASICO 2X16 A
INTERRUPTOR TERMOMAGNETICO MONOFASICO 2x20A
INTERRUPTOR TERMOMAGNETICO MONOFASICO 2 X25 A
INTERRUPTOR TERMOMAGNETICO TRIFASICO 3X20 A.
INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 25 A
INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 32 A
INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 40 A
INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 50 A
INTERRUPTOR DIFERENCIAL 2 X 25 A, 30 mA
PUESTA A TIERRA
EXCAVACION DE HOYO PARA PUESTA A TIERRA
INSTALACION DE PUESTA A TIERRA
PRUEBAS ELECTRICAS
PRUEBA DE CONTINUIDAD
PRUEBA DE AISLAMIENTO
PRUEBA DE RESISTENCIA DE PUESTA A T IERRA
PRUEBA DE NIVEL DE ILUMINACION