Está en la página 1de 172

CALE

Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR


Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

01 INSTALACIONES EXTERIORES

01.01 CONSTRUCCION DE CERCO PERIMETRICO

01.01.01 ESTRUCTURAS

01.01.01.01 OBRAS PROVISIONALES

01.01.01.01.01 CAMPAMENTO PROVISIONAL DE OBRA glb 4.00 1,872.42 7,489.68 100.00% 7489.68

01.01.01.01.02 CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO m2 20.00 164.38 3,287.60 100.00% 3287.60

01.01.01.01.03 CARTEL DE IDENTIFICACION DE OBRA DE 3.60x2.40 m und 3.00 1,051.40 3,154.20 100.00% 3154.20

01.01.01.01.04 CONSUMOS DE AGUA Y ENERGIA DURANTE LA CONSTRUCCION mes 1.00 6,000.00 6,000.00 100.00% 6000.00

01.01.01.01.05 SERVICIOS HIGIENICOS DURANTE LA CONSTRUCCION glb 1.00 6,500.00 6,500.00 100.00% 6500.00

01.01.01.01.06 CERCO DE OBRA CON POSTES DE MADERA Y CALAMINA m 820.00 16.65 13,653.00 100.00% 13653.00

01.01.01.01.07 TRANSPORTE DE EQUIPO Y MAQUINARIA A OBRA glb 1.00 10,000.00 10,000.00 100.00% 10000.00

01.01.01.01.08 ELABORACION IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD EN EL TRABAJO glb 1.00 8,000.00 8,000.00 100.00% 8000.00

01.01.01.01.09 SEÑALIZACION TEMPORAL DE SEGURIDAD und 1.00 2,000.00 2,000.00 100.00% 2000.00

01.01.01.02 TRABAJOS PRELIMINARES

01.01.01.02.01 DESMONTAJE DE PUERTAS m2 58.70 8.61 505.41 100.00% 505.41

01.01.01.02.02 DESMONTAJE DE VENTANAS m2 13.32 10.77 143.46 100.00% 143.46

01.01.01.02.03 DEMOLICION DE CIMIENTOS DE CONCRETO m3 311.98 52.52 16,385.19 90.47% 14823.07

01.01.01.02.04 DEMOLICION DE ESTRUCTURAS DE CONCRETO m3 30.00 98.79 2,963.70 100.00% 2963.70

01.01.01.02.05 DEMOLICION DE SOBRECIMIENTOS DE CONCRETO m3 115.60 32.47 3,753.53 74.99% 2814.76

01.01.01.02.06 DEMOLICION DE COLUMNAS Y VIGAS DE CONCRETO m3 13.84 109.88 1,520.74 100.00% 1520.74

01.01.01.02.07 DEMOLICION DE LOSAS DE CONCRETO m2 22.00 29.30 644.60 100.00% 644.60

01.01.01.02.08 DEMOLICION DE MUROS DE LADRILLO KK SOGA m2 125.00 4.87 608.75 100.00% 608.75

01.01.01.02.09 DEMOLICION DE MUROS DE LADRILLO KK CABEZA m2 2,019.50 4.87 9,834.97 25.49% 2506.55

01.01.01.02.10 LIMPIEZA DEL TERRENO MANUAL m2 805.74 2.32 1,869.32 100.00% 1869.32

01.01.01.02.11 TRAZO Y REPLANTEO PRELIMINAR m2 805.74 1.30 1,047.46 100.00% 1047.46

01.01.01.02.12 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 805.74 1.24 999.12 100.00% 999.12

01.01.01.03 MOVIMIENTO DE TIERRAS

01.01.01.03.01 EXCAVACION PARA ZAPATAS DE 1.00 m A 1.40 m DE PROFUNDIDAD m3 1,048.73 31.00 32,510.63

01.01.01.03.02 EXCAVACION PARA CIMIENTOS HASTA 1.00 m TERRENO NORMAL m3 371.90 31.00 11,528.90

01.01.01.03.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL PROPIO m3 475.28 32.55 15,470.36

01.01.01.03.04 NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA m2 475.28 3.37 1,601.69

01.01.01.03.05 ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m m3 1,420.63 30.41 43,201.36

01.01.01.03.06 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES m3 1,420.63 44.02 62,536.13

01.01.01.04 OBRAS DE CONCRETO SIMPLE

01.01.01.04.01 SUBCIMIENTOS Y SUBZAPTAS CONCRETO 1:10 C:H + 30% P. G. m3 209.75 160.70 33,706.83

01.01.01.04.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G. m3 203.05 208.43 42,321.71

01.01.01.04.03 SOBRECIMIENTOS MEZCLA 1:8 C:H + 25% P.M. m3 3.59 282.43 1,013.92

01.01.01.04.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HASTA 0.30 m m2 47.84 36.34 1,738.51

01.01.01.05 OBRAS DE CONCRETO ARMADO

01.01.01.05.01 ZAPATAS

01.01.01.05.01.01 ZAPATAS: CONCRETO f'c=175 kg/cm2 m3 227.07 289.90 65,827.59

01.01.01.05.01.02 ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,945.07 3.62 7,041.15

01.01.01.05.02 SOBRECIMIENTO REFORZADO

01.01.01.05.02.01 SOBRECIMIENTO REFORZADO: CONCRETO f'c=210 kg/cm2 m3 61.56 407.68 25,096.78

01.01.01.05.02.02 SOBRECIMEINTO REFORZADO: ENCOFRADO Y DESENCOFRADO m2 820.80 36.79 30,197.23

01.01.01.05.02.03 SOBRECIMIENTOS REFORZADOS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 2,508.06 3.52 8,828.37

01.01.01.05.03 COLUMNAS

01.01.01.05.03.01 COLUMNAS: CONCRETO f'c=210 kg/cm2 m3 140.83 421.83 59,406.32

01.01.01.05.03.02 COLUMNAS: ENCOFRADO Y DESENCOFRADO m2 1,986.84 46.43 92,248.98

01.01.01.05.03.03 COLUMNAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 15,411.75 3.78 58,256.42

01.01.01.05.04 VIGAS

01.01.01.05.04.01 VIGAS: CONCRETO f'c=210 kg/cm2 1 m3 29.37 344.19 10,108.86

01.01.01.05.04.02 VIGAS: ENCOFRADO Y DESENCOFRADO m2 520.52 52.68 27,420.99

01.01.01.05.04.03 VIGAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4,003.02 3.62 14,490.93

01.01.01.05.05 LOSA ALIGERADA

01.01.01.05.05.01 LOSAS ALIGERADAS: CONCRETO f'c=210 kg/cm2 m3 1.53 341.12 521.91

01.01.01.05.05.02 LOSAS ALIGERADAS: ENCOFRADO Y DESENCOFRADO 1 m2 19.15 32.11 614.91

Pág. 1
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

01.01.01.05.05.03 LOSAS ALIGERADAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 36.15 3.60 130.14

01.01.01.05.05.04 LOSAS ALIGERADAS: LADRILLO HUECO DE ARCILLA DE 15 x 30 x 30 cm PARA TECHO und 161.00 3.51 565.11

01.01.02 ARQUITECTURA

01.01.02.01 MUROS Y TABIQUES DE ALBAÑILERIA

01.01.02.01.01 MURO DE LADRILLO KK TIPO IV SOGA M 1:1:4 e=1.50 cm m2 1,854.51 65.36 121,210.77

01.01.02.02 REVOQUES ENLUCIDOS Y MOLDADURAS

01.01.02.02.01 TARRAJEO PRIMARIO O RAYADO, MORTERO C:A 1:5 m2 223.15 14.14 3,155.34

01.01.02.02.02 TARRAJEO EN MURO:EXTERIOR (C:A 1:5 e=1.50cm) m2 4,523.87 19.84 89,753.58

01.01.02.02.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA m2 869.43 26.96 23,439.83

01.01.02.02.04 TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO - ARENA m2 228.49 31.94 7,297.97

01.01.02.02.05 BRUÑAS SEGUN DETALLE m 854.10 6.62 5,654.14

01.01.02.03 ZOCALOS

01.01.02.03.01 ENCHAPE PIEDRA IRREGULAR GRIS m2 223.15 75.21 16,783.11

01.01.02.04 CARPINTERIA METALICA

01.01.02.04.01 PUERTA METALICA T-01 2.50 X 2.80 M. und 17.00 1,800.00 30,600.00

01.01.02.04.02 PUERTA METALICA T-02 4.00 X 2.80 M. und 4.00 3,800.00 15,200.00

01.01.02.04.03 CERCO METALICO CON TUBO GALVANIZADO m 428.70 221.05 94,764.14

01.01.02.05 PINTURA

01.01.02.05.01 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES (SUPERLATEX O SIM.) m2 4,523.87 8.09 36,598.11

01.01.02.05.02 PINTURA LATEX 2 MANOS EN COLUMNAS (VINILATEX O SIM.) m2 869.43 8.09 7,033.69

01.01.02.05.03 PINTURA LATEX 2 MANOS EN VIGAS (VINILATEX O SIM.) m2 228.49 13.43 3,068.62

01.01.02.05.04 PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS m2 595.70 13.48 8,030.04

01.02 CONSTRUCCION DE AREA DE GUARDIANIA

01.02.01 ESTRUCTURAS

01.02.01.01 TRABAJOS PRELIMINARES

01.02.01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 98.04 2.32 227.45 100.00% 227.45

01.02.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 34.13 1.30 44.37 100.00% 44.37

01.02.01.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 11.83 1.24 14.67 100.00% 14.67

01.02.01.02 MOVIMIENTO DE TIERRAS

01.02.01.02.01 EXCAVACION PARA ZAPATAS DE 1.00 m A 1.40 m DE PROFUNDIDAD m3 24.62 31.00 763.22 100.00% 763.22

01.02.01.02.02 EXCAVACION PARA CIMIENTOS HASTA 1.50 m TERRENO NORMAL m3 24.11 31.00 747.41 100.00% 747.41

01.02.01.02.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL SELECCIONADO m3 19.25 32.55 626.59 100.00% 626.59

01.02.01.02.04 NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA m2 79.79 3.37 268.89 100.00% 268.89

01.02.01.02.05 ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m m3 33.45 30.41 1,017.21 99.93% 1016.50

01.02.01.02.06 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES m3 33.45 44.02 1,472.47

01.02.01.03 OBRAS DE CONCRETO SIMPLE

01.02.01.03.01 FALSO PISO DE 4" MEZCLA 1:8 (C:H) m2 67.31 39.02 2,626.44 100.00% 2626.44

01.02.01.03.02 SUBCIMIENTOS Y SUBZAPTAS CONCRETO 1:10 C:H + 30% P. G. m3 3.89 160.70 625.12 100.00% 625.12

01.02.01.03.03 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G. m3 22.13 208.43 4,612.56 100.00% 4612.56

01.02.01.03.04 SOBRECIMIENTOS MEZCLA 1:8 C:H + 25% P.M. m3 5.55 278.25 1,544.29

01.02.01.03.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HASTA 0.30 m m2 60.00 30.81 1,848.60 88.74% 1640.49

01.02.01.04 OBRAS DE CONCRETO ARMADO

01.02.01.04.01 ZAPATAS

01.02.01.04.01.01 ZAPATAS: CONCRETO f'c=175 kg/cm2 m3 5.18 289.90 1,501.68 100.00% 1501.68

01.02.01.04.01.02 ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 117.61 3.62 425.75 100.00% 425.75

01.02.01.04.02 COLUMNAS

01.02.01.04.02.01 COLUMNAS: CONCRETO f'c=210 kg/cm2 1 m3 4.35 422.01 1,835.74

01.02.01.04.02.02 COLUMNAS: ENCOFRADO Y DESENCOFRADO m2 76.70 46.43 3,561.18 58.77% 2092.92

01.02.01.04.02.03 COLUMNAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 378.95 3.78 1,432.43 100.00% 1432.43

01.02.01.04.03 VIGAS

01.02.01.04.03.01 VIGAS: CONCRETO f'c=210 kg/cm2 1 m3 5.01 344.19 1,724.39

01.02.01.04.03.02 VIGAS: ENCOFRADO Y DESENCOFRADO m2 39.24 52.68 2,067.16

01.02.01.04.03.03 VIGAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 871.37 3.62 3,154.36

01.02.01.04.04 LOSA ALIGERADA

01.02.01.04.04.01 LOSAS ALIGERADAS: CONCRETO f'c=210 kg/cm2 m3 28.08 341.12 9,578.65

01.02.01.04.04.02 LOSAS ALIGERADAS: ENCOFRADO Y DESENCOFRADO 1 m2 66.08 32.11 2,121.83

01.02.01.04.04.03 LOSAS ALIGERADAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 850.10 3.60 3,060.36

01.02.01.04.04.04 LOSAS ALIGERADAS: LADRILLO HUECO DE ARCILLA DE 15 x 30 x 30 cm PARA TECHO und 551.00 3.51 1,934.01

Pág. 2
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

01.02.02 ARQUITECTURA

01.02.02.01 MUROS Y TABIQUES DE ALBAÑILERIA

01.02.02.01.01 MURO DE LADRILLO KK TIPO IV SOGA M 1:1:4 e=1.50 cm m2 121.98 65.36 7,972.61

01.02.02.01.02 JUNTA DE DILATACION CON ESPUMA PLASTICA MAS JEBE MICROPOROSO m 57.20 12.58 719.58

01.02.02.02 REVOQUES ENLUCIDOS Y MOLDEDURAS

01.02.02.02.01 TARRAJEO PRIMARIO O RAYADO, MORTERO C:A 1:5 m2 17.45 10.09 176.07

01.02.02.02.02 TARRAJEO EN MURO:INTERIOR (C:A 1:5 e=1.50cm) m2 188.80 24.36 4,599.17

01.02.02.02.03 TARRAJEO EN MURO:EXTERIOR (C:A 1:5 e=1.50cm) m2 37.71 24.36 918.62

01.02.02.02.04 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA m2 20.16 26.96 543.51

01.02.02.02.05 TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO - ARENA m2 22.32 31.94 712.90

01.02.02.02.06 VESTIDURA DE DERRAMES (MEZCLA C:A1:5) m 80.70 9.24 745.67

01.02.02.02.07 BRUÑAS SEGUN DETALLE m 85.00 6.62 562.70

01.02.02.03 CIELO RASOS

01.02.02.03.01 CIELORASO CON BALDOSAS DE FIBRO MINERAL m2 67.68 140.61 9,516.48

01.02.02.04 PISOS Y PAVIMENTOS

01.02.02.04.01 CONTRAPISO DE 40 mm (MEZCLA C:A BASE 1:5, ACABADO 1:2) m2 68.46 22.48 1,538.98

01.02.02.04.02 PISO DE CEMENTO COLOREADO (OCRE ROJO): ACABADO PULIDO m2 42.91 30.81 1,322.06

01.02.02.04.03 PISO CERAMICO ANTIDESLIZANTE 40x40 m2 25.55 67.81 1,732.55

01.02.02.04.04 VEREDA: ENCOFRADO Y DESENCOFRADO m2 6.26 21.04 131.71

01.02.02.04.05 VEREDAS DE CONCRETO f'c=175 kg/cm2 m2 25.14 89.58 2,252.04

01.02.02.04.06 VEREDA: JUNTA DE DILATACION E=1" m 5.10 2.80 14.28

01.02.02.05 ZOCALOS

01.02.02.05.01 ENCHAPE FACHALETA RUSTICA 10 X50 CM m2 15.92 136.76 2,177.22

01.02.02.05.02 ZOCALO DE CERAMICO 20 X 30 cm m2 17.45 50.63 883.49

01.02.02.06 CONTRAZOCALOS

01.02.02.06.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.30 m m 38.40 9.84 377.86

01.02.02.07 CARPINTERIA DE MADERA

01.02.02.07.01 PUERTAS DE MADERA CONTRAPLACADA m2 11.96 192.75 2,305.29

01.02.02.08 CARPINTERIA METALICA

01.02.02.08.01 PUERTA METALICA 06 und 2.00 680.00 1,360.00

01.02.02.09 CERRAJERIA

01.02.02.09.01 BISAGRA CAPUCHINA DE 3 1/2" x 3 1/2" pza 18.00 15.00 270.00

01.02.02.09.02 CERRADURA DE TRES GOLPES PUERTAS INTERIORES und 2.00 85.01 170.02

01.02.02.09.03 CERRADURA DE PERILLA EN PUERTA und 6.00 40.01 240.06

01.02.02.09.04 MANIJA DE 3" ALUMINIZADA PARA PUERTA pza 2.00 43.00 86.00

01.02.02.10 VIDRIOS, CRISTALES Y SIMILARES

01.02.02.10.01 VIDRIO SISTEMA MODUGLASS 6mm p2 219.31 3.12 684.25

01.02.02.11 PINTURA

01.02.02.11.01 PINTURA LATEX 2 MANOS EN MUROS INTERIORES (VINILATEX O SIM.) m2 200.90 7.90 1,587.11

01.02.02.11.02 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES (SUPERLATEX O SIM.) m2 37.71 8.09 305.07

01.02.02.11.03 PINTURA LATEX 2 MANOS EN COLUMNAS (VINILATEX O SIM.) m2 20.16 8.09 163.09

01.02.02.11.04 PINTURA LATEX 2 MANOS EN VIGAS (VINILATEX O SIM.) m2 22.32 13.43 299.76

01.02.02.11.05 PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS m2 2.07 13.48 27.90

01.02.02.11.06 PINTURA ESMALTE EN CONTRAZOCALOS m 11.52 6.95 80.06

01.02.02.11.07 PINTURA EN DERRAMES m 12.11 2.41 29.19

01.03 CONSTRUCCION DE AREA DE BOLETERIA

01.03.01 ESTRUCTURAS

01.03.01.01 TRABAJOS PRELIMINARES

01.03.01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 51.80 2.32 120.18

01.03.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 40.12 1.30 52.16

01.03.01.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 7.68 1.24 9.52

01.03.01.02 MOVIMIENTO DE TIERRAS

01.03.01.02.01 EXCAVACION PARA ZAPATAS DE 1.00 m A 1.40 m DE PROFUNDIDAD m3 27.20 37.19 1,011.57

01.03.01.02.02 EXCAVACION PARA CIMIENTOS HASTA 1.00 m TERRENO NORMAL m3 2.84 37.19 105.62

01.03.01.02.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL SELECCIONADO m3 11.20 32.55 364.56

01.03.01.02.04 NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA m2 43.68 3.37 147.20

01.03.01.02.05 ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m m3 21.49 30.41 653.51

01.03.01.02.06 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES m3 21.49 44.02 945.99

Pág. 3
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

01.03.01.03 OBRAS DE CONCRETO SIMPLE

01.03.01.03.01 FALSO PISO DE 4" MEZCLA 1:8 (C:H) m2 17.80 39.02 694.56

01.03.01.03.02 SUBCIMIENTOS Y SUBZAPTAS CONCRETO 1:10 C:H + 30% P. G. m3 6.12 160.70 983.48

01.03.01.03.03 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G. m3 5.19 208.43 1,081.75

01.03.01.03.04 SOBRECIMIENTOS MEZCLA 1:8 C:H + 25% P.M. m3 2.23 278.25 620.50

01.03.01.03.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HASTA 0.30 m m2 21.20 30.81 653.17

01.03.01.04 OBRAS DE CONCRETO ARMADO

01.03.01.04.01 ZAPATAS

01.03.01.04.01.01 ZAPATAS: CONCRETO f'c=175 kg/cm2 m3 9.60 289.90 2,783.04

01.03.01.04.01.02 ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 139.39 3.62 504.59

01.03.01.04.02 COLUMNAS

01.03.01.04.02.01 COLUMNAS: CONCRETO f'c=210 kg/cm2 1 m3 4.90 422.01 2,067.85

01.03.01.04.02.02 COLUMNAS: ENCOFRADO Y DESENCOFRADO m2 100.16 46.43 4,650.43

01.03.01.04.02.03 COLUMNAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 838.04 3.78 3,167.79

01.03.01.04.03 VIGAS

01.03.01.04.03.01 VIGAS: CONCRETO f'c=210 kg/cm2 1 m3 2.99 344.19 1,029.13

01.03.01.04.03.02 VIGAS: ENCOFRADO Y DESENCOFRADO m2 33.28 52.68 1,753.19

01.03.01.04.03.03 VIGAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 351.70 3.62 1,273.15

01.03.01.04.04 LOSAS MACIZAS

01.03.01.04.04.01 LOSAS MACIZAS: CONCRETO f'c=210 kg/cm2 m3 2.86 335.38 959.19

01.03.01.04.04.02 LOSAS MACIZAS: ENCOFRADO Y DESENCOFRADO m2 19.04 52.05 991.03

01.03.01.04.04.03 LOSAS MACIZAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 118.25 3.78 446.99

01.03.02 ARQUITECTURA

01.03.02.01 MUROS Y TABIQUES DE ALBAÑILERIA

01.03.02.01.01 MURO DE LADRILLO KK TIPO IV SOGA M 1:1:4 e=1.50 cm m2 123.94 65.36 8,100.72

01.03.02.01.02 JUNTA DE DILATACION CON ESPUMA PLASTICA MAS JEBE MICROPOROSO m 40.00 12.58 503.20

01.03.02.02 REVOQUES ENLUCIDOS Y MOLDEDURAS

01.03.02.02.01 TARRAJEO EN MURO:INTERIOR (C:A 1:5 e=1.50cm) m2 123.94 24.36 3,019.18

01.03.02.02.02 TARRAJEO EN MURO:EXTERIOR (C:A 1:5 e=1.50cm) m2 123.94 24.36 3,019.18

01.03.02.02.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA m2 60.64 26.96 1,634.85

01.03.02.02.04 TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO - ARENA m2 25.76 31.94 822.77

01.03.02.02.05 VESTIDURA DE DERRAMES (MEZCLA C:A1:5) m 88.80 9.24 820.51

01.03.02.02.06 BRUÑAS SEGUN DETALLE m 78.96 6.62 522.72

01.03.02.03 CIELO RASOS

01.03.02.03.01 CIELORASO CON MEZCLA DE CEMENTO - ARENA 1:5 m2 19.82 31.61 626.51

01.03.02.04 PISOS Y PAVIMENTOS

01.03.02.04.01 CONTRAPISO DE 40 mm (MEZCLA C:A BASE 1:5, ACABADO 1:2) m2 21.24 22.48 477.48

01.03.02.04.02 PISO DE CEMENTO COLOREADO (OCRE ROJO): ACABADO PULIDO m2 21.24 30.81 654.40

01.03.02.05 ZOCALOS

01.03.02.05.01 ENCHAPE FACHALETA RUSTICA 10 X50 CM m2 93.04 136.76 12,724.15

01.03.02.06 CONTRAZOCALOS

01.03.02.06.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.30 m m 39.60 9.84 389.66

01.03.02.06.02 CONTRAZOCALO DE CEMENTO PULIDO h=0.10 m m 49.60 7.70 381.92

01.03.02.07 CUBIERTAS Y CERRAMIENTOS

01.03.02.07.01 COBERTURA ONDULINE m2 38.16 52.64 2,008.74

01.03.02.07.02 CORREAS DE MADERA m 90.00 8.10 729.00

01.03.02.08 CARPINTERIA METALICA

01.03.02.08.01 PUERTA METALICA T-5 und 8.00 550.00 4,400.00

01.03.02.09 CERRAJERIA

01.03.02.09.01 BISAGRA CAPUCHINA DE 3½" X 3½" und 24.00 15.00 360.00

01.03.02.09.02 CERRADURA DE TRES GOLPES PUERTAS INTERIORES und 8.00 85.01 680.08

01.03.02.09.03 MANIJA DE 3" ALUMINIZADA PARA PUERTA pza 8.00 43.00 344.00

01.03.02.10 VIDRIOS, CRISTALES Y SIMILARES

01.03.02.10.01 VIDRIO SISTEMA MODUGLASS 6mm p2 77.50 3.12 241.80

01.03.02.11 PINTURA

01.03.02.11.01 PINTURA LATEX 2 MANOS EN MUROS INTERIORES (VINILATEX O SIM.) m2 137.26 7.90 1,084.35

01.03.02.11.02 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES (SUPERLATEX O SIM.) m2 30.90 8.09 249.98

01.03.02.11.03 PINTURA LATEX 2 MANOS EN COLUMNAS (VINILATEX O SIM.) m2 60.64 8.09 490.58

Pág. 4
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

01.03.02.11.04 PINTURA LATEX 2 MANOS EN VIGAS (VINILATEX O SIM.) m2 25.76 13.43 345.96

01.03.02.11.05 PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS m2 32.40 13.48 436.75

01.03.02.11.06 PINTURA ESMALTE EN CONTRAZOCALOS DE CEMENTO m2 16.20 5.74 92.99

01.03.02.11.07 PINTURA EN DERRAMES m 18.00 2.41 43.38

01.04 INSTALACIONES SANITARIAS

01.04.01 SISTEMA DE AGUA FRIA

01.04.01.01 SALIDA DE AGUA FRIA

01.04.01.01.01 SALIDA DE A.F. PVC C/R - 1/2" C-10 pto 4.00 16.14 64.56

01.04.01.01.02 SALIDA DE A.F. PVC C/R - 1.1/4" C-10 pto 8.00 29.84 238.72

01.04.01.02 REDES DE DISTRIBUCION

01.04.01.02.01 SUM. E INST. TUB. PVC C-10 - D=1.1/4" m 16.94 12.80 216.83

01.04.01.03 VALVULAS

01.04.01.03.01 SUM. E INST. VALV. ESFERICA DE BRONCE C150 - D=1.1/4" (INC. UU, NIPLES DE F°G° Y CAJUELA DE CONCRETO) m 4.00 92.66 370.64

01.04.02 SISTEMA DE DESAGUE Y VENTILACION

01.04.02.01 SALIDA DE AGUA FRIA

01.04.02.01.01 SALIDA DE DESAGUE PVC SAL 2" pto 4.00 78.96 315.84

01.04.02.01.02 SALIDA DE DESAGUE PVC SAL 4" pto 8.00 92.75 742.00

01.04.02.01.03 SALIDA DE VENTILACION DE 2" pto 8.00 81.99 655.92

01.04.02.02 ADITAMENTOS VARIOS

01.04.02.02.01 SUMIDERO DE BRONCE ROSCADO 3" und 4.00 90.83 363.32

01.04.02.02.02 REGISTRO ROSCADO DE BRONCE 4" pza 4.00 52.74 210.96

01.04.02.02.03 SOMBRERO DE VENTILACION 2" und 8.00 11.94 95.52

01.04.02.03 CAJA DE REGISTRO

01.04.02.03.01 CAJA DE REGISTRO 18"x24" und 1.00 192.96 192.96 100.00% 192.96

01.04.02.03.02 CAJA DE REGISTRO 10"x20" und 2.00 184.96 369.92 100.00% 369.92

01.04.02.04 CONEXION DOMICILIARIA

01.04.02.04.01 CONEXION DOMICILIARIA PVC SAL 6" und 1.00 52.82 52.82 100.00% 52.82

01.04.02.05 APARATOS SANITARIOS

01.04.02.05.01 INODORO CON VALVULA SEMIAUTOMATICA INC/ACCESORIO und 2.00 115.00 230.00

01.04.02.05.02 LAVATORIO INC/ACCESORIO und 2.00 55.00 110.00

01.04.02.05.03 DUCHA INC/ACCESORIO und 2.00 55.00 110.00

01.04.02.05.04 LAVADERO DE ACERO INOXIDABLE UNA POZA und 2.00 250.00 500.00

01.04.02.05.05 JABONERA DE LOSA DE 15x15 cm pza 2.00 25.00 50.00

01.04.02.05.06 PAPELERA DE BARRA pza 2.00 30.00 60.00

01.04.02.05.07 ESPEJO m2 2.00 32.00 64.00

01.04.02.05.08 COLOCACION DE APARATOS SANITARIOS und 6.00 70.42 422.52

01.04.02.05.09 COLOCACION DE ACCESORIOS SANITARIOS und 6.00 42.25 253.50

01.05 JARDINES Y EXTERIORES

01.05.01 TRABAJOS PRELIMINARES

01.05.01.01 LIMPIEZA DEL TERRENO MANUAL m2 14,082.67 2.32 32,671.79

01.05.02 MOVIMIENTO DE TIERRAS

01.05.02.01 CORTE DE MATERIAL SUELTO CON EQUIPO m3 7,041.34 5.59 39,361.09

01.05.02.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 8,801.68 8.15 71,733.69

01.05.03 MEJORAMIENTO DE SUBRASANTE

01.05.03.01 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 14,082.67 1.70 23,940.54

01.05.03.02 EXTRACCION Y APILAMIENTO DE MATERIAL SELECCIONADO m3 2,436.30 9.86 24,021.92

01.05.03.03 CARGUIO Y TRANSPORTE DE MATERIAL SELECCIONADO m3 2,436.30 11.79 28,723.98

01.05.03.04 MEJORAMIENTO DE LA SUB-RASANTE m3 2,436.30 2.76 6,724.19

01.05.04 SUB BASE

01.05.04.01 EXTRACCION Y APILAMIENTO DE MATERIAL DE SUB BASE EN CANTERA m3 2,816.53 3.79 10,674.65

01.05.04.02 CARGUIO Y TRANSPORTE DE MATERIAL SELECCIONADO m3 2,816.53 11.79 33,206.89

01.05.04.03 CONFORMACION DE SUB BASE m2 27,224.12 5.13 139,659.74

01.05.05 SARDINELES

01.05.05.01 SARDINELES: ENCOFRADO Y DESENCOFRADO m2 662.10 53.74 35,581.25

01.05.05.02 SARDINELES: CONCRETO f'c=175 kg/cm2 m3 47.79 307.67 14,703.55

01.05.05.03 TARRAJEO EN SARDINEL DE CONCRETO m2 465.38 26.75 12,448.92

01.05.06 RAMPAS PARA DISCAPACITADOS

01.05.06.01 RAMPAS: ENCOFRADO Y DESENCOFRADO m2 56.64 49.11 2,781.59

Pág. 5
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

01.05.06.02 RAMPAS DE CONCRETO: f´c=175 kg/cm2 ACAB. 1:2 FROTACH. Y PULIDO m2 4.25 43.03 182.88

01.05.07 PISOS Y VEREDAS

01.05.07.01 FALSO PISO DE 4" MEZCLA 1:8 (C:H) m2 10,287.44 42.01 432,175.35

01.05.07.02 PISOS: ENCOFRADO Y DESENCOFRADO m2 605.73 35.07 21,242.95

01.05.07.03 PISO DE CEMENTO COLOREADO ESTAMPADO m2 9,478.44 36.01 341,318.62

01.05.07.04 PISO DE CEMENTO COLOREADO ACABADO BRUÑADO m2 809.00 33.69 27,255.21

01.05.07.05 PISOS: JUNTA DE DILATACION E=1" m 1,140.00 3.10 3,534.00

01.05.07.06 VEREDA: ENCOFRADO Y DESENCOFRADO m2 495.35 21.04 10,422.16

01.05.07.07 VEREDAS DE CONCRETO f'c=175 kg/cm2 m2 1,966.64 89.58 176,171.61

01.05.07.08 VEREDA: JUNTA DE DILATACION E=1" m 250.00 2.80 700.00

01.06 TANQUE CISTERNA

01.06.01 TRABAJOS PRELIMINARES

01.06.01.01 LIMPIEZA DEL TERRENO MANUAL m2 170.10 2.32 394.63

01.06.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 121.00 1.30 157.30

01.06.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 121.00 1.24 150.04

01.06.02 MOVIMIENTO DE TIERRAS

01.06.02.01 EXCAVACION PARA ZAPATAS DE 2.00 M. A 2.50 M. DE PROFUNDIDAD m3 98.29 36.48 3,585.62

01.06.02.02 NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA m2 121.00 5.03 608.63

01.06.02.03 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES m3 113.03 8.03 907.63

01.06.03 OBRAS DE CONCRETO SIMPLE

01.06.03.01 SOLADO e=3" m2 121.00 21.61 2,614.81

01.06.04 OBRAS DE CONCRETO ARMADO

01.06.04.01 TANQUE CISTERNA CONCRETO F'C=210 KG/CM2 m3 138.40 400.37 55,411.21

01.06.04.02 TANQUE CISTERNA: ENCOFRADO Y DESENCOFRADO m2 489.30 30.18 14,767.07

01.06.04.03 TANQUE CISTERNA: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 7,987.14 3.52 28,114.73

01.06.05 TARRAJEO INTERIOR DE TANQUE CISTERNA

01.06.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 2,816.53 21.53 60,639.89

01.07 AREAS VERDES Y EQUIPAMIENTO DE ESPACIOS EXTERIORES

01.07.01 AREAS VERDES

01.07.01.01 PREPARACION Y EXTENDIDO DE TIERRA NEGRA m3 14.58 14.57 212.43

01.07.01.02 SEMBRADO DE GRASS m2 48.60 29.44 1,430.78

01.07.01.03 SEMBRADO DE ARBUSTOS und 18.00 27.13 488.34

01.07.02 EQUIPAMIENTO DE ESPACIOS EXTERIORES

01.07.02.01 EXCAVACION MANUAL DE ZANJAS m3 2.25 36.48 82.08

01.07.02.02 CONCRETO f'c=175 kg/cm2 m3 0.56 238.86 133.76

01.07.02.03 COLECTOR DE DESHECHOS und 18.00 128.17 2,307.06

01.08 ESTACIONAMIENTO VEHICULAR

01.08.01 OBRAS PRELIMINARES

01.08.01.01 DEMOLICION DE VEREDAS DE CONCRETO e=10cm m2 1,142.74 4.37 4,993.77

01.08.02 TRABAJOS PRELIMINARES

01.08.02.01 LIMPIEZA DEL TERRENO MANUAL m2 4,028.50 2.32 9,346.12

01.08.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 4,028.50 1.30 5,237.05

01.08.03 MEJORAMIENTO DE SUBRASANTE

01.08.03.01 CAPA ANTICONTAMINANTE e=0.05 m. m3 201.43 102.86 20,719.09

01.08.04 SUB BASE

01.08.04.01 EXTRACCION Y APILAMIENTO DE MATERIAL SELECCIONADO m3 1,268.98 9.86 12,512.14

01.08.04.02 CARGUIO Y TRANSPORTE DE MATERIAL SELECCIONADO m3 1,268.98 11.79 14,961.27

01.08.05 CONFORMACION DE SUB BASE

01.08.05.01 CONFORMACION DE SUB BASE E=0.20 M m2 4,028.50 4.85 19,538.23

01.08.05.02 RIEGO - AGUA m3 805.70 2.03 1,635.57

01.08.06 PAVIMENTO RIGIDO

01.08.06.01 PAVIMENTO RIGIDO: CONCRETO f'c=210 kg/cm2 m3 845.99 314.15 265,767.76

01.08.06.02 PAVIMENTO RIGIDO: ENCOFRADO Y DESENCOFRADO m2 421.34 49.11 20,692.01

01.08.06.03 PAVIMENTO RIGIDO: CURADO DE CONCRETO m2 4,028.50 0.93 3,746.51

01.08.06.04 PAVIMENTO RIGIDO: JUNTA ASFALTICA E=1" m 1,300.00 1.49 1,937.00

01.08.07 ARQUITECTURA

01.08.07.01 SARDINELES

01.08.07.01.01 SARDINELES: ENCOFRADO Y DESENCOFRADO m2 1,242.91 52.23 64,917.19

Pág. 6
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

01.08.07.01.02 SARDINELES:CONCRETO f'c=175 kg/cm2 m3 99.59 309.01 30,774.31

01.08.07.01.03 TARRAJEO EN SARDINEL DE CONCRETO m2 419.40 26.75 11,218.95

01.08.07.02 BANCAS DE CONCRETO

01.08.07.02.01 BANCAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 2,511.99 3.60 9,043.16

01.08.07.02.02 BANCAS: ENCOFRADO Y DESENCOFRADO 1 m2 393.30 24.98 9,824.63

01.08.07.02.03 BANCAS: CONCRETO f'c=210 kg/cm2 m3 30.33 306.77 9,304.33

01.08.07.02.04 ENCHAPE PIEDRA IRREGULAR GRIS m2 264.60 75.21 19,900.57

01.08.07.03 RAMPAS PARA DISCAPACITADOS

01.08.07.03.01 RAMPAS: ENCOFRADO Y DESENCOFRADO m2 45.60 49.11 2,239.42

01.08.07.03.02 RAMPAS DE CONCRETO: f´c=175 kg/cm2 ACAB. 1:2 FROTACH. Y PULIDO m2 3.42 43.03 147.16

01.08.07.04 PISOS Y VEREDAS

01.08.07.04.01 PISOS: ENCOFRADO Y DESENCOFRADO m2 92.67 35.07 3,249.94

01.08.07.04.02 FALSO PISO DE 4" MEZCLA 1:8 (C:H) m2 2,831.74 42.01 118,961.40

01.08.07.04.03 PISO DE CEMENTO COLOREADO ACABADO BRUÑADO m2 2,831.74 33.69 95,401.32

01.08.07.04.04 PISOS: JUNTA DE DILATACION E=1" m 617.00 3.10 1,912.70

01.09 CONSTRUCCION DEL CAMPO DEPORTIVO DE GRASS SINTENTICO

01.09.01 TRABAJOS PRELIMINARES

01.09.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 1,140.72 1.61 1,836.56

01.09.01.02 LIMPIEZA DEL TERRENO MANUAL m2 1,140.72 2.32 2,646.47

01.09.02 MOVIMIENTO DE TIERRAS

01.09.02.01 CORTE DE MATERIAL SUELTO CON EQUIPO m3 251.04 5.59 1,403.31

01.09.02.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 288.69 8.15 2,352.82

01.09.02.03 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 953.52 1.70 1,620.98

01.09.02.04 CONFORMACION DE SUB-BASE GRANULAR e=0.30 m m2 953.52 14.18 13,520.91

01.09.03 EXTRACCION DE MATERIALES EN CANTERA

01.09.03.01 EXTRACCION Y APILAMIENTO DE PIEDRA CANTO RODADO EN CANTERA m3 302.56 5.21 1,576.34

01.09.03.02 EXTRACCION Y APILAMIENTO DE ARENA FINA EN CANTERA m3 121.02 6.86 830.20

01.09.03.03 ZARANDEO DE ARENA FINA EN CANTERA m3 121.02 6.26 757.59

01.09.03.04 CARGUIO DE MATERIALES EN CANTERA m3 423.59 4.26 1,804.49

01.09.03.05 TRANSPORTE DE MATERIALES A OBRA m3 423.59 6.74 2,855.00

01.09.04 CONFORMACION DE ESTRUCTURA DE CAMPO DEPORTIVO

01.09.04.01 COLOCADO Y COMPACTADO DE PIEDRA CANTO RODADO m3 302.56 2.64 798.76

01.09.04.02 COLOCADO Y COMPACTADO DE PIEDRA CHANCADA DE 1" m3 157.86 65.64 10,361.93

01.09.04.03 COLOCADO Y COMPACTADO DE PIEDRA CHANCADA DE 3/4" m3 105.24 66.49 6,997.41

01.09.04.04 COLOCADO Y COMPACTADO DE PIEDRA CHANCADA DE 3/8" m3 105.24 42.32 4,453.76

01.09.04.05 COLOCADO Y COMPACTADO DE ARENA FINA m3 121.02 2.80 338.86

01.09.05 GEOTEXTIL

01.09.05.01 SUMINISTRO E INSTALACION DE GEOTEXTIL TEJIDO m2 953.52 8.62 8,219.34

01.09.06 CONCRETO SIMPLE

01.09.06.01 SARDINELES Y VEREDAS

01.09.06.01.01 ENCOFRADO Y DESENCOFRADO m2 78.12 44.82 3,501.34

01.09.06.01.02 CONCRETO f'c=175 kg/cm2 m3 16.47 238.86 3,934.02

01.09.07 CONFORMACION DE ESTRUCTURA DE GRASS

01.09.07.01 CESPED DE GRASS ARTIFICIAL PARA CAMPO DEPORTIVO m2 1,052.39 178.50 187,851.62

01.09.08 SISTEMA DE DRENAJE CAMPO DEPORTIVO

01.09.08.01 TRABAJOS PRELIMINARES

01.09.08.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 1,352.99 1.61 2,178.31 100.00% 2178.31

01.09.08.02 INSTALACION SUB DRENES CON TUBERIA

01.09.08.02.01 RETIRO DE MATERIAL SELECCIONADO DE SUB DRENES m 156.80 3.28 514.30 100.00% 514.30

01.09.08.02.02 SUMINISTRO Y COLOCACION DE TUBERIA CRIBADA PARA DRENAJE m 280.00 20.50 5,740.00 100.00% 5740.00

01.09.08.02.03 RELLENO CON MATERIAL CLASIFICADO POR CAPAS m3 156.80 55.01 8,625.57 76.45% 6594.16

01.09.08.02.04 ACCESORIOS DE INSTALACION TUBERIAS DE DRENAJE glb 1.00 2,500.00 2,500.00

01.09.08.03 INSTALACION DREN COLECTOR

01.09.08.03.01 RETIRO DE MATERIAL SELECCIONADO DE SUB DRENES m 61.60 3.28 202.05

01.09.08.03.02 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP D=6" m 88.00 13.31 1,171.28

01.09.08.03.03 RELLENO CON MATERIAL CLASIFICADO POR CAPAS m3 61.60 51.26 3,157.62

01.09.08.04 CONCRETO ARMADO

01.09.08.04.01 ENCOFRADO Y DESENCOFRADO m2 9.20 44.82 412.34

Pág. 7
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

01.09.08.04.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 147.90 3.78 559.06

01.09.08.04.03 CONCRETO f'c=210 kg/cm2 m3 1.19 303.32 360.95

01.09.08.05 PRUEBAS DE CALIDAD

01.09.08.05.01 PRUEBA HIDRAULICA EN TUBERIAS DE RIEGO glb 1.00 4,500.00 4,500.00

01.10 CONSTRUCCION DEL CAMPO DEPORTIVO CON GOMA PREFABRICADA

01.10.01 MOVIMIENTO DE TIERRAS

01.10.01.01 LIMPIEZA DEL TERRENO MANUAL m2 1,257.12 2.32 2,916.52

01.10.01.02 CORTE DE MATERIAL SUELTO CON EQUIPO m3 447.49 5.59 2,501.47

01.10.01.03 EXCAVACION DE ZANJAS m3 3.79 37.19 140.95

01.10.01.04 RELLENO CON MATERIAL PROPIO m3 306.00 147.67 45,187.02

01.10.01.05 NIVELACION Y COMPACTADO DE TERRENO m2 1,020.00 13.90 14,178.00

01.10.01.06 EMPEDRADO DE PLATAFORMA m3 204.00 49.23 10,042.92

01.10.01.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 518.97 8.15 4,229.61

01.10.02 CONCRETO SIMPLE

01.10.02.01 CONCRETO f'c=210 kg/cm2 m3 175.99 303.32 53,381.29

01.10.02.02 JUNTA DE CONTRACCION m 495.60 3.10 1,536.36

01.10.03 IMPRIMADO

01.10.03.01 IMPRIMACION RC 250 m2 1,057.92 3.37 3,565.19

01.10.04 CARPETA ASFALTICA EN CALIENTE

01.10.04.01 SUMINISTRO Y COLOCACION DE CARPETA ASFALT. EN CALIENTE E=3" (DOS CAPAS DE 1.5") m2 1,057.92 67.52 71,430.76

01.10.05 GOMA PREFABRICADA

01.10.05.01 SUMINISTRO Y COLOCACION DE GOMA PREFABRICADA m2 1,057.92 115.50 122,189.76

01.11 CONSTRUCCION DEL CAMPO DEPORTIVO CON CONCRETO

01.11.01 TRABAJOS PRELIMINARES

01.11.01.01 LIMPIEZA DEL TERRENO MANUAL m2 570.36 2.32 1,323.24

01.11.02 MOVIMIENTO DE TIERRAS

01.11.02.01 CORTE DE MATERIAL SUELTO CON EQUIPO m3 190.70 5.59 1,066.01

01.11.02.02 EXCAVACION DE ZANJAS m3 1.78 37.19 66.20

01.11.02.03 RELLENO CON MATERIAL PROPIO m3 137.70 147.67 20,334.16

01.11.02.04 NIVELACION Y COMPACTADO DE TERRENO m2 459.00 13.90 6,380.10

01.11.02.05 EMPEDRADO DE PLATAFORMA m3 91.80 49.23 4,519.31

01.11.02.06 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 221.35 8.15 1,804.00

01.11.03 CONCRETO SIMPLE

01.11.03.01 CONCRETO f'c=210 kg/cm2 m3 79.62 303.32 24,150.34

01.11.03.02 JUNTA DE CONTRACCION m 221.40 3.10 686.34

01.12 CONSTRUCCION DE GRADERIOS DE PLATAFORMAS EXTERIORES

01.12.01 TRABAJOS PRELIMINARES

01.12.01.01 LIMPIEZA DEL TERRENO MANUAL m2 308.00 2.32 714.56

01.12.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 198.83 1.61 320.12

01.12.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 198.83 1.52 302.22

01.12.02 MOVIMIENTO DE TIERRAS

01.12.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.00 m TERRENO NORMAL m3 88.67 31.00 2,748.77

01.12.02.02 RELLENO COMPACTADO CON EQUIPO Y MATERIAL SELECCIONADO m3 103.15 34.72 3,581.37

01.12.02.03 NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA m2 50.43 5.03 253.66

01.12.02.04 ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m m3 101.97 30.41 3,100.91

01.12.03 ESTRUCTURAS

01.12.03.01 OBRAS DE CONCRETO SIMPLE

01.12.03.01.01 SOLADO e=3" m2 27.00 21.61 583.47

01.12.03.01.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G. m3 42.49 241.75 10,271.96

01.12.03.02 SARDINELES

01.12.03.02.01 SARDINELES:CONCRETO f'c=175 kg/cm2 m3 26.61 292.96 7,795.67

01.12.03.02.02 SARDINELES: ENCOFRADO Y DESENCOFRADO m2 266.12 52.23 13,899.45

01.12.03.03 OBRAS DE CONCRETO ARMADO

01.12.03.04 ZAPATAS

01.12.03.04.01 ZAPATAS: CONCRETO f'c=175 kg/cm2 m3 16.20 373.45 6,049.89

01.12.03.04.02 ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 650.70 3.78 2,459.65

01.12.03.05 GRADERIOS PLATAFORMA

01.12.03.05.01 GRADERIOS: CONCRETO f'c=175 kg/cm2 m3 51.01 373.45 19,049.68

Pág. 8
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

01.12.03.05.02 GRADERIOS: ENCOFRADO Y DESENCOFRADO m2 91.86 47.77 4,388.15

01.12.03.05.03 GRADERIOS: ACERO CORRUGADO FY=4200 kg/cm2 GRADO60 kg 2,789.89 3.78 10,545.78

01.12.03.06 ESTRUCTURA METALICA

01.12.03.06.01 ESTRUCTURA METALICA PARA COBERTURA DE GRADERIOS und 28.00 320.00 8,960.00

01.12.03.06.02 CORREA METALICA SECCION TUBO TR m 355.00 37.23 13,216.65

01.12.04 ARQUITECTURA

01.12.04.01 REVOQUES ENLUCIDOS Y MOLDEDURAS

01.12.04.01.01 TARRAJEO EN MURO:INTERIOR (C:A 1:5 e=1.50cm) m2 258.27 23.39 6,040.94

01.12.04.02 CUBIERTAS Y CERRAMIENTOS

01.12.04.02.01 COBERTURA TIPO ONDULINE m2 241.56 52.64 12,715.72

01.12.04.03 CARPINTERIA METALICA

01.12.04.03.01 BARANDA METALICA GRADERIOS m 9.80 57.75 565.95

01.12.04.03.02 TUBO METALICO DE 4" EN MALLA OLIMPICA 2 und 55.00 358.72 19,729.60

01.12.04.03.03 MALLA METALICA EN INTERIOR m2 264.60 81.52 21,570.19

01.12.04.04 PINTURA

01.12.04.04.01 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES (SUPERLATEX O SIM.) m2 406.94 5.09 2,071.32

01.12.04.04.02 PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS m2 357.60 13.48 4,820.45

01.12.05 INSTALACIONES SANITARIAS EXTERIORES

01.12.05.01 SISTEMA DE DESAGUE

01.12.05.01.01 MOVIMIENTO DE TIERRAS REDES EXTERIORES

01.12.05.01.01.01 EXCAVACIONES DE ZANJAS P/TUBERIAS

01.12.05.01.01.01.0 EXCAVACION MANUAL T.S.R. - H MENOR 1.00 M - P/TUB. 1" - 1 1/2" m 222.64 6.97 1,551.80 100.00% 1551.80

01.12.05.01.01.01.0 EXCAVACION MANUAL T.S.R. - H MENOR 1.00 M - P/TUB. 2" - 3" m 263.02 6.97 1,833.25 42.83% 785.13

01.12.05.01.01.01.0 EXCAVACION MANUAL T.S.R. - H MENOR 1.50 M - P/TUB. 4" - 6" m 894.09 7.97 7,125.90

01.12.05.01.01.01.0 EXCAVACION MANUAL T.S.R. - H MENOR 1.50 M - P/TUB. 8" m 45.86 7.97 365.50

01.12.05.01.01.02 REFINE Y NIVELACION DE ZANJAS

01.12.05.01.01.02.0 REFINE Y NIVELACION DE ZANJAS T.S.R. P/TUB 1" - 1 1/2" m 222.64 2.28 507.62

01.12.05.01.01.02.0 REFINE Y NIVELACION DE ZANJAS T.S.R. P/TUB 2" - 3" m 263.02 2.28 599.69

01.12.05.01.01.02.0 REFINE Y NIVELACION DE ZANJAS T.S.R. P/TUB 4" - 6" m 894.09 2.76 2,467.69

01.12.05.01.01.02.0 REFINE Y NIVELACION DE ZANJAS T.S.R. P/TUB 8" m 45.86 2.76 126.57

01.12.05.01.01.03 SUMINISTRO Y COLOCACION DE CAMA DE APOYO

01.12.05.01.01.03.0 SUM. Y COLOC. CAMA DE ARENA PARA APOYO TUBERIA E=0.10 - P/TUB. 1" - 1 1/2" m 222.64 1.97 438.60

01.12.05.01.01.03.0 SUM. Y COLOC. CAMA DE ARENA PARA APOYO E=0.10 - CM - P/TUB. 2" - 3" m 263.02 1.97 518.15

01.12.05.01.01.03.0 SUM. Y COLOC. CAMA DE ARENA PARA APOYO E=0.10 - CM - P/TUB. 4" - 6" m 894.09 2.02 1,806.06

01.12.05.01.01.03.0 SUM. Y COLOC. CAMA DE ARENA PARA APOYO E=0.10 - CM - P/TUB. 8" m 45.86 2.02 92.64

01.12.05.01.01.04 RELLENO Y COMPACTO DE ZANJA

01.12.05.01.01.04.0 RELLENO Y COMP DE ZANJA T.S.R. - H MENOR 1.00 M - P/TUB. 1" - 1 1/2" m 239.58 27.83 6,667.51

01.12.05.01.01.04.0 RELLENO Y COMP DE ZANJA T.S.R. - H MENOR 1.00 M - P/TUB. 2" - 3" m 263.02 27.83 7,319.85

01.12.05.01.01.04.0 RELLENO Y COMP DE ZANJA T.S.R. - H MENOR 1.00 M - P/TUB. 4" - 6" m 894.09 28.25 25,258.04

01.12.05.01.01.04.0 RELLENO Y COMP DE ZANJA T.S.R. - H MENOR 1.00 M - P/TUB. 8" m 45.86 28.25 1,295.55

01.12.05.01.02 REDES EXTERIORES DE DESAGUE

01.12.05.01.02.01 TUBERIAS

01.12.05.01.02.01.0 SUM. E INST. TUB. PVC-CP-D=4" (INC. EXCAV. - RELLENO Y COMPACT.) m 126.01 24.10 3,036.84

01.12.05.01.02.01.0 SUM. E INST. TUB. PVC-CP-D=6" (INC. EXCAV. - RELLENO Y COMPACT.) m 4.39 49.10 215.55

01.12.05.01.02.01.0 SUM. E INST. TUB. PVC-UU-S.20 , D=110 MM (INC. EXCAV. - RELLENO Y COMPACT.) m 56.19 78.31 4,400.24

01.12.05.01.02.01.0 SUM. E INST. TUB. PVC-UU-S.20 , D=160 MM (INC. EXCAV. - RELLENO Y COMPACT.) m 337.18 99.11 33,417.91

01.12.05.01.02.01.0 SUM. Y COLOCACION TUB PVC - UF - P/DES. D=200 MM - INC. DESP Y ACCES m 45.86 172.83 7,925.98

01.12.05.01.02.02 CAMARAS DE INSPECCION

01.12.05.01.02.02.0 CAJAS DE REGISTRO DE DESAGUE 12" x 24" und 40.00 168.84 6,753.60

01.12.05.01.02.02.0 CAJAS DE REGISTRO 18" x 24" und 12.00 192.96 2,315.52

01.12.05.01.02.02.0 CAJAS DE REGISTRO DE DESAGUE 24" x 24" und 2.00 256.40 512.80

01.12.05.02 SISTEMA DE AGUA POTABLE

01.12.05.02.01 REDES EXTERIORES DE AGUA

01.12.05.02.01.01 TUBERIAS

01.12.05.02.01.01.0 SUM. E INST. TUB. PVC C-10 - D=1.1/4" m 5.33 19.98 106.49

01.12.05.02.01.01.0 SUM. E INST. TUB. PVC C-10 - D=1.1/2" (INC. EXCAV. RELLENO Y COMPACT.) m 61.49 31.02 1,907.42

01.12.05.02.01.01.0 SUM. E INST. TUB. PVC C-10 - D=2" (INC. EXCAV. RELLENO Y COMPACT.) m 50.26 23.16 1,164.02

01.12.05.02.01.01.0 SUM. E INST. TUB. PVC C-10 - D=2.1/2" (INC. EXCAV. RELLENO Y COMPACT.) m 41.10 25.05 1,029.56

Pág. 9
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

01.12.05.02.01.01.0 SUM. E INST. TUB. PVC C-10 - D=4" (INC. EXCAV. RELLENO Y COMPACT.) m 614.12 37.88 23,262.87

01.12.05.02.01.01.0 SUM. E INST. TUB. PVC C-10 - D=6" (INC. ACCES. Y SOPORT.) m 13.14 77.76 1,021.77

01.12.05.02.01.02 VALVULAS

01.12.05.02.01.02.0 SUM. E INST. VALV. ESFERICA DE BRONCE C150 - D=1.1/4" (INC. UU, NIPLES DE F°G° Y CAJUELA DE CONCRETO) m 1.00 93.41 93.41

01.12.05.02.01.02.0 SUM. E INST. VALV. ESFERICA DE BRONCE C150 - D=1.1/2" (INC. UU, NIPLES DE F°G° Y CAJUELA DE CONCRETO) m 5.00 103.41 517.05

01.12.05.02.01.02.0 SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=2" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA) und 11.00 123.41 1,357.51

01.12.05.02.01.02.0 SUM. E INST. VALV. ESFERICA DE BRONCE C150 - D=2 1/2" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA) m 5.00 155.41 777.05

01.12.05.02.01.03 CAMARAS DE INSPECCION

01.12.05.02.01.03.0 CAJA DE REGISTRO DE CONCRETO DE 10"x20" INC. TAPA DE CONCRETO Y JALADOR und 153.00 80.25 12,278.25

01.12.05.02.02 EQUIPAMIENTO E INSTALACION

01.12.05.02.02.01 ELECTROBOMBA EJE VERTICAL DE VELOCIDAD VARIABLE Y PRESION CONSTANTE PARA AGUA POTABLE Q=8.75 LPS - 65 M - und 3.00 2,500.00 7,500.00

01.12.05.02.02.02 ELECTROBOMBA SUMIDERO Q=3 LPS - 10 M, - INC. TABLERO DE CONTROL und 1.00 1,400.00 1,400.00

01.12.05.02.02.03 MOTOBOMBA DIESEL Q=350 GPM - 175 PSI INC. ELECTROBOMBA JOCKEY 15 GPM PSI INC. TABLERO DE CONTROL und 1.00 2,550.00 2,550.00

01.12.05.02.02.04 SUM. E INST. VALVULAS - NIPLERIA Y ACCES. EN CISTERNA Y CTO BOMBAS glb 1.00 2,500.00 2,500.00

01.12.06 INSTALACIONES ELECTRICAS

01.12.06.01 TRABAJOS PRELIMINARES

01.12.06.01.01 REPLANTEO DE INSTALACIONES ELECTRICAS glb 1.00 2,000.00 2,000.00

01.12.06.02 SALIDAS PARA INST. ELECTRICA

01.12.06.02.01 SALIDA DE TECHO C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2, CAJAS PESADAS pto 14.00 97.17 1,360.38

01.12.06.02.02 SALIDA DE PARED C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2, CAJAS PESADAS pto 4.00 89.42 357.68

01.12.06.02.03 SALIDA PARA LUZ DE CONMUTACION SIMPLE C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2 CAJAS PESADAS pto 4.00 106.22 424.88

01.12.06.02.04 SALIDA P/INTERRUPTOR SIMPLE, TUB. PVC-P (1/2) CABLE THW 2.5mm2, CAJAS PESADAS pto 14.00 81.72 1,144.08

01.12.06.02.05 SALIDA P/TOMACORRIENTE BIPOLAR DOBLE TUB. PVC-P (1/2) CABLE LSOH 4mm2 CAJAS PESADAS pto 18.00 92.69 1,668.42

01.12.06.03 TUBERIAS/ALIMENTADORES

01.12.06.03.01 EXCAVACION MANUAL DE ZANJAS m 120.00 37.19 4,462.80

01.12.06.03.02 TUBERIA PVC SAP (ELECTRICAS) D=20mm m 105.00 5.52 579.60

01.12.06.03.03 TUBERIA PVC SAP (ELECTRICAS) D=25mm m 459.00 8.12 3,727.08

01.12.06.03.04 TUBERIA PVC SAP (ELECTRICAS) D=35mm m 691.00 11.60 8,015.60

01.12.06.03.05 TUBERIA PVC-P (ELECTRICAS) D=50mm m 208.00 23.07 4,798.56

01.12.06.03.06 TUBERIA PVC-P (ELECTRICAS) D=65mm m 315.00 17.49 5,509.35

01.12.06.04 CAJAS DE PASO

01.12.06.04.01 CAJA DE PASO FºGº DE 100x100x50mm, PESADO pza 2.00 38.92 77.84

01.12.06.04.02 CAJA DE PASO FºGº DE 200x200x100mm, PESADO pza 12.00 55.69 668.28

01.12.06.05 CABLES Y CONDUCTORES

01.12.06.05.01 CABLE ELECTRICO LSOH 6 mm2 m 1,478.00 5.34 7,892.52

01.12.06.05.02 CABLE ELECTRICO LSOH 10 mm2 m 2,442.00 9.08 22,173.36

01.12.06.05.03 CABLE ELECTRICO LSOH 16 mm2 m 790.00 11.59 9,156.10

01.12.06.05.04 CABLE ELECTRICO LSOH 25mm2 m 435.00 15.96 6,942.60

01.12.06.05.05 CABLE ELECTRICO LSOH 35mm2 m 215.00 21.24 4,566.60

01.12.06.05.06 CABLE ELECTRICO LSOH 50mm2 m 645.00 28.25 18,221.25

01.12.06.05.07 CABLE ELECTRICO LSOH 120mm2 m 325.00 61.88 20,111.00

01.12.06.05.08 CABLE ELECTRICO LSOH 150mm2 m 975.00 74.46 72,598.50

01.12.06.05.09 CABLE ELECTRICO NLT 3X12 AWG m 295.00 20.98 6,189.10

01.12.06.06 ARTEFACTOS/LUMINARIAS

01.12.06.06.01 REJILLA DE ALUMINIO P/EMPOTRAR CON LAMPARA LED 3X22W, ALTA EFICIENCIA und 2.00 400.71 801.42

01.12.06.06.02 LUMINARIA CIRCULAR P/EMPOTRAR C/LAMPARA LED DE 20W P/TECHO und 6.00 295.77 1,774.62

01.12.06.06.03 ARTEFACTO FLURESCENTE CON LAMPARA COMPACTO DE 1x18W P/TECHO pza 6.00 55.77 334.62

01.12.06.06.04 LUMINARIA TIPO BRAQUET C/2 LAMP. COMP. DE 18W E27 und 4.00 69.20 276.80

01.12.06.06.05 REFLECTOR DE 1000W, 130000 LUMENES und 56.00 2,320.77 129,963.12

01.12.06.06.06 REFLECTOR DE 400W, 4800 LUMENES und 16.00 1,676.41 26,822.56

01.12.06.06.07 REFLECTOR CON LAMPARA LED DE 500W und 20.00 3,826.47 76,529.40

01.12.06.06.08 LUMINARIA DE ALUMBRADO PUBLICO CON LAMPARA LED DE 80W und 40.00 2,292.31 91,692.40

01.12.06.07 TABLEROS ELECTRICOS

01.12.06.07.01 TABLERO DE DISTRIBUCION TRIFASICA DE 1ITM + 24POLOS + 12ID und 2.00 840.22 1,680.44

01.12.06.07.02 TABLERO DISTRIBUCION, MONOFASICO, 24 POLOS und 2.00 178.84 357.68

01.12.06.07.03 TABLERO DE CONTROL DE ENCENDIDO Y APAGADO TC-EA und 5.00 965.38 4,826.90

01.12.06.07.04 TABLERO DE CONTROL PARA ESPECTACULOS 32A und 4.00 857.69 3,430.76

01.12.06.08 INTERRUPTORES TERMOMAGNETICOS

Pág. 10
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

01.12.06.08.01 INTERRUPTOR TERMOMAGNETICO MONOFASICO 2x10A und 1.00 50.01 50.01

01.12.06.08.02 INTERRUPTOR TERMOMAGNETICO MONOFASICO 2x20A und 2.00 50.01 100.02

01.12.06.08.03 INTERRUPTOR TERMOMAGNETICO MONOFASICO 2 X25 A pza 13.00 50.01 650.13

01.12.06.08.04 INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 25 A pza 1.00 140.01 140.01

01.12.06.08.05 INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 32 A pza 5.00 115.03 575.15

01.12.06.08.06 INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 63 A pza 1.00 132.01 132.01

01.12.06.08.07 INTERRUPTOR TERMOMAGNETICO TRIFASICA 3x75A, 380 V und 1.00 125.71 125.71

01.12.06.08.08 INTERRUPTOR DIFERENCIAL 2 X 25 A, 30 mA pza 15.00 162.01 2,430.15

01.12.06.08.09 INTERRUPTOR DIFERENCIAL 2x40A, 220V und 1.00 117.01 117.01

01.12.06.08.10 INTERRUPTOR RELOJ HORARIO, 220V und 2.00 162.01 324.02

01.12.06.09 PUESTA A TIERRA

01.12.06.09.01 EXCAVACION DE HOYO PARA PUESTA A TIERRA und 2.00 72.98 145.96

01.12.06.09.02 INSTALACION DE PUESTA A TIERRA und 2.00 863.18 1,726.36

01.12.06.10 PRUEBAS ELECTRICAS

01.12.06.10.01 PRUEBA DE CONTINUIDAD glb 2.00 350.00 700.00

01.12.06.10.02 PRUEBA DE AISLAMIENTO glb 2.00 400.00 800.00

01.12.06.10.03 PRUEBA DE RESISTENCIA DE PUESTA A T IERRA glb 2.00 400.00 800.00

01.12.06.10.04 PRUEBA DE NIVEL DE ILUMINACION glb 2.00 250.00 500.00

01.12.06.11 VARIOS

01.12.06.11.01 POSTE METALICO P/ILUMINACION EXTERIOR PLATAFORMA und 10.00 699.14 6,991.40

01.12.06.11.02 PASTORAL P/ILUMINACION EXTERIOR INCLUYE ACC. FIJ. und 40.00 395.87 15,834.80

01.12.06.11.03 POSTE DE CONCRETO ARMADO CENTRIFUGADO 9/300 und 20.00 1,298.39 25,967.80

01.12.06.12 RED DE DISTRIBUCION DE MEDIA TENSION

01.12.06.12.01 MOVIMIENTO DE TIERRAS

01.12.06.12.01.01 TRAZO Y REPLANTEO RED PRIMARIA km 0.06 3,015.70 180.94

01.12.06.12.01.02 EXCAVACION A MANO EN TERRENO NORMAL m3 11.00 36.84 405.24

01.12.06.12.02 POSTES Y CRUCETAS

01.12.06.12.02.01 POSTE DE CONCRETO ARMADO CENTRIFUGADO 13/400/2/180/355 und 1.00 2,024.08 2,024.08

01.12.06.12.03 TUBERIAS Y CAJAS DE PASO

01.12.06.12.03.01 TUBERIA F°G°, D=80MM m 6.00 25.16 150.96

01.12.06.12.03.02 TUBERIA PVC-P (ELECTRICAS) D=80mm m 48.00 16.07 771.36

01.12.06.12.03.03 CAJA DE PASO DE C.A. 1X1X1m pza 1.00 500.00 500.00

01.12.06.12.04 CABLES Y CONDUCTORES

01.12.06.12.04.01 CONDUCTOR DE ALEACION DE ALUMINI DE 35 mm2 m 75.00 2.74 205.50

01.12.06.12.04.02 CABLE SUBTERRANEO N2XSY, 25 MM2 COBRE m 180.00 75.36 13,564.80

01.12.06.12.05 ARMADOS

01.12.06.12.05.01 ARMADO DT-0 und 1.00 2,587.36 2,587.36

01.12.06.12.05.02 ARMADO PSEC1 und 1.00 20,147.69 20,147.69

01.12.06.12.06 SUBESTACION

01.12.06.12.06.01 CELDA DE LLEGADA jgo 1.00 35,000.00 35,000.00

01.12.06.12.06.02 CELDA DE TRANSFORMACION glb 1.00 20,000.00 20,000.00

01.12.06.12.07 PUESTA A TIERRA

01.12.06.12.07.01 EXCAVACION DE HOYOS EN TERRENO TERRENO NORMAL POSTES Y PAT und 2.00 37.19 74.38

01.12.06.12.07.02 INSTALACION DE PUESTA A TIERRA und 2.00 1,567.10 3,134.20

01.12.06.12.08 TRABAJOS COMPLEMENTARIOS

01.12.06.12.08.01 MEDIDOR EN MEDIA TENSION und 1.00 2,231.77 2,231.77

01.12.06.12.08.02 PINTADO DE SEÑALIZACION glb 1.00 14.45 14.45

01.12.06.12.08.03 ELIMINACION DE MATERIAL EXCEDENTE m3 6.00 149.03 894.18

01.12.06.12.08.04 MEDICION DE AISLAMIENTO DE TRANSFORMADOR und 1.00 309.78 309.78

01.12.06.12.08.05 MEDICION DE PUESTAS A TIERRA und 2.00 59.07 118.14


RENOVACION DE CAMPO DEPORTIVO DE FUTBOL, PISTA ATLETICA,PLATAFORMAS DEPORTIVAS, MEJORAMIENTO Y AMPLIACION DE LAS
02
TRIBUNAS Y OBRAS COMPLEMENTARIAS
02.01 MEJORAMIENTO DE TRIBUNAS DEL ESTADIO

02.01.01 ESTRUCTURAS

02.01.01.01 OBRAS PROVISIONALES

02.01.01.01.01 CAMPAMENTO PROVISIONAL DE OBRA glb 1.00 1,872.42 1,872.42 100.00% 1872.42

02.01.01.01.02 CARTEL DE IDENTIFICACION DE OBRA DE 3.60x2.40 m und 3.00 1,248.26 3,744.78 100.00% 3744.78

02.01.01.02 TRABAJOS PRELIMINARES

02.01.01.02.01 DESMONTAJE DE PUERTAS m2 92.40 14.35 1,325.94 100.00% 1325.94

Pág. 11
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

02.01.01.02.02 DESMONTAJE DE VENTANAS m2 337.50 11.96 4,036.50 55.53% 2241.57

02.01.01.02.03 DESMONTAJE DE TIJERALES DE MADERA L=10.00m und 88.00 38.55 3,392.40

02.01.01.02.04 DESMONTAJE DE CORREAS DE MADERA m 72.00 3.61 259.92

02.01.01.02.05 DESMONTAJE DE APARATOS SANITARIOS und 46.00 14.35 660.10

02.01.01.02.06 DESMONTAJE DE FALSO CIELO RASO DE TRIPLAY m2 64.92 4.31 279.81

02.01.01.02.07 DEMOLICION DE CIMIENTOS DE CONCRETO m3 343.85 52.52 18,059.00

02.01.01.02.08 DEMOLICION DE SOBRECIMIENTOS DE CONCRETO m3 251.40 32.47 8,162.96

02.01.01.02.09 DEMOLICION DE PISO DE CONCRETOINCLUYENDO F.P. e=15cm m2 1,540.92 26.27 40,479.97

02.01.01.02.10 DEMOLICION DE VEREDAS DE CONCRETO e=10cm m2 1,707.52 26.27 44,856.55

02.01.01.02.11 DEMOLICION DE GRADERIOS DE CONCRETO m2 715.05 11.24 8,037.16

02.01.01.02.12 DEMOLICION DE COLUMNAS Y VIGAS DE CONCRETO m3 38.95 109.88 4,279.83

02.01.01.02.13 DEMOLICION DE LOSAS DE CONCRETO m2 149.00 29.30 4,365.70

02.01.01.02.14 DEMOLICION DE URINARIOS Y BEBEDEROS DE CONCRETO m 1.74 8.12 14.13

02.01.01.02.15 DEMOLICION DE MUROS DE LADRILLO KK SOGA m2 222.95 4.87 1,085.77

02.01.01.02.16 DEMOLICION DE MUROS DE LADRILLO KK CABEZA m2 4,064.66 4.87 19,794.89

02.01.01.02.17 LIMPIEZA DEL TERRENO MANUAL m2 3,069.50 2.32 7,121.24

02.01.01.02.18 TRAZO Y REPLANTEO PRELIMINAR m2 3,069.50 1.30 3,990.35

02.01.01.02.19 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 3,069.50 1.24 3,806.18

02.01.01.03 MOVIMIENTO DE TIERRAS

02.01.01.03.01 CORTE SUPERFICIAL MANUAL m3 615.75 145.95 89,868.71

02.01.01.03.02 CORTE DE MATERIAL CON EQUIPO m3 770.40 6.26 4,822.70

02.01.01.03.03 PERFILADO Y COMPACTADO DE SUB-RASANTE EN ZONAS DE CORTE m2 3,597.22 1.97 7,086.52

02.01.01.03.04 EXCAVACION PARA ZAPATAS DE 2.00 M. A 2.50 M. DE PROFUNDIDAD m3 5,875.25 30.41 178,666.35

02.01.01.03.05 EXCAVACION PARA CIMIENTOS HASTA 1.50 m TERRENO NORMAL m3 115.20 31.00 3,571.20

02.01.01.03.06 EXCAVACION PARA VIGAS DE CIMENTACION HASTA 1.50 M EN TERRENO NORMAL m3 247.00 309.96 76,560.12

02.01.01.03.07 RELLENO COMPACTADO CON MATERIAL PROPIO m3 983.76 52.74 51,883.50

02.01.01.03.08 RELLENO COMPACTADO CON EQUIPO Y MATERIAL SELECCIONADO m3 1,320.76 31.80 42,000.17

02.01.01.03.09 NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA m2 2,973.74 3.37 10,021.50

02.01.01.03.10 ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m m3 6,237.45 30.41 189,680.85

02.01.01.03.11 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES m3 5,253.69 8.03 42,187.13

02.01.01.04 OBRAS DE CONCRETO SIMPLE

02.01.01.04.01 FALSO PISO DE 4" MEZCLA 1:8 (C:H) m2 2,943.38 42.01 123,651.39

02.01.01.04.02 SUBCIMIENTOS Y SUBZAPTAS CONCRETO 1:10 C:H + 30% P. G. m3 650.87 160.70 104,594.81

02.01.01.04.03 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G. m3 58.71 241.75 14,193.14

02.01.01.04.04 SOBRECIMIENTOS MEZCLA 1:8 C:H + 25% P.M. m3 31.15 282.43 8,797.69

02.01.01.04.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HASTA 0.30 m m2 246.58 36.34 8,960.72

02.01.01.04.06 RAMPAS DE CONCRETO: f´c=175 kg/cm2 ACAB. 1:2 FROTACH. Y PULIDO m2 7.18 43.03 308.96

02.01.01.04.07 RAMPAS: ENCOFRADO Y DESENCOFRADO m2 7.56 49.11 371.27

02.01.01.05 OBRAS DE CONCRETO ARMADO

02.01.01.05.01 SOBRECIMIENTO REFORZADO

02.01.01.05.01.01 SOBRECIMIENTO REFORZADO: CONCRETO f'c=210 kg/cm2 m3 41.59 407.68 16,955.41

02.01.01.05.01.02 SOBRECIMEINTO REFORZADO: ENCOFRADO Y DESENCOFRADO m2 514.11 36.79 18,914.11

02.01.01.05.01.03 SOBRECIMIENTOS REFORZADOS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 2,036.43 3.52 7,168.23

02.01.01.05.02 ZAPATAS

02.01.01.05.02.01 ZAPATAS: CONCRETO PREMEZCLADO f'c=210 kg/cm2 m3 714.41 461.93 330,007.41

02.01.01.05.02.02 ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 36,987.03 3.78 139,810.97

02.01.01.05.03 VIGAS DE CIMENTACION

02.01.01.05.03.01 VIGAS DE CIMENTACION: CONCRETO PREMEZCLADO f'c=210 kg/cm2 m3 207.32 440.91 91,409.46

02.01.01.05.03.02 VIGAS DE CIMENTACION: ENCOFRADO Y DESENCOFRADO m2 1,297.41 41.14 53,375.45

02.01.01.05.03.03 VIGAS DE CIMENTACION: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 23,738.10 3.78 89,730.02

02.01.01.05.04 COLUMNAS

02.01.01.05.04.01 COLUMNAS: CONCRETO f'c=210 kg/cm2 1 m3 179.18 422.01 75,615.75

02.01.01.05.04.02 CONCRETO PREMEZCLADO COLUMNAS f'c=280 kg/cm2 m3 596.55 500.99 298,865.58

02.01.01.05.04.03 COLUMNAS: ENCOFRADO Y DESENCOFRADO METALICO m2 7,310.79 49.20 359,690.87

02.01.01.05.04.04 COLUMNAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 110,589.31 3.78 418,027.59

02.01.01.05.05 VIGAS

02.01.01.05.05.01 VIGAS: CONCRETO f'c=210 kg/cm2 1 m3 120.27 344.19 41,395.73

02.01.01.05.05.02 CONCRETO PREMEZCLADO VIGAS f'c=280 kg/cm2 m3 384.25 495.40 190,357.45

Pág. 12
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

02.01.01.05.05.03 VIGAS: ENCOFRADO Y DESENCOFRADO METALICO m2 4,784.10 49.10 234,899.31

02.01.01.05.05.04 VIGAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 71,239.05 3.78 269,283.61

02.01.01.05.06 GRADERIOS

02.01.01.05.06.01 GRADERIOS: CONCRETO PREMEZCLADO f'c=280 kg/cm2 m3 535.37 505.19 270,463.57

02.01.01.05.06.02 GRADERIOS: ENCOFRADO Y DESENCOFRADO METALICO m2 2,626.69 53.66 140,948.19

02.01.01.05.06.03 GRADERIOS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 33,407.30 3.78 126,279.59

02.01.01.05.07 PLACAS

02.01.01.05.07.01 PLACA:CONCRETO f'c=210 kg/cm2 m3 155.10 310.82 48,208.18

02.01.01.05.07.02 PLACAS: ENCOFRADO Y DESENCOFRAD m2 1,679.22 39.23 65,875.80

02.01.01.05.07.03 PLACAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 11,256.91 3.54 39,849.46

02.01.01.05.08 ESCALERAS

02.01.01.05.08.01 ESCALERAS: CONCRETO f'c=210 kg/cm2 m3 195.90 364.73 71,450.61

02.01.01.05.08.02 ESCALERAS: ENCOFRADO Y DESENCOFRADO m2 419.21 49.03 20,553.87

02.01.01.05.08.03 ESCALERAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 6,423.10 3.78 24,279.32

02.01.01.05.09 LOSAS MACIZAS

02.01.01.05.09.01 LOSAS MACIZAS: CONCRETO f'c=210 kg/cm2 m3 34.47 340.14 11,724.63

02.01.01.05.09.02 LOSAS MACIZAS: ENCOFRADO Y DESENCOFRADO m2 235.00 47.49 11,160.15

02.01.01.05.09.03 LOSAS MACIZAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 662.26 3.78 2,503.34

02.01.01.05.10 LOSA ALIGERADA

02.01.01.05.10.01 LOSAS ALIGERADAS: CONCRETO f'c=210 kg/cm2 m3 92.05 341.12 31,400.10

02.01.01.05.10.02 LOSAS ALIGERADAS: ENCOFRADO Y DESENCOFRADO 1 m2 1,051.96 32.11 33,778.44

02.01.01.05.10.03 LOSAS ALIGERADAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 8,403.41 3.60 30,252.28

02.01.01.05.10.04 LOSAS ALIGERADAS: LADRILLO HUECO DE ARCILLA DE 15 x 30 x 30 cm PARA TECHO und 8,763.00 3.51 30,758.13

02.01.01.05.11 DRENAJE EN GRADERIOS

02.01.01.05.11.01 DRENAJE: CONCRETO f'c=210 kg/cm2 m3 3.50 324.85 1,136.98

02.01.01.05.11.02 DRENAJE: ENCOFRADO Y DESENCOFRADO m2 16.01 46.69 747.51

02.01.01.05.11.03 DRENAJE: ACERO CORRUGADO FY=4200 kg/cm2 GRADO 60 kg 408.45 3.78 1,543.94

02.01.01.05.12 MESADA DE CONCRETO

02.01.01.05.12.01 MESADA: CONCRETO f'c=175 kg/cm2 m3 5.09 333.13 1,695.63

02.01.01.05.12.02 MESADA: ENCOFRADO Y DESENCOFRADO m2 73.70 49.56 3,652.57

02.01.01.05.12.03 MESADA: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 670.04 3.54 2,371.94

02.01.01.05.13 ESTRUCTURA METALICA

02.01.01.05.13.01 TUBO RECTANGULAR 100x150x4.5MM PARA ESCOLARES m 762.00 103.98 79,232.76

02.01.01.05.13.02 TUBO RECTANGULAR 40x80x3MM PARA ESCOLARES m 273.70 69.20 18,940.04

02.01.01.05.13.03 LAMINA RETICULAR INCLUIDO SOPORTES m2 538.43 130.63 70,335.11

02.01.01.05.14 REHABILITACION DE ESTRUCTURAS

02.01.01.05.14.01 REHABILITACION DE ESTRUCTURAS (SELLADO CON CONCRETO) glb 1.00 90,000.00 90,000.00

02.01.02 ARQUITECTURA

02.01.02.01 MUROS Y TABIQUES DE ALBAÑILERIA

02.01.02.01.01 MURO DE LADRILLO KK TIPO IV CABEZA M 1:1:4 e=1.50 cm m2 1,738.10 109.52 190,356.71

02.01.02.01.02 MURO DE LADRILLO KK TIPO IV SOGA M 1:1:4 e=1.50 cm m2 6,700.77 65.90 441,580.74

02.01.02.01.03 TABIQUE SUPERBOARD und 2,734.06 105.71 289,017.48

02.01.02.01.04 TABIQUE DE MELAMINE CON ESTRUCTURA DE ALUMINIO EN CUBICULOS DE SSHH m2 743.78 80.72 60,037.92

02.01.02.01.05 JUNTA DE DILATACION CON ESPUMA PLASTICA MAS JEBE MICROPOROSO m 1,247.50 12.58 15,693.55

02.01.02.02 REVOQUES ENLUCIDOS Y MOLDEDURAS

02.01.02.02.01 TARRAJEO PRIMARIO O RAYADO, MORTERO C:A 1:5 m2 2,451.82 10.09 24,738.86

02.01.02.02.02 TARRAJEO EN MURO:INTERIOR (C:A 1:5 e=1.50cm) m2 8,114.57 23.72 192,477.60

02.01.02.02.03 TARRAJEO EN MURO:EXTERIOR (C:A 1:5 e=1.50cm) m2 3,885.70 25.88 100,561.92

02.01.02.02.04 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA m2 6,484.35 26.17 169,695.44

02.01.02.02.05 TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO - ARENA m2 3,307.95 33.30 110,154.74

02.01.02.02.06 TARRAJEO EN SUPERFICIE DE GRADERIOS CON IMPERMEABILIZANTE m2 11,881.56 30.79 365,833.23

02.01.02.02.07 TARRAJEO EN SUPERFICIE DE ESCALERA CON IMPERMEABILIZANTE m2 722.03 30.79 22,231.30

02.01.02.02.08 VESTIDURA DE DERRAMES (MEZCLA C:A1:5) m 3,382.80 8.98 30,377.54

02.01.02.02.09 BRUÑAS SEGUN DETALLE m 9,583.79 6.62 63,444.69

02.01.02.03 CIELO RASOS

02.01.02.03.01 CIELORASO CON MEZCLA DE CEMENTO - ARENA 1:5 m2 4,025.18 26.47 106,546.51

02.01.02.03.02 CIELORASO CON BALDOSAS DE FIBRO MINERAL m2 2,965.47 40.41 119,834.64

02.01.02.04 PISOS Y PAVIMENTOS

Pág. 13
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

02.01.02.04.01 FALSO PISO DE 4" MEZCLA 1:8 (C:H) m2 6,347.84 29.57 187,705.63

02.01.02.04.02 CONTRAPISO DE 40 mm (MEZCLA C:A BASE 1:5, ACABADO 1:2) m2 7,305.37 22.69 165,758.85

02.01.02.04.03 PISO DE CEMENTO SIN COLOREAR: ACABADO PULIDO e=2" m2 803.59 32.95 26,478.29

02.01.02.04.04 PISO DE CEMENTO COLOREADO (OCRE AZUL): ACABADO PULIDO m2 2,827.24 35.19 99,490.58

02.01.02.04.05 PISO CERAMICO ANTIDESLIZANTE 40x40 m2 3,035.85 63.20 191,865.72

02.01.02.04.06 PISO CERAMICO ANTIDESLIZANTE 60x60 m2 685.18 65.69 45,009.47

02.01.02.05 ZOCALOS

02.01.02.05.01 ENCHAPE FACHALETA RUSTICA 10 X50 CM m2 1,154.80 136.76 157,930.45

02.01.02.05.02 ZOCALO DE CERAMICO 20 X 30 cm m2 2,193.31 50.63 111,047.29

02.01.02.06 CONTRAZOCALOS

02.01.02.06.01 CONTRAZOCALO CERAMICO 15 cm m 865.37 14.23 12,314.22

02.01.02.06.02 CONTRAZOCALO DE CEMENTO PULIDO h=0.10 m m 1,728.91 7.70 13,312.61

02.01.02.06.03 CONTRAZOCALO DE MADERA CEDRO DE 3/4" X 4" CON RODON DE 3/4" m 163.57 11.81 1,931.76

02.01.02.07 CUBIERTAS Y CERRAMIENTOS

02.01.02.07.01 COBERTURA TIPO ONDULINE m2 514.52 52.64 27,084.33

02.01.02.07.02 CUMBRERA DE ONDULINE m 140.00 7.37 1,031.80

02.01.02.08 CARPINTERIA DE MADERA

02.01.02.08.01 PUERTAS DE MADERA CONTRAPLACADA m2 364.54 197.84 72,120.59

02.01.02.09 CARPINTERIA METALICA

02.01.02.09.01 PUERTA METALICA 03 und 12.00 530.00 6,360.00

02.01.02.09.02 PUERTA METALICA 04 und 8.00 440.00 3,520.00

02.01.02.09.03 PUERTA METALICA T-5A und 23.76 377.00 8,957.52

02.01.02.09.04 PUERTA METALICA PARA EXTERIORES m2 46.20 377.00 17,417.40

02.01.02.09.05 PUERTA METALICA EN ESCALERAS und 5.00 2,250.65 11,253.25

02.01.02.09.06 PUERTA METALICA ANTIPANICO und 2.00 6,320.00 12,640.00

02.01.02.09.07 TRAMA METALICA EN CAJA DE ESCALERA m2 243.00 190.00 46,170.00

02.01.02.09.08 BARANDA METALICA CAJA DE ESCALERA m 190.00 36.00 6,840.00

02.01.02.09.09 MALLA METALICA CON REFUERZOS GALVANIZADOS m 80.00 162.96 13,036.80

02.01.02.09.10 ESTRUCTURA METALICA PARA VITRAL m2 1,467.08 80.86 118,628.09

02.01.02.09.11 BARANDA METALICA GRADERIOS m 810.21 57.75 46,789.63

02.01.02.09.12 BARANDA METALICA ACCESOS A TRIBUNAS m 111.40 57.75 6,433.35

02.01.02.09.13 BARANDAS METALICAS PARA MUROS m 222.10 69.48 15,431.51

02.01.02.09.14 ESCALERA METALICA TIPO I und 2.00 2,500.00 5,000.00

02.01.02.09.15 ESCALERA METALICA TIPO II und 1.00 4,500.00 4,500.00

02.01.02.09.16 ESCALERA METALICA TIPO III und 2.00 3,500.00 7,000.00

02.01.02.10 CERRAJERIA

02.01.02.10.01 BISAGRAS CAPUCHINA ALUMINIZADA DE 4" und 120.00 20.01 2,401.20

02.01.02.10.02 BISAGRAS CAPUCHINA ALUMINIZADA DE 3" PESADA EN PUERTAS und 1,471.00 15.00 22,065.00

02.01.02.10.03 CERRADURA DE TRES GOLPES PUERTAS INTERIORES und 44.00 85.01 3,740.44

02.01.02.10.04 CERRADURA TIPO BOLA P/BAÑOS und 126.00 38.00 4,788.00

02.01.02.10.05 MANIJA DE 3" ALUMINIZADA PARA PUERTA pza 44.00 47.01 2,068.44

02.01.02.11 VIDRIOS, CRISTALES Y SIMILARES

02.01.02.11.01 VIDRIO SISTEMA MODUGLASS 6mm p2 3,889.13 3.35 13,028.59

02.01.02.11.02 VIDRIO TEMPLADO DE 8 mm p2 8,241.12 18.32 150,977.32

02.01.02.11.03 VIDRIO E=8 MM INCOLORO CRUDO p2 23,942.73 4.78 114,446.25

02.01.02.11.04 MAMPARA EN CRISTAL TEMPLADO DE 8 mm CON ESTRUCTURA DE ALUMINIO m2 198.56 198.36 39,386.36

02.01.02.12 PINTURA

02.01.02.12.01 PINTURA LATEX EN CIELO RASO m2 4,025.18 9.75 39,245.51

02.01.02.12.02 PINTURA LATEX 2 MANOS EN MUROS INTERIORES (VINILATEX O SIM.) m2 8,114.57 8.09 65,646.87

02.01.02.12.03 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES (SUPERLATEX O SIM.) m2 3,885.70 8.09 31,435.31

02.01.02.12.04 PINTURA LATEX 2 MANOS EN COLUMNAS (VINILATEX O SIM.) m2 6,484.35 13.21 85,658.26

02.01.02.12.05 PINTURA LATEX 2 MANOS EN VIGAS (VINILATEX O SIM.) m2 3,307.95 13.43 44,425.77

02.01.02.12.06 PINTURA LATEX 2 MANOS EN MUROS SUPERBOARD m2 5,468.11 6.69 36,581.66

02.01.02.12.07 PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS m2 2,258.21 13.48 30,440.67

02.01.02.12.08 PINTURA ESMALTE EN CONTRAZOCALOS m 273.44 6.95 1,900.41

02.01.02.12.09 PINTURA BARNIZ EN CONTRAZOCALOS DE MADERA H=0.10 m m 163.57 9.37 1,532.65

02.01.02.12.10 PINTURA EN DERRAMES m 3,536.80 2.41 8,523.69

02.02 SEÑALIZACION

Pág. 14
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

02.02.01 PINTURA

02.02.02 VARIOS

02.02.03 LETREROS DE SALIDA und 238.00 39.60 9,424.80

02.02.04 LETREROS DE ZONA DE SEGURIDAD EN CASO DE SISMOS und 330.00 32.60 10,758.00

02.02.05 EXTINTORES und 98.00 95.00 9,310.00

02.02.06 LETREROS DE EXTINTORES und 98.00 35.00 3,430.00

02.02.07 LETREROS DE SALIDA POR ESCALERA und 108.00 37.00 3,996.00

02.02.08 ZONA DE SEGURIDAD und 58.00 39.00 2,262.00

02.02.09 LETREROS DE RIESGO ELECTRICO und 9.00 45.20 406.80

02.03 INSTALACIONES SANITARIAS

02.03.01 SISTEMA DE AGUA POTABLE

02.03.01.01 SALIDAS DE AGUA FRIA

02.03.01.01.01 SALIDA DE A.F. PVC C/R - 1/2" C-10 pto 217.00 16.14 3,502.38

02.03.01.01.02 SALIDA DE A.F. PVC C/R - 1" C-10 pto 261.00 14.99 3,912.39

02.03.01.01.03 SALIDA DE A.F. PVC C/R - 1.1/4" C-10 pto 154.00 29.84 4,595.36

02.03.01.02 REDES DE DISTRIBUCION

02.03.01.02.01 SUM. E INST. TUB. PVC C-10 - D=1.1/4" m 145.49 12.80 1,862.27

02.03.01.02.02 SUM. E INST. TUB. PVC C-10 - D=1.1/2" m 153.22 13.18 2,019.44

02.03.01.02.03 SUM. E INST. TUB. PVC C-10 - D=2" m 76.32 14.44 1,102.06

02.03.01.02.04 SUM. E INST. TUB. PVC C-10 - D=2.1/2" m 95.34 16.75 1,596.95

02.03.01.03 VALVULAS

02.03.01.03.01 SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1/2" und 6.00 40.66 243.96

02.03.01.03.02 SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=3/4" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA) und 28.00 71.66 2,006.48

02.03.01.03.03 SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA) und 11.00 74.66 821.26

02.03.01.03.04 SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1.1/4" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA) und 56.00 92.66 5,188.96

02.03.01.03.05 SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1.1/2" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA) und 27.00 102.66 2,771.82

02.03.01.03.06 SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=2" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA) und 3.00 122.66 367.98

02.03.02 SISTEMA DE AGUA CALIENTE

02.03.02.01 SALIDAS DE AGUA CALIENTE

02.03.02.01.01 SALIDA AGUA CALIENTE TUBERIA CPVC O 1/2" pto 69.00 86.31 5,955.39

02.03.02.01.02 SALIDA AGUA CALIENTE TUBERIA CPVC O 3/4" pto 11.00 89.41 983.51

02.03.02.02 REDES DE DISTRIBUCION

02.03.02.02.01 SUM. Y COLOC. TUB. CPVC D=3/4 ENTERRADA INC. DESP Y ACCES m 10.33 16.54 170.86

02.03.02.03 LLAVES Y VALVULAS

02.03.02.03.01 SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1/2" und 4.00 55.41 221.64

02.03.02.04 THERMAS Y VALVULAS

02.03.02.04.01 SUM Y COLOC. THERMAS 100 LT INCL. TIMER Y ACCES P/INST pto 1.00 750.00 750.00

02.03.02.04.02 SUM Y COLOC. THERMAS 150 LT INCL. TIMER Y ACCES P/INST pto 15.00 1,050.00 15,750.00

02.03.03 SISTEMA CONTRA INCENDIO

02.03.03.01 TUBERIA ENTERRADA

02.03.03.01.01 TUBERIA HDPE PN15 2 1/2" PARA AGUA POTABLE CON UNIONES TERMOFUSIONADAS m 125.00 18.27 2,283.75

02.03.03.01.02 TUBERIA HDPE PN15 4" PARA AGUA POTABLE CON UNIONES TERMOFUSIONADAS m 685.00 19.58 13,412.30

02.03.03.01.03 TUBERIA HDPE PN15 6" PARA AGUA POTABLE CON UNIONES TERMOFUSIONADAS m 35.00 22.72 795.20

02.03.03.02 TUBERIA AEREA

02.03.03.02.01 TUBERIA ACERO SCH 40 2 1/2" INC. PINTURA 8 MILS - INCL SOPORTE m 87.50 132.02 11,551.75

02.03.03.02.02 TUBERIA ACERO SCH 40 4" INC. PINTURA 8 MILS - INCL SOPORTE m 26.00 177.04 4,603.04

02.03.03.03 GABINETE

02.03.03.03.01 GABINETE CONTRA INCENDIO und 25.00 194.01 4,850.25

02.03.04 SISTEMA DE DESAGUE Y VENTILACION

02.03.04.01 SALIDA DE DESAGUE Y VENTILACION

02.03.04.01.01 SALIDA DE DESAGUE PVC CP - 2" pto 148.00 78.96 11,686.08

02.03.04.01.02 SALIDA DE DESAGUE PVC CP - 3" pto 267.00 91.37 24,395.79

02.03.04.01.03 SALIDA DE DESAGUE PVC CP - 4" pto 154.00 92.75 14,283.50

02.03.04.01.04 SALIDA DE VENTILACION PROMEDIO PVC CP - 2" pto 531.00 81.99 43,536.69

02.03.04.02 REDES DE EVACUACION

02.03.04.02.01 SUM. E INST. TUB. PVC CP - D=4" (INC. EXCAV. RELLENO Y COMPACT.) m 74.10 24.10 1,785.81

02.03.04.02.02 SUM. E INST. TUB. PVC CP - D=6" (INC. EXCAV. RELLENO Y COMPACT.) m 6.14 49.10 301.47

02.03.04.02.03 SUM. Y COLOC. TUB. PVC-CP D=3" COLGADAS INCL. DESP Y ACCES - COLG Y SOPORTE m 364.00 22.96 8,357.44

Pág. 15
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

02.03.04.02.04 SUM. Y COLOC. TUB. PVC-CP D=4" COLGADAS INCL. DESP Y ACCES - COLG Y SOPORTE m 434.80 26.86 11,678.73

02.03.04.02.05 SUM. Y COLOC. TUB. PVC-CP D=3" ADOSADAS INCL. DESP Y ACCES - COLG Y SOPORTE m 644.00 22.96 14,786.24

02.03.04.02.06 SUM. Y COLOC. TUB. PVC-CP D=4" ADOSADAS INCL. DESP Y ACCES - COLG Y SOPORTE m 462.00 26.86 12,409.32

02.03.04.03 ADITAMENTOS VARIOS

02.03.04.03.01 SUM. E INST. REGISTRO ROSCADO A RAS DE PISO - BRONCE CROMADO PESADO 2" pza 51.00 42.24 2,154.24

02.03.04.03.02 SUM. E INST. SUMIDERO BRONCE CROMADO PESADO - 3" pza 52.00 33.01 1,716.52

02.03.04.03.03 REGISTRO ROSCADO DE BRONCE 2" pza 6.00 42.24 253.44

02.03.04.03.04 SUM. E INST. REGISTRO ROSCADO A RAS DE PISO - BRONCE CROMADO PESADO 3" pza 45.00 48.24 2,170.80

02.03.04.03.05 SUM. E INST. REGISTRO ROSCADO A RAS DE PISO - BRONCE CROMADO PESADO 4" pza 95.00 52.74 5,010.30

02.03.04.03.06 SUM. E INST. REGISTRO ROSCADO A RAS DE PISO - BRONCE CROMADO PESADO 6" und 33.00 108.74 3,588.42

02.03.04.03.07 SOMBRERO DE VENTILACION 2" und 2.00 10.37 20.74

02.03.04.03.08 SOMBRERO DE VENTILACION 3" und 15.00 14.88 223.20

02.03.04.03.09 SOMBRERO DE VENTILACION 4" und 15.00 15.06 225.90

02.03.04.04 CAMARAS DE INSPECCION

02.03.04.04.01 CAJAS DE REGISTRO DE DESAGUE 12" x 24" und 41.00 168.84 6,922.44

02.03.04.05 APARATOS SANITARIOS

02.03.04.05.01 INODORO CON VALVULA SEMIAUTOMATICA INC/ACCESORIO und 165.00 115.00 18,975.00

02.03.04.05.02 LAVATORIO INC/ACCESORIO und 176.00 55.00 9,680.00

02.03.04.05.03 DUCHA INC/ACCESORIO und 73.00 55.00 4,015.00

02.03.04.05.04 LAVADERO DE ACERO INOXIDABLE UNA POZA und 2.00 250.00 500.00

02.03.04.05.05 JABONERA DE LOSA DE 15x15 cm pza 73.00 25.00 1,825.00

02.03.04.05.06 PAPELERA DE BARRA pza 73.00 30.00 2,190.00

02.03.04.05.07 ESPEJO m2 176.00 32.00 5,632.00

02.03.04.05.08 URINARIO DE LOZA DE PICO BLANCO pza 249.00 252.00 62,748.00

02.03.04.05.09 COLOCACION DE APARATOS SANITARIOS und 590.00 70.42 41,547.80

02.03.04.05.10 COLOCACION DE ACCESORIOS SANITARIOS und 219.00 42.25 9,252.75

02.04 INSTALACIONES ELECTRICAS

02.04.01 TRABAJOS PRELIMINARES

02.04.01.01 REPLANTEO DE INSTALACIONES ELECTRICAS glb 1.00 2,000.00 2,000.00

02.04.01.02 DESMONTAJE DE INSTALACIONES ELECTRICAS EXISTENTES glb 1.00 2,500.00 2,500.00

02.04.01.03 PICADO Y RESANE DE PAREDES DE CONCRETO EXISTENTE m 1,187.00 15.20 18,042.40

02.04.02 SALIDAS PARA INST. ELECTRICA

02.04.02.01 SALIDA DE TECHO C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2, CAJAS PESADA pto 527.00 88.52 46,650.04

02.04.02.02 SALIDA DE PARED C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2, CAJAS PESADAS pto 68.00 89.42 6,080.56

02.04.02.03 SALIDA PARA LUZ DE CONMUTACION SIMPLE C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2 CAJAS PESADAS pto 82.00 106.22 8,710.04

02.04.02.04 SALIDA P/INTERRUPTOR SIMPLE, TUB. PVC-P (1/2) CABLE LS0H 2.5mm2, CAJAS PESADAS pto 118.00 76.52 9,029.36

02.04.02.05 SALIDA P/INTERRUPTOR DOBLE, TUB. PVC-P (1/2) CABLE LS0H 2.5mm2, CAJAS PESADAS pto 36.00 84.52 3,042.72

02.04.02.06 SALIDA P/TOMACORRIENTE BIPOLAR DOBLE TUB. PVC-P (1/2) CABLE LSOH 4mm2 CAJAS PESADAS pto 373.00 90.72 33,838.56

02.04.02.07 SALIDA P/SECADORA DE MANOS, TUB. PVC-P (1/2) CABLE LSOH 4mm2 CAJAS PESADAS pto 22.00 50.32 1,107.04

02.04.02.08 SALIDA PARA ILUMINACION DE EMERGENCIA, TUB. PVC-P (1/2) CABLE LSOH 4mm2, CAJA PESADA pto 118.00 43.81 5,169.58

02.04.02.09 SALIDA DE FUERZA PARA EXTRACTOR DE AIRE, TUB. PVC-P (1/2) CABLE LSOH 4mm2, CAJA PESADA pto 53.00 43.81 2,321.93

02.04.03 TUBERIAS/ALIMENTADORES

02.04.03.01 EXCAVACION DE ZANJAS m 1,753.00 12.16 21,316.48

02.04.03.02 TUBERIA PVC-P (ELECTRICAS) D=20mm m 53.00 5.66 299.98

02.04.03.03 TUBERIA PVC-P (ELECTRICAS) D=25mm m 1,275.36 8.69 11,082.88

02.04.03.04 TUBERIA PVC-P (ELECTRICAS) D=35mm m 872.51 11.98 10,452.67

02.04.03.05 TUBERIA PVC-P (ELECTRICAS) D=40mm m 1,263.76 15.50 19,588.28

02.04.03.06 TUBERIA PVC-P (ELECTRICAS) D=50mm m 270.00 18.39 4,965.30

02.04.03.07 TUBERIA PVC-P (ELECTRICAS) D=65mm m 570.00 17.49 9,969.30

02.04.03.08 TUBERIA PVC-P (ELECTRICAS) D=80mm m 750.00 16.07 12,052.50

02.04.04 CAJAS DE PASO

02.04.04.01 CAJA DE PASO FºGº DE 100x100x50 mm, PESADO pza 14.00 40.19 562.66

02.04.04.02 CAJA DE PASO FºGº DE 150x150x100 mm, PESADO pza 3.00 41.09 123.27

02.04.04.03 CAJA DE PASO FºGº DE 200x200x100 mm, PESADO pza 9.00 43.69 393.21

02.04.04.04 BUZON DE CONCRETO DE 1.00x1.00x1.00m, PARA INSTALACIONES ELECTRICAS und 12.00 1,000.00 12,000.00

02.04.05 CABLES Y CONDUCTORES

02.04.05.01 CABLE ELECTRICO LSOH 10 mm2 m 2,146.34 9.08 19,488.77

02.04.05.02 CABLE ELECTRICO LSOH 16 mm2 m 4,388.84 11.59 50,866.66

Pág. 16
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

02.04.05.03 CABLE ELECTRICO LSOH 25mm2 m 3,777.71 15.96 60,292.25

02.04.05.04 CABLE ELECTRICO LSOH 35mm2 m 4,346.97 21.24 92,329.64

02.04.05.05 CABLE ELECTRICO LSOH 70mm2 m 18.00 36.54 657.72

02.04.05.06 CABLE ELECTRICO LSOH 95mm2 m 3.30 50.18 165.59

02.04.05.07 CABLE ELECTRICO LSOH 120mm2 m 13.70 61.88 847.76

02.04.05.08 CABLE ELECTRICO LSOH 150mm2 m 17.30 74.46 1,288.16

02.04.05.09 CABLE ELECTRICO LSOH 240mm2 m 32.40 106.31 3,444.44

02.04.06 ARTEFACTOS/LUMINARIAS

02.04.06.01 REJILLA DE ALUMINIO P/ADOSAR CON LAMPARA DE LED 3X24W, ALTA EFICIENCIA und 101.00 400.71 40,471.71

02.04.06.02 LUMINARIA CIRCULAR P/EMPOTRAR C/LAMPARA LED DE 20W P/TECHO und 309.00 295.77 91,392.93

02.04.06.03 LUMINARIA C/LAMPARA FLUORESCENTE COMPACTA DE 2X18W, 2X1200 LUMENES P/TECHO und 49.00 95.71 4,689.79

02.04.06.04 LUMINARIA DE EMERGENCIA C/LAMPARA LED DE 2x10W und 118.00 141.57 16,705.26

02.04.06.05 LUMINARIA TIPO BRAQUET C/2 LAMP. COMP. DE 18W E27 und 68.00 69.20 4,705.60

02.04.06.06 REFLECTOR CON LAMPARA HM DE 2000W, 230000 LUMENES und 132.00 3,905.64 515,544.48

02.04.06.07 REFLECTOR TIPO CAMPANA C/LAMPARA LED DE 100W, 10000 LUMENES und 56.00 1,085.64 60,795.84

02.04.06.08 LUMINARIA C/SOCKET, E27, C/LAMP. FC 65W, 4000 LUMENES und 28.00 105.61 2,957.08

02.04.06.09 SECADORA DE MANOS, AUTOMATICO und 16.00 193.31 3,092.96

02.04.06.10 LUMINARIA CINTA LED, TIPO MANGUERA DE 30M und 6.00 641.42 3,848.52

02.04.07 TABLEROS ELECTRICOS

02.04.07.01 TABLERO TRIFASICO TPN, AUTOSOPORTADO 630A und 1.00 15,165.67 15,165.67

02.04.07.02 TABLERO TRIFASICO TPE, AUTOSOPORTADO 400A und 1.00 12,165.67 12,165.67

02.04.07.03 TABLERO TRIFASICO P/EMPOTRAR DE 18 POLOS + 6ID und 14.00 477.61 6,686.54

02.04.07.04 TABLERO TRIFASICO P/EMPOTRAR DE 24 POLOS + 8ID und 5.00 632.83 3,164.15

02.04.07.05 TABLERO TRIFASICO P/EMPOTRAR DE 24 POLOS + 10ID und 1.00 682.83 682.83

02.04.07.06 TABLERO TRIFASICO P/EMPOTRAR DE 1 ITMG+36 POLOS+12ID, 100A und 1.00 3,165.67 3,165.67

02.04.07.07 TABLERO DE BANCO DE CONDENSADORES, 200A und 1.00 9,855.22 9,855.22

02.04.07.08 TABLERO GENERAL NORMAL TGN, AUTOSOPORTADO 800A. und 1.00 16,657.25 16,657.25

02.04.07.09 TABLERO GENERAL DE EMERGENCIA TGE 500A. und 1.00 9,657.25 9,657.25

02.04.07.10 TABLERO DE CONTROL DE ENCENDIDO Y APAGADO TC-EA und 4.00 965.38 3,861.52

02.04.07.11 TABLERO DE CONTROL DE BOMBEO DE CONTRAINCENDIO TBCI und 1.00 3,715.38 3,715.38

02.04.07.12 TABLERO DE CONTROL DE BOMBEO TBAF und 1.00 3,715.38 3,715.38

02.04.07.13 TABLERO MONOFASICO DE 24 POLOS. und 1.00 282.25 282.25

02.04.07.14 TABLERO DE TRANSFERENCIA AUTOMATICA DE 3x630 A und 1.00 26,314.50 26,314.50

02.04.07.15 TABLERO PARA ESPECTACU;LO DE 32A pto 1.00 537.25 537.25

02.04.08 INTERRUPTORES TERMOMAGNETICOS

02.04.08.01 INTERRUPTOR TERMOMAGNETICO MONOFASICO 2x10A und 58.00 50.01 2,900.58

02.04.08.02 INTERRUPTOR TERMOMAGNETICO MONOFASICO 2X16 A und 1.00 55.71 55.71

02.04.08.03 INTERRUPTOR TERMOMAGNETICO MONOFASICO 2x20A und 78.00 50.01 3,900.78

02.04.08.04 INTERRUPTOR TERMOMAGNETICO MONOFASICO 2 X25 A pza 2.00 50.01 100.02

02.04.08.05 INTERRUPTOR TERMOMAGNETICO TRIFASICO 3X20 A. und 18.00 76.42 1,375.56

02.04.08.06 INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 25 A pza 20.00 140.01 2,800.20

02.04.08.07 INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 32 A pza 15.00 115.03 1,725.45

02.04.08.08 INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 40 A pza 1.00 170.03 170.03

02.04.08.09 INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 50 A pza 4.00 115.03 460.12

02.04.08.10 INTERRUPTOR DIFERENCIAL 2 X 25 A, 30 mA pza 118.00 162.01 19,117.18

02.04.09 PUESTA A TIERRA

02.04.09.01 EXCAVACION DE HOYO PARA PUESTA A TIERRA und 6.00 364.87 2,189.22

02.04.09.02 INSTALACION DE PUESTA A TIERRA und 6.00 1,567.10 9,402.60

02.04.10 PRUEBAS ELECTRICAS

02.04.10.01 PRUEBA DE CONTINUIDAD glb 1.00 350.00 350.00

02.04.10.02 PRUEBA DE AISLAMIENTO glb 1.00 400.00 400.00

02.04.10.03 PRUEBA DE RESISTENCIA DE PUESTA A T IERRA glb 1.00 400.00 400.00

02.04.10.04 PRUEBA DE NIVEL DE ILUMINACION glb 1.00 250.00 250.00

02.04.11 VARIOS

02.04.11.01 UPS 10 KVA, TRIFASICO und 1.00 45,422.55 45,422.55

02.04.11.02 TRANSFORMADOR DE AISLAMIENTO und 1.00 9,922.55 9,922.55

02.04.11.03 TABLERO ELECTRONICO CON PANTALLA DIGITAL glb 1.00 100,000.00 100,000.00

02.04.11.04 FIJACION ORIENTACION DE REFLECTORES EN LA COBERTURA und 72.00 110.00 7,920.00

Pág. 17
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

02.04.11.05 PARARRAYOS TIPO DESIONIZANTE PDCE SENIOR R=120m, INC. ACC. jgo 1.00 16,000.00 16,000.00

02.04.11.06 SUM Y COLOC. THERMAS 110 LT INCL. TIMER Y ACCES. P/INST. 2000 W und 4.00 750.00 3,000.00

02.05 INSTALACIONES MECANICAS

02.05.01 SISTEMA DE GRUPO ELECTROGENO

02.05.01.01 EXCAVACION MANUAL DE ZANJAS m3 1.00 36.48 36.48

02.05.01.02 LOSAS MACIZAS PARA EL MONTAJE DEL GRUPO ELECTROGENO m2 1.00 450.00 450.00

02.05.01.03 SUMINISTRO Y MONTAJE DE GRUPO ELECTROGENO m2 1.00 293,959.00 293,959.00

02.05.01.04 SUMINISTRO Y MONTAJE DE SILENCIADOR Y DUCT. DE ESCAPE und 1.00 12,000.00 12,000.00

02.05.02 SISTEMA DE COMBUSTIBLE

02.05.02.01 TANQUE DE PETROLEO

02.05.02.01.01 TANQUE DIARIO DE PETROLEO DE 100 GALONES (INCLUYE SOPORTE) und 1.00 950.00 950.00

02.05.02.01.02 TANQUE DE ALMACENAMIENTO DE 500 GALONES (INCLUYE SOPORTE) und 1.00 15,004.00 15,004.00

02.05.02.02 MOVIMIENTO DE TIERRAS

02.05.02.02.01 TRAZO Y REPLANTEO m 48.00 7.01 336.48

02.05.02.02.02 EXCAVACION MANUAL DE ZANJAS m 15.00 37.19 557.85

02.05.02.02.03 TIERRA CERNIDA Y COMPACTADA m3 12.00 46.56 558.72

02.05.02.03 TUBERIAS

02.05.02.03.01 TUBERIA DE ACERO NEGRO 1" m 60.00 18.52 1,111.20

02.05.02.03.02 TUBERIA DE ACERO NEGRO 1 1/4" m 20.00 25.56 511.20

02.05.02.03.03 TUBERIA DE ACERO NEGRO 1 1/2" m 10.00 19.53 195.30

02.05.02.03.04 TUBERIA DE ACERO NEGRO 2" m 10.00 20.06 200.60

02.05.02.03.05 TUBERIA DE ACERO NEGRO 4" m 4.00 40.02 160.08

02.05.02.03.06 REVESTIMIENTO P/TUBERIA CON YUTE ALQUITRANADO m 80.00 13.77 1,101.60

02.05.02.04 ACCESORIOS VARIOS

02.05.02.04.01 UNION FLEXIBLE DE 1" (SIST. PETROLEO) und 4.00 9.80 39.20

02.05.02.04.02 UNION FLEXIBLE DE 1 1/4" (SIST. PETROLEO) und 4.00 11.80 47.20

02.05.02.04.03 UNION FLEXIBLE DE 1 1/2" (SIST. PETROLEO) und 4.00 12.80 51.20

02.05.02.04.04 CODO DE ACERO NEGRO DE 1/2" pza 4.00 8.44 33.76

02.05.02.04.05 CODO DE ACERO NEGRO DE 3/4" pza 4.00 10.44 41.76

02.05.02.04.06 CODO DE ACERO NEGRO DE 1" pza 45.00 12.21 549.45

02.05.02.04.07 CODO DE ACERO NEGRO DE 1 1/4" pza 5.00 14.21 71.05

02.05.02.04.08 CODO DE ACERO NEGRO DE 1 1/2" pza 6.00 14.21 85.26

02.05.02.04.09 CODO DE ACERO NEGRO DE 2" pza 4.00 16.21 64.84

02.05.02.04.10 TEE DE ACERO NEGRO DE 1/2" pza 2.00 8.44 16.88

02.05.02.04.11 TEE DE ACERO NEGRO DE 3/4" pza 2.00 10.44 20.88

02.05.02.04.12 TEE DE ACERO NEGRO DE 1" pza 2.00 11.44 22.88

02.05.02.04.13 TEE DE ACERO NEGRO DE 1 1/4" pza 6.00 14.21 85.26

02.05.02.04.14 TEE DE ACERO NEGRO DE 1 1/2" pza 6.00 14.21 85.26

02.05.02.04.15 TEE DE ACERO NEGRO DE 2" pza 2.00 18.21 36.42

02.05.02.04.16 REDUCCION DE ACERO CEDULA 40 DE 1 1/4" A 1/2" pza 4.00 11.21 44.84

02.05.02.04.17 REDUCCION DE ACERO CEDULA 40 DE 1 1/4" A 3/4" pza 2.00 11.21 22.42

02.05.02.04.18 REDUCCION DE ACERO CEDULA 40 DE 1 1/4" A 1" pza 2.00 11.21 22.42

02.05.02.04.19 REDUCCION DE ACERO CEDULA 40 DE 1 1/2" A 1/2" pza 2.00 13.21 26.42

02.05.02.04.20 REDUCCION DE ACERO CEDULA 40 DE 1 1/2" A 1 1/4" pza 4.00 13.21 52.84

02.05.02.04.21 REDUCCION DE ACERO CEDULA 40 DE 2" A 1 1/2" pza 5.00 18.21 91.05

02.05.02.04.22 REDUCCION DE ACERO CEDULA 40 DE 2" A 1/2" pza 2.00 18.21 36.42

02.05.02.05 VALVULAS

02.05.02.05.01 VALVULA DE BOLA DE 1/2" und 6.00 68.82 412.92

02.05.02.05.02 VALVULA DE BOLA DE 1" und 5.00 81.82 409.10

02.05.02.05.03 VALVULA DE BOLA DE 1 1/4" und 4.00 96.82 387.28

02.05.02.05.04 VALVULA DE BOLA DE 1 1/2" und 5.00 104.82 524.10

02.05.02.05.05 VALVULA CHECK DE BRONCE DE 1 1/4" und 4.00 136.43 545.72

02.05.02.05.06 VALVULA DE PIE D=1" und 2.00 69.02 138.04

02.05.02.05.07 VALVULA REGULADORA DE PRESION DE 3/4" und 4.00 118.80 475.20

02.05.02.06 ACCESORIOS PARA TANQUE DE PETROLEO

02.05.02.06.01 BOQUILLA DE LLENADO DE PETROLEO DIAM.=4" und 2.00 176.67 353.34

02.05.02.06.02 BOQUILLA DEMEDICION DIAM.=2" und 2.00 27.63 55.26

02.05.02.06.03 BOQUILLA DE VENTILACION DIAM.=1" und 2.00 41.65 83.30

Pág. 18
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

02.05.02.06.04 FILTRO DE PETROLEO und 2.00 1,212.37 2,424.74

02.05.02.06.05 FILTRO COLADOR DE PETROLEO DE 1 1/4 und 2.00 555.64 1,111.28

02.05.02.06.06 PREFILTRO DE PETROLEO und 6.00 566.26 3,397.56

02.05.02.06.07 VISOR DE VIDRIO DE 1 1/4" und 2.00 585.18 1,170.36

02.05.02.06.08 CONTROL DE NIVEL VARILLA+FLOTADOR (ACERO INOXIDABLE) und 2.00 4,310.97 8,621.94

02.05.02.06.09 CAJUELA DE LLENADO DE PETROLEO C/BOQUILLA und 2.00 367.30 734.60

02.05.02.06.10 MANOMETROS und 4.00 403.07 1,612.28

02.05.02.06.11 POZO DE PUESTA A TIERRA (15 OMH) und 1.00 1,430.54 1,430.54

02.05.02.06.12 CABLE DE COBRE DESNUDO DE 10 mm2 - TUB. 20 mm. m 16.00 7.61 121.76

02.05.02.07 BOMBA PARA PETROLEO

02.05.02.07.01 ELECTROBOMBA DE Q=12.5 GPM, H=17.3M,P=1 HP (PETROLEO), INC. TAB. DE CONTROL glb 2.00 1,200.00 2,400.00

02.05.02.08 PRUEBAS

02.05.02.09 PRUEBA DE INSTALAC. DEL SISTEMA DE PETROLEO glb 1.00 951.00 951.00

02.05.03 SISTEMA DE VENTILACION MECANICA

02.05.03.01 PERFORACION DE MUROS und 53.00 13.74 728.22

02.05.03.02 SUMINISTRO E INSTALACION DE EXTRACTORES DE AIRE und 53.00 1,055.53 55,943.09

02.05.03.03 DUCTOS FLEXIBLES 1 kg 2.00 26.94 53.88

02.05.03.04 REJILLAS DE EXTRACCION DE AIRE und 3.00 311.59 934.77

02.06 INSTALACIONES DE INFORMACION TECNOLOGICA Y COMUNICACIONES

02.06.01 SALIDA PARA VOZ Y DATOS

02.06.01.01 SALIDA PARA PUNTO DE INTERNET pto 104.00 45.06 4,686.24

02.06.01.02 SALIDA PARA TELEFONO pto 104.00 52.39 5,448.56

02.06.01.03 CENTRAL IP PARA INTERNET Y TELEFONIA glb 3.00 8,445.38 25,336.14

02.06.01.04 SUMINISTRO DE LINEA EXTERIOR DE TELEFONO pto 10.00 650.00 6,500.00

02.06.02 SALIDA PARA SISTEMA DE ALARMA Y MONITOREO

02.06.02.01 TABLERO CENTRAL PARA CONTROL DE INCENDIOS 1 pto 14.00 5,138.38 71,937.32

02.06.02.02 ESTACION MANUAL DE PROGRAMACION DE ALARMA glb 14.00 80.64 1,128.96

02.06.02.03 SALIDA PARA DETECTOR DE HUMO pto 144.00 398.88 57,438.72

02.06.02.04 SALIDA PARA DIFUSOR DE SONIDO O SIRENA pto 14.00 69.58 974.12

02.06.02.05 SALIDA PARA SENSOR DE MOVIMIENTO pto 58.00 177.84 10,314.72

02.06.02.06 SALIDA PARA SENSOR MAGNETICO pto 59.00 124.64 7,353.76

02.06.03 SALIDA PARA SISTEMAS DE SONIDO

02.06.03.01 SALIDA PARA MEGAFONIA EXTERIOR pto 12.00 363.00 4,356.00

02.06.03.02 SALIDA PARA PARLANTES DE ALTA POTENCIA pto 39.00 539.26 21,031.14

02.06.03.03 CENTRAL DE DIFUSION Y PERIFONIA pto 3.00 2,514.35 7,543.05

02.06.03.04 AMPLIFICADOR und 11.00 3,882.14 42,703.54

02.06.04 SALIDA PARA SISTEMAS DE VIGILANCIA CCTV

02.06.04.01 SALIDA PARA CAMARA DE VIGILANCIA IP und 76.00 1,775.47 134,935.72

02.06.04.02 UNIDAD DE ADMINISTRACION DE CCTV, GRAVADOR DVR glb 1.00 21,934.25 21,934.25

02.06.05 SALIDA PARA TELEVISION

02.06.05.01 SALIDA PARA PUNTO DE IPTV pto 55.00 406.94 22,381.70

02.06.05.02 UNIDAD DE RECEPCION Y DIFUSION DE TV CABLE pto 1.00 1,571.55 1,571.55

02.06.06 CENTRAL DE COMUNICACIONES

02.06.06.01 ESTACION CENTRAL DE COMUNICACIONES pto 1.00 17,101.15 17,101.15

02.06.06.02 REPARTIDOR DE CABLEADO ESTRUCTURADO 12 UR pto 3.00 15,218.76 45,656.28

02.06.06.03 REPARTIDOR DE CABLEADO ESTRUCTURADO 6 UR pto 7.00 17,728.76 124,101.32

02.06.07 CONTROL DE ACCESOS

02.06.07.01 ESTACION CENTRAL DE CONTROL DE TAQUILLA pto 2.00 978.61 1,957.22

02.06.07.02 BARRERA DE CONTROL DE ACCESO ELECTRONICO pto 12.00 6,463.63 77,563.56

02.06.08 CANALIZACIONES Y/O TUBERIAS

02.06.08.01 TUBERIA PVC-P, D=15 mm. m 918.00 3.71 3,405.78

02.06.08.02 TUBERIA PVC-P, D=20mm. m 967.00 27.41 26,505.47

02.06.08.03 BANDEJA PORTACABLE DE 250MMX150MM 1 m 642.00 55.12 35,387.04

02.06.08.04 CAJA DE PASO FºGº DE 250x250x150 mm, PESADO pza 65.00 82.69 5,374.85

02.06.09 CABLEADO EN TUBERIAS

02.06.09.01 CABLE DE VOZ Y DATOS m 3,868.00 7.77 30,054.36

02.06.09.02 CABLE TELEFONICO DE INTERIORES m 355.00 3.36 1,192.80

02.06.09.03 CABLE DE SEÑALES DEBILES m 1,836.00 1.35 2,478.60

Pág. 19
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

02.06.09.04 CABLE DE FIBRA OPTICA m 660.00 18.00 11,880.00

02.06.10 OTROS

02.06.10.01 SERVICIO DE INSTALACION Y CONFIGURACION DE EQUIPOS DE COMUNICACIONES glb 1.00 1,000.00 1,000.00

02.06.10.02 SERVICIO DE INSTALACION Y CONFIGURACION DE EQUIPOS DE SEGURIDAD glb 1.00 1,000.00 1,000.00

03 MEJORAMIENTO DE AREAS DEPORTIVAS

03.01 CAMPO DEPORTIVO GRASS NATURAL

03.01.01 TRABAJOS PRELIMINARES

03.01.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 7,891.05 1.30 10,258.37 94.89% 9734.50

03.01.01.02 LIMPIEZA Y DESBROCE DEL TERRENO h=0.30 m m2 7,891.05 3.27 25,803.73

03.01.02 DEMOLICIONES Y DESMONTAJES

03.01.02.01 DEMOLICIONES

03.01.02.01.01 DEMOLICION DE ESTRUCTURAS DE CONCRETO m3 202.53 21.79 4,413.13

03.01.02.02 DESMONTAJES

03.01.02.02.01 DESMONTAJE DE SISTEMA DE RIEGO und 35.00 14.22 497.70

03.01.02.02.02 DESMONTAJE DEL SISTEMA DE RIEGO TUBERIA m 670.50 2.61 1,750.01

03.01.03 MOVIMIENTO DE TIERRAS

03.01.03.01 CORTE DE MATERIAL SUELTO CON EQUIPO m3 2,367.32 5.59 13,233.32

03.01.03.02 EXCAVACION A MANO EN TERRENO NORMAL m3 375.90 30.41 11,431.12

03.01.03.03 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 3,429.02 8.15 27,946.51

03.01.03.04 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 7,891.05 1.70 13,414.79

03.01.03.05 CONFORMACION DE SUB BASE m2 3,550.97 5.12 18,180.97

03.01.03.06 ACARREO DE MATERIAL PROVENIENTE DE LA DEMOLICION DEL CONCRETO m3 303.79 26.06 7,916.77

03.01.03.07 ELIMINACION DE MATERIAL DE DEMOLICIONES m3 303.79 8.16 2,478.93

03.01.04 EXTRACCION DE MATERIALES EN CANTERA

03.01.04.01 EXTRACCION Y APILAMIENTO DE MATERIAL DE SUB BASE EN CANTERA m3 4,083.62 3.79 15,476.92

03.01.04.02 ZARANDEO DE MATERIAL SELECCIONADO m3 4,083.62 10.82 44,184.77

03.01.04.03 CARGUIO DE MATERIAL DE SUB BASE EN CANTERA m3 4,083.62 4.24 17,314.55

03.01.04.04 TRANSPORTE DE MATERIAL SUB BASE A OBRA m3 4,083.62 5.97 24,379.21

03.01.04.05 EXTRACCION Y APILAMIENTO DE ARENA FINA EN CANTERA m3 907.47 6.86 6,225.24

03.01.04.06 ZARANDEO DE ARENA FINA EN CANTERA m3 907.47 6.26 5,680.76

03.01.04.07 CARGUIO DE ARENA FINA EN CANTERA m3 907.47 4.26 3,865.82

03.01.04.08 TRANSPORTE DE ARENA FINA A OBRA m3 907.47 6.74 6,116.35

03.01.04.09 EXTRACCION Y APILAMIENTO DE TIERRA AGRICOLA EN CANTERA m3 1,814.94 8.38 15,209.20

03.01.04.10 CARGUIO DE MATERIALES EN CANTERA m3 1,814.94 4.26 7,731.64

03.01.04.11 TRANSPORTE DE TIERRA AGRICOLA A OBRA m3 1,814.94 5.97 10,835.19

03.01.05 CONFORMACION DE ESTRUCTURA DE CAMPO DEPORTIVO

03.01.05.01 COLOCADO Y COMPACTADO DE MATERIAL SUB BASE m3 1,814.94 32.27 58,568.11

03.01.05.02 PREPARACION Y BATIDO DE TIERRA AGRICOLA + ARENA FINA + ABONO NATURAL m3 2,880.23 14.55 41,907.35

03.01.05.03 ESPARCIDO Y COMPACTADO DE BATIDO DE TIERRA AGRICOLA + ARENA FINA + ABONO NATURAL m3 7,891.05 22.96 181,178.51

03.01.06 GRAMADO

03.01.06.01 GRASS NATURAL EN CAMPO DEPORTIVO m3 7,891.05 59.83 472,121.52

03.02 SISTEMA DE DRENAJE CAMPO DEPORTIVO

03.02.01 TRABAJOS PRELIMINARES

03.02.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 7,891.05 1.30 10,258.37

03.02.02 INSTALACION SUB DRENES CON TUBERIA

03.02.02.01 COLOCADO Y COMPACTADO DE PIEDRA CHANCADA DE 3/8" m3 109.67 42.32 4,641.23

03.02.02.02 SUMINISTRO Y COLOCACION DE TUBERIA APANELADA PARA DRENAJE m3 1,827.84 76.80 140,378.11

03.02.02.03 ACCESORIOS PARA INSTALACION DETUBERIA - TAPONES und 56.00 250.01 14,000.56

03.02.02.04 ACCESORIOS PARA INSTALACION DETUBERIA - CODOS und 56.00 137.87 7,720.72

03.02.02.05 ACCESORIOS PARA INSTALACION DETUBERIA - ACOPLES und 56.00 112.99 6,327.44

03.02.02.06 ACCESORIOS PARA INSTALACION DETUBERIA - EMPALMES und 56.00 136.36 7,636.16

03.02.02.07 ACCESORIOS PARA INSTALACION DETUBERIA - GEOTEXTIL und 1,462.27 30.36 44,394.52

03.02.03 INSTALACION DREN COLECTOR

03.02.03.01 SUMINISTRO Y COLOCACION DE TUBERIA HDPE ADS D=10" m 220.00 66.90 14,718.00

03.02.04 INSTALACION DE COLECTORES PARA DESFOGUE FINAL

03.02.04.01 EXCAVACION MANUAL DE ZANJAS PARA TUBERIA COLECTOR m 197.50 6.97 1,376.58

03.02.04.02 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 17.78 22.80 405.38

03.02.04.03 REFINE Y NIVELACION DE ZANJAS m2 197.50 2.28 450.30

Pág. 20
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

03.02.04.04 RELLENO CON MATERIAL CLASIFICADO POR CAPAS m3 197.50 14.50 2,863.75

03.02.04.05 CAMA DE ARENA PARA APOYO DE TUBERIA m 197.50 1.97 389.08

03.02.04.06 SUMINISTRO Y COLOCACION DE TUBERIA PVC S-20 D=250 MM m 83.40 82.53 6,883.00

03.02.04.07 SUMINISTRO Y COLOCACION DE TUBERIA PVC S-20 D=315 MM m 33.10 104.80 3,468.88

03.02.04.08 SUMINISTRO Y COLOCACION DE TUBERIA PVC S-20 D=355 MM m 81.00 134.39 10,885.59

03.02.04.09 CONCRETO f'c=210 kg/cm2 m3 13.50 314.15 4,241.03

03.02.04.10 SOLADO e=2" m2 131.25 14.17 1,859.81

03.02.05 BUZONES DE CONCRETO HASTA 1.20 M.

03.02.05.01 EXCAVACION MANUAL DE ZANJAS m3 23.54 36.48 858.74

03.02.05.02 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 30.60 22.80 697.68

03.02.05.03 REFINE Y NIVELACION EN FONDO DE ZANJAS m2 12.72 2.28 29.00

03.02.05.04 SOLADO e=2" m2 12.72 14.17 180.24

03.02.05.05 CONCRETO f'c=210 kg/cm2 m3 11.94 303.32 3,621.64

03.02.05.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 423.70 3.78 1,601.59

03.02.05.07 ENCOFRADO Y DESENCOFRADO METALICO m2 97.26 40.26 3,915.69

03.02.06 CONCRETO ARMADO

03.02.06.01 CANAL: ENCOFRADO Y DESENCOFRADO m2 268.70 49.56 13,316.77

03.02.06.02 CANAL: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,808.80 3.52 6,366.98

03.02.06.03 CANAL: CONCRETO f'c=210 kg/cm2 m3 41.34 306.77 12,681.87

03.02.06.04 TAPA: ENCOFRADO Y DESENCOFRADO m2 150.45 49.56 7,456.30

03.02.06.05 TAPA: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 628.32 3.52 2,211.69

03.02.06.06 TAPA: CONCRETO f'c=210 kg/cm2 m3 24.10 306.77 7,393.16

03.02.06.07 TAPA: REJILLA METALICA m2 3.42 71.31 243.88

03.03 SISTEMA DE RIEGO CAMPO DEPORTIVO GRASS NATURAL

03.03.01 TRABAJOS PRELIMINARES

03.03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 7,891.05 1.30 10,258.37

03.03.02 MOVIMIENTO DE TIERRAS

03.03.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 126.67 36.48 4,620.92

03.03.02.02 RELLENO CON MATERIAL CLASIFICADO POR CAPAS m3 126.67 14.50 1,836.72

03.03.03 INSTALACIONES DE SISTEMA DE RIEGO

03.03.03.01 TUBERIAS

03.03.03.01.01 SUMINISTRO Y COLOCACION DE TUBERIA HDPE 3" m 186.57 17.88 3,335.87

03.03.03.01.02 SUMINISTRO Y COLOCACION DE TUBERIA HDPE 2" m 500.16 15.72 7,862.52

03.03.03.02 ASPERSORES

03.03.03.02.01 SUMINISTRO E INSTALACION DE ASPERSORES DE TIPO 1 und 4.00 313.66 1,254.64

03.03.03.02.02 SUMINISTRO E INSTALACION DE ASPERSORES DE TIPO 2 und 10.00 313.66 3,136.60

03.03.03.02.03 SUMINISTRO E INSTALACION DE ASPERSORES DE TIPO 3 und 18.00 178.66 3,215.88

03.03.03.03 ACCESORIOS Y VALVULAS

03.03.03.03.01 VALVULA COMPUERTA DE 2" und 5.00 264.37 1,321.85

03.03.03.03.02 CAJA VALVULA TIPO ARQUETAS und 5.00 44.01 220.05

03.03.03.03.03 ACCESORIOS VARIOS EN INSTALACION DE TUBERIA HDPE glb 1.00 3,500.00 3,500.00

03.03.04 PRUEBAS DE CALIDAD

03.03.04.01 PRUEBA HIDRAULICA EN TUBERIAS DE RIEGO glb 1.00 1,200.00 1,200.00

03.03.05 EQUIPAMIENTO ELECTROMECANICO

03.03.05.01 ELECTROBOMBA SUMERGIBLE und 2.00 2,500.00 5,000.00

03.03.05.02 TABLERO ELECTRICO DE CONTROL AUTOMATICO DE ELECTROBOMBA und 1.00 1,500.00 1,500.00

03.03.06 OPERACION Y MANTENIMIENTO DE GRASS NATURAL

03.03.06.01 OPERACION Y MANTENIMIENTO glb 1.00 80,000.00 80,000.00

03.03.07 OTROS

03.03.07.01 COBERTURA DE PROTECCION DE GRASS NATURAL m2 7,891.05 10.00 78,910.50

03.03.07.02 PRUEBA HIDRAULICA DEL SISTEMA DE DRENAJE glb 2.00 4,500.00 9,000.00

03.03.07.03 CAJAS DE INSPECCION und 3.00 68.67 206.01

03.04 TRATAMIENTO DE MALLA OLIMPICA

03.04.01 ESTRUCTURAS

03.04.01.01 TRABAJOS PRELIMINARES

03.04.01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 281.36 2.32 652.76

03.04.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 237.01 1.30 308.11

03.04.01.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 100.27 1.24 124.33

Pág. 21
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

03.04.01.02 MOVIMIENTO DE TIERRAS

03.04.01.02.01 EXCAVACION PARA ZAPATAS DE 1.00 m A 1.40 m DE PROFUNDIDAD m3 46.97 37.19 1,746.81

03.04.01.02.02 EXCAVACION PARA CIMIENTOS HASTA 1.00 m TERRENO NORMAL m3 93.79 31.00 2,907.49

03.04.01.02.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL SELECCIONADO m3 26.54 40.22 1,067.44

03.04.01.02.04 NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA m2 126.75 5.03 637.55

03.04.01.02.05 ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m m3 134.40 30.41 4,087.10

03.04.01.02.06 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES m3 134.40 44.02 5,916.29

03.04.01.03 OBRAS DE CONCRETO SIMPLE

03.04.01.03.01 SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 C:H m2 49.44 26.17 1,293.84

03.04.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G. m3 65.65 241.75 15,870.89

03.04.01.03.03 SARDINELES DE CONCRETO f'c=175 kg/cm2 m3 46.89 324.48 15,214.87

03.04.01.03.04 ENCOFRADO Y DESENCOFRADO CARAVISTA EN SARDINELES m2 468.93 52.05 24,407.81

03.04.01.04 OBRAS DE CONCRETO ARMADO

03.04.01.04.01 ZAPATAS

03.04.01.04.01.01 ZAPATAS: CONCRETO f'c=175 kg/cm2 m3 29.66 373.45 11,076.53

03.04.01.04.01.02 ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 232.79 3.78 879.95

03.04.01.04.02 DADOS

03.04.01.04.02.01 DADOS: CONCRETO f'c=175 kg/cm2 m3 4.54 242.69 1,101.81

03.04.01.04.02.02 DADOS: ENCOFRADO Y DESENCOFRADO m2 49.28 49.56 2,442.32

03.04.01.04.02.03 DADOS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 620.33 3.52 2,183.56

03.04.01.05 ARQUITECTURA

03.04.01.05.01 REVOQUES ENLUCIDOS Y MOLDEDURAS

03.04.01.05.01.01 TARRAJEO EN SARDINEL DE CONCRETO m2 451.15 26.75 12,068.26

03.04.01.05.02 CARPINTERIA METALICA

03.04.01.05.02.01 PUERTA METALICA m2 60.00 397.01 23,820.60

03.04.01.05.02.02 TUBO METALICO DE 4" EN MALLA OLIMPICA 1 und 170.00 338.60 57,562.00

03.04.01.05.02.03 MALLA METALICA EN INTERIOR m2 1,354.64 81.52 110,430.25

03.04.01.05.03 PINTURA

03.04.01.05.03.01 PINTURA LATEX 2 MANOS EN SARDINEL DE CONCRETO (SUPERLATEX O SIM.) m2 451.15 8.09 3,649.80

03.04.01.05.03.02 PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS m2 1,414.64 13.48 19,069.35
RENOVACION DE CAMPO DEPORTIVO DE FUTBOL, PISTA ATLETICA,PLATAFORMAS DEPORTIVAS, MEJORAMIENTO Y AMPLIACION DE LAS
04
TRIBUNAS Y OBRAS COMPLEMENTARIAS
04.01 TRATAMIENTO DE PISTA ATLETICA

04.01.01 TRABAJOS PRELIMINARES

04.01.01.01 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 6,192.10 1.21 7,492.44

04.01.01.02 TRANSPORTE DE MATERIALES Y HERRAMIENTAS A OBRA glb 1.00 12,000.00 12,000.00

04.01.02 PISTA ATLETICA SON SUPERFICIE SINTETICA

04.01.02.01 MOVIMIENTO DE TIERRAS PARA PISTAS INCLUYE MEDIAS LUNAS Y SALTOS

04.01.02.01.01 EXCAVACION A NIVEL DE SUBRASANTE AREA DE LA PISTA ATLETICA m3 1,165.01 9.49 11,055.94

04.01.02.01.02 SUBRASANTE MEJORADA, NIVELADO Y COMPACTADO m2 5,825.06 10.17 59,240.86

04.01.02.01.03 SUB-BASE GRANULAR e=0.15 m. m2 5,825.06 9.17 53,415.80

04.01.02.01.04 BASE GRANULAR E=0.36 m m2 5,825.06 13.48 78,521.81

04.01.02.01.05 ELIMINACION DE MATERIAL EXCEDENTE CORRESPONDIENTE A LA PISTA m3 1,514.52 28.79 43,603.03

04.01.02.02 GEOTEXTIL

04.01.02.02.01 SUMINISTRO E INSTALACION DE GEOTEXTIL TEJIDO m2 5,825.06 8.62 50,212.02

04.01.02.03 SARDINELES

04.01.02.03.01 EXCAVACION MANUAL DE ZANJAS PARA SARDINELES m3 49.86 30.41 1,516.24

04.01.02.03.02 ELIMINACION DE MATERIAL EXCEDENTE CORRESPONDIENTE A SARDINELES m3 66.52 22.80 1,516.66

04.01.02.03.03 REFINE, NIVELACION Y COMPACTACION m2 513.51 4.56 2,341.61

04.01.02.03.04 CONCRETO f'c=210 kg/cm2 m3 66.77 314.15 20,975.80

04.01.02.03.05 ACERO FY= 4200 kg/cm2 kg 2,054.31 3.70 7,600.95

04.01.02.03.06 ENCOFRADO Y DESENCOFRADO m2 931.29 35.01 32,604.46

04.01.02.03.07 MATERIAL CLASIFICADO EN FOSA m3 24.30 38.24 929.23

04.01.02.03.08 COBERTURA DE CAUCHO DE FOSA DE SALTO LARGO Y TRIPLE m 42.00 23.00 966.00

04.01.02.04 IMPRIMADO

04.01.02.04.01 IMPRIMACION RC 250 m2 5,825.06 3.37 19,630.45

04.01.02.05 CARPETA ASFALTICA EN CALIENTE

04.01.02.05.01 SUMINISTRO Y COLOCACION DE CARPETA ASFALT. EN CALIENTE E=3" (DOS CAPAS DE 1.5") m2 5,825.06 67.60 393,774.06

04.01.02.06 CAPA DE SINTETICO

Pág. 22
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

04.01.02.06.01 SUMINISTRO Y COLOCACION DE CAPA SINTENTICA m2 5,825.06 115.50 672,794.43

04.01.02.07 LOSA PARA CAFETIN DE PERDIGA

04.01.02.07.01 CONCRETO f'c=210 kg/cm2 m3 0.20 297.48 59.50

04.01.02.07.02 ENCOFRADO Y DESENCOFRADO m2 0.71 22.09 15.68

04.01.02.08 RIA

04.01.02.08.01 EXCAVACION MANUAL DE ZANJAS m3 20.96 30.41 637.39

04.01.02.08.02 ELIMINACION DE MATERIAL EXCEDENTE m3 27.25 22.80 621.30

04.01.02.08.03 REFINE, NIVELACION Y COMPACTACION m2 18.08 4.56 82.44

04.01.02.08.04 BASE GRANULAR E=0.15 m. m2 0.60 7.57 4.54

04.01.02.08.05 SOLADO e=2" m2 16.72 14.17 236.92

04.01.02.08.06 CONCRETO f'c=210 kg/cm2 m3 3.30 314.15 1,036.70

04.01.02.08.07 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 196.64 3.78 743.30

04.01.02.08.08 ENCOFRADO Y DESENCOFRADO m2 71.00 35.01 2,485.71

04.01.02.08.09 EXCAVACION MANUAL DE ZANJAS (PARA TUBERIA DE DESAGUE DE RIA) m 55.00 18.60 1,023.00

04.01.02.08.10 REFINE Y NIVELACION DE ZANJAS m2 55.00 2.28 125.40

04.01.02.08.11 RELLENO, COMPACTACION DE ZANJA CON MATERIAL PROPIO m 55.00 3.65 200.75

04.01.02.08.12 CAMA DE ARENA PARA APOYO DE TUBERIA m 55.00 1.97 108.35

04.01.02.08.13 TUBERIA DE PVC SAL 2" m 55.00 24.03 1,321.65

04.01.02.08.14 TARRAJEO CON IMPERMEABILIZANTES m2 14.06 21.53 302.71

04.01.02.09 LOSA LANZAMIENTO DE PESO

04.01.02.09.01 CONCRETO f'c=210 kg/cm2 m3 3.19 297.48 948.96

04.01.02.09.02 BASE GRANULAR e=0.20 m. m2 2.74 7.57 20.74

04.01.02.09.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 65.86 3.78 248.95

04.01.02.09.04 ENCOFRADO Y DESENCOFRADO m2 5.93 44.82 265.78

04.01.02.10 LOSA LANZAMIENTO DE DISCO Y MARTILLO

04.01.02.10.01 CONCRETO f'c=210 kg/cm2 m3 3.34 297.48 993.58

04.01.02.10.02 BASE GRANULAR e=0.20 m. m2 2.89 7.57 21.88

04.01.02.10.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 65.86 3.78 248.95

04.01.02.10.04 ENCOFRADO Y DESENCOFRADO m2 6.08 44.82 272.51

04.02 DRENAJE PISTA ATLETICA

04.02.01 CANAL DE DRENAJE DE LA PISTA ATLETICA

04.02.01.01 EXCAVACION MANUAL DE ZANJAS m 397.00 30.41 12,072.77

04.02.01.02 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 135.48 22.80 3,088.94

04.02.01.03 REFINE Y NIVELACION DE ZANJAS m2 397.00 2.28 905.16

04.02.01.04 CONCRETO f'c=210 kg/cm2 m3 96.23 314.15 30,230.65

04.02.01.05 SUMINISTRO E INSTALACION DE TUBERIA DE DRENAJE 6" m 397.00 54.89 21,791.33

04.02.01.06 ENCOFRADO Y DESENCOFRADO m2 595.50 35.01 20,848.46

04.02.02 CAJA DE REGISTRO (06 UND) DE 0.35 x 0.60 m.

04.02.02.01 EXCAVACION MANUAL DE ZANJAS m3 1.01 30.41 30.71

04.02.02.02 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 1.31 22.80 29.87

04.02.02.03 REFINE, NIVELACION Y COMPACTACION m2 1.26 4.56 5.75

04.02.02.04 SOLADO e=2" m2 1.26 14.17 17.85

04.02.02.05 CONCRETO f'c=210 kg/cm2 m3 0.78 314.15 245.04

04.02.02.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 102.82 3.78 388.66

04.02.02.07 ENCOFRADO Y DESENCOFRADO m2 17.01 35.01 595.52

04.03 DRENAJE DE AREAS VERDES ARTIFICIAL

04.03.01 TUBERIA DE DRENAJE DE AREAS VERDES ARTIFICIAL

04.03.01.01 EXCAVACION MANUAL DE ZANJAS m 474.70 31.00 14,715.70

04.03.01.02 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 3.47 22.80 79.12

04.03.01.03 REFINE Y NIVELACION DE ZANJAS m2 474.70 2.28 1,082.32

04.03.01.04 FILTRO DE GRAVA m3 249.22 19.10 4,760.10

04.03.01.05 SUMINISTRO E INSTALACION DE TUBERIA DE 3" m 474.70 22.64 10,747.21

04.03.01.06 SUMINISTRO E INSTALACION TUBERIA PVC D=110MM m 44.00 34.64 1,524.16

04.03.02 CAJA DE REGISTRO (13 UND) DE 0.50 x 0.50 m.

04.03.02.01 EXCAVACION MANUAL DE ZANJAS m3 2.60 30.41 79.07

04.03.02.02 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 3.38 22.80 77.06

04.03.02.03 REFINE Y NIVELACION DE ZANJAS m2 3.25 2.28 7.41

04.03.02.04 SOLADO e=2" m2 3.25 14.17 46.05

Pág. 23
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

04.03.02.05 CONCRETO f'c=210 kg/cm2 m3 2.31 314.15 725.69

04.03.02.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 208.94 3.78 789.79

04.03.02.07 ENCOFRADO Y DESENCOFRADO m2 39.13 35.01 1,369.94

04.04 SISTEMA DE RIEGO DE PISTA ATLETICA

04.04.01 DEMOLICIONES

04.04.01.01 DEMOLICION DE PAVIMENTO RIGIDO (LOSA Y VEREDAS DE CONCRETO) m2 1.60 7.29 11.66

04.04.01.02 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE D=50 M m3 0.54 22.80 12.31

04.04.02 CAJA DE SALIDA DE VALVULA DE RIEGO (05 UND DE 0.60 x 0.40 m.)

04.04.02.01 EXCAVACION MANUAL DE ZANJAS m3 0.60 30.41 18.25

04.04.02.02 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 0.78 22.80 17.78

04.04.02.03 REFINE, NIVELACION Y COMPACTACION m2 1.20 4.56 5.47

04.04.02.04 SOLADO e=2" m2 1.20 14.17 17.00

04.04.02.05 SUMINISTRO E INSTALACION DE CAJAS DE CONCRETO PREFABRICADA DE 0.60 x 0.40 M. und 5.00 394.14 1,970.70

04.04.03 HIDRANTE

04.04.03.01 VALVULA ESFERICA DOBLE UNIVERSAL DESMONTABLE DE DIAM. 1" und 4.00 90.19 360.76

04.04.03.02 VALVULA ESFERICA DOBLE UNIVERSAL DESMONTABLE DE DIAM. 1 1/2" und 1.00 110.19 110.19

04.04.04 TUBERIA Y ACCESORIOS DE FIJACION

04.04.04.01 TUBERIA PVC SAP CLASE 10 1 1/2" m 246.50 10.03 2,472.40

04.04.04.02 TUBERIA PVC SAP CLASE 10 1 1" m 234.80 6.05 1,420.54

04.04.04.03 ABRAZADERAS DE FIJACION PARA TUBERIA DE 1 1/2" und 123.00 10.41 1,280.43

04.04.04.04 ABRAZADERAS DE FIJACION PARA TUBERIA DE 1" und 117.00 15.41 1,802.97

04.04.04.05 DOBLE PRUEBA HIDRAULICA m 481.30 1.47 707.51

04.04.04.06 ACCESORIOS VARIOS glb 1.00 68.68 68.68

04.05 AREAS VERDES ARTIFICIALES

04.05.01 MOVIMIENTO DE TIERRAS

04.05.01.01 NIVELACION Y COMPACTADO DE TERRENO m2 1,584.50 13.90 22,024.55

04.05.01.02 EXCAVACION A NIVEL DE SUBRASANTE AREA DE LA PISTA ATLETICA m3 316.90 9.49 3,007.38

04.05.01.03 SUBRASANTE MEJORADA, NIVELADO Y COMPACTADO m2 1,584.50 10.17 16,114.37

04.05.01.04 SUB-BASE GRANULAR e=0.15 m. m2 1,584.50 9.17 14,529.87

04.05.01.05 BASE GRANULAR E=0.40 m m2 1,584.50 14.36 22,753.42

04.05.02 GEOTEXTIL

04.05.02.01 SUMINISTRO E INSTALACION DE GEOTEXTIL TEJIDO m2 1,584.50 8.62 13,658.39

04.05.03 SUMINISTRO Y COLOCACION DE GRASS ARTIFICIAL

04.05.03.01 SUMINISTRO Y COLOCACION DE CESPED ARTIFICIAL m2 1,584.50 140.00 221,830.00

04.06 INSTALACIONES ELECTRICAS

04.06.01 TUBERIA DE CONEXION

04.06.01.01 EXCAVACION MANUAL DE ZANJAS m3 11.00 31.00 341.00

04.06.01.02 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 4.58 22.80 104.42

04.06.01.03 REFINE Y NIVELACION DE ZANJAS m2 11.00 2.28 25.08

04.06.01.04 CONCRETO f'c=210 kg/cm2 (TUBERIA EMBEBIDA) m3 2.38 314.15 747.68

04.06.01.05 SUMINISTRO E INSTALACION DE TUBERIA PESADA DE 3" m 22.00 32.98 725.56

04.06.02 CAJA DE REGISTRO (02 UND) DE 1.00 x 1.00 m.

04.06.02.01 EXCAVACION MANUAL DE ZANJAS m3 2.30 30.41 69.94

04.06.02.02 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 3.00 22.80 68.40

04.06.02.03 REFINE, NIVELACION Y COMPACTACION m2 2.00 4.56 9.12

04.06.02.04 SOLADO e=2" m2 2.00 14.17 28.34

04.06.02.05 CONCRETO f'c=210 kg/cm2 m3 0.94 314.15 295.30

04.06.02.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 64.29 3.78 243.02

04.06.02.07 ENCOFRADO Y DESENCOFRADO m2 13.60 35.01 476.14

04.06.02.08 TARRAJEO CON IMPERMEABILIZANTES m2 6.40 21.53 137.79

04.06.03 SUMINISTRO E INSTALACION DE IMPLEMENTOS Y EQUIPOS EMPOTRADOS

04.06.03.01 BORDILLO INTERNO DE ALUMINIO DE LA PISTA ATLETICA glb 1.00 31,360.00 31,360.00

04.06.03.02 CAJETINES DE PERDIGA, ACERO CONFORME A NORMA IAAF, CO NTAPA und 2.00 3,706.00 7,412.00

04.06.03.03 TABLA DE BATIDA PARA SALTO LARGO Y TRIPLE, CONFORME A NORMA IAAF und 6.00 5,930.00 35,580.00

04.06.03.04 OBSTACULO DE RIA MOVIBLE/STEPLECHASE CON CALZOS und 1.00 2,870.00 2,870.00

04.06.03.05 TAPA CIEGA (BLIND BOARD) und 5.00 2,250.00 11,250.00

04.06.03.06 CIRCULO DE LANZAMIENTO CON CONTENEDOR, REFUERZOS RADIALES, ALUMINIO, und 1.00 3,800.00 3,800.00

04.06.03.07 CIRCULO DE LANZAMIENTO DEL DISCO, PVC, CONFORME A NORMA IAAF und 1.00 3,000.00 3,000.00

Pág. 24
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

04.06.03.08 REDUCTOR DEL DISCO A MARTILLO, PVC, CONFORME A NORMA IAAF Y ACCESORIOS und 1.00 3,000.00 3,000.00

04.06.03.09 JAULA PARA LANZAMIENTO DE DISCO Y MARTILLO und 1.00 40,000.00 40,000.00

04.06.03.10 CERTIFICACION IAAF glb 1.00 10,000.00 10,000.00

05 IMPLEMENTACION CON MOBILIARIO Y EQUIPO ADMINISTRATIVO Y DEPORTIVO

05.01 EQUIPAMIENTO CON IMPLEMENTOS DEPORTIVOS

05.01.01 EQUIPAMIENTO DEPORTIVO glb 1.00 601,771.00 601,771.00

05.02 EQUIPAMIENTO ADMINISTRATIVO

05.02.01 EQUIPAMIENTO ADMINISTRATIVO glb 1.00 284,086.00 284,086.00

06 PROTECCION AMBIENTAL

06.01 PROGRAMA DE EDUCACION AMBIENTAL

06.01.01 SUB PROGRAMA DE EDUCACION Y CAPACITACION AMBIENTAL und 8.00 275.00 2,200.00

06.01.02 SUB PROGRAMA DE RELACIONES COMUNITARIAS und 15.00 357.50 5,362.50

06.02 PROGRAMA DE MONITOREO DE CALIDAD AMBIENTAL

06.02.01 MONITEREO DE CALIDAD DEL AGUA

06.02.01.01 MUESTREO DE COLIFORMES TOTALES Y FECALES und 8.00 45.00 360.00

06.02.01.02 MUESTRO DE DE METALES TOTALES und 8.00 200.30 1,602.40

06.02.01.03 DEMANDA BIOQUIMICA DE OXIGENO (DBO5) und 8.00 112.00 896.00

06.02.01.04 REMISION DE MUESTRAS A LABORATORIO CERTIFICADO und 8.00 88.00 704.00

06.02.02 MONITEREO DE CALIDAD DEL AIRE

06.02.02.01 MUESTREO DE CALIDAD DE AIRE PM 10 und 6.00 3,110.00 18,660.00

06.02.03 MONITOREO DE CALIDAD DE SUELO

06.02.03.01 ANALISIS DE SALINIDAD DE SUELO AGRICOLA pto 8.00 140.00 1,120.00

06.02.04 MONITOREO ARQUEOLOGICO

06.02.04.01 MONITOREO ARQUEOLOGICO glb 1.00 3,600.00 3,600.00

06.02.04.02 PLAN DE MONITOREO ARQUEOLOGICO und 1.00 3,600.00 3,600.00

06.03 PREVISIONES AMBIENTALES

06.03.01 COORDINACION ADMINISTRACION LOCAL DEL AGUA glb 1.00 680.00 680.00

06.03.02 COORDINACION AUTORIDAD REGIONAL DE CULTURA glb 1.00 2,525.00 2,525.00

06.04 PROGRAMA DE SEÑALIZACION AMBIENTAL

06.04.01 SUB PROGRAMA DE SEÑALIZACION AMBIENTAL mod 5.00 233.00 1,165.00

06.04.02 SEÑALES TEMPORALES und 35.00 99.84 3,494.40

06.05 PROGRAMA DE RECUPERACION DE AREAS AUXILIARES

06.05.01 RECUPERACION DE AREAS AUXILIARES m2 6,283.92 11.28 70,882.62

06.05.02 SEMBRADO DE GRASS m2 5,027.14 6.99 35,139.71

06.05.03 SEMBRADO DE ARBOLES und 350.00 27.54 9,639.00

06.05.04 SEMBRADO DE ARBUSTOS und 524.00 29.44 15,426.56

06.05.05 RIEGO m3 2,400.00 26.17 62,808.00

06.06 SUB PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS

06.06.01 MICROCELDA DE SEGURIDAD und 1.00 5,556.97 5,556.97

06.06.02 MICROCELDA DE RELLENO SANITARIO und 1.00 4,084.92 4,084.92

06.06.03 CONTENEDORES DE RESIDUOS (BARRILES DE 55 GLNS) und 4.00 97.81 391.24

06.07 PROGRAMA DE CONTINGENCIAS

06.07.01 KITT DE EMERGENCIAS mod 6.00 789.00 4,734.00

07 INFRAESTRUCTURA DE PROTECCION

7.01 ESTRUCTURAS METALICAS Y COBERTURAS

07.01.01 ARMADURA METALICA 01 L=21 m H=VARIABLE, INCLUYE ANCLAJE und 42.00 19,381.87 814,038.54

07.01.02 ARMADURA METALICA 02 H=0.45 M, INCLUYE ANCLAJE m 944.16 206.46 194,931.27

07.01.03 ARMADURA METALICA 03 H=0.45 M, INCLUYE ANCLAJE m 157.36 445.31 70,073.98

07.01.04 ARRIOSTRES DE FIERRO LISO Ø 1/2" m 4,316.40 62.28 268,825.39

8 COBERTURAS Y CERRAMIENTOS

8.01 COBERTURA DE POLICARBONATO SPRING E=16 MM m2 2,366.93 834.31 1,974,753.37

COSTO DIRECTO S/. 26,706,755.40 0.55% S/. 146,096.52


GASTOS GENERALES 5.43% S/. 1,450,176.82 0.55% 7,933.04
GASTOS DE SUPERVISIÓN 2.39% S/. 638,291.45 0.55% 3,491.71
GASTOS DE ELABORACIÓN DE EXPEDIENTE TÉCNICO 1.05% S/. 280,420.93 0.55% 1,534.01
GASTOS DE LIQUIDACIÓN 0.20% S/. 53,413.51 0.55% 292.19
GASTOS DE MONITOREO Y SEGUIMIENTO 0.11% S/. 29,377.43 0.55% 160.71
Pág. 25
CALE
Proyecto :"MEJORAMIENTO DE LA CAPACIDAD DE PRESTACION DE SERVICIOS DEPORTIVOS EN EL ESTADIO GUILLERMO BR
Fecha : Setiembre del 2016 Plazo de Ejecucion : 300 Dias Calendarios (10.0 Meses)

PRECIO PARCIAL 01° MES


ITEM DESCRIPCIÓN DE LAS PARTIDAS A EJECUTAR UND METRADO
(S/.) (S/.)
% Monto S/.

S/. 26,706,755.40 0.55% S/. 146,096.52

GASTOS DE GESTION DE PROYECTO 0.18% S/. 48,072.16 0.55% 262.97


GASTOS DE GESTION DE PROYECTO S/. 29,206,507.70 0.55% S/. 159,771.15

Pág. 26
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

9.53% 1562.12

25.01% 938.77

60.78% 5978.12 13.73% 1350.30

51.11% 16615.04 48.89% 15895.59

76.66% 8838.02 23.34% 2690.88

81.31% 12578.37 18.69% 2891.99

100.00% 1601.69

79.99% 34558.09 20.01% 8643.27

100.00% 62536.13

93.44% 31496.56 6.56%

100.00%

100.00%

100.00%

94.62% 62282.84 5.38%

97.12% 6838.32 2.88%

75.67%

84.70%

Pág. 27
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

0.07% 0.71

100.00% 1472.47

100.00% 1544.29

11.26% 208.11

100.00% 1835.74

41.23% 1468.26

100.00% 1724.39

100.00% 2067.16

100.00% 3154.36

100.00% 9578.65

100.00% 2121.83

100.00% 3060.36

100.00% 1934.01

Pág. 28
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

100.00% 7972.61

100.00% 719.58

100.00% 176.07

60.27% 2771.83 39.73% 1827.34

100.00% 918.62

100.00% 543.51

100.00% 712.90

63.71% 475.09 36.29% 270.58

100.00% 562.70

94.41% 8984.60 5.59% 531.88

100.00% 1538.98

100.00% 1322.06

100.00% 1732.55

100.00% 131.71

100.00% 2252.04

100.00% 14.28

100.00% 2177.22

100.00% 883.49

100.00% 377.86

70.22% 1618.86 29.78% 686.43

100.00% 1360.00

100.00% 270.00

100.00% 170.02

100.00% 240.06

100.00% 86.00

100.00% 684.25

100.00% 1587.11

100.00% 305.07

100.00% 163.09

100.00% 299.76

100.00% 27.90

100.00% 80.06

100.00% 29.19

100.00% 120.18

100.00% 52.16

100.00% 9.52

54.53% 551.57 45.47% 460.00

100.00% 105.62

100.00% 364.56

100.00% 147.20

100.00% 653.51

100.00% 945.99

Pág. 29
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

100.00% 694.56

100.00% 983.48

100.00% 1081.75

99.92% 620.02 0.08% 0.48

100.00% 653.17

100.00% 2783.04

100.00% 504.59

100.00% 2067.85

100.00% 4650.43

99.99% 3167.43 0.01% 0.36

100.00% 1029.13

100.00% 1753.19

100.00% 1273.15

100.00% 959.19

100.00% 991.03

100.00% 446.99

100.00% 8100.72

100.00% 503.20

40.40% 1219.81 59.60% 1799.37

100.00% 3019.18

45.22% 739.24 54.78% 895.61

100.00% 822.77

100.00% 820.51

100.00% 522.72

100.00% 626.51

100.00% 477.48

100.00% 654.40

100.00% 12724.15

100.00% 389.66

100.00% 381.92

100.00% 2008.74

100.00% 729.00

100.00% 4400.00

66.60% 239.75 33.40% 120.25

100.00% 680.08

100.00% 344.00

100.00% 241.80

100.00% 1084.35

100.00% 249.98

100.00% 490.58

Pág. 30
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

100.00% 345.96

100.00% 436.75

100.00% 92.99

100.00% 43.38

100.00% 64.56

100.00% 238.72

100.00% 216.83

100.00% 370.64

100.00% 315.84

100.00% 742.00

100.00% 655.92

100.00% 363.32

100.00% 210.96

100.00% 95.52

100.00% 230.00

100.00% 110.00

100.00% 110.00

100.00% 500.00

100.00% 50.00

100.00% 60.00

100.00% 64.00

49.90% 210.82 50.10% 211.70

100.00% 253.50

100.00% 32671.79

100.00% 39361.09

39.99% 28686.00 60.01% 43047.69

100.00% 23940.54

100.00% 24021.92

11.09% 3184.90 88.91%

100.00%

100.00%

100.00%

5.26%

28.35%

55.30%

Pág. 31
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

100.00% 394.63

100.00% 157.30

100.00% 150.04

52.49% 1882.26 47.51% 1703.36

100.00% 608.63

100.00% 907.63

100.00% 2614.81

31.82% 4699.49 41.50%

83.94% 23599.55 16.06%

Pág. 32
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

100.00% 1836.56

100.00% 2646.47

100.00% 1403.31

100.00% 2352.82

100.00% 1620.98

100.00% 13520.91

100.00% 1576.34

100.00% 830.20

100.00% 757.59

100.00% 1804.49

100.00% 2855.00

100.00% 798.76

100.00% 10361.93

100.00% 6997.41

99.99% 4453.16 0.01% 0.60

100.00% 338.86

100.00% 8219.34

100.00% 3501.34

100.00% 3934.02

100.00% 187851.62

23.55% 2031.41

100.00% 2500.00

100.00% 202.05

100.00% 1171.28

100.00% 3157.62

100.00% 412.34

Pág. 33
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

100.00% 559.06

100.00% 360.95

100.00% 4500.00

56.24% 1640.35 43.76%

100.00%

100.00%

99.98%

Pág. 34
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

57.17% 1048.12

100.00% 7125.90

49.90% 182.37 50.10% 183.13

100.00% 507.62

100.00% 599.69

57.14% 1409.92 42.86% 1057.77

100.00% 126.57

100.00% 438.60

100.00% 518.15

100.00% 1806.06

100.00% 92.64

100.00% 6667.51

100.00% 7319.85

90.00% 22732.29 10.00% 2525.75

100.00% 1295.55

100.00% 3036.84

100.00% 215.55

100.00% 4400.24

91.84% 30689.91 8.16% 2728.00

100.00% 7925.98

66.59% 4496.94 33.41%

100.00%

100.00%

100.00% 106.49

100.00% 1907.42

100.00% 1164.02

100.00% 1029.56

Pág. 35
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

67.53% 15710.43 32.47% 7552.44

100.00% 1021.77

100.00% 93.41

100.00% 517.05

99.98% 1357.21 0.02% 0.30

100.00% 777.05

100.00% 12278.25

100.00% 7500.00

100.00% 1400.00

100.00% 2550.00

100.00% 2500.00

100.00% 2000.00

99.98% 1360.04 0.02% 0.34

100.00% 357.68

100.00% 424.88

100.00% 1144.08

100.00% 1668.42

100.00% 4462.80

100.00% 579.60

56.68% 2112.54 43.32% 1614.54

89.86% 7202.62 10.14%

100.00%

100.00%

100.00% 77.84

100.00% 668.28

100.00% 7892.52

85.55% 18969.25 14.45% 3204.11

86.97% 7962.90 13.03% 1193.20

100.00% 6942.60

100.00% 4566.60

100.00% 18221.25

96.20% 19346.85 3.80%

100.00%

100.00%

Pág. 36
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

100.00% 180.94

39.96% 161.93 60.04% 243.31

100.00% 2024.08

100.00% 150.96

100.00% 771.36

100.00% 500.00

100.00% 205.50

100.00% 13564.80

100.00% 2587.36

100.00% 20147.69

100.00% 35000.00

100.00% 20000.00

100.00% 74.38

100.00% 3134.20

100.00% 2231.77

100.00% 14.45

100.00% 894.18

100.00% 309.78

100.00% 118.14

Pág. 37
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

44.47% 1794.93

100.00% 3392.40

100.00% 259.92

100.00% 660.10

100.00% 279.81

34.77% 6279.76 65.23% 11779.24

19.04% 1554.44 71.43% 5830.69 9.53% 777.83

69.99% 28333.87 30.01% 12146.10

26.66% 11958.63 73.34% 32897.92

100.00% 8037.16

100.00% 4279.83

99.96% 4363.88 0.04% 1.82

100.00% 14.13

100.00% 1085.77

79.99% 15834.54 20.01%

39.98% 2847.01 60.02%

100.00%

100.00%

26.65% 23952.51 73.35%

100.00% 4822.70

34.28% 2429.27 65.72%

100.00%

100.00%

100.00%

100.00%

81.55%

64.53%

100.00%

100.00%

100.00%

91.57%

97.80%

100.00%

100.00%

99.99%

100.00%

Pág. 38
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

Pág. 39
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

Pág. 40
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

54.93%

78.24%

100.00%

100.00%

95.98%

Pág. 41
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

74.31%

97.10%

100.00% 2000.00

100.00% 2500.00

100.00% 18042.40

74.59% 34797.11 25.41%

100.00% 6080.56

81.05% 7059.61 18.95%

54.84% 4951.52 45.16%

62.82% 1911.45 37.18%

73.98%

100.00%

100.00%

81.61%

100.00%

100.00%

96.31%

97.99%

85.98%

100.00%

100.00%

100.00%

100.00%

73.17%

73.71%

Pág. 42
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

Pág. 43
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

100.00% 36.48

100.00% 450.00

100.00% 293959.00

100.00% 12000.00

100.00% 950.00

100.00% 15004.00

100.00% 336.48

100.00% 557.85

100.00% 558.72

100.00% 1111.20

100.00% 511.20

100.00% 195.30

100.00% 200.60

100.00% 160.08

100.00% 1101.60

100.00% 39.20

100.00% 47.20

100.00% 51.20

100.00% 33.76

100.00% 41.76

100.00% 549.45

100.00% 71.05

100.00% 85.26

100.00% 64.84

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00% 412.92

100.00% 409.10

100.00% 387.28

100.00% 524.10

100.00% 545.72

100.00% 138.04

100.00% 475.20

99.99% 353.29 0.01%

100.00%

100.00%

Pág. 44
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

Pág. 45
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

5.11% 523.87

100.00% 25803.73

100.00% 4413.13

100.00% 497.70

100.00% 1750.01

100.00% 13233.32

94.99% 10858.37 5.01% 572.75

100.00% 27946.51

100.00% 13414.79

79.96% 14537.20 20.04% 3643.77

29.99% 2374.48 70.01% 5542.29

100.00% 2478.93

100.00% 15476.92

22.72% 10037.81 77.28% 34146.96

100.00% 17314.55

100.00% 24379.21

99.93% 6220.92 0.07% 4.32

100.00% 5680.76

66.60% 2574.53 33.40% 1291.29

100.00% 6116.35

100.00% 15209.20

100.00% 7731.64

100.00% 10835.19

31.57% 18488.77 68.43% 40079.34

99.99% 41903.50 0.01% 3.85

100.00% 181178.51

97.45% 460070.76 1.36% 6440.69 1.19%

43.93% 4506.67 56.07% 5751.70

100.00% 4641.23

100.00% 140378.11

99.79% 13970.46 0.21% 30.10

97.66% 7540.42 2.34% 180.30

94.78% 5996.94 5.22% 330.50

100.00% 7636.16

91.31% 40537.86 4.21% 1868.01 3.80%

100.00% 14718.00

100.00% 1376.58

100.00% 405.38

100.00% 450.30

Pág. 46
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

100.00% 2863.75

100.00% 389.08

92.31% 6353.71 7.69% 529.29

100.00% 3468.88

100.00% 10885.59

100.00% 4241.03

100.00% 1859.81

99.98% 858.56 0.02% 0.18

100.00% 697.68

100.00% 29.00

100.00% 180.24

100.00% 3621.64

100.00% 1601.59

100.00% 3915.69

100.00% 13316.77

100.00% 6366.98

100.00% 12681.87

58.49% 4361.09 41.51%

100.00%

100.00%

100.00%

69.41% 7120.59 30.59% 3137.78

19.99% 923.80 80.01% 3697.12

100.00% 1836.72

100.00% 3335.87

100.00% 7862.52

100.00% 1254.64

100.00% 3136.60

100.00% 3215.88

100.00% 1321.85

100.00% 220.05

100.00% 3500.00

100.00% 1200.00

100.00% 5000.00

100.00% 1500.00

100.00% 80000.00

100.00% 78910.50

100.00% 9000.00

100.00% 206.01

62.47% 407.81 37.53%

100.00%

100.00%

Pág. 47
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

100.00%

40.62%

100.00%

100.00%

8.32%

Pág. 48
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

Pág. 49
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

Pág. 50
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%
1.08% 15,685.50 2.20% 31,870.71 4.41% 64,019.38 5.37% 77,847.64 8.48%
1.08% 6,903.93 2.20% 14,027.81 4.41% 28,177.96 5.37% 34,264.43 8.48%
1.08% 3,033.11 2.20% 6,162.85 4.41% 12,379.44 5.37% 15,053.41 8.48%
1.08% 577.73 2.20% 1,173.88 4.41% 2,357.99 5.37% 2,867.32 8.48%
1.08% 317.75 2.20% 645.63 4.41% 1,296.89 5.37% 1,577.02 8.48%
Pág. 51
CALENDARIO VALORIZADO DE EJECUCIÓN DE OBRA
ILLERMO BRICEÑO ROSAMEDINA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO"

02° MES 03° MES 04° MES 05° MES 06° MES

% Monto S/. % Monto S/. % Monto S/. % Monto S/. %

1.08% S/. 288,867.32 2.20% S/. 586,937.64 4.41% S/. 1,178,994.04 5.37% S/. 1,433,658.20 8.48%

1.08% 519.96 2.20% 1,056.49 4.41% 2,122.19 5.37% 2,580.58 8.48%


1.08% S/. 315,905.30 2.20% S/. 641,875.00 4.41% S/. 1,289,347.88 5.37% S/. 1,567,848.61 8.48%

Pág. 52
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

2210.27

42321.71

1013.92

1738.51

3544.75

202.83

100.00% 25096.78

22849.39 24.33% 7347.84

7477.92 15.30% 1350.45

100.00% 59406.32

68.20% 62914.35 31.80% 29334.63

88.57% 51599.21 11.43% 6657.21

100.00% 10108.86

100.00% 27420.99

100.00% 14490.93

100.00% 521.91

100.00% 614.91

Pág. 53
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

100.00% 130.14

100.00% 565.11

85.79% 103992.53 14.21% 17218.24

77.10% 2432.61 22.90% 722.73

100.00% 89753.58

39.34% 9220.40 60.66% 14219.43

26.68% 1947.46 68.87% 5025.92 4.45% 324.59

22.85% 1292.04 77.15% 4362.10

47.01% 7890.12 52.99% 8892.99

100.00% 30600.00 0.00

100.00% 15200.00

100.00% 94764.14

92.93% 34011.61 7.07% 2586.50

95.34% 6705.89 4.66% 327.80

89.71% 2752.86 10.29% 315.76

100.00% 8030.04

Pág. 54
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

Pág. 55
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

Pág. 56
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

25539.08

6724.19

10674.65

33206.89

7342.86 81.58% 113932.95 13.16% 18383.94

10086.93 71.65% 25494.32

100.00% 14703.55

100.00% 12448.92

1538.26 44.70% 1243.33

Pág. 57
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

100.00% 182.88

93.03% 402039.41 6.97% 30135.94

46.34% 9843.86 45.99% 9770.07 7.67% 1629.02

100.00% 341318.62

73.75% 20100.73 13.58% 3700.46 12.67% 3454.02

92.33% 3262.89 7.67% 271.11

100.00% 10422.16

98.09% 172803.58 1.91% 3368.03

100.00% 700.00

100.00% 55411.21

6127.81 26.68% 3939.76

4515.18

56.14% 34040.48 43.86% 26599.41

100.00% 212.43

100.00% 1430.78

100.00% 488.34

100.00% 82.08

100.00% 133.76

100.00% 2307.06

100.00% 4993.77

99.90% 9336.38 0.10% 9.74

100.00% 5237.05

100.00% 20719.09

100.00% 12512.14

100.00% 14961.27

100.00% 19538.23

100.00% 1635.57

80.37% 213593.86 13.52% 35940.36 6.11% 16233.54

47.64% 9858.06 52.36% 10833.95

18.18% 680.95 81.82% 3065.56

100.00% 1937.00

79.53% 51630.84 20.47% 13286.35

Pág. 58
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

100.00% 30774.31

100.00% 11218.95

97.74% 8838.64 2.26% 204.52

100.00% 9824.63

100.00% 9304.33

100.00% 19900.57

100.00% 2239.42

100.00% 147.16

100.00% 3249.94

50.47% 60045.15 49.53% 58916.25

100.00% 95401.32

25.42% 486.12 74.58% 1426.58

Pág. 59
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

1276.17

2501.47

140.95

45177.61 0.02% 9.41

100.00% 14178.00

100.00% 10042.92

100.00% 4229.61

100.00% 53381.29

29.50% 453.16 70.50% 1083.20

100.00% 3565.19

100.00% 71430.76

100.00% 122189.76

100.00% 1323.24

100.00% 1066.01

100.00% 66.20

16.66% 3386.67 83.34% 16947.49

100.00% 6380.10

100.00% 4519.31

100.00% 1804.00

86.74% 20948.59 13.26% 3201.75

100.00% 686.34

100.00% 714.56

100.00% 320.12

99.87% 301.82 0.13% 0.40

100.00% 2748.77

100.00% 3581.37

100.00% 253.66

11.09% 343.83 88.91% 2757.08

100.00% 583.47

100.00% 10271.96

100.00% 7795.67

100.00% 13899.45

100.00% 6049.89

100.00% 2459.65

100.00% 19049.68

Pág. 60
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

100.00% 4388.15

87.95% 9274.67 12.05% 1271.11

100.00% 8960.00

100.00% 13216.65

59.90% 3618.77 40.10% 2422.17

80.72% 10264.14 19.28% 2451.58

100.00% 565.95

100.00% 19729.60

100.00% 21570.19

100.00% 2071.32

60.68% 2924.84 39.32% 1895.61

2256.66

2315.52

512.80

Pág. 61
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

812.98

4798.56

5509.35

764.15

72598.07 0.00% 0.43

6189.10

100.00% 801.42

100.00% 1774.62

99.92% 334.36 0.08% 0.26

100.00% 276.80

100.00% 129963.12

100.00% 26822.56

100.00% 76529.40

100.00% 91692.40

100.00% 1680.44

100.00% 357.68

100.00% 4826.90

100.00% 3430.76

Pág. 62
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

100.00% 50.01

100.00% 100.02

100.00% 650.13

100.00% 140.01

100.00% 575.15

100.00% 132.01

100.00% 125.71

100.00% 2430.15

100.00% 117.01

100.00% 324.02

100.00% 145.96

100.00% 1726.36

100.00% 700.00

100.00% 800.00

100.00% 800.00

100.00% 500.00

100.00% 6991.40

100.00% 15834.80

100.00% 25967.80

Pág. 63
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

3960.35

4274.23

3990.35

3806.18

65916.20

4657.25

178666.35

3571.20

76560.12

51883.50

34251.13 18.45% 7749.04

6466.46 35.47% 3555.04

189680.85

42187.13

123651.39

95781.16 8.43% 8813.65

100.00% 14193.14

100.00% 8797.69

100.00% 8960.72

100.00% 308.96

100.00% 371.27

100.00% 16955.41

100.00% 18914.11

100.00% 7168.23

322751.27 2.20% 7256.14

139810.97

91407.78 0.00% 1.68

53370.13 0.01% 5.32

89730.02

100.00% 75615.75

100.00% 298865.58

100.00% 359690.87

100.00% 418027.59

100.00% 41395.73

97.68% 185934.74 2.32% 4422.71

Pág. 64
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

100.00% 234899.31

100.00% 269283.61

96.03% 259721.45 3.97% 10742.12

100.00% 140948.19

100.00% 126279.59

100.00% 48208.18

100.00% 65875.80

100.00% 39849.46

100.00% 71450.61

72.76% 14955.60 27.24% 5598.27

92.93% 22562.62 7.07% 1716.70

100.00% 11724.63

100.00% 11160.15

100.00% 2503.34

100.00% 31400.10

100.00% 33778.44

80.96% 24490.90 19.04% 5761.38

85.24% 26217.11 9.15% 2815.31 5.61% 1725.70

1136.98

747.51

1543.94

1695.63

3652.57

2371.94

42.30% 33517.09 54.20% 42942.31 3.50% 2773.36

52.79% 9999.07 47.21% 8940.97

89.28% 62794.71 10.72% 7540.40

100.00% 90000.00

96.17% 183058.40 3.83% 7298.31

100.00% 441580.74

92.95% 268628.70 7.05% 20388.78

100.00% 60037.92

100.00% 15693.55

35.57% 8800.03 64.43% 15938.83

99.83% 192141.12 0.17% 336.48

100.00% 100561.92

100.00% 169695.44

100.00% 110154.74

100.00% 365833.23

90.35% 20086.97 9.65% 2144.33

90.85% 27596.61 9.15% 2780.93

100.00% 63444.69

100.00% 106546.51

96.79% 115992.89 3.21% 3841.75

Pág. 65
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

100.00% 187705.63

78.51% 130140.18 21.49% 35618.67

98.08% 25969.53 1.92% 508.76

100.00% 99490.58

96.22% 184614.89 3.78% 7250.83

100.00% 45009.47

100.00% 157930.45

100.00% 111047.29

100.00% 12314.22

100.00% 13312.61

100.00% 1931.76

100.00% 27084.33

100.00% 1031.80

100.00% 72120.59

100.00% 6360.00 0.00

100.00% 3520.00 0.00

100.00% 8957.52

100.00% 17417.40

100.00% 11253.25

100.00% 12640.00

100.00% 46170.00

100.00% 6840.00 0.00

49.34% 6431.96 50.66% 6604.84

56.96% 67573.04 43.04% 51055.05

100.00% 46789.63

100.00% 6433.35

100.00% 15431.51

100.00% 5000.00

100.00% 4500.00

100.00% 7000.00

74.37% 1785.79 25.63% 615.41

100.00% 22065.00

100.00% 3740.44

100.00% 4788.00

100.00% 2068.44

93.55% 12188.34 6.45% 840.25

99.78% 150644.68 0.22% 332.64

98.68% 112937.07 1.32% 1509.18

100.00% 39386.36

100.00% 39245.51

100.00% 65646.87

100.00% 31435.31

64.88% 55576.26 35.12% 30082.00

53.12% 23599.68 46.88% 20826.09

49.24% 18014.15 50.76% 18567.51

100.00% 30440.67

100.00% 1900.41

100.00% 1532.65

100.00% 8523.69

Pág. 66
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

100.00% 9424.80 0.00

100.00% 10758.00 0.00

100.00% 9310.00

100.00% 3430.00

100.00% 3996.00

100.00% 2262.00

100.00% 406.80

100.00% 3502.38

87.95% 3440.84 12.05% 471.55

100.00% 4595.36

100.00% 1862.27

100.00% 2019.44

100.00% 1102.06

100.00% 1596.95

100.00% 243.96

90.77% 1821.22 9.23% 185.26

100.00% 821.26

100.00% 5188.96

100.00% 2771.82

100.00% 367.98

54.54% 3248.00 45.46% 2707.39

100.00% 983.51

100.00% 170.86

100.00% 221.64

100.00% 750.00

100.00% 15750.00

100.00% 2283.75

100.00% 13412.30

100.00% 795.20

100.00% 11551.75

100.00% 4603.04

100.00% 4850.25

69.33% 8101.49 30.67% 3584.59

13399.52 20.85% 5087.67 20.18% 4923.55 4.04% 985.05

11175.60 21.76% 3107.90

46.01% 20029.08 49.08% 21369.21 4.91% 2138.40

1785.81

301.47

8021.86 4.02% 335.58

Pág. 67
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

8677.91 25.69% 3000.82

100.00% 14786.24

100.00% 12409.32

100.00% 2154.24

100.00% 1716.52

100.00% 253.44

72.60% 1576.05 27.40% 594.75

100.00% 5010.30

100.00% 3588.42

100.00% 20.74

100.00% 223.20

100.00% 225.90

6721.79 2.90% 200.65

100.00% 18975.00 0.00 0.00

100.00% 9680.00 0.00

100.00% 4015.00

100.00% 500.00

100.00% 1825.00 0.00

100.00% 2190.00

100.00% 5632.00 0.00

100.00% 62748.00 0.00

100.00% 41547.80

100.00% 9252.75

11852.93

1650.43

4077.84

1131.27

25034.73 26.02% 8803.83

1107.04

5169.58

1894.95 18.39% 426.98

21316.48

299.98

10674.11 3.69% 408.77

10242.83 2.01% 209.84

16841.36 14.02% 2746.92

100.00% 4965.30

78.99% 7874.73 21.01% 2094.57

70.14% 8454.01 29.86% 3598.49

562.66

123.27

393.21

12000.00

14260.46 26.83% 5228.31

37493.35 25.47% 12954.55 0.82% 418.76

Pág. 68
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

99.31% 59876.17 0.69% 416.08

93.67% 86486.44 6.33% 5843.20

100.00% 657.72

100.00% 165.59

100.00% 847.76

100.00% 1288.16

100.00% 3444.44

97.22% 39345.07 2.78% 1126.64

100.00% 91392.93

100.00% 4689.79

94.54% 15792.53 5.46% 912.73

100.00% 4705.60

97.95% 504979.60 2.05% 10564.88

100.00% 60795.84

100.00% 2957.08

100.00% 3092.96

100.00% 3848.52

100.00% 15165.67

100.00% 12165.67

100.00% 6686.54

99.99% 3163.86 0.01% 0.29

100.00% 682.83

100.00% 3165.67

100.00% 9855.10 0.00% 0.12

100.00% 16657.25

100.00% 9657.25

100.00% 3861.52

100.00% 3715.38

100.00% 3715.38

100.00% 282.25

100.00% 26314.50

100.00% 537.25

81.23% 2356.24 18.77% 544.34

100.00% 55.71

100.00% 3900.78

100.00% 100.02

100.00% 1375.56

100.00% 2800.20

100.00% 1725.45

100.00% 170.03

100.00% 460.12

94.44% 18054.05 5.56% 1063.13

100.00% 2189.22

89.38% 8403.96 10.62% 998.64

100.00% 350.00

100.00% 400.00

100.00% 400.00

100.00% 250.00

100.00% 45422.55

97.87% 9710.83 2.13% 211.72

100.00% 100000.00

100.00% 7920.00

Pág. 69
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

100.00% 16000.00

100.00% 3000.00

16.88

20.88

22.88

85.26

85.26

36.42

44.84

22.42

22.42

26.42

52.84

91.05

36.42

0.05

55.26

83.30

Pág. 70
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

2424.74

1111.28

3397.56

1170.36

8621.94

734.60

1612.28

1430.54

121.76

2400.00

951.00

728.22

55943.09

53.88

934.77

65.87% 3086.87 34.13% 1599.37

100.00% 5448.56

100.00% 25336.14

100.00% 6500.00

100.00% 71937.32

100.00% 1128.96

94.11% 54057.69 5.89% 3381.03

100.00% 974.12

100.00% 10314.72

100.00% 7353.76

100.00% 4356.00

100.00% 21031.14

100.00% 7543.05

99.43% 42459.64 0.55% 236.27 0.02% 7.64

97.25% 131222.90 2.75% 3712.82

100.00% 21934.25

20.61% 4611.91 79.39% 17769.79

100.00% 1571.55

100.00% 17101.15

98.52% 44980.06 1.48% 676.22

100.00% 124101.32

100.00% 1957.22

100.00% 77563.56

100.00% 3405.78

100.00% 26505.47

96.30% 34078.99 3.70% 1308.05

100.00% 5374.85

88.87% 26708.68 11.13% 3345.68

100.00% 1192.80

100.00% 2478.60

Pág. 71
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

100.00% 11880.00

100.00% 1000.00

100.00% 1000.00

5610.07

1687.24 0.68% 301.42

Pág. 72
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

3095.21

2211.69

7393.16

243.88

244.95

308.11

124.33

Pág. 73
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

1746.81

1180.98 59.38% 1726.51

1067.44

637.55

339.88 91.68% 3747.22

100.00% 5916.29

100.00% 1293.84

100.00% 15870.89

100.00% 15214.87

61.78% 15078.29 32.76% 7996.26 5.46% 1333.26

100.00% 11076.53

100.00% 879.95

100.00% 1101.81

100.00% 2442.32

100.00% 2183.56

26.43% 3189.65 40.87% 4932.37 32.70% 3946.24

87.48% 20838.21 12.52% 2982.39

98.49% 56691.22 1.51% 870.78

84.70% 93537.70 12.48% 13780.01 2.82% 3112.54

100.00% 3649.80

100.00% 19069.35

100.00% 7492.44

100.00% 12000.00

79.96% 8840.15 20.04% 2215.79

33.00% 19550.13 67.00% 39690.73

100.00% 53415.80

100.00% 78521.81

100.00% 43603.03

91.27% 45827.14 8.73% 4384.88

76.46% 1159.29 23.54% 356.95

47.05% 713.54 52.95% 803.12

30.76% 720.31 69.24% 1621.30

100.00% 20975.80

99.99% 7600.51 0.01% 0.44

100.00% 32604.46

100.00% 929.23

100.00% 966.00 0.00

99.98% 19625.84 0.02% 4.61

100.00% 393774.06

Pág. 74
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

100.00% 672794.43 0.00

100.00% 59.50

100.00% 15.68

42.83% 272.98 57.17% 364.41

100.00% 621.30

100.00% 82.44

100.00% 4.54

100.00% 236.92

100.00% 1036.70

100.00% 743.30

100.00% 2485.71

100.00% 1023.00

100.00% 125.40

100.00% 200.75

100.00% 108.35

100.00% 1321.65

100.00% 302.71

100.00% 948.96

100.00% 20.74

100.00% 248.95

100.00% 265.78

100.00% 993.58

100.00% 21.88

100.00% 248.95

100.00% 272.51

77.26% 9327.82 22.74% 2744.95

70.58% 2180.05 29.42% 908.89

69.98% 633.42 30.02% 271.74

100.00% 30230.65

57.87% 12611.23 42.13% 9180.10

62.05% 12936.92 37.95% 7911.54

100.00% 30.71

100.00% 29.87

100.00% 5.75

100.00% 17.85

100.00% 245.04

100.00% 388.66

100.00% 595.52

100.00% 14715.70

100.00% 79.12

8.32% 90.01 91.68% 992.31

100.00% 4760.10

100.00% 10747.21

100.00% 1524.16

100.00% 79.07

100.00% 77.06

100.00% 7.41

100.00% 46.05

Pág. 75
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

100.00% 725.69

100.00% 789.79

100.00% 1369.94

100.00% 11.66

100.00% 12.31

100.00% 18.25

100.00% 17.78

100.00% 5.47

100.00% 17.00

100.00% 1970.70

100.00% 360.76

100.00% 110.19

100.00% 2472.40

100.00% 1420.54

100.00% 1280.43

99.98% 1802.68 0.02% 0.29

100.00% 707.51

100.00% 68.68

100.00% 22024.55

100.00% 3007.38

100.00% 16114.37

100.00% 14529.87

100.00% 22753.42

100.00% 13658.39

100.00% 221830.00

100.00% 341.00

100.00% 104.42

100.00% 25.08

100.00% 747.68

100.00% 725.56

100.00% 69.94

100.00% 68.40

100.00% 9.12

100.00% 28.34

100.00% 295.30

100.00% 243.02

100.00% 476.14

100.00% 137.79

100.00% 31360.00

100.00% 7412.00

100.00% 35580.00

100.00% 2870.00

100.00% 11250.00

100.00% 3800.00

100.00% 3000.00

Pág. 76
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

100.00% 3000.00

100.00% 40000.00

100.00% 10000.00

100.00% 601771.00

100.00% 284086.00

100.00% 2200.00

100.00% 5362.50

100.00% 360.00

100.00% 1602.40

100.00% 896.00

100.00% 704.00 0.00

100.00% 18660.00 0.00

100.00% 1120.00

100.00% 3600.00

100.00% 3600.00

100.00% 680.00

100.00% 2525.00

100.00% 1165.00

100.00% 3494.40

100.00% 70882.62

54.51% 19154.94 45.49% 15984.77

100.00% 9639.00

100.00% 15426.56

100.00% 62808.00

100.00% 5556.97

100.00% 4084.92

100.00% 391.24

100.00% 4734.00

37.09% 301898.18 62.91% 512140.36

49.07% 95645.85 50.93% 99285.42

100.00% 70073.98

67.50% 181445.49 32.50% 87379.90

99.31% 1961073.99 0.69% 13679.38

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17
122,931.48 17.71% 256,820.54 18.98% 275,248.84 33.82% 490,418.68 7.41% 107,401.01
54,107.96 17.71% 113,038.87 18.98% 121,150.04 33.82% 215,856.47 7.41% 47,272.27
23,771.28 17.71% 49,661.43 18.98% 53,224.91 33.82% 94,832.34 7.41% 20,768.15
4,527.86 17.71% 9,459.32 18.98% 10,138.08 33.82% 18,063.30 7.41% 3,955.84
2,490.32 17.71% 5,202.63 18.98% 5,575.94 33.82% 9,934.82 7.41% 2,175.71
Pág. 77
BRA

06° MES 07° MES 08° MES 09° MES 10° MES

Monto S/. % Monto S/. % Monto S/. % Monto S/. % Monto S/.

S/. 2,263,931.49 17.71% S/. 4,729,660.00 18.98% S/. 5,069,039.39 33.82% S/. 9,031,651.63 7.41% S/. 1,977,919.17

4,075.08 17.71% 8,513.39 18.98% 9,124.27 33.82% 16,256.97 7.41% 3,560.25


S/. 2,475,835.47 17.71% S/. 5,172,356.18 18.98% S/. 5,543,501.48 33.82% S/. 9,877,014.22 7.41% S/. 2,163,052.40

Pág. 78
### ### ### ### ### ### ### ### ### ###
S/.90,531.42 S/.8,479.01 S/.39,381.73 S/.57,638.24 ### S/.81,359.30 ### ### ### ###
S/.90,531.42 S/.8,479.01 S/.39,381.73 S/.57,638.24 ### S/.81,359.30 ### S/.95,398.16 S/.53,852.85
S/.60,084.48
S/.7,489.68
S/.3,287.60
S/.3,154.20
S/.6,000.00
S/.6,500.00
S/.13,653.00
S/.10,000.00
S/.8,000.00
S/.2,000.00
S/.30,446.94 S/.8,479.01 S/.1,350.30
S/.505.41
S/.143.46
S/.14,823.07 S/.1,562.12
S/.2,963.70
S/.2,814.76 S/.938.77
S/.1,520.74
S/.644.60
S/.608.75
S/.2,506.55 S/.5,978.12 S/.1,350.30
S/.1,869.32
S/.1,047.46
S/.999.12
S/.38,031.43 S/.57,638.24 S/.71,179.40
S/.16,615.04 S/.15,895.59
S/.8,838.02 S/.2,690.88
S/.12,578.37 S/.2,891.99
S/.1,601.69
S/.34,558.09 S/.8,643.27
S/.62,536.13
S/.31,496.56 S/.47,284.41
S/.31,496.56 S/.2,210.27
S/.42,321.71
S/.1,013.92
S/.1,738.51
S/.69,121.16 S/.34,074.89 ### S/.95,398.16 S/.53,852.85
S/.69,121.16 S/.3,747.58
S/.62,282.84 S/.3,544.75
S/.6,838.32 S/.202.83
S/.30,327.31 S/.33,795.07
S/.25,096.78
S/.22,849.39 S/.7,347.84
S/.7,477.92 S/.1,350.45
### S/.95,398.16
S/.59,406.32
S/.62,914.35 S/.29,334.63
S/.51,599.21 S/.6,657.21
S/.52,020.78
S/.10,108.86
S/.27,420.99
S/.14,490.93
S/.1,832.07
S/.521.91
S/.614.91
S/.130.14
S/.565.11
### ### ###
### S/.17,218.24
### S/.17,218.24
### S/.24,330.18 S/.324.59
S/.2,432.61 S/.722.73
S/.89,753.58
S/.9,220.40 S/.14,219.43
S/.1,947.46 S/.5,025.92 S/.324.59
S/.1,292.04 S/.4,362.10
S/.7,890.12 S/.8,892.99
S/.7,890.12 S/.8,892.99
S/.30,600.00 ###
S/.30,600.00 S/.0.00
S/.15,200.00
S/.94,764.14
S/.43,470.36 S/.11,260.10
S/.34,011.61 S/.2,586.50
S/.6,705.89 S/.327.80
S/.2,752.86 S/.315.76
S/.8,030.04
S/.18,666.49 S/.58,146.66 S/.16,528.98
S/.18,666.49 S/.30,170.34
S/.286.49
S/.227.45
S/.44.37
S/.14.67
S/.3,422.61 S/.1,473.18
S/.763.22
S/.747.41
S/.626.59
S/.268.89
S/.1,016.50 S/.0.71
S/.1,472.47
S/.9,504.61 S/.1,752.40
S/.2,626.44
S/.625.12
S/.4,612.56
S/.1,544.29
S/.1,640.49 S/.208.11
S/.5,452.78 S/.26,944.76
S/.1,927.43
S/.1,501.68
S/.425.75
S/.3,525.35 S/.3,304.00
S/.1,835.74
S/.2,092.92 S/.1,468.26
S/.1,432.43
S/.6,945.91
S/.1,724.39
S/.2,067.16
S/.3,154.36
S/.16,694.85
S/.9,578.65
S/.2,121.83
S/.3,060.36
S/.1,934.01
S/.27,976.32 S/.16,528.98
S/.8,692.19
S/.7,972.61
S/.719.58
S/.5,242.10 S/.3,016.54
S/.176.07
S/.2,771.83 S/.1,827.34
S/.918.62
S/.543.51
S/.712.90
S/.475.09 S/.270.58
S/.562.70
S/.8,984.60 S/.531.88
S/.8,984.60 S/.531.88
S/.6,991.62
S/.1,538.98
S/.1,322.06
S/.1,732.55
S/.131.71
S/.2,252.04
S/.14.28
S/.3,060.71
S/.2,177.22
S/.883.49
S/.377.86
S/.377.86
S/.1,618.86 S/.686.43
S/.1,618.86 S/.686.43
S/.1,360.00
S/.1,360.00
S/.766.08
S/.270.00
S/.170.02
S/.240.06
S/.86.00
S/.684.25
S/.684.25
S/.2,492.18
S/.1,587.11
S/.305.07
S/.163.09
S/.299.76
S/.27.90
S/.80.06
S/.29.19
S/.11,221.47 S/.41,039.26 S/.15,884.16 S/.4,130.12
S/.11,221.47 S/.15,848.68
S/.181.86
S/.120.18
S/.52.16
S/.9.52
S/.551.57 S/.2,676.88
S/.551.57 S/.460.00
S/.105.62
S/.364.56
S/.147.20
S/.653.51
S/.945.99
S/.4,032.98 S/.0.48
S/.694.56
S/.983.48
S/.1,081.75
S/.620.02 S/.0.48
S/.653.17
S/.6,455.06 S/.13,171.32
S/.3,287.63
S/.2,783.04
S/.504.59
S/.3,167.43 S/.6,718.64
S/.2,067.85
S/.4,650.43
S/.3,167.43 S/.0.36
S/.4,055.47
S/.1,029.13
S/.1,753.19
S/.1,273.15
S/.2,397.21
S/.959.19
S/.991.03
S/.446.99
S/.25,190.58 S/.15,884.16 S/.4,130.12
S/.8,603.92
S/.8,100.72
S/.503.20
S/.1,959.05 S/.7,880.16
S/.1,219.81 S/.1,799.37
S/.3,019.18
S/.739.24 S/.895.61
S/.822.77
S/.820.51
S/.522.72
S/.626.51
S/.626.51
S/.1,131.88
S/.477.48
S/.654.40
S/.12,724.15
S/.12,724.15
S/.771.58
S/.389.66
S/.381.92
S/.2,737.74
S/.2,008.74
S/.729.00
S/.4,400.00
S/.4,400.00
S/.239.75 S/.1,144.33
S/.239.75 S/.120.25
S/.680.08
S/.344.00
S/.241.80
S/.241.80
S/.2,743.99
S/.1,084.35
S/.249.98
S/.490.58
S/.345.96
S/.436.75
S/.92.99
S/.43.38
S/.615.70 S/.4,609.13 S/.465.20
S/.890.75
S/.303.28
S/.64.56
S/.238.72
S/.216.83
S/.216.83
S/.370.64
S/.370.64
S/.615.70 S/.3,718.38 S/.465.20
S/.1,713.76
S/.315.84
S/.742.00
S/.655.92
S/.669.80
S/.363.32
S/.210.96
S/.95.52
S/.562.88
S/.192.96
S/.369.92
S/.52.82
S/.52.82
S/.1,334.82 S/.465.20
S/.230.00
S/.110.00
S/.110.00
S/.500.00
S/.50.00
S/.60.00
S/.64.00
S/.210.82 S/.211.70
S/.253.50
### S/.94,195.05 S/.95,112.86 ### S/.61,990.41 ### S/.4,339.14
S/.32,671.79
S/.32,671.79
S/.68,047.09 S/.43,047.69
S/.39,361.09
S/.28,686.00 S/.43,047.69
S/.51,147.36 S/.32,263.27
S/.23,940.54
S/.24,021.92
S/.3,184.90 S/.25,539.08
S/.6,724.19
S/.51,224.40 ### S/.18,383.94
S/.10,674.65
S/.33,206.89
S/.7,342.86 ### S/.18,383.94
S/.10,086.93 S/.52,646.79
S/.10,086.93 S/.25,494.32
S/.14,703.55
S/.12,448.92
S/.1,538.26 S/.1,426.21
S/.1,538.26 S/.1,243.33
S/.182.88
### S/.43,606.47 ### S/.4,339.14
### S/.30,135.94
S/.9,843.86 S/.9,770.07 S/.1,629.02
###
S/.20,100.73 S/.3,700.46 S/.3,454.02
S/.3,262.89 S/.271.11
S/.10,422.16
### S/.3,368.03
S/.700.00
S/.2,584.23 S/.34,133.47 S/.10,642.99 S/.93,391.45 S/.26,599.41
S/.701.97
S/.394.63
S/.157.30
S/.150.04
S/.1,882.26 S/.3,219.62
S/.1,882.26 S/.1,703.36
S/.608.63
S/.907.63
S/.2,614.81
S/.2,614.81
S/.28,299.04 S/.10,642.99 S/.59,350.97
S/.55,411.21
S/.4,699.49 S/.6,127.81 S/.3,939.76
S/.23,599.55 S/.4,515.18
S/.34,040.48 S/.26,599.41
S/.34,040.48 S/.26,599.41
S/.4,654.45
S/.2,131.55
S/.212.43
S/.1,430.78
S/.488.34
S/.2,522.90
S/.82.08
S/.133.76
S/.2,307.06
S/.77,625.24 ### ### S/.19,299.10
S/.4,993.77
S/.4,993.77
S/.9,336.38 S/.5,246.79
S/.9,336.38 S/.9.74
S/.5,237.05
S/.20,719.09
S/.20,719.09
S/.27,473.41
S/.12,512.14
S/.14,961.27
S/.21,173.80
S/.19,538.23
S/.1,635.57
### S/.49,392.26 S/.19,299.10
### S/.35,940.36 S/.16,233.54
S/.9,858.06 S/.10,833.95
S/.680.95 S/.3,065.56
S/.1,937.00
S/.63,295.09 ### S/.95,940.24
S/.51,630.84 S/.55,279.61
S/.51,630.84 S/.13,286.35
S/.30,774.31
S/.11,218.95
S/.8,838.64 S/.39,234.05
S/.8,838.64 S/.204.52
S/.9,824.63
S/.9,304.33
S/.19,900.57
S/.2,386.58
S/.2,239.42
S/.147.16
S/.63,295.09 ### S/.1,426.58
S/.3,249.94
S/.60,045.15 S/.58,916.25
S/.95,401.32
S/.486.12 S/.1,426.58
S/.15,026.77 S/.14,894.71 S/.53,815.93 ###
S/.4,483.03
S/.1,836.56
S/.2,646.47
S/.18,898.02
S/.1,403.31
S/.2,352.82
S/.1,620.98
S/.13,520.91
S/.7,823.62
S/.1,576.34
S/.830.20
S/.757.59
S/.1,804.49
S/.2,855.00
S/.22,611.26 S/.339.46
S/.798.76
S/.10,361.93
S/.6,997.41
S/.4,453.16 S/.0.60
S/.338.86
S/.8,219.34
S/.8,219.34
S/.7,435.36
S/.7,435.36
S/.3,501.34
S/.3,934.02
###
###
S/.15,026.77 S/.14,894.71
S/.2,178.31
S/.2,178.31
S/.12,848.46 S/.4,531.41
S/.514.30
S/.5,740.00
S/.6,594.16 S/.2,031.41
S/.2,500.00
S/.4,530.95
S/.202.05
S/.1,171.28
S/.3,157.62
S/.1,332.35
S/.412.34
S/.559.06
S/.360.95
S/.4,500.00
S/.4,500.00
S/.1,640.35 S/.49,096.20 ### S/.1,083.20
S/.1,640.35 S/.49,096.20 S/.28,459.94
S/.1,640.35 S/.1,276.17
S/.2,501.47
S/.140.95
S/.45,177.61 S/.9.41
S/.14,178.00
S/.10,042.92
S/.4,229.61
S/.53,834.45 S/.1,083.20
S/.53,381.29
S/.453.16 S/.1,083.20
S/.3,565.19
S/.3,565.19
S/.71,430.76
S/.71,430.76
###
###
S/.5,842.12 S/.50,599.49 S/.3,888.09
S/.1,323.24
S/.1,323.24
S/.4,518.88 S/.29,650.90
S/.1,066.01
S/.66.20
S/.3,386.67 S/.16,947.49
S/.6,380.10
S/.4,519.31
S/.1,804.00
S/.20,948.59 S/.3,888.09
S/.20,948.59 S/.3,201.75
S/.686.34
S/.2,336.93 S/.28,274.31 S/.53,321.93 ### ### S/.95,757.19 ### ### S/.54,492.73 S/.1,895.61
S/.1,336.50 S/.0.40
S/.714.56
S/.320.12
S/.301.82 S/.0.40
S/.6,927.63 S/.2,757.08
S/.2,748.77
S/.3,581.37
S/.253.66
S/.343.83 S/.2,757.08
S/.17,784.21 S/.79,436.14
S/.10,855.43
S/.583.47
S/.10,271.96
S/.21,695.12
S/.7,795.67
S/.13,899.45

S/.8,509.54
S/.6,049.89
S/.2,459.65
S/.9,274.67 S/.24,708.94
S/.19,049.68
S/.4,388.15
S/.9,274.67 S/.1,271.11
S/.22,176.65
S/.8,960.00
S/.13,216.65
S/.13,882.91 S/.51,735.65 S/.1,895.61
S/.3,618.77 S/.2,422.17
S/.3,618.77 S/.2,422.17
S/.10,264.14 S/.2,451.58
S/.10,264.14 S/.2,451.58
S/.41,865.74
S/.565.95
S/.19,729.60
S/.21,570.19
S/.4,996.16 S/.1,895.61
S/.2,071.32
S/.2,924.84 S/.1,895.61
S/.2,336.93 S/.28,274.31 S/.49,961.89 S/.73,209.23 S/.15,150.92 S/.5,084.98
S/.2,336.93 S/.8,356.39 S/.39,420.01 S/.46,203.63 S/.15,150.92 S/.5,084.98
S/.2,336.93 S/.8,356.39 S/.39,420.01 S/.7,861.09
S/.2,336.93 S/.8,356.39 S/.183.13
S/.1,551.80
S/.785.13 S/.1,048.12
S/.7,125.90
S/.182.37 S/.183.13
S/.2,517.23 S/.1,184.34
S/.507.62
S/.599.69
S/.1,409.92 S/.1,057.77
S/.126.57
S/.2,855.45
S/.438.60
S/.518.15
S/.1,806.06
S/.92.64
S/.36,719.65 S/.3,821.30
S/.6,667.51
S/.7,319.85
S/.22,732.29 S/.2,525.75
S/.1,295.55
S/.38,342.54 S/.15,150.92 S/.5,084.98
S/.38,342.54 S/.10,653.98
S/.3,036.84
S/.215.55
S/.4,400.24
S/.30,689.91 S/.2,728.00
S/.7,925.98
S/.4,496.94 S/.5,084.98
S/.4,496.94 S/.2,256.66
S/.2,315.52
S/.512.80
S/.19,917.92 S/.10,541.88 S/.27,005.60
S/.19,917.92 S/.10,541.88 S/.13,055.60
S/.19,917.92 S/.8,574.21
S/.106.49
S/.1,907.42
S/.1,164.02
S/.1,029.56
S/.15,710.43 S/.7,552.44
S/.1,021.77
S/.1,967.67 S/.777.35
S/.93.41
S/.517.05
S/.1,357.21 S/.0.30
S/.777.05
S/.12,278.25
S/.12,278.25
S/.13,950.00
S/.7,500.00
S/.1,400.00
S/.2,550.00
S/.2,500.00
S/.3,360.04 S/.46,664.00 ### S/.90,672.21 ### S/.2,576.30
S/.2,000.00
S/.2,000.00
S/.1,360.04 S/.3,595.40
S/.1,360.04 S/.0.34
S/.357.68
S/.424.88
S/.1,144.08
S/.1,668.42
S/.7,154.94 S/.8,817.16 S/.11,120.89
S/.4,462.80
S/.579.60
S/.2,112.54 S/.1,614.54
S/.7,202.62 S/.812.98
S/.4,798.56
S/.5,509.35
S/.746.12
S/.77.84
S/.668.28
S/.34,824.67 S/.53,474.61 S/.79,551.32 S/.0.43
S/.7,892.52
S/.18,969.25 S/.3,204.11
S/.7,962.90 S/.1,193.20
S/.6,942.60
S/.4,566.60
S/.18,221.25
S/.19,346.85 S/.764.15
S/.72,598.07 S/.0.43
S/.6,189.10
### S/.2,576.30
S/.801.42
S/.1,774.62
S/.334.36 S/.0.26
S/.276.80
###
S/.26,822.56
S/.76,529.40
S/.91,692.40
S/.10,295.78
S/.1,680.44
S/.357.68
S/.4,826.90
S/.3,430.76
S/.4,644.22
S/.50.01
S/.100.02
S/.650.13
S/.140.01
S/.575.15
S/.132.01
S/.125.71
S/.2,430.15
S/.117.01
S/.324.02
S/.1,872.32
S/.145.96
S/.1,726.36
S/.2,800.00
S/.700.00
S/.800.00
S/.800.00
S/.500.00
S/.48,794.00
S/.6,991.40
S/.15,834.80
S/.25,967.80
S/.342.87 ###
S/.342.87 S/.243.31
S/.180.94
S/.161.93 S/.243.31
S/.2,024.08
S/.2,024.08
S/.1,422.32
S/.150.96
S/.771.36
S/.500.00
S/.13,770.30
S/.205.50
S/.13,564.80
S/.22,735.05
S/.2,587.36
S/.20,147.69
S/.55,000.00
S/.35,000.00
S/.20,000.00
S/.3,208.58
S/.74.38
S/.3,134.20
S/.3,568.32
S/.2,231.77
S/.14.45
S/.894.18
S/.309.78
S/.118.14
S/.9,184.71 S/.14,221.36 S/.57,902.43 S/.62,502.72 ### ### ### ### ### ###
S/.9,184.71 S/.14,221.36 S/.57,902.43 S/.62,502.72 S/.50,987.75 ### ### ### ### ###
S/.9,184.71 S/.14,221.36 S/.57,902.43 S/.62,502.72 S/.50,987.75 ### ### ### ### ###
S/.5,617.20
S/.1,872.42
S/.3,744.78
S/.3,567.51 S/.14,221.36 S/.57,902.43 S/.62,502.72 S/.19,783.27 S/.16,031.11
S/.1,325.94
S/.2,241.57 S/.1,794.93
S/.3,392.40
S/.259.92
S/.660.10
S/.279.81
S/.6,279.76 S/.11,779.24
S/.1,554.44 S/.5,830.69 S/.777.83
S/.28,333.87 S/.12,146.10
S/.11,958.63 S/.32,897.92
S/.8,037.16
S/.4,279.83
S/.4,363.88 S/.1.82
S/.14.13
S/.1,085.77
S/.15,834.54 S/.3,960.35
S/.2,847.01 S/.4,274.23
S/.3,990.35
S/.3,806.18
S/.31,204.48 ### S/.11,304.08
S/.23,952.51 S/.65,916.20
S/.4,822.70
S/.2,429.27 S/.4,657.25
###
S/.3,571.20
S/.76,560.12
S/.51,883.50
S/.34,251.13 S/.7,749.04
S/.6,466.46 S/.3,555.04
###
S/.42,187.13
### S/.41,445.43
###
S/.95,781.16 S/.8,813.65
S/.14,193.14
S/.8,797.69
S/.8,960.72
S/.308.96
S/.371.27
### ### ### ### ###
S/.43,037.75
S/.16,955.41
S/.18,914.11
S/.7,168.23
### S/.7,256.14
### S/.7,256.14
###
### S/.7.00
S/.91,407.78 S/.1.68
S/.53,370.13 S/.5.32
S/.89,730.02
###
S/.75,615.75
###
###
###
### S/.45,818.44
S/.41,395.73
### S/.4,422.71
###
###
### S/.10,742.12
### S/.10,742.12
###
###
###
S/.48,208.18
S/.65,875.80
S/.39,849.46
S/.37,518.22 S/.78,765.58
S/.71,450.61
S/.14,955.60 S/.5,598.27
S/.22,562.62 S/.1,716.70
S/.25,388.12
S/.11,724.63
S/.11,160.15
S/.2,503.34
S/.84,486.45 S/.8,576.69 S/.33,125.80
S/.31,400.10
S/.33,778.44
S/.24,490.90 S/.5,761.38
S/.26,217.11 S/.2,815.31 S/.1,725.70
S/.3,428.43
S/.1,136.98
S/.747.51
S/.1,543.94
S/.7,720.14
S/.1,695.63
S/.3,652.57
S/.2,371.94
S/.43,516.16 ### S/.10,313.76
S/.33,517.09 S/.42,942.31 S/.2,773.36
S/.9,999.07 S/.8,940.97
S/.62,794.71 S/.7,540.40
S/.90,000.00
S/.90,000.00
### ### ###
### S/.43,380.64
### S/.7,298.31
###
### S/.20,388.78
S/.60,037.92
S/.15,693.55
### ### S/.68,369.95
S/.8,800.03 S/.15,938.83
### S/.336.48
###
###
###
###
S/.20,086.97 S/.2,144.33
S/.27,596.61 S/.2,780.93
S/.63,444.69
### S/.3,841.75
###
### S/.3,841.75
### ###
###
### S/.35,618.67
S/.25,969.53 S/.508.76
S/.99,490.58
### S/.7,250.83
S/.45,009.47
###
###
###
S/.27,558.59
S/.12,314.22
S/.13,312.61
S/.1,931.76
S/.28,116.13
S/.27,084.33
S/.1,031.80
S/.72,120.59
S/.72,120.59
S/.85,154.49 ### ###
S/.6,360.00 S/.0.00
S/.3,520.00 S/.0.00
S/.8,957.52
S/.17,417.40
S/.11,253.25
S/.12,640.00
S/.46,170.00
S/.6,840.00 S/.0.00
S/.6,431.96 S/.6,604.84
S/.67,573.04 S/.51,055.05
S/.46,789.63
S/.6,433.35
S/.15,431.51
S/.5,000.00
S/.4,500.00
S/.7,000.00
S/.34,447.67 S/.615.41
S/.1,785.79 S/.615.41
S/.22,065.00
S/.3,740.44
S/.4,788.00
S/.2,068.44
S/.12,188.34 ### S/.41,228.18
S/.12,188.34 S/.840.25
### S/.332.64
### S/.1,509.18
S/.39,386.36
### ###
S/.39,245.51
S/.65,646.87
S/.31,435.31
S/.55,576.26 S/.30,082.00
S/.23,599.68 S/.20,826.09
S/.18,014.15 S/.18,567.51
S/.30,440.67
S/.1,900.41
S/.1,532.65
S/.8,523.69
S/.20,182.80 S/.19,404.80

S/.9,424.80 S/.0.00
S/.10,758.00 S/.0.00
S/.9,310.00
S/.3,430.00
S/.3,996.00
S/.2,262.00
S/.406.80
S/.50,083.96 ### S/.64,734.54 S/.93,591.46 S/.55,519.50
S/.25,588.16 S/.4,403.15
S/.8,036.20 S/.3,973.93
S/.3,502.38
S/.3,440.84 S/.471.55
S/.4,595.36
S/.6,580.72
S/.1,862.27
S/.2,019.44
S/.1,102.06
S/.1,596.95
S/.10,971.24 S/.429.22
S/.243.96
S/.1,821.22 S/.185.26
S/.821.26
S/.5,188.96
S/.2,771.82
S/.367.98
S/.20,902.37 S/.2,929.03
S/.4,231.51 S/.2,707.39
S/.3,248.00 S/.2,707.39
S/.983.51
S/.170.86
S/.170.86
S/.221.64
S/.221.64
S/.16,500.00
S/.750.00
S/.15,750.00
S/.32,646.04 S/.4,850.25
S/.16,491.25
S/.2,283.75
S/.13,412.30
S/.795.20
S/.16,154.79
S/.11,551.75
S/.4,603.04
S/.4,850.25
S/.4,850.25
S/.50,083.96 S/.95,713.75 S/.36,217.35 S/.84,338.06 S/.55,519.50
S/.24,575.12 S/.36,326.14 S/.29,877.35 S/.3,123.45
S/.8,101.49 S/.3,584.59
S/.13,399.52 S/.5,087.67 S/.4,923.55 S/.985.05
S/.11,175.60 S/.3,107.90
S/.20,029.08 S/.21,369.21 S/.2,138.40
S/.18,787.05 S/.30,531.96
S/.1,785.81
S/.301.47
S/.8,021.86 S/.335.58
S/.8,677.91 S/.3,000.82
S/.14,786.24
S/.12,409.32
S/.10,644.61 S/.4,718.95
S/.2,154.24
S/.1,716.52
S/.253.44
S/.1,576.05 S/.594.75
S/.5,010.30
S/.3,588.42
S/.20.74
S/.223.20
S/.225.90
S/.6,721.79 S/.200.65
S/.6,721.79 S/.200.65
S/.28,655.00 S/.6,340.00 S/.70,570.00 S/.50,800.55
S/.18,975.00 S/.0.00 S/.0.00
S/.9,680.00 S/.0.00
S/.4,015.00
S/.500.00
S/.1,825.00 S/.0.00
S/.2,190.00
S/.5,632.00 S/.0.00
S/.62,748.00 S/.0.00
S/.41,547.80
S/.9,252.75
S/.77,342.65 ### ### ### ### S/.2,398.64
S/.22,542.40
S/.2,000.00
S/.2,500.00
S/.18,042.40
S/.54,800.25 S/.51,918.77 S/.9,230.81
S/.34,797.11 S/.11,852.93
S/.6,080.56
S/.7,059.61 S/.1,650.43
S/.4,951.52 S/.4,077.84
S/.1,911.45 S/.1,131.27
S/.25,034.73 S/.8,803.83
S/.1,107.04
S/.5,169.58
S/.1,894.95 S/.426.98
S/.59,374.76 S/.24,659.57 S/.5,693.06
S/.21,316.48
S/.299.98
S/.10,674.11 S/.408.77
S/.10,242.83 S/.209.84
S/.16,841.36 S/.2,746.92
S/.4,965.30
S/.7,874.73 S/.2,094.57
S/.8,454.01 S/.3,598.49
S/.13,079.14
S/.562.66
S/.123.27
S/.393.21
S/.12,000.00
S/.51,753.81 ### S/.6,678.04
S/.14,260.46 S/.5,228.31
S/.37,493.35 S/.12,954.55 S/.418.76
S/.59,876.17 S/.416.08
S/.86,486.44 S/.5,843.20
S/.657.72
S/.165.59
S/.847.76
S/.1,288.16
S/.3,444.44
S/.39,345.07 ### S/.86,877.61
S/.39,345.07 S/.1,126.64
S/.91,392.93
S/.4,689.79
S/.15,792.53 S/.912.73
S/.4,705.60
### S/.10,564.88
S/.60,795.84
S/.2,957.08
S/.3,092.96
S/.3,848.52
S/.50,885.34 S/.64,741.19
S/.15,165.67
S/.12,165.67
S/.6,686.54
S/.3,163.86 S/.0.29
S/.682.83
S/.3,165.67
S/.9,855.10 S/.0.12
S/.16,657.25
S/.9,657.25
S/.3,861.52
S/.3,715.38
S/.3,715.38
S/.282.25
S/.26,314.50
S/.537.25
S/.2,356.24 S/.29,186.26 S/.1,063.13
S/.2,356.24 S/.544.34
S/.55.71
S/.3,900.78
S/.100.02
S/.1,375.56
S/.2,800.20
S/.1,725.45
S/.170.03
S/.460.12
S/.18,054.05 S/.1,063.13
S/.10,593.18 S/.998.64
S/.2,189.22
S/.8,403.96 S/.998.64
S/.1,400.00
S/.350.00
S/.400.00
S/.400.00
S/.250.00
S/.55,133.38 ###
S/.45,422.55
S/.9,710.83 S/.211.72
###
S/.7,920.00
S/.16,000.00
S/.3,000.00
### S/.82,338.62
###
S/.36.48
S/.450.00
###
S/.12,000.00
S/.24,916.40 S/.24,678.66
S/.15,954.00
S/.950.00
S/.15,004.00
S/.1,453.05
S/.336.48
S/.557.85
S/.558.72
S/.3,279.98
S/.1,111.20
S/.511.20
S/.195.30
S/.200.60
S/.160.08
S/.1,101.60
S/.983.72 S/.563.99
S/.39.20
S/.47.20
S/.51.20
S/.33.76
S/.41.76
S/.549.45
S/.71.05
S/.85.26
S/.64.84
S/.16.88
S/.20.88
S/.22.88
S/.85.26
S/.85.26
S/.36.42
S/.44.84
S/.22.42
S/.22.42
S/.26.42
S/.52.84
S/.91.05
S/.36.42
S/.2,892.36
S/.412.92
S/.409.10
S/.387.28
S/.524.10
S/.545.72
S/.138.04
S/.475.20
S/.353.29 S/.20,763.67
S/.353.29 S/.0.05
S/.55.26
S/.83.30
S/.2,424.74
S/.1,111.28
S/.3,397.56
S/.1,170.36
S/.8,621.94
S/.734.60
S/.1,612.28
S/.1,430.54
S/.121.76
S/.2,400.00
S/.2,400.00

S/.951.00
S/.57,659.96
S/.728.22
S/.55,943.09
S/.53.88
S/.934.77
### ### ### S/.22,212.77
S/.3,086.87 S/.38,884.07
S/.3,086.87 S/.1,599.37
S/.5,448.56
S/.25,336.14
S/.6,500.00
### S/.4,355.15
S/.71,937.32
S/.1,128.96
S/.54,057.69 S/.3,381.03
S/.974.12
S/.10,314.72
S/.7,353.76
S/.75,389.83 S/.236.27 S/.7.64
S/.4,356.00
S/.21,031.14
S/.7,543.05
S/.42,459.64 S/.236.27 S/.7.64
### S/.25,647.07
### S/.3,712.82
S/.21,934.25
S/.4,611.91 S/.19,341.34
S/.4,611.91 S/.17,769.79
S/.1,571.55
S/.62,081.21 ###
S/.17,101.15
S/.44,980.06 S/.676.22
###
S/.79,520.78
S/.1,957.22
S/.77,563.56
S/.69,365.09 S/.1,308.05
S/.3,405.78
S/.26,505.47
S/.34,078.99 S/.1,308.05
S/.5,374.85
S/.26,708.68
S/.18,897.08
S/.26,708.68
S/.3,345.68
S/.1,192.80
S/.2,478.60
S/.11,880.00
S/.2,000.00
S/.1,000.00
S/.1,000.00
S/.9,734.50 ### ### ### ### S/.25,891.30 S/.85,646.49 ### S/.35,145.16 S/.25,831.69
S/.9,734.50 ### ### ### S/.6,440.69 S/.5,610.07
S/.9,734.50 S/.26,327.60
S/.9,734.50 S/.523.87
S/.25,803.73
S/.6,660.84
S/.4,413.13
S/.4,413.13
S/.2,247.71
S/.497.70
S/.1,750.01
S/.82,364.67 S/.12,237.74
S/.13,233.32
S/.10,858.37 S/.572.75
S/.27,946.51
S/.13,414.79
S/.14,537.20 S/.3,643.77
S/.2,374.48 S/.5,542.29
S/.2,478.93
S/.33,770.02 ### S/.4.32
S/.15,476.92
S/.10,037.81 S/.34,146.96
S/.17,314.55
S/.24,379.21
S/.6,220.92 S/.4.32
S/.5,680.76
S/.2,574.53 S/.1,291.29
S/.6,116.35
S/.15,209.20
S/.7,731.64
S/.10,835.19
S/.60,392.27 ###
S/.18,488.77 S/.40,079.34
S/.41,903.50 S/.3.85
###
### S/.6,440.69 S/.5,610.07
### S/.6,440.69 S/.5,610.07
S/.4,506.67 ### S/.76,130.28 S/.69,625.34 S/.14,631.18 S/.301.42
S/.4,506.67 S/.5,751.70
S/.4,506.67 S/.5,751.70
### S/.48,714.92 S/.1,868.01 S/.1,687.24 S/.301.42
S/.4,641.23
###
S/.13,970.46 S/.30.10
S/.7,540.42 S/.180.30
S/.5,996.94 S/.330.50
S/.7,636.16
S/.40,537.86 S/.1,868.01 S/.1,687.24 S/.301.42
S/.14,718.00
S/.14,718.00
S/.11,838.80 S/.20,984.60
S/.1,376.58
S/.405.38
S/.450.30
S/.2,863.75
S/.389.08
S/.6,353.71 S/.529.29
S/.3,468.88
S/.10,885.59
S/.4,241.03
S/.1,859.81
S/.858.56 S/.10,046.02
S/.858.56 S/.0.18
S/.697.68
S/.29.00
S/.180.24
S/.3,621.64
S/.1,601.59
S/.3,915.69
S/.36,726.71 S/.12,943.94
S/.13,316.77
S/.6,366.98
S/.12,681.87
S/.4,361.09 S/.3,095.21
S/.2,211.69
S/.7,393.16
S/.243.88
S/.8,044.39 ###
S/.7,120.59 S/.3,137.78
S/.7,120.59 S/.3,137.78
S/.923.80 S/.5,533.84
S/.923.80 S/.3,697.12
S/.1,836.72
S/.23,847.41
S/.11,198.39
S/.3,335.87
S/.7,862.52
S/.7,607.12
S/.1,254.64
S/.3,136.60
S/.3,215.88
S/.5,041.90
S/.1,321.85
S/.220.05
S/.3,500.00
S/.1,200.00
S/.1,200.00
S/.6,500.00
S/.5,000.00
S/.1,500.00
S/.80,000.00
S/.80,000.00
S/.88,116.51
S/.78,910.50
S/.9,000.00
S/.206.01
S/.407.81 S/.5,650.05 S/.85,345.07 ### S/.35,145.16 S/.25,831.69
S/.407.81 S/.5,650.05 S/.85,345.07 ### S/.35,145.16 S/.25,831.69
S/.407.81 S/.677.39
S/.407.81 S/.244.95
S/.308.11
S/.124.33
S/.4,972.66 S/.11,390.02
S/.1,746.81
S/.1,180.98 S/.1,726.51
S/.1,067.44
S/.637.55
S/.339.88 S/.3,747.22
S/.5,916.29
S/.32,243.02 S/.7,996.26 S/.16,548.13
S/.1,293.84
S/.15,870.89
S/.15,214.87
S/.15,078.29 S/.7,996.26 S/.1,333.26
S/.17,684.17
S/.11,956.48
S/.11,076.53
S/.879.95
S/.5,727.69
S/.1,101.81
S/.2,442.32
S/.2,183.56
S/.24,027.86 ### S/.18,597.03 S/.25,831.69
S/.3,189.65 S/.4,932.37 S/.3,946.24
S/.3,189.65 S/.4,932.37 S/.3,946.24
S/.20,838.21 ### S/.14,650.79 S/.3,112.54
S/.20,838.21 S/.2,982.39
S/.56,691.22 S/.870.78
S/.93,537.70 S/.13,780.01 S/.3,112.54
S/.22,719.15
S/.3,649.80
S/.19,069.35
### ### ###
S/.47,882.72 ### ###
S/.19,492.44
S/.7,492.44
S/.12,000.00
S/.28,390.28 ### ###
S/.28,390.28 ###
S/.8,840.15 S/.2,215.79
S/.19,550.13 S/.39,690.73
S/.53,415.80
S/.78,521.81
S/.43,603.03
S/.45,827.14 S/.4,384.88
S/.45,827.14 S/.4,384.88
S/.12,088.88 S/.56,362.07
S/.1,159.29 S/.356.95
S/.713.54 S/.803.12
S/.720.31 S/.1,621.30
S/.20,975.80
S/.7,600.51 S/.0.44
S/.32,604.46
S/.929.23
S/.966.00 S/.0.00
S/.19,625.84 S/.4.61
S/.19,625.84 S/.4.61
###
###
### S/.0.00
### S/.0.00
S/.75.18
S/.59.50
S/.15.68
S/.272.98 S/.8,657.18
S/.272.98 S/.364.41
S/.621.30
S/.82.44
S/.4.54
S/.236.92
S/.1,036.70
S/.743.30
S/.2,485.71
S/.1,023.00
S/.125.40
S/.200.75
S/.108.35
S/.1,321.65
S/.302.71
S/.1,484.43
S/.948.96
S/.20.74
S/.248.95
S/.265.78
S/.1,536.92
S/.993.58
S/.21.88
S/.248.95
S/.272.51
S/.39,002.84 S/.51,247.87
S/.37,689.44 S/.51,247.87
S/.9,327.82 S/.2,744.95
S/.2,180.05 S/.908.89
S/.633.42 S/.271.74
S/.30,230.65
S/.12,611.23 S/.9,180.10
S/.12,936.92 S/.7,911.54
S/.1,313.40
S/.30.71
S/.29.87
S/.5.75
S/.17.85
S/.245.04
S/.388.66
S/.595.52
S/.17,979.84 S/.18,023.78
S/.14,884.83 S/.18,023.78
S/.14,715.70
S/.79.12
S/.90.01 S/.992.31
S/.4,760.10
S/.10,747.21
S/.1,524.16
S/.3,095.01
S/.79.07
S/.77.06
S/.7.41
S/.46.05
S/.725.69
S/.789.79
S/.1,369.94
S/.9,500.17 S/.776.48
S/.23.97
S/.11.66
S/.12.31
S/.2,029.20
S/.18.25
S/.17.78
S/.5.47
S/.17.00
S/.1,970.70
S/.470.95
S/.360.76
S/.110.19
S/.6,976.05 S/.776.48
S/.2,472.40
S/.1,420.54
S/.1,280.43
S/.1,802.68 S/.0.29
S/.707.51
S/.68.68
###
S/.78,429.59
S/.22,024.55
S/.3,007.38
S/.16,114.37
S/.14,529.87
S/.22,753.42
S/.13,658.39
S/.13,658.39
###
###
###
S/.1,943.74
S/.341.00
S/.104.42
S/.25.08
S/.747.68
S/.725.56
S/.1,328.05
S/.69.94
S/.68.40
S/.9.12
S/.28.34
S/.295.30
S/.243.02
S/.476.14
S/.137.79
###
S/.31,360.00
S/.7,412.00
S/.35,580.00
S/.2,870.00
S/.11,250.00
S/.3,800.00
S/.3,000.00
S/.3,000.00
S/.40,000.00
S/.10,000.00
###
###
###
###
###
S/.90,037.56 ### S/.16,184.40
S/.7,562.50
S/.2,200.00
S/.5,362.50
S/.22,222.40 S/.8,320.00
S/.3,562.40 S/.0.00
S/.360.00
S/.1,602.40
S/.896.00
S/.704.00 S/.0.00
S/.18,660.00 S/.0.00
S/.18,660.00 S/.0.00
S/.1,120.00
S/.1,120.00
S/.7,200.00
S/.3,600.00
S/.3,600.00
S/.3,205.00
S/.680.00
S/.2,525.00
S/.4,659.40
S/.1,165.00
S/.3,494.40
S/.90,037.56 ###
S/.70,882.62
S/.19,154.94 S/.15,984.77
S/.9,639.00
S/.15,426.56
S/.62,808.00
S/.10,033.13
S/.5,556.97
S/.4,084.92
S/.391.24
S/.4,734.00
S/.4,734.00

### ### ###


### ###
S/.95,645.85 S/.99,285.42
S/.70,073.98
### S/.87,379.90
### S/.13,679.38
### S/.13,679.38

730874.74 1387316.08 2673629.12 5105151.04 6398964.38 11662290.3 24112534.28 23308263.52 33781208.56 9424359.32
S/.0.00
S/.0.00

S/.0.00
### ### ### ###
Costo S/.90,531.42 S/.8,479.01 S/.39,381.73 S/.57,638.24
592,640.35 S/.90,531.42 S/.8,479.01 S/.39,381.73 S/.57,638.24
4,000.00 S/.60,084.48
1,000.00 S/.7,489.68
3,000.00 S/.3,287.60
15,045.10 S/.3,154.20
29.34 S/.6,000.00
12.21 S/.6,500.00
17.13 S/.13,653.00
201.36 S/.10,000.00
83.04 S/.8,000.00
3.91 S/.2,000.00
60.48 S/.30,446.94 S/.8,479.01 S/.1,350.30
53.93 S/.505.41
1,752.76 S/.143.46
219.77 S/.14,823.07 S/.1,562.12
660.74 S/.2,963.70
235.26 S/.2,814.76 S/.938.77
636.99 S/.1,520.74
6,661.11 S/.644.60
3,119.42 S/.608.75
649.29 S/.2,506.55 S/.5,978.12 S/.1,350.30
2,651.90 S/.1,869.32
240.5 S/.1,047.46
360.57 S/.999.12
169.5 S/.38,031.43 S/.57,638.24
191.07 S/.16,615.04 S/.15,895.59
158.09 S/.8,838.02 S/.2,690.88
158.09 S/.12,578.37 S/.2,891.99
93.42 S/.1,601.69
47.4 S/.34,558.09
46.02
5,788.45
2,028.30
927.8
677.8
1,954.55
200
22,770.45
1,204.78
2,119.99
3,056.59
442.57
479.45
2,129.87
1,906.81
3,777.52
44.81
577.8
1,720.14
1.33
1.87
34.38
0.74
13.74
34.48
375.79
291.43
47.89
169.89
37.79
47.69
39.45
302.55
185.56
135.56
2,728.70
4.2
1.75
2.45
36.7
25.2
1
10.5
45.3
45.3
1,100.35
404.07
521.08 S/.18,666.49 S/.58,146.66 S/.16,528.98
175.2 S/.18,666.49 S/.30,170.34
136.67 S/.286.49
66.6 S/.227.45
70.07 S/.44.37
57.97 S/.14.67
57.97 S/.3,422.61 S/.1,473.18
1,347.51 S/.763.22
244.81 S/.747.41
269.61 S/.626.59
276.41 S/.268.89
556.68 S/.1,016.50 S/.0.71
2,278.80 S/.1,472.47
2.81 S/.9,504.61 S/.1,752.40
1.17 S/.2,626.44
1.64 S/.625.12
41.46 S/.4,612.56
29.16 S/.1,544.29
0.66 S/.1,640.49 S/.208.11
11.64 S/.5,452.78 S/.26,944.76
30.2 S/.1,927.43
30.2 S/.1,501.68
1,081.68 S/.425.75
480.84 S/.3,525.35 S/.3,304.00
383.47 S/.1,835.74
47.89 S/.2,092.92 S/.1,468.26
169.48 S/.1,432.43
108.31 S/.6,945.91
55.59 S/.1,724.39
52.72 S/.2,067.16
47.91 S/.3,154.36
47.91 S/.16,694.85
645.31 S/.9,578.65
645.31 S/.2,121.83
321.12 S/.3,060.36
185.56 S/.1,934.01
135.56 S/.27,976.32 S/.16,528.98
302.62 S/.8,692.19
5.88 S/.7,972.61
5.88 S/.719.58
21.66 S/.5,242.10 S/.3,016.54
21.66 S/.176.07
131.47 S/.2,771.83 S/.1,827.34
131.47 S/.918.62
49.92 S/.543.51
49.92 S/.712.90
93.69 S/.475.09 S/.270.58
93.69 S/.562.70
15,693.40 S/.8,984.60 S/.531.88
29.86 S/.8,984.60 S/.531.88
12.43 S/.6,991.62
17.43 S/.1,538.98
209.04 S/.1,322.06
209.04 S/.1,732.55
586.03 S/.131.71
321.73 S/.2,252.04
264.3 S/.14.28
7,728.22 S/.3,060.71
3,678.06 S/.2,177.22
2,032.35 S/.883.49
540.52 S/.377.86
1,477.29 S/.377.86
677.36 S/.1,618.86 S/.686.43
364.56 S/.1,618.86 S/.686.43
312.8 S/.1,360.00
237.47 S/.1,360.00
237.47 S/.766.08
5,080.36 S/.270.00
525.67 S/.170.02
865.07 S/.240.06
2,513.08 S/.86.00
213.08 S/.684.25
110.24 S/.684.25
733.6 S/.2,492.18
119.62 S/.1,587.11
1,145.06 S/.305.07
44.24 S/.163.09
1,020.82 S/.299.76
80 S/.27.90
364,964.53 S/.80.06
25,086.00 S/.29.19
79,657.44 S/.11,221.47 S/.41,039.26 S/.15,884.16
40,501.89 S/.11,221.47 S/.15,848.68
9,215.27 S/.181.86
9,983.20 S/.120.18
44,348.47 S/.52.16
23,402.01 S/.9.52
39,078.20 S/.551.57 S/.2,676.88
16,287.17 S/.551.57 S/.460.00
15,123.09 S/.105.62
21,099.96 S/.364.56
6,484.10 S/.147.20
12,031.04 S/.653.51
1,805.76 S/.945.99
1.33 S/.4,032.98 S/.0.48
1.87 S/.694.56
26.82 S/.983.48
0.74 S/.1,081.75
11.16 S/.620.02 S/.0.48
34.48 S/.653.17
375.79 S/.6,455.06 S/.13,171.32
291.43 S/.3,287.63
47.89 S/.2,783.04
169.89 S/.504.59
37.79 S/.3,167.43 S/.6,718.64
47.69 S/.2,067.85
39.45 S/.4,650.43
398.31 S/.3,167.43 S/.0.36
185.56 S/.4,055.47
135.56 S/.1,029.13
10,595.91 S/.1,753.19
296.01 S/.1,273.15
93.15 S/.2,397.21
202.86 S/.959.19
1,713.96 S/.991.03
747.27 S/.446.99
80.73 S/.25,190.58 S/.15,884.16
74.52 S/.8,603.92
811.44 S/.8,100.72
1,273.17 S/.503.20
1,273.17 S/.1,959.05 S/.7,880.16
5,157.90 S/.1,219.81 S/.1,799.37
1,337.31 S/.3,019.18
2,954.88 S/.739.24 S/.895.61
149.76 S/.822.77
389.52 S/.820.51
326.43 S/.522.72
2,154.87 S/.626.51
2,154.87 S/.626.51
2,134.23 S/.1,131.88
41.16 S/.477.48
41.16 S/.654.40
151.62 S/.12,724.15
151.62 S/.12,724.15
909.9 S/.771.58
909.9 S/.389.66
375.72 S/.381.92
99.06 S/.2,737.74
145.92 S/.2,008.74
49.92 S/.729.00
32.46 S/.4,400.00
48.36 S/.4,400.00
655.83 S/.239.75
655.83 S/.239.75
4,192.72
1.26
1.77
9.06
0.72
6.3
314.75
458.09
41.14
73.8
742.44
560.94
542.28 S/.615.70 S/.4,609.13 S/.465.20
437.82 S/.890.75
51.67 S/.303.28
948.92 S/.64.56
1.76 S/.238.72
S 3,938.07 S/.216.83
2.2 S/.216.83
3.09 S/.370.64
12.86 S/.370.64
1.25 S/.615.70 S/.3,718.38 S/.465.20
9 S/.1,713.76
494.6 S/.315.84
561.45 S/.742.00
56.3 S/.655.92
94.89 S/.669.80
493.19 S/.363.32
529.16 S/.210.96
380.36 S/.95.52
78.51 S/.562.88
1,220.04 S/.192.96
1.17 S/.369.92
44,286.12 S/.52.82
2,205.00 S/.52.82
8,122.50 S/.1,334.82 S/.465.20
877.5 S/.230.00
3,118.50 S/.110.00
5,310.00 S/.110.00
3,226.95 S/.500.00
21,425.67 S/.50.00
99,198.36 S/.60.00
99,198.36 S/.64.00
26,682.39 S/.210.82 S/.211.70
17,788.26 S/.253.50
8,894.13 ###
834,885.55 S/.32,671.79
834,885.55 S/.32,671.79
6,882.79 S/.68,047.09
1,407.84 S/.39,361.09
5,474.95 S/.28,686.00
16,873.07
4,621.86
3,276.11
8,975.10
104,772.82
16,744.87
68,194.07
19,833.88
222,728.70
155,837.73
33,271.04
33,619.93
55,113.75
27,508.95
27,604.80
101,409.79
65,420.33
34,479.50
1,509.96
8,401.51
8,401.51
28,527.43
28,527.43
47,458.53
25,585.56
21,872.97 S/.2,584.23
47,519.81 S/.701.97
47,519.81 S/.394.63
93,805.20 S/.157.30
93,805.20 S/.150.04
7,527.42 S/.1,882.26
7,527.42 S/.1,882.26
50,947.47
42,887.55
8,059.92
42,917.26
460.08
1,789.20
1,917.00
2,809.36
434.52
35,507.10
31,860.10
31,860.10
S/.15,026.77 S/.14,894.71 S/.53,815.93
S/.4,483.03
S/.1,836.56
S/.2,646.47
S/.18,898.02
S/.1,403.31
S/.2,352.82
S/.1,620.98
S/.13,520.91
S/.7,823.62
S/.1,576.34
S/.830.20
S/.757.59
S/.1,804.49
S/.2,855.00
S/.22,611.26
S/.798.76
S/.10,361.93
S/.6,997.41
S/.4,453.16

S/.15,026.77 S/.14,894.71
S/.2,178.31
S/.2,178.31
S/.12,848.46 S/.4,531.41
S/.514.30
S/.5,740.00
S/.6,594.16 S/.2,031.41
S/.2,500.00
S/.4,530.95
S/.202.05
S/.1,171.28
S/.3,157.62
S/.1,332.35
S/.412.34
S/.559.06
S/.360.95
S/.4,500.00
S/.4,500.00
S/.2,336.93 S/.28,274.31 S/.53,321.93 ###
S/.2,336.93 S/.28,274.31 S/.49,961.89 S/.73,209.23
S/.2,336.93 S/.8,356.39 S/.39,420.01 S/.46,203.63
S/.2,336.93 S/.8,356.39 S/.39,420.01 S/.7,861.09
S/.2,336.93 S/.8,356.39 S/.183.13
S/.1,551.80
S/.785.13 S/.1,048.12
S/.7,125.90
S/.182.37 S/.183.13
S/.2,517.23 S/.1,184.34
S/.507.62
S/.599.69
S/.1,409.92 S/.1,057.77
S/.126.57
S/.2,855.45
S/.438.60
S/.518.15
S/.1,806.06
S/.92.64
S/.36,719.65 S/.3,821.30
S/.6,667.51
S/.7,319.85
S/.22,732.29 S/.2,525.75
S/.1,295.55
S/.38,342.54
S/.38,342.54
S/.3,036.84
S/.215.55
S/.4,400.24
S/.30,689.91

S/.19,917.92 S/.10,541.88 S/.27,005.60


S/.19,917.92 S/.10,541.88 S/.13,055.60
S/.19,917.92 S/.8,574.21
S/.106.49
S/.1,907.42
S/.1,164.02
S/.1,029.56
S/.15,710.43 S/.7,552.44
S/.1,021.77
S/.1,967.67 S/.777.35
S/.93.41
S/.517.05
S/.1,357.21 S/.0.30
S/.777.05
S/.12,278.25
S/.12,278.25
S/.13,950.00
S/.7,500.00
S/.1,400.00
S/.2,550.00
S/.2,500.00
S/.3,360.04 S/.46,664.00
S/.2,000.00
S/.2,000.00
S/.1,360.04 S/.3,595.40
S/.1,360.04 S/.0.34
S/.357.68
S/.424.88
S/.1,144.08
S/.1,668.42
S/.7,154.94
S/.4,462.80
S/.579.60
S/.2,112.54

S/.746.12
S/.77.84
S/.668.28
S/.34,824.67
S/.7,892.52
S/.18,969.25
S/.7,962.90
S/.342.87
S/.342.87
S/.180.94
S/.161.93

S/.9,184.71 S/.14,221.36 S/.57,902.43 S/.62,502.72


S/.9,184.71 S/.14,221.36 S/.57,902.43 S/.62,502.72
S/.9,184.71 S/.14,221.36 S/.57,902.43 S/.62,502.72
S/.5,617.20
S/.1,872.42
S/.3,744.78
S/.3,567.51 S/.14,221.36 S/.57,902.43 S/.62,502.72
S/.1,325.94
S/.2,241.57 S/.1,794.93
S/.3,392.40
S/.259.92
S/.660.10
S/.279.81
S/.6,279.76 S/.11,779.24
S/.1,554.44 S/.5,830.69 S/.777.83
S/.28,333.87 S/.12,146.10
S/.11,958.63 S/.32,897.92
S/.8,037.16
S/.4,279.83
S/.4,363.88
S/.9,734.50 ### ### ###
S/.9,734.50 ### ### ###
S/.9,734.50 S/.26,327.60
S/.9,734.50 S/.523.87
S/.25,803.73
S/.6,660.84
S/.4,413.13
S/.4,413.13
S/.2,247.71
S/.497.70
S/.1,750.01
S/.82,364.67 S/.12,237.74
S/.13,233.32
S/.10,858.37 S/.572.75
S/.27,946.51
S/.13,414.79
S/.14,537.20 S/.3,643.77
S/.2,374.48 S/.5,542.29
S/.2,478.93
S/.33,770.02 ### S/.4.32
S/.15,476.92
S/.10,037.81 S/.34,146.96
S/.17,314.55
S/.24,379.21
S/.6,220.92 S/.4.32
S/.5,680.76
S/.2,574.53 S/.1,291.29
S/.6,116.35
S/.15,209.20
S/.7,731.64
S/.10,835.19
S/.60,392.27 ###
S/.18,488.77 S/.40,079.34
S/.41,903.50 S/.3.85
###
###
###
S/.4,506.67 ### S/.76,130.28
S/.4,506.67 S/.5,751.70
S/.4,506.67 S/.5,751.70
### S/.48,714.92
S/.4,641.23
###
S/.13,970.46 S/.30.10
S/.7,540.42 S/.180.30
S/.5,996.94 S/.330.50
S/.7,636.16
S/.40,537.86
S/.14,718.00
S/.14,718.00
S/.11,838.80
S/.1,376.58
S/.405.38
S/.450.30
S/.2,863.75
S/.389.08
S/.6,353.71

S/.858.56
S/.858.56

S/.8,044.39
S/.7,120.59
S/.7,120.59
S/.923.80
S/.923.80
### ### ### ###
### ### S/.1,959,102.21 ### ### S/.147,082.68 01 INSTALACIONES EXTERIORES
### S/.81,359.30 S/.148,308.63 ### ### S/.121,548.83 01.01 CONSTRUCCION DE CERCO PE
### S/.81,359.30 S/.148,308.63 S/.95,398.16 S/.53,852.85 01.01.01 ESTRUCTURAS
01.01.01.01 OBRAS PROVISIONALES
01.01.01.01.0 CAMPAMENTO PROVISION
01.01.01.01.0 CASETA ADICIONAL P/GUA
01.01.01.01.0 CARTEL DE IDENTIFICACIO
01.01.01.01.0 CONSUMOS DE AGUA Y EN
01.01.01.01.0 SERVICIOS HIGIENICOS DU
01.01.01.01.0 CERCO DE OBRA CON POS
01.01.01.01.0 TRANSPORTE DE EQUIPO
01.01.01.01.0 ELABORACION IMPLEMENT
01.01.01.01.0 SEÑALIZACION TEMPORAL
01.01.01.02 TRABAJOS PRELIMINARES
01.01.01.02.0 DESMONTAJE DE PUERTAS
01.01.01.02.0 DESMONTAJE DE VENTANA
01.01.01.02.0 DEMOLICION DE CIMIENTO
01.01.01.02.0 DEMOLICION DE ESTRUCT
01.01.01.02.0 DEMOLICION DE SOBRECIM
01.01.01.02.0 DEMOLICION DE COLUMNA
01.01.01.02.0 DEMOLICION DE LOSAS DE
01.01.01.02.0 DEMOLICION DE MUROS D
01.01.01.02.0 DEMOLICION DE MUROS D
01.01.01.02.1 LIMPIEZA DEL TERRENO M
01.01.01.02.1 TRAZO Y REPLANTEO PRE
01.01.01.02.1 TRAZO Y REPLANTEO DUR
S/.71,179.40 01.01.01.03 MOVIMIENTO DE TIERRAS
01.01.01.03.0 EXCAVACION PARA ZAPAT
01.01.01.03.0 EXCAVACION PARA CIMIEN
01.01.01.03.0 RELLENO COMPACTADO C
01.01.01.03.0 NIVELACION Y APISONADO
S/.8,643.27 01.01.01.03.0 ACARREO MANUAL DE MAT
S/.62,536.13 01.01.01.03.0 CARGUIO Y ELIMINACION D
S/.31,496.56 S/.47,284.41 01.01.01.04 OBRAS DE CONCRETO SIMP
S/.31,496.56 S/.2,210.27 01.01.01.04.0 SUBCIMIENTOS Y SUBZAPT
S/.42,321.71 01.01.01.04.0 CIMIENTOS CORRIDOS ME
S/.1,013.92 01.01.01.04.0 SOBRECIMIENTOS MEZCLA
S/.1,738.51 01.01.01.04.0 ENCOFRADO Y DESENCOF
S/.69,121.16 S/.34,074.89 S/.148,308.63 S/.95,398.16 S/.53,852.85 01.01.01.05 OBRAS DE CONCRETO ARM
S/.69,121.16 S/.3,747.58 01.01.01.05.0 ZAPATAS
S/.62,282.84 S/.3,544.75 01.01.01.05.0 ZAPATAS: CONCRETO f'c
S/.6,838.32 S/.202.83 01.01.01.05.0 ZAPATAS: ACERO CORRU
S/.30,327.31 S/.33,795.07 01.01.01.05.0 SOBRECIMIENTO REFORZA
S/.25,096.78 01.01.01.05.0 SOBRECIMIENTO REFOR
S/.22,849.39 S/.7,347.84 01.01.01.05.0 SOBRECIMEINTO REFOR
S/.7,477.92 S/.1,350.45 01.01.01.05.0 SOBRECIMIENTOS REFO
S/.114,513.56 S/.95,398.16 01.01.01.05.0 COLUMNAS
S/.59,406.32 01.01.01.05.0 COLUMNAS: CONCRETO
S/.62,914.35 S/.29,334.63 01.01.01.05.0 COLUMNAS: ENCOFRADO
S/.51,599.21 S/.6,657.21 01.01.01.05.0 COLUMNAS: ACERO COR
S/.52,020.78 01.01.01.05.0 VIGAS
S/.10,108.86 01.01.01.05.0 VIGAS: CONCRETO f'c=21
S/.27,420.99 01.01.01.05.0 VIGAS: ENCOFRADO Y DE
S/.14,490.93 01.01.01.05.0 VIGAS: ACERO CORRUGA
S/.1,832.07 01.01.01.05.0 LOSA ALIGERADA
S/.521.91 01.01.01.05.0 LOSAS ALIGERADAS: CO
S/.614.91 01.01.01.05.0 LOSAS ALIGERADAS: ENC
S/.130.14 01.01.01.05.0 LOSAS ALIGERADAS: ACE
S/.565.11 01.01.01.05.0 LOSAS ALIGERADAS: LAD
### ### S/.121,548.83 01.01.02 ARQUITECTURA
### S/.17,218.24 01.01.02.01 MUROS Y TABIQUES DE ALB
### S/.17,218.24 01.01.02.01.0 MURO DE LADRILLO KK TIP
### S/.24,330.18 S/.324.59 01.01.02.02 REVOQUES ENLUCIDOS Y M
S/.2,432.61 S/.722.73 01.01.02.02.0 TARRAJEO PRIMARIO O RA
S/.89,753.58 01.01.02.02.0 TARRAJEO EN MURO:EXTE
S/.9,220.40 S/.14,219.43 01.01.02.02.0 TARRAJEO DE SUPERFICIE
S/.1,947.46 S/.5,025.92 S/.324.59 01.01.02.02.0 TARRAJEO DE SUPERFICIE
S/.1,292.04 S/.4,362.10 01.01.02.02.0 BRUÑAS SEGUN DETALLE
S/.7,890.12 S/.8,892.99 01.01.02.03 ZOCALOS
S/.7,890.12 S/.8,892.99 01.01.02.03.0 ENCHAPE PIEDRA IRREGU
S/.30,600.00 S/.109,964.14 01.01.02.04 CARPINTERIA METALICA
S/.30,600.00 S/.0.00 01.01.02.04.0 PUERTA METALICA T-01 2.5
S/.15,200.00 01.01.02.04.0 PUERTA METALICA T-02 4.0
S/.94,764.14 01.01.02.04.0 CERCO METALICO CON TU
S/.43,470.36 S/.11,260.10 01.01.02.05 PINTURA
S/.34,011.61 S/.2,586.50 01.01.02.05.0 PINTURA LATEX 2 MANOS
S/.6,705.89 S/.327.80 01.01.02.05.0 PINTURA LATEX 2 MANOS
S/.2,752.86 S/.315.76 01.01.02.05.0 PINTURA LATEX 2 MANOS
S/.8,030.04 01.01.02.05.0 PIN. ANTICOR. Y ESMALTE
01.02 CONSTRUCCION DE AREA DE G
01.02.01 ESTRUCTURAS
01.02.01.01 TRABAJOS PRELIMINARES
01.02.01.01.0 LIMPIEZA DEL TERRENO M
01.02.01.01.0 TRAZO Y REPLANTEO PRE
01.02.01.01.0 TRAZO Y REPLANTEO DUR
01.02.01.02 MOVIMIENTO DE TIERRAS
01.02.01.02.0 EXCAVACION PARA ZAPAT
01.02.01.02.0 EXCAVACION PARA CIMIEN
01.02.01.02.0 RELLENO COMPACTADO C
01.02.01.02.0 NIVELACION Y APISONADO
01.02.01.02.0 ACARREO MANUAL DE MAT
01.02.01.02.0 CARGUIO Y ELIMINACION D
01.02.01.03 OBRAS DE CONCRETO SIMP
01.02.01.03.0 FALSO PISO DE 4" MEZCLA
01.02.01.03.0 SUBCIMIENTOS Y SUBZAPT
01.02.01.03.0 CIMIENTOS CORRIDOS ME
01.02.01.03.0 SOBRECIMIENTOS MEZCLA
01.02.01.03.0 ENCOFRADO Y DESENCOF
01.02.01.04 OBRAS DE CONCRETO ARM
01.02.01.04.0 ZAPATAS
01.02.01.04.0 ZAPATAS: CONCRETO f'c
01.02.01.04.0 ZAPATAS: ACERO CORRU
01.02.01.04.0 COLUMNAS
01.02.01.04.0 COLUMNAS: CONCRETO
01.02.01.04.0 COLUMNAS: ENCOFRADO
01.02.01.04.0 COLUMNAS: ACERO COR
01.02.01.04.0 VIGAS
01.02.01.04.0 VIGAS: CONCRETO f'c=21
01.02.01.04.0 VIGAS: ENCOFRADO Y DE
01.02.01.04.0 VIGAS: ACERO CORRUGA
01.02.01.04.0 LOSA ALIGERADA
01.02.01.04.0 LOSAS ALIGERADAS: CO
01.02.01.04.0 LOSAS ALIGERADAS: ENC
01.02.01.04.0 LOSAS ALIGERADAS: ACE
01.02.01.04.0 LOSAS ALIGERADAS: LAD
01.02.02 ARQUITECTURA
01.02.02.01 MUROS Y TABIQUES DE ALB
01.02.02.01.0 MURO DE LADRILLO KK TIP
01.02.02.01.0 JUNTA DE DILATACION CO
01.02.02.02 REVOQUES ENLUCIDOS Y M
01.02.02.02.0 TARRAJEO PRIMARIO O RA
01.02.02.02.0 TARRAJEO EN MURO:INTE
01.02.02.02.0 TARRAJEO EN MURO:EXTE
01.02.02.02.0 TARRAJEO DE SUPERFICIE
01.02.02.02.0 TARRAJEO DE SUPERFICIE
01.02.02.02.0 VESTIDURA DE DERRAMES
01.02.02.02.0 BRUÑAS SEGUN DETALLE
01.02.02.03 CIELO RASOS
01.02.02.03.0 CIELORASO CON BALDOSA
01.02.02.04 PISOS Y PAVIMENTOS
01.02.02.04.0 CONTRAPISO DE 40 mm (M
01.02.02.04.0 PISO DE CEMENTO COLOR
01.02.02.04.0 PISO CERAMICO ANTIDESL
01.02.02.04.0 VEREDA: ENCOFRADO Y D
01.02.02.04.0 VEREDAS DE CONCRETO f
01.02.02.04.0 VEREDA: JUNTA DE DILATA
01.02.02.05 ZOCALOS
01.02.02.05.0 ENCHAPE FACHALETA RUS
01.02.02.05.0 ZOCALO DE CERAMICO 20
01.02.02.06 CONTRAZOCALOS
01.02.02.06.0 CONTRAZOCALO DE CEME
01.02.02.07 CARPINTERIA DE MADERA
01.02.02.07.0 PUERTAS DE MADERA CON
01.02.02.08 CARPINTERIA METALICA
01.02.02.08.0 PUERTA METALICA 06
01.02.02.09 CERRAJERIA
01.02.02.09.0 BISAGRA CAPUCHINA DE 3
01.02.02.09.0 CERRADURA DE TRES GOL
01.02.02.09.0 CERRADURA DE PERILLA E
01.02.02.09.0 MANIJA DE 3" ALUMINIZAD
01.02.02.10 VIDRIOS, CRISTALES Y SIMIL
01.02.02.10.0 VIDRIO SISTEMA MODUGLA
01.02.02.11 PINTURA
01.02.02.11.0 PINTURA LATEX 2 MANOS
01.02.02.11.0 PINTURA LATEX 2 MANOS
01.02.02.11.0 PINTURA LATEX 2 MANOS
01.02.02.11.0 PINTURA LATEX 2 MANOS
01.02.02.11.0 PIN. ANTICOR. Y ESMALTE
01.02.02.11.0 PINTURA ESMALTE EN CON
01.02.02.11.0 PINTURA EN DERRAMES
S/.4,130.12 01.03 CONSTRUCCION DE AREA DE B
01.03.01 ESTRUCTURAS
01.03.01.01 TRABAJOS PRELIMINARES
01.03.01.01.0 LIMPIEZA DEL TERRENO M
01.03.01.01.0 TRAZO Y REPLANTEO PRE
01.03.01.01.0 TRAZO Y REPLANTEO DUR
01.03.01.02 MOVIMIENTO DE TIERRAS
01.03.01.02.0 EXCAVACION PARA ZAPAT
01.03.01.02.0 EXCAVACION PARA CIMIEN
01.03.01.02.0 RELLENO COMPACTADO C
01.03.01.02.0 NIVELACION Y APISONADO
01.03.01.02.0 ACARREO MANUAL DE MAT
01.03.01.02.0 CARGUIO Y ELIMINACION D
01.03.01.03 OBRAS DE CONCRETO SIMP
01.03.01.03.0 FALSO PISO DE 4" MEZCLA
01.03.01.03.0 SUBCIMIENTOS Y SUBZAPT
01.03.01.03.0 CIMIENTOS CORRIDOS ME
01.03.01.03.0 SOBRECIMIENTOS MEZCLA
01.03.01.03.0 ENCOFRADO Y DESENCOF
01.03.01.04 OBRAS DE CONCRETO ARM
01.03.01.04.0 ZAPATAS
01.03.01.04.0 ZAPATAS: CONCRETO f'c
01.03.01.04.0 ZAPATAS: ACERO CORRU
01.03.01.04.0 COLUMNAS
01.03.01.04.0 COLUMNAS: CONCRETO
01.03.01.04.0 COLUMNAS: ENCOFRADO
01.03.01.04.0 COLUMNAS: ACERO COR
01.03.01.04.0 VIGAS
01.03.01.04.0 VIGAS: CONCRETO f'c=21
01.03.01.04.0 VIGAS: ENCOFRADO Y DE
01.03.01.04.0 VIGAS: ACERO CORRUGA
01.03.01.04.0 LOSAS MACIZAS
01.03.01.04.0 LOSAS MACIZAS: CONCR
01.03.01.04.0 LOSAS MACIZAS: ENCOF
01.03.01.04.0 LOSAS MACIZAS: ACERO
S/.4,130.12 01.03.02 ARQUITECTURA
01.03.02.01 MUROS Y TABIQUES DE ALB
01.03.02.01.0 MURO DE LADRILLO KK TIP
01.03.02.01.0 JUNTA DE DILATACION CO
01.03.02.02 REVOQUES ENLUCIDOS Y M
01.03.02.02.0 TARRAJEO EN MURO:INTE
01.03.02.02.0 TARRAJEO EN MURO:EXTE
01.03.02.02.0 TARRAJEO DE SUPERFICIE
01.03.02.02.0 TARRAJEO DE SUPERFICIE
01.03.02.02.0 VESTIDURA DE DERRAMES
01.03.02.02.0 BRUÑAS SEGUN DETALLE
01.03.02.03 CIELO RASOS
01.03.02.03.0 CIELORASO CON MEZCLA
01.03.02.04 PISOS Y PAVIMENTOS
01.03.02.04.0 CONTRAPISO DE 40 mm (M
01.03.02.04.0 PISO DE CEMENTO COLOR
01.03.02.05 ZOCALOS
01.03.02.05.0 ENCHAPE FACHALETA RUS
01.03.02.06 CONTRAZOCALOS
01.03.02.06.0 CONTRAZOCALO DE CEME
01.03.02.06.0 CONTRAZOCALO DE CEME
01.03.02.07 CUBIERTAS Y CERRAMIENTO
01.03.02.07.0 COBERTURA ONDULINE
01.03.02.07.0 CORREAS DE MADERA
01.03.02.08 CARPINTERIA METALICA
01.03.02.08.0 PUERTA METALICA T-5
S/.1,144.33 01.03.02.09 CERRAJERIA
S/.120.25 01.03.02.09.0 BISAGRA CAPUCHINA DE 3
S/.680.08 01.03.02.09.0 CERRADURA DE TRES GOL
S/.344.00 01.03.02.09.0 MANIJA DE 3" ALUMINIZAD
S/.241.80 01.03.02.10 VIDRIOS, CRISTALES Y SIMIL
S/.241.80 01.03.02.10.0 VIDRIO SISTEMA MODUGLA
S/.2,743.99 01.03.02.11 PINTURA
S/.1,084.35 01.03.02.11.0 PINTURA LATEX 2 MANOS
S/.249.98 01.03.02.11.0 PINTURA LATEX 2 MANOS
S/.490.58 01.03.02.11.0 PINTURA LATEX 2 MANOS
S/.345.96 01.03.02.11.0 PINTURA LATEX 2 MANOS
S/.436.75 01.03.02.11.0 PIN. ANTICOR. Y ESMALTE
S/.92.99 01.03.02.11.0 PINTURA ESMALTE EN CON
S/.43.38 01.03.02.11.0 PINTURA EN DERRAMES
01.04 INSTALACIONES SANITARIAS
01.04.01 SISTEMA DE AGUA FRIA
01.04.01.01 SALIDA DE AGUA FRIA
01.04.01.01.0 SALIDA DE A.F. PVC C/R - 1
01.04.01.01.0 SALIDA DE A.F. PVC C/R - 1
01.04.01.02 REDES DE DISTRIBUCION
01.04.01.02.0 SUM. E INST. TUB. PVC C-1
01.04.01.03 VALVULAS
01.04.01.03.0 SUM. E INST. VALV. ESFER
01.04.02 SISTEMA DE DESAGUE Y VENT
01.04.02.01 SALIDA DE AGUA FRIA
01.04.02.01.0 SALIDA DE DESAGUE PVC
01.04.02.01.0 SALIDA DE DESAGUE PVC
01.04.02.01.0 SALIDA DE VENTILACION D
01.04.02.02 ADITAMENTOS VARIOS
01.04.02.02.0 SUMIDERO DE BRONCE RO
01.04.02.02.0 REGISTRO ROSCADO DE B
01.04.02.02.0 SOMBRERO DE VENTILACI
01.04.02.03 CAJA DE REGISTRO
01.04.02.03.0 CAJA DE REGISTRO 18"x24
01.04.02.03.0 CAJA DE REGISTRO 10"x20
01.04.02.04 CONEXION DOMICILIARIA
01.04.02.04.0 CONEXION DOMICILIARIA P
01.04.02.05 APARATOS SANITARIOS
01.04.02.05.0 INODORO CON VALVULA S
01.04.02.05.0 LAVATORIO INC/ACCESOR
01.04.02.05.0 DUCHA INC/ACCESORIO
01.04.02.05.0 LAVADERO DE ACERO INO
01.04.02.05.0 JABONERA DE LOSA DE 15
01.04.02.05.0 PAPELERA DE BARRA
01.04.02.05.0 ESPEJO
01.04.02.05.0 COLOCACION DE APARATO
01.04.02.05.0 COLOCACION DE ACCESO
S/.94,195.05 S/.95,112.86 S/.941,308.57 S/.61,990.41 ### S/.4,339.14 01.05 JARDINES Y EXTERIORES
01.05.01 TRABAJOS PRELIMINARES
01.05.01.01 LIMPIEZA DEL TERRENO MA
S/.43,047.69 01.05.02 MOVIMIENTO DE TIERRAS
01.05.02.01 CORTE DE MATERIAL SUELT
S/.43,047.69 01.05.02.02 ELIMINACION DE MATERIAL
S/.51,147.36 S/.32,263.27 01.05.03 MEJORAMIENTO DE SUBRASA
S/.23,940.54 01.05.03.01 PERFILADO Y COMPACTADO
S/.24,021.92 01.05.03.02 EXTRACCION Y APILAMIENT
S/.3,184.90 S/.25,539.08 01.05.03.03 CARGUIO Y TRANSPORTE D
S/.6,724.19 01.05.03.04 MEJORAMIENTO DE LA SUB-
S/.51,224.40 S/.113,932.95 S/.18,383.94 01.05.04 SUB BASE
S/.10,674.65 01.05.04.01 EXTRACCION Y APILAMIENT
S/.33,206.89 01.05.04.02 CARGUIO Y TRANSPORTE D
S/.7,342.86 S/.113,932.95 S/.18,383.94 01.05.04.03 CONFORMACION DE SUB BA
S/.10,086.93 S/.52,646.79 01.05.05 SARDINELES
S/.10,086.93 S/.25,494.32 01.05.05.01 SARDINELES: ENCOFRADO Y
S/.14,703.55 01.05.05.02 SARDINELES: CONCRETO f'c
S/.12,448.92 01.05.05.03 TARRAJEO EN SARDINEL DE
S/.1,538.26 S/.1,426.21 01.05.06 RAMPAS PARA DISCAPACITAD
S/.1,538.26 S/.1,243.33 01.05.06.01 RAMPAS: ENCOFRADO Y DE
S/.182.88 01.05.06.02 RAMPAS DE CONCRETO: f´c=
S/.773,302.62 S/.43,606.47 ### S/.4,339.14 01.05.07 PISOS Y VEREDAS
S/.402,039.41 S/.30,135.94 01.05.07.01 FALSO PISO DE 4" MEZCLA 1
S/.9,843.86 S/.9,770.07 S/.1,629.02 01.05.07.02 PISOS: ENCOFRADO Y DESE
S/.341,318.62 01.05.07.03 PISO DE CEMENTO COLORE
S/.20,100.73 S/.3,700.46 S/.3,454.02 01.05.07.04 PISO DE CEMENTO COLORE
S/.3,262.89 S/.271.11 01.05.07.05 PISOS: JUNTA DE DILATACIO
S/.10,422.16 01.05.07.06 VEREDA: ENCOFRADO Y DES
### S/.3,368.03 01.05.07.07 VEREDAS DE CONCRETO f'c
S/.700.00 01.05.07.08 VEREDA: JUNTA DE DILATAC
S/.34,133.47 S/.10,642.99 S/.93,391.45 S/.26,599.41 01.06 TANQUE CISTERNA
01.06.01 TRABAJOS PRELIMINARES
01.06.01.01 LIMPIEZA DEL TERRENO MA
01.06.01.02 TRAZO Y REPLANTEO PRELI
01.06.01.03 TRAZO Y REPLANTEO DURA
S/.3,219.62 01.06.02 MOVIMIENTO DE TIERRAS
S/.1,703.36 01.06.02.01 EXCAVACION PARA ZAPATA
S/.608.63 01.06.02.02 NIVELACION Y APISONADO D
S/.907.63 01.06.02.03 CARGUIO Y ELIMINACION DE
S/.2,614.81 01.06.03 OBRAS DE CONCRETO SIMPLE
S/.2,614.81 01.06.03.01 SOLADO e=3"
S/.28,299.04 S/.10,642.99 S/.59,350.97 01.06.04 OBRAS DE CONCRETO ARMAD
S/.55,411.21 01.06.04.01 TANQUE CISTERNA CONCRE
S/.4,699.49 S/.6,127.81 S/.3,939.76 01.06.04.02 TANQUE CISTERNA: ENCOFR
S/.23,599.55 S/.4,515.18 01.06.04.03 TANQUE CISTERNA: ACERO
S/.34,040.48 S/.26,599.41 01.06.05 TARRAJEO INTERIOR DE TANQ
S/.34,040.48 S/.26,599.41 01.06.05.01 TARRAJEO CON IMPERMEAB
S/.4,654.45 01.07 AREAS VERDES Y EQUIPAMIENT
S/.2,131.55 01.07.01 AREAS VERDES
S/.212.43 01.07.01.01 PREPARACION Y EXTENDIDO
S/.1,430.78 01.07.01.02 SEMBRADO DE GRASS
S/.488.34 01.07.01.03 SEMBRADO DE ARBUSTOS
S/.2,522.90 01.07.02 EQUIPAMIENTO DE ESPACIOS
S/.82.08 01.07.02.01 EXCAVACION MANUAL DE ZA
S/.133.76 01.07.02.02 CONCRETO f'c=175 kg/cm2
S/.2,307.06 01.07.02.03 COLECTOR DE DESHECHOS
S/.77,625.24 ### ### S/.19,299.10 01.08 ESTACIONAMIENTO VEHICULAR
S/.4,993.77 01.08.01 OBRAS PRELIMINARES
S/.4,993.77 01.08.01.01 DEMOLICION DE VEREDAS D
S/.9,336.38 S/.5,246.79 01.08.02 TRABAJOS PRELIMINARES
S/.9,336.38 S/.9.74 01.08.02.01 LIMPIEZA DEL TERRENO MA
S/.5,237.05 01.08.02.02 TRAZO Y REPLANTEO PRELI
S/.20,719.09 01.08.03 MEJORAMIENTO DE SUBRASA
S/.20,719.09 01.08.03.01 CAPA ANTICONTAMINANTE e
S/.27,473.41 01.08.04 SUB BASE
S/.12,512.14 01.08.04.01 EXTRACCION Y APILAMIENT
S/.14,961.27 01.08.04.02 CARGUIO Y TRANSPORTE D
S/.21,173.80 01.08.05 CONFORMACION DE SUB BAS
S/.19,538.23 01.08.05.01 CONFORMACION DE SUB BA
S/.1,635.57 01.08.05.02 RIEGO - AGUA
### S/.49,392.26 S/.19,299.10 01.08.06 PAVIMENTO RIGIDO
### S/.35,940.36 S/.16,233.54 01.08.06.01 PAVIMENTO RIGIDO: CONCR
S/.9,858.06 S/.10,833.95 01.08.06.02 PAVIMENTO RIGIDO: ENCOF
S/.680.95 S/.3,065.56 01.08.06.03 PAVIMENTO RIGIDO: CURAD
S/.1,937.00 01.08.06.04 PAVIMENTO RIGIDO: JUNTA
S/.63,295.09 ### S/.95,940.24 01.08.07 ARQUITECTURA
S/.51,630.84 S/.55,279.61 01.08.07.01 SARDINELES
S/.51,630.84 S/.13,286.35 01.08.07.01.0 SARDINELES: ENCOFRADO
S/.30,774.31 01.08.07.01.0 SARDINELES:CONCRETO f
S/.11,218.95 01.08.07.01.0 TARRAJEO EN SARDINEL D
S/.8,838.64 S/.39,234.05 01.08.07.02 BANCAS DE CONCRETO
S/.8,838.64 S/.204.52 01.08.07.02.0 BANCAS: ACERO CORRUG
S/.9,824.63 01.08.07.02.0 BANCAS: ENCOFRADO Y D
S/.9,304.33 01.08.07.02.0 BANCAS: CONCRETO f'c=21
S/.19,900.57 01.08.07.02.0 ENCHAPE PIEDRA IRREGU
S/.2,386.58 01.08.07.03 RAMPAS PARA DISCAPACITA
S/.2,239.42 01.08.07.03.0 RAMPAS: ENCOFRADO Y D
S/.147.16 01.08.07.03.0 RAMPAS DE CONCRETO: f´
S/.63,295.09 ### S/.1,426.58 01.08.07.04 PISOS Y VEREDAS
S/.3,249.94 01.08.07.04.0 PISOS: ENCOFRADO Y DES
S/.60,045.15 S/.58,916.25 01.08.07.04.0 FALSO PISO DE 4" MEZCLA
S/.95,401.32 01.08.07.04.0 PISO DE CEMENTO COLOR
S/.486.12 S/.1,426.58 01.08.07.04.0 PISOS: JUNTA DE DILATAC
### 01.09 CONSTRUCCION DEL CAMPO D
01.09.01 TRABAJOS PRELIMINARES
01.09.01.01 TRAZO Y REPLANTEO PRELI
01.09.01.02 LIMPIEZA DEL TERRENO MA
01.09.02 MOVIMIENTO DE TIERRAS
01.09.02.01 CORTE DE MATERIAL SUELT
01.09.02.02 ELIMINACION DE MATERIAL
01.09.02.03 PERFILADO Y COMPACTADO
01.09.02.04 CONFORMACION DE SUB-BA
01.09.03 EXTRACCION DE MATERIALES
01.09.03.01 EXTRACCION Y APILAMIENT
01.09.03.02 EXTRACCION Y APILAMIENT
01.09.03.03 ZARANDEO DE ARENA FINA
01.09.03.04 CARGUIO DE MATERIALES E
01.09.03.05 TRANSPORTE DE MATERIAL
S/.339.46 01.09.04 CONFORMACION DE ESTRUCT
01.09.04.01 COLOCADO Y COMPACTADO
01.09.04.02 COLOCADO Y COMPACTADO
01.09.04.03 COLOCADO Y COMPACTADO
S/.0.60 01.09.04.04 COLOCADO Y COMPACTADO
S/.338.86 01.09.04.05 COLOCADO Y COMPACTADO
S/.8,219.34 01.09.05 GEOTEXTIL
S/.8,219.34 01.09.05.01 SUMINISTRO E INSTALACION
S/.7,435.36 01.09.06 CONCRETO SIMPLE
S/.7,435.36 01.09.06.01 SARDINELES Y VEREDAS
S/.3,501.34 01.09.06.01.0 ENCOFRADO Y DESENCOF
S/.3,934.02 01.09.06.01.0 CONCRETO f'c=175 kg/cm2
### 01.09.07 CONFORMACION DE ESTRUCT
### 01.09.07.01 CESPED DE GRASS ARTIFIC
01.09.08 SISTEMA DE DRENAJE CAMPO
01.09.08.01 TRABAJOS PRELIMINARES
01.09.08.01.0 TRAZO Y REPLANTEO PRE
01.09.08.02 INSTALACION SUB DRENES
01.09.08.02.0 RETIRO DE MATERIAL SEL
01.09.08.02.0 SUMINISTRO Y COLOCACIO
01.09.08.02.0 RELLENO CON MATERIAL C
01.09.08.02.0 ACCESORIOS DE INSTALAC
01.09.08.03 INSTALACION DREN COLECT
01.09.08.03.0 RETIRO DE MATERIAL SEL
01.09.08.03.0 SUMINISTRO Y COLOCACIO
01.09.08.03.0 RELLENO CON MATERIAL C
01.09.08.04 CONCRETO ARMADO
01.09.08.04.0 ENCOFRADO Y DESENCOF
01.09.08.04.0 ACERO DE REFUERZO fy=4
01.09.08.04.0 CONCRETO f'c=210 kg/cm2
01.09.08.05 PRUEBAS DE CALIDAD
01.09.08.05.0 PRUEBA HIDRAULICA EN T
S/.1,640.35 S/.49,096.20 S/.279,480.10 S/.1,083.20 01.10 CONSTRUCCION DEL CAMPO D
S/.1,640.35 S/.49,096.20 S/.28,459.94 01.10.01 MOVIMIENTO DE TIERRAS
S/.1,640.35 S/.1,276.17 01.10.01.01 LIMPIEZA DEL TERRENO MA
S/.2,501.47 01.10.01.02 CORTE DE MATERIAL SUELT
S/.140.95 01.10.01.03 EXCAVACION DE ZANJAS
S/.45,177.61 S/.9.41 01.10.01.04 RELLENO CON MATERIAL PR
S/.14,178.00 01.10.01.05 NIVELACION Y COMPACTADO
S/.10,042.92 01.10.01.06 EMPEDRADO DE PLATAFORM
S/.4,229.61 01.10.01.07 ELIMINACION DE MATERIAL
S/.53,834.45 S/.1,083.20 01.10.02 CONCRETO SIMPLE
S/.53,381.29 01.10.02.01 CONCRETO f'c=210 kg/cm2
S/.453.16 S/.1,083.20 01.10.02.02 JUNTA DE CONTRACCION
S/.3,565.19 01.10.03 IMPRIMADO
S/.3,565.19 01.10.03.01 IMPRIMACION RC 250
S/.71,430.76 01.10.04 CARPETA ASFALTICA EN CALI
S/.71,430.76 01.10.04.01 SUMINISTRO Y COLOCACION
S/.122,189.76 01.10.05 GOMA PREFABRICADA
S/.122,189.76 01.10.05.01 SUMINISTRO Y COLOCACION
S/.5,842.12 S/.50,599.49 S/.3,888.09 01.11 CONSTRUCCION DEL CAMPO D
S/.1,323.24 01.11.01 TRABAJOS PRELIMINARES
S/.1,323.24 01.11.01.01 LIMPIEZA DEL TERRENO MA
S/.4,518.88 S/.29,650.90 01.11.02 MOVIMIENTO DE TIERRAS
S/.1,066.01 01.11.02.01 CORTE DE MATERIAL SUELT
S/.66.20 01.11.02.02 EXCAVACION DE ZANJAS
S/.3,386.67 S/.16,947.49 01.11.02.03 RELLENO CON MATERIAL PR
S/.6,380.10 01.11.02.04 NIVELACION Y COMPACTADO
S/.4,519.31 01.11.02.05 EMPEDRADO DE PLATAFORM
S/.1,804.00 01.11.02.06 ELIMINACION DE MATERIAL
S/.20,948.59 S/.3,888.09 01.11.03 CONCRETO SIMPLE
S/.20,948.59 S/.3,201.75 01.11.03.01 CONCRETO f'c=210 kg/cm2
S/.686.34 01.11.03.02 JUNTA DE CONTRACCION
### S/.95,757.19 S/.413,146.10 ### S/.54,492.73 S/.1,895.61 01.12 CONSTRUCCION DE GRADERIO
S/.1,336.50 S/.0.40 01.12.01 TRABAJOS PRELIMINARES
S/.714.56 01.12.01.01 LIMPIEZA DEL TERRENO MA
S/.320.12 01.12.01.02 TRAZO Y REPLANTEO PRELI
S/.301.82 S/.0.40 01.12.01.03 TRAZO Y REPLANTEO DURA
S/.6,927.63 S/.2,757.08 01.12.02 MOVIMIENTO DE TIERRAS
S/.2,748.77 01.12.02.01 EXCAVACION PARA CIMIENT
S/.3,581.37 01.12.02.02 RELLENO COMPACTADO CO
S/.253.66 01.12.02.03 NIVELACION Y APISONADO D
S/.343.83 S/.2,757.08 01.12.02.04 ACARREO MANUAL DE MATE
S/.17,784.21 S/.79,436.14 01.12.03 ESTRUCTURAS
S/.10,855.43 01.12.03.01 OBRAS DE CONCRETO SIMP
S/.583.47 01.12.03.01.0 SOLADO e=3"
S/.10,271.96 01.12.03.01.0 CIMIENTOS CORRIDOS ME
S/.21,695.12 01.12.03.02 SARDINELES
S/.7,795.67 01.12.03.02.0 SARDINELES:CONCRETO f
S/.13,899.45 01.12.03.02.0 SARDINELES: ENCOFRADO
01.12.03.03 OBRAS DE CONCRETO ARM
S/.8,509.54 01.12.03.04 ZAPATAS
S/.6,049.89 01.12.03.04.0 ZAPATAS: CONCRETO f'c=1
S/.2,459.65 01.12.03.04.0 ZAPATAS: ACERO CORRUG
S/.9,274.67 S/.24,708.94 01.12.03.05 GRADERIOS PLATAFORMA
S/.19,049.68 01.12.03.05.0 GRADERIOS: CONCRETO f'
S/.4,388.15 01.12.03.05.0 GRADERIOS: ENCOFRADO
S/.9,274.67 S/.1,271.11 01.12.03.05.0 GRADERIOS: ACERO CORR
S/.22,176.65 01.12.03.06 ESTRUCTURA METALICA
S/.8,960.00 01.12.03.06.0 ESTRUCTURA METALICA P
S/.13,216.65 01.12.03.06.0 CORREA METALICA SECCI
S/.13,882.91 S/.51,735.65 S/.1,895.61 01.12.04 ARQUITECTURA
S/.3,618.77 S/.2,422.17 01.12.04.01 REVOQUES ENLUCIDOS Y M
S/.3,618.77 S/.2,422.17 01.12.04.01.0 TARRAJEO EN MURO:INTE
S/.10,264.14 S/.2,451.58 01.12.04.02 CUBIERTAS Y CERRAMIENTO
S/.10,264.14 S/.2,451.58 01.12.04.02.0 COBERTURA TIPO ONDULI
S/.41,865.74 01.12.04.03 CARPINTERIA METALICA
S/.565.95 01.12.04.03.0 BARANDA METALICA GRAD
S/.19,729.60 01.12.04.03.0 TUBO METALICO DE 4" EN
S/.21,570.19 01.12.04.03.0 MALLA METALICA EN INTER
S/.4,996.16 S/.1,895.61 01.12.04.04 PINTURA
S/.2,071.32 01.12.04.04.0 PINTURA LATEX 2 MANOS
S/.2,924.84 S/.1,895.61 01.12.04.04.0 PIN. ANTICOR. Y ESMALTE
S/.15,150.92 S/.5,084.98 01.12.05 INSTALACIONES SANITARIAS E
S/.15,150.92 S/.5,084.98 01.12.05.01 SISTEMA DE DESAGUE
01.12.05.01.0 MOVIMIENTO DE TIERRAS
01.12.05.01.0 EXCAVACIONES DE ZANJ
01.12.05.01.0 EXCAVACION MANUAL
01.12.05.01.0 EXCAVACION MANUAL
01.12.05.01.0 EXCAVACION MANUAL
01.12.05.01.0 EXCAVACION MANUAL
01.12.05.01.0 REFINE Y NIVELACION DE
01.12.05.01.0 REFINE Y NIVELACION
01.12.05.01.0 REFINE Y NIVELACION
01.12.05.01.0 REFINE Y NIVELACION
01.12.05.01.0 REFINE Y NIVELACION
01.12.05.01.0 SUMINISTRO Y COLOCAC
01.12.05.01.0 SUM. Y COLOC. CAMA D
01.12.05.01.0 SUM. Y COLOC. CAMA D
01.12.05.01.0 SUM. Y COLOC. CAMA D
01.12.05.01.0 SUM. Y COLOC. CAMA D
01.12.05.01.0 RELLENO Y COMPACTO D
01.12.05.01.0 RELLENO Y COMP DE Z
01.12.05.01.0 RELLENO Y COMP DE Z
01.12.05.01.0 RELLENO Y COMP DE Z
01.12.05.01.0 RELLENO Y COMP DE Z
S/.15,150.92 S/.5,084.98 01.12.05.01.0 REDES EXTERIORES DE DE
S/.10,653.98 01.12.05.01.0 TUBERIAS
01.12.05.01.0 SUM. E INST. TUB. PVC-
01.12.05.01.0 SUM. E INST. TUB. PVC-
01.12.05.01.0 SUM. E INST. TUB. PVC-
S/.2,728.00 01.12.05.01.0 SUM. E INST. TUB. PVC-
S/.7,925.98 01.12.05.01.0 SUM. Y COLOCACION T
S/.4,496.94 S/.5,084.98 01.12.05.01.0 CAMARAS DE INSPECCIO
S/.4,496.94 S/.2,256.66 01.12.05.01.0 CAJAS DE REGISTRO D
S/.2,315.52 01.12.05.01.0 CAJAS DE REGISTRO 1
S/.512.80 01.12.05.01.0 CAJAS DE REGISTRO D
01.12.05.02 SISTEMA DE AGUA POTABLE
01.12.05.02.0 REDES EXTERIORES DE AG
01.12.05.02.0 TUBERIAS
01.12.05.02.0 SUM. E INST. TUB. PVC
01.12.05.02.0 SUM. E INST. TUB. PVC
01.12.05.02.0 SUM. E INST. TUB. PVC
01.12.05.02.0 SUM. E INST. TUB. PVC
01.12.05.02.0 SUM. E INST. TUB. PVC
01.12.05.02.0 SUM. E INST. TUB. PVC
01.12.05.02.0 VALVULAS
01.12.05.02.0 SUM. E INST. VALV. ESF
01.12.05.02.0 SUM. E INST. VALV. ESF
01.12.05.02.0 SUM. E INST. VALV. ESF
01.12.05.02.0 SUM. E INST. VALV. ESF
01.12.05.02.0 CAMARAS DE INSPECCIO
01.12.05.02.0 CAJA DE REGISTRO DE
01.12.05.02.0 EQUIPAMIENTO E INSTALA
01.12.05.02.0 ELECTROBOMBA EJE VE
01.12.05.02.0 ELECTROBOMBA SUMIDE
01.12.05.02.0 MOTOBOMBA DIESEL Q=
01.12.05.02.0 SUM. E INST. VALVULAS -
### S/.90,672.21 S/.394,025.39 S/.2,576.30 01.12.06 INSTALACIONES ELECTRICAS
01.12.06.01 TRABAJOS PRELIMINARES
01.12.06.01.0 REPLANTEO DE INSTALAC
01.12.06.02 SALIDAS PARA INST. ELECTR
01.12.06.02.0 SALIDA DE TECHO C/TUB. P
01.12.06.02.0 SALIDA DE PARED C/TUB. P
01.12.06.02.0 SALIDA PARA LUZ DE CON
01.12.06.02.0 SALIDA P/INTERRUPTOR S
01.12.06.02.0 SALIDA P/TOMACORRIENT
S/.8,817.16 S/.11,120.89 01.12.06.03 TUBERIAS/ALIMENTADORES
01.12.06.03.0 EXCAVACION MANUAL DE
01.12.06.03.0 TUBERIA PVC SAP (ELECTR
S/.1,614.54 01.12.06.03.0 TUBERIA PVC SAP (ELECTR
S/.7,202.62 S/.812.98 01.12.06.03.0 TUBERIA PVC SAP (ELECTR
S/.4,798.56 01.12.06.03.0 TUBERIA PVC-P (ELECTRIC
S/.5,509.35 01.12.06.03.0 TUBERIA PVC-P (ELECTRIC
01.12.06.04 CAJAS DE PASO
01.12.06.04.0 CAJA DE PASO FºGº DE 100
01.12.06.04.0 CAJA DE PASO FºGº DE 200
S/.53,474.61 S/.79,551.32 S/.0.43 01.12.06.05 CABLES Y CONDUCTORES
01.12.06.05.0 CABLE ELECTRICO LSOH 6
S/.3,204.11 01.12.06.05.0 CABLE ELECTRICO LSOH 1
S/.1,193.20 01.12.06.05.0 CABLE ELECTRICO LSOH 1
S/.6,942.60 01.12.06.05.0 CABLE ELECTRICO LSOH 2
S/.4,566.60 01.12.06.05.0 CABLE ELECTRICO LSOH 3
S/.18,221.25 01.12.06.05.0 CABLE ELECTRICO LSOH 5
S/.19,346.85 S/.764.15 01.12.06.05.0 CABLE ELECTRICO LSOH 1
S/.72,598.07 S/.0.43 01.12.06.05.0 CABLE ELECTRICO LSOH 1
S/.6,189.10 01.12.06.05.0 CABLE ELECTRICO NLT 3X
S/.325,618.64 S/.2,576.30 01.12.06.06 ARTEFACTOS/LUMINARIAS
S/.801.42 01.12.06.06.0 REJILLA DE ALUMINIO P/EM
S/.1,774.62 01.12.06.06.0 LUMINARIA CIRCULAR P/EM
S/.334.36 S/.0.26 01.12.06.06.0 ARTEFACTO FLURESCENT
S/.276.80 01.12.06.06.0 LUMINARIA TIPO BRAQUET
S/.129,963.12 01.12.06.06.0 REFLECTOR DE 1000W, 130
S/.26,822.56 01.12.06.06.0 REFLECTOR DE 400W, 4800
S/.76,529.40 01.12.06.06.0 REFLECTOR CON LAMPAR
S/.91,692.40 01.12.06.06.0 LUMINARIA DE ALUMBRAD
S/.10,295.78 01.12.06.07 TABLEROS ELECTRICOS
S/.1,680.44 01.12.06.07.0 TABLERO DE DISTRIBUCIO
S/.357.68 01.12.06.07.0 TABLERO DISTRIBUCION, M
S/.4,826.90 01.12.06.07.0 TABLERO DE CONTROL DE
S/.3,430.76 01.12.06.07.0 TABLERO DE CONTROL PA
S/.4,644.22 01.12.06.08 INTERRUPTORES TERMOMA
S/.50.01 01.12.06.08.0 INTERRUPTOR TERMOMAG
S/.100.02 01.12.06.08.0 INTERRUPTOR TERMOMAG
S/.650.13 01.12.06.08.0 INTERRUPTOR TERMOMAG
S/.140.01 01.12.06.08.0 INTERRUPTOR TERMOMAG
S/.575.15 01.12.06.08.0 INTERRUPTOR TERMOMAG
S/.132.01 01.12.06.08.0 INTERRUPTOR TERMOMAG
S/.125.71 01.12.06.08.0 INTERRUPTOR TERMOMAG
S/.2,430.15 01.12.06.08.0 INTERRUPTOR DIFERENCI
S/.117.01 01.12.06.08.0 INTERRUPTOR DIFERENCI
S/.324.02 01.12.06.08.1 INTERRUPTOR RELOJ HOR
S/.1,872.32 01.12.06.09 PUESTA A TIERRA
S/.145.96 01.12.06.09.0 EXCAVACION DE HOYO PA
S/.1,726.36 01.12.06.09.0 INSTALACION DE PUESTA
S/.2,800.00 01.12.06.10 PRUEBAS ELECTRICAS
S/.700.00 01.12.06.10.0 PRUEBA DE CONTINUIDAD
S/.800.00 01.12.06.10.0 PRUEBA DE AISLAMIENTO
S/.800.00 01.12.06.10.0 PRUEBA DE RESISTENCIA
S/.500.00 01.12.06.10.0 PRUEBA DE NIVEL DE ILUM
S/.48,794.00 01.12.06.11 VARIOS
S/.6,991.40 01.12.06.11.0 POSTE METALICO P/ILUMIN
S/.15,834.80 01.12.06.11.0 PASTORAL P/ILUMINACION
S/.25,967.80 01.12.06.11.0 POSTE DE CONCRETO ARM
### 01.12.06.12 RED DE DISTRIBUCION DE M
S/.243.31 01.12.06.12.0 MOVIMIENTO DE TIERRAS
01.12.06.12.0 TRAZO Y REPLANTEO RE
S/.243.31 01.12.06.12.0 EXCAVACION A MANO EN
S/.2,024.08 01.12.06.12.0 POSTES Y CRUCETAS
S/.2,024.08 01.12.06.12.0 POSTE DE CONCRETO AR
S/.1,422.32 01.12.06.12.0 TUBERIAS Y CAJAS DE PAS
S/.150.96 01.12.06.12.0 TUBERIA F°G°, D=80MM
S/.771.36 01.12.06.12.0 TUBERIA PVC-P (ELECTR
S/.500.00 01.12.06.12.0 CAJA DE PASO DE C.A. 1X
S/.13,770.30 01.12.06.12.0 CABLES Y CONDUCTORES
S/.205.50 01.12.06.12.0 CONDUCTOR DE ALEACIO
S/.13,564.80 01.12.06.12.0 CABLE SUBTERRANEO N
S/.22,735.05 01.12.06.12.0 ARMADOS
S/.2,587.36 01.12.06.12.0 ARMADO DT-0
S/.20,147.69 01.12.06.12.0 ARMADO PSEC1
S/.55,000.00 01.12.06.12.0 SUBESTACION
S/.35,000.00 01.12.06.12.0 CELDA DE LLEGADA
S/.20,000.00 01.12.06.12.0 CELDA DE TRANSFORMA
S/.3,208.58 01.12.06.12.0 PUESTA A TIERRA
S/.74.38 01.12.06.12.0 EXCAVACION DE HOYOS
S/.3,134.20 01.12.06.12.0 INSTALACION DE PUESTA
S/.3,568.32 01.12.06.12.0 TRABAJOS COMPLEMENTA
S/.2,231.77 01.12.06.12.0 MEDIDOR EN MEDIA TEN
S/.14.45 01.12.06.12.0 PINTADO DE SEÑALIZACI
S/.894.18 01.12.06.12.0 ELIMINACION DE MATERI
S/.309.78 01.12.06.12.0 MEDICION DE AISLAMIEN
S/.118.14 01.12.06.12.0 MEDICION DE PUESTAS A
RENOVACION DE CAMPO DEPOR
### ### S/.2,684,911.30 ### ### S/.1,151,483.00 02
TRIBUNAS Y OBRAS COMPLEMEN
S/.50,987.75 ### S/.2,099,301.29 ### ### S/.1,051,947.29 02.01 MEJORAMIENTO DE TRIBUNAS
S/.50,987.75 ### S/.2,099,301.29 ### ### S/.133,439.56 02.01.01 ESTRUCTURAS
02.01.01.01 OBRAS PROVISIONALES
02.01.01.01.0 CAMPAMENTO PROVISION
02.01.01.01.0 CARTEL DE IDENTIFICACIO
S/.19,783.27 S/.16,031.11 02.01.01.02 TRABAJOS PRELIMINARES
02.01.01.02.0 DESMONTAJE DE PUERTAS
02.01.01.02.0 DESMONTAJE DE VENTANA
02.01.01.02.0 DESMONTAJE DE TIJERALE
02.01.01.02.0 DESMONTAJE DE CORREA
02.01.01.02.0 DESMONTAJE DE APARATO
02.01.01.02.0 DESMONTAJE DE FALSO C
02.01.01.02.0 DEMOLICION DE CIMIENTO
02.01.01.02.0 DEMOLICION DE SOBRECIM
02.01.01.02.0 DEMOLICION DE PISO DE C
02.01.01.02.1 DEMOLICION DE VEREDAS
02.01.01.02.1 DEMOLICION DE GRADERIO
02.01.01.02.1 DEMOLICION DE COLUMNA
S/.1.82 02.01.01.02.1 DEMOLICION DE LOSAS DE
S/.14.13 02.01.01.02.1 DEMOLICION DE URINARIO
S/.1,085.77 02.01.01.02.1 DEMOLICION DE MUROS D
S/.15,834.54 S/.3,960.35 02.01.01.02.1 DEMOLICION DE MUROS D
S/.2,847.01 S/.4,274.23 02.01.01.02.1 LIMPIEZA DEL TERRENO M
S/.3,990.35 02.01.01.02.1 TRAZO Y REPLANTEO PRE
S/.3,806.18 02.01.01.02.1 TRAZO Y REPLANTEO DUR
S/.31,204.48 ### S/.11,304.08 02.01.01.03 MOVIMIENTO DE TIERRAS
S/.23,952.51 S/.65,916.20 02.01.01.03.0 CORTE SUPERFICIAL MANU
S/.4,822.70 02.01.01.03.0 CORTE DE MATERIAL CON
S/.2,429.27 S/.4,657.25 02.01.01.03.0 PERFILADO Y COMPACTAD
### 02.01.01.03.0 EXCAVACION PARA ZAPAT
S/.3,571.20 02.01.01.03.0 EXCAVACION PARA CIMIEN
S/.76,560.12 02.01.01.03.0 EXCAVACION PARA VIGAS
S/.51,883.50 02.01.01.03.0 RELLENO COMPACTADO C
S/.34,251.13 S/.7,749.04 02.01.01.03.0 RELLENO COMPACTADO C
S/.6,466.46 S/.3,555.04 02.01.01.03.0 NIVELACION Y APISONADO
### 02.01.01.03.1 ACARREO MANUAL DE MAT
S/.42,187.13 02.01.01.03.1 CARGUIO Y ELIMINACION D
### S/.41,445.43 02.01.01.04 OBRAS DE CONCRETO SIMP
### 02.01.01.04.0 FALSO PISO DE 4" MEZCLA
S/.95,781.16 S/.8,813.65 02.01.01.04.0 SUBCIMIENTOS Y SUBZAPT
S/.14,193.14 02.01.01.04.0 CIMIENTOS CORRIDOS ME
S/.8,797.69 02.01.01.04.0 SOBRECIMIENTOS MEZCLA
S/.8,960.72 02.01.01.04.0 ENCOFRADO Y DESENCOF
S/.308.96 02.01.01.04.0 RAMPAS DE CONCRETO: f´
S/.371.27 02.01.01.04.0 RAMPAS: ENCOFRADO Y D
### S/.2,046,551.78 ### ### S/.133,439.56 02.01.01.05 OBRAS DE CONCRETO ARM
S/.43,037.75 02.01.01.05.0 SOBRECIMIENTO REFORZA
S/.16,955.41 02.01.01.05.0 SOBRECIMIENTO REFOR
S/.18,914.11 02.01.01.05.0 SOBRECIMEINTO REFOR
S/.7,168.23 02.01.01.05.0 SOBRECIMIENTOS REFO
### S/.7,256.14 02.01.01.05.0 ZAPATAS
### S/.7,256.14 02.01.01.05.0 ZAPATAS: CONCRETO PR
### 02.01.01.05.0 ZAPATAS: ACERO CORRU
### S/.7.00 02.01.01.05.0 VIGAS DE CIMENTACION
S/.91,407.78 S/.1.68 02.01.01.05.0 VIGAS DE CIMENTACION:
S/.53,370.13 S/.5.32 02.01.01.05.0 VIGAS DE CIMENTACION:
S/.89,730.02 02.01.01.05.0 VIGAS DE CIMENTACION:
S/.1,152,199.79 02.01.01.05.0 COLUMNAS
S/.75,615.75 02.01.01.05.0 COLUMNAS: CONCRETO
S/.298,865.58 02.01.01.05.0 CONCRETO PREMEZCLA
S/.359,690.87 02.01.01.05.0 COLUMNAS: ENCOFRADO
S/.418,027.59 02.01.01.05.0 COLUMNAS: ACERO COR
S/.690,117.66 S/.45,818.44 02.01.01.05.0 VIGAS
S/.41,395.73 02.01.01.05.0 VIGAS: CONCRETO f'c=21
S/.185,934.74 S/.4,422.71 02.01.01.05.0 CONCRETO PREMEZCLA
S/.234,899.31 02.01.01.05.0 VIGAS: ENCOFRADO Y DE
S/.269,283.61 02.01.01.05.0 VIGAS: ACERO CORRUGA
### S/.10,742.12 02.01.01.05.0 GRADERIOS
### S/.10,742.12 02.01.01.05.0 GRADERIOS: CONCRETO
### 02.01.01.05.0 GRADERIOS: ENCOFRAD
### 02.01.01.05.0 GRADERIOS: ACERO COR
S/.153,933.44 02.01.01.05.0 PLACAS
S/.48,208.18 02.01.01.05.0 PLACA:CONCRETO f'c=21
S/.65,875.80 02.01.01.05.0 PLACAS: ENCOFRADO Y
S/.39,849.46 02.01.01.05.0 PLACAS: ACERO CORRUG
S/.37,518.22 S/.78,765.58 02.01.01.05.0 ESCALERAS
S/.71,450.61 02.01.01.05.0 ESCALERAS: CONCRETO
S/.14,955.60 S/.5,598.27 02.01.01.05.0 ESCALERAS: ENCOFRAD
S/.22,562.62 S/.1,716.70 02.01.01.05.0 ESCALERAS: ACERO COR
S/.25,388.12 02.01.01.05.0 LOSAS MACIZAS
S/.11,724.63 02.01.01.05.0 LOSAS MACIZAS: CONCR
S/.11,160.15 02.01.01.05.0 LOSAS MACIZAS: ENCOF
S/.2,503.34 02.01.01.05.0 LOSAS MACIZAS: ACERO
S/.84,486.45 S/.8,576.69 S/.33,125.80 02.01.01.05.1 LOSA ALIGERADA
S/.31,400.10 02.01.01.05.1 LOSAS ALIGERADAS: CO
S/.33,778.44 02.01.01.05.1 LOSAS ALIGERADAS: ENC
S/.24,490.90 S/.5,761.38 02.01.01.05.1 LOSAS ALIGERADAS: ACE
S/.26,217.11 S/.2,815.31 S/.1,725.70 02.01.01.05.1 LOSAS ALIGERADAS: LAD
S/.3,428.43 02.01.01.05.1 DRENAJE EN GRADERIOS
S/.1,136.98 02.01.01.05.1 DRENAJE: CONCRETO f'c
S/.747.51 02.01.01.05.1 DRENAJE: ENCOFRADO Y
S/.1,543.94 02.01.01.05.1 DRENAJE: ACERO CORRU
S/.7,720.14 02.01.01.05.1 MESADA DE CONCRETO
S/.1,695.63 02.01.01.05.1 MESADA: CONCRETO f'c=
S/.3,652.57 02.01.01.05.1 MESADA: ENCOFRADO Y
S/.2,371.94 02.01.01.05.1 MESADA: ACERO CORRU
S/.43,516.16 ### S/.10,313.76 02.01.01.05.1 ESTRUCTURA METALICA
S/.33,517.09 S/.42,942.31 S/.2,773.36 02.01.01.05.1 TUBO RECTANGULAR 100
S/.9,999.07 S/.8,940.97 02.01.01.05.1 TUBO RECTANGULAR 40x
S/.62,794.71 S/.7,540.40 02.01.01.05.1 LAMINA RETICULAR INCL
S/.90,000.00 02.01.01.05.1 REHABILITACION DE ESTR
S/.90,000.00 02.01.01.05.1 REHABILITACION DE EST
### ### S/.918,507.73 02.01.02 ARQUITECTURA
### S/.43,380.64 02.01.02.01 MUROS Y TABIQUES DE ALB
### S/.7,298.31 02.01.02.01.0 MURO DE LADRILLO KK TIP
### 02.01.02.01.0 MURO DE LADRILLO KK TIP
### S/.20,388.78 02.01.02.01.0 TABIQUE SUPERBOARD
S/.60,037.92 02.01.02.01.0 TABIQUE DE MELAMINE CO
S/.15,693.55 02.01.02.01.0 JUNTA DE DILATACION CO
### ### S/.68,369.95 02.01.02.02 REVOQUES ENLUCIDOS Y M
S/.8,800.03 S/.15,938.83 02.01.02.02.0 TARRAJEO PRIMARIO O RA
### S/.336.48 02.01.02.02.0 TARRAJEO EN MURO:INTE
### 02.01.02.02.0 TARRAJEO EN MURO:EXTE
### 02.01.02.02.0 TARRAJEO DE SUPERFICIE
### 02.01.02.02.0 TARRAJEO DE SUPERFICIE
### 02.01.02.02.0 TARRAJEO EN SUPERFICIE
S/.20,086.97 S/.2,144.33 02.01.02.02.0 TARRAJEO EN SUPERFICIE
S/.27,596.61 S/.2,780.93 02.01.02.02.0 VESTIDURA DE DERRAMES
S/.63,444.69 02.01.02.02.0 BRUÑAS SEGUN DETALLE
### S/.3,841.75 02.01.02.03 CIELO RASOS
### 02.01.02.03.0 CIELORASO CON MEZCLA
### S/.3,841.75 02.01.02.03.0 CIELORASO CON BALDOSA
### S/.187,878.31 02.01.02.04 PISOS Y PAVIMENTOS
### 02.01.02.04.0 FALSO PISO DE 4" MEZCLA
### S/.35,618.67 02.01.02.04.0 CONTRAPISO DE 40 mm (M
S/.25,969.53 S/.508.76 02.01.02.04.0 PISO DE CEMENTO SIN CO
S/.99,490.58 02.01.02.04.0 PISO DE CEMENTO COLOR
### S/.7,250.83 02.01.02.04.0 PISO CERAMICO ANTIDESL
S/.45,009.47 02.01.02.04.0 PISO CERAMICO ANTIDESL
S/.268,977.74 02.01.02.05 ZOCALOS
S/.157,930.45 02.01.02.05.0 ENCHAPE FACHALETA RUS
S/.111,047.29 02.01.02.05.0 ZOCALO DE CERAMICO 20
S/.27,558.59 02.01.02.06 CONTRAZOCALOS
S/.12,314.22 02.01.02.06.0 CONTRAZOCALO CERAMIC
S/.13,312.61 02.01.02.06.0 CONTRAZOCALO DE CEME
S/.1,931.76 02.01.02.06.0 CONTRAZOCALO DE MADE
S/.28,116.13 02.01.02.07 CUBIERTAS Y CERRAMIENTO
S/.27,084.33 02.01.02.07.0 COBERTURA TIPO ONDULI
S/.1,031.80 02.01.02.07.0 CUMBRERA DE ONDULINE
S/.72,120.59 02.01.02.08 CARPINTERIA DE MADERA
S/.72,120.59 02.01.02.08.0 PUERTAS DE MADERA CON
S/.85,154.49 ### S/.107,928.06 02.01.02.09 CARPINTERIA METALICA
S/.6,360.00 S/.0.00 02.01.02.09.0 PUERTA METALICA 03
S/.3,520.00 S/.0.00 02.01.02.09.0 PUERTA METALICA 04
S/.8,957.52 02.01.02.09.0 PUERTA METALICA T-5A
S/.17,417.40 02.01.02.09.0 PUERTA METALICA PARA
S/.11,253.25 02.01.02.09.0 PUERTA METALICA EN ESC
S/.12,640.00 02.01.02.09.0 PUERTA METALICA ANTIPA
S/.46,170.00 02.01.02.09.0 TRAMA METALICA EN CAJA
S/.6,840.00 S/.0.00 02.01.02.09.0 BARANDA METALICA CAJA
S/.6,431.96 S/.6,604.84 02.01.02.09.0 MALLA METALICA CON REF
S/.67,573.04 S/.51,055.05 02.01.02.09.1 ESTRUCTURA METALICA P
S/.46,789.63 02.01.02.09.1 BARANDA METALICA GRAD
S/.6,433.35 02.01.02.09.1 BARANDA METALICA ACCE
S/.15,431.51 02.01.02.09.1 BARANDAS METALICAS PA
S/.5,000.00 02.01.02.09.1 ESCALERA METALICA TIPO
S/.4,500.00 02.01.02.09.1 ESCALERA METALICA TIPO
S/.7,000.00 02.01.02.09.1 ESCALERA METALICA TIPO
S/.34,447.67 S/.615.41 02.01.02.10 CERRAJERIA
S/.1,785.79 S/.615.41 02.01.02.10.0 BISAGRAS CAPUCHINA ALU
S/.22,065.00 02.01.02.10.0 BISAGRAS CAPUCHINA ALU
S/.3,740.44 02.01.02.10.0 CERRADURA DE TRES GOL
S/.4,788.00 02.01.02.10.0 CERRADURA TIPO BOLA P/
S/.2,068.44 02.01.02.10.0 MANIJA DE 3" ALUMINIZAD
S/.12,188.34 ### S/.41,228.18 02.01.02.11 VIDRIOS, CRISTALES Y SIMIL
S/.12,188.34 S/.840.25 02.01.02.11.0 VIDRIO SISTEMA MODUGLA
### S/.332.64 02.01.02.11.0 VIDRIO TEMPLADO DE 8 mm
### S/.1,509.18 02.01.02.11.0 VIDRIO E=8 MM INCOLORO
S/.39,386.36 02.01.02.11.0 MAMPARA EN CRISTAL TEM
### S/.111,873.02 02.01.02.12 PINTURA
S/.39,245.51 02.01.02.12.0 PINTURA LATEX EN CIELO
S/.65,646.87 02.01.02.12.0 PINTURA LATEX 2 MANOS
S/.31,435.31 02.01.02.12.0 PINTURA LATEX 2 MANOS
S/.55,576.26 S/.30,082.00 02.01.02.12.0 PINTURA LATEX 2 MANOS
S/.23,599.68 S/.20,826.09 02.01.02.12.0 PINTURA LATEX 2 MANOS
S/.18,014.15 S/.18,567.51 02.01.02.12.0 PINTURA LATEX 2 MANOS
S/.30,440.67 02.01.02.12.0 PIN. ANTICOR. Y ESMALTE
S/.1,900.41 02.01.02.12.0 PINTURA ESMALTE EN CON
S/.1,532.65 02.01.02.12.0 PINTURA BARNIZ EN CONT
S/.8,523.69 02.01.02.12.1 PINTURA EN DERRAMES
S/.20,182.80 S/.19,404.80 02.02 SEÑALIZACION
02.02.01 PINTURA
02.02.02 VARIOS
S/.9,424.80 S/.0.00 02.02.03 LETREROS DE SALIDA
S/.10,758.00 S/.0.00 02.02.04 LETREROS DE ZONA DE SEGU
S/.9,310.00 02.02.05 EXTINTORES
S/.3,430.00 02.02.06 LETREROS DE EXTINTORES
S/.3,996.00 02.02.07 LETREROS DE SALIDA POR ES
S/.2,262.00 02.02.08 ZONA DE SEGURIDAD
S/.406.80 02.02.09 LETREROS DE RIESGO ELECT
S/.50,083.96 S/.149,262.16 S/.64,734.54 S/.93,591.46 S/.55,519.50 02.03 INSTALACIONES SANITARIAS
S/.25,588.16 S/.4,403.15 02.03.01 SISTEMA DE AGUA POTABLE
S/.8,036.20 S/.3,973.93 02.03.01.01 SALIDAS DE AGUA FRIA
S/.3,502.38 02.03.01.01.0 SALIDA DE A.F. PVC C/R - 1
S/.3,440.84 S/.471.55 02.03.01.01.0 SALIDA DE A.F. PVC C/R - 1
S/.4,595.36 02.03.01.01.0 SALIDA DE A.F. PVC C/R - 1
S/.6,580.72 02.03.01.02 REDES DE DISTRIBUCION
S/.1,862.27 02.03.01.02.0 SUM. E INST. TUB. PVC C-1
S/.2,019.44 02.03.01.02.0 SUM. E INST. TUB. PVC C-1
S/.1,102.06 02.03.01.02.0 SUM. E INST. TUB. PVC C-1
S/.1,596.95 02.03.01.02.0 SUM. E INST. TUB. PVC C-1
S/.10,971.24 S/.429.22 02.03.01.03 VALVULAS
S/.243.96 02.03.01.03.0 SUM. E INST. VALV. ESFER
S/.1,821.22 S/.185.26 02.03.01.03.0 SUM. E INST. VALV. ESFER
S/.821.26 02.03.01.03.0 SUM. E INST. VALV. ESFER
S/.5,188.96 02.03.01.03.0 SUM. E INST. VALV. ESFER
S/.2,771.82 02.03.01.03.0 SUM. E INST. VALV. ESFER
S/.367.98 02.03.01.03.0 SUM. E INST. VALV. ESFER
S/.20,902.37 S/.2,929.03 02.03.02 SISTEMA DE AGUA CALIENTE
S/.4,231.51 S/.2,707.39 02.03.02.01 SALIDAS DE AGUA CALIENTE
S/.3,248.00 S/.2,707.39 02.03.02.01.0 SALIDA AGUA CALIENTE TU
S/.983.51 02.03.02.01.0 SALIDA AGUA CALIENTE TU
S/.170.86 02.03.02.02 REDES DE DISTRIBUCION
S/.170.86 02.03.02.02.0 SUM. Y COLOC. TUB. CPVC
S/.221.64 02.03.02.03 LLAVES Y VALVULAS
S/.221.64 02.03.02.03.0 SUM. E INST. VALV. ESFER
S/.16,500.00 02.03.02.04 THERMAS Y VALVULAS
S/.750.00 02.03.02.04.0 SUM Y COLOC. THERMAS 1
S/.15,750.00 02.03.02.04.0 SUM Y COLOC. THERMAS 1
S/.32,646.04 S/.4,850.25 02.03.03 SISTEMA CONTRA INCENDIO
S/.16,491.25 02.03.03.01 TUBERIA ENTERRADA
S/.2,283.75 02.03.03.01.0 TUBERIA HDPE PN15 2 1/2"
S/.13,412.30 02.03.03.01.0 TUBERIA HDPE PN15 4" PA
S/.795.20 02.03.03.01.0 TUBERIA HDPE PN15 6" PA
S/.16,154.79 02.03.03.02 TUBERIA AEREA
S/.11,551.75 02.03.03.02.0 TUBERIA ACERO SCH 40 2
S/.4,603.04 02.03.03.02.0 TUBERIA ACERO SCH 40 4"
S/.4,850.25 02.03.03.03 GABINETE
S/.4,850.25 02.03.03.03.0 GABINETE CONTRA INCEN
S/.50,083.96 S/.95,713.75 S/.36,217.35 S/.84,338.06 S/.55,519.50 02.03.04 SISTEMA DE DESAGUE Y VENT
S/.24,575.12 S/.36,326.14 S/.29,877.35 S/.3,123.45 02.03.04.01 SALIDA DE DESAGUE Y VENT
S/.8,101.49 S/.3,584.59 02.03.04.01.0 SALIDA DE DESAGUE PVC
S/.13,399.52 S/.5,087.67 S/.4,923.55 S/.985.05 02.03.04.01.0 SALIDA DE DESAGUE PVC
S/.11,175.60 S/.3,107.90 02.03.04.01.0 SALIDA DE DESAGUE PVC
S/.20,029.08 S/.21,369.21 S/.2,138.40 02.03.04.01.0 SALIDA DE VENTILACION P
S/.18,787.05 S/.30,531.96 02.03.04.02 REDES DE EVACUACION
S/.1,785.81 02.03.04.02.0 SUM. E INST. TUB. PVC CP
S/.301.47 02.03.04.02.0 SUM. E INST. TUB. PVC CP
S/.8,021.86 S/.335.58 02.03.04.02.0 SUM. Y COLOC. TUB. PVC-C
S/.8,677.91 S/.3,000.82 02.03.04.02.0 SUM. Y COLOC. TUB. PVC-C
S/.14,786.24 02.03.04.02.0 SUM. Y COLOC. TUB. PVC-C
S/.12,409.32 02.03.04.02.0 SUM. Y COLOC. TUB. PVC-C
S/.10,644.61 S/.4,718.95 02.03.04.03 ADITAMENTOS VARIOS
S/.2,154.24 02.03.04.03.0 SUM. E INST. REGISTRO RO
S/.1,716.52 02.03.04.03.0 SUM. E INST. SUMIDERO B
S/.253.44 02.03.04.03.0 REGISTRO ROSCADO DE B
S/.1,576.05 S/.594.75 02.03.04.03.0 SUM. E INST. REGISTRO RO
S/.5,010.30 02.03.04.03.0 SUM. E INST. REGISTRO RO
S/.3,588.42 02.03.04.03.0 SUM. E INST. REGISTRO RO
S/.20.74 02.03.04.03.0 SOMBRERO DE VENTILACI
S/.223.20 02.03.04.03.0 SOMBRERO DE VENTILACI
S/.225.90 02.03.04.03.0 SOMBRERO DE VENTILACI
S/.6,721.79 S/.200.65 02.03.04.04 CAMARAS DE INSPECCION
S/.6,721.79 S/.200.65 02.03.04.04.0 CAJAS DE REGISTRO DE D
S/.28,655.00 S/.6,340.00 S/.70,570.00 S/.50,800.55 02.03.04.05 APARATOS SANITARIOS
S/.18,975.00 S/.0.00 S/.0.00 02.03.04.05.0 INODORO CON VALVULA S
S/.9,680.00 S/.0.00 02.03.04.05.0 LAVATORIO INC/ACCESOR
S/.4,015.00 02.03.04.05.0 DUCHA INC/ACCESORIO
S/.500.00 02.03.04.05.0 LAVADERO DE ACERO INO
S/.1,825.00 S/.0.00 02.03.04.05.0 JABONERA DE LOSA DE 15
S/.2,190.00 02.03.04.05.0 PAPELERA DE BARRA
S/.5,632.00 S/.0.00 02.03.04.05.0 ESPEJO
S/.62,748.00 S/.0.00 02.03.04.05.0 URINARIO DE LOZA DE PIC
S/.41,547.80 02.03.04.05.0 COLOCACION DE APARATO
S/.9,252.75 02.03.04.05.1 COLOCACION DE ACCESO
S/.77,342.65 ### S/.297,426.17 ### ### S/.2,398.64 02.04 INSTALACIONES ELECTRICAS
S/.22,542.40 02.04.01 TRABAJOS PRELIMINARES
S/.2,000.00 02.04.01.01 REPLANTEO DE INSTALACIO
S/.2,500.00 02.04.01.02 DESMONTAJE DE INSTALACI
S/.18,042.40 02.04.01.03 PICADO Y RESANE DE PARE
S/.54,800.25 S/.51,918.77 S/.9,230.81 02.04.02 SALIDAS PARA INST. ELECTRI
S/.34,797.11 S/.11,852.93 02.04.02.01 SALIDA DE TECHO C/TUB. PV
S/.6,080.56 02.04.02.02 SALIDA DE PARED C/TUB. PV
S/.7,059.61 S/.1,650.43 02.04.02.03 SALIDA PARA LUZ DE CONM
S/.4,951.52 S/.4,077.84 02.04.02.04 SALIDA P/INTERRUPTOR SIM
S/.1,911.45 S/.1,131.27 02.04.02.05 SALIDA P/INTERRUPTOR DO
S/.25,034.73 S/.8,803.83 02.04.02.06 SALIDA P/TOMACORRIENTE
S/.1,107.04 02.04.02.07 SALIDA P/SECADORA DE MA
S/.5,169.58 02.04.02.08 SALIDA PARA ILUMINACION D
S/.1,894.95 S/.426.98 02.04.02.09 SALIDA DE FUERZA PARA EX
S/.59,374.76 S/.24,659.57 S/.5,693.06 02.04.03 TUBERIAS/ALIMENTADORES
S/.21,316.48 02.04.03.01 EXCAVACION DE ZANJAS
S/.299.98 02.04.03.02 TUBERIA PVC-P (ELECTRICA
S/.10,674.11 S/.408.77 02.04.03.03 TUBERIA PVC-P (ELECTRICA
S/.10,242.83 S/.209.84 02.04.03.04 TUBERIA PVC-P (ELECTRICA
S/.16,841.36 S/.2,746.92 02.04.03.05 TUBERIA PVC-P (ELECTRICA
S/.4,965.30 02.04.03.06 TUBERIA PVC-P (ELECTRICA
S/.7,874.73 S/.2,094.57 02.04.03.07 TUBERIA PVC-P (ELECTRICA
S/.8,454.01 S/.3,598.49 02.04.03.08 TUBERIA PVC-P (ELECTRICA
S/.13,079.14 02.04.04 CAJAS DE PASO
S/.562.66 02.04.04.01 CAJA DE PASO FºGº DE 100x
S/.123.27 02.04.04.02 CAJA DE PASO FºGº DE 150x
S/.393.21 02.04.04.03 CAJA DE PASO FºGº DE 200x
S/.12,000.00 02.04.04.04 BUZON DE CONCRETO DE 1
S/.51,753.81 S/.170,949.14 S/.6,678.04 02.04.05 CABLES Y CONDUCTORES
S/.14,260.46 S/.5,228.31 02.04.05.01 CABLE ELECTRICO LSOH 10
S/.37,493.35 S/.12,954.55 S/.418.76 02.04.05.02 CABLE ELECTRICO LSOH 16
S/.59,876.17 S/.416.08 02.04.05.03 CABLE ELECTRICO LSOH 25m
S/.86,486.44 S/.5,843.20 02.04.05.04 CABLE ELECTRICO LSOH 35m
S/.657.72 02.04.05.05 CABLE ELECTRICO LSOH 70m
S/.165.59 02.04.05.06 CABLE ELECTRICO LSOH 95m
S/.847.76 02.04.05.07 CABLE ELECTRICO LSOH 120
S/.1,288.16 02.04.05.08 CABLE ELECTRICO LSOH 150
S/.3,444.44 02.04.05.09 CABLE ELECTRICO LSOH 240
S/.39,345.07 ### S/.86,877.61 02.04.06 ARTEFACTOS/LUMINARIAS
S/.39,345.07 S/.1,126.64 02.04.06.01 REJILLA DE ALUMINIO P/ADO
S/.91,392.93 02.04.06.02 LUMINARIA CIRCULAR P/EMP
S/.4,689.79 02.04.06.03 LUMINARIA C/LAMPARA FLUO
S/.15,792.53 S/.912.73 02.04.06.04 LUMINARIA DE EMERGENCIA
S/.4,705.60 02.04.06.05 LUMINARIA TIPO BRAQUET C
### S/.10,564.88 02.04.06.06 REFLECTOR CON LAMPARA
S/.60,795.84 02.04.06.07 REFLECTOR TIPO CAMPANA
S/.2,957.08 02.04.06.08 LUMINARIA C/SOCKET, E27,
S/.3,092.96 02.04.06.09 SECADORA DE MANOS, AUT
S/.3,848.52 02.04.06.10 LUMINARIA CINTA LED, TIPO
S/.50,885.34 S/.64,741.19 02.04.07 TABLEROS ELECTRICOS
S/.15,165.67 02.04.07.01 TABLERO TRIFASICO TPN, A
S/.12,165.67 02.04.07.02 TABLERO TRIFASICO TPE, A
S/.6,686.54 02.04.07.03 TABLERO TRIFASICO P/EMPO
S/.3,163.86 S/.0.29 02.04.07.04 TABLERO TRIFASICO P/EMPO
S/.682.83 02.04.07.05 TABLERO TRIFASICO P/EMPO
S/.3,165.67 02.04.07.06 TABLERO TRIFASICO P/EMPO
S/.9,855.10 S/.0.12 02.04.07.07 TABLERO DE BANCO DE CON
S/.16,657.25 02.04.07.08 TABLERO GENERAL NORMA
S/.9,657.25 02.04.07.09 TABLERO GENERAL DE EME
S/.3,861.52 02.04.07.10 TABLERO DE CONTROL DE E
S/.3,715.38 02.04.07.11 TABLERO DE CONTROL DE B
S/.3,715.38 02.04.07.12 TABLERO DE CONTROL DE B
S/.282.25 02.04.07.13 TABLERO MONOFASICO DE
S/.26,314.50 02.04.07.14 TABLERO DE TRANSFERENC
S/.537.25 02.04.07.15 TABLERO PARA ESPECTACU
S/.2,356.24 S/.29,186.26 S/.1,063.13 02.04.08 INTERRUPTORES TERMOMAG
S/.2,356.24 S/.544.34 02.04.08.01 INTERRUPTOR TERMOMAGN
S/.55.71 02.04.08.02 INTERRUPTOR TERMOMAGN
S/.3,900.78 02.04.08.03 INTERRUPTOR TERMOMAGN
S/.100.02 02.04.08.04 INTERRUPTOR TERMOMAGN
S/.1,375.56 02.04.08.05 INTERRUPTOR TERMOMAGN
S/.2,800.20 02.04.08.06 INTERRUPTOR TERMOMAGN
S/.1,725.45 02.04.08.07 INTERRUPTOR TERMOMAGN
S/.170.03 02.04.08.08 INTERRUPTOR TERMOMAGN
S/.460.12 02.04.08.09 INTERRUPTOR TERMOMAGN
S/.18,054.05 S/.1,063.13 02.04.08.10 INTERRUPTOR DIFERENCIAL
S/.10,593.18 S/.998.64 02.04.09 PUESTA A TIERRA
S/.2,189.22 02.04.09.01 EXCAVACION DE HOYO PAR
S/.8,403.96 S/.998.64 02.04.09.02 INSTALACION DE PUESTA A
S/.1,400.00 02.04.10 PRUEBAS ELECTRICAS
S/.350.00 02.04.10.01 PRUEBA DE CONTINUIDAD
S/.400.00 02.04.10.02 PRUEBA DE AISLAMIENTO
S/.400.00 02.04.10.03 PRUEBA DE RESISTENCIA D
S/.250.00 02.04.10.04 PRUEBA DE NIVEL DE ILUMIN
S/.55,133.38 ### 02.04.11 VARIOS
S/.45,422.55 02.04.11.01 UPS 10 KVA, TRIFASICO
S/.9,710.83 S/.211.72 02.04.11.02 TRANSFORMADOR DE AISLA
### 02.04.11.03 TABLERO ELECTRONICO CO
S/.7,920.00 02.04.11.04 FIJACION ORIENTACION DE
S/.16,000.00 02.04.11.05 PARARRAYOS TIPO DESIONI
S/.3,000.00 02.04.11.06 SUM Y COLOC. THERMAS 11
### S/.82,338.62 02.05 INSTALACIONES MECANICAS
### 02.05.01 SISTEMA DE GRUPO ELECTRO
S/.36.48 02.05.01.01 EXCAVACION MANUAL DE ZA
S/.450.00 02.05.01.02 LOSAS MACIZAS PARA EL MO
### 02.05.01.03 SUMINISTRO Y MONTAJE DE
S/.12,000.00 02.05.01.04 SUMINISTRO Y MONTAJE DE
S/.24,916.40 S/.24,678.66 02.05.02 SISTEMA DE COMBUSTIBLE
S/.15,954.00 02.05.02.01 TANQUE DE PETROLEO
S/.950.00 02.05.02.01.0 TANQUE DIARIO DE PETRO
S/.15,004.00 02.05.02.01.0 TANQUE DE ALMACENAMIE
S/.1,453.05 02.05.02.02 MOVIMIENTO DE TIERRAS
S/.336.48 02.05.02.02.0 TRAZO Y REPLANTEO
S/.557.85 02.05.02.02.0 EXCAVACION MANUAL DE
S/.558.72 02.05.02.02.0 TIERRA CERNIDA Y COMPA
S/.3,279.98 02.05.02.03 TUBERIAS
S/.1,111.20 02.05.02.03.0 TUBERIA DE ACERO NEGR
S/.511.20 02.05.02.03.0 TUBERIA DE ACERO NEGR
S/.195.30 02.05.02.03.0 TUBERIA DE ACERO NEGR
S/.200.60 02.05.02.03.0 TUBERIA DE ACERO NEGR
S/.160.08 02.05.02.03.0 TUBERIA DE ACERO NEGR
S/.1,101.60 02.05.02.03.0 REVESTIMIENTO P/TUBERI
S/.983.72 S/.563.99 02.05.02.04 ACCESORIOS VARIOS
S/.39.20 02.05.02.04.0 UNION FLEXIBLE DE 1" (SIS
S/.47.20 02.05.02.04.0 UNION FLEXIBLE DE 1 1/4"
S/.51.20 02.05.02.04.0 UNION FLEXIBLE DE 1 1/2"
S/.33.76 02.05.02.04.0 CODO DE ACERO NEGRO D
S/.41.76 02.05.02.04.0 CODO DE ACERO NEGRO D
S/.549.45 02.05.02.04.0 CODO DE ACERO NEGRO D
S/.71.05 02.05.02.04.0 CODO DE ACERO NEGRO D
S/.85.26 02.05.02.04.0 CODO DE ACERO NEGRO D
S/.64.84 02.05.02.04.0 CODO DE ACERO NEGRO D
S/.16.88 02.05.02.04.1 TEE DE ACERO NEGRO DE
S/.20.88 02.05.02.04.1 TEE DE ACERO NEGRO DE
S/.22.88 02.05.02.04.1 TEE DE ACERO NEGRO DE
S/.85.26 02.05.02.04.1 TEE DE ACERO NEGRO DE
S/.85.26 02.05.02.04.1 TEE DE ACERO NEGRO DE
S/.36.42 02.05.02.04.1 TEE DE ACERO NEGRO DE
S/.44.84 02.05.02.04.1 REDUCCION DE ACERO CE
S/.22.42 02.05.02.04.1 REDUCCION DE ACERO CE
S/.22.42 02.05.02.04.1 REDUCCION DE ACERO CE
S/.26.42 02.05.02.04.1 REDUCCION DE ACERO CE
S/.52.84 02.05.02.04.2 REDUCCION DE ACERO CE
S/.91.05 02.05.02.04.2 REDUCCION DE ACERO CE
S/.36.42 02.05.02.04.2 REDUCCION DE ACERO CE
S/.2,892.36 02.05.02.05 VALVULAS
S/.412.92 02.05.02.05.0 VALVULA DE BOLA DE 1/2"
S/.409.10 02.05.02.05.0 VALVULA DE BOLA DE 1"
S/.387.28 02.05.02.05.0 VALVULA DE BOLA DE 1 1/4
S/.524.10 02.05.02.05.0 VALVULA DE BOLA DE 1 1/2
S/.545.72 02.05.02.05.0 VALVULA CHECK DE BRON
S/.138.04 02.05.02.05.0 VALVULA DE PIE D=1"
S/.475.20 02.05.02.05.0 VALVULA REGULADORA DE
S/.353.29 S/.20,763.67 02.05.02.06 ACCESORIOS PARA TANQUE
S/.353.29 S/.0.05 02.05.02.06.0 BOQUILLA DE LLENADO DE
S/.55.26 02.05.02.06.0 BOQUILLA DEMEDICION DI
S/.83.30 02.05.02.06.0 BOQUILLA DE VENTILACIO
S/.2,424.74 02.05.02.06.0 FILTRO DE PETROLEO
S/.1,111.28 02.05.02.06.0 FILTRO COLADOR DE PETR
S/.3,397.56 02.05.02.06.0 PREFILTRO DE PETROLEO
S/.1,170.36 02.05.02.06.0 VISOR DE VIDRIO DE 1 1/4"
S/.8,621.94 02.05.02.06.0 CONTROL DE NIVEL VARIL
S/.734.60 02.05.02.06.0 CAJUELA DE LLENADO DE
S/.1,612.28 02.05.02.06.1 MANOMETROS
S/.1,430.54 02.05.02.06.1 POZO DE PUESTA A TIERR
S/.121.76 02.05.02.06.1 CABLE DE COBRE DESNUD
S/.2,400.00 02.05.02.07 BOMBA PARA PETROLEO
S/.2,400.00 02.05.02.07.0 ELECTROBOMBA DE Q=12.
02.05.02.08 PRUEBAS
S/.951.00 02.05.02.09 PRUEBA DE INSTALAC. DEL
S/.57,659.96 02.05.03 SISTEMA DE VENTILACION ME
S/.728.22 02.05.03.01 PERFORACION DE MUROS
S/.55,943.09 02.05.03.02 SUMINISTRO E INSTALACION
S/.53.88 02.05.03.03 DUCTOS FLEXIBLES 1
S/.934.77 02.05.03.04 REJILLAS DE EXTRACCION D
S/.138,921.68 ### ### S/.22,212.77 02.06 INSTALACIONES DE INFORMACI
S/.3,086.87 S/.38,884.07 02.06.01 SALIDA PARA VOZ Y DATOS
S/.3,086.87 S/.1,599.37 02.06.01.01 SALIDA PARA PUNTO DE INT
S/.5,448.56 02.06.01.02 SALIDA PARA TELEFONO
S/.25,336.14 02.06.01.03 CENTRAL IP PARA INTERNET
S/.6,500.00 02.06.01.04 SUMINISTRO DE LINEA EXTE
### S/.4,355.15 02.06.02 SALIDA PARA SISTEMA DE ALA
S/.71,937.32 02.06.02.01 TABLERO CENTRAL PARA CO
S/.1,128.96 02.06.02.02 ESTACION MANUAL DE PROG
S/.54,057.69 S/.3,381.03 02.06.02.03 SALIDA PARA DETECTOR DE
S/.974.12 02.06.02.04 SALIDA PARA DIFUSOR DE S
S/.10,314.72 02.06.02.05 SALIDA PARA SENSOR DE M
S/.7,353.76 02.06.02.06 SALIDA PARA SENSOR MAGN
S/.75,389.83 S/.236.27 S/.7.64 02.06.03 SALIDA PARA SISTEMAS DE SO
S/.4,356.00 02.06.03.01 SALIDA PARA MEGAFONIA E
S/.21,031.14 02.06.03.02 SALIDA PARA PARLANTES D
S/.7,543.05 02.06.03.03 CENTRAL DE DIFUSION Y PE
S/.42,459.64 S/.236.27 S/.7.64 02.06.03.04 AMPLIFICADOR
S/.131,222.90 S/.25,647.07 02.06.04 SALIDA PARA SISTEMAS DE VI
S/.131,222.90 S/.3,712.82 02.06.04.01 SALIDA PARA CAMARA DE V
S/.21,934.25 02.06.04.02 UNIDAD DE ADMINISTRACIO
S/.4,611.91 S/.19,341.34 02.06.05 SALIDA PARA TELEVISION
S/.4,611.91 S/.17,769.79 02.06.05.01 SALIDA PARA PUNTO DE IPT
S/.1,571.55 02.06.05.02 UNIDAD DE RECEPCION Y DI
S/.62,081.21 ### 02.06.06 CENTRAL DE COMUNICACION
S/.17,101.15 02.06.06.01 ESTACION CENTRAL DE COM
S/.44,980.06 S/.676.22 02.06.06.02 REPARTIDOR DE CABLEADO
### 02.06.06.03 REPARTIDOR DE CABLEADO
S/.79,520.78 02.06.07 CONTROL DE ACCESOS
S/.1,957.22 02.06.07.01 ESTACION CENTRAL DE CON
S/.77,563.56 02.06.07.02 BARRERA DE CONTROL DE A
S/.69,365.09 S/.1,308.05 02.06.08 CANALIZACIONES Y/O TUBERI
S/.3,405.78 02.06.08.01 TUBERIA PVC-P, D=15 mm.
S/.26,505.47 02.06.08.02 TUBERIA PVC-P, D=20mm.
S/.34,078.99 S/.1,308.05 02.06.08.03 BANDEJA PORTACABLE DE 2
S/.5,374.85 02.06.08.04 CAJA DE PASO FºGº DE 250x
S/.26,708.68 S/.18,897.08 02.06.09 CABLEADO EN TUBERIAS
S/.26,708.68 S/.3,345.68 02.06.09.01 CABLE DE VOZ Y DATOS
S/.1,192.80 02.06.09.02 CABLE TELEFONICO DE INTE
S/.2,478.60 02.06.09.03 CABLE DE SEÑALES DEBILES
S/.11,880.00 02.06.09.04 CABLE DE FIBRA OPTICA
S/.2,000.00 02.06.10 OTROS
S/.1,000.00 02.06.10.01 SERVICIO DE INSTALACION Y
S/.1,000.00 02.06.10.02 SERVICIO DE INSTALACION Y
### S/.25,891.30 S/.85,646.49 ### S/.35,145.16 S/.25,831.69 03 MEJORAMIENTO DE AREAS DEPO
S/.6,440.69 S/.5,610.07 03.01 CAMPO DEPORTIVO GRASS NAT
03.01.01 TRABAJOS PRELIMINARES
03.01.01.01 TRAZO Y REPLANTEO PRELI
03.01.01.02 LIMPIEZA Y DESBROCE DEL
03.01.02 DEMOLICIONES Y DESMONTA
03.01.02.01 DEMOLICIONES
03.01.02.01.0 DEMOLICION DE ESTRUCT
03.01.02.02 DESMONTAJES
03.01.02.02.0 DESMONTAJE DE SISTEMA
03.01.02.02.0 DESMONTAJE DEL SISTEM
03.01.03 MOVIMIENTO DE TIERRAS
03.01.03.01 CORTE DE MATERIAL SUELT
03.01.03.02 EXCAVACION A MANO EN TE
03.01.03.03 ELIMINACION DE MATERIAL
03.01.03.04 PERFILADO Y COMPACTADO
03.01.03.05 CONFORMACION DE SUB BA
03.01.03.06 ACARREO DE MATERIAL PRO
03.01.03.07 ELIMINACION DE MATERIAL
03.01.04 EXTRACCION DE MATERIALES
03.01.04.01 EXTRACCION Y APILAMIENT
03.01.04.02 ZARANDEO DE MATERIAL SE
03.01.04.03 CARGUIO DE MATERIAL DE S
03.01.04.04 TRANSPORTE DE MATERIAL
03.01.04.05 EXTRACCION Y APILAMIENT
03.01.04.06 ZARANDEO DE ARENA FINA
03.01.04.07 CARGUIO DE ARENA FINA EN
03.01.04.08 TRANSPORTE DE ARENA FIN
03.01.04.09 EXTRACCION Y APILAMIENT
03.01.04.10 CARGUIO DE MATERIALES E
03.01.04.11 TRANSPORTE DE TIERRA AG
03.01.05 CONFORMACION DE ESTRUCT
03.01.05.01 COLOCADO Y COMPACTADO
03.01.05.02 PREPARACION Y BATIDO DE
03.01.05.03 ESPARCIDO Y COMPACTADO
S/.6,440.69 S/.5,610.07 03.01.06 GRAMADO
S/.6,440.69 S/.5,610.07 03.01.06.01 GRASS NATURAL EN CAMPO
S/.69,625.34 S/.14,631.18 S/.301.42 03.02 SISTEMA DE DRENAJE CAMPO D
03.02.01 TRABAJOS PRELIMINARES
03.02.01.01 TRAZO Y REPLANTEO PRELI
S/.1,868.01 S/.1,687.24 S/.301.42 03.02.02 INSTALACION SUB DRENES CO
03.02.02.01 COLOCADO Y COMPACTADO
03.02.02.02 SUMINISTRO Y COLOCACION
03.02.02.03 ACCESORIOS PARA INSTALA
03.02.02.04 ACCESORIOS PARA INSTALA
03.02.02.05 ACCESORIOS PARA INSTALA
03.02.02.06 ACCESORIOS PARA INSTALA
S/.1,868.01 S/.1,687.24 S/.301.42 03.02.02.07 ACCESORIOS PARA INSTALA
03.02.03 INSTALACION DREN COLECTO
03.02.03.01 SUMINISTRO Y COLOCACION
S/.20,984.60 03.02.04 INSTALACION DE COLECTORE
03.02.04.01 EXCAVACION MANUAL DE ZA
03.02.04.02 ACARREO Y ELIMINACION DE
03.02.04.03 REFINE Y NIVELACION DE ZA
03.02.04.04 RELLENO CON MATERIAL CL
03.02.04.05 CAMA DE ARENA PARA APOY
S/.529.29 03.02.04.06 SUMINISTRO Y COLOCACION
S/.3,468.88 03.02.04.07 SUMINISTRO Y COLOCACION
S/.10,885.59 03.02.04.08 SUMINISTRO Y COLOCACION
S/.4,241.03 03.02.04.09 CONCRETO f'c=210 kg/cm2
S/.1,859.81 03.02.04.10 SOLADO e=2"
S/.10,046.02 03.02.05 BUZONES DE CONCRETO HAS
S/.0.18 03.02.05.01 EXCAVACION MANUAL DE ZA
S/.697.68 03.02.05.02 ACARREO Y ELIMINACION DE
S/.29.00 03.02.05.03 REFINE Y NIVELACION EN FO
S/.180.24 03.02.05.04 SOLADO e=2"
S/.3,621.64 03.02.05.05 CONCRETO f'c=210 kg/cm2
S/.1,601.59 03.02.05.06 ACERO DE REFUERZO fy=4,2
S/.3,915.69 03.02.05.07 ENCOFRADO Y DESENCOFR
S/.36,726.71 S/.12,943.94 03.02.06 CONCRETO ARMADO
S/.13,316.77 03.02.06.01 CANAL: ENCOFRADO Y DESE
S/.6,366.98 03.02.06.02 CANAL: ACERO CORRUGADO
S/.12,681.87 03.02.06.03 CANAL: CONCRETO f'c=210 k
S/.4,361.09 S/.3,095.21 03.02.06.04 TAPA: ENCOFRADO Y DESEN
S/.2,211.69 03.02.06.05 TAPA: ACERO CORRUGADO
S/.7,393.16 03.02.06.06 TAPA: CONCRETO f'c=210 kg
S/.243.88 03.02.06.07 TAPA: REJILLA METALICA
### 03.03 SISTEMA DE RIEGO CAMPO DEP
S/.3,137.78 03.03.01 TRABAJOS PRELIMINARES
S/.3,137.78 03.03.01.01 TRAZO Y REPLANTEO PRELI
S/.5,533.84 03.03.02 MOVIMIENTO DE TIERRAS
S/.3,697.12 03.03.02.01 EXCAVACION MANUAL EN TE
S/.1,836.72 03.03.02.02 RELLENO CON MATERIAL CL
S/.23,847.41 03.03.03 INSTALACIONES DE SISTEMA
S/.11,198.39 03.03.03.01 TUBERIAS
S/.3,335.87 03.03.03.01.0 SUMINISTRO Y COLOCACIO
S/.7,862.52 03.03.03.01.0 SUMINISTRO Y COLOCACIO
S/.7,607.12 03.03.03.02 ASPERSORES
S/.1,254.64 03.03.03.02.0 SUMINISTRO E INSTALACIO
S/.3,136.60 03.03.03.02.0 SUMINISTRO E INSTALACIO
S/.3,215.88 03.03.03.02.0 SUMINISTRO E INSTALACIO
S/.5,041.90 03.03.03.03 ACCESORIOS Y VALVULAS
S/.1,321.85 03.03.03.03.0 VALVULA COMPUERTA DE
S/.220.05 03.03.03.03.0 CAJA VALVULA TIPO ARQU
S/.3,500.00 03.03.03.03.0 ACCESORIOS VARIOS EN I
S/.1,200.00 03.03.04 PRUEBAS DE CALIDAD
S/.1,200.00 03.03.04.01 PRUEBA HIDRAULICA EN TU
S/.6,500.00 03.03.05 EQUIPAMIENTO ELECTROMEC
S/.5,000.00 03.03.05.01 ELECTROBOMBA SUMERGIB
S/.1,500.00 03.03.05.02 TABLERO ELECTRICO DE CO
S/.80,000.00 03.03.06 OPERACION Y MANTENIMIENT
S/.80,000.00 03.03.06.01 OPERACION Y MANTENIMIEN
S/.88,116.51 03.03.07 OTROS
S/.78,910.50 03.03.07.01 COBERTURA DE PROTECCIO
S/.9,000.00 03.03.07.02 PRUEBA HIDRAULICA DEL SI
S/.206.01 03.03.07.03 CAJAS DE INSPECCION
S/.407.81 S/.5,650.05 S/.85,345.07 ### S/.35,145.16 S/.25,831.69 03.04 TRATAMIENTO DE MALLA OLIMP
S/.407.81 S/.5,650.05 S/.85,345.07 ### S/.35,145.16 S/.25,831.69 03.04.01 ESTRUCTURAS
S/.407.81 S/.677.39 03.04.01.01 TRABAJOS PRELIMINARES
S/.407.81 S/.244.95 03.04.01.01.0 LIMPIEZA DEL TERRENO M
S/.308.11 03.04.01.01.0 TRAZO Y REPLANTEO PRE
S/.124.33 03.04.01.01.0 TRAZO Y REPLANTEO DUR
S/.4,972.66 S/.11,390.02 03.04.01.02 MOVIMIENTO DE TIERRAS
S/.1,746.81 03.04.01.02.0 EXCAVACION PARA ZAPAT
S/.1,180.98 S/.1,726.51 03.04.01.02.0 EXCAVACION PARA CIMIEN
S/.1,067.44 03.04.01.02.0 RELLENO COMPACTADO C
S/.637.55 03.04.01.02.0 NIVELACION Y APISONADO
S/.339.88 S/.3,747.22 03.04.01.02.0 ACARREO MANUAL DE MAT
S/.5,916.29 03.04.01.02.0 CARGUIO Y ELIMINACION D
S/.32,243.02 S/.7,996.26 S/.16,548.13 03.04.01.03 OBRAS DE CONCRETO SIMP
S/.1,293.84 03.04.01.03.0 SOLADO PARA ZAPATAS D
S/.15,870.89 03.04.01.03.0 CIMIENTOS CORRIDOS ME
S/.15,214.87 03.04.01.03.0 SARDINELES DE CONCRET
S/.15,078.29 S/.7,996.26 S/.1,333.26 03.04.01.03.0 ENCOFRADO Y DESENCOF
S/.17,684.17 03.04.01.04 OBRAS DE CONCRETO ARM
S/.11,956.48 03.04.01.04.0 ZAPATAS
S/.11,076.53 03.04.01.04.0 ZAPATAS: CONCRETO f'c
S/.879.95 03.04.01.04.0 ZAPATAS: ACERO CORRU
S/.5,727.69 03.04.01.04.0 DADOS
S/.1,101.81 03.04.01.04.0 DADOS: CONCRETO f'c=1
S/.2,442.32 03.04.01.04.0 DADOS: ENCOFRADO Y D
S/.2,183.56 03.04.01.04.0 DADOS: ACERO CORRUG
S/.24,027.86 ### S/.18,597.03 S/.25,831.69 03.04.01.05 ARQUITECTURA
S/.3,189.65 S/.4,932.37 S/.3,946.24 03.04.01.05.0 REVOQUES ENLUCIDOS Y
S/.3,189.65 S/.4,932.37 S/.3,946.24 03.04.01.05.0 TARRAJEO EN SARDINEL
S/.20,838.21 ### S/.14,650.79 S/.3,112.54 03.04.01.05.0 CARPINTERIA METALICA
S/.20,838.21 S/.2,982.39 03.04.01.05.0 PUERTA METALICA
S/.56,691.22 S/.870.78 03.04.01.05.0 TUBO METALICO DE 4" EN
S/.93,537.70 S/.13,780.01 S/.3,112.54 03.04.01.05.0 MALLA METALICA EN INT
S/.22,719.15 03.04.01.05.0 PINTURA
S/.3,649.80 03.04.01.05.0 PINTURA LATEX 2 MANOS
S/.19,069.35 03.04.01.05.0 PIN. ANTICOR. Y ESMALT
RENOVACION DE CAMPO DEPOR
### ### S/.466,204.15 04
TRIBUNAS Y OBRAS COMPLEMEN
S/.47,882.72 ### S/.466,204.15 04.01 TRATAMIENTO DE PISTA ATLET
S/.19,492.44 04.01.01 TRABAJOS PRELIMINARES
S/.7,492.44 04.01.01.01 TRAZO Y REPLANTEO DURA
S/.12,000.00 04.01.01.02 TRANSPORTE DE MATERIAL
S/.28,390.28 ### S/.466,204.15 04.01.02 PISTA ATLETICA SON SUPERF
S/.28,390.28 ### 04.01.02.01 MOVIMIENTO DE TIERRAS PA
S/.8,840.15 S/.2,215.79 04.01.02.01.0 EXCAVACION A NIVEL DE S
S/.19,550.13 S/.39,690.73 04.01.02.01.0 SUBRASANTE MEJORADA,
S/.53,415.80 04.01.02.01.0 SUB-BASE GRANULAR e=0
S/.78,521.81 04.01.02.01.0 BASE GRANULAR E=0.36 m
S/.43,603.03 04.01.02.01.0 ELIMINACION DE MATERIA
S/.45,827.14 S/.4,384.88 04.01.02.02 GEOTEXTIL
S/.45,827.14 S/.4,384.88 04.01.02.02.0 SUMINISTRO E INSTALACIO
S/.12,088.88 S/.56,362.07 04.01.02.03 SARDINELES
S/.1,159.29 S/.356.95 04.01.02.03.0 EXCAVACION MANUAL DE
S/.713.54 S/.803.12 04.01.02.03.0 ELIMINACION DE MATERIA
S/.720.31 S/.1,621.30 04.01.02.03.0 REFINE, NIVELACION Y CO
S/.20,975.80 04.01.02.03.0 CONCRETO f'c=210 kg/cm2
S/.7,600.51 S/.0.44 04.01.02.03.0 ACERO FY= 4200 kg/cm2
S/.32,604.46 04.01.02.03.0 ENCOFRADO Y DESENCOF
S/.929.23 04.01.02.03.0 MATERIAL CLASIFICADO E
S/.966.00 S/.0.00 04.01.02.03.0 COBERTURA DE CAUCHO
S/.19,625.84 S/.4.61 04.01.02.04 IMPRIMADO
S/.19,625.84 S/.4.61 04.01.02.04.0 IMPRIMACION RC 250
S/.393,774.06 04.01.02.05 CARPETA ASFALTICA EN CA
S/.393,774.06 04.01.02.05.0 SUMINISTRO Y COLOCACIO
### S/.0.00 04.01.02.06 CAPA DE SINTETICO
### S/.0.00 04.01.02.06.0 SUMINISTRO Y COLOCACIO
S/.75.18 04.01.02.07 LOSA PARA CAFETIN DE PER
S/.59.50 04.01.02.07.0 CONCRETO f'c=210 kg/cm2
S/.15.68 04.01.02.07.0 ENCOFRADO Y DESENCOF
S/.272.98 S/.8,657.18 04.01.02.08 RIA
S/.272.98 S/.364.41 04.01.02.08.0 EXCAVACION MANUAL DE
S/.621.30 04.01.02.08.0 ELIMINACION DE MATERIA
S/.82.44 04.01.02.08.0 REFINE, NIVELACION Y CO
S/.4.54 04.01.02.08.0 BASE GRANULAR E=0.15 m
S/.236.92 04.01.02.08.0 SOLADO e=2"
S/.1,036.70 04.01.02.08.0 CONCRETO f'c=210 kg/cm2
S/.743.30 04.01.02.08.0 ACERO DE REFUERZO fy=4
S/.2,485.71 04.01.02.08.0 ENCOFRADO Y DESENCOF
S/.1,023.00 04.01.02.08.0 EXCAVACION MANUAL DE
S/.125.40 04.01.02.08.1 REFINE Y NIVELACION DE
S/.200.75 04.01.02.08.1 RELLENO, COMPACTACION
S/.108.35 04.01.02.08.1 CAMA DE ARENA PARA AP
S/.1,321.65 04.01.02.08.1 TUBERIA DE PVC SAL 2"
S/.302.71 04.01.02.08.1 TARRAJEO CON IMPERMEA
S/.1,484.43 04.01.02.09 LOSA LANZAMIENTO DE PES
S/.948.96 04.01.02.09.0 CONCRETO f'c=210 kg/cm2
S/.20.74 04.01.02.09.0 BASE GRANULAR e=0.20 m
S/.248.95 04.01.02.09.0 ACERO DE REFUERZO fy=4
S/.265.78 04.01.02.09.0 ENCOFRADO Y DESENCOF
S/.1,536.92 04.01.02.10 LOSA LANZAMIENTO DE DISC
S/.993.58 04.01.02.10.0 CONCRETO f'c=210 kg/cm2
S/.21.88 04.01.02.10.0 BASE GRANULAR e=0.20 m
S/.248.95 04.01.02.10.0 ACERO DE REFUERZO fy=4
S/.272.51 04.01.02.10.0 ENCOFRADO Y DESENCOF
S/.39,002.84 S/.51,247.87 04.02 DRENAJE PISTA ATLETICA
S/.37,689.44 S/.51,247.87 04.02.01 CANAL DE DRENAJE DE LA PIS
S/.9,327.82 S/.2,744.95 04.02.01.01 EXCAVACION MANUAL DE ZA
S/.2,180.05 S/.908.89 04.02.01.02 ACARREO Y ELIMINACION DE
S/.633.42 S/.271.74 04.02.01.03 REFINE Y NIVELACION DE ZA
S/.30,230.65 04.02.01.04 CONCRETO f'c=210 kg/cm2
S/.12,611.23 S/.9,180.10 04.02.01.05 SUMINISTRO E INSTALACION
S/.12,936.92 S/.7,911.54 04.02.01.06 ENCOFRADO Y DESENCOFR
S/.1,313.40 04.02.02 CAJA DE REGISTRO (06 UND)
S/.30.71 04.02.02.01 EXCAVACION MANUAL DE ZA
S/.29.87 04.02.02.02 ACARREO Y ELIMINACION DE
S/.5.75 04.02.02.03 REFINE, NIVELACION Y COM
S/.17.85 04.02.02.04 SOLADO e=2"
S/.245.04 04.02.02.05 CONCRETO f'c=210 kg/cm2
S/.388.66 04.02.02.06 ACERO DE REFUERZO fy=4,2
S/.595.52 04.02.02.07 ENCOFRADO Y DESENCOFR
S/.17,979.84 S/.18,023.78 04.03 DRENAJE DE AREAS VERDES AR
S/.14,884.83 S/.18,023.78 04.03.01 TUBERIA DE DRENAJE DE ARE
S/.14,715.70 04.03.01.01 EXCAVACION MANUAL DE ZA
S/.79.12 04.03.01.02 ACARREO Y ELIMINACION DE
S/.90.01 S/.992.31 04.03.01.03 REFINE Y NIVELACION DE ZA
S/.4,760.10 04.03.01.04 FILTRO DE GRAVA
S/.10,747.21 04.03.01.05 SUMINISTRO E INSTALACION
S/.1,524.16 04.03.01.06 SUMINISTRO E INSTALACION
S/.3,095.01 04.03.02 CAJA DE REGISTRO (13 UND)
S/.79.07 04.03.02.01 EXCAVACION MANUAL DE ZA
S/.77.06 04.03.02.02 ACARREO Y ELIMINACION DE
S/.7.41 04.03.02.03 REFINE Y NIVELACION DE ZA
S/.46.05 04.03.02.04 SOLADO e=2"
S/.725.69 04.03.02.05 CONCRETO f'c=210 kg/cm2
S/.789.79 04.03.02.06 ACERO DE REFUERZO fy=4,2
S/.1,369.94 04.03.02.07 ENCOFRADO Y DESENCOFR
S/.9,500.17 S/.776.48 04.04 SISTEMA DE RIEGO DE PISTA AT
S/.23.97 04.04.01 DEMOLICIONES
S/.11.66 04.04.01.01 DEMOLICION DE PAVIMENTO
S/.12.31 04.04.01.02 ACARREO Y ELIMINACION DE
S/.2,029.20 04.04.02 CAJA DE SALIDA DE VALVULA
S/.18.25 04.04.02.01 EXCAVACION MANUAL DE ZA
S/.17.78 04.04.02.02 ACARREO Y ELIMINACION DE
S/.5.47 04.04.02.03 REFINE, NIVELACION Y COM
S/.17.00 04.04.02.04 SOLADO e=2"
S/.1,970.70 04.04.02.05 SUMINISTRO E INSTALACION
S/.470.95 04.04.03 HIDRANTE
S/.360.76 04.04.03.01 VALVULA ESFERICA DOBLE
S/.110.19 04.04.03.02 VALVULA ESFERICA DOBLE
S/.6,976.05 S/.776.48 04.04.04 TUBERIA Y ACCESORIOS DE F
S/.2,472.40 04.04.04.01 TUBERIA PVC SAP CLASE 10
S/.1,420.54 04.04.04.02 TUBERIA PVC SAP CLASE 10
S/.1,280.43 04.04.04.03 ABRAZADERAS DE FIJACION
S/.1,802.68 S/.0.29 04.04.04.04 ABRAZADERAS DE FIJACION
S/.707.51 04.04.04.05 DOBLE PRUEBA HIDRAULICA
S/.68.68 04.04.04.06 ACCESORIOS VARIOS
### 04.05 AREAS VERDES ARTIFICIALES
S/.78,429.59 04.05.01 MOVIMIENTO DE TIERRAS
S/.22,024.55 04.05.01.01 NIVELACION Y COMPACTADO
S/.3,007.38 04.05.01.02 EXCAVACION A NIVEL DE SU
S/.16,114.37 04.05.01.03 SUBRASANTE MEJORADA, N
S/.14,529.87 04.05.01.04 SUB-BASE GRANULAR e=0.1
S/.22,753.42 04.05.01.05 BASE GRANULAR E=0.40 m
S/.13,658.39 04.05.02 GEOTEXTIL
S/.13,658.39 04.05.02.01 SUMINISTRO E INSTALACION
### 04.05.03 SUMINISTRO Y COLOCACION
### 04.05.03.01 SUMINISTRO Y COLOCACION
### 04.06 INSTALACIONES ELECTRICAS
S/.1,943.74 04.06.01 TUBERIA DE CONEXION
S/.341.00 04.06.01.01 EXCAVACION MANUAL DE ZA
S/.104.42 04.06.01.02 ACARREO Y ELIMINACION DE
S/.25.08 04.06.01.03 REFINE Y NIVELACION DE ZA
S/.747.68 04.06.01.04 CONCRETO f'c=210 kg/cm2 (T
S/.725.56 04.06.01.05 SUMINISTRO E INSTALACION
S/.1,328.05 04.06.02 CAJA DE REGISTRO (02 UND)
S/.69.94 04.06.02.01 EXCAVACION MANUAL DE ZA
S/.68.40 04.06.02.02 ACARREO Y ELIMINACION DE
S/.9.12 04.06.02.03 REFINE, NIVELACION Y COM
S/.28.34 04.06.02.04 SOLADO e=2"
S/.295.30 04.06.02.05 CONCRETO f'c=210 kg/cm2
S/.243.02 04.06.02.06 ACERO DE REFUERZO fy=4,2
S/.476.14 04.06.02.07 ENCOFRADO Y DESENCOFR
S/.137.79 04.06.02.08 TARRAJEO CON IMPERMEAB
### 04.06.03 SUMINISTRO E INSTALACION D
S/.31,360.00 04.06.03.01 BORDILLO INTERNO DE ALU
S/.7,412.00 04.06.03.02 CAJETINES DE PERDIGA, AC
S/.35,580.00 04.06.03.03 TABLA DE BATIDA PARA SAL
S/.2,870.00 04.06.03.04 OBSTACULO DE RIA MOVIBL
S/.11,250.00 04.06.03.05 TAPA CIEGA (BLIND BOARD)
S/.3,800.00 04.06.03.06 CIRCULO DE LANZAMIENTO
S/.3,000.00 04.06.03.07 CIRCULO DE LANZAMIENTO
S/.3,000.00 04.06.03.08 REDUCTOR DEL DISCO A MA
S/.40,000.00 04.06.03.09 JAULA PARA LANZAMIENTO
S/.10,000.00 04.06.03.10 CERTIFICACION IAAF
### 05 IMPLEMENTACION CON MOBILIAR
### 05.01 EQUIPAMIENTO CON IMPLEMEN
### 05.01.01 EQUIPAMIENTO DEPORTIVO
### 05.02 EQUIPAMIENTO ADMINISTRATIV
### 05.02.01 EQUIPAMIENTO ADMINISTRAT
S/.90,037.56 ### S/.16,184.40 06 PROTECCION AMBIENTAL
S/.7,562.50 06.01 PROGRAMA DE EDUCACION AM
S/.2,200.00 06.01.01 SUB PROGRAMA DE EDUCACI
S/.5,362.50 06.01.02 SUB PROGRAMA DE RELACION
S/.22,222.40 S/.8,320.00 06.02 PROGRAMA DE MONITOREO DE
S/.3,562.40 S/.0.00 06.02.01 MONITEREO DE CALIDAD DEL
S/.360.00 06.02.01.01 MUESTREO DE COLIFORMES
S/.1,602.40 06.02.01.02 MUESTRO DE DE METALES T
S/.896.00 06.02.01.03 DEMANDA BIOQUIMICA DE O
S/.704.00 S/.0.00 06.02.01.04 REMISION DE MUESTRAS A L
S/.18,660.00 S/.0.00 06.02.02 MONITEREO DE CALIDAD DEL
S/.18,660.00 S/.0.00 06.02.02.01 MUESTREO DE CALIDAD DE
S/.1,120.00 06.02.03 MONITOREO DE CALIDAD DE S
S/.1,120.00 06.02.03.01 ANALISIS DE SALINIDAD DE S
S/.7,200.00 06.02.04 MONITOREO ARQUEOLOGICO
S/.3,600.00 06.02.04.01 MONITOREO ARQUEOLOGIC
S/.3,600.00 06.02.04.02 PLAN DE MONITOREO ARQU
S/.3,205.00 06.03 PREVISIONES AMBIENTALES
S/.680.00 06.03.01 COORDINACION ADMINISTRAC
S/.2,525.00 06.03.02 COORDINACION AUTORIDAD R
S/.4,659.40 06.04 PROGRAMA DE SEÑALIZACION
S/.1,165.00 06.04.01 SUB PROGRAMA DE SEÑALIZA
S/.3,494.40 06.04.02 SEÑALES TEMPORALES
S/.90,037.56 ### 06.05 PROGRAMA DE RECUPERACION
S/.70,882.62 06.05.01 RECUPERACION DE AREAS AU
S/.19,154.94 S/.15,984.77 06.05.02 SEMBRADO DE GRASS
S/.9,639.00 06.05.03 SEMBRADO DE ARBOLES
S/.15,426.56 06.05.04 SEMBRADO DE ARBUSTOS
S/.62,808.00 06.05.05 RIEGO
S/.10,033.13 06.06 SUB PROGRAMA DE MANEJO DE
S/.5,556.97 06.06.01 MICROCELDA DE SEGURIDAD
S/.4,084.92 06.06.02 MICROCELDA DE RELLENO SA
S/.391.24 06.06.03 CONTENEDORES DE RESIDUO
S/.4,734.00 06.07 PROGRAMA DE CONTINGENCIA
S/.4,734.00 06.07.01 KITT DE EMERGENCIAS
07 INFRAESTRUCTURA DE PROTECC
### ### S/.157,453.88 08 ESTRUCTURAS METALICAS Y CO
### ### 08.01 ARMADURA METALICA 01 L=21 m
S/.95,645.85 S/.99,285.42 08.02 ARMADURA METALICA 02 H=0.4
S/.70,073.98 08.03 ARMADURA METALICA 03 H=0.4
### S/.87,379.90 08.04 ARRIOSTRES DE FIERRO LISO Ø
### S/.13,679.38 09 COBERTURAS Y CERRAMIENTOS
### S/.13,679.38 09.01 COBERTURA DE POLICARBONA

### ### S/.24,112,534.28 ### ### S/.9,424,359.32 S/.0.00


INSTALACIONES EXTERIORES
CONSTRUCCION DE CERCO PERIMETRICO
ESTRUCTURAS
OBRAS PROVISIONALES
CAMPAMENTO PROVISIONAL DE OBRA
CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO
CARTEL DE IDENTIFICACION DE OBRA DE 3.60x2.40 m
CONSUMOS DE AGUA Y ENERGIA DURANTE LA CONSTRUCCION
SERVICIOS HIGIENICOS DURANTE LA CONSTRUCCION
CERCO DE OBRA CON POSTES DE MADERA Y CALAMINA
TRANSPORTE DE EQUIPO Y MAQUINARIA A OBRA
ELABORACION IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD EN EL TRABAJO
SEÑALIZACION TEMPORAL DE SEGURIDAD
TRABAJOS PRELIMINARES
DESMONTAJE DE PUERTAS
DESMONTAJE DE VENTANAS
DEMOLICION DE CIMIENTOS DE CONCRETO
DEMOLICION DE ESTRUCTURAS DE CONCRETO
DEMOLICION DE SOBRECIMIENTOS DE CONCRETO
DEMOLICION DE COLUMNAS Y VIGAS DE CONCRETO
DEMOLICION DE LOSAS DE CONCRETO
DEMOLICION DE MUROS DE LADRILLO KK SOGA
DEMOLICION DE MUROS DE LADRILLO KK CABEZA
LIMPIEZA DEL TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ZAPATAS DE 1.00 m A 1.40 m DE PROFUNDIDAD
EXCAVACION PARA CIMIENTOS HASTA 1.00 m TERRENO NORMAL
RELLENO COMPACTADO CON EQUIPO Y MATERIAL PROPIO
NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA
ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m
CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES
OBRAS DE CONCRETO SIMPLE
SUBCIMIENTOS Y SUBZAPTAS CONCRETO 1:10 C:H + 30% P. G.
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G.
SOBRECIMIENTOS MEZCLA 1:8 C:H + 25% P.M.
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HASTA 0.30 m
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS: CONCRETO f'c=175 kg/cm2
ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
SOBRECIMIENTO REFORZADO
SOBRECIMIENTO REFORZADO: CONCRETO f'c=210 kg/cm2
SOBRECIMEINTO REFORZADO: ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTOS REFORZADOS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
COLUMNAS
COLUMNAS: CONCRETO f'c=210 kg/cm2
COLUMNAS: ENCOFRADO Y DESENCOFRADO
COLUMNAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
VIGAS
VIGAS: CONCRETO f'c=210 kg/cm2 1
VIGAS: ENCOFRADO Y DESENCOFRADO
VIGAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
LOSA ALIGERADA
LOSAS ALIGERADAS: CONCRETO f'c=210 kg/cm2
LOSAS ALIGERADAS: ENCOFRADO Y DESENCOFRADO 1
LOSAS ALIGERADAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
LOSAS ALIGERADAS: LADRILLO HUECO DE ARCILLA DE 15 x 30 x 30 cm PARA TECHO
ARQUITECTURA
MUROS Y TABIQUES DE ALBAÑILERIA
MURO DE LADRILLO KK TIPO IV SOGA M 1:1:4 e=1.50 cm
REVOQUES ENLUCIDOS Y MOLDADURAS
TARRAJEO PRIMARIO O RAYADO, MORTERO C:A 1:5
TARRAJEO EN MURO:EXTERIOR (C:A 1:5 e=1.50cm)
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA
TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO - ARENA
BRUÑAS SEGUN DETALLE
ZOCALOS
ENCHAPE PIEDRA IRREGULAR GRIS
CARPINTERIA METALICA
PUERTA METALICA T-01 2.50 X 2.80 M.
PUERTA METALICA T-02 4.00 X 2.80 M.
CERCO METALICO CON TUBO GALVANIZADO
PINTURA
PINTURA LATEX 2 MANOS EN MUROS EXTERIORES (SUPERLATEX O SIM.)
PINTURA LATEX 2 MANOS EN COLUMNAS (VINILATEX O SIM.)
PINTURA LATEX 2 MANOS EN VIGAS (VINILATEX O SIM.)
PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS
CONSTRUCCION DE AREA DE GUARDIANIA
ESTRUCTURAS
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ZAPATAS DE 1.00 m A 1.40 m DE PROFUNDIDAD
EXCAVACION PARA CIMIENTOS HASTA 1.50 m TERRENO NORMAL
RELLENO COMPACTADO CON EQUIPO Y MATERIAL SELECCIONADO
NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA
ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m
CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES
OBRAS DE CONCRETO SIMPLE
FALSO PISO DE 4" MEZCLA 1:8 (C:H)
SUBCIMIENTOS Y SUBZAPTAS CONCRETO 1:10 C:H + 30% P. G.
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G.
SOBRECIMIENTOS MEZCLA 1:8 C:H + 25% P.M.
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HASTA 0.30 m
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS: CONCRETO f'c=175 kg/cm2
ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
COLUMNAS
COLUMNAS: CONCRETO f'c=210 kg/cm2 1
COLUMNAS: ENCOFRADO Y DESENCOFRADO
COLUMNAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
VIGAS
VIGAS: CONCRETO f'c=210 kg/cm2 1
VIGAS: ENCOFRADO Y DESENCOFRADO
VIGAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
LOSA ALIGERADA
LOSAS ALIGERADAS: CONCRETO f'c=210 kg/cm2
LOSAS ALIGERADAS: ENCOFRADO Y DESENCOFRADO 1
LOSAS ALIGERADAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
LOSAS ALIGERADAS: LADRILLO HUECO DE ARCILLA DE 15 x 30 x 30 cm PARA TECHO
ARQUITECTURA
MUROS Y TABIQUES DE ALBAÑILERIA
MURO DE LADRILLO KK TIPO IV SOGA M 1:1:4 e=1.50 cm
JUNTA DE DILATACION CON ESPUMA PLASTICA MAS JEBE MICROPOROSO
REVOQUES ENLUCIDOS Y MOLDEDURAS
TARRAJEO PRIMARIO O RAYADO, MORTERO C:A 1:5
TARRAJEO EN MURO:INTERIOR (C:A 1:5 e=1.50cm)
TARRAJEO EN MURO:EXTERIOR (C:A 1:5 e=1.50cm)
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA
TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO - ARENA
VESTIDURA DE DERRAMES (MEZCLA C:A1:5)
BRUÑAS SEGUN DETALLE
CIELO RASOS
CIELORASO CON BALDOSAS DE FIBRO MINERAL
PISOS Y PAVIMENTOS
CONTRAPISO DE 40 mm (MEZCLA C:A BASE 1:5, ACABADO 1:2)
PISO DE CEMENTO COLOREADO (OCRE ROJO): ACABADO PULIDO
PISO CERAMICO ANTIDESLIZANTE 40x40
VEREDA: ENCOFRADO Y DESENCOFRADO
VEREDAS DE CONCRETO f'c=175 kg/cm2
VEREDA: JUNTA DE DILATACION E=1"
ZOCALOS
ENCHAPE FACHALETA RUSTICA 10 X50 CM
ZOCALO DE CERAMICO 20 X 30 cm
CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO h=0.30 m
CARPINTERIA DE MADERA
PUERTAS DE MADERA CONTRAPLACADA
CARPINTERIA METALICA
PUERTA METALICA 06
CERRAJERIA
BISAGRA CAPUCHINA DE 3 1/2" x 3 1/2"
CERRADURA DE TRES GOLPES PUERTAS INTERIORES
CERRADURA DE PERILLA EN PUERTA
MANIJA DE 3" ALUMINIZADA PARA PUERTA
VIDRIOS, CRISTALES Y SIMILARES
VIDRIO SISTEMA MODUGLASS 6mm
PINTURA
PINTURA LATEX 2 MANOS EN MUROS INTERIORES (VINILATEX O SIM.)
PINTURA LATEX 2 MANOS EN MUROS EXTERIORES (SUPERLATEX O SIM.)
PINTURA LATEX 2 MANOS EN COLUMNAS (VINILATEX O SIM.)
PINTURA LATEX 2 MANOS EN VIGAS (VINILATEX O SIM.)
PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS
PINTURA ESMALTE EN CONTRAZOCALOS
PINTURA EN DERRAMES
CONSTRUCCION DE AREA DE BOLETERIA
ESTRUCTURAS
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ZAPATAS DE 1.00 m A 1.40 m DE PROFUNDIDAD
EXCAVACION PARA CIMIENTOS HASTA 1.00 m TERRENO NORMAL
RELLENO COMPACTADO CON EQUIPO Y MATERIAL SELECCIONADO
NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA
ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m
CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES
OBRAS DE CONCRETO SIMPLE
FALSO PISO DE 4" MEZCLA 1:8 (C:H)
SUBCIMIENTOS Y SUBZAPTAS CONCRETO 1:10 C:H + 30% P. G.
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G.
SOBRECIMIENTOS MEZCLA 1:8 C:H + 25% P.M.
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HASTA 0.30 m
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS: CONCRETO f'c=175 kg/cm2
ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
COLUMNAS
COLUMNAS: CONCRETO f'c=210 kg/cm2 1
COLUMNAS: ENCOFRADO Y DESENCOFRADO
COLUMNAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
VIGAS
VIGAS: CONCRETO f'c=210 kg/cm2 1
VIGAS: ENCOFRADO Y DESENCOFRADO
VIGAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
LOSAS MACIZAS
LOSAS MACIZAS: CONCRETO f'c=210 kg/cm2
LOSAS MACIZAS: ENCOFRADO Y DESENCOFRADO
LOSAS MACIZAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
ARQUITECTURA
MUROS Y TABIQUES DE ALBAÑILERIA
MURO DE LADRILLO KK TIPO IV SOGA M 1:1:4 e=1.50 cm
JUNTA DE DILATACION CON ESPUMA PLASTICA MAS JEBE MICROPOROSO
REVOQUES ENLUCIDOS Y MOLDEDURAS
TARRAJEO EN MURO:INTERIOR (C:A 1:5 e=1.50cm)
TARRAJEO EN MURO:EXTERIOR (C:A 1:5 e=1.50cm)
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA
TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO - ARENA
VESTIDURA DE DERRAMES (MEZCLA C:A1:5)
BRUÑAS SEGUN DETALLE
CIELO RASOS
CIELORASO CON MEZCLA DE CEMENTO - ARENA 1:5
PISOS Y PAVIMENTOS
CONTRAPISO DE 40 mm (MEZCLA C:A BASE 1:5, ACABADO 1:2)
PISO DE CEMENTO COLOREADO (OCRE ROJO): ACABADO PULIDO
ZOCALOS
ENCHAPE FACHALETA RUSTICA 10 X50 CM
CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO h=0.30 m
CONTRAZOCALO DE CEMENTO PULIDO h=0.10 m
CUBIERTAS Y CERRAMIENTOS
COBERTURA ONDULINE
CORREAS DE MADERA
CARPINTERIA METALICA
PUERTA METALICA T-5
CERRAJERIA
BISAGRA CAPUCHINA DE 3½" X 3½"
CERRADURA DE TRES GOLPES PUERTAS INTERIORES
MANIJA DE 3" ALUMINIZADA PARA PUERTA
VIDRIOS, CRISTALES Y SIMILARES
VIDRIO SISTEMA MODUGLASS 6mm
PINTURA
PINTURA LATEX 2 MANOS EN MUROS INTERIORES (VINILATEX O SIM.)
PINTURA LATEX 2 MANOS EN MUROS EXTERIORES (SUPERLATEX O SIM.)
PINTURA LATEX 2 MANOS EN COLUMNAS (VINILATEX O SIM.)
PINTURA LATEX 2 MANOS EN VIGAS (VINILATEX O SIM.)
PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS
PINTURA ESMALTE EN CONTRAZOCALOS DE CEMENTO
PINTURA EN DERRAMES
INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA
SALIDA DE A.F. PVC C/R - 1/2" C-10
SALIDA DE A.F. PVC C/R - 1.1/4" C-10
REDES DE DISTRIBUCION
SUM. E INST. TUB. PVC C-10 - D=1.1/4"
VALVULAS
SUM. E INST. VALV. ESFERICA DE BRONCE C150 - D=1.1/4" (INC. UU, NIPLES DE F°G° Y CAJUELA DE CONCRETO)
SISTEMA DE DESAGUE Y VENTILACION
SALIDA DE AGUA FRIA
SALIDA DE DESAGUE PVC SAL 2"
SALIDA DE DESAGUE PVC SAL 4"
SALIDA DE VENTILACION DE 2"
ADITAMENTOS VARIOS
SUMIDERO DE BRONCE ROSCADO 3"
REGISTRO ROSCADO DE BRONCE 4"
SOMBRERO DE VENTILACION 2"
CAJA DE REGISTRO
CAJA DE REGISTRO 18"x24"
CAJA DE REGISTRO 10"x20"
CONEXION DOMICILIARIA
CONEXION DOMICILIARIA PVC SAL 6"
APARATOS SANITARIOS
INODORO CON VALVULA SEMIAUTOMATICA INC/ACCESORIO
LAVATORIO INC/ACCESORIO
DUCHA INC/ACCESORIO
LAVADERO DE ACERO INOXIDABLE UNA POZA
JABONERA DE LOSA DE 15x15 cm
PAPELERA DE BARRA
ESPEJO
COLOCACION DE APARATOS SANITARIOS
COLOCACION DE ACCESORIOS SANITARIOS
JARDINES Y EXTERIORES
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL SUELTO CON EQUIPO
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
MEJORAMIENTO DE SUBRASANTE
PERFILADO Y COMPACTADO DE SUB-RASANTE
EXTRACCION Y APILAMIENTO DE MATERIAL SELECCIONADO
CARGUIO Y TRANSPORTE DE MATERIAL SELECCIONADO
MEJORAMIENTO DE LA SUB-RASANTE
SUB BASE
EXTRACCION Y APILAMIENTO DE MATERIAL DE SUB BASE EN CANTERA
CARGUIO Y TRANSPORTE DE MATERIAL SELECCIONADO
CONFORMACION DE SUB BASE
SARDINELES
SARDINELES: ENCOFRADO Y DESENCOFRADO
SARDINELES: CONCRETO f'c=175 kg/cm2
TARRAJEO EN SARDINEL DE CONCRETO
RAMPAS PARA DISCAPACITADOS
RAMPAS: ENCOFRADO Y DESENCOFRADO
RAMPAS DE CONCRETO: f´c=175 kg/cm2 ACAB. 1:2 FROTACH. Y PULIDO
PISOS Y VEREDAS
FALSO PISO DE 4" MEZCLA 1:8 (C:H)
PISOS: ENCOFRADO Y DESENCOFRADO
PISO DE CEMENTO COLOREADO ESTAMPADO
PISO DE CEMENTO COLOREADO ACABADO BRUÑADO
PISOS: JUNTA DE DILATACION E=1"
VEREDA: ENCOFRADO Y DESENCOFRADO
VEREDAS DE CONCRETO f'c=175 kg/cm2
VEREDA: JUNTA DE DILATACION E=1"
TANQUE CISTERNA
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ZAPATAS DE 2.00 M. A 2.50 M. DE PROFUNDIDAD
NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA
CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES
OBRAS DE CONCRETO SIMPLE
SOLADO e=3"
OBRAS DE CONCRETO ARMADO
TANQUE CISTERNA CONCRETO F'C=210 KG/CM2
TANQUE CISTERNA: ENCOFRADO Y DESENCOFRADO
TANQUE CISTERNA: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
TARRAJEO INTERIOR DE TANQUE CISTERNA
TARRAJEO CON IMPERMEABILIZANTES
AREAS VERDES Y EQUIPAMIENTO DE ESPACIOS EXTERIORES
AREAS VERDES
PREPARACION Y EXTENDIDO DE TIERRA NEGRA
SEMBRADO DE GRASS
SEMBRADO DE ARBUSTOS
EQUIPAMIENTO DE ESPACIOS EXTERIORES
EXCAVACION MANUAL DE ZANJAS
CONCRETO f'c=175 kg/cm2
COLECTOR DE DESHECHOS
ESTACIONAMIENTO VEHICULAR
OBRAS PRELIMINARES
DEMOLICION DE VEREDAS DE CONCRETO e=10cm
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MEJORAMIENTO DE SUBRASANTE
CAPA ANTICONTAMINANTE e=0.05 m.
SUB BASE
EXTRACCION Y APILAMIENTO DE MATERIAL SELECCIONADO
CARGUIO Y TRANSPORTE DE MATERIAL SELECCIONADO
CONFORMACION DE SUB BASE
CONFORMACION DE SUB BASE E=0.20 M
RIEGO - AGUA
PAVIMENTO RIGIDO
PAVIMENTO RIGIDO: CONCRETO f'c=210 kg/cm2
PAVIMENTO RIGIDO: ENCOFRADO Y DESENCOFRADO
PAVIMENTO RIGIDO: CURADO DE CONCRETO
PAVIMENTO RIGIDO: JUNTA ASFALTICA E=1"
ARQUITECTURA
SARDINELES
SARDINELES: ENCOFRADO Y DESENCOFRADO
SARDINELES:CONCRETO f'c=175 kg/cm2
TARRAJEO EN SARDINEL DE CONCRETO
BANCAS DE CONCRETO
BANCAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
BANCAS: ENCOFRADO Y DESENCOFRADO 1
BANCAS: CONCRETO f'c=210 kg/cm2
ENCHAPE PIEDRA IRREGULAR GRIS
RAMPAS PARA DISCAPACITADOS
RAMPAS: ENCOFRADO Y DESENCOFRADO
RAMPAS DE CONCRETO: f´c=175 kg/cm2 ACAB. 1:2 FROTACH. Y PULIDO
PISOS Y VEREDAS
PISOS: ENCOFRADO Y DESENCOFRADO
FALSO PISO DE 4" MEZCLA 1:8 (C:H)
PISO DE CEMENTO COLOREADO ACABADO BRUÑADO
PISOS: JUNTA DE DILATACION E=1"
CONSTRUCCION DEL CAMPO DEPORTIVO DE GRASS SINTENTICO
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
LIMPIEZA DEL TERRENO MANUAL
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL SUELTO CON EQUIPO
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
PERFILADO Y COMPACTADO DE SUB-RASANTE
CONFORMACION DE SUB-BASE GRANULAR e=0.30 m
EXTRACCION DE MATERIALES EN CANTERA
EXTRACCION Y APILAMIENTO DE PIEDRA CANTO RODADO EN CANTERA
EXTRACCION Y APILAMIENTO DE ARENA FINA EN CANTERA
ZARANDEO DE ARENA FINA EN CANTERA
CARGUIO DE MATERIALES EN CANTERA
TRANSPORTE DE MATERIALES A OBRA
CONFORMACION DE ESTRUCTURA DE CAMPO DEPORTIVO
COLOCADO Y COMPACTADO DE PIEDRA CANTO RODADO
COLOCADO Y COMPACTADO DE PIEDRA CHANCADA DE 1"
COLOCADO Y COMPACTADO DE PIEDRA CHANCADA DE 3/4"
COLOCADO Y COMPACTADO DE PIEDRA CHANCADA DE 3/8"
COLOCADO Y COMPACTADO DE ARENA FINA
GEOTEXTIL
SUMINISTRO E INSTALACION DE GEOTEXTIL TEJIDO
CONCRETO SIMPLE
SARDINELES Y VEREDAS
ENCOFRADO Y DESENCOFRADO
CONCRETO f'c=175 kg/cm2
CONFORMACION DE ESTRUCTURA DE GRASS
CESPED DE GRASS ARTIFICIAL PARA CAMPO DEPORTIVO
SISTEMA DE DRENAJE CAMPO DEPORTIVO
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
INSTALACION SUB DRENES CON TUBERIA
RETIRO DE MATERIAL SELECCIONADO DE SUB DRENES
SUMINISTRO Y COLOCACION DE TUBERIA CRIBADA PARA DRENAJE
RELLENO CON MATERIAL CLASIFICADO POR CAPAS
ACCESORIOS DE INSTALACION TUBERIAS DE DRENAJE
INSTALACION DREN COLECTOR
RETIRO DE MATERIAL SELECCIONADO DE SUB DRENES
SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP D=6"
RELLENO CON MATERIAL CLASIFICADO POR CAPAS
CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO
ACERO DE REFUERZO fy=4,200 kg/cm2
CONCRETO f'c=210 kg/cm2
PRUEBAS DE CALIDAD
PRUEBA HIDRAULICA EN TUBERIAS DE RIEGO
CONSTRUCCION DEL CAMPO DEPORTIVO CON GOMA PREFABRICADA
MOVIMIENTO DE TIERRAS
LIMPIEZA DEL TERRENO MANUAL
CORTE DE MATERIAL SUELTO CON EQUIPO
EXCAVACION DE ZANJAS
RELLENO CON MATERIAL PROPIO
NIVELACION Y COMPACTADO DE TERRENO
EMPEDRADO DE PLATAFORMA
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
CONCRETO SIMPLE
CONCRETO f'c=210 kg/cm2
JUNTA DE CONTRACCION
IMPRIMADO
IMPRIMACION RC 250
CARPETA ASFALTICA EN CALIENTE
SUMINISTRO Y COLOCACION DE CARPETA ASFALT. EN CALIENTE E=3" (DOS CAPAS DE 1.5")
GOMA PREFABRICADA
SUMINISTRO Y COLOCACION DE GOMA PREFABRICADA
CONSTRUCCION DEL CAMPO DEPORTIVO CON CONCRETO
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL SUELTO CON EQUIPO
EXCAVACION DE ZANJAS
RELLENO CON MATERIAL PROPIO
NIVELACION Y COMPACTADO DE TERRENO
EMPEDRADO DE PLATAFORMA
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
CONCRETO SIMPLE
CONCRETO f'c=210 kg/cm2
JUNTA DE CONTRACCION
CONSTRUCCION DE GRADERIOS DE PLATAFORMAS EXTERIORES
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMIENTOS HASTA 1.00 m TERRENO NORMAL
RELLENO COMPACTADO CON EQUIPO Y MATERIAL SELECCIONADO
NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA
ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m
ESTRUCTURAS
OBRAS DE CONCRETO SIMPLE
SOLADO e=3"
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G.
SARDINELES
SARDINELES:CONCRETO f'c=175 kg/cm2
SARDINELES: ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS: CONCRETO f'c=175 kg/cm2
ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
GRADERIOS PLATAFORMA
GRADERIOS: CONCRETO f'c=175 kg/cm2
GRADERIOS: ENCOFRADO Y DESENCOFRADO
GRADERIOS: ACERO CORRUGADO FY=4200 kg/cm2 GRADO60
ESTRUCTURA METALICA
ESTRUCTURA METALICA PARA COBERTURA DE GRADERIOS
CORREA METALICA SECCION TUBO TR
ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDEDURAS
TARRAJEO EN MURO:INTERIOR (C:A 1:5 e=1.50cm)
CUBIERTAS Y CERRAMIENTOS
COBERTURA TIPO ONDULINE
CARPINTERIA METALICA
BARANDA METALICA GRADERIOS
TUBO METALICO DE 4" EN MALLA OLIMPICA 2
MALLA METALICA EN INTERIOR
PINTURA
PINTURA LATEX 2 MANOS EN MUROS EXTERIORES (SUPERLATEX O SIM.)
PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS
INSTALACIONES SANITARIAS EXTERIORES
SISTEMA DE DESAGUE
MOVIMIENTO DE TIERRAS REDES EXTERIORES
EXCAVACIONES DE ZANJAS P/TUBERIAS
EXCAVACION MANUAL T.S.R. - H MENOR 1.00 M - P/TUB. 1" - 1 1/2"
EXCAVACION MANUAL T.S.R. - H MENOR 1.00 M - P/TUB. 2" - 3"
EXCAVACION MANUAL T.S.R. - H MENOR 1.50 M - P/TUB. 4" - 6"
EXCAVACION MANUAL T.S.R. - H MENOR 1.50 M - P/TUB. 8"
REFINE Y NIVELACION DE ZANJAS
REFINE Y NIVELACION DE ZANJAS T.S.R. P/TUB 1" - 1 1/2"
REFINE Y NIVELACION DE ZANJAS T.S.R. P/TUB 2" - 3"
REFINE Y NIVELACION DE ZANJAS T.S.R. P/TUB 4" - 6"
REFINE Y NIVELACION DE ZANJAS T.S.R. P/TUB 8"
SUMINISTRO Y COLOCACION DE CAMA DE APOYO
SUM. Y COLOC. CAMA DE ARENA PARA APOYO TUBERIA E=0.10 - P/TUB. 1" - 1 1/2"
SUM. Y COLOC. CAMA DE ARENA PARA APOYO E=0.10 - CM - P/TUB. 2" - 3"
SUM. Y COLOC. CAMA DE ARENA PARA APOYO E=0.10 - CM - P/TUB. 4" - 6"
SUM. Y COLOC. CAMA DE ARENA PARA APOYO E=0.10 - CM - P/TUB. 8"
RELLENO Y COMPACTO DE ZANJA
RELLENO Y COMP DE ZANJA T.S.R. - H MENOR 1.00 M - P/TUB. 1" - 1 1/2"
RELLENO Y COMP DE ZANJA T.S.R. - H MENOR 1.00 M - P/TUB. 2" - 3"
RELLENO Y COMP DE ZANJA T.S.R. - H MENOR 1.00 M - P/TUB. 4" - 6"
RELLENO Y COMP DE ZANJA T.S.R. - H MENOR 1.00 M - P/TUB. 8"
REDES EXTERIORES DE DESAGUE
TUBERIAS
SUM. E INST. TUB. PVC-CP-D=4" (INC. EXCAV. - RELLENO Y COMPACT.)
SUM. E INST. TUB. PVC-CP-D=6" (INC. EXCAV. - RELLENO Y COMPACT.)
SUM. E INST. TUB. PVC-UU-S.20 , D=110 MM (INC. EXCAV. - RELLENO Y COMPACT.)
SUM. E INST. TUB. PVC-UU-S.20 , D=160 MM (INC. EXCAV. - RELLENO Y COMPACT.)
SUM. Y COLOCACION TUB PVC - UF - P/DES. D=200 MM - INC. DESP Y ACCES
CAMARAS DE INSPECCION
CAJAS DE REGISTRO DE DESAGUE 12" x 24"
CAJAS DE REGISTRO 18" x 24"
CAJAS DE REGISTRO DE DESAGUE 24" x 24"
SISTEMA DE AGUA POTABLE
REDES EXTERIORES DE AGUA
TUBERIAS
SUM. E INST. TUB. PVC C-10 - D=1.1/4"
SUM. E INST. TUB. PVC C-10 - D=1.1/2" (INC. EXCAV. RELLENO Y COMPACT.)
SUM. E INST. TUB. PVC C-10 - D=2" (INC. EXCAV. RELLENO Y COMPACT.)
SUM. E INST. TUB. PVC C-10 - D=2.1/2" (INC. EXCAV. RELLENO Y COMPACT.)
SUM. E INST. TUB. PVC C-10 - D=4" (INC. EXCAV. RELLENO Y COMPACT.)
SUM. E INST. TUB. PVC C-10 - D=6" (INC. ACCES. Y SOPORT.)
VALVULAS
SUM. E INST. VALV. ESFERICA DE BRONCE C150 - D=1.1/4" (INC. UU, NIPLES DE F°G° Y CAJUELA DE CONCRETO)
SUM. E INST. VALV. ESFERICA DE BRONCE C150 - D=1.1/2" (INC. UU, NIPLES DE F°G° Y CAJUELA DE CONCRETO)
SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=2" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA)
SUM. E INST. VALV. ESFERICA DE BRONCE C150 - D=2 1/2" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA)
CAMARAS DE INSPECCION
CAJA DE REGISTRO DE CONCRETO DE 10"x20" INC. TAPA DE CONCRETO Y JALADOR
EQUIPAMIENTO E INSTALACION
ELECTROBOMBA EJE VERTICAL DE VELOCIDAD VARIABLE Y PRESION CONSTANTE PARA AGUA POTABLE Q=8.75 LPS - 65 M - INC. 01 VARIADOR C/EL
ELECTROBOMBA SUMIDERO Q=3 LPS - 10 M, - INC. TABLERO DE CONTROL
MOTOBOMBA DIESEL Q=350 GPM - 175 PSI INC. ELECTROBOMBA JOCKEY 15 GPM PSI INC. TABLERO DE CONTROL
SUM. E INST. VALVULAS - NIPLERIA Y ACCES. EN CISTERNA Y CTO BOMBAS
INSTALACIONES ELECTRICAS
TRABAJOS PRELIMINARES
REPLANTEO DE INSTALACIONES ELECTRICAS
SALIDAS PARA INST. ELECTRICA
SALIDA DE TECHO C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2, CAJAS PESADAS
SALIDA DE PARED C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2, CAJAS PESADAS
SALIDA PARA LUZ DE CONMUTACION SIMPLE C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2 CAJAS PESADAS
SALIDA P/INTERRUPTOR SIMPLE, TUB. PVC-P (1/2) CABLE THW 2.5mm2, CAJAS PESADAS
SALIDA P/TOMACORRIENTE BIPOLAR DOBLE TUB. PVC-P (1/2) CABLE LSOH 4mm2 CAJAS PESADAS
TUBERIAS/ALIMENTADORES
EXCAVACION MANUAL DE ZANJAS
TUBERIA PVC SAP (ELECTRICAS) D=20mm
TUBERIA PVC SAP (ELECTRICAS) D=25mm
TUBERIA PVC SAP (ELECTRICAS) D=35mm
TUBERIA PVC-P (ELECTRICAS) D=50mm
TUBERIA PVC-P (ELECTRICAS) D=65mm
CAJAS DE PASO
CAJA DE PASO FºGº DE 100x100x50mm, PESADO
CAJA DE PASO FºGº DE 200x200x100mm, PESADO
CABLES Y CONDUCTORES
CABLE ELECTRICO LSOH 6 mm2
CABLE ELECTRICO LSOH 10 mm2
CABLE ELECTRICO LSOH 16 mm2
CABLE ELECTRICO LSOH 25mm2
CABLE ELECTRICO LSOH 35mm2
CABLE ELECTRICO LSOH 50mm2
CABLE ELECTRICO LSOH 120mm2
CABLE ELECTRICO LSOH 150mm2
CABLE ELECTRICO NLT 3X12 AWG
ARTEFACTOS/LUMINARIAS
REJILLA DE ALUMINIO P/EMPOTRAR CON LAMPARA LED 3X22W, ALTA EFICIENCIA
LUMINARIA CIRCULAR P/EMPOTRAR C/LAMPARA LED DE 20W P/TECHO
ARTEFACTO FLURESCENTE CON LAMPARA COMPACTO DE 1x18W P/TECHO
LUMINARIA TIPO BRAQUET C/2 LAMP. COMP. DE 18W E27
REFLECTOR DE 1000W, 130000 LUMENES
REFLECTOR DE 400W, 4800 LUMENES
REFLECTOR CON LAMPARA LED DE 500W
LUMINARIA DE ALUMBRADO PUBLICO CON LAMPARA LED DE 80W
TABLEROS ELECTRICOS
TABLERO DE DISTRIBUCION TRIFASICA DE 1ITM + 24POLOS + 12ID
TABLERO DISTRIBUCION, MONOFASICO, 24 POLOS
TABLERO DE CONTROL DE ENCENDIDO Y APAGADO TC-EA
TABLERO DE CONTROL PARA ESPECTACULOS 32A
INTERRUPTORES TERMOMAGNETICOS
INTERRUPTOR TERMOMAGNETICO MONOFASICO 2x10A
INTERRUPTOR TERMOMAGNETICO MONOFASICO 2x20A
INTERRUPTOR TERMOMAGNETICO MONOFASICO 2 X25 A
INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 25 A
INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 32 A
INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 63 A
INTERRUPTOR TERMOMAGNETICO TRIFASICA 3x75A, 380 V
INTERRUPTOR DIFERENCIAL 2 X 25 A, 30 mA
INTERRUPTOR DIFERENCIAL 2x40A, 220V
INTERRUPTOR RELOJ HORARIO, 220V
PUESTA A TIERRA
EXCAVACION DE HOYO PARA PUESTA A TIERRA
INSTALACION DE PUESTA A TIERRA
PRUEBAS ELECTRICAS
PRUEBA DE CONTINUIDAD
PRUEBA DE AISLAMIENTO
PRUEBA DE RESISTENCIA DE PUESTA A T IERRA
PRUEBA DE NIVEL DE ILUMINACION
VARIOS
POSTE METALICO P/ILUMINACION EXTERIOR PLATAFORMA
PASTORAL P/ILUMINACION EXTERIOR INCLUYE ACC. FIJ.
POSTE DE CONCRETO ARMADO CENTRIFUGADO 9/300
RED DE DISTRIBUCION DE MEDIA TENSION
MOVIMIENTO DE TIERRAS
TRAZO Y REPLANTEO RED PRIMARIA
EXCAVACION A MANO EN TERRENO NORMAL
POSTES Y CRUCETAS
POSTE DE CONCRETO ARMADO CENTRIFUGADO 13/400/2/180/355
TUBERIAS Y CAJAS DE PASO
TUBERIA F°G°, D=80MM
TUBERIA PVC-P (ELECTRICAS) D=80mm
CAJA DE PASO DE C.A. 1X1X1m
CABLES Y CONDUCTORES
CONDUCTOR DE ALEACION DE ALUMINI DE 35 mm2
CABLE SUBTERRANEO N2XSY, 25 MM2 COBRE
ARMADOS
ARMADO DT-0
ARMADO PSEC1
SUBESTACION
CELDA DE LLEGADA
CELDA DE TRANSFORMACION
PUESTA A TIERRA
EXCAVACION DE HOYOS EN TERRENO TERRENO NORMAL POSTES Y PAT
INSTALACION DE PUESTA A TIERRA
TRABAJOS COMPLEMENTARIOS
MEDIDOR EN MEDIA TENSION
PINTADO DE SEÑALIZACION
ELIMINACION DE MATERIAL EXCEDENTE
MEDICION DE AISLAMIENTO DE TRANSFORMADOR
MEDICION DE PUESTAS A TIERRA
RENOVACION DE CAMPO DEPORTIVO DE FUTBOL, PISTA ATLETICA,PLATAFORMAS DEPORTIVAS, MEJORAMIENTO Y AMPLIACION DE LAS
TRIBUNAS Y OBRAS COMPLEMENTARIAS
MEJORAMIENTO DE TRIBUNAS DEL ESTADIO
ESTRUCTURAS
OBRAS PROVISIONALES
CAMPAMENTO PROVISIONAL DE OBRA
CARTEL DE IDENTIFICACION DE OBRA DE 3.60x2.40 m
TRABAJOS PRELIMINARES
DESMONTAJE DE PUERTAS
DESMONTAJE DE VENTANAS
DESMONTAJE DE TIJERALES DE MADERA L=10.00m
DESMONTAJE DE CORREAS DE MADERA
DESMONTAJE DE APARATOS SANITARIOS
DESMONTAJE DE FALSO CIELO RASO DE TRIPLAY
DEMOLICION DE CIMIENTOS DE CONCRETO
DEMOLICION DE SOBRECIMIENTOS DE CONCRETO
DEMOLICION DE PISO DE CONCRETOINCLUYENDO F.P. e=15cm
DEMOLICION DE VEREDAS DE CONCRETO e=10cm
DEMOLICION DE GRADERIOS DE CONCRETO
DEMOLICION DE COLUMNAS Y VIGAS DE CONCRETO
DEMOLICION DE LOSAS DE CONCRETO
DEMOLICION DE URINARIOS Y BEBEDEROS DE CONCRETO
DEMOLICION DE MUROS DE LADRILLO KK SOGA
DEMOLICION DE MUROS DE LADRILLO KK CABEZA
LIMPIEZA DEL TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
CORTE SUPERFICIAL MANUAL
CORTE DE MATERIAL CON EQUIPO
PERFILADO Y COMPACTADO DE SUB-RASANTE EN ZONAS DE CORTE
EXCAVACION PARA ZAPATAS DE 2.00 M. A 2.50 M. DE PROFUNDIDAD
EXCAVACION PARA CIMIENTOS HASTA 1.50 m TERRENO NORMAL
EXCAVACION PARA VIGAS DE CIMENTACION HASTA 1.50 M EN TERRENO NORMAL
RELLENO COMPACTADO CON MATERIAL PROPIO
RELLENO COMPACTADO CON EQUIPO Y MATERIAL SELECCIONADO
NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA
ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m
CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES
OBRAS DE CONCRETO SIMPLE
FALSO PISO DE 4" MEZCLA 1:8 (C:H)
SUBCIMIENTOS Y SUBZAPTAS CONCRETO 1:10 C:H + 30% P. G.
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G.
SOBRECIMIENTOS MEZCLA 1:8 C:H + 25% P.M.
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HASTA 0.30 m
RAMPAS DE CONCRETO: f´c=175 kg/cm2 ACAB. 1:2 FROTACH. Y PULIDO
RAMPAS: ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
SOBRECIMIENTO REFORZADO
SOBRECIMIENTO REFORZADO: CONCRETO f'c=210 kg/cm2
SOBRECIMEINTO REFORZADO: ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTOS REFORZADOS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
ZAPATAS
ZAPATAS: CONCRETO PREMEZCLADO f'c=210 kg/cm2
ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION: CONCRETO PREMEZCLADO f'c=210 kg/cm2
VIGAS DE CIMENTACION: ENCOFRADO Y DESENCOFRADO
VIGAS DE CIMENTACION: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
COLUMNAS
COLUMNAS: CONCRETO f'c=210 kg/cm2 1
CONCRETO PREMEZCLADO COLUMNAS f'c=280 kg/cm2
COLUMNAS: ENCOFRADO Y DESENCOFRADO METALICO
COLUMNAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
VIGAS
VIGAS: CONCRETO f'c=210 kg/cm2 1
CONCRETO PREMEZCLADO VIGAS f'c=280 kg/cm2
VIGAS: ENCOFRADO Y DESENCOFRADO METALICO
VIGAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
GRADERIOS
GRADERIOS: CONCRETO PREMEZCLADO f'c=280 kg/cm2
GRADERIOS: ENCOFRADO Y DESENCOFRADO METALICO
GRADERIOS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
PLACAS
PLACA:CONCRETO f'c=210 kg/cm2
PLACAS: ENCOFRADO Y DESENCOFRAD
PLACAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
ESCALERAS
ESCALERAS: CONCRETO f'c=210 kg/cm2
ESCALERAS: ENCOFRADO Y DESENCOFRADO
ESCALERAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
LOSAS MACIZAS
LOSAS MACIZAS: CONCRETO f'c=210 kg/cm2
LOSAS MACIZAS: ENCOFRADO Y DESENCOFRADO
LOSAS MACIZAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
LOSA ALIGERADA
LOSAS ALIGERADAS: CONCRETO f'c=210 kg/cm2
LOSAS ALIGERADAS: ENCOFRADO Y DESENCOFRADO 1
LOSAS ALIGERADAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
LOSAS ALIGERADAS: LADRILLO HUECO DE ARCILLA DE 15 x 30 x 30 cm PARA TECHO
DRENAJE EN GRADERIOS
DRENAJE: CONCRETO f'c=210 kg/cm2
DRENAJE: ENCOFRADO Y DESENCOFRADO
DRENAJE: ACERO CORRUGADO FY=4200 kg/cm2 GRADO 60
MESADA DE CONCRETO
MESADA: CONCRETO f'c=175 kg/cm2
MESADA: ENCOFRADO Y DESENCOFRADO
MESADA: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
ESTRUCTURA METALICA
TUBO RECTANGULAR 100x150x4.5MM PARA ESCOLARES
TUBO RECTANGULAR 40x80x3MM PARA ESCOLARES
LAMINA RETICULAR INCLUIDO SOPORTES
REHABILITACION DE ESTRUCTURAS
REHABILITACION DE ESTRUCTURAS (SELLADO CON CONCRETO)
ARQUITECTURA
MUROS Y TABIQUES DE ALBAÑILERIA
MURO DE LADRILLO KK TIPO IV CABEZA M 1:1:4 e=1.50 cm
MURO DE LADRILLO KK TIPO IV SOGA M 1:1:4 e=1.50 cm
TABIQUE SUPERBOARD
TABIQUE DE MELAMINE CON ESTRUCTURA DE ALUMINIO EN CUBICULOS DE SSHH
JUNTA DE DILATACION CON ESPUMA PLASTICA MAS JEBE MICROPOROSO
REVOQUES ENLUCIDOS Y MOLDEDURAS
TARRAJEO PRIMARIO O RAYADO, MORTERO C:A 1:5
TARRAJEO EN MURO:INTERIOR (C:A 1:5 e=1.50cm)
TARRAJEO EN MURO:EXTERIOR (C:A 1:5 e=1.50cm)
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA
TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO - ARENA
TARRAJEO EN SUPERFICIE DE GRADERIOS CON IMPERMEABILIZANTE
TARRAJEO EN SUPERFICIE DE ESCALERA CON IMPERMEABILIZANTE
VESTIDURA DE DERRAMES (MEZCLA C:A1:5)
BRUÑAS SEGUN DETALLE
CIELO RASOS
CIELORASO CON MEZCLA DE CEMENTO - ARENA 1:5
CIELORASO CON BALDOSAS DE FIBRO MINERAL
PISOS Y PAVIMENTOS
FALSO PISO DE 4" MEZCLA 1:8 (C:H)
CONTRAPISO DE 40 mm (MEZCLA C:A BASE 1:5, ACABADO 1:2)
PISO DE CEMENTO SIN COLOREAR: ACABADO PULIDO e=2"
PISO DE CEMENTO COLOREADO (OCRE AZUL): ACABADO PULIDO
PISO CERAMICO ANTIDESLIZANTE 40x40
PISO CERAMICO ANTIDESLIZANTE 60x60
ZOCALOS
ENCHAPE FACHALETA RUSTICA 10 X50 CM
ZOCALO DE CERAMICO 20 X 30 cm
CONTRAZOCALOS
CONTRAZOCALO CERAMICO 15 cm
CONTRAZOCALO DE CEMENTO PULIDO h=0.10 m
CONTRAZOCALO DE MADERA CEDRO DE 3/4" X 4" CON RODON DE 3/4"
CUBIERTAS Y CERRAMIENTOS
COBERTURA TIPO ONDULINE
CUMBRERA DE ONDULINE
CARPINTERIA DE MADERA
PUERTAS DE MADERA CONTRAPLACADA
CARPINTERIA METALICA
PUERTA METALICA 03
PUERTA METALICA 04
PUERTA METALICA T-5A
PUERTA METALICA PARA EXTERIORES
PUERTA METALICA EN ESCALERAS
PUERTA METALICA ANTIPANICO
TRAMA METALICA EN CAJA DE ESCALERA
BARANDA METALICA CAJA DE ESCALERA
MALLA METALICA CON REFUERZOS GALVANIZADOS
ESTRUCTURA METALICA PARA VITRAL
BARANDA METALICA GRADERIOS
BARANDA METALICA ACCESOS A TRIBUNAS
BARANDAS METALICAS PARA MUROS
ESCALERA METALICA TIPO I
ESCALERA METALICA TIPO II
ESCALERA METALICA TIPO III
CERRAJERIA
BISAGRAS CAPUCHINA ALUMINIZADA DE 4"
BISAGRAS CAPUCHINA ALUMINIZADA DE 3" PESADA EN PUERTAS
CERRADURA DE TRES GOLPES PUERTAS INTERIORES
CERRADURA TIPO BOLA P/BAÑOS
MANIJA DE 3" ALUMINIZADA PARA PUERTA
VIDRIOS, CRISTALES Y SIMILARES
VIDRIO SISTEMA MODUGLASS 6mm
VIDRIO TEMPLADO DE 8 mm
VIDRIO E=8 MM INCOLORO CRUDO
MAMPARA EN CRISTAL TEMPLADO DE 8 mm CON ESTRUCTURA DE ALUMINIO
PINTURA
PINTURA LATEX EN CIELO RASO
PINTURA LATEX 2 MANOS EN MUROS INTERIORES (VINILATEX O SIM.)
PINTURA LATEX 2 MANOS EN MUROS EXTERIORES (SUPERLATEX O SIM.)
PINTURA LATEX 2 MANOS EN COLUMNAS (VINILATEX O SIM.)
PINTURA LATEX 2 MANOS EN VIGAS (VINILATEX O SIM.)
PINTURA LATEX 2 MANOS EN MUROS SUPERBOARD
PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS
PINTURA ESMALTE EN CONTRAZOCALOS
PINTURA BARNIZ EN CONTRAZOCALOS DE MADERA H=0.10 m
PINTURA EN DERRAMES
SEÑALIZACION
PINTURA

LETREROS DE SALIDA
LETREROS DE ZONA DE SEGURIDAD EN CASO DE SISMOS
EXTINTORES
LETREROS DE EXTINTORES
LETREROS DE SALIDA POR ESCALERA
ZONA DE SEGURIDAD
LETREROS DE RIESGO ELECTRICO
INSTALACIONES SANITARIAS
SISTEMA DE AGUA POTABLE
SALIDAS DE AGUA FRIA
SALIDA DE A.F. PVC C/R - 1/2" C-10
SALIDA DE A.F. PVC C/R - 1" C-10
SALIDA DE A.F. PVC C/R - 1.1/4" C-10
REDES DE DISTRIBUCION
SUM. E INST. TUB. PVC C-10 - D=1.1/4"
SUM. E INST. TUB. PVC C-10 - D=1.1/2"
SUM. E INST. TUB. PVC C-10 - D=2"
SUM. E INST. TUB. PVC C-10 - D=2.1/2"
VALVULAS
SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1/2"
SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=3/4" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA)
SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA)
SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1.1/4" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA)
SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1.1/2" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA)
SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=2" (INC. UU, NIPLES DE F°G° Y CAJUELA METALICA)
SISTEMA DE AGUA CALIENTE
SALIDAS DE AGUA CALIENTE
SALIDA AGUA CALIENTE TUBERIA CPVC O 1/2"
SALIDA AGUA CALIENTE TUBERIA CPVC O 3/4"
REDES DE DISTRIBUCION
SUM. Y COLOC. TUB. CPVC D=3/4 ENTERRADA INC. DESP Y ACCES
LLAVES Y VALVULAS
SUM. E INST. VALV. ESFERICA BRONCE C.150 - D=1/2"
THERMAS Y VALVULAS
SUM Y COLOC. THERMAS 100 LT INCL. TIMER Y ACCES P/INST
SUM Y COLOC. THERMAS 150 LT INCL. TIMER Y ACCES P/INST
SISTEMA CONTRA INCENDIO
TUBERIA ENTERRADA
TUBERIA HDPE PN15 2 1/2" PARA AGUA POTABLE CON UNIONES TERMOFUSIONADAS
TUBERIA HDPE PN15 4" PARA AGUA POTABLE CON UNIONES TERMOFUSIONADAS
TUBERIA HDPE PN15 6" PARA AGUA POTABLE CON UNIONES TERMOFUSIONADAS
TUBERIA AEREA
TUBERIA ACERO SCH 40 2 1/2" INC. PINTURA 8 MILS - INCL SOPORTE
TUBERIA ACERO SCH 40 4" INC. PINTURA 8 MILS - INCL SOPORTE
GABINETE
GABINETE CONTRA INCENDIO
SISTEMA DE DESAGUE Y VENTILACION
SALIDA DE DESAGUE Y VENTILACION
SALIDA DE DESAGUE PVC CP - 2"
SALIDA DE DESAGUE PVC CP - 3"
SALIDA DE DESAGUE PVC CP - 4"
SALIDA DE VENTILACION PROMEDIO PVC CP - 2"
REDES DE EVACUACION
SUM. E INST. TUB. PVC CP - D=4" (INC. EXCAV. RELLENO Y COMPACT.)
SUM. E INST. TUB. PVC CP - D=6" (INC. EXCAV. RELLENO Y COMPACT.)
SUM. Y COLOC. TUB. PVC-CP D=3" COLGADAS INCL. DESP Y ACCES - COLG Y SOPORTE
SUM. Y COLOC. TUB. PVC-CP D=4" COLGADAS INCL. DESP Y ACCES - COLG Y SOPORTE
SUM. Y COLOC. TUB. PVC-CP D=3" ADOSADAS INCL. DESP Y ACCES - COLG Y SOPORTE
SUM. Y COLOC. TUB. PVC-CP D=4" ADOSADAS INCL. DESP Y ACCES - COLG Y SOPORTE
ADITAMENTOS VARIOS
SUM. E INST. REGISTRO ROSCADO A RAS DE PISO - BRONCE CROMADO PESADO 2"
SUM. E INST. SUMIDERO BRONCE CROMADO PESADO - 3"
REGISTRO ROSCADO DE BRONCE 2"
SUM. E INST. REGISTRO ROSCADO A RAS DE PISO - BRONCE CROMADO PESADO 3"
SUM. E INST. REGISTRO ROSCADO A RAS DE PISO - BRONCE CROMADO PESADO 4"
SUM. E INST. REGISTRO ROSCADO A RAS DE PISO - BRONCE CROMADO PESADO 6"
SOMBRERO DE VENTILACION 2"
SOMBRERO DE VENTILACION 3"
SOMBRERO DE VENTILACION 4"
CAMARAS DE INSPECCION
CAJAS DE REGISTRO DE DESAGUE 12" x 24"
APARATOS SANITARIOS
INODORO CON VALVULA SEMIAUTOMATICA INC/ACCESORIO
LAVATORIO INC/ACCESORIO
DUCHA INC/ACCESORIO
LAVADERO DE ACERO INOXIDABLE UNA POZA
JABONERA DE LOSA DE 15x15 cm
PAPELERA DE BARRA
ESPEJO
URINARIO DE LOZA DE PICO BLANCO
COLOCACION DE APARATOS SANITARIOS
COLOCACION DE ACCESORIOS SANITARIOS
INSTALACIONES ELECTRICAS
TRABAJOS PRELIMINARES
REPLANTEO DE INSTALACIONES ELECTRICAS
DESMONTAJE DE INSTALACIONES ELECTRICAS EXISTENTES
PICADO Y RESANE DE PAREDES DE CONCRETO EXISTENTE
SALIDAS PARA INST. ELECTRICA
SALIDA DE TECHO C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2, CAJAS PESADA
SALIDA DE PARED C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2, CAJAS PESADAS
SALIDA PARA LUZ DE CONMUTACION SIMPLE C/TUB. PVC-P (1/2) CABLE LSOH 2.5mm2 CAJAS PESADAS
SALIDA P/INTERRUPTOR SIMPLE, TUB. PVC-P (1/2) CABLE LS0H 2.5mm2, CAJAS PESADAS
SALIDA P/INTERRUPTOR DOBLE, TUB. PVC-P (1/2) CABLE LS0H 2.5mm2, CAJAS PESADAS
SALIDA P/TOMACORRIENTE BIPOLAR DOBLE TUB. PVC-P (1/2) CABLE LSOH 4mm2 CAJAS PESADAS
SALIDA P/SECADORA DE MANOS, TUB. PVC-P (1/2) CABLE LSOH 4mm2 CAJAS PESADAS
SALIDA PARA ILUMINACION DE EMERGENCIA, TUB. PVC-P (1/2) CABLE LSOH 4mm2, CAJA PESADA
SALIDA DE FUERZA PARA EXTRACTOR DE AIRE, TUB. PVC-P (1/2) CABLE LSOH 4mm2, CAJA PESADA
TUBERIAS/ALIMENTADORES
EXCAVACION DE ZANJAS
TUBERIA PVC-P (ELECTRICAS) D=20mm
TUBERIA PVC-P (ELECTRICAS) D=25mm
TUBERIA PVC-P (ELECTRICAS) D=35mm
TUBERIA PVC-P (ELECTRICAS) D=40mm
TUBERIA PVC-P (ELECTRICAS) D=50mm
TUBERIA PVC-P (ELECTRICAS) D=65mm
TUBERIA PVC-P (ELECTRICAS) D=80mm
CAJAS DE PASO
CAJA DE PASO FºGº DE 100x100x50 mm, PESADO
CAJA DE PASO FºGº DE 150x150x100 mm, PESADO
CAJA DE PASO FºGº DE 200x200x100 mm, PESADO
BUZON DE CONCRETO DE 1.00x1.00x1.00m, PARA INSTALACIONES ELECTRICAS
CABLES Y CONDUCTORES
CABLE ELECTRICO LSOH 10 mm2
CABLE ELECTRICO LSOH 16 mm2
CABLE ELECTRICO LSOH 25mm2
CABLE ELECTRICO LSOH 35mm2
CABLE ELECTRICO LSOH 70mm2
CABLE ELECTRICO LSOH 95mm2
CABLE ELECTRICO LSOH 120mm2
CABLE ELECTRICO LSOH 150mm2
CABLE ELECTRICO LSOH 240mm2
ARTEFACTOS/LUMINARIAS
REJILLA DE ALUMINIO P/ADOSAR CON LAMPARA DE LED 3X24W, ALTA EFICIENCIA
LUMINARIA CIRCULAR P/EMPOTRAR C/LAMPARA LED DE 20W P/TECHO
LUMINARIA C/LAMPARA FLUORESCENTE COMPACTA DE 2X18W, 2X1200 LUMENES P/TECHO
LUMINARIA DE EMERGENCIA C/LAMPARA LED DE 2x10W
LUMINARIA TIPO BRAQUET C/2 LAMP. COMP. DE 18W E27
REFLECTOR CON LAMPARA HM DE 2000W, 230000 LUMENES
REFLECTOR TIPO CAMPANA C/LAMPARA LED DE 100W, 10000 LUMENES
LUMINARIA C/SOCKET, E27, C/LAMP. FC 65W, 4000 LUMENES
SECADORA DE MANOS, AUTOMATICO
LUMINARIA CINTA LED, TIPO MANGUERA DE 30M
TABLEROS ELECTRICOS
TABLERO TRIFASICO TPN, AUTOSOPORTADO 630A
TABLERO TRIFASICO TPE, AUTOSOPORTADO 400A
TABLERO TRIFASICO P/EMPOTRAR DE 18 POLOS + 6ID
TABLERO TRIFASICO P/EMPOTRAR DE 24 POLOS + 8ID
TABLERO TRIFASICO P/EMPOTRAR DE 24 POLOS + 10ID
TABLERO TRIFASICO P/EMPOTRAR DE 1 ITMG+36 POLOS+12ID, 100A
TABLERO DE BANCO DE CONDENSADORES, 200A
TABLERO GENERAL NORMAL TGN, AUTOSOPORTADO 800A.
TABLERO GENERAL DE EMERGENCIA TGE 500A.
TABLERO DE CONTROL DE ENCENDIDO Y APAGADO TC-EA
TABLERO DE CONTROL DE BOMBEO DE CONTRAINCENDIO TBCI
TABLERO DE CONTROL DE BOMBEO TBAF
TABLERO MONOFASICO DE 24 POLOS.
TABLERO DE TRANSFERENCIA AUTOMATICA DE 3x630 A
TABLERO PARA ESPECTACU;LO DE 32A
INTERRUPTORES TERMOMAGNETICOS
INTERRUPTOR TERMOMAGNETICO MONOFASICO 2x10A
INTERRUPTOR TERMOMAGNETICO MONOFASICO 2X16 A
INTERRUPTOR TERMOMAGNETICO MONOFASICO 2x20A
INTERRUPTOR TERMOMAGNETICO MONOFASICO 2 X25 A
INTERRUPTOR TERMOMAGNETICO TRIFASICO 3X20 A.
INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 25 A
INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 32 A
INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 40 A
INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 X 50 A
INTERRUPTOR DIFERENCIAL 2 X 25 A, 30 mA
PUESTA A TIERRA
EXCAVACION DE HOYO PARA PUESTA A TIERRA
INSTALACION DE PUESTA A TIERRA
PRUEBAS ELECTRICAS
PRUEBA DE CONTINUIDAD
PRUEBA DE AISLAMIENTO
PRUEBA DE RESISTENCIA DE PUESTA A T IERRA
PRUEBA DE NIVEL DE ILUMINACION

UPS 10 KVA, TRIFASICO


TRANSFORMADOR DE AISLAMIENTO
TABLERO ELECTRONICO CON PANTALLA DIGITAL
FIJACION ORIENTACION DE REFLECTORES EN LA COBERTURA
PARARRAYOS TIPO DESIONIZANTE PDCE SENIOR R=120m, INC. ACC.
SUM Y COLOC. THERMAS 110 LT INCL. TIMER Y ACCES. P/INST. 2000 W
INSTALACIONES MECANICAS
SISTEMA DE GRUPO ELECTROGENO
EXCAVACION MANUAL DE ZANJAS
LOSAS MACIZAS PARA EL MONTAJE DEL GRUPO ELECTROGENO
SUMINISTRO Y MONTAJE DE GRUPO ELECTROGENO
SUMINISTRO Y MONTAJE DE SILENCIADOR Y DUCT. DE ESCAPE
SISTEMA DE COMBUSTIBLE
TANQUE DE PETROLEO
TANQUE DIARIO DE PETROLEO DE 100 GALONES (INCLUYE SOPORTE)
TANQUE DE ALMACENAMIENTO DE 500 GALONES (INCLUYE SOPORTE)
MOVIMIENTO DE TIERRAS
TRAZO Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS
TIERRA CERNIDA Y COMPACTADA
TUBERIAS
TUBERIA DE ACERO NEGRO 1"
TUBERIA DE ACERO NEGRO 1 1/4"
TUBERIA DE ACERO NEGRO 1 1/2"
TUBERIA DE ACERO NEGRO 2"
TUBERIA DE ACERO NEGRO 4"
REVESTIMIENTO P/TUBERIA CON YUTE ALQUITRANADO
ACCESORIOS VARIOS
UNION FLEXIBLE DE 1" (SIST. PETROLEO)
UNION FLEXIBLE DE 1 1/4" (SIST. PETROLEO)
UNION FLEXIBLE DE 1 1/2" (SIST. PETROLEO)
CODO DE ACERO NEGRO DE 1/2"
CODO DE ACERO NEGRO DE 3/4"
CODO DE ACERO NEGRO DE 1"
CODO DE ACERO NEGRO DE 1 1/4"
CODO DE ACERO NEGRO DE 1 1/2"
CODO DE ACERO NEGRO DE 2"
TEE DE ACERO NEGRO DE 1/2"
TEE DE ACERO NEGRO DE 3/4"
TEE DE ACERO NEGRO DE 1"
TEE DE ACERO NEGRO DE 1 1/4"
TEE DE ACERO NEGRO DE 1 1/2"
TEE DE ACERO NEGRO DE 2"
REDUCCION DE ACERO CEDULA 40 DE 1 1/4" A 1/2"
REDUCCION DE ACERO CEDULA 40 DE 1 1/4" A 3/4"
REDUCCION DE ACERO CEDULA 40 DE 1 1/4" A 1"
REDUCCION DE ACERO CEDULA 40 DE 1 1/2" A 1/2"
REDUCCION DE ACERO CEDULA 40 DE 1 1/2" A 1 1/4"
REDUCCION DE ACERO CEDULA 40 DE 2" A 1 1/2"
REDUCCION DE ACERO CEDULA 40 DE 2" A 1/2"
VALVULAS
VALVULA DE BOLA DE 1/2"
VALVULA DE BOLA DE 1"
VALVULA DE BOLA DE 1 1/4"
VALVULA DE BOLA DE 1 1/2"
VALVULA CHECK DE BRONCE DE 1 1/4"
VALVULA DE PIE D=1"
VALVULA REGULADORA DE PRESION DE 3/4"
ACCESORIOS PARA TANQUE DE PETROLEO
BOQUILLA DE LLENADO DE PETROLEO DIAM.=4"
BOQUILLA DEMEDICION DIAM.=2"
BOQUILLA DE VENTILACION DIAM.=1"
FILTRO DE PETROLEO
FILTRO COLADOR DE PETROLEO DE 1 1/4
PREFILTRO DE PETROLEO
VISOR DE VIDRIO DE 1 1/4"
CONTROL DE NIVEL VARILLA+FLOTADOR (ACERO INOXIDABLE)
CAJUELA DE LLENADO DE PETROLEO C/BOQUILLA
MANOMETROS
POZO DE PUESTA A TIERRA (15 OMH)
CABLE DE COBRE DESNUDO DE 10 mm2 - TUB. 20 mm.
BOMBA PARA PETROLEO
ELECTROBOMBA DE Q=12.5 GPM, H=17.3M,P=1 HP (PETROLEO), INC. TAB. DE CONTROL
PRUEBAS
PRUEBA DE INSTALAC. DEL SISTEMA DE PETROLEO
SISTEMA DE VENTILACION MECANICA
PERFORACION DE MUROS
SUMINISTRO E INSTALACION DE EXTRACTORES DE AIRE
DUCTOS FLEXIBLES 1
REJILLAS DE EXTRACCION DE AIRE
INSTALACIONES DE INFORMACION TECNOLOGICA Y COMUNICACIONES
SALIDA PARA VOZ Y DATOS
SALIDA PARA PUNTO DE INTERNET
SALIDA PARA TELEFONO
CENTRAL IP PARA INTERNET Y TELEFONIA
SUMINISTRO DE LINEA EXTERIOR DE TELEFONO
SALIDA PARA SISTEMA DE ALARMA Y MONITOREO
TABLERO CENTRAL PARA CONTROL DE INCENDIOS 1
ESTACION MANUAL DE PROGRAMACION DE ALARMA
SALIDA PARA DETECTOR DE HUMO
SALIDA PARA DIFUSOR DE SONIDO O SIRENA
SALIDA PARA SENSOR DE MOVIMIENTO
SALIDA PARA SENSOR MAGNETICO
SALIDA PARA SISTEMAS DE SONIDO
SALIDA PARA MEGAFONIA EXTERIOR
SALIDA PARA PARLANTES DE ALTA POTENCIA
CENTRAL DE DIFUSION Y PERIFONIA
AMPLIFICADOR
SALIDA PARA SISTEMAS DE VIGILANCIA CCTV
SALIDA PARA CAMARA DE VIGILANCIA IP
UNIDAD DE ADMINISTRACION DE CCTV, GRAVADOR DVR
SALIDA PARA TELEVISION
SALIDA PARA PUNTO DE IPTV
UNIDAD DE RECEPCION Y DIFUSION DE TV CABLE
CENTRAL DE COMUNICACIONES
ESTACION CENTRAL DE COMUNICACIONES
REPARTIDOR DE CABLEADO ESTRUCTURADO 12 UR
REPARTIDOR DE CABLEADO ESTRUCTURADO 6 UR
CONTROL DE ACCESOS
ESTACION CENTRAL DE CONTROL DE TAQUILLA
BARRERA DE CONTROL DE ACCESO ELECTRONICO
CANALIZACIONES Y/O TUBERIAS
TUBERIA PVC-P, D=15 mm.
TUBERIA PVC-P, D=20mm.
BANDEJA PORTACABLE DE 250MMX150MM 1
CAJA DE PASO FºGº DE 250x250x150 mm, PESADO
CABLEADO EN TUBERIAS
CABLE DE VOZ Y DATOS
CABLE TELEFONICO DE INTERIORES
CABLE DE SEÑALES DEBILES
CABLE DE FIBRA OPTICA

SERVICIO DE INSTALACION Y CONFIGURACION DE EQUIPOS DE COMUNICACIONES


SERVICIO DE INSTALACION Y CONFIGURACION DE EQUIPOS DE SEGURIDAD
MEJORAMIENTO DE AREAS DEPORTIVAS
CAMPO DEPORTIVO GRASS NATURAL
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
LIMPIEZA Y DESBROCE DEL TERRENO h=0.30 m
DEMOLICIONES Y DESMONTAJES
DEMOLICIONES
DEMOLICION DE ESTRUCTURAS DE CONCRETO
DESMONTAJES
DESMONTAJE DE SISTEMA DE RIEGO
DESMONTAJE DEL SISTEMA DE RIEGO TUBERIA
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL SUELTO CON EQUIPO
EXCAVACION A MANO EN TERRENO NORMAL
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
PERFILADO Y COMPACTADO DE SUB-RASANTE
CONFORMACION DE SUB BASE
ACARREO DE MATERIAL PROVENIENTE DE LA DEMOLICION DEL CONCRETO
ELIMINACION DE MATERIAL DE DEMOLICIONES
EXTRACCION DE MATERIALES EN CANTERA
EXTRACCION Y APILAMIENTO DE MATERIAL DE SUB BASE EN CANTERA
ZARANDEO DE MATERIAL SELECCIONADO
CARGUIO DE MATERIAL DE SUB BASE EN CANTERA
TRANSPORTE DE MATERIAL SUB BASE A OBRA
EXTRACCION Y APILAMIENTO DE ARENA FINA EN CANTERA
ZARANDEO DE ARENA FINA EN CANTERA
CARGUIO DE ARENA FINA EN CANTERA
TRANSPORTE DE ARENA FINA A OBRA
EXTRACCION Y APILAMIENTO DE TIERRA AGRICOLA EN CANTERA
CARGUIO DE MATERIALES EN CANTERA
TRANSPORTE DE TIERRA AGRICOLA A OBRA
CONFORMACION DE ESTRUCTURA DE CAMPO DEPORTIVO
COLOCADO Y COMPACTADO DE MATERIAL SUB BASE
PREPARACION Y BATIDO DE TIERRA AGRICOLA + ARENA FINA + ABONO NATURAL
ESPARCIDO Y COMPACTADO DE BATIDO DE TIERRA AGRICOLA + ARENA FINA + ABONO NATURAL
GRAMADO
GRASS NATURAL EN CAMPO DEPORTIVO
SISTEMA DE DRENAJE CAMPO DEPORTIVO
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
INSTALACION SUB DRENES CON TUBERIA
COLOCADO Y COMPACTADO DE PIEDRA CHANCADA DE 3/8"
SUMINISTRO Y COLOCACION DE TUBERIA APANELADA PARA DRENAJE
ACCESORIOS PARA INSTALACION DETUBERIA - TAPONES
ACCESORIOS PARA INSTALACION DETUBERIA - CODOS
ACCESORIOS PARA INSTALACION DETUBERIA - ACOPLES
ACCESORIOS PARA INSTALACION DETUBERIA - EMPALMES
ACCESORIOS PARA INSTALACION DETUBERIA - GEOTEXTIL
INSTALACION DREN COLECTOR
SUMINISTRO Y COLOCACION DE TUBERIA HDPE ADS D=10"
INSTALACION DE COLECTORES PARA DESFOGUE FINAL
EXCAVACION MANUAL DE ZANJAS PARA TUBERIA COLECTOR
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
REFINE Y NIVELACION DE ZANJAS
RELLENO CON MATERIAL CLASIFICADO POR CAPAS
CAMA DE ARENA PARA APOYO DE TUBERIA
SUMINISTRO Y COLOCACION DE TUBERIA PVC S-20 D=250 MM
SUMINISTRO Y COLOCACION DE TUBERIA PVC S-20 D=315 MM
SUMINISTRO Y COLOCACION DE TUBERIA PVC S-20 D=355 MM
CONCRETO f'c=210 kg/cm2
SOLADO e=2"
BUZONES DE CONCRETO HASTA 1.20 M.
EXCAVACION MANUAL DE ZANJAS
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
REFINE Y NIVELACION EN FONDO DE ZANJAS
SOLADO e=2"
CONCRETO f'c=210 kg/cm2
ACERO DE REFUERZO fy=4,200 kg/cm2
ENCOFRADO Y DESENCOFRADO METALICO
CONCRETO ARMADO
CANAL: ENCOFRADO Y DESENCOFRADO
CANAL: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
CANAL: CONCRETO f'c=210 kg/cm2
TAPA: ENCOFRADO Y DESENCOFRADO
TAPA: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
TAPA: CONCRETO f'c=210 kg/cm2
TAPA: REJILLA METALICA
SISTEMA DE RIEGO CAMPO DEPORTIVO GRASS NATURAL
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO NORMAL
RELLENO CON MATERIAL CLASIFICADO POR CAPAS
INSTALACIONES DE SISTEMA DE RIEGO
TUBERIAS
SUMINISTRO Y COLOCACION DE TUBERIA HDPE 3"
SUMINISTRO Y COLOCACION DE TUBERIA HDPE 2"
ASPERSORES
SUMINISTRO E INSTALACION DE ASPERSORES DE TIPO 1
SUMINISTRO E INSTALACION DE ASPERSORES DE TIPO 2
SUMINISTRO E INSTALACION DE ASPERSORES DE TIPO 3
ACCESORIOS Y VALVULAS
VALVULA COMPUERTA DE 2"
CAJA VALVULA TIPO ARQUETAS
ACCESORIOS VARIOS EN INSTALACION DE TUBERIA HDPE
PRUEBAS DE CALIDAD
PRUEBA HIDRAULICA EN TUBERIAS DE RIEGO
EQUIPAMIENTO ELECTROMECANICO
ELECTROBOMBA SUMERGIBLE
TABLERO ELECTRICO DE CONTROL AUTOMATICO DE ELECTROBOMBA
OPERACION Y MANTENIMIENTO DE GRASS NATURAL
OPERACION Y MANTENIMIENTO

COBERTURA DE PROTECCION DE GRASS NATURAL


PRUEBA HIDRAULICA DEL SISTEMA DE DRENAJE
CAJAS DE INSPECCION
TRATAMIENTO DE MALLA OLIMPICA
ESTRUCTURAS
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ZAPATAS DE 1.00 m A 1.40 m DE PROFUNDIDAD
EXCAVACION PARA CIMIENTOS HASTA 1.00 m TERRENO NORMAL
RELLENO COMPACTADO CON EQUIPO Y MATERIAL SELECCIONADO
NIVELACION Y APISONADO DEL TERRENO C/PLANCHA COMPACTADORA
ACARREO MANUAL DE MATERIAL EXCEDENTE DIST. PROM. 30 m
CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE Y PROCEDENTE DE DEMOLICIONES
OBRAS DE CONCRETO SIMPLE
SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 C:H
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P. G.
SARDINELES DE CONCRETO f'c=175 kg/cm2
ENCOFRADO Y DESENCOFRADO CARAVISTA EN SARDINELES
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS: CONCRETO f'c=175 kg/cm2
ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
DADOS
DADOS: CONCRETO f'c=175 kg/cm2
DADOS: ENCOFRADO Y DESENCOFRADO
DADOS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDEDURAS
TARRAJEO EN SARDINEL DE CONCRETO
CARPINTERIA METALICA
PUERTA METALICA
TUBO METALICO DE 4" EN MALLA OLIMPICA 1
MALLA METALICA EN INTERIOR
PINTURA
PINTURA LATEX 2 MANOS EN SARDINEL DE CONCRETO (SUPERLATEX O SIM.)
PIN. ANTICOR. Y ESMALTE 2 MANOS EN ELEMENTOS METALICOS
RENOVACION DE CAMPO DEPORTIVO DE FUTBOL, PISTA ATLETICA,PLATAFORMAS DEPORTIVAS, MEJORAMIENTO Y AMPLIACION DE LAS
TRIBUNAS Y OBRAS COMPLEMENTARIAS
TRATAMIENTO DE PISTA ATLETICA
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE EL PROCESO
TRANSPORTE DE MATERIALES Y HERRAMIENTAS A OBRA
PISTA ATLETICA SON SUPERFICIE SINTETICA
MOVIMIENTO DE TIERRAS PARA PISTAS INCLUYE MEDIAS LUNAS Y SALTOS
EXCAVACION A NIVEL DE SUBRASANTE AREA DE LA PISTA ATLETICA
SUBRASANTE MEJORADA, NIVELADO Y COMPACTADO
SUB-BASE GRANULAR e=0.15 m.
BASE GRANULAR E=0.36 m
ELIMINACION DE MATERIAL EXCEDENTE CORRESPONDIENTE A LA PISTA
GEOTEXTIL
SUMINISTRO E INSTALACION DE GEOTEXTIL TEJIDO
SARDINELES
EXCAVACION MANUAL DE ZANJAS PARA SARDINELES
ELIMINACION DE MATERIAL EXCEDENTE CORRESPONDIENTE A SARDINELES
REFINE, NIVELACION Y COMPACTACION
CONCRETO f'c=210 kg/cm2
ACERO FY= 4200 kg/cm2
ENCOFRADO Y DESENCOFRADO
MATERIAL CLASIFICADO EN FOSA
COBERTURA DE CAUCHO DE FOSA DE SALTO LARGO Y TRIPLE
IMPRIMADO
IMPRIMACION RC 250
CARPETA ASFALTICA EN CALIENTE
SUMINISTRO Y COLOCACION DE CARPETA ASFALT. EN CALIENTE E=3" (DOS CAPAS DE 1.5")
CAPA DE SINTETICO
SUMINISTRO Y COLOCACION DE CAPA SINTENTICA
LOSA PARA CAFETIN DE PERDIGA
CONCRETO f'c=210 kg/cm2
ENCOFRADO Y DESENCOFRADO

EXCAVACION MANUAL DE ZANJAS


ELIMINACION DE MATERIAL EXCEDENTE
REFINE, NIVELACION Y COMPACTACION
BASE GRANULAR E=0.15 m.
SOLADO e=2"
CONCRETO f'c=210 kg/cm2
ACERO DE REFUERZO fy=4,200 kg/cm2
ENCOFRADO Y DESENCOFRADO
EXCAVACION MANUAL DE ZANJAS (PARA TUBERIA DE DESAGUE DE RIA)
REFINE Y NIVELACION DE ZANJAS
RELLENO, COMPACTACION DE ZANJA CON MATERIAL PROPIO
CAMA DE ARENA PARA APOYO DE TUBERIA
TUBERIA DE PVC SAL 2"
TARRAJEO CON IMPERMEABILIZANTES
LOSA LANZAMIENTO DE PESO
CONCRETO f'c=210 kg/cm2
BASE GRANULAR e=0.20 m.
ACERO DE REFUERZO fy=4,200 kg/cm2
ENCOFRADO Y DESENCOFRADO
LOSA LANZAMIENTO DE DISCO Y MARTILLO
CONCRETO f'c=210 kg/cm2
BASE GRANULAR e=0.20 m.
ACERO DE REFUERZO fy=4,200 kg/cm2
ENCOFRADO Y DESENCOFRADO
DRENAJE PISTA ATLETICA
CANAL DE DRENAJE DE LA PISTA ATLETICA
EXCAVACION MANUAL DE ZANJAS
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
REFINE Y NIVELACION DE ZANJAS
CONCRETO f'c=210 kg/cm2
SUMINISTRO E INSTALACION DE TUBERIA DE DRENAJE 6"
ENCOFRADO Y DESENCOFRADO
CAJA DE REGISTRO (06 UND) DE 0.35 x 0.60 m.
EXCAVACION MANUAL DE ZANJAS
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
REFINE, NIVELACION Y COMPACTACION
SOLADO e=2"
CONCRETO f'c=210 kg/cm2
ACERO DE REFUERZO fy=4,200 kg/cm2
ENCOFRADO Y DESENCOFRADO
DRENAJE DE AREAS VERDES ARTIFICIAL
TUBERIA DE DRENAJE DE AREAS VERDES ARTIFICIAL
EXCAVACION MANUAL DE ZANJAS
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
REFINE Y NIVELACION DE ZANJAS
FILTRO DE GRAVA
SUMINISTRO E INSTALACION DE TUBERIA DE 3"
SUMINISTRO E INSTALACION TUBERIA PVC D=110MM
CAJA DE REGISTRO (13 UND) DE 0.50 x 0.50 m.
EXCAVACION MANUAL DE ZANJAS
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
REFINE Y NIVELACION DE ZANJAS
SOLADO e=2"
CONCRETO f'c=210 kg/cm2
ACERO DE REFUERZO fy=4,200 kg/cm2
ENCOFRADO Y DESENCOFRADO
SISTEMA DE RIEGO DE PISTA ATLETICA
DEMOLICIONES
DEMOLICION DE PAVIMENTO RIGIDO (LOSA Y VEREDAS DE CONCRETO)
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE D=50 M
CAJA DE SALIDA DE VALVULA DE RIEGO (05 UND DE 0.60 x 0.40 m.)
EXCAVACION MANUAL DE ZANJAS
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
REFINE, NIVELACION Y COMPACTACION
SOLADO e=2"
SUMINISTRO E INSTALACION DE CAJAS DE CONCRETO PREFABRICADA DE 0.60 x 0.40 M.
HIDRANTE
VALVULA ESFERICA DOBLE UNIVERSAL DESMONTABLE DE DIAM. 1"
VALVULA ESFERICA DOBLE UNIVERSAL DESMONTABLE DE DIAM. 1 1/2"
TUBERIA Y ACCESORIOS DE FIJACION
TUBERIA PVC SAP CLASE 10 1 1/2"
TUBERIA PVC SAP CLASE 10 1 1"
ABRAZADERAS DE FIJACION PARA TUBERIA DE 1 1/2"
ABRAZADERAS DE FIJACION PARA TUBERIA DE 1"
DOBLE PRUEBA HIDRAULICA
ACCESORIOS VARIOS
AREAS VERDES ARTIFICIALES
MOVIMIENTO DE TIERRAS
NIVELACION Y COMPACTADO DE TERRENO
EXCAVACION A NIVEL DE SUBRASANTE AREA DE LA PISTA ATLETICA
SUBRASANTE MEJORADA, NIVELADO Y COMPACTADO
SUB-BASE GRANULAR e=0.15 m.
BASE GRANULAR E=0.40 m
GEOTEXTIL
SUMINISTRO E INSTALACION DE GEOTEXTIL TEJIDO
SUMINISTRO Y COLOCACION DE GRASS ARTIFICIAL
SUMINISTRO Y COLOCACION DE CESPED ARTIFICIAL
INSTALACIONES ELECTRICAS
TUBERIA DE CONEXION
EXCAVACION MANUAL DE ZANJAS
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
REFINE Y NIVELACION DE ZANJAS
CONCRETO f'c=210 kg/cm2 (TUBERIA EMBEBIDA)
SUMINISTRO E INSTALACION DE TUBERIA PESADA DE 3"
CAJA DE REGISTRO (02 UND) DE 1.00 x 1.00 m.
EXCAVACION MANUAL DE ZANJAS
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
REFINE, NIVELACION Y COMPACTACION
SOLADO e=2"
CONCRETO f'c=210 kg/cm2
ACERO DE REFUERZO fy=4,200 kg/cm2
ENCOFRADO Y DESENCOFRADO
TARRAJEO CON IMPERMEABILIZANTES
SUMINISTRO E INSTALACION DE IMPLEMENTOS Y EQUIPOS EMPOTRADOS
BORDILLO INTERNO DE ALUMINIO DE LA PISTA ATLETICA
CAJETINES DE PERDIGA, ACERO CONFORME A NORMA IAAF, CO NTAPA
TABLA DE BATIDA PARA SALTO LARGO Y TRIPLE, CONFORME A NORMA IAAF
OBSTACULO DE RIA MOVIBLE/STEPLECHASE CON CALZOS
TAPA CIEGA (BLIND BOARD)
CIRCULO DE LANZAMIENTO CON CONTENEDOR, REFUERZOS RADIALES, ALUMINIO,
CIRCULO DE LANZAMIENTO DEL DISCO, PVC, CONFORME A NORMA IAAF
REDUCTOR DEL DISCO A MARTILLO, PVC, CONFORME A NORMA IAAF Y ACCESORIOS
JAULA PARA LANZAMIENTO DE DISCO Y MARTILLO
CERTIFICACION IAAF
IMPLEMENTACION CON MOBILIARIO Y EQUIPO ADMINISTRATIVO Y DEPORTIVO
EQUIPAMIENTO CON IMPLEMENTOS DEPORTIVOS
EQUIPAMIENTO DEPORTIVO
EQUIPAMIENTO ADMINISTRATIVO
EQUIPAMIENTO ADMINISTRATIVO
PROTECCION AMBIENTAL
PROGRAMA DE EDUCACION AMBIENTAL
SUB PROGRAMA DE EDUCACION Y CAPACITACION AMBIENTAL
SUB PROGRAMA DE RELACIONES COMUNITARIAS
PROGRAMA DE MONITOREO DE CALIDAD AMBIENTAL
MONITEREO DE CALIDAD DEL AGUA
MUESTREO DE COLIFORMES TOTALES Y FECALES
MUESTRO DE DE METALES TOTALES
DEMANDA BIOQUIMICA DE OXIGENO (DBO5)
REMISION DE MUESTRAS A LABORATORIO CERTIFICADO
MONITEREO DE CALIDAD DEL AIRE
MUESTREO DE CALIDAD DE AIRE PM 10
MONITOREO DE CALIDAD DE SUELO
ANALISIS DE SALINIDAD DE SUELO AGRICOLA
MONITOREO ARQUEOLOGICO
MONITOREO ARQUEOLOGICO
PLAN DE MONITOREO ARQUEOLOGICO
PREVISIONES AMBIENTALES
COORDINACION ADMINISTRACION LOCAL DEL AGUA
COORDINACION AUTORIDAD REGIONAL DE CULTURA
PROGRAMA DE SEÑALIZACION AMBIENTAL
SUB PROGRAMA DE SEÑALIZACION AMBIENTAL
SEÑALES TEMPORALES
PROGRAMA DE RECUPERACION DE AREAS AUXILIARES
RECUPERACION DE AREAS AUXILIARES
SEMBRADO DE GRASS
SEMBRADO DE ARBOLES
SEMBRADO DE ARBUSTOS

SUB PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS


MICROCELDA DE SEGURIDAD
MICROCELDA DE RELLENO SANITARIO
CONTENEDORES DE RESIDUOS (BARRILES DE 55 GLNS)
PROGRAMA DE CONTINGENCIAS
KITT DE EMERGENCIAS
INFRAESTRUCTURA DE PROTECCION
ESTRUCTURAS METALICAS Y COBERTURAS
ARMADURA METALICA 01 L=21 m H=VARIABLE, INCLUYE ANCLAJE
ARMADURA METALICA 02 H=0.45 M, INCLUYE ANCLAJE
ARMADURA METALICA 03 H=0.45 M, INCLUYE ANCLAJE
ARRIOSTRES DE FIERRO LISO Ø 1/2"
COBERTURAS Y CERRAMIENTOS
COBERTURA DE POLICARBONATO SPRING E=16 MM
LPS - 65 M - INC. 01 VARIADOR C/ELECTROBOMBA - INC. TABLERO
IACION DE LAS
IACION DE LAS

También podría gustarte