STRICTLY CONFIDENTIAL
OF SYNCHRONIZATION RFP184/2009
Table of Contents
STRICTLY CONFIDENTIAL
1. Introduction………………………………………… 3
2. Objective …………………………………………... 3
4. List of Bidders…………………………………….... 3
7. Technical Evaluation……………………………….. 4
Page 2 of 7
Final Evaluation Report
1 Introduction
2 Objective
The main objective is to align the time & frequency scales of all clocks in Mobily
SDH network. It’s important ever since telecommunication became enter in digital
phase. Clock is used to transmit data over the channel and if the exact same clock
is not used at receiver end, errors are born. Synchronization becomes increasingly
important when coming to NGN network using packet switched technology; Jitter
& Wander are the two main culprits that need to be controlled. Synchronization in
modern networks determines the QoS.
4 List of Bidders.
Page 3 of 7
Final Evaluation Report
Non of them.
7 Technical Evaluation
A final technical evaluation is conducted for the offered solutions by all bidders. The
following is the technical scope of the each bidder:
STESA
Scope of work
Training:
ROKN-AL-BRAAH
Scope of work
Page 4 of 7
Final Evaluation Report
Training:
STRICTLY CONFIDENTIAL
Pos QTY Description UP SR TP SR
8.1 5 Local & Abroad Training 115,023.15 575,115.75
9 Financial Evaluation
The commercial evaluation is based on a reference price for each project deliverable
as attached Annex-II.
Page 5 of 7
Final Evaluation Report
10 Contractual Evaluation
The subjected RFP was released with SICET 2A conditions provided that
SICET 2A shall applicable for ‘Supply, Installation and testing commissioning Services’
Annex-III is being attached for detail reference:
11 Overall Ranking
From the Technical, Financial and contractual evaluation, the over all ranking
has been concluded as follow:
Based on the result of the Technical, Financial and Contractual evaluation, the
committee recommend following Bidder to start this project.
X company will complete SDU project.
Nothing
13 Annexure
Page 6 of 7
Final Evaluation Report
Page 7 of 7