FOLIO N° 254

MONTO AVANCE ANTERIOR


ITEM DESCRIPCION PARTIDA
PPTDO MONTO

1 CERCO PERIMETRICO 260,968.48 69,912.34

COSTO DIRECTO 260,968.48 69,912.34


GASTOS GENERALES 15,858.94 3,000.00
GASTOS DE SUPERVISION 9,259.00 0.00
GASTOS DE LIQUIDACION 4,500.00 0.00
GASTOS DE EXPEDIENTE TECNICO 6,000.00 4,000.00
PRESUPUESTO TOTAL 296,586.42 76,912.34

PORCENTAJE DE AVANCE VALORIZADO TOTAL SEGÚN EXP. 100.00%

PORCENTAJE DE AVANCE VALORIZADO TOTAL SEGÚN ASIG. 100.00%

VALORIZACION TOTAL SEGÚN EXPEDIENTE TECNICO S/. 81,534.11

PORCENTAJE DE LA VALORIZACION TOTAL S/. = 27.49%


AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
% MONTO % MONTO % MONTO %

26.79% 4,621.77 1.77% 74,534.11 28.56% 186,434.37 71.44%

69,912.34 4,621.77 74,534.11 186,434.37


0.00 3,000.00 12,858.94
0.00 0.00 9,259.00
0.00 0.00 4,500.00
0.00 4,000.00 2,000.00
4,621.77 81,534.11 215,052.31

25.93% 1.56% 27.49% 72.51%

153.82% 9.24% 163.07% -63.07%