Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Proyecto de Alcantarillados
Proyecto de Alcantarillados
Densidad 28771.772
RUTA 1
RUTA 2
Qin
2
l/Ha.s
QCE
5.1432 ha 0.3
l/Ha.s
RUGOSIDAD
0.013
PVC
QD
QD PENDIENTE (S) Øo Øo
(Area*Qar+Qin+QCE) m3/s MIN 0,02 m In
L/Ha.s
Øo
Øo Qo RELACIÓN
COMERCIAL v/v0 d/Do R/Ro H/D
m m3/s Q/Qo
In
1.40325 3.3399
1.40325 3.4078
1.40325 3.1787
1.40325 2.7147
1.40325 4.8478
1.40325 4.8604
1.40325 4.7060
1.40325 4.6416
1.40325 4.6250
1.40325 3.4401
1.40325 3.3729
1.40325 3.2041
1.40325 3.1518
1.40325 2.8071
1.40325 2.7306
1.40325 3.2396
V/Vo d/Do R/Ro H/D T/to
0.000 0.000 0.000 0.000 0.000 0.000
0.1 0.292 0.092 0.239 0.041 0.195
0.2 0.362 0.124 0.315 0.67 0.273
0.3 0.4 0.148 0.37 0.086 0.328
0.4 0.427 0.165 0.41 0.102 0.375
0.5 0.453 0.182 0.449 0.115 0.415
0.6 0.473 0.196 0.481 0.128 0.452
0.7 0.492 0.21 0.51 0.14 0.485
0.8 0.505 0.22 0.53 0.151 0.515
0.9 0.52 0.232 0.554 0.161 0.542
1 0.54 0.248 0.586 0.17 0.568
1.1 0.553 0.258 0.606 0.179 0.592
1.2 0.57 0.27 0.63 0.188 0.615
1.3 0.58 0.28 0.65 0.197 0.637
1.4 0.59 0.289 0.668 0.205 0.658
1.5 0.6 0.298 0.686 0.213 0.678
1.6 0.613 0.308 0.704 0.221 0.697
1.7 0.624 0.315 0.716 0.229 0.715
1.8 0.634 0.323 0.729 0.236 0.732
1.9 0.645 0.334 0.748 0.244 0.748
2 0.656 0.346 0.768 0.251 0.764
2.1 0.664 0.353 0.78 0.258 0.779
2.2 0.672 0.362 0.795 0.266 0.794
2.3 0.68 0.37 0.809 0.273 0.809
2.4 0.687 0.379 0.824 0.28 0.822
2.5 0.695 0.386 0.836 0.287 0.836
2.6 0.7 0.393 0.848 0.294 0.849
2.7 0.706 0.4 0.86 0.3 0.862
2.8 0.713 0.409 0.874 0.307 0.874
2.9 0.72 0.417 0.886 0.314 0.885
3 0.729 0.424 0.896 0.321 0.897
3.1 0.732 0.431 0.907 0.328 0.908
3.2 0.74 0.439 0.919 0.334 0.918
3.3 0.75 0.447 0.931 0.341 0.929
3.4 0.755 0.452 0.938 0.348 0.939
3.5 0.76 0.46 0.95 0.354 0.949
3.6 0.768 0.468 0.962 0.361 0.959
3.7 0.776 0.476 0.974 0.368 0.968
3.8 0.781 0.482 0.983 0.374 0.978
3.9 0.787 0.488 0.992 0.381 0.987
4 0.796 0.498 1.007 0.338 0.996
4.1 0.802 0.504 1.014 0.395 1.004
4.2 0.806 0.51 1.021 0.402 1.013
4.3 0.81 0.516 1.028 0.408 1.021
4.4 0.816 0.523 1.035 0.415 1.029
4.5 0.822 0.53 1.043 0.422 1.037
4.6 0.83 0.536 1.05 0.429 1.045
4.7 0.834 0.542 1.056 0.436 1.052
4.8 0.84 0.55 1.065 0.443 1.059
4.9 0.845 0.557 1.073 0.45 1.067
5 0.85 0.563 1.079 0.458 1.074
5.1 0.855 0.57 1.087 0.465 1.08
5.2 0.86 0.576 1.094 0.472 1.087
5.3 0.865 0.582 1.1 0.479 1.083
5.4 0.87 0.588 1.107 0.487 1.1
5.5 0.875 0.594 1.113 0.494 1.106
5.6 0.88 0.601 1.121 0.502 1.112
5.7 0.885 0.608 1.125 0.51 1.116
5.8 0.89 0.615 1.129 0.518 1.124
5.9 0.895 0.62 1.132 0.526 1.129
6 0.9 0.626 0.136 0.534 1.135
6.1 0.903 0.632 1.139 0.542 1.14
6.2 0.908 0.639 1.143 0.55 1.145
6.3 0.913 0.645 1.147 0.559 1.15
6.4 0.918 0.651 1.151 0.568 1.155
6.5 0.922 0.658 1.155 0.576 1.159
6.6 0.927 0.666 1.16 0.585 1.164
6.7 0.931 0.672 1.163 0.595 1.168
6.8 0.936 0.678 1.167 0.604 1.173
6.9 0.941 0.686 1.172 0.614 1.177
7 0.945 0.692 1.175 0.623 1.181
7.1 0.951 0.699 1.179 0.633 1.184
7.2 0.955 0.705 1.182 0.644 1.188
7.3 0.958 0.71 1.184 0.654 1.191
7.4 0.961 0.719 1.188 0.665 1.194
7.5 0.965 0.724 1.19 0.677 1.197
7.6 0.969 0.732 1.193 0.688 1.2
7.7 0.972 0.738 1.195 0.7 1.202
7.8 0.975 0.743 1.197 0.713 1.205
7.9 0.98 0.75 1.2 0.725 1.207
8 0.984 0.756 1.202 0.739 1.209
8.1 0.987 0.763 1.205 0.753 1.211
8.2 0.99 0.77 1.208 0.767 1.213
8.3 0.993 0.778 1.211 0.783 1.214
8.4 0.997 0.785 1.214 0.798 1.215
8.5 1.001 0.791 1.216 0.815 1.216
8.6 1.005 0.798 1.219 0.833 1.217
8.7 1.007 0.804 1.219 0.852 1.217
8.8 1.011 0.813 1.215 0.871 1.217
8.9 1.015 0.82 1.214 0.992 1.217
9 1.018 0.826 1.212 0.915 1.217
9.1 1.021 0.835 1.210 0.94 1.216
9.2 1.024 0.843 1.207 0.966 1.215
9.3 1.027 0.852 1.204 0.995 1.214
9.4 1.03 0.86 1.202 1.027 1.213
9.5 1.033 0.868 1.2 1.063 1.211
9.6 1.036 0.876 1.197 1.103 1.209
9.7 1.038 0.884 1.195 1.149 1.206
9.8 1.039 0.892 1.192 1.202 1.202
9.9 1.04 0.9 1.19 1.265 1.198
10 1.041 0.914 1.172 1.344 1.193
10.1 1.042 0.92 1.164 1.445 1.187
10.2 1.042 0.31 1.15 1.584 1.179
10.3 1.168
CANTIDADES DE OBRA
POZOS TUBERÍA
FONDO DE
EXCAVACIÓN
ID EXCAVACIÓN TRAMOS
m m3
SUBTOTAL
ADMINISTRACIÓN 12%
IMPREVISTOS 2%
UTILIDAD 4%
IVA (19%)/UTILIDAD 19%
TOTAL
CANIDAD VR.TOTAL
854.35 1,589,091
81.79 1,750,263
358.83 7,678,898
119.61 3,413,641
17.94 868,361
119.61 11,963,890
89.71 6,787,572
854.35 44,814,929
12 59,880,000
138,746,645
16,649,597.41
2,774,932.90
5,549,865.80
1,054,474.50
164,775,516