OBRA: INSTALACIONES ELECTRICAS EN OFICINAS DE MASTERCARD, UBICADA EN EL CENTRO FINANCIERO MA

Propietario:
PRESUPUESTO
Nº Part. Nº Alterno Cod. Part. Cod. COVENIN
1 1 SALAMPAR E-S/C
2 2 SALTOMA E-S/C
3 3 SALTOMA1 E-S/C
4 4 SALTOMA0 E-S/C
5 5 SALTOMA2 E-S/C
6 6 SALTOMA3 E-S/C
7 7 SAINTER E-S/C
8 8 IETUBERI E-S/C
9 9 CABEL E-S/C
10 10 CABEL001 E-S/C

11 11 CABEL002 E-S/C

12 12 TABLERO E-S/C

13 13 TABLERO1 E-S/C

14 14 TABLERO2 E-S/C

15 15 TABLERO3 E-S/C
16 16 TABLERO4 E-S/C

17 17 TABLERO5 E-S/C

18 18 TABLERO6 E-S/C

19 19 ALITAB E-S/C

20 20 ALITAB01 E-S/C

21 21 ALITAB02 E-S/C

22 22 ALITAB03 E-S/C

23 23 ALITAB04 E-S/C

24 24 CABEL003 E-S/C

25 25 ALITAB05 E-S/C

26 26 ALITAB06 E-S/C

27 27 ESCALE E-S/C

28 28 CABEL004 E-S/C

29 29 CABEL005 E-S/C
30 30 ALITAB07 E-S/C

31 31 TUBPRE E-S/C

32 32 BLOQCONS M.414.S/C

33 33 BLOQCON1 M.414.S/C
UBICADA EN EL CENTRO FINANCIERO MADRID EN LAS MERCEDES, PISO N°9, MUNICIPIO BARUTA, ESTADO MIRANDA

UPUESTO
Descripción de partida Unidad Cantidad
SALIDA PARA LAMPARA SUPERFICIAL EN TECHO. UND 301.00
SALIDA PARA T/C DOBLE EN PARED UND 88.00
SALIDA PARA T/C DOBLE EN MOBILIARIO UND 264.00
SALIDA PARA T/C DOBLE EN PISO UND 84.00
SALIDA EN PISO FLOTANTE UND 33.00
SALIDA PARA SENSOR EN BAÑOS UND 39.00
SALIDA PARA INTERRUPTOR SENCILLO UND 50.00
TUBERIA EMT Ø3/4 (PIEZA 3M) UND 550.00
CABLE COBRE TRENZADO THW CALIBRE #12 AWG ML 9,430.00
CABLE COBRE TRENZADO THW CALIBRE #10 AWG ML 2,930.00
UMA 20TON, 3F,208V
ALIMENTADOR:45 MTS DE 3THW10+1#10(t) EN Ø1" A T-
UND 4.00
AA-208. INCLUYE CAJA PARA BREAKER Y BREAKER
3X40A

TABLERO T-P-480
NHB, 3F, 5H, 480/277 V; 24 CIR, INT. PPAL 3X200A, CON
MEDIDOR INTEGRADO Y LAS SIGUIENTES
PROTECCIONES
2T/M DE 3X20 A.
UND 1.00
1T/M DE 3X30 A.
1T/M DE 3X40 A.
2T/M DE 3X50 A.
6 ESPACIOS DE RESERVA

TABLERO T-REG-208
NLAB, 3F, 5H, 208/120 V; 42 CIR, CON MEDIDOR
INTEGRADO Y LAS SIGUIENTES PROTECCIONES
UND 1.00
32T/M DE 1X20 A.
10 ESPACIOS DE RESERVA

TABLERO T-AA-208
NLAB, 3F, 5H, 208/120 V; 18 CIR, CON MEDIDOR
INTEGRADO Y LAS SIGUIENTES PROTECCIONES
UND 1.00
4T/M DE 3X40 A.
6 ESPACIOS DE RESERVA

TABLERO T-DC-208
NLAB, 3F, 5H, 208/120 V; 18 CIR, CON MEDIDOR
INTEGRADO Y LAS SIGUIENTES PROTECCIONES
UND 1.00
3T/M DE 3X40 A.
9 ESPACIOS DE RESERVA
TABLERO T-IL-208
NLAB, 3F, 5H, 208/120 V; 24 CIR, CON MEDIDOR
INTEGRADO Y LAS SIGUIENTES PROTECCIONES
UND 1.00
12T/M DE 1X20 A.
12 ESPACIOS DE RESERVA

TABLERO POWERLINK T-NOR-208-1


POWERLINK, 3F, 5H, 208/120 V; 30 CIR, CON MEDIDOR
INTEGRADO Y LAS SIGUIENTES PROTECCIONES
UND 1.00
20T/M DE 1X20 A. MOTORIZADOS
10 ESPACIOS DE RESERVA

TABLERO POWERLINK T-NOR-208-2


POWERLINK, 3F, 5H, 208/120 V; 42 CIR, CON MEDIDOR
INTEGRADO Y LAS SIGUIENTES PROTECCIONES
UND 1.00
36T/M DE 1X20 A. MOTORIZADOS
6 ESPACIOS DE RESERVA

TABLERO T-P-480
ALIMENTADOR 50 MTS DE 3THW3/0+1THW3/0(n)+1#6(t) UND 1.00
EN Ø3"
TABLERO T-REG-208
ALIMENTADOR 4 MTS DE 3THW4+1THW4+1#8(t) EN Ø 1- UND 1.00
1/2" A TRX-REG
TABLERO T-AA-208
ALIMENTADOR 4 MTS DE 3THW2+1THW2+1#8(t) EN Ø 1- UND 1.00
1/2" A TRX-AA
TABLERO T-DC1-208
ALIMENTADOR 4 MTS DE 3THW4+1THW4+1#8(t) EN Ø 1- UND 1.00
1/2" A TRX-DC1
TABLERO T-DC2-208
ALIMENTADOR 4 MTS DE 3THW4+1THW4+1#8(t) EN Ø 1- UND 1.00
1/2" A TRX-DC2
TABLERO T-IL-208
ALIMENTADOR 4MTS 3THW8+1THW8+1#10(t) EN Ø 1" A UND 1.00
TRX-IL
TABLERO POWERLINK T-NOR-208-1
ALIMENTADOR 4 MTS DE 3THW6+1THW6+1#10(t) EN Ø 1- UND 1.00
1/2" A TRX-NOR-1
TABLERO POWERLINK T-NOR-208-2
ALIMENTADOR 8 MTS DE 3THW1/0+1THW1/0+1#8(t) EN Ø UND 1.00
2" A TRX-NOR-2
ESCALERILLA 200mm (PIEZA DE 2,4M) UND 105.00

TRANSFORMADOR SECO 15KVA, 3F, 480/208-120V, DYN5


(TRX-NOR-1 Y TRX-IL) UND 2.00
ALIMENTADOR 9MTS 3THW10+1#10(t) EN Ø 1" A T-P-480

TRANSFORMADOR SECO 30KVA, 3F, 480/208-120V, DYN5


(TRX-AA, TRX-REG, TRX-DC1 Y 2) UND 4.00
ALIMENTADOR 20MTS 3THW8+1#8(t) EN Ø 1" A T-P-480
TRANSFORMADOR SECO 37,5 KVA, 3F, 480/208-
120V,DYN5 (TRX-NOR-2)
UND 1.00
ALIMENTADOR 5 MTS DE 3THW6+1#8(t) EN Ø 1-1/2" A T-
P- 480
PREVISION CANALIZACION DATA CENTER
UND 15.00
TUBERIA Ø1" (PZA 3M)
CONSTRUCCION DE REVESTIMIENTO DE BALDOSAS DE
PORCELANATO EN PISOS, INCLUYE MORTERO BASE Y
M2 305.00
ACARREO. NO INCLUYE EL SUMINISTRO DEL
PORCELANATO
CONSTRUCCION DE REVESTIMIENTO DE BALDOSAS DE
PORCELANATO EN PAREDES, INCLUYE MORTERO BASE
M2 240.00
Y ACARREO. NO INCLUYE EL SUMINISTRO DEL
PORCELANATO

TOTAL DEL PRESUPUESTO

OBRAS EXTRAS ACLARAR


DESMANTELAMIENTO DE TUBERIAS DE 2
DESMANTELAMINETO DE CAJAS DE PASO
DESMANTELAMIENTO DE TUBERIA 3/4
DESMANTELAMIENTO DE CAJETINES.
REUBICACION DE BANDEJAS DE 40 CM
REUBICACION DE TUBERIA DE 1 1/2
DESMANTELAMIENTO DE TUBERIA DE 3/4
DESMANTELAMIENTO DE CABLEADO # 12
BAJANTES DE FLEXIBLE 1/2 TAPA REDONDA
4 BREAKER DE 2X50 AMPERIOS
1 BREAKER Y CAJA PARA EXTRACTORES
ACOMETIDAS PARA EXTRACTORES
reflectores
colocacion de electricidad provional.
ranurado
desmantelamiento de bandejas
breaker principal.
Fecha 07/09/2020

VAL 01
Precio Unitario Total
43.93 13,222.93 249.00 10938.57
46.80 4,118.40 83.00 3884.4
49.10 12,962.40
46.80 3,931.20
48.07 1,586.31
48.07 1,874.73
46.80 2,340.00
19.30 10,615.00 320.2066667 6179.988667
1.58 14,899.40 4000 6320
2.28 6,680.40

1,067.94 4,271.76

13,505.08 13,505.08

13,881.34 13,881.34

10,039.13 10,039.13

8,828.94 8,828.94
8,089.08 8,089.08

20,525.61 20,525.61

47,308.93 47,308.93

13,592.97 13,592.97

296.67 296.67

374.31 374.31

296.67 296.67

296.67 296.67

191.71 191.71

235.02 235.02

1,071.72 1,071.72

410.90 43,144.50 104.35 42877.415

268.85 537.70
METER EL DE MULTIMEDIA AQUÍ O GENERAR UNA OBRA EX
ALIMENTADOR DE 14 M

508.18 2,032.72
TIRAR EL DE AIRE NUEVO AA2
250.78 250.78

32.22 483.30
42.11666667 1356.999

53.23 16,235.15

55.14 13,233.60

290,954.13 71557.37267

261,485.38
VAL 01

HAY 39 CAJETINES 4X4 249 10938.57


83 3884.4

HAY 26 CAJETINES 4X4 320 6176


6112 9656.96

1 13505.08

1 13881.34

1 10039.13

1 8828.94
1 8089.08

1 20525.61

1 47308.93

1 13592.97

105 43144.5

A AQUÍ O GENERAR UNA OBRA EXTRA CON UN


ALIMENTADOR DE 14 M

R EL DE AIRE NUEVO AA2


15 483.3

210054.81