Está en la página 1de 14

Format of Data Collection for Assessment of Existing Urban Infrastructure in Project Towns in

Tripura State

A. General

1. Name of town: Ranirbazar

2. Location: Ranirbazar

3. Connectivity (Road/Railway/Airport): Railway Station, Jirania= 7 Km, Airport= 22 Km

4. Distance from State Capital Agartala: 10 Km

5. Distance from District HQ: 10 Km

6. Average annual rainfall: 2146 Mm

7. Temperature: Summer- 30° C, Winter- 20° C

8. General Topography (Highest and lowest 12.70 Mtr from sea level on average
elevation in meter):

9. Population as per 2011 census: 13117

10. Total Area of Town: 3.595 Sq Km

11. Land use details of the Town: Commercial= 5 to 6 %


Residential= 40%
Agriculture= 40%
Other= 15%
12. Present (2020) population: 16295 Nos

13. Present numbers of households: 4564

14. Details of tourist locations nearby: Chaturdas Devata Mandir ( Temple of 14 Gods)

15. Occupation of citizen Job, Small Business

16 Average annual income of household 1,30,000.00

17. Details of commercial establishments 1.Ranirbazar Shopping Complex


2.Nalgaria Market
3.Daily Market
18. Details of educational institutes 1.Ranirbazar Vidyamandir
2.Ranigonj Girls H.S School
3.Sukanta Colony S.B School
4.Durganagar J.B School
5. Sukanta Academy English Medium School

Inception Report
Page 1
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
19. Details of Social organizations Setu Bandhan & Drishtipath NGO

B. Water Supply

1. Coverage of water supply connections (%): Family= 3900 as per Register


Connection= 1120=29%
2. Gross quantity of piped water supplied in the 46 Km
town:

3. Per capita supply of water (LPCD): 100 Ltr / Per day

4. Extent of metering of water connections (%): No

5. Extent of non-revenue water (%): No

6. Quality of water supplied (%): 90%

7. Cost recovery in water supply services (%): 60%

8. Efficiency in collection of water supply related 80%


charges (%):

9. Details of existing sources of water: Treatment Plan

10. Details of raw water pumping stations: Ranirbazar, Assampara

11. Treatment provided to raw water: Assampara

12. Quantity of water is treated daily: 4 Lac Gallon

13. Details of water treatment plant: 1 Lac gallon treatment plan

14. Details of treated water pumping stations: Assampara

15. Numbers of distribution zones for piped water Nil


supply:

16. Total no of households (HH) and present 4564 Nos, 16295 Nos
population in each zone:

17. Zone wise numbers of households with piped Does not arise
water connections:

Inception Report
Page 2
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
18 Total storage capacity: Reservoir= 1 Lac gallon
Over head tank= 1 Lac gallon
Total= 2 Lac gallon
19 Details and storage capacity of ELSR: 4 Lac gallon

20 Details of Ground level Reservoirs: 1 Lac gallon

21 Whether water being supplied to consumers Theory elevated reservoirs


through direct pumping or through elevated
reservoirs:

22 Total length of water supply distribution pipelines 46 Km


laid in the city:

23 Total road length in the city: 46.85 Km

24 Whether pipelines are laid in all streets: Yes

25 Kind of pipe materials used in distribution lines: PVC, DI, CI

26 Zone wise details of street length with and without Total Covered= 46 Km
water distribution lines:
Uncovered= 8 Km

27 Names of Institutions responsible for planning and DWS, Govt. of Tripura


design, construction and O & M:

28 Details and status of ongoing and sanctioned Nil


projects:

C Sewerage and Sanitation:

1 Coverage of latrines (individual or community): 100% Coverage

2 Percentage of town area is covered by sewer Nil


network:

3 Efficiency of collection of sewage: Nil

4 Adequacy of sewerage treatment capacity: Nil

5 Existing length of sewer network (km): Nil

Inception Report
Page 3
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
6 Numbers of households covered under sewerage Nil
system:

7 Details of sewage pumping stations: Nil

8 Details of Sewerage Treatment Plant (MLD): Nil

9 Whether the town has separate drainage system No


or sewer lines to take care of storm water:

10 Total numbers of households with sewer network: Nil

11 Total numbers of households with septic tanks:

12 Total numbers of households without any outlets Nil


for toilets:

13 Is there any systematic and organized method to No


collect and treat waste from septic tanks:

14 How wastes collected from septic tanks are Collected by cesspool hired from AMC and
treated and disposed: disposed by AMC

15 What is the duration of cleaning of septic tanks Annually


(monthly, quarterly, semiannually or annually):

16 Status of overflows from septic tanks to nearby Nearby drains and sock pit
drains /open fields/ sewerage lines etc:

17 Institution responsible for planning and design, Nil


construction and O & M of sanitation system:

18 Details and status of ongoing and sanctioned Door to Door garbage collections, source
projects: segregation.

Sanctioned Project- Tertiary Centre Under


SWM

19 Status of recycling and reuse of treated sewage: Nil

20 How much quantity of treated water may be 15%


reused in future:

D Stormwater Drainage:

1 Total length of drains in the town: 23.5 Km

Inception Report
Page 4
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
2 Length of existing natural and manmade drains: Manmade- 13.5 Km

Natural- 10 Km

3 At present, how storm water of the town is drained Through Drains Naturally
off:

4 Types of drains: Open drains (Pucca)


Open drains (Kutcha)
5 Maximum and minimum sizes of drains: Maximum- 2 mtr
Minimum- 3 mtr
6 Total lengths outfall drains: 23.5 Km

7 Details of disposal points of drains: Howrah River, Ghoramara Chera, Mara Khal

8 Area coverage of storm water drainage network in 60%


the town:

9 Details of existing storm water drainage zones: Pucca- 10 Km,


Cover- 3.5 Km
Katcha- 16 Km
10 Incidence and locations of sewage mixing in the Nil
drains:

11 Whether there is incidence of water logging in the Nil


town:

12 Coverage of existing drains with respect to road 60%


network:

13 Condition of existing drains: Pucca- 10 Km,


Cover- 3.5 Km
Katcha- 16 Km
14 Whether capacity of existing drains is sufficient to No
carry peak flows of the drainage zones:

15 Locations of gray water mixing with existing From house hold


drains:

16 How the problem of water logging is handled and Manually


what is the outcome:

17 Details of flood points and areas (road Water logging happens due to havoc rain
intersections, roads and localities) prone to
frequent water logging:

Inception Report
Page 5
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
18 Whether existing drains are prone to chocking No
due to dumping of solid wastes in them:

19 Details of locations prone to chocking of drains No


due to solid waste:

20 How presently the problem of choking of drains is NA


addressed:

21 Institutions responsible planning and design, Water Resources Deptt. Govt of Tripura
construction and O &M:

22 Status of ongoing and sanctioned projects:

E Park and Open Space:

1. Per Person available Open Space (Sqm. per 15 Sq mtr


person) in the town:

2. Details of physical condition of existing parks in


the Town:

Details of
Amenities
such as
Sl. Name of Boundary benches, Water
Toilet Dust bins
No Park Wall children Supply
playing
equipment
etc.

Children
park near
1 Ranirbaza Yes Yes Yes Yes Yes
r M.C
Office

Inception Report
Page 6
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
F Urban Roads and Transport Infrastructure:

1 Total length of major roads: NH- 03 km

2 Total length of other roads: 43.85 Km

3 Details of right of way of roads: PED norms

4 Details of width of carriage way: 13 Feet

5 Details of road Pavement (Type and condition): Black Top

6 Numbers and details of road Intersections: 7 Nos

7 Details of bus stop bus shelter: 3 Nos

8 Details of traffic signals: 01 Nos

9 Details of pollution levels at major road junctions: Nil

10 Availability of public transport: Yes

11 Service coverage of public transport in the town: Yes

12 Average waiting time for public transport users: 15 Min

13 Level of comfort of public transport (Crowding): Normal

14 Percentage of fleet as per urban bus specification: 60%

15 Percentage of city road length covered with Nil


footpath wider than 1.2m along major roads or
public transport corridors:

16 Percentage of dedicated cycle track length along Nil


public transport corridors:

17 Total numbers of signalized intersections: 2 Nos

Inception Report
Page 7
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
18 Details of usage of intelligent transport systems: Nil

19 Total length of roads with street lights: 36.5 Km

20 Details of availability of parking space: 01 Acre

21 Road accident fatality rate per lakh population 06 Nos


within past 2 years:

G. Solid Waste Management:

1 Ward wise area and present population: Total= 2.95 Sq Km

Population= 16295 Nos

2 Zone wise collection of solid waste (Daily): 4.2 mtr

3 Whether solid waste is segregated at household No


level:

4 Characteristics of household waste collected: Bio degradable & Non Bio degradable

5 Zone wise collection of solid waste from drains 0.9 mtr


(daily):

6 Zone wise collection of wastes from road 0.5 mtr


sweepings (daily):

Inception Report
Page 8
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
7 Zone wise numbers and locations of SW 55 points & bins
collection points along with number of bins at
each location:

8 Zone wise numbers and details of primary 26 Nos. push curt


collection vehicles (for collection of solid wastes
from Households to collection points:

9 Zone wise numbers and details of secondary Solid waste collected from all wards & market
transportation vehicles (For transportation of solid area through compactor, dumper, tipper,
wastes from collections points to transfer stations transported to DC Nagar dumping station under
and disposal sites): AMC.

10 Details of transportations vehicle for --Do--


transportation of solid wastes from existing
transfer station to disposal sites:

11 Details of solid waste treatment process: No

12 Details of solid waste disposal locations: Solid waste collected from all wards & market
area through compactor, dumper, tipper,
transported to DC Nagar dumping station under
AMC.

H. Public Amenities:

1 Details of municipal markets Daily market, Weekly market, nalgaria market,


Shopping Complex

2 Details of other markets: Hospital Chowmuhani, Dhan Chowmuhani,


Cattle market, Nalgaria Old market

3 Details of vending zones: No

Inception Report
Page 9
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
4 Details of community halls in the town: Gitanjali Hall, Assampara Community Hall

5 Details, locations and conditions of public toilets: Thana road, daily market, weekly market &
cattle market

6 Details of drinking Water Fountains: No

I Slum and Low-Income Areas:

1 Names and locations of slum areas: 1. Debinagar, Ward No- 02


2. Durganagar, Ward No- 03
3. Das Para & Saha Para (Nalgaria),
Ward No-04
4. West Assampara, Ward No- 06
5. Madhya Assampara, Ward No- 07
6. Krsihnatali (Nalgaria), Ward No-08
7. East Assampara (Nalgaria), Ward No-09
8. Sukanta Colony (Nalgaria), Ward No- 11
2 Areas and population in each of the slum areas: 1. Debinagar, Ward No- 02, Area- 29 acres,
Population- 593
2. Durganagar, Ward No- 03, Area- 54 acres,
Types of housing in slum areas: Population- 1080
3. Das Para & Saha Para (Nalgaria),
Ward No-04, Area- 38 acres, Population- 998
4. West Assampara, Ward No- 06, Area- 26
acres, Population- 680
5. Madhya Assampara, Ward No- 07, Area- 26
acres, Population- 585
6. Krsihnatali (Nalgaria), Ward No-08, Area- 20
acres, Population- 280
7. East Assampara (Nalgaria), Ward No-09,
Area- 22 acres, Population- 502
8. Sukanta Colony (Nalgaria), Ward No- 11,
Area- 30 acres, Population- 565

4 Status of water supply, sanitation, storm water Each slum area water supply, sanitation, storm
drains, roads and street lights in each of slum water, street light facility available here.
areas:

Inception Report
Page 10
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
10. History of Natural Calamities and Disaster in Every year during rainy season, cyclone & flood
Project Town: affects various part of the town

1 Details of natural calamities and disasters in past 1. Cyclone, 2. Flooed in around


20 years: Ghoramarachera, 3. Road accident

2 Details of damages and impacts of natural The damage to road & houses by flood &
calamities and disasters: cyclone

J Urban Governance Reforms and Institutional


Strengthening:

1 Citizen Services

2 Online property tax collection (Yes/No) No

3 Online water bill collection (Yes/No) No

4 Online sewerage charges (Yes/No) No

5 Online Birth & Dearth Registration (Yes/No) Yes

6 Citizen charter available (Yes/No) No

7 Online building plan approvals (Yes/No) Yes

8 Online issue of licenses (Yes/No) Yes

9 Garbage Management data collection (Y/N) Yes

10 Online citizen feedback mechanism (Y/N) No

Inception Report
Page 11
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
11 Usage of social media platforms (Y/N) No

12 Whether town plan available (Yes/No) No

Citizen Amenities

1 List of key citizen amenities (hospitals/public Ranirbazar Primary Health Centre, Parks, Town
health clinics, parks, community halls/town halls Halls are available
and open places) available in the ULB/VP.

Institutional

1 Total number of staff in the ULB/VP : Regular= 16


DRW= 48

2 List of designation of officers, staff and others CEO= Deputed


working in the ULB/VP: Dy. CEO= Deputed

3 Details of elected council/body of the ULB/VP: 13 councilors in 13 wards among this


Chairperson/ Vice-Chairperson. At present
there is no Councilor/ elected member due to
expiry of tenure

a When elections conducted: December 2015 last election

b Total number of wards: 13 wards

c Details of elected representatives of ULB/VP: Not available, (Previous elected body has been
dissolved, fresh election yet to be held
(Please provide the List)

d Council/body meetings held regularly (Yes/No): Yes

e Is meeting of minutes/resolutions record available Yes


(Y/N):

f Is there any deviation of implementing No


council/body resolutions (Y/N):

4 Any training facility available (Yes/No): Yes

5 Any orientations conducted in ULB/VP No

Inception Report
Page 12
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
6 Special training conducted on Swachh Bharat Yes

7 Any training IT/Digital technologies to staff Yes

8 Details of staff positioning/vacancy details: Yes


Regular= 16
DRW= 48
(Please furnish/attach any document)

9 Details of performance management process of Appraisal & monitoring by supervisors staff &
the staff councilor

(Please furnish/attach any document)

Municipal Devolution

1 What are the roles and responsibilities and Development work like construction of Building,
transfer of functions to ULB/VP? Road, Drain, Building plan approval, ROR, TC,
Death & Birth certificate, Water supply
connection, Street light facilities, Cremation
(Please provide the list of functions currently van, Septic tank clearance, Door to Door
ULB/VP is performing) garbage collection, Drain clearance etc.

2 Status of the transfer of funds/allocation of funds? TUEP= 8210002.00

Flow/process of transfer of funds/financial SOT (Procurement of equipments)= 31052.00


resources from the state government and
centrally sponsored schemes?
SOT (Sports and cultural activities)= 47102.00

(Please provide details/attach any additional


SOT (Operation and Maintenance)= 47102.00
documents)

SOT (Maintenance of Asset)= 47102.00

SOT (others)= 539626.00

SOT (Salary)= 4320320.00

SOT (Honourium and Seating fees)= 24685.00

DAY-Nulm (Street Vendor)= 260000.00

Covid 19 (IEC)= 20000.00

15th FC= 3795000.00

Inception Report
Page 13
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
IHHL= 924000.00

Const. of CT= 490000.00

PMAY (O and AE)= 120000.00

Distribution of Pineapple and lemon=


312000.00

SBM (IEC)= 363437.00

15th FC (tide grant)= 3796100.00

3 Is ULB/VP receiving the funds/financial Not fully, Yes


resources/allocation of budget as per the
recommendation of the state finance
commission? (Yes/No)

4 What is the allocation pattern of the staff in All recruited by ULB except Dy. CEO & CEO
ULB/VP?

(Please furnish details of staff deputed by the


state government)

5 Organogram of the ULB/VP (Please attach) TUEP, DAY-NULM, Solid Waste

Inception Report
Page 14
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for

También podría gustarte