Format of Data Collection For Assessment of Existing Urban Infrastructure in Project Towns in Tripura State A. General
Format of Data Collection For Assessment of Existing Urban Infrastructure in Project Towns in Tripura State A. General
Tripura State
A. General
2. Location: Ranirbazar
8. General Topography (Highest and lowest 12.70 Mtr from sea level on average
elevation in meter):
14. Details of tourist locations nearby: Chaturdas Devata Mandir ( Temple of 14 Gods)
Inception Report
Page 1
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
19. Details of Social organizations Setu Bandhan & Drishtipath NGO
B. Water Supply
16. Total no of households (HH) and present 4564 Nos, 16295 Nos
population in each zone:
17. Zone wise numbers of households with piped Does not arise
water connections:
Inception Report
Page 2
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
18 Total storage capacity: Reservoir= 1 Lac gallon
Over head tank= 1 Lac gallon
Total= 2 Lac gallon
19 Details and storage capacity of ELSR: 4 Lac gallon
26 Zone wise details of street length with and without Total Covered= 46 Km
water distribution lines:
Uncovered= 8 Km
Inception Report
Page 3
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
6 Numbers of households covered under sewerage Nil
system:
14 How wastes collected from septic tanks are Collected by cesspool hired from AMC and
treated and disposed: disposed by AMC
16 Status of overflows from septic tanks to nearby Nearby drains and sock pit
drains /open fields/ sewerage lines etc:
18 Details and status of ongoing and sanctioned Door to Door garbage collections, source
projects: segregation.
D Stormwater Drainage:
Inception Report
Page 4
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
2 Length of existing natural and manmade drains: Manmade- 13.5 Km
Natural- 10 Km
3 At present, how storm water of the town is drained Through Drains Naturally
off:
7 Details of disposal points of drains: Howrah River, Ghoramara Chera, Mara Khal
17 Details of flood points and areas (road Water logging happens due to havoc rain
intersections, roads and localities) prone to
frequent water logging:
Inception Report
Page 5
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
18 Whether existing drains are prone to chocking No
due to dumping of solid wastes in them:
21 Institutions responsible planning and design, Water Resources Deptt. Govt of Tripura
construction and O &M:
Details of
Amenities
such as
Sl. Name of Boundary benches, Water
Toilet Dust bins
No Park Wall children Supply
playing
equipment
etc.
Children
park near
1 Ranirbaza Yes Yes Yes Yes Yes
r M.C
Office
Inception Report
Page 6
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
F Urban Roads and Transport Infrastructure:
Inception Report
Page 7
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
18 Details of usage of intelligent transport systems: Nil
4 Characteristics of household waste collected: Bio degradable & Non Bio degradable
Inception Report
Page 8
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
7 Zone wise numbers and locations of SW 55 points & bins
collection points along with number of bins at
each location:
9 Zone wise numbers and details of secondary Solid waste collected from all wards & market
transportation vehicles (For transportation of solid area through compactor, dumper, tipper,
wastes from collections points to transfer stations transported to DC Nagar dumping station under
and disposal sites): AMC.
12 Details of solid waste disposal locations: Solid waste collected from all wards & market
area through compactor, dumper, tipper,
transported to DC Nagar dumping station under
AMC.
H. Public Amenities:
Inception Report
Page 9
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
4 Details of community halls in the town: Gitanjali Hall, Assampara Community Hall
5 Details, locations and conditions of public toilets: Thana road, daily market, weekly market &
cattle market
4 Status of water supply, sanitation, storm water Each slum area water supply, sanitation, storm
drains, roads and street lights in each of slum water, street light facility available here.
areas:
Inception Report
Page 10
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
10. History of Natural Calamities and Disaster in Every year during rainy season, cyclone & flood
Project Town: affects various part of the town
2 Details of damages and impacts of natural The damage to road & houses by flood &
calamities and disasters: cyclone
1 Citizen Services
Inception Report
Page 11
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
11 Usage of social media platforms (Y/N) No
Citizen Amenities
1 List of key citizen amenities (hospitals/public Ranirbazar Primary Health Centre, Parks, Town
health clinics, parks, community halls/town halls Halls are available
and open places) available in the ULB/VP.
Institutional
c Details of elected representatives of ULB/VP: Not available, (Previous elected body has been
dissolved, fresh election yet to be held
(Please provide the List)
Inception Report
Page 12
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
6 Special training conducted on Swachh Bharat Yes
9 Details of performance management process of Appraisal & monitoring by supervisors staff &
the staff councilor
Municipal Devolution
1 What are the roles and responsibilities and Development work like construction of Building,
transfer of functions to ULB/VP? Road, Drain, Building plan approval, ROR, TC,
Death & Birth certificate, Water supply
connection, Street light facilities, Cremation
(Please provide the list of functions currently van, Septic tank clearance, Door to Door
ULB/VP is performing) garbage collection, Drain clearance etc.
Inception Report
Page 13
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for
IHHL= 924000.00
4 What is the allocation pattern of the staff in All recruited by ULB except Dy. CEO & CEO
ULB/VP?
Inception Report
Page 14
Project Readiness Financing for Improving Readiness of Integrated Urban Planning and Infrastructure Development for