09 OBRAS PROVISION ALES

09.01 C ARTEL DE O BRA 3.60 X 2.40 SEG UN M O DELO INC L. INSTALAC IO N EN O BRA G LB 0.00 0.00
09.02 G UARDIANÍA Y ALM AC ÉN me s 0.00 0.00
09.03 O FIC INA P ARA RESIDENC IA Y SUP ERVISIÓ N me s 0.00 0.00
0.00
10 CAPTACION
10.01 CAPTACION TIPO MAN AN TIAL (03 UN D)
10.01.01 TRABAJOS PRELIMIN ARES
10.01.01.01 LIM P IEZA DE TERRENO M ANUAL m2 0.00 0.00
10.01.01.02 TRAZO , NIVELAC IO N Y REP LANTEO P RELIM INAR m2 0.00 0.00
10.01.01.03 TRAZO , NIVELAC IO N Y REP LANTEO DURANTE EL P RO C ESO m2 0.00 0.00
0.00
10.01.02 MOVIMIEN TO DE TIERRAS
10.01.02.01 EXC AVAC IO N M ANUAL EN TERRENO SEM I RO C O SO m3 0.00 0.00
10.01.02.02 RELLENO Y C O M P AC TADO M ATERIAL P RO P IO m3 0.00 0.00
10.01.02.03 ELIM INAC IO N DE M ATERIAL EXC EDENTE + 25% ESP O NJ. DIST. P RO M . 30M m3 0.00 0.00
0.00
10.01.03 OBRAS DE CON CRETO SIMPLE
10.01.03.01 SO LADO E= 4", F'C = 100 KG / C M 2 m2 0.00 0.00
10.01.03.02 C O NC RETO F'c = 140 Kg / c m 2 P ARA SELLADO DE M ANANTIAL m3 0.00 0.00
10.01.03.03 EM BO Q UILLADO C O N P IEDRA Y C O NC RETO F'c = 100 kg / c m 2 E=4" m2 0.00 0.00
0.00
10.01.04 OBRAS DE CON CRETO ARMADO
10.01.04.01 ENC O FRADO Y DESENC O FRADO m2 0.00 0.00
10.01.04.02 C O NC RETO F'C =175 KG / C M 2 (S/ M ) M3 0.00 0.00
10.01.04.03 AC ERO F'Y= 4200 KG / C M 2 kg 0.00 0.00
0.00
10.01.05 REVOQUES Y EN LUCIDOS
10.01.05.01 TARRAJEO C / IM P ERM EABILIZANTE DE M URO S INTERIO RES M EZC LA 1:2, e =1.5 C M m2 0.00 0.00
10.01.05.02 TARRAJEO DE M URO S EXTERIO RES m2 0.00 0.00
0.00
10.01.06 PIN TURA
10.01.06.01 P INTURA LATEX EN M URO S EXTERIO RES C / ESM ALTE SINTETIC O m2 286.87 100.00
286.87
10.01.07 ACCESORIOS
10.01.07.01 AC C ESO RIO S C AJA DE C AP TAC IO N G LB. 920.07 100.00
10.01.07.02 TAP A M ETALIC A P ARA INSP EC C IO N 1.00 x 1.00 m . INC L. M ARC O Y AC C . DE SEG URO S und 413.46 100.00
10.01.07.03 TAP A M ETALIC A P ARA INSP EC C IO N 0,60 x 0,60 m . INC L. M ARC O Y AC C . DE SEG URO S und 361.26 100.00
1694.79
10.01.08 FILTRO
10.01.08.01 SUM INISTRO Y C O LO C . DE FILTRO DE G RAVA 1" M IN. M3 77.64 100.00
10.01.08.02 SUM INISTRO Y C O LO C . DE FILTRO DE G RAVA 1/ 2". M3 50.12 100.00
10.01.08.03 SUM INISTRO Y C O LO C . DE FILTRO DE ARENA M3 476.66 100.00
10.01.08.04 M ATERIAL IM P ERM EABLE (ARC ILLA O LEC HADA DE C EM ENTO ) m3 114.85 100.00
10.01.08.05 LIM P IEZA FINAL DE O BRA m2 6.82 100.00
726.09
10.02 CERCO PERIMETRICO (CAPTACION ALTAR HUACCTA 01)
10.02.01 TRAZO , NIVELAC IO N Y REP LANTEO P RELIM INAR m2 71.25 100.00
10.02.02 C INTA P LASTIC A P / SEÑALIZAC IO N DE PELIG RO ml 9.63 100.00
10.02.03 EXC AVAC IO N DE M ATERIAL SUELTO M3 32.76 100.00
10.02.04 ELIM INAC IO N DE M ATERIAL EXC EDENTE HASTA D= 30.0M . M3 17.00 100.00
10.02.05 DADO DE C O NC RETO F'C = 140KG / C M 2 m3 432.75 100.00
10.02.06 TUBO VERTIC AL DE FIERRO NEG RO DE 3", 2m m x6m t . m 1156.42 100.00
10.02.07 TUBO HO RIZO NTAL DE FIERRO NEG RO DE 3", 2m m x6m t . m 2218.04 100.00
10.02.08 P UERTA DE FIERRO G ALVANIZADO . und 198.79 100.00
4136.64
10.02.09 SUMIN ISTRO Y COLOCACION DE MALLA DE ALAMBRE GALVAN IZADO
10.02.09.01 M ALLA C O C ADA DE ALAM BRE G ALVANIZADO DE 4 M M . 8 BWG m2 1578.39 100.00
10.02.09.02 P INTADO DE M ALLA C O N P INTURA ESM ALTE m2 322.28 100.00
10.02.09.03 P INTURA ANTIC O RRO SIVA / ESM ALTE TUBERIAS NEG RO DE 3" ml 632.74 100.00
2533.41
10.03 CERCO PERIMETRICO (CAPTACION ALTAR HUACCTA 02)
10.03.01 TRAZO , NIVELAC IO N Y REP LANTEO P RELIM INAR m2 71.25 100.00
10.03.02 C INTA P LASTIC A P / SEÑALIZAC IO N DE PELIG RO ml 9.63 100.00
10.03.03 EXC AVAC IO N DE M ATERIAL SUELTO M3 32.76 100.00
10.03.04 ELIM INAC IO N DE M ATERIAL EXC EDENTE HASTA D= 30.0M . M3 17.00 100.00
10.03.05 DADO DE C O NC RETO F'C = 140KG / C M 2 m3 432.75 100.00
10.03.06 TUBO VERTIC AL DE FIERRO NEG RO DE 3", 2m m x6m t . m 1198.43 100.00
10.03.07 TUBO HO RIZO NTAL DE FIERRO NEG RO DE 3", 2m m x6m t . m 1977.80 100.00
10.03.08 P UERTA DE FIERRO G ALVANIZADO . und 198.79 100.00
3938.41
10.03.09 SUMIN ISTRO Y COLOCACION DE MALLA DE ALAMBRE GALVAN IZADO
10.03.09.01 M ALLA C O C ADA DE ALAM BRE G ALVANIZADO DE 4 M M . 8 BWG m2 1528.61 100.00
10.03.09.02 P INTADO DE M ALLA C O N P INTURA ESM ALTE m2 312.12 100.00
10.03.09.03 P INTURA ANTIC O RRO SIVA / ESM ALTE TUBERIAS NEG RO DE 3" ml 595.65 100.00
2436.38
10.04 CERCO PERIMETRICO (CAPTACION TECCOY HUACCTA)
10.04.01 TRAZO , NIVELAC IO N Y REP LANTEO P RELIM INAR m2 71.25 100.00
10.04.02 C INTA P LASTIC A P / SEÑALIZAC IO N DE PELIG RO ml 9.63 100.00
10.04.03 EXC AVAC IO N DE M ATERIAL SUELTO M3 32.76 100.00
10.04.04 ELIM INAC IO N DE M ATERIAL EXC EDENTE HASTA D= 30.0M . M3 17.00 100.00
10.04.05 DADO DE C O NC RETO F'C = 140KG / C M 2 m3 432.75 100.00
10.04.06 TUBO VERTIC AL DE FIERRO NEG RO DE 3", 2m m x6m t . m 1171.67 100.00
10.04.07 TUBO HO RIZO NTAL DE FIERRO NEG RO DE 3", 2m m x6m t . m 2232.10 100.00
10.04.08 P UERTA DE FIERRO G ALVANIZADO . und 198.79 100.00
4165.95
10.04.09 SUMIN ISTRO Y COLOCACION DE MALLA DE ALAMBRE GALVAN IZADO
10.04.09.01 M ALLA C O C ADA DE ALAM BRE G ALVANIZADO DE 4 M M . 8 BWG m2 1588.46 100.00
10.04.09.02 P INTADO DE M ALLA C O N P INTURA ESM ALTE m2 324.34 100.00
10.04.09.03 P INTURA ANTIC O RRO SIVA / ESM ALTE TUBERIAS NEG RO DE 3" ml 638.24 100.00
2551.04
11 LIN EA DE CON DUCCIÓN
11.01 LIN EA DE CON DUCCION , Ø = 3/ 4"
11.01.01 TRABAJOS PRELIMIN ARES
11.01.01.01 LIM P IEZA DE TERRENO M ANUAL m2 0.00 0.00
11.01.01.02 TRAZO Y REP LANTEO P RELIM INAR m2 0.00 0.00
0.00
11.01.02 MOVIMIEN TO DE TIERRAS
11.01.02.01 EXC AVAC IO N EN M ATERIAL SUELTO m3 0.00 0.00
11.01.02.02 REFINE Y NIVELAC IO N DE ZANJ A ml 0.00 0.00
11.01.02.03 C AM A DE AP O YO P ARA TUBERIA ml 0.00 0.00
11.01.02.04 RELLENO C O M P AC TADO M ATERIAL SELEC C IO NADO M3 0.00 0.00
11.01.02.05 RELLENO Y C O M P AC TADO M ATERIAL P RO P IO m3 0.00 0.00
0.00
11.01.03 IN STALACION DE TUBERIAS - CON DUCCION
11.01.03.01 SUM INISTRO E INST. DE AC C ES P VC SAP C -10, D= 1" G LB 0.00 0.00
11.01.03.02 INSTALAC IO N DE TUBERIA P VC SAP C -10, Ø = 3/ 4" M L. 0.00 0.00
0.00
11.01.04 PRUEBA HIDRAULICA
11.01.04.01 P RUEBA HIDRAULIC A EN TUBERIA P VC ml 0.00 0.00
0.00
11.02 CAMARA DE REUN ION 01 y 02
11.02.01 TRABAJOS PRELIMIN ARES
11.02.01.01 LIM P IEZA DE TERRENO M ANUAL m2 0.00 0.00
11.02.01.02 TRAZO , NIVEL Y REP LANTEO P RELIM INAR m2 0.00 0.00
11.02.01.03 TRAZO , NIVELAC IO N Y REP LANTEO DURANTE EL P RO C ESO m2 0.00 0.00
0.00
11.02.02 MOVIMIEN TO DE TIERRAS
11.02.02.01 EXC AVAC IO N M ANUAL EN TERRENO NATURAL m3 0.00 0.00
11.02.02.02 RELLENO Y C O M P AC TADO M ATERIAL P RO P IO m3 0.00 0.00
11.02.02.03 ELIM INAC IO N DE M ATERIAL EXC EDENTE + 25% ESP O NJ . DIST. P RO M . 30M m3 0.00 0.00
0.00
11.02.03 OBRAS DE CON CRETO SIMPLE
11.02.03.01 SO LADO E= 4" C O NC RETO F'C = 100 kg / c m 2 m2 0.00 0.00
11.02.03.02 C O NC RETO F'C = 140 KG / C M 2 M3 0.00 0.00
11.02.03.03 EM BO Q UILLADO C O N P IEDRA Y C O NC RETO F'c = 100 kg / c m 2 E= 4" m2 0.00 0.00
0.00
11.02.04 OBRAS DE CON CRETO ARMADO
11.02.04.01 ENC O FRADO Y DESENC O FRADO m2 0.00 0.00
11.02.04.02 C O NC RETO F'C = 175 KG / C M 2 (S/ M ) M3 0.00 0.00
11.02.04.03 AC ERO F'Y= 4200 KG / C M 2 kg 0.00 0.00
0.00
11.02.05 REVOQUES, EN LUCIDOS Y MOLDURAS
11.02.05.01 TARRAJ EO INTERIO RES C / IM P ERM EAB. M EZC LA C :A 1:5, E= 1.5C M m2 0.00 0.00
11.02.05.02 TARRAJ EO EXTERIO RES M EZC LA C :A 1:5, E= 1.5 C M . m2 0.00 0.00
0.00
11.02.06 PIN TURA
11.02.06.01 P INTURA EN M URO S EXTERIO RES C O N ESM ALTE m2 0.00 0.00
11.02.06.02 P INTURA EN C ARP INTERIA M ETALIC A m2 0.00 0.00
0.00
11.02.07 ACCESORIOS
11.02.07.01 AC C ESO RIO S P ARA C AM ARA DE REUNIO N Ø 1 1/ 2"- 02 ING RESO S G LB. 0.00 0.00
11.02.07.02 TAP A M ETALIC A P ARA INSP EC C IO N 1.00 x 1.00 m . INC L. M ARC O Y AC C . DE SEG URO S und 0.00 0.00
0.00
11.02.08 VARIOS
11.02.08.01 LIM P IEZA FINAL DE O BRA m2 0.00 0.00
11 .03 CERCO PERI
METRI
CO ( CAMARA DE REUN I
ON 01 )
11 .03 .0 1 TRAZO , NIVELAC IO N Y REP LANTEO P RELIM INAR m2 0.00 0.00
11 .03 .0 2 C INTA P LASTIC A P / SEÑALIZAC IO N DE P ELIG RO ml 0.00 0.00
11 .03 .0 3 EXC AVAC IO N DE M ATERIAL SUELTO M3 0.00 0.00
11 .03 .0 4 ELIM INAC IO N DE M ATERIAL EXC EDENTE HASTA D= 30 .0 M . M3 0.00 0.00
11 .03 .0 5 DADO DE C O NC RETO F'C = 140 KG / C M 2 m3 0.00 0.00
11 .03 .0 6 TUBO VERTIC AL DE FIERRO NEG RO DE 3 ", 2m m x6 m t . m 0.00 0.00
11 .03 .0 7 TUBO HO RIZO NTAL DE FIERRO NEG RO DE 3 ", 2 m m x6 m t . m 0.00 0.00
11 .03 .0 8 P UERTA DE FIERRO G ALVANIZADO . und 0.00 0.00
0.00
11 .03 .0 9 SUMI
NISTRO Y COLOCACI
ON DE MALLA DE ALAMBRE GALVAN I
ZADO
11 .03 .0 9.01 M ALLA C O C ADA DE ALAM BRE G ALVANIZADO DE 4 M M . 8 BW G m2 0.00 0.00
11 .03 .0 9.02 P INTADO DE M ALLA C O N P INTURA ESM ALTE m2 0.00 0.00
11 .03 .0 9.03 P INTURA ANTIC O RRO SIVA / ESM ALTE TUBERIAS NEG RO DE 3" ml 0.00 0.00
0.00
11 .04 CERCO PERI
METRI
CO ( CAMARA DE REUN I
ON 02 )
11 .04 .0 1 TRAZO , NIVELAC IO N Y REP LANTEO P RELIM INAR m2 2 3.75 100 .0 0
11 .04 .0 2 C INTA P LASTIC A P / SEÑALIZAC IO N DE P ELIG RO ml 5.78 100 .0 0
11 .04 .0 3 EXC AVAC IO N DE M ATERIAL SUELTO M3 2 0.71 100 .0 0
11 .04 .0 4 ELIM INAC IO N DE M ATERIAL EXC EDENTE HASTA D= 30 .0 M . M3 1 0.82 100 .0 0
11 .04 .0 5 DADO DE C O NC RETO F'C = 140 KG / C M 2 m3 273 .5 3 100 .0 0
11 .04 .0 6 TUBO VERTIC AL DE FIERRO NEG RO DE 3 ", 2m m x6 m t . m 794 .8 0 100 .0 0
11 .04 .0 7 TUBO HO RIZO NTAL DE FIERRO NEG RO DE 3 ", 2 m m x6 m t . m 13 81 .4 3 100 .0 0
11 .04 .0 8 P UERTA DE FIERRO G ALVANIZADO . und 198 .7 9 100 .0 0
27 09 .6 1
11 .04 .0 9 SUMI
NISTRO Y COLOCACI
ON DE MALLA DE ALAMBRE GALVAN I
ZADO
11 .04 .0 9.01 M ALLA C O C ADA DE ALAM BRE G ALVANIZADO DE 4 M M . 8 BW G m2 958 .8 3 100 .0 0
11 .04 .0 9.02 P INTADO DE M ALLA C O N P INTURA ESM ALTE m2 195 .7 8 100 .0 0
11 .04 .0 9.03 P INTURA ANTIC O RRO SIVA / ESM ALTE TUBERIAS NEG RO DE 3" ml 408 .1 0 100 .0 0
15 62 .7 1
12 RESERVORI
O RECTAN GULAR DE 5 M3
12 .01 CON STRUCCI
ÓN DE RESERVORI
O APOYADO DE 5 M3
12 .01 .0 1 TRABAJOS PRELI
MIN ARES
12 .01 .0 1.01 TRAZO Y REP LANTEO INIC IAL m2 0.00 0.00
12 .01 .0 1.02 TRAZO Y REP LANTEO FINAL m2 0.00 0.00
12 .01 .0 1.03 TRANSP O RTE DE M ATERIALES Y HERRAM IENTAS EN ZO NA S/ N AC C ESO G LB 0.00 0.00
0.00
12 .01 .0 2 MOVI
MIEN TO DE TI
ERRAS
12 .01 .0 2.01 C O RTE EN TERRENO NATURAL C O N EQ UIP O m3 0.00 0.00
12 .01 .0 2.02 EXC AVAC IO N EN TERRENO NO RM AL HASTA 1.0 0 M DE P RO FUNDIDAD m3 0.00 0.00
12 .01 .0 2.03 REFINE, NIVELAC IO N Y C O M P AC TAC IO N EN TERRENO NO RM AL m2 0.00 0.00
12 .01 .0 2.04 RELLENO C O N M ATERIAL P RO P IO C O M P AC TADO m3 0.00 0.00
12 .01 .0 2.05 ELIM INAC IO N DE M ATERIAL EXC EDENTE HASTA D= 30 .0M . M3 0.00 0.00
0.00
12 .01 .0 3 OBRAS DE CON CRETO SI
MP LE
12 .01 .0 3.01 C O NC RETO F'C = 100 KG / C M 2 P ARA SO LADO , E = 10 C M m3 0.00 0.00
0.00
12 .01 .0 4 OBRAS DE CON CRETO ARMADO
12 .01 .0 4.01 C O NC RETO F'C = 21 0KG / C M 2 (ZAP ATAS) m3 0.00 0.00
12 .01 .0 4.02 AC ERO F'Y= 42 00 KG / C M 2 kg 0.00 0.00
12 .01 .0 4.03 C O NC RETO F'C = 21 0KG / C M 2 P / LO SA DE FO NDO m3 0.00 0.00
12 .01 .0 4.04 AC ERO F'Y= 42 00 KG / C M 2 kg 0.00 0.00
12 .01 .0 4.05 C O NC RETO F'C = 21 0 KG / C M 2 P ARA M URO S REFO RZADO S m3 0.00 0.00
12 .01 .0 4.06 AC ERO F'Y= 42 00 KG / C M 2 kg 0.00 0.00
12 .01 .0 4.07 ENC O FRADO Y DESENC O FRADO P ARA M URO S m2 0.00 0.00
12 .01 .0 4.08 C O NC RETO F'C = 21 0 KG / C M 2 P ARA LO SA M AC IZA m3 0.00 0.00
12 .01 .0 4.09 AC ERO F'Y= 42 00 KG / C M 2 kg 0.00 0.00
12 .01 .0 4.10 ENC O FRADO Y DESENC O FRADO EN LO SA M AC IZA m2 0.00 0.00
12 .01 .0 4.11 C URADO DE C O NC RETO C O N ADITIVO m2 0.00 0.00
12 .01 .0 4.12 ADITIVO DESM O LDADO R P ARA ENC O FRADO m2 0.00 0.00
0.00
12 .01 .0 5 REVOQUES Y EN LUCI
DOS
12 .01 .0 5.01 TARRAJ EO C / IM P ERM EABILIZANTE LO SA FO NDO - P ISO , E= 2 0m m ; C :A- 1:3 m2 0.00 0.00
12 .01 .0 5.02 TARRAJ EO C / IM P ERM EABILIZANTE M URO S P ARA RESERVO RIO ; C :A- 1:3, E= 20 m m m2 0.00 0.00
0.00
12 .01 .0 6 PI
SO S Y PAVI
MEN TOS
12 .01 .0 6.01 C O NC RETO F'C = 17 5 KG / C M 2 P / VEREDA m3 0.00 0.00
12 .01 .0 6.02 ENC O FRADO Y DESENC O FRADO m2 0.00 0.00
12 .01 .0 6.03 SELLADO DE J UNTAS EN VEREDA; E=1" ml 0.00 0.00
0.00
12 .01 .0 7 CARPI
NTERI
A METALI
CA
12 .01 .0 7.01 ESC ALERA TUBO DE FºG º C / P ARANTES DE 1 1 / 2 " y P ELDAÑO S DE 3 / 4 " G LB. 0.00 0.00
12 .01 .0 7.02 TAP A M ETALIC A 0 .6 0 X 0 .6 0 + M ARC O DE M ETAL und 0.00 0.00
12 .01 .0 7.03 VENTILAC IO N C / TUBERIA DE AC ERO S/ DISEÑO DE ø 2" und 0.00 0.00
0.00
1 2.0 1 .0 3 O BRAS DE CO N CRETO SI
MPLE
1 2.0 1 .0 3. 01 C O NC RETO F'C = 1 0 0 KG / C M 2 P ARA SO LADO , E = 1 0 C M m 3 0.0 0 0.0 0
0.0 0
1 2.0 1 .0 4 O BRAS DE CO N CRETO ARMADO
1 2.0 1 .0 4. 01 C O NC RETO F'C = 2 1 0 KG / C M 2 ( ZAP ATAS) m 3 0.0 0 0.0 0
1 2.0 1 .0 4. 02 AC ERO F'Y= 4 20 0 KG / C M 2 kg 0.0 0 0.0 0
1 2.0 1 .0 4. 03 C O NC RETO F'C = 2 1 0 KG / C M 2 P / LO SA DE FO NDO m 3 0.0 0 0.0 0
1 2.0 1 .0 4. 04 AC ERO F'Y= 4 20 0 KG / C M 2 kg 0.0 0 0.0 0
1 2.0 1 .0 4. 05 C O NC RETO F'C = 2 1 0 KG / C M 2 P ARA M URO S REFO RZADO S m 3 0.0 0 0.0 0
1 2.0 1 .0 4. 06 AC ERO F'Y= 4 20 0 KG / C M 2 kg 0.0 0 0.0 0
1 2.0 1 .0 4. 07 ENC O FRADO Y DESENC O FRADO P ARA M URO S m 2 0.0 0 0.0 0
1 2.0 1 .0 4. 08 C O NC RETO F'C = 2 1 0 KG / C M 2 P ARA LO SA M AC IZA m 3 0.0 0 0.0 0
1 2.0 1 .0 4. 09 AC ERO F'Y= 4 20 0 KG / C M 2 kg 0.0 0 0.0 0
1 2.0 1 .0 4. 10 ENC O FRADO Y DESENC O FRADO EN LO SA M AC IZA m 2 0.0 0 0.0 0
1 2.0 1 .0 4. 11 C URADO DE C O NC RETO C O N ADITIVO m 2 0.0 0 0.0 0
1 2.0 1 .0 4. 12 AD ITIVO DESM O LDADO R P ARA ENC O FRADO m 2 0.0 0 0.0 0
0.0 0
1 2.0 1 .0 5 REVO Q UES Y EN LUCI
DO S
1 2.0 1 .0 5. 01 TARRAJ EO C / IM P ERM EABILIZANTE LO SA FO N DO - P ISO , E= 2 0 m m ; C :A- 1 :3 m 2 0.0 0 0.0 0
1 2.0 1 .0 5. 02 TARRAJ EO C / IM P ERM EABILIZANTE M URO S P ARA RESERVO RIO ; C :A- 1 :3 , E= 20 m m m 2 0.0 0 0.0 0
0.0 0
1 2.0 1 .0 6 PI
SO S Y P AVIMEN TOS
1 2.0 1 .0 6. 01 C O NC RETO F'C = 1 7 5 KG / C M 2 P / VEREDA m 3 0.0 0 0.0 0
1 2.0 1 .0 6. 02 ENC O FRADO Y DESENC O FRADO m 2 0.0 0 0.0 0
1 2.0 1 .0 6. 03 SELLAD O DE J UNTAS EN VEREDA; E=1 " m l 0.0 0 0.0 0
0.0 0
1 2.0 1 .0 7 CARPINTERI
A METALI
CA
1 2.0 1 .0 7. 01 ESC ALERA TUBO DE FºG º C / P ARANTES DE 1 1 / 2 " y P ELDAÑO S DE 3/ 4 " G LB. 0.0 0 0.0 0
1 2.0 1 .0 7. 02 TAP A M ETALIC A 0 .60 X 0 .6 0 + M ARC O DE M ETAL un d 0.0 0 0.0 0
1 2.0 1 .0 7. 03 VENTILAC IO N C / TUBERIA DE AC ERO S/ DISEÑO DE ø 2" un d 0.0 0 0.0 0
0.0 0
1 2.0 1 .0 8 CERRAJERI
A
1 2.0 1 .0 8. 01 C ANDADO INC LUYENDO ALDABAS un d 0.0 0 0.0 0
0.0 0
1 2.0 1 .0 9 PI
NTURA
1 2.0 1 .0 9. 01 P INTURA LATEX EN M URO S EXTERIO RES m 2 1 0 6 .6 9 1 0 0 .0 0
1 0 6 .6 9
1 2.0 1 .1 0 ADITAMI
EN TO VARI
OS
1 2.0 1 .1 0. 01 W ATER STO P P VC DE 6 " P RO VISIO N Y C O LO C AD O DE J UNTA m 0.0 0 0.0 0
1 2.0 1 .1 0. 02 J UNTA DE DILATAC IO N DE TEKNO P O R, E = 1 " m 2 0.0 0 0.0 0
0.0 0
1 2.0 1 .1 1 P RUEBAS DE CALI
DAD
1 2.0 1 .1 1. 01 P RUEBA DE C ALIDAD DEL C O NC RETO ( P RUEBA A LA C O M P RESIO N) G LB 1 5 0 .4 0 1 0 0 .0 0
1 2.0 1 .1 1. 02 P RUEBA HIDRAULIC A C O N EM P LEO DE C ISTERNA Y EQ UIP O DE BO M BEO m 3 2 4 .4 5 1 0 0 .0 0
1 7 4 .8 5
1 2.0 1 .1 2 OTRO S
1 2.0 1 .1 2. 01 EVAC U AC IO N DE AG UA P O R P RUEBA C / EM P LEO LINEA DE SALIDA m 3 1 5 0 .8 0 1 0 0 .0 0
1 2.0 1 .1 2. 02 LIM P IEZA Y DESINFEC C IÓ N DE RESERVO RIO AP O YADO m 2 2 0 .8 1 1 0 0 .0 0
1 7 1 .6 1
1 2.0 1 .1 3 HIPO CLO RADO R PO R G O TEO
1 2.0 1 .1 3. 01 M URO DE LADRILLO TIP O IV 1 8 HUEC O S DE SO G AC :A-1 :5 x 1.5 C M m 2 4 2 6 .3 4 1 0 0 .0 0
1 2.0 1 .1 3. 02 LISTO N DE M ADERA TO RNILLO DE 2"x 3 " m l 3 6 9 .9 3 1 0 0 .0 0
1 2.0 1 .1 3. 03 C O RREA DE M ADERA TO RNILLO DE 2 "x 2 " m l 1 1 1 .1 3 1 0 0 .0 0
1 2.0 1 .1 3. 04 C O BERTURA C O N TEJ A TIP O ANDINA DE 1.1 4 m x 0 .72 m x 5m m . m 2 2 0 9 .3 0 1 0 0 .0 0
1 2.0 1 .1 3. 05 P U ERTA M ETALIC A P ARA HIP O C LO RADO R un d 4 5 7 .8 7 1 0 0 .0 0
1 2.0 1 .1 3. 06 TARRAJ EO EN EXTERIO RES M O RTERO 1:5 ; E= 1 .5 c m m 2 1 7 1 .7 2 1 0 0 .0 0
1 2.0 1 .1 3. 07 SUM INISTRO E INSTALAC IO N DE HIPO C LO RADO R G LB. 8 7 7 .6 5 1 0 0 .0 0
2 6 23 .9 4
1 2.0 1 .1 4 CASETA DE VALV ULAS - RESERVO RI
O D E 5 M3
1 2.0 1 .1 4. 01 TRA BAJO S PRELI
MIN ARES
1 2.0 1 .1 4. 01 .0 1 LIM P IEZA DE TERRENO M ANUAL m 2 0.0 0 0.0 0
1 2.0 1 .1 4. 01 .0 2 TRAZO , NIVELAC IO N Y REP LAN TEO m 2 0.0 0 0.0 0
0.0 0
1 2.0 1 .1 4. 02 MO VI
MIEN TO DE TIERRA S
1 2.0 1 .1 4. 02 .0 1 EXC AVAC IO N M ANUAL P ARA ESTRUC TURAS M3 0.0 0 0.0 0
0.0 0
1 2.0 1 .1 4. 03 O BRAS DE CO N CRETO ARMADO
1 2.0 1 .1 4. 03 .0 1 C O NC RETO F'C = 1 75 KG / C M 2 M3 0.0 0 0.0 0
1 2.0 1 .1 4. 03 .0 2 ENC O FRADO Y DESENC O FRADO m 2 0.0 0 0.0 0
1 2.0 1 .1 4. 03 .0 3 AC ERO F'Y= 4 20 0 KG / C M 2 kg 0.0 0 0.0 0
0.0 0
1 2.0 1 .1 4. 04 REVO Q UES Y EN LUCIDO S
1 2.0 1 .1 4. 04 .0 1 TARRAJ EO EN EXTERIO RES m 2 0.0 0 0.0 0
0.0 0
1 2.0 1 .1 4. 05 SUMI
NISTRO E I
N STALACI
ON DE V ALVULAS Y ACCESO RI
OS
1 2.0 1 .1 4. 05 .0 1 SUM INISTRO E INST. DE AC C ESO RIO S DE C ASETA DE VALVULAS ( ING = 1 ", SAL D= 1") G LB. 0.0 0 0.0 0
0.0 0
1 2.0 1 .1 4. 06 PINTURA
1 2.0 1 .1 4. 06 .0 1 P INTURA EN M URO S EXTERIO RES C O N ESM ALTE m 2 0.0 0 0.0 0
0.0 0
1 2 . 01 . 1 2 OTRO S
1 2 . 01 . 1 2. 0 1 EVAC UAC IO N DE AG UA P O R P RUEBA C / EM P LEO LINEA DE SALIDA m3 1 5 0. 8 0 1 0 0. 0 0
1 2 . 01 . 1 2. 0 2 LIM P IEZA Y DESINFEC C IÓ N DE RESERVO RIO AP O YADO m2 2 0 .8 1 1 0 0. 0 0
1 7 1. 6 1
1 2 . 01 . 1 3 HI
PO CLO RADO R PO R GO TEO
1 2 . 01 . 1 3. 0 1 M URO DE LADRILLO TIP O IV 1 8 HUEC O S DE SO G AC :A-1 :5 x1 . 5 C M m2 4 2 6. 3 4 1 0 0. 0 0
1 2 . 01 . 1 3. 0 2 LISTO N DE M ADERA TO RNILLO DE 2"x 3 " ml 3 6 9. 9 3 1 0 0. 0 0
1 2 . 01 . 1 3. 0 3 C O RREA DE M ADERA TO RNILLO DE 2 "x 2 " ml 1 1 1. 1 3 1 0 0. 0 0
1 2 . 01 . 1 3. 0 4 C O BERTURA C O N TEJ A TIP O ANDINA DE 1 .1 4 m x 0 .7 2 m x 5m m . m2 2 0 9. 3 0 1 0 0. 0 0
1 2 . 01 . 1 3. 0 5 P UERTA M ETALIC A P ARA HIP O C LO RADO R und 4 5 7. 8 7 1 0 0. 0 0
1 2 . 01 . 1 3. 0 6 TARRAJ EO EN EXTERIO RES M O RTERO 1 :5 ; E= 1 .5 c m m2 1 7 1. 7 2 1 0 0. 0 0
1 2 . 01 . 1 3. 0 7 SUM INISTRO E INSTALAC IO N DE HIPO C LO RADO R G LB. 8 7 7. 6 5 1 0 0. 0 0
2 62 3 . 94
1 2 . 01 . 1 4 CASETA DE VALVULAS - RESERVORI
O DE 5 M3
1 2 . 01 . 1 4. 0 1 TRABAJO S PRELI
MIN ARES
1 2 . 01 . 1 4. 0 1 .0 1 LIM P IEZA DE TERRENO M ANUAL m2 0 .0 0 0 .0 0
1 2 . 01 . 1 4. 0 1 .0 2 TRAZO , NIVELAC IO N Y REP LANTEO m2 0 .0 0 0 .0 0
0 .0 0
1 2 . 01 . 1 4. 0 2 MOVI
MIEN TO DE TI
ERRAS
1 2 . 01 . 1 4. 0 2 .0 1 EXC AVAC IO N M ANUAL P ARA ESTRUC TURAS M3 0 .0 0 0 .0 0
0 .0 0
1 2 . 01 . 1 4. 0 3 O BRAS DE CON CRETO ARMADO
1 2 . 01 . 1 4. 0 3 .0 1 C O NC RETO F'C = 1 7 5 KG / C M 2 M3 0 .0 0 0 .0 0
1 2 . 01 . 1 4. 0 3 .0 2 ENC O FRADO Y DESENC O FRADO m2 0 .0 0 0 .0 0
1 2 . 01 . 1 4. 0 3 .0 3 AC ERO F'Y= 4 2 0 0 KG / C M 2 kg 0 .0 0 0 .0 0
0 .0 0
1 2 . 01 . 1 4. 0 4 REVOQ UES Y EN LUCI
DO S
1 2 . 01 . 1 4. 0 4 .0 1 TARRAJ EO EN EXTERIO RES m2 0 .0 0 0 .0 0
0 .0 0
1 2 . 01 . 1 4. 0 5 SUMI
NISTRO E I
N STALACI
O N DE VALVULAS Y ACCESO RI
OS
1 2 . 01 . 1 4. 0 5 .0 1 SUM INISTRO E INST. DE AC C ESO RIO S DE C ASETA DE VALVULAS (ING = 1 ", SAL D= 1 ") G LB. 0 .0 0 0 .0 0
0 .0 0
1 2 . 01 . 1 4. 0 6 PI
NTURA
1 2 . 01 . 1 4. 0 6 .0 1 P INTURA EN M URO S EXTERIO RES C O N ESM ALTE m2 0 .0 0 0 .0 0
0 .0 0
1 2 . 01 . 1 4. 0 7 FI
L TROS
1 2 . 01 . 1 4. 0 7 .0 1 FILTRO M3 0 .0 0 0 .0 0
0 .0 0
1 2 . 01 . 1 4. 0 8 ASEN TADO DE PI
EDRA
1 2 . 01 . 1 4. 0 8 .0 1 P IEDRA ASENTADA C O N M O RTERO 1 :8 m2 0 .0 0 0 .0 0
0 .0 0
1 2 . 02 CERCO PERI
METRI
CO RESERVORI
O DE 5 M3
1 2 . 02 . 0 1 TRAZO , NIVELAC IO N Y REP LANTEO P RELIM INAR m2 7 1 .2 5 1 0 0. 0 0
1 2 . 02 . 0 2 C INTA P LASTIC A P / SEÑALIZAC IO N DE P ELIG RO ml 9 .6 3 1 0 0. 0 0
1 2 . 02 . 0 3 EXC AVAC IO N DE M ATERIAL SUELTO M3 3 2 .7 6 1 0 0. 0 0
1 2 . 02 . 0 4 ELIM INAC IO N DE M ATERIAL EXC EDENTE HASTA D= 3 0. 0 M . M3 1 7 .0 0 1 0 0. 0 0
1 2 . 02 . 0 5 DADO DE C O NC RETO F'C = 1 4 0KG / C M 2 m3 4 3 2. 7 5 1 0 0. 0 0
1 2 . 02 . 0 6 TUBO VERTIC AL DE FIERRO NEG RO DE 3 ", 2 m m x 6 m t . m 1 22 3 . 95 1 0 0. 0 0
1 2 . 02 . 0 7 TUBO HO RIZO NTAL DE FIERRO NEG RO DE 3", 2 m m x 6 m t . m 2 05 7 . 47 1 0 0. 0 0
1 2 . 02 . 0 8 P UERTA DE FIERRO G ALVANIZADO . und 1 9 8. 7 9 1 0 0. 0 0
4 04 3 . 60
1 2 . 02 . 0 9 SUMI
NISTRO Y COLO CACI
ON DE MALLA DE ALAMBRE G ALVAN I
ZADO
1 2 . 02 . 0 9. 0 1 M ALLA C O C ADA DE ALAM BRE G ALVANIZADO DE 4 M M . 8 BW G m2 1 48 4 . 17 1 0 0. 0 0
1 2 . 02 . 0 9. 0 2 P INTADO DE M ALLA C O N P INTURA ESM ALTE m2 3 0 3. 0 4 1 0 0. 0 0
1 2 . 02 . 0 9. 0 3 P INTURA ANTIC O RRO SIVA / ESM ALTE TUBERIAS NEG RO DE 3 " ml 6 1 5. 3 6 1 0 0. 0 0
2 40 2 . 57
13 SI
STEMA RED DE DI
STRI
BUCI
ÓN
1 3 . 01 RED DE DI
STRI
BUCI
ON (L = 2 68 0 . 8 1 M)
1 3 . 01 . 0 1 TRABAJOS PRELI
MIN ARES
1 3 . 01 . 0 1. 0 1 TRAZO Y REP LANTEO ANTES Y DURANTE LA O BRA KM 0 .0 0 0 .0 0
0 .0 0
1 3 . 01 . 0 2 MO VI
MIEN TO DE TI
ERRAS
1 3 . 01 . 0 2. 0 1 EXC AVAC IO N T.N. DN 2 6 .5 m m (3 / 4") EN TERRENO NO RM AL m3 0 .0 0 0 .0 0
1 3 . 01 . 0 2. 0 2 EXC AVAC IO N T.N. DN 3 3 m m ( 1 ") EN TERRENO NO RM AL m3 0 .0 0 0 .0 0
1 3 . 01 . 0 2. 0 3 REFINE, NIVELAC IO N Y C O NFO RM AC IO N DE FO NDO DE T.N. TUB. DN 2 6 . 5 m m (3 / 4 ") m2 0 .0 0 0 .0 0
1 3 . 01 . 0 2. 0 4 REFINE, NIVELAC IO N Y C O NFO RM AC IO N DE FO NDO DE T.N. TUB. DN 3 3 m m ( 1 ") m2 0 .0 0 0 .0 0
1 3 . 01 . 0 2. 0 5 C AM A C O N M ATERIAL P RO P IO SELEC C IO NDO P ARA TUBERIA P VC SAP m3 0 .0 0 0 .0 0
1 3 . 01 . 0 2. 0 6 RELLENO C O M P AC . DE ZANJ A C O N M ATERIAL SELEC C IO NADO TUB. DN 2 6 . 5 m m m3 0 .0 0 0 .0 0
1 3 . 01 . 0 2. 0 7 RELLENO C O M P AC . DE ZANJ A C O N M ATERIAL SELEC C IO NADO TUB. DN 3 3 m m m3 0 .0 0 0 .0 0
1 3 . 01 . 0 2. 0 8 RELLENO C O M P AC . DE ZANJ A C O N M ATERIAL P RO P IO TUB. DN 2 6 .5 m m m3 0 .0 0 0 .0 0
1 3 . 01 . 0 2. 0 9 RELLENO C O M P AC . DE ZANJ A C O N M ATERIAL P RO P IO TUB. DN 3 3 m m m3 0 .0 0 0 .0 0
1 3 . 01 . 0 2. 1 0 ELIM INAC IO N DE M ATERIAL EXC EDENTE + 2 5 % ESP O NJ. DIST. P RO M . 3 0 M m3 0 .0 0 0 .0 0
0 .0 0
1 3 . 01 . 0 3 SUMI
NISTRO E I
N STALACI
ON DE TUBERI
AS
1 3 . 01 . 0 3. 0 1 TUBERIA P VC -SAP N. TP . ISO 39 9 . 00 2 NTP A- 5 DN 3 / 4 " ( 26 . 5 m m ) + ELEM ENTO S DE UNIO N+2 % DESP
m l. 0 .0 0 0 .0 0
1 3 . 01 . 0 3. 0 2 TUBERIA P VC -SAP N. TP . ISO 39 9 . 00 2 NTP A- 5 DN 1 " ( 3 3 m m ) + ELEM ENTO S DE UNIO N+2 % DESP . m l 0 .0 0 0 .0 0
0 .0 0
1 3 . 01 . 0 4 SUMI
NISTRO E I
N STALACI
ON DE ACCESORI
OS
1 3 . 01 . 0 4. 0 1 SUM INISTRO E INSTALAC IO N DE AC C ESO RIO S, RED Y EM P ALM ES G LB. 0 .0 0 0 .0 0
12.02.09 SUMIN ISTRO Y COLOCACION DE MALLA DE ALAMBRE GALVAN IZADO
12.02.09.01 M ALLA C O C ADA DE ALAM BRE G ALVANIZADO DE 4 M M . 8 BW G m2 1484.17 100.00
12.02.09.02 P INTADO DE M ALLA C O N P INTURA ESM ALTE m2 303.04 100.00
12.02.09.03 P INTURA ANTIC O RRO SIVA / ESM ALTE TUBERIAS NEG RO DE 3" ml 615.36 100.00
2402.57
13 SISTEMA RED DE DISTRIBUCIÓN
13.01 RED DE DISTRIBUCION (L = 2680.81 M)
13.01.01 TRABAJOS PRELIMIN ARES
13.01.01.01 TRAZO Y REP LANTEO ANTES Y DURANTE LA O BRA KM 0.00 0.00
0.00
13.01.02 MOVIMIEN TO DE TIERRAS
13.01.02.01 EXC AVAC IO N T.N. DN 26.5 m m (3/ 4") EN TERRENO NO RM AL m3 0.00 0.00
13.01.02.02 EXC AVAC IO N T.N. DN 33 m m (1") EN TERRENO NO RM AL m3 0.00 0.00
13.01.02.03 REFINE, NIVELAC IO N Y C O NFO RM AC IO N DE FO NDO DE T.N. TUB. DN 26.5 m m (3/ 4") m2 0.00 0.00
13.01.02.04 REFINE, NIVELAC IO N Y C O NFO RM AC IO N DE FO NDO DE T.N. TUB. DN 33 m m (1") m2 0.00 0.00
13.01.02.05 C AM A C O N M ATERIAL P RO P IO SELEC C IO NDO P ARA TUBERIA P VC SAP m3 0.00 0.00
13.01.02.06 RELLENO C O M P AC . DE ZANJ A C O N M ATERIAL SELEC C IO NADO TUB. DN 26.5 m m m3 0.00 0.00
13.01.02.07 RELLENO C O M P AC . DE ZANJ A C O N M ATERIAL SELEC C IO NADO TUB. DN 33 m m m3 0.00 0.00
13.01.02.08 RELLENO C O M P AC . DE ZANJ A C O N M ATERIAL P RO P IO TUB. DN 26.5 m m m3 0.00 0.00
13.01.02.09 RELLENO C O M P AC . DE ZANJ A C O N M ATERIAL P RO P IO TUB. DN 33 m m m3 0.00 0.00
13.01.02.10 ELIM INAC IO N DE M ATERIAL EXC EDENTE + 25% ESP O NJ . DIST. P RO M . 30M m3 0.00 0.00
0.00
13.01.03 SUMIN ISTRO E IN STALACION DE TUBERIAS
13.01.03.01 TUBERIA P VC -SAP N.TP . ISO 399.002 NTP A-5 DN 3/ 4" (26.5m m )+ ELEM ENTO S DE UNIO N+2% DESP
m l. 0.00 0.00
13.01.03.02 TUBERIA P VC -SAP N.TP . ISO 399.002 NTP A-5 DN 1" (33m m ) + ELEM ENTO S DE UNIO N+2% DESP . m l 0.00 0.00
0.00
13.01.04 SUMIN ISTRO E IN STALACION DE ACCESORIOS
13.01.04.01 SUM INISTRO E INSTALAC IO N DE AC C ESO RIO S, RED Y EM P ALM ES G LB. 0.00 0.00
0.00
13.01.05 PRUEBA HIDRAULICA
13.01.05.01 P RUEBA HIDRAULIC A A ZANJ A TAP ADA+ DESINFEC C IO N DE TUBERIA P VC C -10 DE 26.5m m ml 0.00 0.00
13.01.05.02 P RUEBA HIDRAULIC A A ZANJ A TAP ADA+ DESINFEC C IO N DE TUBERIA P VC C -10 DE 33m m ml 0.00 0.00
0.00
13.02 CAJA VALVULA DE CON TROL (3/ 4" y 1")
13.02.01 TRABAJOS PRELIMIN ARES
13.02.01.01 LIM J P IEZA DE TERRENO M ANUAL m2 3.38 100.00
13.02.01.02 TRAZO Y REP LANTEO P RELIM INAR DE ESTRUC TURAS m2 3.00 100.00
6.38
13.02.02 MOVIMIEN TO DE TIERRAS
13.02.02.01 EXC AVAC IO N M ANUAL P ARA ESTRUC TURAS M3 61.82 100.00
13.02.02.02 ELIM INAC IO N DE M ATERIAL EXC EDENTE A M ANO (D= 30 m ) M3 28.57 100.00
90.39
13.02.03 OBRAS DE CON CRETO SIMPLE
13.02.03.01 C O NC RETO F'C = 140 KG / C M 2 M3 351.80 100.00
13.02.03.02 ENC O FRADO Y DESENC O FRADO m2 272.83 100.00
624.63
13.02.04 REVOQUES Y EN LUCIDOS
13.02.04.01 TARRAJ EO INTERIO R C O N M EZC LA 1:2, E= 1.5 C M . m2 104.03 100.00
104.03
13.02.05 PIN TURA
13.02.05.01 P INTURA ANTIC O RRO SIVA ESM ALTE EN C ARP INTERIA M ETALIC A m2 9.82 100.00
9.82
13.02.06 VALVULAS Y ACCESORIOS
13.02.06.01 SUM INISTRO E INSTALAC IO N DE VALVULAS Y AC C ESO RIO S (3/ 4") G LB. 191.26 100.00
13.02.06.02 SUM INISTRO E INSTALAC IO N DE VALVULAS Y AC C ESO RIO S (1") G LB. 207.96 100.00
399.22
13.02.07 TAPA METALICA
13.02.07.01 TAP A M ETALIC A (0.60 X 0.60M )+M ARC O DE M ETAL und 539.52 100.00
13.02.04 REVOQUES Y EN LUCIDOS
13.02.04.01 TARRAJEO INTERIO R C O N M EZC LA 1:2, E=1.5 C M . m2 104.03 100.00
104.03
13.02.05 PIN TURA
13.02.05.01 P INTURA ANTIC O RRO SIVA ESM ALTE EN C ARPINTERIA M ETALIC A m2 9.82 100.00
9.82
13.02.06 VALVULAS Y ACCESORIOS
13.02.06.01 SUM INISTRO E INSTALAC IO N DE VALVULAS Y AC C ESO RIO S (3/ 4") G LB. 191.26 100.00
13.02.06.02 SUM INISTRO E INSTALAC IO N DE VALVULAS Y AC C ESO RIO S (1") G LB. 207.96 100.00
399.22
13.02.07 TAPA METALICA
13.02.07.01 TAP A M ETALIC A (0.60 X 0.60M )+M ARC O DE M ETAL und 539.52 100.00
539.52
13.03 CAMARA ROMPE PRESION EN RED DE DISTRIBUCION (03 UN D.)
13.03.01 TRABAJOS PRELIMIN ARES
13.03.01.01 LIM PIEZA DE TERRENO M ANUAL m2 1.04 100.00
13.03.01.02 TRAZO Y REPLANTEO P RELIM INAR m2 6.03 100.00
7.07
13.03.02 MOVIMIEN TO DE TIERRAS
13.03.02.01 EXC AVAC IO N EN M ATERIAL SUELTO m3 59.35 100.00
13.03.02.02 ELIM INAC IO N DE M ATERIAL EXC EDENTE HASTA D=30.0M . M3 32.20 100.00
91.55
13.03.03 OBRAS DE CON CRETO ARMADO
13.03.03.01 C O NC RETO F'C =210 Kg / c m 2 m3 661.95 100.00
13.03.03.02 AC ERO F'Y= 4200 KG / C M 2 kg 1946.41 100.00
13.03.03.03 ENC O FRADO Y DESENC O FRADO m2 914.72 100.00
3523.08
13.03.04 REVOQUES Y EN LUCIDOS
13.03.04.01 TARRAJEO C / IM PERM EABILIZANTE M EZC LA 1:2, e =1.5 C M m2 242.52 100.00
13.03.04.02 TARRAJEO EXTERIO R M EZC LA C :A 1:2, E = 1.5C M m2 300.41 100.00
542.93
13.03.05 PIN TURA
13.03.05.01 P INTURA LATEX EN M URO S EXTERIO RES m2 84.27 100.00
13.03.05.02 P INTURA ANTIC O RRO SIVA ESM ALTE EN C ARPINTERIA M ETALIC A m2 5.12 100.00
89.39
13.03.06 VALVULAS Y ACCESORIOS
13.03.06.01 SUM INISTRO E INSTALAC IO N DE VALV. Y AC C ESO RIO S (C RP DE 3/ 4") G LB. 370.28 100.00
13.03.06.02 SUM INISTRO E INSTALAC IO N DE VALV. Y AC C ESO RIO S (C RP DE 1") G LB. 743.50 100.00
1113.78
13.03.07 TAPA METALICA
13.03.07.01 TAP A M ETALIC A (0.50 X 0.50M X 1/ 8")+M ARC O DE M ETAL und 404.64 100.00
13.04 CAJA VALVULA DE PURGA (13 UN D.)
13.04.01 TRABAJOS PRELIMIN ARES
13.04.01.01 LIM P IEZA DE TERRENO M ANUAL m2 1.26 100.00
13.04.01.02 TRAZO Y REP LANTEO P RELIM INAR m2 7.35 100.00
8.61
13.04.02 MOVIMIEN TO DE TIERRAS
13.04.02.01 EXC AVAC IO N EN M ATERIAL SUELTO m3 64.29 100.00
13.04.02.02 ELIM INAC IO N DE M ATERIAL EXC EDENTE HASTA D= 30.0M . M3 34.78 100.00
99.07
13.04.03 OBRAS DE CON CRETO SIMPLE
13.04.03.01 C O NC RETO F'C = 140 KG / C M 2 M3 428.76 100.00
13.04.03.02 ENC O FRADO Y DESENC O FRADO m2 385.73 100.00
814.49
13.04.04 REVOQUES Y EN LUCIDOS
13.04.04.01 TARRAJEO INTERIO R C O N M EZC LA 1:2, E= 1.5 C M . m2 144.89 100.00
144.89
13.04.05 PIN TURA
13.04.05.01 P INTURA ANTIC O RRO SIVA ESM ALTE EN C ARP INTERIA M ETALIC A m2 14.19 100.00
14.19
13.04.06 VALVULAS Y ACCESORIOS
13.04.06.01 SUM INISTRO E INSTALAC IO N DE VALVULAS Y AC C ESO RIO S (P URG A 1") G LB. 97.91 100.00
13.04.06.02 SUM INISTRO E INSTALAC IO N DE VALVULAS Y AC C ESO RIO S (P URG A 3/ 4") G LB. 1250.04 100.00
13.04.06.03 TAP A M ETALIC A (0.40 X 0.40M )+M ARC O DE M ETAL und 1536.21 100.00
2884.16
14 CON EXION ES DOMICILIARIAS
14.01 CON EXION ES DOMICILIARIAS - AGUA (17 UN D)
14.01.01 TRAZO Y REP LANTEO DE ZANJA ml 41.31 100.00
14.01.02 EXC AVAC . ZANJAS P ARA TUBERIA DE 1/ 2" HASTA 1.00 M P RO F ml 184.11 100.00
14.01.03 REFINE Y NIVELAC IO N ZANJA P ARA TUBERIA ml 11.22 100.00
14.01.04 P REP ARAC IO N C AM A DE AP O YO C / M AT ZARANDEADO D/ LUG AR; E= 0.10M ml 92.14 100.00
14.01.05 RELLENO C O M P AC TADO C AP AS 0.30M HASTA 1.20M C / M AT. ZAR. DEL LUG AR ml 302.09 100.00
14.01.06 C O NEXIO N DE AG UA P O TABLE (8 M . P RO M EDIO ) und 3673.02 100.00
4303.89
15 PASE AÉREO L= 5.00M.
15.01 COLUMN A DE SOPORTE
15.01.01 TRABAJOS PRELIMIN ARES
15.01.01.01 LIM P IEZA DE TERRENO M ANUAL m2 1.08 100.00
15.01.01.02 TRAZO Y REP LANTEO P RELIM INAR DE ESTRUC TURAS m2 4.68 100.00
5.76
15.01.02 MOVIMIEN TO DE TIERRAS
15.01.02.01 EXC AVAC IO N M ANUAL P ARA ESTRUC TURAS EN T.N. m2 4.93 100.00
15.01.02.02 REFINE Y C O M P AC TAC IO N M ANUAL EN T.N. P ARA ESTRUC TURAS m2 4.48 100.00
15.01.02.03 RELLENO C O N M ATERIAL P RO P IO C O M P AC TADO m3 34.34 100.00
15.01.02.04 ELIM INAC IO N DE M ATERIAL EXC EDENTE A M ANO (D= 30 m ) M3 58.47 100.00
102.22
15.01.03 OBRAS DE CON CRETO ARMADO
15.01.03.01 C O NC RETO F'C = 100 KG / C M 2 P / SO LADO M3 25.05 100.00
15.01.03.02 C O NC RETO F'C = 210KG / C M 2 (ZAP ATAS) m3 623.44 100.00
15.01.03.03 C O NC RETO F'C = 210 KG / C M 2 EN C O LUM NAS m3 307.82 100.00
15.01.03.04 AC ERO F'Y= 4200 KG / C M 2 P ARA ZAPATAS kg 362.81 100.00
15.01.03.05 AC ERO F'Y= 4200 KG / C M 2 P ARA C O LUM NAS kg 561.65 100.00
15.01.03.06 ENC O FRADO Y DESENC O FRADO EN ZAP ATAS m2 304.77 100.00
15.01.03.07 ENC O FRADO Y DESENC O FRADO EN C O LUM NAS m2 502.87 100.00
2688.41
15.01.04 ACABADOS
15.01.04.01 TARRAJEO EXTERIO R; C :A 1:4, E = 1.50 C M m2 168.65 100.00
15.01.04.02 P INTURA LATEX EN ESTRUC TURA, 2 M ANO S m2 37.86 100.00
206.51
15.02 CAMARA DE AN CLAJE
15.02.01 TRABAJOS PRELIMIN ARES
15.02.01.01 LIM P IEZA DE TERRENO M ANUAL m2 0.53 100.00
15.02.01.02 TRAZO Y REP LANTEO P RELIM INAR DE ESTRUC TURAS m2 2.29 100.00
2.82
15.02.02 MOVIEN TO DE TIERRA
15.02.02.01 EXC AVAC IO N M ANUAL P ARA ESTRUC TURAS EN T.N. m2 0.99 100.00
15.02.02.02 REFINE Y C O M P AC TAC IO N M ANUAL EN T.N. P ARA ESTRUC TURAS m2 2.20 100.00
15.02.02.03 ELIM INAC IO N DE M ATERIAL EXC EDENTE A M ANO (D= 30 m ) M3 23.30 100.00
26.49
15.02.03 OBRAS DE CON CRETO
15.02.03.01 C O NC RETO F'C = 175 KG / C M 2 M3 453.45 100.00
15.02.03.02 ENC O FRADO Y DESENC O FRADO m2 46.16 100.00
499.61
15.03 TUBERIAS
15.03.01 SUM INISTRO E INSTALAC IÓ N DE TUBERIA DE FIERRO G ALVANIZADO ml 207.90 100.00
15.03.02 TUBERIA P VC -SAP N.TP . ISO 399.002 NTP A-5 DN 3/ 4" (26.5m m )+ ELEM ENTO S DE UNIO N+2% DESP.
ml 84.98 100.00
292.88
16 UN IDAD BÁSICA DE SAN EAMIEN TO
16.01 LETRIN AS CON ARRASTRE HIDRAULICO (19 UN D.)
16.01.01 TRABAJOS PRELIMIN ARES
16.01.01.01 LIM P IEZA DE TERRENO M ANUAL m2 0.00 0.00
16.01.01.02 TRAZO Y REP LANTEO P RELIM INAR m2 0.00 0.00
0.00
16.01.02 MOVIMIEN TO DE TIERRAS
16.01.02.01 EXC AVAC IO N M ANUAL P ARA ESTRUC TURAS EN SANEAM IENTO m3 0.00 0.00
16.01.02.02 RELLENO C O N M ATERIAL P RO P IO m3 0.00 0.00
16.01.02.03 AC ARREO DE M ATERIAL EXC EDENTE DP= 30 M . M3 0.00 0.00
0.00
16.01.03 CON CRETO SIMPLE
16.01.03.01 C IM IENTO C :H, 1:10 + 30% P .G . EN SANEAM IENTO m3 0.00 0.00
16.01.03.02 SO BREC IM IENTO C :H 1:10 m3 0.00 0.00
16.01.03.03 ENC O FRADO Y DESENC O FRADO EN SANEAM IENTO m2 0.00 0.00
16.01.03.04 C O NC RETO F'C = 175 KG / C M 2 LO SA PISO m3 0.00 0.00
16.01.04 CO N CRETO ARMADO
16.01.04.01 C O NC RETO F'C = 175 KG / C M 2 C AJ A DE REG ISTRO m3 1806.45 100.00
16.01.04.02 ENC O FRADO Y DESENC O FRADO EN C AJ A DE REG ISTRO m2 644.72 100.00
16.01.04.03 AC ERO F'Y= 4200 KG / C M 2 kg 221.17 100.00
2672.34
16.01.05 CO LUMN AS
16.01.05.01 C O NC RETO F'C = 175 KG / C M 2 EN C O LUM NAS M3 0.00 0.00
16.01.05.02 ENC O FRADO Y DESENC O FRADO EN C O LUM NAS m2 0.00 0.00
16.01.05.03 AC ERO F'Y= 4200 KG / C M 2 kg 0.00 0.00
0.00
16.01.06 VIGAS
16.01.06.01 C O NC RETO F'C = 175 Kg / c m 2 P ARA VIG AS DE TEC HO m3 1191.73 100.00
16.01.06.02 ENC O FRADO Y DESENC O FRADO EN VIG AS m2 2448.55 100.00
16.01.06.03 AC ERO F'Y= 4200 KG / C M 2 kg 3698.86 100.00
7339.14
16.01.07 MURO DE LADRILLO
16.01.07.01 M URO DE LADRILLO C ARAVISTA DE 18 HUEC O S DE SO G A C / M 1:4 x 1.5c m m2 0.00 0.00
16.01.07.02 EM P EDRADO DE P RO TEC C IO N C O N P IEDRA 4"- 6" m2 0.00 0.00
0.00
16.01.08 REVOQ UES Y EN LUCIDOS
16.01.08.01 TARRAJ EO DE M URO S, P ISO S Y TEC HO INTERIO R C / IM P ERM EBILIZANTE m2 4841.16 100.00
16.01.08.02 TARRAJ EO DE M URO S Y C O LUM NAS SEM I P ULIDO EXTERIO R m2 5905.36 100.00
16.01.08.03 BRUÑAS DE 1" m 486.78 100.00
16.01.08.04 EM BO Q UILLADO DE M EZC LA C EM ENTO Y ARENA m2 131.62 100.00
11364.92
16.01.09 PIN TURA
16.01.09.01 P INTURA LATEX EN M URO S EXTERIO RES m2 537.21 100.00
16.01.09.02 P INTURA LATEX EN M URO S INTERIO RES m2 1449.72 100.00
1986.93
16.01.10 CO BERTURA
16.01.10.01 C O BERTURA C O N C ALAM INA G ALVANIZADA m2 2433.91 100.00
2433.91
16.01.11 CARPIN TERIA METALICA
16.01.11.01 INSTALAC IO N DE P UERTA M ETALIC A INC LUYE AC SESO RIO S G LB. 4721.69 100.00
16.01.11.02 VENTANA DE M ADERA TO RNILLO INC . M ALLA M O SQ UITERA m2 314.67 100.00
5036.36
16.01.12 CARPIN TERIA DE MADERA
16.01.12.01 C O BERTURA DE M ADERA P ARA TEC HO G LB. 3186.68 100.00
3186.68
16.01.13 SISTEMA DE AGUA FRIA
16.01.13.01 TUBERIA Ø = 1/ 2" P VC SAP C L-10 m 852.15 100.00
852.15
16.01.14 ACCESORIOS PARA SISTEMA DE AGUA FRIA
16.01.14.01 TEE P VC -SAP 1/ 2" P ARA AG UA und 278.92 100.00
16.01.14.02 C O DO P VC -SAP 1/ 2" P ARA AG UA und 725.04 100.00
16.01.14.03 VALVULA DE C O M P UERTA DE BRO NC E DE 1/ 2" und 1359.64 100.00
16.01.14.04 SUM INISTRO E INSTALAC IO N DE DUC HA INC LUYE AC C ESO RIO S und 372.40 100.00
2736.00
16.01.15 SISTEMA DE DESAG UE
16.01.15.01 TUBERIA Ø = 2" P VC SAL m 3028.21 100.00
16.01.15.02 TUBERIA P VC SAL 4" m 1272.57 100.00
4300.78
16.01.16 ACCESORIOS PARA SISTEMA DE DESAGUE
16.01.16.01 C O DO P VC SAL 2"X90° p za 1208.40 100.00
16.01.16.02 C O DO 90º REVENTILADO P VC -SAL 2"X4" und 481.46 100.00
16.01.16.03 YEE C O N REDUC C IO N P VC SAL 2" A 4" P VC SAL p za 1163.56 100.00
2853.42
16.01.17 ADITAMIEN TO VARIOS
16.01.17.01 SUM IDERO DE BRO NC E DE 2" p za 1168.50 100.00
16.01.17.02 REG ISTRO RO SC ADO DE BRO NC E DE 2" p za 2069.86 100.00
16.01.17.03 INO DO RO DE LO SA VITRIFIC ADA C O LO R BLANC O INC LUYE TANQ UE und 3423.61 100.00
16.01.17.04 SUM INISTRO E INSTAL. DE TUBERIA DE VENTILAC IO N P VC 2" Y AC C ESO RIO S G LB. 519.46 100.00
7181.43
16.01.15 SISTEMA DE DESAGUE
16.01.15.01 TUBERIA Ø = 2 " P VC SAL m 30 28.21 100 .0 0
16.01.15.02 TUBERIA P VC SAL 4 " m 12 72.57 100 .0 0
43 00.78
16.01.16 ACCESORIOS PARA SISTEMA DE DESAGUE
16.01.16.01 C O DO P VC SAL 2"X90° p za 12 08.40 100 .0 0
16.01.16.02 C O DO 9 0º REVENTILADO P VC -SAL 2"X4" und 481 .4 6 100 .0 0
16.01.16.03 YEE C O N REDUC C IO N P VC SAL 2" A 4" P VC SAL p za 11 63.56 100 .0 0
28 53.42
16.01.17 ADITAMIEN TO VARIOS
16.01.17.01 SUM IDERO DE BRO NC E DE 2" p za 11 68.50 100 .0 0
16.01.17.02 REG ISTRO RO SC ADO DE BRO NC E DE 2" p za 20 69.86 100 .0 0
16.01.17.03 INO DO RO DE LO SA VITRIFIC ADA C O LO R BLANC O INC LUYE TANQ UE und 34 23.61 100 .0 0
16.01.17.04 SUM INISTRO E INSTAL. DE TUBERIA DE VENTILAC IO N P VC 2" Y AC C ESO RIO S G LB. 519 .4 6 100 .0 0
71 81.43
16.02 IN STALACION ES ELECTRICAS
16.02.01 IN STALACION ES DE ILUMIN ACION
16.02.01.01 SALIDA C ENTRO DE LUZ p to 10 24.86 100 .0 0
10 24.86
16.02.02 CAN ALIZACION Y/ O TUBERIAS
16.02.02.01 TUBERIA P VC SEL 1/ 2" m 801 .4 6 100 .0 0
801 .4 6
16.02.03 CON DUCTORES Y/ O CABLES
16.02.03.01 C ABLE ELEC TRIC O THW N°14 AWG (2.08m m 2 ) ml 457 .9 8 100 .0 0
457 .9 8
16.03 CON STRUCCION DE POZO PERCOLADOR
16.03.01 TRABAJOS PRELIMIN ARES
16.03.01.01 LIM P IEZA DE TERRENO M ANUAL m2 0.00 0.00
16.03.01.02 TRAZO Y REP LANTEO P RELIM INAR EN SANEAM IENTO m2 0.00 0.00
0.00
16.03.02 MOVIMIEN TO DE TIERRAS
16.03.02.01 EXC AVAC IO N M ANUAL P ARA ESTRUC TURAS EN SANEAM IENTO m3 0.00 0.00
16.03.02.02 RELLENO C O N M ATERIAL P RO P IO EN SANEAM IENTO m3 0.00 0.00
16.03.02.03 FILTRO DE G RAVA M3 37 80.90 48.74
16.03.02.04 AC ARREO DE M ATERIAL EXC EDENTE DP = 30 M . M3 0.00 0.00
37 80.90
16.03.03 TAPA DE CON CRETO
16.03.03.01 C O NC RETO F'C = 175 KG / C M 2 M3 21 07.70 100 .0 0
16.03.03.02 ENC O FRADO Y DESENC O FRADO m2 21 89.49 100 .0 0
16.03.03.03 AC ERO F'Y= 4200 KG / C M 2 kg 23 38.35 100 .0 0
66 35.54
16.03.04 AN ILLO DE CON CRETO
16.03.04.01 C O NC RETO F'C = 175 KG / C M 2 M3 0.00 0.00
16.03.04.02 ENC O FRADO Y DESENC O FRADO m2 0.00 0.00
16.03.04.03 AC ERO F'Y= 4200 KG / C M 2 kg 0.00 0.00
0.00
16.03.05 MURO DE LADRILLO
16.03.05.01 M URO DE LADRILLO ARTESANAL AM ARRE DE SO G A, J UNTA 1.5 C M M O RTERO 1:1:5 m2 0.00 0.00
0.00
16.03.06 SISTEMA DE DESAGÜE LLEGADA
16.03.06.01 TUBERIA Ø = 2 " P VC SAL m 392 .3 6 100 .0 0
16.03.06.02 C O DO P VC SAL 2"X90° p za 311 .0 3 100 .0 0
703 .3 9
1 6.0 4 IN STALACI
O N D E BI
O DI
G ESTOR
1 6.0 4 .0 1 TRABAJOS PRELI
MIN ARES
1 6.0 4 .0 1. 01 LIM P IEZA D E TERRENO M ANUAL m 2 0.0 0 0.0 0
1 6.0 4 .0 1. 02 TRAZO Y REP LANTEO P RELIM INAR EN SANEAM IENTO m 2 0.0 0 0.0 0
0.0 0
1 6.0 4 .0 2 MOVIMI
EN TO DE TI
ERRAS
1 6.0 4 .0 2. 01 EXC AVAC IO N M ANUAL P ARA ESTRUC TURAS EN SANEAM IENTO m 3 0.0 0 0.0 0
1 6.0 4 .0 2. 02 RELLEN O C O N M ATERIAL P RO P IO EN SANEAM IENTO m 3 0.0 0 0.0 0
1 6.0 4 .0 2. 03 AC ARREO D E M ATERIAL EXC EDENTE DP = 30 M . M3 0.0 0 0.0 0
0.0 0
1 6.0 4 .0 3 CO N CRETO SI
MP LE
1 6.0 4 .0 3. 01 SO LADO e = 4" m 2 -1 9 2 .5 4 -1 0 0 .0 0
- 1 9 2.5 4
1 6.0 4 .0 4 CO N CRETO ARMADO
1 6.0 4 .0 4. 01 C O NC RETO F'C = 1 7 5 KG / C M 2 M3 2 7 79 .4 7 1 0 0 .0 0
1 6.0 4 .0 4. 02 ENC O FRADO Y DESENC O FRADO m 2 2 2 08 .0 3 1 0 0 .0 0
1 6.0 4 .0 4. 03 AC ERO F'Y= 4 20 0 KG / C M 2 kg 4 0 9 .8 9 1 0 0 .0 0
5 3 97 .3 9
1 6.0 4 .0 5 BI
O DI
G ESTOR DE 60 0 LT Y 16 0 0 LT
1 6.0 4 .0 5. 01 SUM INISTRO E INSTALAC IO N DE BIO DIG ESTO R AU TO LIM P IABLE DE P VC DE 6 0 0 LTS un d 1 25 7 0 .90 5 2 .6 3
1 25 7 0 .90
1 6.0 4 .0 6 REVO Q UES Y EN LUCI
DO S
1 6.0 4 .0 6. 01 TARRAJ EO C / IM P ERM EABILIZANTE M EZC LA 1 :2 , e = 1 .5 C M m 2 1 7 16 .9 3 1 0 0 .0 0
1 7 16 .9 3
1 6.0 4 .0 7 SUMI
NISTRO E I
N STALACION DE TUBERIAS
1 6.0 4 .0 7. 01 TUBERIA Ø = 2 " P VC SAL m 2 1 9 .6 4 1 0 0 .0 0
1 6.0 4 .0 7. 02 SUM INISTRO E INSTALAC IO N DE VALVULA P VC 2" un d 5 2 6 .1 1 1 0 0 .0 0
1 6.0 4 .0 7. 03 TUBERIA Ø = 4 " P VC SAP m 5 1 61 .9 2 1 0 0 .0 0
5 9 07 .6 7
1 6.0 5 LAVADERO DO MI
CILI
ARI
O (1 9 UN D)
1 6.0 5 .0 1 O BRAS DE CO N CRETO SI
MPLE
1 6.0 5 .0 1. 01 C O NC RETO F'C = 1 4 0 KG / C M 2 M3 1 0 0 .8 1 1 0 0 .0 0
1 6.0 5 .0 1. 02 ENC O FRADO Y DESENC O FRADO m 2 3 7 5 .7 9 1 0 0 .0 0
4 7 6 .6 0
1 6.0 5 .0 2 O BRAS DE CO N CRETO ARMADO
1 6.0 5 .0 2. 01 C O NC RETO F'C = 2 1 0 KG / C M 2 M3 1 5 00 .1 5 1 0 0 .0 0
1 6.0 5 .0 2. 02 AC ERO F'Y= 4 20 0 KG / C M 2 kg 7 7 1 .8 8 1 0 0 .0 0
1 6.0 5 .0 2. 03 ENC O FRADO Y DESENC O FRADO m 2 3 0 56 .8 5 1 0 0 .0 0
5 3 28 .8 8
1 6.0 5 .0 3 MURO DE LADRI
L LO
1 6.0 5 .0 3. 01 M URO DE SO G A C / LADRILLO K- K ARTESANAL DE ARC ILLA DE 9 x 1 2 x2 4 m 2 2 2 13 .6 5 1 0 0 .0 0
2 2 13 .6 5
1 6.0 5 .0 4 REVESTIMI
EN TOS
1 6.0 5 .0 4. 01 TARRAJ EO P ULIDO C O N C EM ENTO Y ARENA (TABLERO Y P O ZA) m 2 9 6 1 .0 0 1 0 0 .0 0
1 6.0 5 .0 4. 02 P INTURA DE M URO S EN LAVADERO C O N ESM ALTE m 2 2 2 1 .3 3 1 0 0 .0 0
1 1 82 .3 3
1 6.0 5 .0 5 ACC ESO RIOS Y V ALVULAS
1 6.0 5 .0 5. 01 SUM INISTRO E INST. DE AC C ESO RIO S P ARA LAVADERO un d 9 8 1 .9 2 1 0 0 .0 0
9 8 1 .9 2
17 MI
T IG ACI
O N AMBIEN TAL
1 7.0 1 MI
T IGACIO N DEL I
MPACTO AMBI
EN TAL
1 7.0 1 .0 1 EDUC ACI
ON EN MAN TEN I
MIEN TO Y CO N SERVACION AMBI
EN TAL
1 7.0 1 .0 1. 01 C AP AC ITAC IÓ N A LA C O M UNID AD BENEFIC IARIA G LB 1 75 0 6 .77 1 0 0 .0 0
1 75 0 6 .77
1 7.0 2 PLAN DE MO N I
T O REO A RQ UEO LOGI
CO
1 7.0 2 .0 1 ELABO RAC IO N DE P LAN DE M O NITO REO E INFO RM E FINAL ( ARQ .) G LB. 0.0 0 0.0 0
1 7.0 2 .0 2 IM P LEM ENTAC IO N DE P LAN DE M O NITO REO ( ARQ .) G LB. 0.0 0 0.0 0
1 7.0 2 .0 3 G ASTO S ADM INISTRATIVO S Y TUP A AL M C G LB. 0.0 0 0.0 0
0.0 0
1 7.0 3 CO N TROL DE CALI
DAD
1 7.0 3 .0 1 DISEÑO DE M EZC LAS (F'C = 2 1 0 KG / C M 2 Y F'C = 17 5 KG / C M 2 ) G LB 0.0 0 0.0 0
1 7.0 3 .0 2 P RUEBA DE C ALIDAD DEL C O NC RETO :RO TURA DE P RO BETAS G LB 0.0 0 0.0 0
0.0 0
18 FLETE TERRESTRE
1 8.0 1 FLETE TERRESTRE Y RURAL G LB. 1 00 0 9 .00 1 0 .0 0
1 00 0 9 .00

46 3 7 3 7 .9 5
CO STO DIRECTO TOTAL 46 3 7 3 7 .9 5
16.05.03 MURO DE LADRILLO
16.05.03.01 M URO DE SO G A C / LADRILLO K-K ARTESANAL DE ARC ILLA DE 9x12x24 m2 2213.65 100.00
2213.65
16.05.04 REVESTIMIEN TOS
16.05.04.01 TARRAJEO PULIDO C O N C EM ENTO Y ARENA (TABLERO Y P O ZA) m2 961.00 100.00
16.05.04.02 P INTURA DE M URO S EN LAVADERO C O N ESM ALTE m2 221.33 100.00
1182.33
16.05.05 ACCESORIOS Y VALVULAS
16.05.05.01 SUM INISTRO E INST. DE AC C ESO RIO S P ARA LAVADERO und 981.92 100.00
981.92
17 MITIGACION AMBIEN TAL
17.01 MITIGACION DEL IMPACTO AMBIEN TAL
17.01.01 EDUCACION EN MAN TEN IMIEN TO Y CON SERVACION AMBIEN TAL
17.01.01.01 C APAC ITAC IÓ N A LA C O M UNIDAD BENEFIC IARIA G LB 17506.77 100.00
17506.77
17.02 PLAN DE MON ITOREO ARQUEOLOGICO
17.02.01 ELABO RAC IO N DE P LAN DE M O NITO REO E INFO RM E FINAL (ARQ .) G LB. 0.00 0.00
17.02.02 IM PLEM ENTAC IO N DE P LAN DE M O NITO REO (ARQ .) G LB. 0.00 0.00
17.02.03 G ASTO S ADM INISTRATIVO S Y TUP A AL M C G LB. 0.00 0.00
0.00
17.03 CON TROL DE CALIDAD
17.03.01 DISEÑO DE M EZC LAS (F'C = 210 KG / C M 2 Y F'C =175 KG / C M 2) G LB 0.00 0.00
17.03.02 PRUEBA DE C ALIDAD DEL C O NC RETO :RO TURA DE PRO BETAS G LB 0.00 0.00
0.00
18 FLETE TERRESTRE
18.01 FLETE TERRESTRE Y RURAL G LB. 10009.00 10.00
10009.00

463737.95
COSTO DIRECTO TOTAL 463737.95

COSTO DIRECTO (CD) 463737.95


GASTOS GENERALES (13.7 %) 63532.10
UTILIDAD (10.0 %) 46373.80
SUB TOTAL 573643.84
IGV (18%) 103255.89
PRESUPUESTO DE OBRA 676899.73
TOTAL 676899.73
% AVANCE FISICO 37.23%