Obra: "CONSTRUCCION DE CAMPO DEPORTIVO SAN JOSE DE COZO EN LA LOCALIDAD DE SAN JOSE DE COZO, DISTRITO DE YARUMAYO, PROVINCIA HUANUCO, DEPARTAMENTO HUANUCO"
Ubicación: REGION: HUANUCO DISTRITO: YARUMAYO LOCALIDAD:SAN JOSE DE COZO
Fecha: Feb-11
01 CAMPO DEPORTIVO
3744.07
01.01 OBRAS PROVISIONALES S/. 3,744.07
3607.87
01.02 OBRAS PRELIMINARES S/. 3,607.87
1273.00
01.04 TRANSPORTE DE MATERIALES S/. 1,273.00
02 CONSTRUCCION DE TRIBUNA
557.28
02.01 OBRAS PRELIMINARES S/. 557.28
30708.18
02.02 CONCRETO SIMPLE S/. 30,708.18
8715.32
02.02 CONSTRUCCION DE GRADAS S/. 8,715.32
590.00
03.01 OBRAS PRELIMINARES S/. 590.00
04 MALLA OLIMPICA
53.10
04.01 OBRAS PRELIMINARES S/. 53.10
243.18
04.02 MOVIMIENTO DE TIERRAS S/. 243.18
5085.39
04.03 OBRAS DE CONCRETO SIMPLE S/. 5,085.39
7112.00 7112.00
04.04 CARPINTERIA METALICA S/. 14,224.00
697.95 697.95
04.05 PINTURA S/. 1,395.89
05 ENROCADO DE MURO
165.51
05.01 TRABAJOS PRELIMINARES S/. 165.51
4899.00 4899.00
05.02 MOVIMIENTO DE TIERRAS S/. 9,798.00
1000.00
06.01 IMPACTO AMBIENTAL S/. 1,000.00
COSTO DIRECTO S/. 7,351.94 S/. 45,592.80 S/. 45,592.80 S/. 45,592.80 S/. 3,938.05 S/. 2,632.33 S/. 32,836.33 S/. 8,958.50 S/. 12,362.90 S/. 12,011.00 S/. 5,596.95 S/. 1,697.95 S/. 224,164.36
UTILIDAD (10.0%) S/. 735.19 S/. 4,559.28 S/. 4,559.28 S/. 4,559.28 S/. 393.81 S/. 263.23 S/. 3,283.63 S/. 895.85 S/. 1,236.29 S/. 1,201.10 S/. 559.69 S/. 169.79 S/. 22,416.44
GASTOS GENERALES (10.0%) S/. 735.19 S/. 4,559.28 S/. 4,559.28 S/. 4,559.28 S/. 393.81 S/. 263.23 S/. 3,283.63 S/. 895.85 S/. 1,236.29 S/. 1,201.10 S/. 559.69 S/. 169.79 S/. 22,416.44
SUB TOTAL S/. 8,822.33 S/. 54,711.36 S/. 54,711.36 S/. 54,711.36 S/. 4,725.66 S/. 3,158.80 S/. 39,403.60 S/. 10,750.20 S/. 14,835.48 S/. 14,413.20 S/. 6,716.33 S/. 2,037.53 S/. 268,997.24
I.G.V. 18% S/. 1,588.02 S/. 9,848.05 S/. 9,848.05 S/. 9,848.05 S/. 850.62 S/. 568.58 S/. 7,092.65 S/. 1,935.04 S/. 2,670.39 S/. 2,594.38 S/. 1,208.94 S/. 366.76 S/. 48,419.50
PRESUPUESTO DE OBRA S/. 10,410.35 S/. 64,559.41 S/. 64,559.41 S/. 64,559.41 S/. 5,576.28 S/. 3,727.38 S/. 46,496.25 S/. 12,685.24 S/. 17,505.87 S/. 17,007.58 S/. 7,925.27 S/. 2,404.29 S/. 317,416.74
AVANCE PARCIAL (MES) S/. 204,088.58 S/. 68,485.15 S/. 44,843.01 S/. 317,416.74
PORCENTAJE MENSUAL 64.30% 21.58% 14.13% 100.00%
CRONOGRAMA VALORIZADO DE OBRA
Obra: RECUPERACION DE CARPETA ASFALTICA AV. SANTA TRAMO AV. CHIMBOTE Y AV. COUNTRY.
Ubicación: AV. SANTA ,URB. BUENOS AIRES PRIMERA ETAPA
Hecho por: Ing° RAFAEL ALEGRE SILVA
Fecha: 20 DE DICIEMBRE DEL AÑO 2,002
1573.68 1000.00
02.00.00 OBRAS PRELIMINARES
128.25 128.25
03.00.00 MOVIMIENTO DE TIERRAS
9415.60 18831.20
04.00.00 PAVIMENTOS
05.00.00 PINTURA
1795.68
19959.45 12806.75 64593.18 64593.18
1596.76 1024.54 5167.45
21556.21 13831.29 69760.63
3325.39 2133.70 10761.70
24881.60 15964.99
80522.33
30.90 19.83
80.17 100.00