AREQUIPA
CLIENTE: BANCO DE LA NACION
LUGAR: AREQUIPA - CASTILLA - PAMPACOLCA
HECHO POR: GUTIERREZ BARON SILVIA AMARILIS
VALORIZACIONES
ITEM DESCRIPCIÓN Und. Metrado Precio Parcial
1 2 3 4
1 OBRAS PROVISIONALES
1.01 TRANSPORTE DE MATERIALES Y EQUIPOS A OBRA cjt 1.00 4,095.36 4,095.36 1.00 0.00 0.00 0.00 1.00
1.02 CERCO PERIMETRICO PROVISIONAL m 26.61 64.34 1,712.09 26.61 0.00 0.00 0.00 26.61
1.03 CARTEL DE IDENTIFICACION DE LA OBRA und 1.00 1,013.26 1,013.26 1.00 0.00 0.00 0.00 1.00
2 TRABAJOS PRELIMINARES
2.1 DEMOLICIONES
2.01.01 DEMOLICION DE CIMIENTOS DE CONCRETO SIMPLE MANUAL m3 3.09 259.01 800.34 3.09 0.00 0.00 0.00 3.09
2.01.02 DEMOLICION DE MUROS DE ALBAÑILERIA m2 42.16 24.35 1,026.60 42.16 0.00 0.00 0.00 42.16
2.01.03 DEMOLICION DE PISOS VINILICOS m2 74.27 3.65 271.09 74.27 0.00 0.00 0.00 74.27
2.01.04 DEMOLICION DE PISO LOSETA m2 3.95 12.70 50.17 3.95 0.00 0.00 0.00 3.95
2.01.05 DEMOLICION DE REVESTIMIENTO DE PIEDRA EN FACHADA m2 9.12 24.35 222.07 9.12 0.00 0.00 0.00 9.12
2.01.06 DEMOLICION DE PISO DE CONCRETO SIMPLE EN VEREDA m2 10.92 19.48 212.72 10.92 0.00 0.00 0.00 10.92
2.2 DESMONTAJES
2.02.01 DESMONTAJE DE PUERTAS DE MADERA m2 7.65 19.48 149.02 7.65 0.00 0.00 0.00 7.65
2.02.02 DESMONTAJE DE VENTANAS DE MADERA m2 5.54 24.35 134.90 5.54 0.00 0.00 0.00 5.54
2.02.03 DESMONTAJE DE CONTRAZOCALO DE MADERA m 56.08 1.93 108.23 56.08 0.00 0.00 0.00 56.08
2.02.04 DESMONTAJE DE PUERTAS METALICAS m2 4.98 20.87 103.93 4.98 0.00 0.00 0.00 4.98
2.02.05 DESMONTAJE DE VENTANAS METALICAS m2 18.26 29.22 533.56 18.26 0.00 0.00 0.00 18.26
2.02.06 DESMONTAJE DE APARATOS SANITARIOS und 3.00 19.62 58.86 3.00 0.00 0.00 0.00 3.00
2.02.07 DESMONTAJE DE ELEMENTOS ELECTRICOS und 15.00 13.08 196.20 15.00 0.00 0.00 0.00 15.00
2.03 TRAZO Y REPLANTEO m2 71.07 8.81 626.13 71.07 0.00 0.00 0.00 71.07
2.4 SEGURIDAD Y SALUD
2.04.01 EQUIPOS DE SEGURIDAD INDIVIDUAL und 10.00 225.13 2,251.30 10.00 0.00 0.00 0.00 10.00
2.04.02 EQUIPOS DE PROTECCION COLECTIVA cjt 1.00 2,295.59 2,295.59 1.00 0.00 0.00 0.00 1.00
2.04.03 SEÑALIZACION TEMPORAL DE SEGURIDAD cjt 1.00 145.08 145.08 0.30 0.40 0.30 0.00 1.00
2.04.04 CAPACITACION EN SEGURIDAD Y SALUD cjt 1.00 760.00 760.00 0.25 0.25 0.25 0.25 1.00
E 2.04.05 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SALU cjt 1.00 234.77 234.77 0.25 0.25 0.25 0.25 1.00
S
3 CARPINTERIA DE MADERA
T 3.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 17.38 40.01 695.37 8.69 8.69 0.00 0.00 17.38
R 3.02 ELLENO Y COMPACTACION CON MATERIAL PROPIO m3 0.33 22.98 7.58 0.13 0.20 0.00 0.00 0.33
U 3.03 ELIMINACION DE MATERIAL EXCEDENTE m3 48.61 26.25 1,276.01 14.58 14.58 9.72 9.73 48.61
C
4 CONCRETO SIMPLE
T 4.01 CONCRETO PARA CALZADURA MEZCLA 1:10 (C:H) 30% P.G. m3 1.15 191.73 220.49 0.52 0.58 0.05 0.00 1.15
U
4.02 CONCRETO PARA SOLADOS e=2" MEZCLA 1:10 m2 10.93 24.72 270.19 4.92 5.46 0.55 0.00 10.93
R
4.03 CONCRETO PARA CIMIENTOS CORRIDOS 1:10 (C:H) + 30% P.G. m3 4.70 192.70 905.69 2.12 2.34 0.24 0.00 4.70
A
4.04 CONCRETO PARA SOBRECIMIENTO 1:8 (C:H) + 25% P.M. m3 0.74 267.23 197.75 0.33 0.37 0.04 0.00 0.74
4.05 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS m2 9.91 45.67 452.59 4.46 4.95 0.50 0.00 9.91
4.06 FALSO PISO DE 4" CON MEZC. 1:8 C:H m2 70.17 32.63 2,289.65 0.00 42.10 28.07 0.00 70.17
4.07 CONCRETO f'c=175kg/cm2 PARA VEREDA Y RAMPA m3 2.85 350.34 998.47 0.00 0.00 2.85 0.00 2.85
4.08 JUNTA DE DILATACION e=1" + SELLO ASFALTICO m2 5.62 15.30 85.99 0.00 0.00 5.62 0.00 5.62
5 CONCRETO ARMADO
6.01 MURO DE SOGA LADRILLO KING KONG MEZCLA C:A 1:5 TIPO IV m2 30.87 65.98 2,036.91 0.00 12.35 18.52 0.00 30.87
6.02 MURO DE CABEZA LADRILLO KING KONG MEZCLA C:A 1:5 TIPO IV m2 17.76 100.00 1,775.92 0.00 7.10 10.66 0.00 17.76
6.03 TABIQUE DE DRYWALL m2 7.92 131.33 1,040.16 0.00 0.00 6.34 1.58 7.92
7 REVOQUES ENLUCIDOS Y MOLDURAS
7.01 TARRAJEO PRIMARIO RAYADO O PRIMARIO C/MEZCLA 1:5 e=1.5 cm m2 22.76 21.60 491.55 0.00 4.55 15.93 2.28 22.76
7.02 TARRAJEO MUROS INT. Y EXT. FROTACHADO MEZ. C:A 1:5 e=1.5 cm m2 83.53 23.54 1,966.25 0.00 25.06 50.12 8.35 83.53
7.03 TARRAJEO DE PLACAS Y COLUMNAS MEZ. C:A 1:5 e=1.5 cm m2 63.97 23.12 1,479.07 0.00 12.79 44.78 6.40 63.97
7.04 VESTIDURA DE DERRAMES C/MEZCLA C:A 1:5 e=1.5 cm m 57.62 16.69 961.63 0.00 34.57 17.29 5.76 57.62
7.05 BRUÑAS DE 1cm m 83.95 8.27 694.33 0.00 33.58 33.58 16.79 83.95
7.06 TARRAJEO FROTACHADO CON IMPERMEABILIZANTE PARA CISTERNA MEZC. C:A m2 10.75 25.19 270.78 0.00 0.00 10.75 0.00 10.75
8 CIELORRASOS
8.01 CIELORRASO CON MEZCLA C:A 1:5 e=1.5 cm m2 5.39 39.18 211.21 0.00 1.08 3.77 0.54 5.39
8.02 FALSO CIELORRASO CON BALDOSA ACUSTICA DE FIBRA MINERAL m2 60.02 225.65 13,543.57 0.00 0.00 0.00 60.02 60.02
9 PISOS, CONTRAPISOS Y PAVIMENTOS
9.01 CONTRAPISO e=42mm m2 68.86 28.19 1,941.23 0.00 0.00 48.20 20.66 68.86
9.02 PISO DE CERAMICO DE 0.31x0.31m m2 68.86 462.13 31,822.38 0.00 0.00 48.20 20.66 68.86
9.03 PISO DE CEMENTO PULIDO e=2" m2 7.11 85.65 608.99 0.00 0.00 7.11 0.00 7.11
9.04 PISO DE CEMENTO FROTACHADO m2 8.68 28.85 250.41 0.00 0.00 8.68 0.00 8.68
9.05 PISO DE CEMENTO FROTACHADO Y BRUÑADO EN RAMPA m2 8.34 30.40 253.51 0.00 0.00 8.34 0.00 8.34
10 CONTRAZOCALOS
10.01 CONTRAZOCALO DE CERAMICO 10x31cm m 51.18 33.93 1,736.38 0.00 0.00 35.83 15.35 51.18
10.02 CONTRAZOCALO DE CEMENTO h=10cm MEZCLA 1:5 m 13.09 11.18 146.40 0.00 0.00 10.47 2.62 13.09
11 ZOCALOS
11.01 ZOCALO DE CERAMICO DE 31 x 31cm m2 22.75 267.03 6,074.90 0.00 0.00 15.92 6.83 22.75
12 CARPINTERIA DE MADERA
12.01 PUERTA CONTRAPLACADA CON TRIPLAY e=6mm PINTADO AL DUCO CON REJIL m2 7.98 334.35 2,668.11 0.00 0.00 0.00 7.98 7.98
12.02 PUERTA CONTRAPLACADA CON TRIPLAY e=6mm PINTADA AL DUCO und 1.00 446.53 446.53 0.00 0.00 0.00 1.00 1.00
13 CARPINTERIA METALICA
A 13.02.03 REJA METALICA DE INGRESO (P-8) und 1.00 2,145.52 2,145.52 0.00 0.00 0.00 1.00 1.00
R 13.02.04 REJA DE SEGURIDAD (R-4) und 1.00 1,187.63 1,187.63 0.00 0.00 0.00 1.00 1.00
Q 13.02.05 REJA DE SEGURIDAD (R-1, R-2 Y R-3) m2 1.53 406.39 621.78 0.00 0.00 0.00 1.53 1.53
U 13.03 ESTRUCTURAS METALICAS
I 13.03.01 BARANDA METALICA und 1.00 1,124.49 1,124.49 0.00 0.00 0.00 1.00 1.00
T 14 CERRAJERIA
E 14.01 CERRADURAS
C 14.01.01 CERRADURA TIPO PERILLA pza 6.00 56.55 339.29 0.00 0.00 0.00 6.00 6.00
T 15 CRISTAL TEMPLADO Y SIMILARES
U 15.01 CRISTALES
R 15.01.01 PUERTA PRINCIPAL PC-1 und 1.00 2,329.17 2,329.17 0.00 0.00 0.00 1.00 1.00
A 15.01.02 PUERTA PC-2 und 2.00 1,135.16 2,270.31 0.00 0.00 0.00 2.00 2.00
15.01.03 PUERTA PC-3 und 1.00 894.81 894.81 0.00 0.00 0.00 1.00 1.00
15.01.04 TABIQUE DE CRISTAL TEMPLADO m2 8.43 469.55 3,958.31 0.00 0.00 0.00 8.43 8.43
15.01.05 VENTANA PRINCIPAL V-1 und 1.00 2,482.50 2,482.50 0.00 0.00 0.00 1.00 1.00
15.02 CRISTAL CON ALUMINIO
15.02.01 VENTANAS DE ALUMINIO CON CRISTAL TEMPLADO DE 10mm m2 1.37 727.63 996.85 0.00 0.00 0.00 1.37 1.37
16 PINTURA
16.01 PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 242.90 18.98 4,610.83 0.00 0.00 145.74 97.16 242.90
16.02 PINTURA EN CIELORRASOS Y VIGAS 2 MANOS m2 15.56 21.22 330.13 0.00 0.00 9.34 6.22 15.56
17 APARATOS Y ACCESORIOS SANITARIOS
17.01 APARATOS SANITARIOS
17.01.01 INODORO SIFON JET DE LOSA COLOR BLANCO (SIN COLOCACION) pza 2.00 180.64 361.28 0.00 0.00 1.00 1.00 2.00
17.01.02 LAVATORIO MALIBU DE LOSA COLOR BLANCO (SIN COLOCACION) pza 2.00 34.36 68.72 0.00 0.00 1.00 1.00 2.00
17.01.03 LAVATORIO FONTANA DE LOSA COLOR BLANCO (SIN COLOCACION) pza 1.00 123.25 123.25 0.00 0.00 0.00 1.00 1.00
17.02 ACCESORIOS SANITARIOS
17.02.01 DISPENSADOR DE JABON LIQUIDO pza 3.00 47.00 141.00 0.00 0.00 0.00 3.00 3.00
17.02.02 PAPELERA DE LOSA C/EJE ADOSADA pza 2.00 14.35 28.70 0.00 0.00 0.00 2.00 2.00
17.02.03 ASIENTO PARA INODORO pza 2.00 8.90 17.80 0.00 0.00 0.00 2.00 2.00
17.02.04 ESPEJOS DE 0.60 x 0.50 m pza 2.00 96.27 192.54 0.00 0.00 0.00 2.00 2.00
17.02.05 GANCHOS DOBLES pza 2.00 12.07 24.14 0.00 0.00 0.00 2.00 2.00
17.02.06 DISPENSADOR DE PAPEL TOALLA pza 2.00 73.37 146.74 0.00 0.00 0.00 2.00 2.00
17.03 COLOCACION DE APARATOS Y ACCESORIOS SANITARIOS
17.03.01 COLOCACION DE APARATOS SANITARIOS pza 5.00 92.85 464.26 0.00 0.00 0.00 5.00 5.00
17.03.02 COLOCACION DE ACCESORIOS SANITARIOS pza 13.00 28.15 365.94 0.00 0.00 0.00 13.00 13.00
18 VARIOS 1,156.34
18.01 LETRERO DEL BANCO DE LA NACION0 und 1.00 1,156.34 1,156.34 0.00 0.00 0.00 1.00
19 MOBILIARIO
19.01 MUEBLES DE MELAMINA
19.01.01 MODULO DE ATENCION EN MELAMINA 18mm und 3.00 3,355.33 10,065.99 0.00 0.00 0.00 3.00 3.00
19.01.02 MESA PARA FORMULARIOS EN MELAMINA e = 18mm und 1.00 917.21 917.21 0.00 0.00 0.00 1.00 1.00
19.01.03 CLOSET PARA TABLEROS EN MELAMINA e = 18mm und 1.00 2,002.14 2,002.14 0.00 0.00 0.00 1.00 1.00
19.02 MESA DE RECONTEO und 1.00 221.18 221.18 0.00 0.00 0.00 1.00 1.00
19.03 PAPELERA METALICA pza 1.00 231.55 231.55 0.00 0.00 0.00 1.00 1.00
19.04 ESTANTE METALICO und 4.00 77.12 308.47 0.00 0.00 0.00 4.00 4.00
19.05 SEÑALETICA cjt 1.00 186.04 186.04 0.00 0.00 0.00 1.00 1.00
20 SISTEMA DE DESAGUE
20.01 SALIDAS DE DESAGUE Y VENTILACION
20.01.01 1.20 1.80 0.00 0.00
SALIDAS PARA DESAGUE PVC - SAP 2" pto 3.00 112.90 338.70 3.00
20.01.02 0.80 1.20 0.00 0.00
SALIDAS PARA DESAGUE PVC - SAP 4" pto 2.00 151.54 303.08 2.00
20.01.03 0.00 0.80 1.20 0.00
SALIDAS PARA VENTILACION PVC - SAL 2" pto 2.00 105.40 210.80 2.00
20.02 REDES DE DESAGUE
20.02.01 12.98 19.46 0.00 0.00
TUBERIA PVC - SAP 2" (RED COLECTOR) m 32.44 28.07 910.59 32.44
20.02.02 1.42 2.12 0.00 0.00
TUBERIA PVC - SAP 4" (RED COLECTOR) m 3.54 31.57 111.76 3.54
20.02.03 0.00 8.15 8.15 0.00
TUBERIA PVC - SAL 2" (VENTILACION) m 16.30 17.18 280.03 16.30
20.03 ACCESORIOS DE REDES
20.03.01 3.00 2.00 0.00 0.00
CODO 90º DE DESAGUE DE PVC 2" pza 5.00 14.58 72.90 5.00
20.03.02 1.20 0.80 0.00 0.00
CODO 90º DE DESAGUE DE PVC 4" pza 2.00 24.06 48.12 2.00
20.03.03 1.20 0.80 0.00 0.00
YEE DESAGUE DE PVC 4" pza 2.00 27.41 54.82 2.00
20.03.04 1.80 1.20 0.00 0.00
YEE DESAGUE DE PVC 2" pza 3.00 151.90 455.70 3.00
20.03.05 1.20 0.80 0.00 0.00
TEE DESAGUE DE PVC 4" pza 2.00 59.90 119.80 2.00
20.04 ADITAMENTOS VARIOS
0.00 0.00 1.00 0.00
S 20.04.01 REGISTROS DE BRONCE DE 4" pza 1.00 85.37 85.37 1.00
0.00 0.00 3.00 0.00
A 20.04.02 REGISTROS DE BRONCE DE 2" pza 3.00 43.05 129.15 3.00
0.00 0.00 1.00 0.00
N 20.04.03 SUMIDERO DE BRONCE 2" pza 1.00 35.60 35.60 1.00
I 20.04.04 SOMBRERO VENTILACION DE 2" pza 2.00 27.51 55.02
0.00 0.00 0.80 1.20
2.00 0 0.8 0.8 0.4
T 20.05 VARIOS
A 21.01.01 SALIDA DE AGUA FRIA PVC clase 10 de 21mm (1/2") inc. tuberia y acc. pto 5.00 101.56 507.80
0.00 2.00 3.00 0.00
5.00
S 21.02.02 TUBERIA PVC CLASE 10 33.0mm (1") m 29.55 17.59 519.78
5.91 17.73 5.91 0.00
29.55
21.02.02 0.00 21.45 14.30 0.00
TUBERIA PVC CLASE 10 26.5mm (3/4") m 35.75 17.02 608.47 35.75
21.03 ACCESORIOS DE REDES
21.03.01 0.00 7.80 5.20 0.00
CODO PVC CLASE 10 - 33.0mm (1") pza 13.00 6.39 83.07 13.00
21.03.02 0.00 9.60 6.40 0.00
CODO PVC CLASE 10 - 26.5mm (3/4") pza 16.00 5.66 90.56 16.00
21.03.03 0.00 7.20 4.80 0.00
CODO PVC CLASE 10 - 21.0mm (1/2") pza 12.00 5.07 60.84 12.00
21.03.04 0.00 1.20 0.80 0.00
TEE PVC CLASE 10 - 26.5mm (3/4") pza 2.00 7.62 15.24 2.00
21.03.05 0.00 1.20 0.80 0.00
TEE PVC CLASE 10 - 21.0mm (1/2") pza 2.00 6.46 12.92 2.00
21.04 LLAVES Y VALVULAS
21.04.01 0.00 0.00 1.00 0.00
VALVULA DE COMPUERTA DE BRONCE ø 26.5 mm (3/4") und 1.00 79.88 79.88 1.00
21.04.02 0.00 0.00 3.00 0.00
VALVULA DE COMPUERTA DE BRONCE ø 21.0 mm (1/2") und 3.00 72.42 217.26 3.00
21.05 VARIOS
21.05.01 0.00 0.60 0.40 0.00
ACCESORIOS DE CISTERNA cjt 1.00 179.08 179.08 1.00
21.05.02 0.00 0.00 1.00 0.00
SISTEMA DE BOMBEO cjt 1.00 695.36 695.36 1.00
21.05.03 0.00 0.00 1.00 0.00
TANQUE ELEVADO 600 L und 1.00 800.10 800.10 1.00
21.05.04 0.00 0.00 3.00 0.00
NICHOS EN PARED PARA VALVULAS und 3.00 55.81 167.43 3.00
21.05.05 0.00 0.00 65.30 0.00
PRUEBA HIDRAULICA + DESINFECCION DE SISTEMA AGUA FRIA m 65.3 6.27 409.43 65.30
22 SISTEMA ELECTRICO
22.01 SALIDAS PARA ALUMBRADO
22.01.01 0.00 15.50 15.50 0.00
SALIDA PARA CENTRO DE LUZ EN TECHO pto 31.00 79.73 2,471.63 31.00
22.01.02 0.00 0.00 1.00 0.00
SALIDA PARA LETRERO LUMINOSO pto 1.00 96.28 96.28 1.00
22.02 SALIDAS PARA TOMACORRIENTES
22.02.01 0.00 6.40 9.60 0.00
TOMACORRIENTE DOBLE / T BIPASO pto 16.00 135.75 2,172.00 16.00
22.02.02 0.00 0.00 0.00 9.00
TOMACORRIENTE DOBLE / T BIPASO EN MUEBLE pto 9.00 63.12 568.08 9.00
22.02.03 0.00 0.00 0.00 17.00
TOMACORRIENTE DOBLE / T BIPASO ESTABILIZADO pto 17.00 56.45 959.65 17.00
22.02.04 0.00 0.00 0.00 5.00
TOMACORRIENTE DOBLE / T BIPASO H=2.20 pto 5.00 94.46 472.30 5.00
22.02.05 0.00 0.00 0.00 1.00
SALIDA PARA CERRADURA ELECTRICA pto 1.00 70.23 70.23 1.00
22.03 SALIDAS PARA INTERRUPTORES
22.03.01 0.00 0.00 6.60 4.40
INTERRUPTOR UNIPOLAR SIMPLE pto 11.00 68.44 752.84 11.00
22.03.02 0.00 0.00 0.60 0.40
INTERRUPTOR UNIPOLAR SIMPLE pto 1.00 103.72 103.72 1.00
22.03.03 0.00 0.00 0.00 1.00
PULSADOR PARA CERRADURA ELECTRICA pto 1.00 52.14 52.14 1.00
22.04 SALIDAS DE FUERZA
22.04.01 0.00 0.30 0.50 0.20
SALIDA DE FUERZA PARA ELECTROBOMBAS pto 1.00 115.54 115.54 1.00
22.5 ALIMENTADORES
22.05.01 0.00 0.00 18.00 12.00
ALIMENTADOR 2 - 1x10mm2 LSOH + 1x10mm2 / T - 25mm PVC-P m 30.00 28.41 852.30 30.00
22.05.02 0.00 0.00 12.50 5.35
ALIMENTADOR 2 - 1x6mm2 LSOH + 1x6mm2 / T - 25mm PVC-P m 17.85 49.69 886.97 17.85
22.05.03 0.00 0.00 11.03 4.72
CONDUCTOR DE Cu DESNUDO 1x10 mm2 - 20mm PVC-P m 15.75 18.48 291.06 15.75
22.06 CAJAS DE PASE
22.06.01 0.00 0.00 6.40 1.60
CAJA DE PASE CUADRADA DE FºGº 100 x 100 x 50 mm und 8.00 11.42 91.36 8.00
22.07 TABLEROS
0.00 0.00 0.00 1.00
E 22.07.01 TABLERO TG - 1 und 1.00 1,800.69 1,800.69 1.00
0.00 0.00 0.00 1.00
L 22.07.02 TABLERO T - EM und 1.00 1,097.93 1,097.93 1.00
E 22.07.03 TABLERO T - ES und 1.00 1,633.65 1,633.65
0.00 0.00 0.00 1.00
1.00
C 22.08 ARTEFACTOS DE ALUMBRADO
COSTO DIRECTO
207,578.68
GASTOS GENERALES 10 %
20,757.87
UTILIDAD 5 %
10,378.93
SUB TOTAL
238,715.48
IGV 18%
42,968.79
TOTAL DE PRESUPUESTO
281,684.27
VALORIZACION
1 OBRAS PROVISIONALES
1.01 TRANSPORTE DE MATERIALES Y EQUIPOS A OBRA cjt 1.00 4,095.36 4,095.36
2.2 DESMONTAJES
2.02.01 DESMONTAJE DE PUERTAS DE MADERA m2 7.65 19.48 149.02
2.02.02 DESMONTAJE DE VENTANAS DE MADERA m2 5.54 24.35 134.90
2.02.03 DESMONTAJE DE CONTRAZOCALO DE MADERA m 56.08 1.93 108.23
2.02.04 DESMONTAJE DE PUERTAS METALICAS m2 4.98 20.87 103.93
2.02.05 DESMONTAJE DE VENTANAS METALICAS m2 18.26 29.22 533.56
2.02.06 DESMONTAJE DE APARATOS SANITARIOS und 3.00 19.62 58.86
2.02.07 DESMONTAJE DE ELEMENTOS ELECTRICOS und 15.00 13.08 196.20
2.03 TRAZO Y REPLANTEO m2 71.07 8.81 626.13
2.4 SEGURIDAD Y SALUD
2.04.01 EQUIPOS DE SEGURIDAD INDIVIDUAL und 10.00 225.13 2,251.30
2.04.02 EQUIPOS DE PROTECCION COLECTIVA cjt 1.00 2,295.59 2,295.59
2.04.03 SEÑALIZACION TEMPORAL DE SEGURIDAD cjt 1.00 145.08 145.08
2.04.04 CAPACITACION EN SEGURIDAD Y SALUD cjt 1.00 760.00 760.00
2.04.05 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SALU cjt 1.00 234.77 234.77
3 CARPINTERIA DE MADERA
3.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 17.38 40.01 695.37
3.02 ELLENO Y COMPACTACION CON MATERIAL PROPIO m3 0.33 22.98 7.58
3.03 ELIMINACION DE MATERIAL EXCEDENTE m3 48.61 26.25 1,276.01
4 CONCRETO SIMPLE
4.01 CONCRETO PARA CALZADURA MEZCLA 1:10 (C:H) 30% P.G. m3 1.15 191.73 220.49
4.02 CONCRETO PARA SOLADOS e=2" MEZCLA 1:10 m2 10.93 24.72 270.19
4.03 CONCRETO PARA CIMIENTOS CORRIDOS 1:10 (C:H) + 30% P.G. m3 4.7 192.7 905.69
4.04 CONCRETO PARA SOBRECIMIENTO 1:8 (C:H) + 25% P.M. m3 0.74 267.23 197.75
4.05 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS m2 9.91 45.67 452.59
4.06 FALSO PISO DE 4" CON MEZC. 1:8 C:H m2 70.17 32.63 2,289.65
4.07 CONCRETO f'c=175kg/cm2 PARA VEREDA Y RAMPA m3 2.85 350.34 998.47
4.08 JUNTA DE DILATACION e=1" + SELLO ASFALTICO m2 5.62 15.30 85.99
5 CONCRETO ARMADO
5.01.02 ENCOFRADO Y DESENCOFRADO NORMAL DE PLACAS Y LOSAS DE BOVEDA m2 52.36 76.22 3,990.88
5.01.03 ACERO fy=4200 kg/cm2 GRADO 60 PARA PLACAS Y LOSAS DE BOVEDA kg 956.56 4.30 4,113.21
5.02 COLUMNAS
5.02.01 CONCRETO f'c= 210 kg/cm2 PARA COLUMNAS m3 1.19 477.82 568.61
5.02.03 ACERO fy=4200 kg/cm2 GRADO 60 PARA COLUMNAS kg 274.16 4.30 1,178.89
5.03 VIGAS
5.03.01 CONCRETO f'c= 210 kg/cm2 PARA VIGAS m3 0.56 477.82 267.58
5.03.03 ACERO fy=4200 kg/cm2 GRADO 60 PARA VIGAS kg 96.38 4.30 414.43
5.4 CISTERNA
5.04.01 CONCRETO f'c= 210 kg/cm2 PARA CISTERNA m3 2.82 470.83 1,327.74
5.5 GRADAS
5.05.01 CONCRETO f'c= 210 kg/cm2 PARA GRADAS m3 0.62 424.45 263.16
5.05.03 ACERO fy=4200 kg/cm2 GRADO 60 PARA GRADAS kg 26.94 4.21 113.42
VALORIZACION N° 01
PARCIAL %
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
101.56 70.00%
570.00 75.00%
176.08 75.00%
347.69 50.00%
4.60 61.00%
893.29 70.00%
120.79 55.00%
148.57 55.00%
497.17 55.00%
109.56 55.00%
248.90 55.00%
2,289.65 100.00%
998.47 100.00%
85.99 100.00%
4,494.99 100.00%
3,990.88 100.00%
4,113.21 100.00%
568.61 100.00%
2,766.02 100.00%
1,178.89 100.00%
267.58 100.00%
1,532.25 100.00%
414.43 100.00%
1,327.74 100.00%
1,354.43 100.00%
1,242.66 100.00%
263.16 100.00%
98.29 100.00%
113.42 100.00%
30318.88 63.00%
3031.89
1515.94
34866.71
0.93
32426.04
VALORIZACION
1 OBRAS PROVISIONALES
1.01 TRANSPORTE DE MATERIALES Y EQUIPOS A OBRA cjt 1.00 4,095.36 4,095.36
2.2 DESMONTAJES
2.02.01 DESMONTAJE DE PUERTAS DE MADERA m2 7.65 19.48 149.02
2.02.02 DESMONTAJE DE VENTANAS DE MADERA m2 5.54 24.35 134.90
2.02.03 DESMONTAJE DE CONTRAZOCALO DE MADERA m 56.08 1.93 108.23
2.02.04 DESMONTAJE DE PUERTAS METALICAS m2 4.98 20.87 103.93
2.02.05 DESMONTAJE DE VENTANAS METALICAS m2 18.26 29.22 533.56
2.02.06 DESMONTAJE DE APARATOS SANITARIOS und 3.00 19.62 58.86
2.02.07 DESMONTAJE DE ELEMENTOS ELECTRICOS und 15.00 13.08 196.20
2.03 TRAZO Y REPLANTEO m2 71.07 8.81 626.13
2.4 SEGURIDAD Y SALUD
2.04.01 EQUIPOS DE SEGURIDAD INDIVIDUAL und 10.00 225.13 2,251.30
2.04.02 EQUIPOS DE PROTECCION COLECTIVA cjt 1.00 2,295.59 2,295.59
2.04.03 SEÑALIZACION TEMPORAL DE SEGURIDAD cjt 1.00 145.08 145.08
2.04.04 CAPACITACION EN SEGURIDAD Y SALUD cjt 1.00 760.00 760.00
2.04.05 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SALU cjt 1.00 234.77 234.77
3 CARPINTERIA DE MADERA
3.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 17.38 40.01 695.37
3.02 ELLENO Y COMPACTACION CON MATERIAL PROPIO m3 0.33 22.98 7.58
3.03 ELIMINACION DE MATERIAL EXCEDENTE m3 48.61 26.25 1,276.01
4 CONCRETO SIMPLE
4.01 CONCRETO PARA CALZADURA MEZCLA 1:10 (C:H) 30% P.G. m3 1.15 191.73 220.49
4.02 CONCRETO PARA SOLADOS e=2" MEZCLA 1:10 m2 10.93 24.72 270.19
4.03 CONCRETO PARA CIMIENTOS CORRIDOS 1:10 (C:H) + 30% P.G. m3 4.7 192.7 905.69
4.04 CONCRETO PARA SOBRECIMIENTO 1:8 (C:H) + 25% P.M. m3 0.74 267.23 197.75
4.05 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS m2 9.91 45.67 452.59
4.06 FALSO PISO DE 4" CON MEZC. 1:8 C:H m2 70.17 32.63 2,289.65
4.07 CONCRETO f'c=175kg/cm2 PARA VEREDA Y RAMPA m3 2.85 350.34 998.47
4.08 JUNTA DE DILATACION e=1" + SELLO ASFALTICO m2 5.62 15.30 85.99
5 CONCRETO ARMADO
5.01.02 ENCOFRADO Y DESENCOFRADO NORMAL DE PLACAS Y LOSAS DE BOVEDA m2 52.36 76.22 3,990.88
5.01.03 ACERO fy=4200 kg/cm2 GRADO 60 PARA PLACAS Y LOSAS DE BOVEDA kg 956.56 4.30 4,113.21
5.02 COLUMNAS
5.02.01 CONCRETO f'c= 210 kg/cm2 PARA COLUMNAS m3 1.19 477.82 568.61
5.02.03 ACERO fy=4200 kg/cm2 GRADO 60 PARA COLUMNAS kg 274.16 4.30 1,178.89
5.03 VIGAS
5.03.01 CONCRETO f'c= 210 kg/cm2 PARA VIGAS m3 0.56 477.82 267.58
5.03.03 ACERO fy=4200 kg/cm2 GRADO 60 PARA VIGAS kg 96.38 4.30 414.43
5.4 CISTERNA
5.04.01 CONCRETO f'c= 210 kg/cm2 PARA CISTERNA m3 2.82 470.83 1,327.74
5.5 GRADAS
5.05.01 CONCRETO f'c= 210 kg/cm2 PARA GRADAS m3 0.62 424.45 263.16
5.05.03 ACERO fy=4200 kg/cm2 GRADO 60 PARA GRADAS kg 26.94 4.21 113.42
VALORIZACION N° 02
PARCIAL %
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
43.52 30.00%
380.00 50.00%
117.39 50.00%
0.00 0.00%
0.00 0.00%
510.56 40.00%
9.59 4.00%
13.60 5.00%
46.25 5.00%
10.69 5.00%
22.84 5.00%
915.92 40.00%
998.47 100.00%
85.99 100.00%
1,799.91 40.00%
1,596.05 40.00%
1,645.27 40.00%
229.35 40.00%
1,106.71 40.00%
471.54 40.00%
105.12 39.00%
613.05 40.00%
165.77 40.00%
532.04 40.00%
541.92 40.00%
497.08 40.00%
212.23 81.00%
78.64 80.00%
90.73 80.00%
12,840.23 27.00%
1284.02
642.01
14,766.26
0.93
13732.62
VALORIZACION
1 OBRAS PROVISIONALES
1.01 TRANSPORTE DE MATERIALES Y EQUIPOS A OBRA cjt 1.00 4,095.36 4,095.36
2.2 DESMONTAJES
2.02.01 DESMONTAJE DE PUERTAS DE MADERA m2 7.65 19.48 149.02
2.02.02 DESMONTAJE DE VENTANAS DE MADERA m2 5.54 24.35 134.90
2.02.03 DESMONTAJE DE CONTRAZOCALO DE MADERA m 56.08 1.93 108.23
2.02.04 DESMONTAJE DE PUERTAS METALICAS m2 4.98 20.87 103.93
2.02.05 DESMONTAJE DE VENTANAS METALICAS m2 18.26 29.22 533.56
2.02.06 DESMONTAJE DE APARATOS SANITARIOS und 3.00 19.62 58.86
2.02.07 DESMONTAJE DE ELEMENTOS ELECTRICOS und 15.00 13.08 196.20
2.03 TRAZO Y REPLANTEO m2 71.07 8.81 626.13
2.4 SEGURIDAD Y SALUD
2.04.01 EQUIPOS DE SEGURIDAD INDIVIDUAL und 10.00 225.13 2,251.30
2.04.02 EQUIPOS DE PROTECCION COLECTIVA cjt 1.00 2,295.59 2,295.59
2.04.03 SEÑALIZACION TEMPORAL DE SEGURIDAD cjt 1.00 145.08 145.08
2.04.04 CAPACITACION EN SEGURIDAD Y SALUD cjt 1.00 760.00 760.00
2.04.05 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SALU cjt 1.00 234.77 234.77
3 CARPINTERIA DE MADERA
3.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 17.38 40.01 695.37
3.02 ELLENO Y COMPACTACION CON MATERIAL PROPIO m3 0.33 22.98 7.58
3.03 ELIMINACION DE MATERIAL EXCEDENTE m3 48.61 26.25 1,276.01
4 CONCRETO SIMPLE
4.01 CONCRETO PARA CALZADURA MEZCLA 1:10 (C:H) 30% P.G. m3 1.15 191.73 220.49
4.02 CONCRETO PARA SOLADOS e=2" MEZCLA 1:10 m2 10.93 24.72 270.19
4.03 CONCRETO PARA CIMIENTOS CORRIDOS 1:10 (C:H) + 30% P.G. m3 4.7 192.7 905.69
4.04 CONCRETO PARA SOBRECIMIENTO 1:8 (C:H) + 25% P.M. m3 0.74 267.23 197.75
4.05 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS m2 9.91 45.67 452.59
4.06 FALSO PISO DE 4" CON MEZC. 1:8 C:H m2 70.17 32.63 2,289.65
4.07 CONCRETO f'c=175kg/cm2 PARA VEREDA Y RAMPA m3 2.85 350.34 998.47
4.08 JUNTA DE DILATACION e=1" + SELLO ASFALTICO m2 5.62 15.30 85.99
5 CONCRETO ARMADO
5.01.02 ENCOFRADO Y DESENCOFRADO NORMAL DE PLACAS Y LOSAS DE BOVEDA m2 52.36 76.22 3,990.88
5.01.03 ACERO fy=4200 kg/cm2 GRADO 60 PARA PLACAS Y LOSAS DE BOVEDA kg 956.56 4.30 4,113.21
5.02 COLUMNAS
5.02.01 CONCRETO f'c= 210 kg/cm2 PARA COLUMNAS m3 1.19 477.82 568.61
5.02.03 ACERO fy=4200 kg/cm2 GRADO 60 PARA COLUMNAS kg 274.16 4.30 1,178.89
5.03 VIGAS
5.03.01 CONCRETO f'c= 210 kg/cm2 PARA VIGAS m3 0.56 477.82 267.58
5.03.03 ACERO fy=4200 kg/cm2 GRADO 60 PARA VIGAS kg 96.38 4.30 414.43
5.4 CISTERNA
5.04.01 CONCRETO f'c= 210 kg/cm2 PARA CISTERNA m3 2.82 470.83 1,327.74
5.5 GRADAS
5.05.01 CONCRETO f'c= 210 kg/cm2 PARA GRADAS m3 0.62 424.45 263.16
5.05.03 ACERO fy=4200 kg/cm2 GRADO 60 PARA GRADAS kg 26.94 4.21 113.42
VALORIZACION N° 03
PARCIAL %
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
190.00 25.00%
58.69 25.00%
0.00 0.00%
0.00 0.00%
255.41 20.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
504.10 1.00%
50.41
25.21
579.72
0.93
539.14
VALORIZACION
1 OBRAS PROVISIONALES
1.01 TRANSPORTE DE MATERIALES Y EQUIPOS A OBRA cjt 1.00 4,095.36 4,095.36
2.2 DESMONTAJES
2.02.01 DESMONTAJE DE PUERTAS DE MADERA m2 7.65 19.48 149.02
2.02.02 DESMONTAJE DE VENTANAS DE MADERA m2 5.54 24.35 134.90
2.02.03 DESMONTAJE DE CONTRAZOCALO DE MADERA m 56.08 1.93 108.23
2.02.04 DESMONTAJE DE PUERTAS METALICAS m2 4.98 20.87 103.93
2.02.05 DESMONTAJE DE VENTANAS METALICAS m2 18.26 29.22 533.56
2.02.06 DESMONTAJE DE APARATOS SANITARIOS und 3.00 19.62 58.86
2.02.07 DESMONTAJE DE ELEMENTOS ELECTRICOS und 15.00 13.08 196.20
2.03 TRAZO Y REPLANTEO m2 71.07 8.81 626.13
2.4 SEGURIDAD Y SALUD
2.04.01 EQUIPOS DE SEGURIDAD INDIVIDUAL und 10.00 225.13 2,251.30
2.04.02 EQUIPOS DE PROTECCION COLECTIVA cjt 1.00 2,295.59 2,295.59
2.04.03 SEÑALIZACION TEMPORAL DE SEGURIDAD cjt 1.00 145.08 145.08
2.04.04 CAPACITACION EN SEGURIDAD Y SALUD cjt 1.00 760.00 760.00
2.04.05 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SALU cjt 1.00 234.77 234.77
3 CARPINTERIA DE MADERA
3.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 17.38 40.01 695.37
3.02 ELLENO Y COMPACTACION CON MATERIAL PROPIO m3 0.33 22.98 7.58
3.03 ELIMINACION DE MATERIAL EXCEDENTE m3 48.61 26.25 1,276.01
4 CONCRETO SIMPLE
4.01 CONCRETO PARA CALZADURA MEZCLA 1:10 (C:H) 30% P.G. m3 1.15 191.73 220.49
4.02 CONCRETO PARA SOLADOS e=2" MEZCLA 1:10 m2 10.93 24.72 270.19
4.03 CONCRETO PARA CIMIENTOS CORRIDOS 1:10 (C:H) + 30% P.G. m3 4.7 192.7 905.69
4.04 CONCRETO PARA SOBRECIMIENTO 1:8 (C:H) + 25% P.M. m3 0.74 267.23 197.75
4.05 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS m2 9.91 45.67 452.59
4.06 FALSO PISO DE 4" CON MEZC. 1:8 C:H m2 70.17 32.63 2,289.65
4.07 CONCRETO f'c=175kg/cm2 PARA VEREDA Y RAMPA m3 2.85 350.34 998.47
4.08 JUNTA DE DILATACION e=1" + SELLO ASFALTICO m2 5.62 15.30 85.99
5 CONCRETO ARMADO
5.01.02 ENCOFRADO Y DESENCOFRADO NORMAL DE PLACAS Y LOSAS DE BOVEDA m2 52.36 76.22 3,990.88
5.01.03 ACERO fy=4200 kg/cm2 GRADO 60 PARA PLACAS Y LOSAS DE BOVEDA kg 956.56 4.30 4,113.21
5.02 COLUMNAS
5.02.01 CONCRETO f'c= 210 kg/cm2 PARA COLUMNAS m3 1.19 477.82 568.61
5.02.03 ACERO fy=4200 kg/cm2 GRADO 60 PARA COLUMNAS kg 274.16 4.30 1,178.89
5.03 VIGAS
5.03.01 CONCRETO f'c= 210 kg/cm2 PARA VIGAS m3 0.56 477.82 267.58
5.03.03 ACERO fy=4200 kg/cm2 GRADO 60 PARA VIGAS kg 96.38 4.30 414.43
5.4 CISTERNA
5.04.01 CONCRETO f'c= 210 kg/cm2 PARA CISTERNA m3 2.82 470.83 1,327.74
5.5 GRADAS
5.05.01 CONCRETO f'c= 210 kg/cm2 PARA GRADAS m3 0.62 424.45 263.16
5.05.03 ACERO fy=4200 kg/cm2 GRADO 60 PARA GRADAS kg 26.94 4.21 113.42
VALORIZACION N° 04
PARCIAL %
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.93
0.00
VALORIZACION
6.01 MURO DE SOGA LADRILLO KING KONG MEZCLA C:A 1:5 TIPO IV m2 30.87 65.98 2,036.91
6.02 MURO DE CABEZA LADRILLO KING KONG MEZCLA C:A 1:5 TIPO IV m2 17.76 100.00 1,775.92
7.01 TARRAJEO PRIMARIO RAYADO O PRIMARIO C/MEZCLA 1:5 e=1.5 cm m2 22.76 21.60 491.55
7.02 TARRAJEO MUROS INT. Y EXT. FROTACHADO MEZ. C:A 1:5 e=1.5 cm m2 83.53 23.54 1,966.25
7.03 TARRAJEO DE PLACAS Y COLUMNAS MEZ. C:A 1:5 e=1.5 cm m2 63.97 23.12 1,479.07
7.04 VESTIDURA DE DERRAMES C/MEZCLA C:A 1:5 e=1.5 cm m 57.62 16.69 961.63
7.06 TARRAJEO FROTACHADO CON IMPERMEABILIZANTE PARA CISTERNA MEZC. C:A m2 10.75 25.19 270.78
8 CIELORRASOS
8.01 CIELORRASO CON MEZCLA C:A 1:5 e=1.5 cm m2 5.39 39.18 211.21
8.02 FALSO CIELORRASO CON BALDOSA ACUSTICA DE FIBRA MINERAL m2 60.02 225.65 13,543.57
9 PISOS, CONTRAPISOS Y PAVIMENTOS
12.01 PUERTA CONTRAPLACADA CON TRIPLAY e=6mm PINTADO AL DUCO CON REJIL m2 7.98 334.35 2,668.11
12.02 PUERTA CONTRAPLACADA CON TRIPLAY e=6mm PINTADA AL DUCO und 1.00 446.53 446.53
13 CARPINTERIA METALICA
16 PINTURA
16.01 PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 242.90 18.98 4,610.83
17.01.02 LAVATORIO MALIBU DE LOSA COLOR BLANCO (SIN COLOCACION) pza 2.00 34.36 68.72
17.01.03 LAVATORIO FONTANA DE LOSA COLOR BLANCO (SIN COLOCACION) pza 1.00 123.25 123.25
18 VARIOS
18.01 LETRERO DEL BANCO DE LA NACION0 und 1.00 1,156.34 1,156.34
19 MOBILIARIO
19.01 MUEBLES DE MELAMINA
19.01.01 MODULO DE ATENCION EN MELAMINA 18mm und 3.00 3,355.33 10,065.99
19.01.02 MESA PARA FORMULARIOS EN MELAMINA e = 18mm und 1.00 917.21 917.21
19.01.03 CLOSET PARA TABLEROS EN MELAMINA e = 18mm und 1.00 2,002.14 2,002.14
VALORIZACION N° 01
PARCIAL %
2,036.91 100.00%
1,775.92 100.00%
1,040.16 100.00%
491.55 100.00%
1,966.25 100.00%
1,479.07 100.00%
961.63 100.00%
694.33 100.00%
270.78 100.00%
211.21 100.00%
13,543.57 100.00%
1,941.23 100.00%
31,822.38 100.00%
608.99 100.00%
250.41 100.00%
253.51 100.00%
1,736.38 100.00%
146.40 100.00%
6,074.90 100.00%
2,668.11 100.00%
446.53 100.00%
2,447.29 100.00%
1,839.37 100.00%
1,067.37 100.00%
2,145.52 100.00%
1,187.63 100.00%
621.78 100.00%
1,124.49 100.00%
339.29 100.00%
2,329.17 100.00%
2,270.31 100.00%
894.81 100.00%
3,958.31 100.00%
2,482.50 100.00%
996.85 100.00%
4,610.83 100.00%
330.13 100.00%
361.28 100.00%
68.72 100.00%
123.25 100.00%
141.00 100.00%
28.70 100.00%
17.80 100.00%
192.54 100.00%
24.14 100.00%
146.74 100.00%
464.26 100.00%
365.94 100.00%
1,156.34 100.00%
10,065.99 100.00%
917.21 100.00%
2,002.14 100.00%
221.18 100.00%
231.55 100.00%
308.47 100.00%
186.04 100.00%
116,089.16 100.00%
11608.92
5804.46
133,502.54
0.93
124157.36
VALORIZACION
6.01 MURO DE SOGA LADRILLO KING KONG MEZCLA C:A 1:5 TIPO IV m2 30.87 65.98 2,036.91
6.02 MURO DE CABEZA LADRILLO KING KONG MEZCLA C:A 1:5 TIPO IV m2 17.76 100.00 1,775.92
7.01 TARRAJEO PRIMARIO RAYADO O PRIMARIO C/MEZCLA 1:5 e=1.5 cm m2 22.76 21.60 491.55
7.02 TARRAJEO MUROS INT. Y EXT. FROTACHADO MEZ. C:A 1:5 e=1.5 cm m2 83.53 23.54 1,966.25
7.03 TARRAJEO DE PLACAS Y COLUMNAS MEZ. C:A 1:5 e=1.5 cm m2 63.97 23.12 1,479.07
7.04 VESTIDURA DE DERRAMES C/MEZCLA C:A 1:5 e=1.5 cm m 57.62 16.69 961.63
7.06 TARRAJEO FROTACHADO CON IMPERMEABILIZANTE PARA CISTERNA MEZC. C:A m2 10.75 25.19 270.78
8 CIELORRASOS
8.01 CIELORRASO CON MEZCLA C:A 1:5 e=1.5 cm m2 5.39 39.18 211.21
8.02 FALSO CIELORRASO CON BALDOSA ACUSTICA DE FIBRA MINERAL m2 60.02 225.65 13,543.57
9 PISOS, CONTRAPISOS Y PAVIMENTOS
12.01 PUERTA CONTRAPLACADA CON TRIPLAY e=6mm PINTADO AL DUCO CON REJIL m2 7.98 334.35 2,668.11
12.02 PUERTA CONTRAPLACADA CON TRIPLAY e=6mm PINTADA AL DUCO und 1.00 446.53 446.53
13 CARPINTERIA METALICA
16 PINTURA
16.01 PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 242.90 18.98 4,610.83
17.01.02 LAVATORIO MALIBU DE LOSA COLOR BLANCO (SIN COLOCACION) pza 2.00 34.36 68.72
17.01.03 LAVATORIO FONTANA DE LOSA COLOR BLANCO (SIN COLOCACION) pza 1.00 123.25 123.25
18 VARIOS
18.01 LETRERO DEL BANCO DE LA NACION0 und 1.00 1,156.34 1,156.34
19 MOBILIARIO
19.01 MUEBLES DE MELAMINA
19.01.01 MODULO DE ATENCION EN MELAMINA 18mm und 3.00 3,355.33 10,065.99
19.01.02 MESA PARA FORMULARIOS EN MELAMINA e = 18mm und 1.00 917.21 917.21
19.01.03 CLOSET PARA TABLEROS EN MELAMINA e = 18mm und 1.00 2,002.14 2,002.14
VALORIZACION N° 02
PARCIAL %
1,222.01 60.00%
1,065.95 60.00%
1,040.16 100.00%
393.28 80.00%
1,376.35 70.00%
1,183.35 80.00%
384.65 40.00%
416.60 60.00%
270.78 100.00%
168.89 80.00%
13,543.57 100.00%
1,941.23 100.00%
31,822.38 100.00%
608.99 100.00%
250.41 100.00%
253.51 100.00%
1,736.38 100.00%
146.40 100.00%
6,074.90 100.00%
2,668.11 100.00%
446.53 100.00%
2,447.29 100.00%
1,839.37 100.00%
1,067.37 100.00%
2,145.52 100.00%
1,187.63 100.00%
621.78 100.00%
1,124.49 100.00%
339.29 100.00%
2,329.17 100.00%
2,270.31 100.00%
894.81 100.00%
3,958.31 100.00%
2,482.50 100.00%
996.85 100.00%
4,610.83 100.00%
330.13 100.00%
361.28 100.00%
68.72 100.00%
123.25 100.00%
141.00 100.00%
28.70 100.00%
17.80 100.00%
192.54 100.00%
24.14 100.00%
146.74 100.00%
464.26 100.00%
365.94 100.00%
1,156.34 100.00%
10,065.99 100.00%
917.21 100.00%
2,002.14 100.00%
221.18 100.00%
231.55 100.00%
308.47 100.00%
186.04 100.00%
112,683.37 97.00%
11268.34
5634.17
129,585.88
0.93
120514.87
VALORIZACION
6.01 MURO DE SOGA LADRILLO KING KONG MEZCLA C:A 1:5 TIPO IV m2 30.87 65.98 2,036.91
6.02 MURO DE CABEZA LADRILLO KING KONG MEZCLA C:A 1:5 TIPO IV m2 17.76 100.00 1,775.92
7.01 TARRAJEO PRIMARIO RAYADO O PRIMARIO C/MEZCLA 1:5 e=1.5 cm m2 22.76 21.60 491.55
7.02 TARRAJEO MUROS INT. Y EXT. FROTACHADO MEZ. C:A 1:5 e=1.5 cm m2 83.53 23.54 1,966.25
7.03 TARRAJEO DE PLACAS Y COLUMNAS MEZ. C:A 1:5 e=1.5 cm m2 63.97 23.12 1,479.07
7.04 VESTIDURA DE DERRAMES C/MEZCLA C:A 1:5 e=1.5 cm m 57.62 16.69 961.63
7.06 TARRAJEO FROTACHADO CON IMPERMEABILIZANTE PARA CISTERNA MEZC. C:A m2 10.75 25.19 270.78
8 CIELORRASOS
8.01 CIELORRASO CON MEZCLA C:A 1:5 e=1.5 cm m2 5.39 39.18 211.21
8.02 FALSO CIELORRASO CON BALDOSA ACUSTICA DE FIBRA MINERAL m2 60.02 225.65 13,543.57
9 PISOS, CONTRAPISOS Y PAVIMENTOS
12.01 PUERTA CONTRAPLACADA CON TRIPLAY e=6mm PINTADO AL DUCO CON REJIL m2 7.98 334.35 2,668.11
12.02 PUERTA CONTRAPLACADA CON TRIPLAY e=6mm PINTADA AL DUCO und 1.00 446.53 446.53
13 CARPINTERIA METALICA
16 PINTURA
16.01 PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 242.90 18.98 4,610.83
17.01.02 LAVATORIO MALIBU DE LOSA COLOR BLANCO (SIN COLOCACION) pza 2.00 34.36 68.72
17.01.03 LAVATORIO FONTANA DE LOSA COLOR BLANCO (SIN COLOCACION) pza 1.00 123.25 123.25
18 VARIOS
18.01 LETRERO DEL BANCO DE LA NACION0 und 1.00 1,156.34 1,156.34
19 MOBILIARIO
19.01 MUEBLES DE MELAMINA
19.01.01 MODULO DE ATENCION EN MELAMINA 18mm und 3.00 3,355.33 10,065.99
19.01.02 MESA PARA FORMULARIOS EN MELAMINA e = 18mm und 1.00 917.21 917.21
19.01.03 CLOSET PARA TABLEROS EN MELAMINA e = 18mm und 1.00 2,002.14 2,002.14
VALORIZACION N° 03
PARCIAL %
0.00 0.00%
0.00 0.00%
207.51 20.00%
49.24 10.00%
196.55 10.00%
147.98 10.00%
96.16 10.00%
138.87 20.00%
0.00 0.00%
21.16 10.00%
13,543.57 100.00%
582.42 30.00%
9,547.64 30.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
520.78 30.00%
29.30 20.00%
1,823.80 30.00%
2,668.11 100.00%
446.53 100.00%
2,447.29 100.00%
1,839.37 100.00%
1,067.37 100.00%
2,145.52 100.00%
1,187.63 100.00%
621.78 100.00%
1,124.49 100.00%
339.29 100.00%
2,329.17 100.00%
2,270.31 100.00%
894.81 100.00%
3,958.31 100.00%
2,482.50 100.00%
996.85 100.00%
1,844.33 40.00%
131.97 40.00%
180.64 50.00%
34.36 50.00%
123.25 100.00%
141.00 100.00%
28.70 100.00%
17.80 100.00%
192.54 100.00%
24.14 100.00%
146.74 100.00%
464.26 100.00%
365.94 100.00%
1,156.34 100.00%
10,065.99 100.00%
917.21 100.00%
2,002.14 100.00%
221.18 100.00%
231.55 100.00%
308.47 100.00%
186.04 100.00%
72,508.90 62.00%
7250.89
3625.45
83,385.24
0.93
77548.27
VALORIZACION
6.01 MURO DE SOGA LADRILLO KING KONG MEZCLA C:A 1:5 TIPO IV m2 30.87 65.98 2,036.91
6.02 MURO DE CABEZA LADRILLO KING KONG MEZCLA C:A 1:5 TIPO IV m2 17.76 100.00 1,775.92
7.01 TARRAJEO PRIMARIO RAYADO O PRIMARIO C/MEZCLA 1:5 e=1.5 cm m2 22.76 21.60 491.55
7.02 TARRAJEO MUROS INT. Y EXT. FROTACHADO MEZ. C:A 1:5 e=1.5 cm m2 83.53 23.54 1,966.25
7.03 TARRAJEO DE PLACAS Y COLUMNAS MEZ. C:A 1:5 e=1.5 cm m2 63.97 23.12 1,479.07
7.04 VESTIDURA DE DERRAMES C/MEZCLA C:A 1:5 e=1.5 cm m 57.62 16.68 961.10
7.06 TARRAJEO FROTACHADO CON IMPERMEABILIZANTE PARA CISTERNA MEZC. C:A m2 10.75 25.19 270.78
8 CIELORRASOS
8.01 CIELORRASO CON MEZCLA C:A 1:5 e=1.5 cm m2 5.39 39.18 211.21
8.02 FALSO CIELORRASO CON BALDOSA ACUSTICA DE FIBRA MINERAL m2 60.02 225.65 13,543.57
9 PISOS, CONTRAPISOS Y PAVIMENTOS
12.01 PUERTA CONTRAPLACADA CON TRIPLAY e=6mm PINTADO AL DUCO CON REJIL m2 7.98 334.35 2,668.11
12.02 PUERTA CONTRAPLACADA CON TRIPLAY e=6mm PINTADA AL DUCO und 1.00 446.53 446.53
13 CARPINTERIA METALICA
16 PINTURA
16.01 PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 242.90 18.98 4,610.83
17.01.02 LAVATORIO MALIBU DE LOSA COLOR BLANCO (SIN COLOCACION) pza 2.00 34.36 68.72
17.01.03 LAVATORIO FONTANA DE LOSA COLOR BLANCO (SIN COLOCACION) pza 1.00 123.25 123.25
18 VARIOS
18.01 LETRERO DEL BANCO DE LA NACION0 und 1.00 1156.34 1,156.34
19 MOBILIARIO
19.01 MUEBLES DE MELAMINA
19.01.01 MODULO DE ATENCION EN MELAMINA 18mm und 3.00 3355.33 10,065.99
19.01.02 MESA PARA FORMULARIOS EN MELAMINA e = 18mm und 1.00 917.21 917.21
19.01.03 CLOSET PARA TABLEROS EN MELAMINA e = 18mm und 1.00 2002.14 2,002.14
VALORIZACION N° 03
PARCIAL %
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.03 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.03 0.00%
0.00
0.00
0.03
0.93
0.03
VALORIZACION N
20 SISTEMA DE DESAGUE
20.01 SALIDAS DE DESAGUE Y VENTILACION
20.01.01 SALIDAS PARA DESAGUE PVC - SAP 2" pto 3.00 112.90 338.70
20.01.02 SALIDAS PARA DESAGUE PVC - SAP 4" pto 2.00 151.54 303.09
20.01.03 SALIDAS PARA VENTILACION PVC - SAL 2" pto 2.00 105.40 210.81
20.02 REDES DE DESAGUE
20.02.01 TUBERIA PVC - SAP 2" (RED COLECTOR) m 32.44 28.07 910.74
20.02.02 TUBERIA PVC - SAP 4" (RED COLECTOR) m 3.54 31.57 111.77
20.02.03 TUBERIA PVC - SAL 2" (VENTILACION) m 16.30 17.18 280.11
20.03 ACCESORIOS DE REDES
20.03.01 CODO 90º DE DESAGUE DE PVC 2" pza 5.00 14.58 72.88
20.03.02 CODO 90º DE DESAGUE DE PVC 4" pza 2.00 24.06 48.12
20.03.03 YEE DESAGUE DE PVC 4" pza 2.00 27.41 54.83
20.03.04 YEE DESAGUE DE PVC 2" pza 3.00 151.90 455.69
20.03.05 TEE DESAGUE DE PVC 4" pza 2.00 59.90 119.80
20.04 ADITAMENTOS VARIOS
20.04.01 REGISTROS DE BRONCE DE 4" pza 1.00 85.37 85.37
20.04.02 REGISTROS DE BRONCE DE 2" pza 3.00 43.05 129.14
20.04.03 SUMIDERO DE BRONCE 2" pza 1.00 35.60 35.60
20.04.04 SOMBRERO VENTILACION DE 2" pza 2.00 27.51 55.02
20.05 VARIOS
20.05.01 PRUEBA HIDRAULICA DE TUBERIAS EN REDES DE DESAGUE m 35.98 3.98 143.18
21 SISTEMA DE AGUA FRIA
21.01 SALIDA DE AGUA FRIA
21.01.01 SALIDA DE AGUA FRIA PVC clase 10 de 21mm (1/2") inc. tuberia y acc. pto 5.00 101.56 507.78
21.02.01 TUBERIA PVC CLASE 10 33.0mm (1") m 29.55 17.59 519.84
21.02.02 TUBERIA PVC CLASE 10 26.5mm (3/4") m 35.75 17.02 608.29
21.03 ACCESORIOS DE REDES
21.03.01 CODO PVC CLASE 10 - 33.0mm (1") pza 13.00 6.39 83.11
21.03.02 CODO PVC CLASE 10 - 26.5mm (3/4") pza 16.00 5.66 90.61
21.03.03 CODO PVC CLASE 10 - 21.0mm (1/2") pza 12.00 5.07 60.86
21.03.04 TEE PVC CLASE 10 - 26.5mm (3/4") pza 2.00 7.62 15.25
21.03.05 TEE PVC CLASE 10 - 21.0mm (1/2") pza 2.00 6.46 12.92
21.04 LLAVES Y VALVULAS
21.04.01 VALVULA DE COMPUERTA DE BRONCE ø 26.5 mm (3/4") und 1.00 79.88 79.88
21.04.02 VALVULA DE COMPUERTA DE BRONCE ø 21.0 mm (1/2") und 3.00 72.42 217.25
21.05 VARIOS
21.05.01 ACCESORIOS DE CISTERNA cjt 1.00 179.08 179.08
21.05.02 SISTEMA DE BOMBEO cjt 1.00 695.36 695.36
21.05.03 TANQUE ELEVADO 600 L und 1.00 800.10 800.10
21.05.04 NICHOS EN PARED PARA VALVULAS und 3.00 55.81 167.43
21.05.05 PRUEBA HIDRAULICA + DESINFECCION DE SISTEMA AGUA FRIA m 65.30 6.27 409.27
VALORIZACION N° 01
PARCIAL %
203.22 60.00%
181.85 60.00%
210.81 100.00%
546.33 60.00%
66.94 60.00%
280.11 100.00%
29.15 40.00%
19.25 40.00%
21.93 40.00%
182.28 40.00%
47.92 40.00%
85.37 100.00%
129.14 100.00%
35.60 100.00%
55.02 100.00%
143.18 100.00%
507.78 100.00%
415.87 80.00%
608.29 100.00%
83.11 100.00%
90.61 100.00%
60.86 100.00%
15.25 100.00%
12.92 100.00%
79.88 100.00%
217.25 100.00%
179.08 100.00%
695.36 100.00%
800.10 100.00%
167.43 100.00%
409.27 100.00%
6,581.16 84.00%
658.12
329.06
7,568.34
0.93
7038.56
VALORIZACION N
20 SISTEMA DE DESAGUE
20.01 SALIDAS DE DESAGUE Y VENTILACION
20.01.01 SALIDAS PARA DESAGUE PVC - SAP 2" pto 3.00 112.90 338.70
20.01.02 SALIDAS PARA DESAGUE PVC - SAP 4" pto 2.00 151.54 303.09
20.01.03 SALIDAS PARA VENTILACION PVC - SAL 2" pto 2.00 105.40 210.81
20.02 REDES DE DESAGUE
20.02.01 TUBERIA PVC - SAP 2" (RED COLECTOR) m 32.44 28.07 910.74
20.02.02 TUBERIA PVC - SAP 4" (RED COLECTOR) m 3.54 31.57 111.77
20.02.03 TUBERIA PVC - SAL 2" (VENTILACION) m 16.30 17.18 280.11
20.03 ACCESORIOS DE REDES
20.03.01 CODO 90º DE DESAGUE DE PVC 2" pza 5.00 14.58 72.88
20.03.02 CODO 90º DE DESAGUE DE PVC 4" pza 2.00 24.06 48.12
20.03.03 YEE DESAGUE DE PVC 4" pza 2.00 27.41 54.83
20.03.04 YEE DESAGUE DE PVC 2" pza 3.00 151.90 455.69
20.03.05 TEE DESAGUE DE PVC 4" pza 2.00 59.90 119.80
20.04 ADITAMENTOS VARIOS
20.04.01 REGISTROS DE BRONCE DE 4" pza 1.00 85.37 85.37
20.04.02 REGISTROS DE BRONCE DE 2" pza 3.00 43.05 129.14
20.04.03 SUMIDERO DE BRONCE 2" pza 1.00 35.60 35.60
20.04.04 SOMBRERO VENTILACION DE 2" pza 2.00 27.51 55.02
20.05 VARIOS
20.05.01 PRUEBA HIDRAULICA DE TUBERIAS EN REDES DE DESAGUE m 35.98 3.98 143.18
21 SISTEMA DE AGUA FRIA
21.01 SALIDA DE AGUA FRIA
21.01.01 SALIDA DE AGUA FRIA PVC clase 10 de 21mm (1/2") inc. tuberia y acc. pto 5.00 101.56 507.78
21.02.01 TUBERIA PVC CLASE 10 33.0mm (1") m 29.55 17.59 519.84
21.02.02 TUBERIA PVC CLASE 10 26.5mm (3/4") m 35.75 17.02 608.29
21.03 ACCESORIOS DE REDES
21.03.01 CODO PVC CLASE 10 - 33.0mm (1") pza 13.00 6.39 83.11
21.03.02 CODO PVC CLASE 10 - 26.5mm (3/4") pza 16.00 5.66 90.61
21.03.03 CODO PVC CLASE 10 - 21.0mm (1/2") pza 12.00 5.07 60.86
21.03.04 TEE PVC CLASE 10 - 26.5mm (3/4") pza 2.00 7.62 15.25
21.03.05 TEE PVC CLASE 10 - 21.0mm (1/2") pza 2.00 6.46 12.92
21.04 LLAVES Y VALVULAS
21.04.01 VALVULA DE COMPUERTA DE BRONCE ø 26.5 mm (3/4") und 1.00 79.88 79.88
21.04.02 VALVULA DE COMPUERTA DE BRONCE ø 21.0 mm (1/2") und 3.00 72.42 217.25
21.05 VARIOS
21.05.01 ACCESORIOS DE CISTERNA cjt 1.00 179.08 179.08
21.05.02 SISTEMA DE BOMBEO cjt 1.00 695.36 695.36
21.05.03 TANQUE ELEVADO 600 L und 1.00 800.10 800.10
21.05.04 NICHOS EN PARED PARA VALVULAS und 3.00 55.81 167.43
21.05.05 PRUEBA HIDRAULICA + DESINFECCION DE SISTEMA AGUA FRIA m 65.30 6.27 409.27
VALORIZACION N° 02
PARCIAL %
0.00 0.00%
0.00 0.00%
126.48 60.00%
0.00 0.00%
0.00 0.00%
140.05 50.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
85.37 100.00%
129.14 100.00%
35.60 100.00%
55.02 100.00%
143.18 100.00%
304.67 60.00%
103.97 20.00%
243.32 40.00%
33.24 40.00%
36.24 40.00%
24.34 40.00%
6.10 40.00%
5.17 40.00%
79.88 100.00%
217.25 100.00%
71.63 40.00%
695.36 100.00%
800.10 100.00%
167.43 100.00%
409.27 100.00%
3,912.81 50.00%
391.28
195.64
4,499.73
0.93
4184.75
VALORIZACION N
20 SISTEMA DE DESAGUE
20.01 SALIDAS DE DESAGUE Y VENTILACION
20.01.01 SALIDAS PARA DESAGUE PVC - SAP 2" pto 3.00 112.90 338.70
20.01.02 SALIDAS PARA DESAGUE PVC - SAP 4" pto 2.00 151.54 303.09
20.01.03 SALIDAS PARA VENTILACION PVC - SAL 2" pto 2.00 105.40 210.81
20.02 REDES DE DESAGUE
20.02.01 TUBERIA PVC - SAP 2" (RED COLECTOR) m 32.44 28.07 910.74
20.02.02 TUBERIA PVC - SAP 4" (RED COLECTOR) m 3.54 31.57 111.77
20.02.03 TUBERIA PVC - SAL 2" (VENTILACION) m 16.30 17.18 280.11
20.03 ACCESORIOS DE REDES
20.03.01 CODO 90º DE DESAGUE DE PVC 2" pza 5.00 14.58 72.88
20.03.02 CODO 90º DE DESAGUE DE PVC 4" pza 2.00 24.06 48.12
20.03.03 YEE DESAGUE DE PVC 4" pza 2.00 27.41 54.83
20.03.04 YEE DESAGUE DE PVC 2" pza 3.00 151.90 455.69
20.03.05 TEE DESAGUE DE PVC 4" pza 2.00 59.90 119.80
20.04 ADITAMENTOS VARIOS
20.04.01 REGISTROS DE BRONCE DE 4" pza 1.00 85.37 85.37
20.04.02 REGISTROS DE BRONCE DE 2" pza 3.00 43.05 129.14
20.04.03 SUMIDERO DE BRONCE 2" pza 1.00 35.60 35.60
20.04.04 SOMBRERO VENTILACION DE 2" pza 2.00 27.51 55.02
20.05 VARIOS
20.05.01 PRUEBA HIDRAULICA DE TUBERIAS EN REDES DE DESAGUE m 35.98 3.98 143.18
21 SISTEMA DE AGUA FRIA
21.01 SALIDA DE AGUA FRIA
21.01.01 SALIDA DE AGUA FRIA PVC clase 10 de 21mm (1/2") inc. tuberia y acc. pto 5.00 101.56 507.78
21.02.01 TUBERIA PVC CLASE 10 33.0mm (1") m 29.55 17.59 519.84
21.02.02 TUBERIA PVC CLASE 10 26.5mm (3/4") m 35.75 17.02 608.29
21.03 ACCESORIOS DE REDES
21.03.01 CODO PVC CLASE 10 - 33.0mm (1") pza 13.00 6.39 83.11
21.03.02 CODO PVC CLASE 10 - 26.5mm (3/4") pza 16.00 5.66 90.61
21.03.03 CODO PVC CLASE 10 - 21.0mm (1/2") pza 12.00 5.07 60.86
21.03.04 TEE PVC CLASE 10 - 26.5mm (3/4") pza 2.00 7.62 15.25
21.03.05 TEE PVC CLASE 10 - 21.0mm (1/2") pza 2.00 6.46 12.92
21.04 LLAVES Y VALVULAS
21.04.01 VALVULA DE COMPUERTA DE BRONCE ø 26.5 mm (3/4") und 1.00 79.88 79.88
21.04.02 VALVULA DE COMPUERTA DE BRONCE ø 21.0 mm (1/2") und 3.00 72.42 217.25
21.05 VARIOS
21.05.01 ACCESORIOS DE CISTERNA cjt 1.00 179.08 179.08
21.05.02 SISTEMA DE BOMBEO cjt 1.00 695.36 695.36
21.05.03 TANQUE ELEVADO 600 L und 1.00 800.10 800.10
21.05.04 NICHOS EN PARED PARA VALVULAS und 3.00 55.81 167.43
21.05.05 PRUEBA HIDRAULICA + DESINFECCION DE SISTEMA AGUA FRIA m 65.30 6.27 409.27
VALORIZACION N° 03
PARCIAL %
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
33.01 60.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
33.01 0.00%
3.30
1.65
37.96
0.93
35.30
VALORIZACION N
20 SISTEMA DE DESAGUE
20.01 SALIDAS DE DESAGUE Y VENTILACION
20.01.01 SALIDAS PARA DESAGUE PVC - SAP 2" pto 3.00 112.90 338.70
20.01.02 SALIDAS PARA DESAGUE PVC - SAP 4" pto 2.00 151.54 303.09
20.01.03 SALIDAS PARA VENTILACION PVC - SAL 2" pto 2.00 105.40 210.81
20.02 REDES DE DESAGUE
20.02.01 TUBERIA PVC - SAP 2" (RED COLECTOR) m 32.44 28.07 910.74
20.02.02 TUBERIA PVC - SAP 4" (RED COLECTOR) m 3.54 31.57 111.77
20.02.03 TUBERIA PVC - SAL 2" (VENTILACION) m 16.30 17.18 280.11
20.03 ACCESORIOS DE REDES
20.03.01 CODO 90º DE DESAGUE DE PVC 2" pza 5.00 14.58 72.88
20.03.02 CODO 90º DE DESAGUE DE PVC 4" pza 2.00 24.06 48.12
20.03.03 YEE DESAGUE DE PVC 4" pza 2.00 27.41 54.83
20.03.04 YEE DESAGUE DE PVC 2" pza 3.00 151.90 455.69
20.03.05 TEE DESAGUE DE PVC 4" pza 2.00 59.90 119.80
20.04 ADITAMENTOS VARIOS
20.04.01 REGISTROS DE BRONCE DE 4" pza 1.00 85.37 85.37
20.04.02 REGISTROS DE BRONCE DE 2" pza 3.00 43.05 129.14
20.04.03 SUMIDERO DE BRONCE 2" pza 1.00 35.60 35.60
20.04.04 SOMBRERO VENTILACION DE 2" pza 2.00 27.51 55.02
20.05 VARIOS
20.05.01 PRUEBA HIDRAULICA DE TUBERIAS EN REDES DE DESAGUE m 35.98 3.98 143.18
21 SISTEMA DE AGUA FRIA
21.01 SALIDA DE AGUA FRIA
21.01.01 SALIDA DE AGUA FRIA PVC clase 10 de 21mm (1/2") inc. tuberia y acc. pto 5.00 101.56 507.78
21.02.01 TUBERIA PVC CLASE 10 33.0mm (1") m 29.55 17.59 519.84
21.02.02 TUBERIA PVC CLASE 10 26.5mm (3/4") m 35.75 17.02 608.29
21.03 ACCESORIOS DE REDES
21.03.01 CODO PVC CLASE 10 - 33.0mm (1") pza 13.00 6.39 83.11
21.03.02 CODO PVC CLASE 10 - 26.5mm (3/4") pza 16.00 5.66 90.61
21.03.03 CODO PVC CLASE 10 - 21.0mm (1/2") pza 12.00 5.07 60.86
21.03.04 TEE PVC CLASE 10 - 26.5mm (3/4") pza 2.00 7.62 15.25
21.03.05 TEE PVC CLASE 10 - 21.0mm (1/2") pza 2.00 6.46 12.92
21.04 LLAVES Y VALVULAS
21.04.01 VALVULA DE COMPUERTA DE BRONCE ø 26.5 mm (3/4") und 1.00 79.88 79.88
21.04.02 VALVULA DE COMPUERTA DE BRONCE ø 21.0 mm (1/2") und 3.00 72.42 217.25
21.05 VARIOS
21.05.01 ACCESORIOS DE CISTERNA cjt 1.00 179.08 179.08
21.05.02 SISTEMA DE BOMBEO cjt 1.00 695.36 695.36
21.05.03 TANQUE ELEVADO 600 L und 1.00 800.10 800.10
21.05.04 NICHOS EN PARED PARA VALVULAS und 3.00 55.81 167.43
21.05.05 PRUEBA HIDRAULICA + DESINFECCION DE SISTEMA AGUA FRIA m 65.30 6.27 409.27
VALORIZACION N° 04
PARCIAL %
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.93
0.00
VALORIZACION N
ACUMULADO ANTERIOR
Item Descripción Und. Metrado Precio Parcial
CANTIDAD
22 SISTEMA ELECTRICO
22.01 SALIDAS DE ALUMBRADO
22.01.01 SALIDA PARA CENTRO DE LUZ EN TECHO pto 31.00 79.73 2,471.51 0.00
22.01.02 SALIDA PARA LETRERO LUMINOSO pto 1.00 96.28 96.28 0.00
22.02 SALIDAS PARA TOMACORRIENTES
22.02.01 TOMACORRIENTE DOBLE / T BIPASO pto 16.00 135.75 2,172.05 0.00
22.02.02 TOMACORRIENTE DOBLE / T BIPASO EN MUEBLE pto 9.00 63.12 568.10 0.00
22.02.03 TOMACORRIENTE DOBLE / T BIPASO ESTABILIZADO pto 17.00 56.45 959.60 0.00
22.02.04 TOMACORRIENTE DOBLE / T BIPASO H=2.20 pto 5.00 94.46 472.31 0.00
22.02.05 SALIDA PARA CERRADURA ELECTRICA pto 1.00 70.23 70.23 0.00
22.03 SALIDA PARA INTERRUPTORES
22.03.01 INTERRUPTOR UNIPOLAR SIMPLE pto 11.00 68.44 752.81 0.00
22.03.02 INTERRUPTOR UNIPOLAR SIMPLE pto 1.00 103.72 103.72 0.00
22.03.03 PULSADOR PARA CERRADURA ELECTRICA pto 1.00 52.14 52.14 0.00
22.04 SALIDAS DE FUERZA
22.04.01 SALIDA DE FUERZA PARA ELECTROBOMBAS pto 1.00 115.5391 115.54 0.00
22.5 ALIMENTADORES
22.05.01 ALIMENTADOR 2 - 1x10mm2 LSOH + 1x10mm2 / T - 25mm PVC-P m 30.00 28.41 852.17 0.00
22.05.02 ALIMENTADOR 2 - 1x6mm2 LSOH + 1x6mm2 / T - 25mm PVC-P m 17.85 49.69392 887.04 0.00
22.05.03 CONDUCTOR DE Cu DESNUDO 1x10 mm2 - 20mm PVC-P m 15.75 18.48 291.02 0.00
22.06 CAJAS DE PASE
22.06.01 CAJA DE PASE CUADRADA DE FºGº 100 x 100 x 50 mm und 8.00 11.42 91.39 0.00
22.07 TABLEROS
22.07.01 TABLERO TG - 1 und 1.00 1800.69 1,800.69 0.00
22.07.02 TABLERO T - EM und 1.00 1097.93 1,097.93 0.00
22.07.03 TABLERO T - ES und 1.00 1633.65 1,633.65 0.00
22.08 TABLEROS
22.08.01 LUMINARIA TIPO 1 und 6.00 221.97 1,331.83 0.00
22.08.02 LUMINARIA TIPO 2 und 17.00 123.57 2,100.72 0.00
22.08.03 LUMINARIA TIPO 3 und 4.00 123.57 494.29 0.00
22.08.04 LUMINARIA TIPO 4 und 4.00 87.67 350.69 0.00
22.08.05 LUMINARIA TIPO LUZ DE EMERGENCIA und 5.00 294.40 1,471.99 0.00
22.09 SISTEMA DE PUESTA A TIERRA
22.09.01 SISTEMA DE PUESTA A TIERRA GENERAL < 25 ohm und 2.00 728.46 1,456.92 0.00
22.09.02 SISTEMA DE PUESTA A TIERRA PARA COMPUTO < 5 ohm und 1.00 732.83 732.83 0.00
22.10 VARIOS
22.10.01 GRUPO ELECTROGENO DE 7kW 1Ø 220V und 1.00 7126.89 7,126.89 0.00
23 SISTEMA DE COMUNICACION Y DATA
23.01 SALIDAS DE VOZ Y DATA
23.01.01 SALIDA PARA VOZ Y DATA EN PARED pto 4.00 89.49 357.97 0.00
23.01.02 SALIDA PARA VOZ Y DATA EN MUEBLE O VENTANILLAS pto 3.00 94.98 284.95 0.00
23.01.03 SUMINISTRO E INSTALACION DE TUBERIA 2" PVC-P PARA ACOMETIDA AER m 30.00 27.69 830.80 0.00
23.02 CAJAS DE PASE Y DUCTOS
23.02.01 CAJA DE PASE CUADRADA 100 x 100 x 55mm und 11.00 20.26 222.82 0.00
23.02.02 CAJA DE PASE CUADRADA 300 x 300 x 150mm und 2.00 26.15 52.30 0.00
24 SISTEMA DE ALARMA Y VIGILANCIA
24.01 SALIDA PARA ALARMA
24.01.01 SALIDA PARA CENTRAL DE ALARMAS (CAR, CAI y CDA) pto 3.00 40.82 122.46 0.00
24.01.02 SALIDA PARA ALARMAS (PULSADORES DE ALARMA Y SENSORES) pto 23.00 56.55 1,300.75 0.00
24.01.03 SALIDA PARA PULSADOR DE ALARMA CONTRA INCENDIO pto 1.00 62.37 62.37 0.00
24.01.04 SALIDA PARA PULSADOR DE ALARMAS EN MUEBLE O VENTANILLA pto 5.00 57.01 285.04 0.00
24.01.05 SALIDA PARA DETECTOR DE HUMO, TEMPERATURA, LUZ ESTROBOSCOPIC pto 11.00 62.32 685.48 0.00
24.01.06 SALIDA PARA DETECTORES DE ANIEGO pto 3.00 89.28 267.84 0.00
24.02 SALIDAS PARA VIGILANCIA
24.02.01 SALIDA PARA VIDEO GRABADORA Y MONITOR CCTV pto 1.00 59.54 59.54 0.00
24.02.02 SALIDA PARA CCTV Y SIRENA pto 6.00 52.85 317.13 0.00
VALORIZACION N° 01
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
VALORIZACION N
ACUMULADO ANTERIOR
Item Descripción Und. Metrado Precio Parcial
CANTIDAD
22 SISTEMA ELECTRICO
22.01 SALIDAS DE ALUMBRADO
22.01.01 SALIDA PARA CENTRO DE LUZ EN TECHO pto 31.00 79.73 2,471.51 0.00
22.01.02 SALIDA PARA LETRERO LUMINOSO pto 1.00 96.28 96.28 0.00
22.02 SALIDAS PARA TOMACORRIENTES
22.02.01 TOMACORRIENTE DOBLE / T BIPASO pto 16.00 135.75 2,172.05 0.00
22.02.02 TOMACORRIENTE DOBLE / T BIPASO EN MUEBLE pto 9.00 63.12 568.10 0.00
22.02.03 TOMACORRIENTE DOBLE / T BIPASO ESTABILIZADO pto 17.00 56.45 959.60 0.00
22.02.04 TOMACORRIENTE DOBLE / T BIPASO H=2.20 pto 5.00 94.46 472.31 0.00
22.02.05 SALIDA PARA CERRADURA ELECTRICA pto 1.00 70.23 70.23 0.00
22.03 SALIDA PARA INTERRUPTORES
22.03.01 INTERRUPTOR UNIPOLAR SIMPLE pto 11.00 68.44 752.81 0.00
22.03.02 INTERRUPTOR UNIPOLAR SIMPLE pto 1.00 103.72 103.72 0.00
22.03.03 PULSADOR PARA CERRADURA ELECTRICA pto 1.00 52.14 52.14 0.00
22.04 SALIDAS DE FUERZA
22.04.01 SALIDA DE FUERZA PARA ELECTROBOMBAS pto 1.00 115.5391 115.54 0.00
22.5 ALIMENTADORES
22.05.01 ALIMENTADOR 2 - 1x10mm2 LSOH + 1x10mm2 / T - 25mm PVC-P m 30.00 28.41 852.17 0.00
22.05.02 ALIMENTADOR 2 - 1x6mm2 LSOH + 1x6mm2 / T - 25mm PVC-P m 17.85 49.69392 887.04 0.00
22.05.03 CONDUCTOR DE Cu DESNUDO 1x10 mm2 - 20mm PVC-P m 15.75 18.48 291.02 0.00
22.06 CAJAS DE PASE
22.06.01 CAJA DE PASE CUADRADA DE FºGº 100 x 100 x 50 mm und 8.00 11.42 91.39 0.00
22.07 TABLEROS
22.07.01 TABLERO TG - 1 und 1.00 1800.69 1,800.69 0.00
22.07.02 TABLERO T - EM und 1.00 1097.93 1,097.93 0.00
22.07.03 TABLERO T - ES und 1.00 1633.65 1,633.65 0.00
22.08 TABLEROS
22.08.01 LUMINARIA TIPO 1 und 6.00 221.97 1,331.83 0.00
22.08.02 LUMINARIA TIPO 2 und 17.00 123.57 2,100.72 0.00
22.08.03 LUMINARIA TIPO 3 und 4.00 123.57 494.29 0.00
22.08.04 LUMINARIA TIPO 4 und 4.00 87.67 350.69 0.00
22.08.05 LUMINARIA TIPO LUZ DE EMERGENCIA und 5.00 294.40 1,471.99 0.00
22.09 SISTEMA DE PUESTA A TIERRA
22.09.01 SISTEMA DE PUESTA A TIERRA GENERAL < 25 ohm und 2.00 728.46 1,456.92 0.00
22.09.02 SISTEMA DE PUESTA A TIERRA PARA COMPUTO < 5 ohm und 1.00 732.83 732.83 0.00
22.10 VARIOS
22.10.01 GRUPO ELECTROGENO DE 7kW 1Ø 220V und 1.00 7126.89 7,126.89 0.00
23 SISTEMA DE COMUNICACION Y DATA
23.01 SALIDAS DE VOZ Y DATA
23.01.01 SALIDA PARA VOZ Y DATA EN PARED pto 4.00 89.49 357.97 0.00
23.01.02 SALIDA PARA VOZ Y DATA EN MUEBLE O VENTANILLAS pto 3.00 94.98 284.95 0.00
23.01.03 SUMINISTRO E INSTALACION DE TUBERIA 2" PVC-P PARA ACOMETIDA AER m 30.00 27.69 830.80 0.00
23.02 CAJAS DE PASE Y DUCTOS
23.02.01 CAJA DE PASE CUADRADA 100 x 100 x 55mm und 11.00 20.26 222.82 0.00
23.02.02 CAJA DE PASE CUADRADA 300 x 300 x 150mm und 2.00 26.15 52.30 0.00
24 SISTEMA DE ALARMA Y VIGILANCIA
24.01 SALIDA PARA ALARMA
24.01.01 SALIDA PARA CENTRAL DE ALARMAS (CAR, CAI y CDA) pto 3.00 40.82 122.46 0.00
24.01.02 SALIDA PARA ALARMAS (PULSADORES DE ALARMA Y SENSORES) pto 23.00 56.55 1,300.75 0.00
24.01.03 SALIDA PARA PULSADOR DE ALARMA CONTRA INCENDIO pto 1.00 62.37 62.37 0.00
24.01.04 SALIDA PARA PULSADOR DE ALARMAS EN MUEBLE O VENTANILLA pto 5.00 57.01 285.04 0.00
24.01.05 SALIDA PARA DETECTOR DE HUMO, TEMPERATURA, LUZ ESTROBOSCOPIC pto 11.00 62.32 685.48 0.00
24.01.06 SALIDA PARA DETECTORES DE ANIEGO pto 3.00 89.28 267.84 0.00
24.02 SALIDAS PARA VIGILANCIA
24.02.01 SALIDA PARA VIDEO GRABADORA Y MONITOR CCTV pto 1.00 59.54 59.54 0.00
24.02.02 SALIDA PARA CCTV Y SIRENA pto 6.00 52.85 317.13 0.00
VALORIZACION N° 02
50.00%
100.00%
60.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
70.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
94.00%
VALORIZACION N
ACUMULADO ANTERIOR
Item Descripción Und. Metrado Precio Parcial
CANTIDAD
22 SISTEMA ELECTRICO
22.01 SALIDAS DE ALUMBRADO
22.01.01 SALIDA PARA CENTRO DE LUZ EN TECHO pto 31.00 79.73 2,471.51 15.50
22.01.02 SALIDA PARA LETRERO LUMINOSO pto 1.00 96.28 96.28 0.00
22.02 SALIDAS PARA TOMACORRIENTES
22.02.01 TOMACORRIENTE DOBLE / T BIPASO pto 16.00 135.75 2,172.05 6.40
22.02.02 TOMACORRIENTE DOBLE / T BIPASO EN MUEBLE pto 9.00 63.12 568.10 0.00
22.02.03 TOMACORRIENTE DOBLE / T BIPASO ESTABILIZADO pto 17.00 56.45 959.60 0.00
22.02.04 TOMACORRIENTE DOBLE / T BIPASO H=2.20 pto 5.00 94.46 472.31 0.00
22.02.05 SALIDA PARA CERRADURA ELECTRICA pto 1.00 70.23 70.23 0.00
22.03 SALIDA PARA INTERRUPTORES
22.03.01 INTERRUPTOR UNIPOLAR SIMPLE pto 11.00 68.44 752.81 0.00
22.03.02 INTERRUPTOR UNIPOLAR SIMPLE pto 1.00 103.72 103.72 0.00
22.03.03 PULSADOR PARA CERRADURA ELECTRICA pto 1.00 52.14 52.14 0.00
22.04 SALIDAS DE FUERZA
22.04.01 SALIDA DE FUERZA PARA ELECTROBOMBAS pto 1.00 115.5391 115.54 0.30
22.5 ALIMENTADORES
22.05.01 ALIMENTADOR 2 - 1x10mm2 LSOH + 1x10mm2 / T - 25mm PVC-P m 30.00 28.41 852.17 0.00
22.05.02 ALIMENTADOR 2 - 1x6mm2 LSOH + 1x6mm2 / T - 25mm PVC-P m 17.85 49.69392 887.04 0.00
22.05.03 CONDUCTOR DE Cu DESNUDO 1x10 mm2 - 20mm PVC-P m 15.75 18.48 291.02 0.00
22.06 CAJAS DE PASE
22.06.01 CAJA DE PASE CUADRADA DE FºGº 100 x 100 x 50 mm und 8.00 11.42 91.39 0.00
22.07 TABLEROS
22.07.01 TABLERO TG - 1 und 1.00 1800.69 1,800.69 0.00
22.07.02 TABLERO T - EM und 1.00 1097.93 1,097.93 0.00
22.07.03 TABLERO T - ES und 1.00 1633.65 1,633.65 0.00
22.08 TABLEROS
22.08.01 LUMINARIA TIPO 1 und 6.00 221.97 1,331.83 0.00
22.08.02 LUMINARIA TIPO 2 und 17.00 123.57 2,100.72 0.00
22.08.03 LUMINARIA TIPO 3 und 4.00 123.57 494.29 0.00
22.08.04 LUMINARIA TIPO 4 und 4.00 87.67 350.69 0.00
22.08.05 LUMINARIA TIPO LUZ DE EMERGENCIA und 5.00 294.40 1,471.99 0.00
22.09 SISTEMA DE PUESTA A TIERRA
22.09.01 SISTEMA DE PUESTA A TIERRA GENERAL < 25 ohm und 2.00 728.46 1,456.92 0.00
22.09.02 SISTEMA DE PUESTA A TIERRA PARA COMPUTO < 5 ohm und 1.00 732.83 732.83 0.00
22.10 VARIOS
22.10.01 GRUPO ELECTROGENO DE 7kW 1Ø 220V und 1.00 7126.89 7,126.89 0.00
23 SISTEMA DE COMUNICACION Y DATA
23.01 SALIDAS DE VOZ Y DATA
23.01.01 SALIDA PARA VOZ Y DATA EN PARED pto 4.00 89.49 357.97 0.00
23.01.02 SALIDA PARA VOZ Y DATA EN MUEBLE O VENTANILLAS pto 3.00 94.98 284.95 0.00
23.01.03 SUMINISTRO E INSTALACION DE TUBERIA 2" PVC-P PARA ACOMETIDA AER m 30.00 27.69 830.80 0.00
23.02 CAJAS DE PASE Y DUCTOS
23.02.01 CAJA DE PASE CUADRADA 100 x 100 x 55mm und 11.00 20.26 222.82 0.00
23.02.02 CAJA DE PASE CUADRADA 300 x 300 x 150mm und 2.00 26.15 52.30 0.00
24 SISTEMA DE ALARMA Y VIGILANCIA
24.01 SALIDA PARA ALARMA
24.01.01 SALIDA PARA CENTRAL DE ALARMAS (CAR, CAI y CDA) pto 3.00 40.82 122.46 0.00
24.01.02 SALIDA PARA ALARMAS (PULSADORES DE ALARMA Y SENSORES) pto 23.00 56.55 1,300.75 0.00
24.01.03 SALIDA PARA PULSADOR DE ALARMA CONTRA INCENDIO pto 1.00 62.37 62.37 0.00
24.01.04 SALIDA PARA PULSADOR DE ALARMAS EN MUEBLE O VENTANILLA pto 5.00 57.01 285.04 0.00
24.01.05 SALIDA PARA DETECTOR DE HUMO, TEMPERATURA, LUZ ESTROBOSCOPIC pto 11.00 62.32 685.48 0.00
24.01.06 SALIDA PARA DETECTORES DE ANIEGO pto 3.00 89.28 267.84 0.00
24.02 SALIDAS PARA VIGILANCIA
24.02.01 SALIDA PARA VIDEO GRABADORA Y MONITOR CCTV pto 1.00 59.54 59.54 0.00
24.02.02 SALIDA PARA CCTV Y SIRENA pto 6.00 52.85 317.13 0.00
VALORIZACION N° 03
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
40.00%
40.00%
100.00%
20.00%
40.00%
29.97%
29.97%
20.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
60.00%
40.00%
40.00%
40.00%
0.00%
0.00%
80.00%
80.00%
80.01%
80.00%
80.00%
80.00%
80.00%
80.00%
61.00%
VALORIZACION N
22 SISTEMA ELECTRICO
22.01 SALIDAS DE ALUMBRADO
22.01.01 SALIDA PARA CENTRO DE LUZ EN TECHO pto 31.00 79.73 2,471.51
22.01.02 SALIDA PARA LETRERO LUMINOSO pto 1.00 96.28 96.28
22.02 SALIDAS PARA TOMACORRIENTES
22.02.01 TOMACORRIENTE DOBLE / T BIPASO pto 16.00 135.75 2,172.05
22.02.02 TOMACORRIENTE DOBLE / T BIPASO EN MUEBLE pto 9.00 63.12 568.10
22.02.03 TOMACORRIENTE DOBLE / T BIPASO ESTABILIZADO pto 17.00 56.45 959.60
22.02.04 TOMACORRIENTE DOBLE / T BIPASO H=2.20 pto 5.00 94.46 472.31
22.02.05 SALIDA PARA CERRADURA ELECTRICA pto 1.00 70.23 70.23
22.03 SALIDA PARA INTERRUPTORES
22.03.01 INTERRUPTOR UNIPOLAR SIMPLE pto 11.00 68.44 752.81
22.03.02 INTERRUPTOR UNIPOLAR SIMPLE pto 1.00 103.72 103.72
22.03.03 PULSADOR PARA CERRADURA ELECTRICA pto 1.00 52.14 52.14
22.04 SALIDAS DE FUERZA
22.04.01 SALIDA DE FUERZA PARA ELECTROBOMBAS pto 1.00 115.5391 115.54
22.5 ALIMENTADORES
22.05.01 ALIMENTADOR 2 - 1x10mm2 LSOH + 1x10mm2 / T - 25mm PVC-P m 30.00 28.41 852.17
22.05.02 ALIMENTADOR 2 - 1x6mm2 LSOH + 1x6mm2 / T - 25mm PVC-P m 17.85 49.69392 887.04
22.05.03 CONDUCTOR DE Cu DESNUDO 1x10 mm2 - 20mm PVC-P m 15.75 18.48 291.02
22.06 CAJAS DE PASE
22.06.01 CAJA DE PASE CUADRADA DE FºGº 100 x 100 x 50 mm und 8.00 11.42 91.39
22.07 TABLEROS
22.07.01 TABLERO TG - 1 und 1.00 1800.69 1,800.69
22.07.02 TABLERO T - EM und 1.00 1097.93 1,097.93
22.07.03 TABLERO T - ES und 1.00 1633.65 1,633.65
22.08 TABLEROS
22.08.01 LUMINARIA TIPO 1 und 6.00 221.97 1,331.83
22.08.02 LUMINARIA TIPO 2 und 17.00 123.57 2,100.72
22.08.03 LUMINARIA TIPO 3 und 4.00 123.57 494.29
22.08.04 LUMINARIA TIPO 4 und 4.00 87.67 350.69
22.08.05 LUMINARIA TIPO LUZ DE EMERGENCIA und 5.00 294.40 1,471.99
22.09 SISTEMA DE PUESTA A TIERRA
22.09.01 SISTEMA DE PUESTA A TIERRA GENERAL < 25 ohm und 2.00 728.46 1,456.92
22.09.02 SISTEMA DE PUESTA A TIERRA PARA COMPUTO < 5 ohm und 1.00 732.83 732.83
22.10 VARIOS
22.10.01 GRUPO ELECTROGENO DE 7kW 1Ø 220V und 1.00 7126.89 7,126.89
23 SISTEMA DE COMUNICACION Y DATA
23.01 SALIDAS DE VOZ Y DATA
23.01.01 SALIDA PARA VOZ Y DATA EN PARED pto 4.00 89.49 357.97
23.01.02 SALIDA PARA VOZ Y DATA EN MUEBLE O VENTANILLAS pto 3.00 94.98 284.95
23.01.03 SUMINISTRO E INSTALACION DE TUBERIA 2" PVC-P PARA ACOMETIDA AER m 30.00 27.69 830.80
23.02 CAJAS DE PASE Y DUCTOS
23.02.01 CAJA DE PASE CUADRADA 100 x 100 x 55mm und 11.00 20.26 222.82
23.02.02 CAJA DE PASE CUADRADA 300 x 300 x 150mm und 2.00 26.15 52.30
24 SISTEMA DE ALARMA Y VIGILANCIA
24.01 SALIDA PARA ALARMA
24.01.01 SALIDA PARA CENTRAL DE ALARMAS (CAR, CAI y CDA) pto 3.00 40.82 122.46
24.01.02 SALIDA PARA ALARMAS (PULSADORES DE ALARMA Y SENSORES) pto 23.00 56.55 1,300.75
24.01.03 SALIDA PARA PULSADOR DE ALARMA CONTRA INCENDIO pto 1.00 62.37 62.37
24.01.04 SALIDA PARA PULSADOR DE ALARMAS EN MUEBLE O VENTANILLA pto 5.00 57.01 285.04
24.01.05 SALIDA PARA DETECTOR DE HUMO, TEMPERATURA, LUZ ESTROBOSCOPIC pto 11.00 62.32 685.48
24.01.06 SALIDA PARA DETECTORES DE ANIEGO pto 3.00 89.28 267.84
24.02 SALIDAS PARA VIGILANCIA
24.02.01 SALIDA PARA VIDEO GRABADORA Y MONITOR CCTV pto 1.00 59.54 59.54
24.02.02 SALIDA PARA CCTV Y SIRENA pto 6.00 52.85 317.13
VALORIZACION N° 04
PARCIAL %
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.93
0.00
I.- FICHA DE IDENTIFICACION DE LA OBRA
VALORIZACION DE OBRA Nº2
ACONDICIONAMIENTO DE LA AGENCIA BANCARIA
1 Obra: : PAMPACOLPA
REAJUSTES (S)
AMORTIZACION (A)
REAJUSTES (S)
AMORTIZACION (A)
RESUMEN
ESPECIALIDAD MONTO CONTRATO S/IGV ANTERIOR MES ACTUAL
Estructuras
Arquitectura
Electricas
Sanitarias
Obras
SUB-TOTAL IMPUESTO
IGV 18%
TOTAL
VALORIZACIONES
PACOLCA
24-Nov-20
MEN
ACUMULADO % ACUMULADO % POR EJECUTAR