OBRA REMODELACION DE LOCAL GILDEMEISTER SEMANA 01 SEMANA 02 SEMANA 03 SEMANA 04 SEMANA 05 SEMANA 06 SEMANA 07 SEMANA 08 SEMANA 09 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 13
FECHA 8/6/2018 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 0 0 0 0 0 0 0 0 0 1 1 1 1 1
7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Item Descripción Und. Metrado Nº de dias 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8

01 OBRAS PRELIMINARES Y PROVISIONALES


01.01 OBRAS PROVISIONALES
01.01.01 ALMACEN / COMEDOR Y VESTUARIO GLB 1.00 3.00
01.01.02 OFICINA AMOBLADA GLB 1.00 3.00
01.01.03 HABILITACION DE PUNTO ELECTRICO PARA LA OBRA GLB 1.00 2.00
01.01.04 HABILITACION DE PUNTO DE AGUA PARA LA OBRA GLB 1.00 2.00
01.01.05 CERCO PROVISIONAL CON PANELES DE MADERA M 43.69 3.00
01.02 TRABAJOS PRELIMINARES
01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GBL 1.00 4.00
01.02.02 LIMPIEZA PERMANENTE DE LA OBRA MES 3.00 66.00
01.02.03 TRAZO Y REPLANTEO DURANTE LA OBRA GBL 1.00 26.00
01.02.04 LIMPIEZA FINAL DE OBRA GBL 1.00 6.00
01.02.06 DESMONTAJE DE BALDOSAS EXISTENTES, PISO EXISTENTE EN OFICINAS, MUROS DEGLB 1.00 10.00
01.03 DEMOLICIONES Y MOVIMIENTOS DE TIERRA
01.03.01 CORTE DE LOSA M 180.46 5.00
01.03.02 DEMOLICION DE LOSA M2 59.84 3.00
01.03.03 DEMOLICION DE SARDINEL EXISTENTE M 29.50 2.00
01.03.04 EXCAVACION DE TERRENO M3 56.63 6.00
01.03.05 EXTRACCION DE TIERRA DE JARDIN M3 8.65 2.00
01.03.06 RELLENO CON MATERIAL PROPIO M3 15.87 4.00
01.03.07 RELLENO CON MATERIAL DE PRESTAMO M3 10.84 3.00
01.03.08 COMPACTACION DE TERRENO M2 59.84 3.00
01.03.09 ELIMINACION DE ESCOMBROS GLB 1.00 3.00

02 ESTRUCTURAS
02.01 SHOWROOM
02.01.01 CONCRETO SIMPLE
02.01.01.01 CIMENTACIONES CORRIDAS CONCRETO CICLOPEO f'c=100 kg/cm2 M3 5.44 1.00
02.01.01.02 SOBRECIMIENTO EN MUROS CONCRETO CICLOPEO f'c=140 kg/cm2 M3 0.23 1.00
02.01.01.03 ENCOFRADO DE SOBRECIMIENTOS M2 1.50 1.00
02.01.01.04 SOLADO PARA ZAPATAS 2" f'c=100 kg/cm2 M2 25.60 3.00
02.01.02 CONCRETO ARMADO
02.01.02.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS M3 16.24 2.00
02.01.02.02 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS M3 3.05 1.00
02.01.02.03 CONCRETO f'c=210 kg/cm2 PARA VIGAS M3 0.61 1.00
02.01.02.04 CONCRETO f'c= 210 kg/cm2 PARA REPOSICION DE PISOS M3 9.98 1.00
02.01.02.05 ACERO DE REFUERZO f'y=4200 kg/cm2 GRADO 60 KG 720.79 4.00
02.01.02.06 ENCOFRADO EN PEDESTAL M2 5.88 1.00
02.01.03 ESTRUCTURA METALICA - SUMINISTROS
02.01.03.01 SUMINISTRO Y FABRICACIÓN DE COLUMNAS METALICAS D=30cm KG 5,165.74 18.00
02.01.03.02 SUMINISTRO Y FABRICACIÓN DE "Z" METALICAS SEGUN PLANOS KG 3,040.62 24.00
02.01.03.03 SUMINISTRO Y FABRICACIÓNDE TIJERALES SEGUN PLANOS KG 4,613.17 24.00
02.01.03.04 SUMINISTRO Y FABRICACIÓN DE PLANCHAS DE APOYO SEGUN PLANOS KG 349.30 24.00
02.01.03.05 SUMINISTRO Y FABRICACIÓN DE PLANCHA DE REMATE e=1/4" SEGUN PLANOS KG 72.24 24.00
02.01.03.06 SUMINISTROY FABRICACIÓN DE ARRIOSTRES METALICOS SEGUN PLANOS KG 130.61 24.00
02.01.03.07 SUMINISTRO Y FABRICACION DE ESTRUCTURA PARA CARTEL DE SUPERBOARD KG 2,933.88 24.00
02.01.03.08 SUMINISTRO Y FABRICACIÓN DE PERNOS DE ANCLAJE GLB 1.00 9.00
SUMINSITRO Y FABRICACIÓN DE PERNOS PARA UNION DE COLUMNA Y VIGA
02.01.03.09 GLB 1.00 9.00
METALICA
02.01.03.10 SUMINISTRO E INSTALACION DE COBERTURA TI CALAMINON O SIMILAR M2 476.52 7.00
02.01.03.11 SUMINISTRO E INSTALACION DE SOPORTE METALICO EN MURO DE DRYWALL KG 375.44 2.00
02.01.03.12 CANALETA PARA LLUVIA ML 35.00 2.00
02.01.04 ESTRUCTURA METALICA - MANO DE OBRA
02.01.04.01 SUMINISTRO E INSTALACION DE ESTRUCTURA METALICA KG 13,747.12 18.00

02.02 SS.HH. - ESPERA DE CLIENTES


02.02.01 CONCRETO SIMPLE
02.02.01.01 SOLADO PARA CIMIENTO ARMADO M2 21.76 1.00
02.02.02 CONCRETO ARMADO
02.02.02.01 CIMIENTO ARMADO f'c=210 kg/cm2 M3 13.05 1.00
02.02.02.02 SOBRE/CIMIENTO M3 5.17 1.00
02.02.02.03 ENCOFRADO DE SOBRE/CIMIENTOS M2 34.45 1.00
02.02.02.04 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS M3 0.43 1.00
02.02.02.05 CONCRETO f'c= 210 kg/cm2 PARA REPOSICION DE PISOS M3 3.26 1.00
02.02.02.06 CONCRETO f'c= 210 kg/cm2 EN COLUMNAS M3 1.22 1.00
02.02.02.07 CONCRETO f'c= 210 kg/cm2 EN VIGAS M3 2.90 1.00
02.02.02.08 CONCRETO f'c= 210 kg/cm2 EN LOSA ALIGERADA M3 4.68 1.00
02.02.02.09 ACERO DE REFUERZO KG 541.80 5.00
02.02.02.10 ENCOFRADO DE LOSA M2 47.57 1.00
02.02.02.11 ENCOFRADO DE COLUMNAS M2 24.30 2.00
02.02.02.12 ENCOFRADO DE VIGAS M 16.01 1.00
02.02.03 ESTRUCTURA METALICA
02.02.03.01 SUMINISTRO E INSTALACION DE COLUMNAS Ø20CM KG 213.79 1.00
02.02.03.02 SUMINISTRO E INSTALACION DE PLANCHAS DE APOYO e=1/2" KG 17.30 1.00
02.02.03.03 SUMINISTRO E INSTALACION DE PLANCHA DE REMATE e=1/2" KG 17.30 1.00
02.02.03.04 BASE METALICA PARA T.E. GLB 1.00 1.00

02.03 AIRE ACONDICIONADO


02.03.01 ESTRUCTURAS METÁLICAS
SUMINISTRO E INSTALACIÓN DE SOPORTES METALICOS Y ANCLAJES DE EQUIPOS
02.03.01.01 CONDENSADORES Y EVAPORADORES; LA ESTRCUTURA SERÁ DE ACERO A-36 UND 14.00 7.00
SOLDADA Y PINTADA.

03 ARQUITECTURA - SHOWROOM
03.01 TABIQUERIA
SUMINISTRO Y MONTAJE DE MUROS DE SUPERBOARD EXTERIOR DE e=120 mm
03.01.01 M2 96.86 2.00
ANCLADOS A PISO Y TECHO EXISTENTES
SUMINISTRO Y MONTAJE DE MUROS DE DRYWALL DE e=120 mm ANCLADOS A PISO Y
03.01.02 M2 302.17 8.00
TECHO EXISTENTES
SUMINISTRO Y MONTAJE DE CIELO RASO TIPO AMSTRONG MODELO SERENE DE 600
03.01.03 M2 390.48 8.00
X 600 INCLUYE SOPORTES Y ANCLAJES
03.01.04 MURO DE ALBAÑILERIA KING KONG e=150 mm M2 75.91 3.00
SUMINISTRO Y MONTAJE DE DRYWALL EN CIELO RASO ANCLADOS A TECHO
03.01.05 M2 77.90 3.00
METALICO
03.02 REVESTIMIENTOS
03.02.01 TARRAJEO DE MUROS M2 151.82 2.00
03.02.02 TARRAJEO DE COLUMNAS M2 6.40 1.00
03.02.03 EMPASTADO DE MUROS INTERIORES Y EXTERIORES M2 737.66 3.00
03.02.04 PINTURA LATEX PAREDES EXTERIORES M2 192.92 4.00
03.02.05 PINTURA LATEX PAREDES INTERIOR M2 544.73 4.00
03.02.06 PINTURA LATEX TECHO INTERIOR M2 77.90 2.00
03.02.07 PINTURA ESTRUCTURA METÁLICA ACABADO GLOSS COLOR NEGRO M2 79.13 2.00
03.02.08 PISO CON PORCELANATO SHOWROOM M2 476.52 8.00
03.02.09 PISO CON PORCELANATO EN BAÑOS M2 23.95 2.00
03.02.10 CONTRAZOCALO H=0.10m DE PORCELANATO M 68.92 2.00
03.02.11 CONTRAZOCALO H=2.80m EN BAÑOS M2 86.49 2.00
03.02.12 CERRAMIENTO TR7 EN FACHADA M2 15.00 2.00
03.03 CARPINTERIA DE MADERA
03.03.01 PUERTA CONTRAPLACADA MDF, PINTADO AL DUCO UND 3.00 3.00
03.03.02 SUMINISTRO E INSTALACION DE BISAGRAS UND 12.00 2.00

03.03.03 CERRADURA DE MANIJA ACERO INOXIDABLE, LLAVE BOTON MARCA YALE O SIMILAR UND 3.00 2.00

03.03.04 CIERRA PUERTAS HIDRAULICO DE ACERO INOXIDABLE, MARCA YALE O SIMILAR UND 3.00 2.00

03.04 VIDRIOS
03.04.01 VENTANAS DE VIDRIO TEMPLADO M2 2.40 2.00

03.04.02 PUERTA DOBLE HOJA DE VIDRIO TEMPLADO, INCLUYE CERRADURAS Y TIRADORES M2 10.50 2.00

03.04.03 MAMPARA INCLUYE CERRADURAS Y TIRADORES M2 18.00 6.00


MURO CORTINA INCLUYE ACCESORIOS DE SOPORTE, ACCESORIOS DE PUERTAS
03.04.04 M2 186.65 9.00
BATIENTES Y CORREDISAS
03.05 VARIOS
03.05.01 MESA DE CONCRETO PARA OVALINES, INCLUYE REVESTIMIENTO GLB 1.00 2.00
03.05.02 DIVISIONES DE BAÑO EN ALUMINIO Y MELAMINE GLB 1.00 2.00

04 ARQUITECTURA - SALA DE VENTAS


04.01 TABIQUERIA
SUMINISTRO Y MONTAJE DE MUROS DE DRYWALL DE e=120 mm ANCLADOS A PISO Y
04.01.01 M2 75.57 3.00
TECHO EXISTENTES
SUMINISTRO Y MONTAJE DE CIELO RASO TIPO AMSTRONG MODELO SERENE DE 600
04.01.02 M2 49.53 2.00
X 600 INCLUYE SOPORTES Y ANCLAJES
04.02 REVESTIMIENTOS
04.02.01 EMPASTADO DE MUROS INTERIORES M2 103.78 2.00
04.02.02 EMPASTADO Y PINTURA LATEX EN INTERIORES M2 103.78 2.00
04.02.03 PISO CON PORCELANATO M2 49.53 2.00
04.02.04 CONTRAZOCALO H=0.10m, ALUMINIO M 68.71 2.00
04.03 CARPINTERIA DE MADERA
04.03.01 PUERTA CONTRAPLACADA MDF, PINTADO AL DUCO UND 6.00 3.00
04.03.02 SUMINISTRO E INSTALACION DE BISAGRAS UND 24.00 3.00

04.03.03 CERRADURA DE MANIJA ACERO INOXIDABLE, LLAVE BOTON MARCA YALE O SIMILAR UND 6.00 3.00

04.04 VIDRIOS
04.04.01 VENTANAS DE VIDRIO TEMPLADO M2 15.86 1.00

05 INSTALACIONES ELECTRICAS
05.01 TRAZO
05.01.01 TRAZADO Y REPLANTEO M2 14.20 1.00
05.01.02 CAJUELA PARA CAJA F1 Y MEDIDOR NUEVO GBL 1.00 1.00
05.01.03 CORTE DE PISO PARA ALIMENTADOR TG, TF-101 Y STD-101 M 73.40 1.00
05.01.04 DEMOLICION DE LOSA M2 14.20 1.00
05.01.05 EXCAVACION DE ZANJA PARA ALIMENTADOR M3 8.52 1.00
05.01.06 RELLENO CON MATERIAL PROPIO M3 2.84 1.00
05.01.07 RELLENO CON MATERIAL DE PRESTAMO M3 2.84 1.00
05.01.08 CORTE DE PARED PARA ALIMENTADOR M 6.00 2.00
05.01.09 REPOSICIÓN DE LOSA DE CONCRETO M3 2.84 1.00
05.01.10 RESANE DE PARED, EMPASTADO Y PINTURA GBL 1.00 1.00
05.02 ALIMENTADORES
05.02.01 ALIMENTADOR TG TUBERIA DE PVC-P Ø 80MM ML 27.80 3.00
05.02.02 ALIMENTADOR TF-101 TUBERIA DE PVC-P Ø 50MM ML 21.31 3.00
05.02.03 ALIMENTADOR STD-101 TUBERIA DE PVC-P Ø 35MM ML 37.83 3.00
05.02.04 ALIMENTADOR TB TUBERIA DE PVC-P Ø 25MM ML 70.55 3.00
05.02.05 ALIMENTADOR CONDENSADOR TUBERIA DE PVC-P Ø 25MM ML 104.00 3.00
05.02.06 CABLE 185MM2 LSOH-80 TG ML 89.40 3.00
05.02.07 CABLE 70MM2 LSOH-80 TF-101 ML 69.93 3.00
05.02.08 CABLE 25MM2 LSOH-80 STD-101 ML 120.69 3.00
05.02.09 CABLE 4MM2 LSOH-80 TB ML 218.85 3.00
05.02.10 CABLE 6MM2 LSOH-80 CONDENSADOR 1 ML 204.00 3.00
05.02.11 CABLE 4MM2 LSOH-80 CONDENSADOR 2 ML 108.00 3.00
05.02.12 CABLE 35MM2 LSOH-80 TG, TF-101 TIERRA ML 13.68 3.00
05.02.13 CABLE 16MM2 LSOH-80 STD TIERRA ML 30.20 3.00
05.02.14 CABLE 4MM2 LSOH-80 TB TIERRA ML 36.90 3.00
05.03 INSTALACIONES
05.03.01 SALIDA DE TECHO UND 90.00 4.00
05.03.02 SALIDA DE PARED UND 16.00 2.00
05.03.03 SALIDA PARA TOMACORRIENTE UND 23.00 3.00
05.03.04 SALIDA PARA DATA UND 17.00 3.00
05.03.05 SALIDA PARA LUZ DE EMERGENCIA UND 9.00 1.00
05.03.06 TUBERIA DE PVC-P Ø 20MM ALUMBRADO TOMACORRIENTES Y DATA M 439.40 3.00
05.03.07 CABLE 4MM2 LSOH-80 TOMACORRIENTES M 298.17 4.00
05.03.08 CABLE 2.5MM2 LSOH-80 ALUMBRADO M 654.42 4.00
05.03.09 POZO A TIERRA NORMADO UND 2.00 2.00
05.03.10 SUMINSTRO E INSTALACION DE CANALETA 100x75x4, PLANCHAS GALVANIZADAS M 30.40 2.00
05.04 EQUIPOS
05.04.01 LUCES DE EMERGENCIA LED UND 9.00 6.00
05.04.02 APARATOS LED EMPOTRADO EN FALSO CIELO SHOWROOM UND 77.00 6.00
05.04.03 APARATOS LED EMPOTRADO EN FALSO CIELO OFICINAS UND 13.00 6.00
05.05 TABLEROS
05.05.01 TABLERO GENERAL UND 1.00 2.00
05.05.02 TABLERO TF-101 UND 1.00 2.00
05.05.03 TABLERO STD-101 UND 1.00 2.00
05.05.04 TABLERO TB UND 1.00 2.00

06 AIRE ACONDICIONADO
06.01 TRAZO
02.01.01 TRAZADO Y REPLANTEO GLB 1.00 1.00
02.02 ALIMENTADORES
02.02.01 TUBERIA DE PVC -Ø 40MM ML 52.00 3.00
02.02.02 TUBERIA DE PVC -Ø 25MM ML 34.00 3.00
02.02.03 CABLE 120MM2 LSOH-80 ML 52.00 3.00
02.02.04 CABLE 95MM2 LSOH-80 ML 34.00 3.00
02.03 CIRCUITOS DERIVADOS DE DISTRIBUCION
INSTALACIÓN ELECTRICA DE EQUIPO AIRE ACONDIONADO 60,000 BTU/hr EN CIELO
02.03.01 UND 8.00 4.00
RASO DE SHOWROOM
INSTALACIÓN ELECTRICA DE EQUIPO AIRE ACONDIONADO 24,000 BTU/hr EN CIELO
02.03.02 UND 1.00 1.00
RASO DE OFICINA
INSTALACIÓN ELECTRICA DE EQUIPO AIRE ACONDIONADO 18,000 BTU/hr EN CIELO
02.03.03 UND 1.00 2.00
RASO DE OFICINA
INSTALACIÓN ELECTRICA DE EQUIPO AIRE ACONDIONADO 12,000 BTU/hr EN CIELO
02.03.04 UND 4.00 2.00
RASO DE OFICINA
02.04 CAJAS DE PASE
02.04.01 CAJAS DE PASE FUERZA UND 28.00 2.00
02.05 TABLEROS
TABLERO FUERZA DE AIRE ACONDICIONADO CON POSIBLIDAD DE ALIMENTACIÓN
02.05.01 UND 1.00 1.00
CON GENERADOR
02.06 VARIOS
02.06.01 SISTEMA DE SEGURIDAD UND 1.00 1.00

07 INSTALACIONES SANITARIAS
01.01 OBRAS PRELIMINARES
01.01.01 TRAZO Y REPLANTERO M2 27.50 1.00
01.01.02 DEMOLICION DE PISO PARA TUBERIA M3 7.07 1.00
01.01.03 REPOSICION DE PISO M3 7.07 1.00
01.01.04 ELIMINACION DE ESCOMBROS GLB 1.00 1.00
01.01.05 CONEXIÓN DE DESAGUE A RED EXISTENTE GLB 1.00 2.00
01.01.06 CONEXIÓN A RED DE AGUA EXISTENTE GLB 1.00 2.00
REDES DE DESAGUE Y VENTILACION
01.02
01.02.01 PUNTO DE 2" UND 13.00 2.00
01.02.02 PUNTO DE 4" UND 6.00 2.00
01.02.03 PUNTO DE VENTILACION UND 5.00 2.00
01.02.04 TUBERIA DE 2" ML 27.55 1.00
01.02.05 TUBERIA DE 4" ML 13.78 1.00
01.02.06 ACCESORIOS PARA DESAGUE GLB 1.00 2.00
01.02.07 SUMINSITRO E INSTALACION DE CAJA DE REGISTROS UND 2.00 2.00
01.03 REDES DE AGUA FRIA
01.03.01 SALIDA PARA AGUA FRIA 1/2" UND 6.00 1.00
01.03.02 SALIDA PARA AGUA FRIA 1 1/2" UND 8.00 1.00
01.03.03 RED DE DISTRIBUCION Ø1/2" ML 38.70 2.00
01.03.04 RED DE DISTRIBUCION Ø3/4" ML 8.38 2.00
01.03.05 RED DE DISTRIBUCION Ø1 1/2" ML 61.80 2.00
01.03.06 ACCESORIOS DE AGUA FRIA GLB 1.00 1.00
01.04 EQUIPOS
01.04.01 INODOROS, URINARIOS, LAVATORIOS, GRIFERIA, FLUXOMETRO, T.E. Y BOMBA HIDR UND 28.00 3.00

08 AIRE ACONDICIONADO
REDES DE DESAGUE Y VENTILACION
08.01
08.01.01 TRAZO Y REPLANTERO GBL 1.00 2.00
08.01.02 TUBERIA PVC SAL PARA DESAGÜE DE 1 1/2" ML 243.00 3.00

09 AIRE ACONDICIONADO
09.01 EQUIPOS
09.01.01 INSTALACIÓN DE EQUIPOS DE AIRE ACONDICIONADO UND 14.00 4.00
09.01.02 INSTALACIÓN DE TERMOSTATO UND 13.00 2.00
PROPUESTA ECONOMICA

OBRA REMODELACION DE LOCAL GILDEMEISTER SEMANA 01 SEMANA 02 SEMANA 03 SEMANA 04 SEMANA 05 SEMANA 06 SEMANA 07 SEMANA 08 SEMANA 09 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 13
FECHA 7/20/2018 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 0 0 0 0 0 0 0 0 0 1 1 1 1 1
7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Item Descripción Und. Metrado Nº de dias 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8

01 OBRAS PRELIMINARES Y PROVISIONALES


01.01 OBRAS PROVISIONALES
01.01.01 ALMACEN / COMEDOR Y VESTUARIO GLB 1.00 3.00
01.01.02 OFICINA AMOBLADA GLB 1.00 3.00
01.01.03 HABILITACION DE PUNTO ELECTRICO PARA LA OBRA GLB 1.00 2.00
01.01.04 HABILITACION DE PUNTO DE AGUA PARA LA OBRA GLB 1.00 2.00
01.01.05 CERCO PROVISIONAL CON PANELES DE MADERA M 43.69 3.00
01.02 TRABAJOS PRELIMINARES
01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GBL 1.00 4.00
01.02.02 LIMPIEZA PERMANENTE DE LA OBRA MES 3.00 66.00
01.02.03 TRAZO Y REPLANTEO DURANTE LA OBRA GBL 1.00 26.00
01.02.04 LIMPIEZA FINAL DE OBRA GBL 1.00 6.00
01.02.06 DESMONTAJE DE BALDOSAS EXISTENTES, PISO EXISTENTE EN OFICINAS, MUROS DEGLB 1.00 10.00
01.03 DEMOLICIONES Y MOVIMIENTOS DE TIERRA
01.03.01 CORTE DE LOSA M 180.46 5.00
01.03.02 DEMOLICION DE LOSA M2 59.84 2.00
01.03.03 DEMOLICION DE SARDINEL EXISTENTE M 29.50 2.00
01.03.04 EXCAVACION DE TERRENO M3 56.63 5.00
01.03.05 EXTRACCION DE TIERRA DE JARDIN M3 8.65 2.00
01.03.06 RELLENO CON MATERIAL PROPIO M3 15.87 3.00
01.03.07 RELLENO CON MATERIAL DE PRESTAMO M3 10.84 3.00
01.03.08 COMPACTACION DE TERRENO M2 59.84 3.00
01.03.09 ELIMINACION DE ESCOMBROS GLB 1.00 2.00

02 ESTRUCTURAS
02.01 SHOWROOM
02.01.01 CONCRETO SIMPLE
02.01.01.01 CIMENTACIONES CORRIDAS CONCRETO CICLOPEO f'c=100 kg/cm2 M3 5.44 1.00
02.01.01.02 SOBRECIMIENTO EN MUROS CONCRETO CICLOPEO f'c=140 kg/cm2 M3 0.23 1.00
02.01.01.03 ENCOFRADO DE SOBRECIMIENTOS M2 1.50 1.00
02.01.01.04 SOLADO PARA ZAPATAS 2" f'c=100 kg/cm2 M2 25.60 3.00
02.01.02 CONCRETO ARMADO
02.01.02.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS M3 16.24 2.00
02.01.02.02 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS M3 3.05 1.00
02.01.02.03 CONCRETO f'c=210 kg/cm2 PARA VIGAS M3 0.61 1.00
02.01.02.04 CONCRETO f'c= 210 kg/cm2 PARA REPOSICION DE PISOS M3 9.98 1.00
02.01.02.05 ACERO DE REFUERZO f'y=4200 kg/cm2 GRADO 60 KG 720.79 4.00
02.01.02.06 ENCOFRADO EN PEDESTAL M2 5.88 1.00
02.01.03 ESTRUCTURA METALICA - SUMINISTROS
02.01.03.01 SUMINISTRO Y FABRICACIÓN DE COLUMNAS METALICAS D=30cm KG 5,165.74 18.00
02.01.03.02 SUMINISTRO Y FABRICACIÓN DE "Z" METALICAS SEGUN PLANOS KG 3,040.62 24.00
02.01.03.03 SUMINISTRO Y FABRICACIÓNDE TIJERALES SEGUN PLANOS KG 4,613.17 24.00
02.01.03.04 SUMINISTRO Y FABRICACIÓN DE PLANCHAS DE APOYO SEGUN PLANOS KG 349.30 24.00
02.01.03.05 SUMINISTRO Y FABRICACIÓN DE PLANCHA DE REMATE e=1/4" SEGUN PLANOS KG 72.24 24.00
02.01.03.06 SUMINISTROY FABRICACIÓN DE ARRIOSTRES METALICOS SEGUN PLANOS KG 130.61 24.00
02.01.03.07 SUMINISTRO Y FABRICACION DE ESTRUCTURA PARA CARTEL DE SUPERBOARD KG 2,933.88 24.00
02.01.03.08 SUMINISTRO Y FABRICACIÓN DE PERNOS DE ANCLAJE GLB 1.00 9.00
SUMINSITRO Y FABRICACIÓN DE PERNOS PARA UNION DE COLUMNA Y VIGA
02.01.03.09 GLB 1.00 9.00
METALICA
02.01.03.10 SUMINISTRO E INSTALACION DE COBERTURA TI CALAMINON O SIMILAR M2 476.52 7.00
02.01.03.11 SUMINISTRO E INSTALACION DE SOPORTE METALICO EN MURO DE DRYWALL KG 375.44 2.00
02.01.03.12 CANALETA PARA LLUVIA ML 35.00 2.00
02.01.04 ESTRUCTURA METALICA - MANO DE OBRA
02.01.04.01 SUMINISTRO E INSTALACION DE ESTRUCTURA METALICA KG 13,747.12 18.00

02.02 SS.HH. - ESPERA DE CLIENTES


02.02.01 CONCRETO SIMPLE
02.02.01.01 SOLADO PARA CIMIENTO ARMADO M2 21.76 1.00
02.02.02 CONCRETO ARMADO
02.02.02.01 CIMIENTO ARMADO f'c=210 kg/cm2 M3 13.05 1.00
02.02.02.02 SOBRE/CIMIENTO M3 5.17 1.00
02.02.02.03 ENCOFRADO DE SOBRE/CIMIENTOS M2 34.45 1.00
02.02.02.04 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS M3 0.43 1.00
02.02.02.05 CONCRETO f'c= 210 kg/cm2 PARA REPOSICION DE PISOS M3 3.26 1.00
02.02.02.06 CONCRETO f'c= 210 kg/cm2 EN COLUMNAS M3 1.22 1.00
02.02.02.07 CONCRETO f'c= 210 kg/cm2 EN VIGAS M3 2.90 1.00
02.02.02.08 CONCRETO f'c= 210 kg/cm2 EN LOSA ALIGERADA M3 4.68 1.00
02.02.02.09 ACERO DE REFUERZO KG 541.80 5.00
02.02.02.10 ENCOFRADO DE LOSA M2 47.57 1.00
02.02.02.11 ENCOFRADO DE COLUMNAS M2 24.30 2.00
02.02.02.12 ENCOFRADO DE VIGAS M 16.01 1.00
02.02.03 ESTRUCTURA METALICA
02.02.03.01 SUMINISTRO E INSTALACION DE COLUMNAS Ø20CM KG 213.79 1.00
02.02.03.02 SUMINISTRO E INSTALACION DE PLANCHAS DE APOYO e=1/2" KG 17.30 1.00
02.02.03.03 SUMINISTRO E INSTALACION DE PLANCHA DE REMATE e=1/2" KG 17.30 1.00
02.02.03.04 BASE METALICA PARA T.E. GLB 1.00 1.00

02.03 AIRE ACONDICIONADO


02.03.01 ESTRUCTURAS METÁLICAS
SUMINISTRO E INSTALACIÓN DE SOPORTES METALICOS Y ANCLAJES DE EQUIPOS
02.03.01.01 CONDENSADORES Y EVAPORADORES; LA ESTRCUTURA SERÁ DE ACERO A-36 UND 14.00 7.00
SOLDADA Y PINTADA.

03 ARQUITECTURA - SHOWROOM
03.01 TABIQUERIA
SUMINISTRO Y MONTAJE DE MUROS DE SUPERBOARD EXTERIOR DE e=120 mm
03.01.01 M2 96.86 2.00
ANCLADOS A PISO Y TECHO EXISTENTES
SUMINISTRO Y MONTAJE DE MUROS DE DRYWALL DE e=120 mm ANCLADOS A PISO Y
03.01.02 M2 302.17 8.00
TECHO EXISTENTES
SUMINISTRO Y MONTAJE DE CIELO RASO TIPO AMSTRONG MODELO SERENE DE 600
03.01.03 M2 390.48 8.00
X 600 INCLUYE SOPORTES Y ANCLAJES
03.01.04 MURO DE ALBAÑILERIA KING KONG e=150 mm M2 75.91 3.00
SUMINISTRO Y MONTAJE DE DRYWALL EN CIELO RASO ANCLADOS A TECHO
03.01.05 M2 77.90 3.00
METALICO
03.02 REVESTIMIENTOS
03.02.01 TARRAJEO DE MUROS M2 151.82 2.00
03.02.02 TARRAJEO DE COLUMNAS M2 6.40 1.00
03.02.03 EMPASTADO DE MUROS INTERIORES Y EXTERIORES M2 737.66 3.00
03.02.04 PINTURA LATEX PAREDES EXTERIORES M2 192.92 4.00
03.02.05 PINTURA LATEX PAREDES INTERIOR M2 544.73 4.00
03.02.06 PINTURA LATEX TECHO INTERIOR M2 77.90 2.00
03.02.07 PINTURA ESTRUCTURA METÁLICA ACABADO GLOSS COLOR NEGRO M2 79.13 2.00
03.02.08 PISO CON PORCELANATO SHOWROOM M2 476.52 8.00
03.02.09 PISO CON PORCELANATO EN BAÑOS M2 23.95 2.00
03.02.10 CONTRAZOCALO H=0.10m DE PORCELANATO M 68.92 2.00
03.02.11 CONTRAZOCALO H=2.80m EN BAÑOS M2 86.49 2.00
03.02.12 CERRAMIENTO TR7 EN FACHADA M2 15.00 2.00
03.03 CARPINTERIA DE MADERA
03.03.01 PUERTA CONTRAPLACADA MDF, PINTADO AL DUCO UND 3.00 3.00
03.03.02 SUMINISTRO E INSTALACION DE BISAGRAS UND 12.00 2.00

03.03.03 CERRADURA DE MANIJA ACERO INOXIDABLE, LLAVE BOTON MARCA YALE O SIMILAR UND 3.00 2.00

03.03.04 CIERRA PUERTAS HIDRAULICO DE ACERO INOXIDABLE, MARCA YALE O SIMILAR UND 3.00 2.00

03.04 VIDRIOS
03.04.01 VENTANAS DE VIDRIO TEMPLADO M2 2.40 2.00

03.04.02 PUERTA DOBLE HOJA DE VIDRIO TEMPLADO, INCLUYE CERRADURAS Y TIRADORES M2 10.50 2.00

03.04.03 MAMPARA INCLUYE CERRADURAS Y TIRADORES M2 18.00 6.00


MURO CORTINA INCLUYE ACCESORIOS DE SOPORTE, ACCESORIOS DE PUERTAS
03.04.04 M2 186.65 9.00
BATIENTES Y CORREDISAS
03.05 VARIOS
03.05.01 MESA DE CONCRETO PARA OVALINES, INCLUYE REVESTIMIENTO GLB 1.00 2.00
03.05.02 DIVISIONES DE BAÑO EN ALUMINIO Y MELAMINE GLB 1.00 2.00

04 ARQUITECTURA - SALA DE VENTAS


04.01 TABIQUERIA
SUMINISTRO Y MONTAJE DE MUROS DE DRYWALL DE e=120 mm ANCLADOS A PISO Y
04.01.01 M2 75.57 3.00
TECHO EXISTENTES
SUMINISTRO Y MONTAJE DE CIELO RASO TIPO AMSTRONG MODELO SERENE DE 600
04.01.02 M2 49.53 2.00
X 600 INCLUYE SOPORTES Y ANCLAJES
04.02 REVESTIMIENTOS
04.02.01 EMPASTADO DE MUROS INTERIORES M2 103.78 2.00
04.02.02 EMPASTADO Y PINTURA LATEX EN INTERIORES M2 103.78 2.00
04.02.03 PISO CON PORCELANATO M2 49.53 2.00
04.02.04 CONTRAZOCALO H=0.10m, ALUMINIO M 68.71 2.00
04.03 CARPINTERIA DE MADERA
04.03.01 PUERTA CONTRAPLACADA MDF, PINTADO AL DUCO UND 6.00 3.00
04.03.02 SUMINISTRO E INSTALACION DE BISAGRAS UND 24.00 3.00

04.03.03 CERRADURA DE MANIJA ACERO INOXIDABLE, LLAVE BOTON MARCA YALE O SIMILAR UND 6.00 3.00

04.04 VIDRIOS
04.04.01 VENTANAS DE VIDRIO TEMPLADO M2 15.86 1.00

05 INSTALACIONES ELECTRICAS
05.01 TRAZO
05.01.01 TRAZADO Y REPLANTEO M2 14.20 1.00
05.01.02 CAJUELA PARA CAJA F1 Y MEDIDOR NUEVO GBL 1.00 1.00
05.01.03 CORTE DE PISO PARA ALIMENTADOR TG, TF-101 Y STD-101 M 73.40 1.00
05.01.04 DEMOLICION DE LOSA M2 14.20 1.00
05.01.05 EXCAVACION DE ZANJA PARA ALIMENTADOR M3 8.52 1.00
05.01.06 RELLENO CON MATERIAL PROPIO M3 2.84 1.00
05.01.07 RELLENO CON MATERIAL DE PRESTAMO M3 2.84 1.00
05.01.08 CORTE DE PARED PARA ALIMENTADOR M 6.00 2.00
05.01.09 REPOSICIÓN DE LOSA DE CONCRETO M3 2.84 1.00
05.01.10 RESANE DE PARED, EMPASTADO Y PINTURA GBL 1.00 1.00
05.02 ALIMENTADORES
05.02.01 ALIMENTADOR TG TUBERIA DE PVC-P Ø 80MM ML 27.80 3.00
05.02.02 ALIMENTADOR TF-101 TUBERIA DE PVC-P Ø 50MM ML 21.31 3.00
05.02.03 ALIMENTADOR STD-101 TUBERIA DE PVC-P Ø 35MM ML 37.83 3.00
05.02.04 ALIMENTADOR TB TUBERIA DE PVC-P Ø 25MM ML 70.55 3.00
05.02.05 ALIMENTADOR CONDENSADOR TUBERIA DE PVC-P Ø 25MM ML 104.00 3.00
05.02.06 CABLE 185MM2 LSOH-80 TG ML 89.40 3.00
05.02.07 CABLE 70MM2 LSOH-80 TF-101 ML 69.93 3.00
05.02.08 CABLE 25MM2 LSOH-80 STD-101 ML 120.69 3.00
05.02.09 CABLE 4MM2 LSOH-80 TB ML 218.85 3.00
05.02.10 CABLE 6MM2 LSOH-80 CONDENSADOR 1 ML 204.00 3.00
05.02.11 CABLE 4MM2 LSOH-80 CONDENSADOR 2 ML 108.00 3.00
05.02.12 CABLE 35MM2 LSOH-80 TG, TF-101 TIERRA ML 13.68 3.00
05.02.13 CABLE 16MM2 LSOH-80 STD TIERRA ML 30.20 3.00
05.02.14 CABLE 4MM2 LSOH-80 TB TIERRA ML 36.90 3.00
05.03 INSTALACIONES
05.03.01 SALIDA DE TECHO UND 90.00 4.00
05.03.02 SALIDA DE PARED UND 16.00 2.00
05.03.03 SALIDA PARA TOMACORRIENTE UND 23.00 3.00
05.03.04 SALIDA PARA DATA UND 17.00 3.00
05.03.05 SALIDA PARA LUZ DE EMERGENCIA UND 9.00 1.00
05.03.06 TUBERIA DE PVC-P Ø 20MM ALUMBRADO TOMACORRIENTES Y DATA M 439.40 3.00
05.03.07 CABLE 4MM2 LSOH-80 TOMACORRIENTES M 298.17 4.00
05.03.08 CABLE 2.5MM2 LSOH-80 ALUMBRADO M 654.42 4.00
05.03.09 POZO A TIERRA NORMADO UND 2.00 2.00
05.03.10 SUMINSTRO E INSTALACION DE CANALETA 100x75x4, PLANCHAS GALVANIZADAS M 30.40 2.00
05.04 EQUIPOS
05.04.01 LUCES DE EMERGENCIA LED UND 9.00 6.00
05.04.02 APARATOS LED EMPOTRADO EN FALSO CIELO SHOWROOM UND 77.00 6.00
05.04.03 APARATOS LED EMPOTRADO EN FALSO CIELO OFICINAS UND 13.00 6.00
05.05 TABLEROS
05.05.01 TABLERO GENERAL UND 1.00 2.00
05.05.02 TABLERO TF-101 UND 1.00 2.00
05.05.03 TABLERO STD-101 UND 1.00 2.00
05.05.04 TABLERO TB UND 1.00 2.00

06 AIRE ACONDICIONADO
06.01 TRAZO
02.01.01 TRAZADO Y REPLANTEO GLB 1.00 1.00
02.02 ALIMENTADORES
02.02.01 TUBERIA DE PVC -Ø 40MM ML 52.00 3.00
02.02.02 TUBERIA DE PVC -Ø 25MM ML 34.00 3.00
02.02.03 CABLE 120MM2 LSOH-80 ML 52.00 3.00
02.02.04 CABLE 95MM2 LSOH-80 ML 34.00 3.00
02.03 CIRCUITOS DERIVADOS DE DISTRIBUCION
INSTALACIÓN ELECTRICA DE EQUIPO AIRE ACONDIONADO 60,000 BTU/hr EN CIELO
02.03.01 UND 8.00 4.00
RASO DE SHOWROOM
INSTALACIÓN ELECTRICA DE EQUIPO AIRE ACONDIONADO 24,000 BTU/hr EN CIELO
02.03.02 UND 1.00 1.00
RASO DE OFICINA
INSTALACIÓN ELECTRICA DE EQUIPO AIRE ACONDIONADO 18,000 BTU/hr EN CIELO
02.03.03 UND 1.00 2.00
RASO DE OFICINA
INSTALACIÓN ELECTRICA DE EQUIPO AIRE ACONDIONADO 12,000 BTU/hr EN CIELO
02.03.04 UND 4.00 2.00
RASO DE OFICINA
02.04 CAJAS DE PASE
02.04.01 CAJAS DE PASE FUERZA UND 28.00 2.00
02.05 TABLEROS
TABLERO FUERZA DE AIRE ACONDICIONADO CON POSIBLIDAD DE ALIMENTACIÓN
02.05.01 UND 1.00 1.00
CON GENERADOR
02.06 VARIOS
02.06.01 SISTEMA DE SEGURIDAD UND 1.00 1.00

07 INSTALACIONES SANITARIAS
01.01 OBRAS PRELIMINARES
01.01.01 TRAZO Y REPLANTERO M2 27.50 1.00
01.01.02 DEMOLICION DE PISO PARA TUBERIA M3 7.07 1.00
01.01.03 REPOSICION DE PISO M3 7.07 1.00
01.01.04 ELIMINACION DE ESCOMBROS GLB 1.00 1.00
01.01.05 CONEXIÓN DE DESAGUE A RED EXISTENTE GLB 1.00 2.00
01.01.06 CONEXIÓN A RED DE AGUA EXISTENTE GLB 1.00 2.00
REDES DE DESAGUE Y VENTILACION
01.02
01.02.01 PUNTO DE 2" UND 13.00 2.00
01.02.02 PUNTO DE 4" UND 6.00 2.00
01.02.03 PUNTO DE VENTILACION UND 5.00 2.00
01.02.04 TUBERIA DE 2" ML 27.55 1.00
01.02.05 TUBERIA DE 4" ML 13.78 1.00
01.02.06 ACCESORIOS PARA DESAGUE GLB 1.00 2.00
01.02.07 SUMINSITRO E INSTALACION DE CAJA DE REGISTROS UND 2.00 2.00
01.03 REDES DE AGUA FRIA
01.03.01 SALIDA PARA AGUA FRIA 1/2" UND 6.00 1.00
01.03.02 SALIDA PARA AGUA FRIA 1 1/2" UND 8.00 1.00
01.03.03 RED DE DISTRIBUCION Ø1/2" ML 38.70 2.00
01.03.04 RED DE DISTRIBUCION Ø3/4" ML 8.38 2.00
01.03.05 RED DE DISTRIBUCION Ø1 1/2" ML 61.80 2.00
01.03.06 ACCESORIOS DE AGUA FRIA GLB 1.00 1.00
01.04 EQUIPOS
01.04.01 INODOROS, URINARIOS, LAVATORIOS, GRIFERIA, FLUXOMETRO, T.E. Y BOMBA HIDR UND 28.00 3.00

08 AIRE ACONDICIONADO
REDES DE DESAGUE Y VENTILACION
08.01
08.01.01 TRAZO Y REPLANTERO GBL 1.00 2.00
08.01.02 TUBERIA PVC SAL PARA DESAGÜE DE 1 1/2" ML 243.00 3.00

09 AIRE ACONDICIONADO
09.01 EQUIPOS
09.01.01 INSTALACIÓN DE EQUIPOS DE AIRE ACONDICIONADO UND 14.00 4.00
09.01.02 INSTALACIÓN DE TERMOSTATO UND 13.00 2.00