Cronograma Valorizado
Cronograma Valorizado
PRESUPUESTO MES1
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL
PRESUPUESTO MES1
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL
820.00
820.00
###
19,805.11 48,015.48
###
2,440.98
684.98
800.00
200.00
756.00
680.00
221.00
459.00
2,749.55
962.41
788.58
110.86
410.83
476.87
4,867.52
4,867.52
19,805.11 37,277.43
5,392.14
4,536.78
855.36
3,281.97 15,362.15
3,281.97 4,269.49
7,156.96
3,935.70
16,523.14 16,523.14
4,436.21 4,436.21
7,444.19 7,444.19
4,642.74 4,642.74
33,677.79 34597.63 22576.71 92,479.22
4,731.48 4,731.48
2,536.68 2,536.68
2,194.80 2,194.80
1,627.09
1,627.09
13148.99 13,148.99
13148.99 13,148.99
28,946.31 34597.63 5978.53 69,522.47
12,889.51 1740.06 14,629.57
15,348.48 1777.98 17,126.46
1925.64 1,925.64
21954.12 76.53 22,030.65
1392.49 1,392.49
708.32 708.32
2115.28 2,115.28
3786.72 3,786.72
2903.67 2,903.67
2903.67 2,903.67
3449.19 3,449.19
3449.19 3,449.19
4092.85 4,092.85
AMA VALORIZADO DE OBRA
1279.70 1,279.70
338.28 338.28
941.42 941.42
694.99 694.99
694.99 694.99
994.19 994.19
994.19 994.19
171.05 171.05
136.62 136.62
34.43 34.43
952.92 952.92
952.92 952.92
425.00 425.00
425.00 425.00
3,250.00
3,250.00
0.00
###
53,482.90 34,597.63 27,094.56 149,082.55 ###
15,295.15 9,894.30 7,748.56 42,634.93 ###
4,278.63 2,767.81 2,167.56 11,926.60 ###
73,056.68 47,259.74 37,010.68 203,644.08 ###
13,150.2024 8,506.7532 6,661.9224 36,655.9344 ###
86,206.88 55,766.49 43,672.60 240,300.01 ###
10,030.72 6,488.79 5,081.59 27,960.44
0.00 0.00 0.00 0.00
96,237.60 62,255.28 48,754.19 268,260.45
###
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
02.01.04.02.04 RELLENO Y COMPACTACION DE ZANJAS MANUAL E=0.60m, A=0.45m m 61.90 6.11 378.21
02.01.04.03 SUMINISTRO E INSTALACION DE TUBERIAS 598.58
02.01.04.03.01 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, DIA=1 1/2" m 61.90 8.55 529.25
02.01.04.03.02 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS m 61.90 1.12 69.33
02.01.05 RED DE DISTRIBUCION - SISTEMA PATACON 69,532.27
02.01.05.01 TRABAJOS PRELIMINARES 3,800.13
02.01.05.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,539.90 0.99 1,524.50
02.01.05.01.02 TRAZO Y REPLANTEO PRELIMINAR m 1,711.00 1.33 2,275.63
02.01.05.02 MOVIMIENTO DE TIERRAS 54,461.13
02.01.05.02.01 EXCAVACION MANUAL DE ZANJAS, A=0.45m x H=0.90m EN TERRENO NORMAL m 1,711.00 15.57 26,640.27
02.01.05.02.02 CAMA DE APOYO E=0.10m, A=0.45m PARA TUBERIA m 1,711.00 6.59 11,275.49
02.01.05.02.03 RELLENO CON MATERIAL PROPIO ZARANDEADO E=0.20m, A=0.45m m 1,711.00 3.56 6,091.16
02.01.05.02.04 RELLENO Y COMPACTACION DE ZANJAS MANUAL E=0.60m, A=0.45m m 1,711.00 6.11 10,454.21
02.01.05.03 TUBERIAS Y PRUEBA HIDRAULICA 11,016.18
02.01.05.03.01 SUM. Y COLOC. DE TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=1.5" m 594.00 8.85 5,256.90
02.01.05.03.02 SUM. Y COLOC. DE TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=1" m 385.00 5.35 2,059.75
02.01.05.03.03 SUM. Y COLOC. DE TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=3/4" m 377.00 4.73 1,783.21
02.01.05.03.04 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS m 1,711.00 1.12 1,916.32
02.01.05.04 SUMINISTRO E INSTALACION DE ACCESORIOS 254.83
02.01.05.04.01 TEE PVC SP DE 1 1/2" NTP 399.002 und 12.00 8.61 103.32
02.01.05.04.02 TEE PVC SP DE 1" NTP 399.002 und 5.00 6.01 30.05
02.01.05.04.03 TEE PVC SP DE 3/4" NTP 399.002 und 2.00 4.47 8.94
02.01.05.04.04 REDUCCIÓN PVC SP DE 3/4" A 1/2" NTP 399.002 und 8.00 2.20 17.60
02.01.05.04.05 REDUCCION PVC SP DE 1 1/2" a 1" NTP 399.002 und 2.00 4.02 8.04
02.01.05.04.06 REDUCCION PVC SP DE 1 1/2" a 3/4" NTP 399.002 und 2.00 3.74 7.48
02.01.05.04.07 REDUCCION PVC SP DE 1 1/2" a 1/2" NTP 399.002 und 10.00 3.74 37.40
02.01.05.04.08 REDUCCION PVC SP DE 1" a 3/4" NTP 399.002 und 2.00 5.80 11.60
02.01.05.04.09 REDUCCION PVC SP DE 1" a 1/2" NTP 399.002 und 5.00 6.08 30.40
02.01.06 VALVULA DE AIRE (03 UNID) 1,444.88
02.01.06.01 TRABAJOS PRELIMINARES 3.40
02.01.06.01.01 LIMPIEZA DEL TERRENO MANUAL m2 1.92 0.99 1.90
02.01.06.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.92 0.78 1.50
02.01.06.02 MOVIMIENTO DE TIERRAS 76.61
02.01.06.02.01 EXCAVACION MANUAL DE TERRENO m3 1.19 33.90 40.34
02.01.06.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 1.92 2.25 4.32
02.01.06.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 0.42 18.84 7.91
02.01.06.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 0.92 14.83 13.64
02.01.06.02.05 EMPEDRADO EXTERIOR SIN MORTERO DE 0.60m x 0.40m m2 0.72 14.44 10.40
02.01.06.03 OBRAS DE CONCRETO SIMPLE 512.96
02.01.06.03.01 CONCRETO F'C=140 KG/CM2, Sin Mezcladora m3 0.48 375.47 180.23
02.01.06.03.02 ENCOFRADO Y DESENCOFRADO m2 8.88 37.47 332.73
02.01.06.04 REVOQUES Y ENLUCIDOS 64.43
02.01.06.04.01 TARRAJEO EN EXTERIORES (MORTERO CA 1:5) E=1.5 CM m2 2.88 22.37 64.43
02.01.06.05 SUMINISTRO E INSTALACION DE ACCESORIOS 434.50
02.01.06.05.01 VALVULA TIPO GLOBO DE BRONCE DE 1 1/2" INC. ACCESORIOS und 2.00 151.95 303.90
02.01.06.05.02 VALVULA TIPO GLOBO DE BRONCE DE 1" INC. ACCESORIOS und 1.00 130.60 130.60
02.01.06.06 VARIOS 352.98
02.01.06.06.01 FILTRO DE GRAVA DIA. MAX. 1/2" m3 0.03 166.20 4.99
02.01.06.06.02 TAPA SANITARIA METALICA 0.40x0.40x1/8" und 3.00 114.08 342.24
02.01.06.06.03 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 0.60 9.58 5.75
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
02.01.09.04.01 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZC. C:A=1:5, AP. DE SOGA m2 11.03 56.19 619.78
02.01.09.04.02 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZC. C:A=1:5, AP. DE CANTO m2 9.92 52.43 520.11
02.01.09.05 REVOQUES Y ENLUCIDOS 1,874.99
02.01.09.05.01 TARRAJEO PULIDO EN LAVADERO - INTERIORES, CON MORTERO C:A 1:5, E=1.5 CM m2 26.93 22.37 602.42
02.01.09.05.02 TARRAJEO DE LAVADERO - EXTERIORES, CON MORTERO C:A 1:5, E=1.5 CM m2 54.57 23.32 1,272.57
02.01.09.06 CONEXION DOMICILIARIA, INC. VALVULAS Y ACCESORIOS 2,024.61
02.01.09.06.01 ACCESORIOS EN LAVADEROS MULTIUSOS AGUA Y DESAGÜE und 21.00 96.41 2,024.61
02.01.09.07 VARIOS 596.65
02.01.09.07.01 PINTURA OCRE COLOR ROJO EN PILETA m2 81.51 7.32 596.65
02.01.10 UNIDADES BASICAS CON ARRASTRE HIDRAULICO Y BIODIGESTOR (21 UND) 202,059.42
02.01.10.01 ESTRUCTURAS Y ARQUITECTURA 122,790.31
02.01.10.01.01 TRABAJOS PRELIMINARES 303.31
02.01.10.01.01 LIMPIEZA DE TERRENO MANUAL m2 171.36 0.99 169.65
02.01.10.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 171.36 0.78 133.66
02.01.10.01.02 MOVIMIENTO DE TIERRAS 2,250.19
02.01.10.01.02 EXCAVACION MANUAL DE TERRENO PARA CIMIENTOS m3 35.28 33.90 1,195.99
02.01.10.01.02 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 44.10 14.83 654.00
02.01.10.01.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 14.22 18.84 267.90
02.01.10.01.02 NIVELACIÓN INTERIOR Y APISONADO m2 58.80 2.25 132.30
02.01.10.01.03 OBRAS DE CONCRETO SIMPLE 13,526.49
02.01.10.01.03 CIMIENTOS CORRIDOS MEZCLA C:H 1:10 +30% P.G., Sin mezcladora m3 25.32 233.57 5,913.99
02.01.10.01.03 SOBRECIMIENTOS MEZCLA C:H 1:8 + 25% PM, Sin mezcladora m3 5.91 333.04 1,968.27
02.01.10.01.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 78.75 50.99 4,015.46
02.01.10.01.03 CONCRETO EN FALSO PISO MEZCLA C:H 1:10 E=10CM, Sin Mezcladora m2 65.36 24.92 1,628.77
02.01.10.01.04 OBRAS DE CONCRETO ARMADO 32,303.31
02.01.10.01.04 CONCRETO EN COLUMNAS f'c=175 kg/cm2, Sin mezcladora m3 8.35 526.33 4,394.86
02.01.10.01.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 119.02 61.41 7,309.02
02.01.10.01.04 ACERO DE REFUERZO EN COLUMNAS, FY=4200 KG/CM2 kg 1,837.09 4.42 8,119.94
02.01.10.01.04 CONCRETO EN VIGAS f'c=175 kg/cm2, Sin mezcladora m3 5.42 421.71 2,285.67
02.01.10.01.04 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 67.20 73.68 4,951.30
02.01.10.01.04 ACERO DE REFUERZO EN VIGAS, FY=4200 KG/CM2 kg 1,186.09 4.42 5,242.52
02.01.10.01.05 MUROS Y TABIQUES 17,690.86
02.01.10.01.05 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZC. C:A=1:5, AP. DE SOGA m2 314.84 56.19 17,690.86
02.01.10.01.06 REVOQUES Y ENLUCIDOS 15,168.34
02.01.10.01.06 TARRAJEO EN MUROS Y COLUMNAS, MORTERO C:A 1:5, E=1.5 CM m2 532.93 23.68 12,619.78
02.01.10.01.06 VESTIDURA DE DERRAMES, C:A 1:5, E=1.5 CM m 168.00 15.17 2,548.56
02.01.10.01.07 PISOS Y PAVIMENTOS 6,950.78
02.01.10.01.07 PISO DE CEMENTO PULIDO f'c=140 kg/cm2 E=10CM, Sin mezcladora m2 65.36 35.13 2,296.10
02.01.10.01.07 VEREDA DE CONCRETO f'c=140 kg/cm2 E=10CM, Sin mezcladora m2 83.16 45.18 3,757.17
02.01.10.01.07 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 34.44 26.06 897.51
02.01.10.01.08 ZOCALOS 4,994.74
02.01.10.01.08 ZOCALO DE CEMENTO PULIDO MORTERO C:A 1:5, E=1.5 CM m2 209.16 23.88 4,994.74
02.01.10.01.09 CONTRAZOCALOS 1,431.33
02.01.10.01.09 BLOQUE DE CONCRETO MEZCLA C:H 1:8 E=0.10m, H=0.30m, L= 1.20m und 21.00 50.71 1,064.91
02.01.10.01.09 TARRAJEO DE CONTRAZOCALO C:A 1:5, E=1.5 CM m2 16.38 22.37 366.42
02.01.10.01.10 COBERTURAS 5,024.75
02.01.10.01.10 COBERTURA CON CALAMINA GALVANIZADA 0.83m x 1.80m, E=0.30mm m2 198.45 25.32 5,024.75
02.01.10.01.11 CARPINTERIA DE MADERA 15,795.57
02.01.10.01.11 VIGUETA DE MADERA PARA TECHO DE 2.50m x 5" x 2", MADERA EUCALIPTO und 84.00 22.11 1,857.24
02.01.10.01.11 CORREAS DE MADERA PARA TECHO EUCALIPTO 3.40m x 2"x 2", MADERA EUCALIPTO und 84.00 27.21 2,285.64
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
02.03.07 UNIDADES BASICAS CON ARRASTRE HIDRAULICO Y BIODIGESTOR (135 UND) 1,307,388.14
02.03.07.01 ESTRUCTURAS Y ARQUITECTURA 802,141.31
02.03.07.01.01 TRABAJOS PRELIMINARES 1,949.83
02.03.07.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,101.60 0.99 1,090.58
02.03.07.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 1,101.60 0.78 859.25
02.03.07.01.02 MOVIMIENTO DE TIERRAS 29,968.55
02.03.07.01.02 EXCAVACION MANUAL DE TERRENO PARA CIMIENTOS m3 226.80 33.90 7,688.52
02.03.07.01.02 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 283.50 14.83 4,204.31
02.03.07.01.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 914.29 18.84 17,225.22
02.03.07.01.02 NIVELACIÓN INTERIOR Y APISONADO m2 378.00 2.25 850.50
02.03.07.01.03 OBRAS DE CONCRETO SIMPLE 84,246.13
02.03.07.01.03 CIMIENTOS CORRIDOS MEZCLA C:H 1:10 +30% P.G., Sin mezcladora m3 151.20 233.57 35,315.78
02.03.07.01.03 SOBRECIMIENTOS MEZCLA C:H 1:8 + 25% PM, Sin mezcladora m3 37.97 333.04 12,645.53
02.03.07.01.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 506.25 50.99 25,813.69
02.03.07.01.03 CONCRETO EN FALSO PISO MEZCLA C:H 1:10 E=10CM, Sin Mezcladora m2 420.19 24.92 10,471.13
02.03.07.01.04 OBRAS DE CONCRETO ARMADO 207,644.97
02.03.07.01.04 CONCRETO EN COLUMNAS f'c=175 kg/cm2, Sin mezcladora m3 53.66 526.33 28,242.87
02.03.07.01.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 765.11 61.41 46,985.41
02.03.07.01.04 ACERO DE REFUERZO EN COLUMNAS, FY=4200 KG/CM2 kg 11,809.25 4.42 52,196.89
02.03.07.01.04 CONCRETO EN VIGAS f'c=175 kg/cm2, Sin mezcladora m3 34.83 421.71 14,688.16
02.03.07.01.04 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 432.00 73.68 31,829.76
02.03.07.01.04 ACERO DE REFUERZO EN VIGAS, FY=4200 KG/CM2 kg 7,624.86 4.42 33,701.88
02.03.07.01.05 MUROS Y TABIQUES 113,728.00
02.03.07.01.05 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZC. C:A=1:5, AP. DE SOGA m2 2,023.99 56.19 113,728.00
02.03.07.01.06 REVOQUES Y ENLUCIDOS 97,510.33
02.03.07.01.06 TARRAJEO EN MUROS Y COLUMNAS, MORTERO C:A 1:5, E=1.5 CM m2 3,425.96 23.68 81,126.73
02.03.07.01.06 VESTIDURA DE DERRAMES, C:A 1:5, E=1.5 CM m 1,080.00 15.17 16,383.60
02.03.07.01.07 PISOS Y PAVIMENTOS 44,684.18
02.03.07.01.07 PISO DE CEMENTO PULIDO f'c=140 kg/cm2 E=10CM, Sin mezcladora m2 420.19 35.13 14,761.27
02.03.07.01.07 VEREDA DE CONCRETO f'c=140 kg/cm2 E=10CM, Sin mezcladora m2 534.60 45.18 24,153.23
02.03.07.01.07 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 221.40 26.06 5,769.68
02.03.07.01.08 ZOCALOS 32,109.05
02.03.07.01.08 ZOCALO DE CEMENTO PULIDO MORTERO C:A 1:5, E=1.5 CM m2 1,344.60 23.88 32,109.05
02.03.07.01.09 CONTRAZOCALOS 9,201.41
02.03.07.01.09 BLOQUE DE CONCRETO MEZCLA C:H 1:8 E=0.10m, H=0.30m, L= 1.20m und 135.00 50.71 6,845.85
02.03.07.01.09 TARRAJEO DE CONTRAZOCALO C:A 1:5, E=1.5 CM m2 105.30 22.37 2,355.56
02.03.07.01.10 COBERTURAS 32,301.99
02.03.07.01.10 COBERTURA CON CALAMINA GALVANIZADA 0.83m x 1.80m, E=0.30mm m2 1,275.75 25.32 32,301.99
02.03.07.01.11 CARPINTERIA DE MADERA 101,542.95
02.03.07.01.11 VIGUETA DE MADERA PARA TECHO DE 2.50m x 5" x 2", MADERA EUCALIPTO und 540.00 22.11 11,939.40
02.03.07.01.11 CORREAS DE MADERA PARA TECHO EUCALIPTO 3.40m x 2"x 2", MADERA EUCALIPTO und 540.00 27.21 14,693.40
02.03.07.01.11 PUERTA DE CONTRAPLACADA C/SOBREVENTANA und 135.00 468.32 63,223.20
02.03.07.01.11 VENTANA DE MADERA C/MOSQUETERO 60x40CM und 135.00 86.57 11,686.95
02.03.07.01.12 PINTURA 47,253.92
02.03.07.01.12 PINTURA EN MUROS INT.Y EXT./LATEX LAVABLE m2 4,932.56 9.58 47,253.92
02.03.07.02 INSTALACIONES SANITARIAS 263,536.57
02.03.07.02.01 TRABAJOS PRELIMINARES 1,242.54
02.03.07.02.01 LIMPIEZA DE TERRENO MANUAL m2 702.00 0.99 694.98
02.03.07.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 702.00 0.78 547.56
02.03.07.02.02 MOVIMIENTO DE TIERRAS 21,700.61
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
02.03.07.02.02 EXCAVACION MANUAL DE ZANJAS PARA TUBERIA DE AGUA m3 38.88 33.90 1,318.03
02.03.07.02.02 EXCAVACION MANUAL DE ZANJAS PARA TUBERIAL DE DESAGÜE m3 263.52 33.90 8,933.33
02.03.07.02.02 CAMA DE APOYO PARA TUBERIAS H=0.05M m3 37.80 152.17 5,752.03
02.03.07.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 302.40 18.84 5,697.22
02.03.07.02.03 INSTALACIONES DE AGUA FRIA 49,577.97
02.03.07.02.03 TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=1/2" m 1,215.00 3.36 4,082.40
02.03.07.02.03 SALIDA DE AGUA FRIA CON TUBERIA PVC SP 1/2" pto 405.00 81.65 33,068.25
02.03.07.02.03 VALVULA ESFERICA DE 1/2" und 135.00 83.18 11,229.30
02.03.07.02.03 ACCESORIOS PVC AGUA glb 1.00 1,198.02 1,198.02
02.03.07.02.04 INSTALACIONES DE DESAGÜE 102,782.15
02.03.07.02.04 SUM. Y COLOC. DE TUBERIA PVC SAL NTP 399.003, DIA=4" m 742.50 9.05 6,719.63
02.03.07.02.04 SUM. Y COLOC. DE TUBERIA PVC SAL NTP 399.003, DIA=2" m 2,268.00 6.30 14,288.40
02.03.07.02.04 SALIDA DE DESAGÜE CON TUBERIA PVC SAL DE 2" pto 540.00 61.26 33,080.40
02.03.07.02.04 SALIDA DE VENTILACIÓN CON TUBERIA PVC SAL DE 2" pto 135.00 66.26 8,945.10
02.03.07.02.04 REGISTRO DE BRONCE CROMADO DE 2" und 135.00 64.17 8,662.95
02.03.07.02.04 REGISTRO DE BRONCE CROMADO DE 4" und 135.00 70.73 9,548.55
02.03.07.02.04 SUMIDERO DE BRONCE CROMADO 2" und 270.00 67.53 18,233.10
02.03.07.02.04 ACCESORIOS PVC DESAGÜE glb 1.00 3,304.02 3,304.02
02.03.07.02.05 APARATOS SANITARIOS Y ACCESORIOS 69,566.85
02.03.07.02.05 INODORO TANQUE BAJO COLOR und 135.00 212.72 28,717.20
02.03.07.02.05 LAVATORIO DE PARED COLOR BLANCO und 135.00 117.76 15,897.60
02.03.07.02.05 DUCHA CON ACCESORIOS und 135.00 36.63 4,945.05
02.03.07.02.05 INSTALACION DE APARATOS SANITARIOS und 135.00 58.20 7,857.00
02.03.07.02.05 INSTALACION DE ACCESORIOS und 135.00 90.00 12,150.00
02.03.07.02.06 CAJAS DE INSPECCION Y/O REGISTRO 18,666.45
02.03.07.02.06 CAJA DE REGISTRO DE 12"x24" pza 135.00 138.27 18,666.45
02.03.07.03 INSTALACION DE TANQUE BIODIGESTOR 600 LTS 174,885.66
02.03.07.03.01 TRABAJOS PRELIMINARES 764.64
02.03.07.03.01 LIMPIEZA DE TERRENO MANUAL m2 432.00 0.99 427.68
02.03.07.03.01 TRAZO Y REPLANTEO PRELIMINAR m2 432.00 0.78 336.96
02.03.07.03.02 MOVIMIENTO DE TIERRAS 16,470.72
02.03.07.03.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 313.52 33.90 10,628.33
02.03.07.03.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 100.51 18.84 1,893.61
02.03.07.03.02 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 266.27 14.83 3,948.78
02.03.07.03.03 CAJA DE REGISTRO DE LODOS 18,225.00
02.03.07.03.03 CAJA DE REGISTRO PARA LODOS DE 24"x24" pza 135.00 135.00 18,225.00
02.03.07.03.04 TANQUE BIODIGESTOR 139,425.30
02.03.07.03.04 INSTALACION DE BIODIGESTOR DE 600 LITROS und 135.00 1,032.78 139,425.30
02.03.07.04 ZANJA DE PERCOLACION 66,824.60
02.03.07.04.01 TRABAJOS PRELIMINARES 2,246.13
02.03.07.04.01 LIMPIEZA DE TERRENO MANUAL m2 1,269.00 0.99 1,256.31
02.03.07.04.01 TRAZO Y REPLANTEO PRELIMINAR m2 1,269.00 0.78 989.82
02.03.07.04.02 MOVIMIENTO DE TIERRAS 53,115.05
02.03.07.04.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 534.60 33.90 18,122.94
02.03.07.04.02 RELLENO CON GRAVA 1" PARA FILTRO m3 243.00 102.84 24,990.12
02.03.07.04.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 303.75 18.84 5,722.65
02.03.07.04.02 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 288.56 14.83 4,279.34
02.03.07.04.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS 11,463.42
02.03.07.04.03 SUM. Y COLOC. DE TUBERIA PVC SAL NTP 399.003, DIA=2" m 337.50 6.30 2,126.25
02.03.07.04.03 SUM. Y COLOC. DE TUBERIA PERFORADA PVC SAL NTP 399.003, DIA=2" m 1,350.00 5.27 7,114.50
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
03.01.02.02.04 RELLENO Y COMPACTACION DE ZANJAS MANUAL E=0.60m, A=0.45m m 262.00 6.11 1,600.82
03.01.02.03 SUMINISTRO E INSTALACION DE TUBERIAS 2,520.44
03.01.02.03.01 SUM. Y COLOC. DE TUBERIA PVC SAP NTP 399.002 CLASE 10, DIA=1 1/2" m 262.00 8.50 2,227.00
03.01.02.03.02 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS m 262.00 1.12 293.44
03.01.03 VALVULA DE PURGA - LINEA DE CONDUCCIÓN (01UNID) 527.72
03.01.03.01 TRABAJOS PRELIMINARES 1.13
03.01.03.01.01 LIMPIEZA DEL TERRENO MANUAL m2 0.64 0.99 0.63
03.01.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 0.64 0.78 0.50
03.01.03.02 MOVIMIENTO DE TIERRAS 21.56
03.01.03.02.01 EXCAVACION MANUAL DE TERRENO m3 0.38 33.90 12.88
03.01.03.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 0.64 2.25 1.44
03.01.03.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 0.14 18.84 2.64
03.01.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 0.31 14.83 4.60
03.01.03.03 OBRAS DE CONCRETO SIMPLE 220.74
03.01.03.03.01 CONCRETO F'C=140 KG/CM2, Sin Mezcladora m3 0.17 375.47 63.83
03.01.03.03.02 ENCOFRADO Y DESENCOFRADO m2 3.22 37.47 120.65
03.01.03.03.03 EMPEDRADO D=4" ASENTADO MEZCLA C:H=1:8 m2 1.00 36.26 36.26
03.01.03.04 REVOQUES Y ENLUCIDOS 21.48
03.01.03.04.01 TARRAJEO EN INTERIORES (MORTERO CA 1:5) E=1.5 CM m2 0.96 22.37 21.48
03.01.03.05 SUMINISTRO E INSTALACION DE ACCESORIOS 145.15
03.01.03.05.01 VALVULA TIPO GLOBO DE BRONCE DE 1 1/2" INC. ACCESORIOS und 1.00 145.15 145.15
03.01.03.06 VARIOS 117.66
03.01.03.06.01 FILTRO DE GRAVA DIA. MAX. 1/2" m3 0.01 166.20 1.66
03.01.03.06.02 TAPA SANITARIA METALICA 0.40x0.40x1/8" und 1.00 114.08 114.08
03.01.03.06.03 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 0.20 9.58 1.92
03.01.04 VALVULA DE AIRE - LINEA DE CONDUCCIÓN (01 UNID) 482.12
03.01.04.01 TRABAJOS PRELIMINARES 1.13
03.01.04.01.01 LIMPIEZA DEL TERRENO MANUAL m2 0.64 0.99 0.63
03.01.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 0.64 0.78 0.50
03.01.04.02 MOVIMIENTO DE TIERRAS 25.71
03.01.04.02.01 EXCAVACION MANUAL DE TERRENO m3 0.40 33.90 13.56
03.01.04.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 0.64 2.25 1.44
03.01.04.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 0.14 18.84 2.64
03.01.04.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 0.31 14.83 4.60
03.01.04.02.05 EMPEDRADO EXTERIOR SIN MORTERO DE 0.60m x 0.40m m2 0.24 14.44 3.47
03.01.04.03 OBRAS DE CONCRETO SIMPLE 170.99
03.01.04.03.01 CONCRETO F'C=140 KG/CM2, Sin Mezcladora m3 0.16 375.47 60.08
03.01.04.03.02 ENCOFRADO Y DESENCOFRADO m2 2.96 37.47 110.91
03.01.04.04 REVOQUES Y ENLUCIDOS 21.48
03.01.04.04.01 TARRAJEO EN EXTERIORES (MORTERO CA 1:5) E=1.5 CM m2 0.96 22.37 21.48
03.01.04.05 SUMINISTRO E INSTALACION DE ACCESORIOS 145.15
03.01.04.05.01 VALVULA TIPO GLOBO DE BRONCE DE 1 1/2" INC. ACCESORIOS und 1.00 145.15 145.15
03.01.04.06 VARIOS 117.66
03.01.04.06.01 FILTRO DE GRAVA DIA. MAX. 1/2" m3 0.01 166.20 1.66
03.01.04.06.02 TAPA SANITARIA METALICA 0.40x0.40x1/8" und 1.00 114.08 114.08
03.01.04.06.03 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 0.20 9.58 1.92
03.01.05 RESERVORIO RECTANGULAR DE 4.00 m3 (01 UNID) - SISTEMA EL ROSO 12,713.44
03.01.05.01 TRABAJOS PRELIMINARES 48.83
03.01.05.01.01 LIMPIEZA DE TERRENO MANUAL m2 27.59 0.99 27.31
03.01.05.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 27.59 0.78 21.52
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
03.01.12.09.08 ARGOLLA DE 2 1/2" x 1/8" PARA CABLE PRINCIPAL und 30.00 15.92 477.60
03.01.12.09.09 ABRAZADERA DE 1 1/2" x 1/4" PARA ANCLAJE SUPERIOR EN COLUMNA und 12.00 9.58 114.96
03.01.12.09.10 PERNOS DE ANCLAJE DE 3/4" x 6" PARA ANCLAJE SUPERIOR EN COLUMNA und 12.00 41.84 502.08
03.01.13 PASE AEREO N°02 L=30.00 m (01 UND), TUBERÍA 1" 10,245.59
03.01.13.01 TRABAJOS PRELIMINARES 19.40
03.01.13.01.01 LIMPIEZA DEL TERRENO MANUAL m2 13.78 0.99 13.64
03.01.13.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 7.38 0.78 5.76
03.01.13.02 MOVIMIENTO DE TIERRAS 205.77
03.01.13.02.01 EXCAVACION MANUAL m3 6.07 33.90 205.77
03.01.13.03 OBRAS DE CONCRETO SIMPLE 593.99
03.01.13.03.01 SOLADO BASE TORRE DE SUSP. Y CAM. ANCLAJE, E=4", Sin Mezcladora m2 14.58 40.74 593.99
03.01.13.04 OBRAS DE CONCRETO ARMADO 2,702.49
03.01.13.04.01 CONCRETO F'C=210 KG/CM2, TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.63 545.45 343.63
03.01.13.04.02 CONCRETO F'C=175 KG/CM2, ZAPATAS TORRE DE SUSPENSIÓN, Sin Mezcladora m3 2.02 388.61 784.99
03.01.13.04.03 CONCRETO F'C=175 KG/CM2, CÁMARA DE ANCLAJE, Sin Mezcladora m3 4.05 388.61 1,573.87
03.01.13.05 ACERO fy= 4200 kg/cm2 427.41
03.01.13.05.01 ACERO DE REFUERZO fy=4200 Kg/cm2, TORRE DE SUSPENSIÓN kg 96.70 4.42 427.41
03.01.13.06 ENCOFRADO Y DESENCOFRADO 1,673.23
03.01.13.06.01 ZAPATAS, TORRES DE SUSPENSIÓN m2 6.72 81.33 546.54
03.01.13.06.02 COLUMNAS, TORRE DE SUSPENSIÓN m2 8.40 61.41 515.84
03.01.13.06.03 CÁMARA DE ANCLAJE m2 10.80 56.56 610.85
03.01.13.07 REVOQUES Y ENLUCIDOS 420.15
03.01.13.07.01 TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 8.40 28.94 243.10
03.01.13.07.02 ZAPATA DE TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 2.88 23.99 69.09
03.01.13.07.03 CÁMARA DE ANCLAJE C/MORTERO 1:5 x 1.5CM m2 4.50 23.99 107.96
03.01.13.08 CABLES TIPO BOA 2,161.15
03.01.13.08.01 CABLE DE ACERO TIPO BOA DE 3/8" m 43.75 27.27 1,193.06
03.01.13.08.02 CABLE DE ACERO TIPO BOA DE 1/4" m 52.16 18.56 968.09
03.01.13.09 ACCESORIOS VARIOS DE PASE AEREO 2,042.00
03.01.13.09.01 TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=1" m 36.95 7.03 259.76
03.01.13.09.02 TUBERIA POLIETILENO DIA=2" m 36.95 11.92 440.44
03.01.13.09.03 CODO PVC SP 1" x 45° und 4.00 4.88 19.52
03.01.13.09.04 FIERRO LISO MACIZO DE ANCLAJE Ø 3/8", L=0.15m und 2.00 14.14 28.28
03.01.13.09.05 ALAMBRE N°08 kg 10.00 5.26 52.60
03.01.13.09.06 GRAPAS DE 3/8" EN CABLE PRINCIPAL und 6.00 13.42 80.52
03.01.13.09.07 GRILLETE DE SEGURIDAD DE 1/2" EN CABLE PRINCIPAL und 30.00 15.92 477.60
03.01.13.09.08 ARGOLLA DE 2 1/2" x 1/8" PARA CABLE PRINCIPAL und 30.00 15.92 477.60
03.01.13.09.09 ABRAZADERA DE 1 1/2" x 1/4" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 9.58 38.32
03.01.13.09.10 PERNOS DE ANCLAJE DE 3/4" x 6" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 41.84 167.36
03.01.14 PASE AEREO N°04 L=6.00 m (01 UND), TUBERÍA 1 1/2" 2,771.50
03.01.14.01 TRABAJOS PRELIMINARES 7.39
03.01.14.01.01 LIMPIEZA DEL TERRENO MANUAL m2 5.85 0.99 5.79
03.01.14.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.05 0.78 1.60
03.01.14.02 MOVIMIENTO DE TIERRAS 35.26
03.01.14.02.01 EXCAVACION MANUAL m3 1.04 33.90 35.26
03.01.14.03 OBRAS DE CONCRETO SIMPLE 159.70
03.01.14.03.01 SOLADO BASE TORRE DE SUSP. Y CAM. ANCLAJE, E=4", Sin Mezcladora m2 3.92 40.74 159.70
03.01.14.04 OBRAS DE CONCRETO ARMADO 449.36
03.01.14.04.01 CONCRETO F'C=210 KG/CM2, TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.09 545.45 49.09
03.01.14.04.02 CONCRETO F'C=175 KG/CM2, ZAPATAS TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.24 388.61 93.27
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
03.01.14.04.03 CONCRETO F'C=175 KG/CM2, CÁMARA DE ANCLAJE, Sin Mezcladora m3 0.79 388.61 307.00
03.01.14.05 ACERO fy= 4200 kg/cm2 99.41
03.01.14.05.01 ACERO DE REFUERZO fy=4200 Kg/cm2, TORRE DE SUSPENSIÓN kg 22.49 4.42 99.41
03.01.14.06 ENCOFRADO Y DESENCOFRADO 462.75
03.01.14.06.01 ZAPATAS, TORRES DE SUSPENSIÓN m2 1.76 81.33 143.14
03.01.14.06.02 COLUMNAS, TORRE DE SUSPENSIÓN m2 1.76 61.41 108.08
03.01.14.06.03 CÁMARA DE ANCLAJE m2 3.74 56.56 211.53
03.01.14.07 REVOQUES Y ENLUCIDOS 100.35
03.01.14.07.01 TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 1.76 28.94 50.93
03.01.14.07.02 ZAPATA DE TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 0.61 23.99 14.63
03.01.14.07.03 CÁMARA DE ANCLAJE C/MORTERO 1:5 x 1.5CM m2 1.45 23.99 34.79
03.01.14.08 CABLES TIPO BOA 512.86
03.01.14.08.01 CABLE DE ACERO TIPO BOA DE 3/8" m 11.79 27.27 321.51
03.01.14.08.02 CABLE DE ACERO TIPO BOA DE 1/4" m 10.31 18.56 191.35
03.01.14.09 ACCESORIOS VARIOS DE PASE AEREO 944.42
03.01.14.09.01 TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=1.5" m 8.23 10.23 84.19
03.01.14.09.02 TUBERIA POLIETILENO DIA=3" m 8.23 17.17 141.31
03.01.14.09.03 CODO PVC SP 1 1/2" x 45° und 4.00 8.36 33.44
03.01.14.09.04 FIERRO LISO MACIZO DE ANCLAJE Ø 3/8", L=0.15m und 2.00 14.14 28.28
03.01.14.09.05 ALAMBRE N°08 kg 10.00 5.26 52.60
03.01.14.09.06 GRAPAS DE 3/8" EN CABLE PRINCIPAL und 6.00 13.42 80.52
03.01.14.09.07 GRILLETE DE SEGURIDAD DE 1/2" EN CABLE PRINCIPAL und 10.00 15.92 159.20
03.01.14.09.08 ARGOLLA DE 2 1/2" x 1/8" PARA CABLE PRINCIPAL und 10.00 15.92 159.20
03.01.14.09.09 ABRAZADERA DE 1 1/2" x 1/4" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 9.58 38.32
03.01.14.09.10 PERNOS DE ANCLAJE DE 3/4" x 6" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 41.84 167.36
03.01.15 PASE AEREO N°05 L=5.00 m (01 UND), TUBERÍA 3/4" 2,357.25
03.01.15.01 TRABAJOS PRELIMINARES 6.35
03.01.15.01.01 LIMPIEZA DEL TERRENO MANUAL m2 5.13 0.99 5.08
03.01.15.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.63 0.78 1.27
03.01.15.02 MOVIMIENTO DE TIERRAS 25.76
03.01.15.02.01 EXCAVACION MANUAL m3 0.76 33.90 25.76
03.01.15.03 OBRAS DE CONCRETO SIMPLE 127.52
03.01.15.03.01 SOLADO BASE TORRE DE SUSP. Y CAM. ANCLAJE, E=4", Sin Mezcladora m2 3.13 40.74 127.52
03.01.15.04 OBRAS DE CONCRETO ARMADO 344.43
03.01.15.04.01 CONCRETO F'C=210 KG/CM2, TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.09 545.45 49.09
03.01.15.04.02 CONCRETO F'C=175 KG/CM2, ZAPATAS TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.20 388.61 77.72
03.01.15.04.03 CONCRETO F'C=175 KG/CM2, CÁMARA DE ANCLAJE, Sin Mezcladora m3 0.56 388.61 217.62
03.01.15.05 ACERO fy= 4200 kg/cm2 97.42
03.01.15.05.01 ACERO DE REFUERZO fy=4200 Kg/cm2, TORRE DE SUSPENSIÓN kg 22.04 4.42 97.42
03.01.15.06 ENCOFRADO Y DESENCOFRADO 407.89
03.01.15.06.01 ZAPATAS, TORRES DE SUSPENSIÓN m2 1.60 81.33 130.13
03.01.15.06.02 COLUMNAS, TORRE DE SUSPENSIÓN m2 1.76 61.41 108.08
03.01.15.06.03 CÁMARA DE ANCLAJE m2 3.00 56.56 169.68
03.01.15.07 REVOQUES Y ENLUCIDOS 90.04
03.01.15.07.01 TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 1.76 28.94 50.93
03.01.15.07.02 ZAPATA DE TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 0.50 23.99 12.00
03.01.15.07.03 CÁMARA DE ANCLAJE C/MORTERO 1:5 x 1.5CM m2 1.13 23.99 27.11
03.01.15.08 CABLES TIPO BOA 417.68
03.01.15.08.01 CABLE DE ACERO TIPO BOA DE 3/8" m 10.28 27.27 280.34
03.01.15.08.02 CABLE DE ACERO TIPO BOA DE 1/4" m 7.40 18.56 137.34
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
03.02.11.05.03 VALVULA TIPO GLOBO DE BRONCE DE 1" INC. ACCESORIOS und 4.00 125.59 502.36
03.02.11.05.04 VALVULA TIPO GLOBO DE BRONCE DE 3/4" INC. ACCESORIOS und 5.00 98.20 491.00
03.02.11.06 VARIOS 1,748.25
03.02.11.06.01 FILTRO DE GRAVA DIA. MAX. 1/2" m3 0.05 166.20 8.31
03.02.11.06.02 TAPA SANITARIA METALICA 0.40x0.40x1/8" und 15.00 114.08 1,711.20
03.02.11.06.03 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 3.00 9.58 28.74
03.02.12 VALVULA DE AIRE (04 UNID) 1,980.06
03.02.12.01 TRABAJOS PRELIMINARES 4.53
03.02.12.01.01 LIMPIEZA DEL TERRENO MANUAL m2 2.56 0.99 2.53
03.02.12.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.56 0.78 2.00
03.02.12.02 MOVIMIENTO DE TIERRAS 101.82
03.02.12.02.01 EXCAVACION MANUAL DE TERRENO m3 1.58 33.90 53.56
03.02.12.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 2.56 2.25 5.76
03.02.12.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 0.56 18.84 10.55
03.02.12.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 1.22 14.83 18.09
03.02.12.02.05 EMPEDRADO EXTERIOR SIN MORTERO DE 0.60m x 0.40m m2 0.96 14.44 13.86
03.02.12.03 OBRAS DE CONCRETO SIMPLE 683.94
03.02.12.03.01 CONCRETO F'C=140 KG/CM2, Sin Mezcladora m3 0.64 375.47 240.30
03.02.12.03.02 ENCOFRADO Y DESENCOFRADO m2 11.84 37.47 443.64
03.02.12.04 REVOQUES Y ENLUCIDOS 85.90
03.02.12.04.01 TARRAJEO EN EXTERIORES (MORTERO CA 1:5) E=1.5 CM m2 3.84 22.37 85.90
03.02.12.05 SUMINISTRO E INSTALACION DE ACCESORIOS 633.24
03.02.12.05.01 VALVULA TIPO GLOBO DE BRONCE DE 2" INC. ACCESORIOS und 2.00 181.25 362.50
03.02.12.05.02 VALVULA TIPO GLOBO DE BRONCE DE 1 1/2" INC. ACCESORIOS und 1.00 145.15 145.15
03.02.12.05.03 VALVULA TIPO GLOBO DE BRONCE DE 1" INC. ACCESORIOS und 1.00 125.59 125.59
03.02.12.06 VARIOS 470.63
03.02.12.06.01 FILTRO DE GRAVA DIA. MAX. 1/2" m3 0.04 166.20 6.65
03.02.12.06.02 TAPA SANITARIA METALICA 0.40x0.40x1/8" und 4.00 114.08 456.32
03.02.12.06.03 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 0.80 9.58 7.66
03.02.13 VALVULA DE CONTROL (14 UNID) 6,381.13
03.02.13.01 TRABAJOS PRELIMINARES 15.86
03.02.13.01.01 LIMPIEZA DEL TERRENO MANUAL m2 8.96 0.99 8.87
03.02.13.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 8.96 0.78 6.99
03.02.13.02 MOVIMIENTO DE TIERRAS 302.79
03.02.13.02.01 EXCAVACION MANUAL DE TERRENO m3 5.38 33.90 182.38
03.02.13.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 8.96 2.25 20.16
03.02.13.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 1.96 18.84 36.93
03.02.13.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 4.27 14.83 63.32
03.02.13.03 OBRAS DE CONCRETO SIMPLE 2,397.57
03.02.13.03.01 CONCRETO F'C=140 KG/CM2, Sin Mezcladora m3 2.25 375.47 844.81
03.02.13.03.02 ENCOFRADO Y DESENCOFRADO m2 41.44 37.47 1,552.76
03.02.13.04 REVOQUES Y ENLUCIDOS 300.65
03.02.13.04.01 TARRAJEO INTERIOR C/MORTERO 1:5 x 1.5CM m2 13.44 22.37 300.65
03.02.13.05 SUMINISTRO E INSTALACION DE ACCESORIOS 1,733.67
03.02.13.05.01 VALVULA COMPUERTA DE BRONCE PARA 2" INC. ACCESORIOS und 3.00 209.31 627.93
03.02.13.05.02 VALVULA COMPUERTA DE BRONCE PARA 1.5" INC. ACCESORIOS und 2.00 90.45 180.90
03.02.13.05.03 VALVULA COMPUERTA DE BRONCE PARA 1" INC. ACCESORIOS und 6.00 114.85 689.10
03.02.13.05.04 VALVULA COMPUERTA DE BRONCE PARA 3/4" INC. ACCESORIOS und 3.00 78.58 235.74
03.02.13.06 VARIOS 1,630.59
03.02.13.06.01 FILTRO DE GRAVA DIA. MAX. 1/2" m3 0.04 166.20 6.65
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
03.02.15.07.02 ZAPATA DE TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 2.88 23.99 69.09
03.02.15.07.03 CÁMARA DE ANCLAJE C/MORTERO 1:5 x 1.5CM m2 4.50 23.99 107.96
03.02.15.08 CABLES TIPO BOA 2,161.15
03.02.15.08.01 CABLE DE ACERO TIPO BOA DE 3/8" m 43.75 27.27 1,193.06
03.02.15.08.02 CABLE DE ACERO TIPO BOA DE 1/4" m 52.16 18.56 968.09
03.02.15.09 ACCESORIOS VARIOS DE PASE AEREO 2,472.51
03.02.15.09.01 TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=2" m 36.95 10.53 389.08
03.02.15.09.02 TUBERIA POLIETILENO DIA=4" m 36.95 19.27 712.03
03.02.15.09.03 CODO PVC SP 2" x 45° und 4.00 12.28 49.12
03.02.15.09.04 FIERRO LISO MACIZO DE ANCLAJE Ø 3/8", L=0.15m und 2.00 14.14 28.28
03.02.15.09.05 ALAMBRE N°08 kg 10.00 5.26 52.60
03.02.15.09.06 GRAPAS DE 3/8" EN CABLE PRINCIPAL und 6.00 13.42 80.52
03.02.15.09.07 GRILLETE DE SEGURIDAD DE 1/2" EN CABLE PRINCIPAL und 30.00 15.92 477.60
03.02.15.09.08 ARGOLLA DE 2 1/2" x 1/8" PARA CABLE PRINCIPAL und 30.00 15.92 477.60
03.02.15.09.09 ABRAZADERA DE 1 1/2" x 1/4" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 9.58 38.32
03.02.15.09.10 PERNOS DE ANCLAJE DE 3/4" x 6" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 41.84 167.36
03.02.16 PASE AEREO N° 02 L=6.00 m (01 UND), TUBERÍA 2" 2,806.93
03.02.16.01 TRABAJOS PRELIMINARES 7.39
03.02.16.01.01 LIMPIEZA DEL TERRENO MANUAL m2 5.85 0.99 5.79
03.02.16.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.05 0.78 1.60
03.02.16.02 MOVIMIENTO DE TIERRAS 35.26
03.02.16.02.01 EXCAVACION MANUAL m3 1.04 33.90 35.26
03.02.16.03 OBRAS DE CONCRETO SIMPLE 159.70
03.02.16.03.01 SOLADO BASE TORRE DE SUSP. Y CAM. ANCLAJE, E=4", Sin Mezcladora m2 3.92 40.74 159.70
03.02.16.04 OBRAS DE CONCRETO ARMADO 449.36
03.02.16.04.01 CONCRETO F'C=210 KG/CM2, TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.09 545.45 49.09
03.02.16.04.02 CONCRETO F'C=175 KG/CM2, ZAPATAS TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.24 388.61 93.27
03.02.16.04.03 CONCRETO F'C=175 KG/CM2, CÁMARA DE ANCLAJE, Sin Mezcladora m3 0.79 388.61 307.00
03.02.16.05 ACERO fy= 4200 kg/cm2 99.41
03.02.16.05.01 ACERO DE REFUERZO fy=4200 Kg/cm2, TORRE DE SUSPENSIÓN kg 22.49 4.42 99.41
03.02.16.06 ENCOFRADO Y DESENCOFRADO 462.75
03.02.16.06.01 ZAPATAS, TORRES DE SUSPENSIÓN m2 1.76 81.33 143.14
03.02.16.06.02 COLUMNAS, TORRE DE SUSPENSIÓN m2 1.76 61.41 108.08
03.02.16.06.03 CÁMARA DE ANCLAJE m2 3.74 56.56 211.53
03.02.16.07 REVOQUES Y ENLUCIDOS 100.35
03.02.16.07.01 TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 1.76 28.94 50.93
03.02.16.07.02 ZAPATA DE TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 0.61 23.99 14.63
03.02.16.07.03 CÁMARA DE ANCLAJE C/MORTERO 1:5 x 1.5CM m2 1.45 23.99 34.79
03.02.16.08 CABLES TIPO BOA 512.86
03.02.16.08.01 CABLE DE ACERO TIPO BOA DE 3/8" m 11.79 27.27 321.51
03.02.16.08.02 CABLE DE ACERO TIPO BOA DE 1/4" m 10.31 18.56 191.35
03.02.16.09 ACCESORIOS VARIOS DE PASE AEREO 979.85
03.02.16.09.01 TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=2" m 8.23 10.53 86.66
03.02.16.09.02 TUBERIA POLIETILENO DIA=4" m 8.23 19.27 158.59
03.02.16.09.03 CODO PVC SP 2" x 45° und 4.00 12.28 49.12
03.02.16.09.04 FIERRO LISO MACIZO DE ANCLAJE Ø 3/8", L=0.15m und 2.00 14.14 28.28
03.02.16.09.05 ALAMBRE N°08 kg 10.00 5.26 52.60
03.02.16.09.06 GRAPAS DE 3/8" EN CABLE PRINCIPAL und 6.00 13.42 80.52
03.02.16.09.07 GRILLETE DE SEGURIDAD DE 1/2" EN CABLE PRINCIPAL und 10.00 15.92 159.20
03.02.16.09.08 ARGOLLA DE 2 1/2" x 1/8" PARA CABLE PRINCIPAL und 10.00 15.92 159.20
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
03.02.16.09.09 ABRAZADERA DE 1 1/2" x 1/4" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 9.58 38.32
03.02.16.09.10 PERNOS DE ANCLAJE DE 3/4" x 6" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 41.84 167.36
03.02.17 PASE AEREO N° 03 L=10.00 m (01 UND), TUBERÍA 2" 4,007.10
03.02.17.01 TRABAJOS PRELIMINARES 9.63
03.02.17.01.01 LIMPIEZA DEL TERRENO MANUAL m2 7.38 0.99 7.31
03.02.17.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.98 0.78 2.32
03.02.17.02 MOVIMIENTO DE TIERRAS 64.07
03.02.17.02.01 EXCAVACION MANUAL m3 1.89 33.90 64.07
03.02.17.03 OBRAS DE CONCRETO SIMPLE 235.48
03.02.17.03.01 SOLADO BASE TORRE DE SUSP. Y CAM. ANCLAJE, E=4", Sin Mezcladora m2 5.78 40.74 235.48
03.02.17.04 OBRAS DE CONCRETO ARMADO 843.56
03.02.17.04.01 CONCRETO F'C=210 KG/CM2, TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.20 545.45 109.09
03.02.17.04.02 CONCRETO F'C=175 KG/CM2, ZAPATAS TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.49 388.61 190.42
03.02.17.04.03 CONCRETO F'C=175 KG/CM2, CÁMARA DE ANCLAJE, Sin Mezcladora m3 1.40 388.61 544.05
03.02.17.05 ACERO fy= 4200 kg/cm2 129.90
03.02.17.05.01 ACERO DE REFUERZO fy=4200 Kg/cm2, TORRE DE SUSPENSIÓN kg 29.39 4.42 129.90
03.02.17.06 ENCOFRADO Y DESENCOFRADO 740.97
03.02.17.06.01 ZAPATAS, TORRES DE SUSPENSIÓN m2 2.80 81.33 227.72
03.02.17.06.02 COLUMNAS, TORRE DE SUSPENSIÓN m2 3.20 61.41 196.51
03.02.17.06.03 CÁMARA DE ANCLAJE m2 5.60 56.56 316.74
03.02.17.07 REVOQUES Y ENLUCIDOS 164.10
03.02.17.07.01 TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 3.20 28.94 92.61
03.02.17.07.02 ZAPATA DE TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 0.98 23.99 23.51
03.02.17.07.03 CÁMARA DE ANCLAJE C/MORTERO 1:5 x 1.5CM m2 2.00 23.99 47.98
03.02.17.08 CABLES TIPO BOA 688.45
03.02.17.08.01 CABLE DE ACERO TIPO BOA DE 3/8" m 17.65 27.27 481.32
03.02.17.08.02 CABLE DE ACERO TIPO BOA DE 1/4" m 11.16 18.56 207.13
03.02.17.09 ACCESORIOS VARIOS DE PASE AEREO 1,130.94
03.02.17.09.01 TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=2" m 13.30 10.53 140.05
03.02.17.09.02 TUBERIA POLIETILENO DIA=4" m 13.30 19.27 256.29
03.02.17.09.03 CODO PVC SP 2" x 45° und 4.00 12.28 49.12
03.02.17.09.04 FIERRO LISO MACIZO DE ANCLAJE Ø 3/8", L=0.15m und 2.00 14.14 28.28
03.02.17.09.05 ALAMBRE N°08 kg 10.00 5.26 52.60
03.02.17.09.06 GRAPAS DE 3/8" EN CABLE PRINCIPAL und 6.00 13.42 80.52
03.02.17.09.07 GRILLETE DE SEGURIDAD DE 1/2" EN CABLE PRINCIPAL und 10.00 15.92 159.20
03.02.17.09.08 ARGOLLA DE 2 1/2" x 1/8" PARA CABLE PRINCIPAL und 10.00 15.92 159.20
03.02.17.09.09 ABRAZADERA DE 1 1/2" x 1/4" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 9.58 38.32
03.02.17.09.10 PERNOS DE ANCLAJE DE 3/4" x 6" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 41.84 167.36
03.02.18 PASE AEREO N° 04 L=5.00 m (01 UND), TUBERÍA 2" 2,470.12
03.02.18.01 TRABAJOS PRELIMINARES 6.35
03.02.18.01.01 LIMPIEZA DEL TERRENO MANUAL m2 5.13 0.99 5.08
03.02.18.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.63 0.78 1.27
03.02.18.02 MOVIMIENTO DE TIERRAS 25.76
03.02.18.02.01 EXCAVACION MANUAL m3 0.76 33.90 25.76
03.02.18.03 OBRAS DE CONCRETO SIMPLE 127.52
03.02.18.03.01 SOLADO BASE TORRE DE SUSP. Y CAM. ANCLAJE, E=4", Sin Mezcladora m2 3.13 40.74 127.52
03.02.18.04 OBRAS DE CONCRETO ARMADO 344.43
03.02.18.04.01 CONCRETO F'C=210 KG/CM2, TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.09 545.45 49.09
03.02.18.04.02 CONCRETO F'C=175 KG/CM2, ZAPATAS TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.20 388.61 77.72
03.02.18.04.03 CONCRETO F'C=175 KG/CM2, CÁMARA DE ANCLAJE, Sin Mezcladora m3 0.56 388.61 217.62
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
03.02.19.09.01 TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=2" m 9.52 10.53 100.25
03.02.19.09.02 TUBERIA POLIETILENO DIA=4" m 9.52 19.27 183.45
03.02.19.09.03 CODO PVC SP 2" x 45° und 4.00 12.28 49.12
03.02.19.09.04 FIERRO LISO MACIZO DE ANCLAJE Ø 3/8", L=0.15m und 2.00 14.14 28.28
03.02.19.09.05 ALAMBRE N°08 kg 10.00 5.26 52.60
03.02.19.09.06 GRAPAS DE 3/8" EN CABLE PRINCIPAL und 6.00 13.42 80.52
03.02.19.09.07 GRILLETE DE SEGURIDAD DE 1/2" EN CABLE PRINCIPAL und 10.00 15.92 159.20
03.02.19.09.08 ARGOLLA DE 2 1/2" x 1/8" PARA CABLE PRINCIPAL und 10.00 15.92 159.20
03.02.19.09.09 ABRAZADERA DE 1 1/2" x 1/4" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 9.58 38.32
03.02.19.09.10 PERNOS DE ANCLAJE DE 3/4" x 6" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 41.84 167.36
03.02.20 PASE AEREO N° 06 L=8.00 m (01 UND), TUBERÍA 2" 3,455.00
03.02.20.01 TRABAJOS PRELIMINARES 8.38
03.02.20.01.01 LIMPIEZA DEL TERRENO MANUAL m2 6.57 0.99 6.50
03.02.20.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.41 0.78 1.88
03.02.20.02 MOVIMIENTO DE TIERRAS 50.17
03.02.20.02.01 EXCAVACION MANUAL m3 1.48 33.90 50.17
03.02.20.03 OBRAS DE CONCRETO SIMPLE 195.96
03.02.20.03.01 SOLADO BASE TORRE DE SUSP. Y CAM. ANCLAJE, E=4", Sin Mezcladora m2 4.81 40.74 195.96
03.02.20.04 OBRAS DE CONCRETO ARMADO 658.53
03.02.20.04.01 CONCRETO F'C=210 KG/CM2, TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.16 545.45 87.27
03.02.20.04.02 CONCRETO F'C=175 KG/CM2, ZAPATAS TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.42 388.61 163.22
03.02.20.04.03 CONCRETO F'C=175 KG/CM2, CÁMARA DE ANCLAJE, Sin Mezcladora m3 1.05 388.61 408.04
03.02.20.05 ACERO fy= 4200 kg/cm2 107.72
03.02.20.05.01 ACERO DE REFUERZO fy=4200 Kg/cm2, TORRE DE SUSPENSIÓN kg 24.37 4.42 107.72
03.02.20.06 ENCOFRADO Y DESENCOFRADO 635.83
03.02.20.06.01 ZAPATAS, TORRES DE SUSPENSIÓN m2 2.60 81.33 211.46
03.02.20.06.02 COLUMNAS, TORRE DE SUSPENSIÓN m2 2.60 61.41 159.67
03.02.20.06.03 CÁMARA DE ANCLAJE m2 4.68 56.56 264.70
03.02.20.07 REVOQUES Y ENLUCIDOS 134.49
03.02.20.07.01 TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 2.60 28.94 75.24
03.02.20.07.02 ZAPATA DE TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 0.85 23.99 20.39
03.02.20.07.03 CÁMARA DE ANCLAJE C/MORTERO 1:5 x 1.5CM m2 1.62 23.99 38.86
03.02.20.08 CABLES TIPO BOA 608.37
03.02.20.08.01 CABLE DE ACERO TIPO BOA DE 3/8" m 15.36 27.27 418.87
03.02.20.08.02 CABLE DE ACERO TIPO BOA DE 1/4" m 10.21 18.56 189.50
03.02.20.09 ACCESORIOS VARIOS DE PASE AEREO 1,055.55
03.02.20.09.01 TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=2" m 10.77 10.53 113.41
03.02.20.09.02 TUBERIA POLIETILENO DIA=4" m 10.77 19.27 207.54
03.02.20.09.03 CODO PVC SP 2" x 45° und 4.00 12.28 49.12
03.02.20.09.04 FIERRO LISO MACIZO DE ANCLAJE Ø 3/8", L=0.15m und 2.00 14.14 28.28
03.02.20.09.05 ALAMBRE N°08 kg 10.00 5.26 52.60
03.02.20.09.06 GRAPAS DE 3/8" EN CABLE PRINCIPAL und 6.00 13.42 80.52
03.02.20.09.07 GRILLETE DE SEGURIDAD DE 1/2" EN CABLE PRINCIPAL und 10.00 15.92 159.20
03.02.20.09.08 ARGOLLA DE 2 1/2" x 1/8" PARA CABLE PRINCIPAL und 10.00 15.92 159.20
03.02.20.09.09 ABRAZADERA DE 1 1/2" x 1/4" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 9.58 38.32
03.02.20.09.10 PERNOS DE ANCLAJE DE 3/4" x 6" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 41.84 167.36
03.02.21 PASE AEREO N° 07 L=15.00 m (01 UND), TUBERÍA 1 1/2" 5,606.76
03.02.21.01 TRABAJOS PRELIMINARES 11.70
03.02.21.01.01 LIMPIEZA DEL TERRENO MANUAL m2 8.77 0.99 8.68
03.02.21.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.87 0.78 3.02
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
03.02.23.09.07 GRILLETE DE SEGURIDAD DE 1/2" EN CABLE PRINCIPAL und 10.00 15.92 159.20
03.02.23.09.08 ARGOLLA DE 2 1/2" x 1/8" PARA CABLE PRINCIPAL und 10.00 15.92 159.20
03.02.23.09.09 ABRAZADERA DE 1 1/2" x 1/4" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 9.58 38.32
03.02.23.09.10 PERNOS DE ANCLAJE DE 3/4" x 6" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 41.84 167.36
03.02.24 PASE AEREO N° 10 L=5.00 m (01 UND), TUBERÍA 1" 2,360.99
03.02.24.01 TRABAJOS PRELIMINARES 6.35
03.02.24.01.01 LIMPIEZA DEL TERRENO MANUAL m2 5.13 0.99 5.08
03.02.24.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.63 0.78 1.27
03.02.24.02 MOVIMIENTO DE TIERRAS 25.76
03.02.24.02.01 EXCAVACION MANUAL m3 0.76 33.90 25.76
03.02.24.03 OBRAS DE CONCRETO SIMPLE 127.52
03.02.24.03.01 SOLADO BASE TORRE DE SUSP. Y CAM. ANCLAJE, E=4", Sin Mezcladora m2 3.13 40.74 127.52
03.02.24.04 OBRAS DE CONCRETO ARMADO 344.43
03.02.24.04.01 CONCRETO F'C=210 KG/CM2, TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.09 545.45 49.09
03.02.24.04.02 CONCRETO F'C=175 KG/CM2, ZAPATAS TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.20 388.61 77.72
03.02.24.04.03 CONCRETO F'C=175 KG/CM2, CÁMARA DE ANCLAJE, Sin Mezcladora m3 0.56 388.61 217.62
03.02.24.05 ACERO fy= 4200 kg/cm2 97.42
03.02.24.05.01 ACERO DE REFUERZO fy=4200 Kg/cm2, TORRE DE SUSPENSIÓN kg 22.04 4.42 97.42
03.02.24.06 ENCOFRADO Y DESENCOFRADO 407.89
03.02.24.06.01 ZAPATAS, TORRES DE SUSPENSIÓN m2 1.60 81.33 130.13
03.02.24.06.02 COLUMNAS, TORRE DE SUSPENSIÓN m2 1.76 61.41 108.08
03.02.24.06.03 CÁMARA DE ANCLAJE m2 3.00 56.56 169.68
03.02.24.07 REVOQUES Y ENLUCIDOS 90.04
03.02.24.07.01 TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 1.76 28.94 50.93
03.02.24.07.02 ZAPATA DE TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 0.50 23.99 12.00
03.02.24.07.03 CÁMARA DE ANCLAJE C/MORTERO 1:5 x 1.5CM m2 1.13 23.99 27.11
03.02.24.08 CABLES TIPO BOA 417.68
03.02.24.08.01 CABLE DE ACERO TIPO BOA DE 3/8" m 10.28 27.27 280.34
03.02.24.08.02 CABLE DE ACERO TIPO BOA DE 1/4" m 7.40 18.56 137.34
03.02.24.09 ACCESORIOS VARIOS DE PASE AEREO 843.90
03.02.24.09.01 TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=1" m 7.33 7.03 51.53
03.02.24.09.02 TUBERIA POLIETILENO DIA=2" m 7.33 11.92 87.37
03.02.24.09.03 CODO PVC SP 1" x 45° und 4.00 4.88 19.52
03.02.24.09.04 FIERRO LISO MACIZO DE ANCLAJE Ø 3/8", L=0.15m und 2.00 14.14 28.28
03.02.24.09.05 ALAMBRE N°08 kg 10.00 5.26 52.60
03.02.24.09.06 GRAPAS DE 3/8" EN CABLE PRINCIPAL und 6.00 13.42 80.52
03.02.24.09.07 GRILLETE DE SEGURIDAD DE 1/2" EN CABLE PRINCIPAL und 10.00 15.92 159.20
03.02.24.09.08 ARGOLLA DE 2 1/2" x 1/8" PARA CABLE PRINCIPAL und 10.00 15.92 159.20
03.02.24.09.09 ABRAZADERA DE 1 1/2" x 1/4" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 9.58 38.32
03.02.24.09.10 PERNOS DE ANCLAJE DE 3/4" x 6" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 41.84 167.36
03.02.25 PASE AEREO N° 11 L=6.00 m (01 UND), TUBERÍA 3/4" 2,683.73
03.02.25.01 TRABAJOS PRELIMINARES 7.39
03.02.25.01.01 LIMPIEZA DEL TERRENO MANUAL m2 5.85 0.99 5.79
03.02.25.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.05 0.78 1.60
03.02.25.02 MOVIMIENTO DE TIERRAS 35.26
03.02.25.02.01 EXCAVACION MANUAL m3 1.04 33.90 35.26
03.02.25.03 OBRAS DE CONCRETO SIMPLE 159.70
03.02.25.03.01 SOLADO BASE TORRE DE SUSP. Y CAM. ANCLAJE, E=4", Sin Mezcladora m2 3.92 40.74 159.70
03.02.25.04 OBRAS DE CONCRETO ARMADO 449.36
03.02.25.04.01 CONCRETO F'C=210 KG/CM2, TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.09 545.45 49.09
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
03.02.25.04.02 CONCRETO F'C=175 KG/CM2, ZAPATAS TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.24 388.61 93.27
03.02.25.04.03 CONCRETO F'C=175 KG/CM2, CÁMARA DE ANCLAJE, Sin Mezcladora m3 0.79 388.61 307.00
03.02.25.05 ACERO fy= 4200 kg/cm2 99.41
03.02.25.05.01 ACERO DE REFUERZO fy=4200 Kg/cm2, TORRE DE SUSPENSIÓN kg 22.49 4.42 99.41
03.02.25.06 ENCOFRADO Y DESENCOFRADO 462.75
03.02.25.06.01 ZAPATAS, TORRES DE SUSPENSIÓN m2 1.76 81.33 143.14
03.02.25.06.02 COLUMNAS, TORRE DE SUSPENSIÓN m2 1.76 61.41 108.08
03.02.25.06.03 CÁMARA DE ANCLAJE m2 3.74 56.56 211.53
03.02.25.07 REVOQUES Y ENLUCIDOS 100.35
03.02.25.07.01 TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 1.76 28.94 50.93
03.02.25.07.02 ZAPATA DE TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 0.61 23.99 14.63
03.02.25.07.03 CÁMARA DE ANCLAJE C/MORTERO 1:5 x 1.5CM m2 1.45 23.99 34.79
03.02.25.08 CABLES TIPO BOA 512.86
03.02.25.08.01 CABLE DE ACERO TIPO BOA DE 3/8" m 11.79 27.27 321.51
03.02.25.08.02 CABLE DE ACERO TIPO BOA DE 1/4" m 10.31 18.56 191.35
03.02.25.09 ACCESORIOS VARIOS DE PASE AEREO 856.65
03.02.25.09.01 TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=3/4" m 8.23 6.41 52.75
03.02.25.09.02 TUBERIA POLIETILENO DIA=2" m 8.23 11.92 98.10
03.02.25.09.03 CODO PVC SP 3/4" x 45° und 4.00 5.08 20.32
03.02.25.09.04 FIERRO LISO MACIZO DE ANCLAJE Ø 3/8", L=0.15m und 2.00 14.14 28.28
03.02.25.09.05 ALAMBRE N°08 kg 10.00 5.26 52.60
03.02.25.09.06 GRAPAS DE 3/8" EN CABLE PRINCIPAL und 6.00 13.42 80.52
03.02.25.09.07 GRILLETE DE SEGURIDAD DE 1/2" EN CABLE PRINCIPAL und 10.00 15.92 159.20
03.02.25.09.08 ARGOLLA DE 2 1/2" x 1/8" PARA CABLE PRINCIPAL und 10.00 15.92 159.20
03.02.25.09.09 ABRAZADERA DE 1 1/2" x 1/4" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 9.58 38.32
03.02.25.09.10 PERNOS DE ANCLAJE DE 3/4" x 6" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 41.84 167.36
03.02.26 PASE AEREO N° 12 L=5.00 m (01 UND), TUBERÍA 1" 2,360.99
03.02.26.01 TRABAJOS PRELIMINARES 6.35
03.02.26.01.01 LIMPIEZA DEL TERRENO MANUAL m2 5.13 0.99 5.08
03.02.26.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.63 0.78 1.27
03.02.26.02 MOVIMIENTO DE TIERRAS 25.76
03.02.26.02.01 EXCAVACION MANUAL m3 0.76 33.90 25.76
03.02.26.03 OBRAS DE CONCRETO SIMPLE 127.52
03.02.26.03.01 SOLADO BASE TORRE DE SUSP. Y CAM. ANCLAJE, E=4", Sin Mezcladora m2 3.13 40.74 127.52
03.02.26.04 OBRAS DE CONCRETO ARMADO 344.43
03.02.26.04.01 CONCRETO F'C=210 KG/CM2, TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.09 545.45 49.09
03.02.26.04.02 CONCRETO F'C=175 KG/CM2, ZAPATAS TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.20 388.61 77.72
03.02.26.04.03 CONCRETO F'C=175 KG/CM2, CÁMARA DE ANCLAJE, Sin Mezcladora m3 0.56 388.61 217.62
03.02.26.05 ACERO fy= 4200 kg/cm2 97.42
03.02.26.05.01 ACERO DE REFUERZO fy=4200 Kg/cm2, TORRE DE SUSPENSIÓN kg 22.04 4.42 97.42
03.02.26.06 ENCOFRADO Y DESENCOFRADO 407.89
03.02.26.06.01 ZAPATAS, TORRES DE SUSPENSIÓN m2 1.60 81.33 130.13
03.02.26.06.02 COLUMNAS, TORRE DE SUSPENSIÓN m2 1.76 61.41 108.08
03.02.26.06.03 CÁMARA DE ANCLAJE m2 3.00 56.56 169.68
03.02.26.07 REVOQUES Y ENLUCIDOS 90.04
03.02.26.07.01 TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 1.76 28.94 50.93
03.02.26.07.02 ZAPATA DE TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 0.50 23.99 12.00
03.02.26.07.03 CÁMARA DE ANCLAJE C/MORTERO 1:5 x 1.5CM m2 1.13 23.99 27.11
03.02.26.08 CABLES TIPO BOA 417.68
03.02.26.08.01 CABLE DE ACERO TIPO BOA DE 3/8" m 10.28 27.27 280.34
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
03.02.31.04.03 SUM. Y COLOC. DE TUBERIA PERFORADA PVC SAL NTP 399.003, DIA=2" m 610.00 5.27 3,214.70
03.02.31.04.03 ACCESORIOS PVC DESAGÜE glb 1.00 1,150.41 1,150.41
03.03 SISTEMA LAS MANZANAS 1,148,385.50
03.03.01 MEJORAMIENTO DE CAPTACION DE FONDO 1,457.38
03.03.01.01 VARIOS 1,457.38
03.03.01.01.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 2.00 157.78 315.56
03.03.01.01.02 SUM. E INST. TAPA SANITARIA METALICA DE 0.40x0.40x1/8" und 1.00 132.36 132.36
03.03.01.01.03 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 16.36 9.58 156.73
03.03.01.01.04 CERCO PERIMETRICO C/ALAMBRE DE PUAS m 23.00 27.14 624.22
03.03.01.01.05 PUERTA EN CERCO PERIMETRICO und 1.00 228.51 228.51
03.03.02 MEJORAMIENTO RESERVORIO (01 UNID) - SISTEMA LA TORRE 1,564.83
03.03.02.01 VARIOS 1,564.83
03.03.02.01.01 SUM. E INST. DE SISTEMA DE CLORACION POR GOTEO und 1.00 288.43 288.43
03.03.02.01.02 PINTURA EN MUROS EXTERIORES (DOS MANOS) m2 30.79 9.58 294.97
03.03.02.01.03 CERCO PERIMETRICO C/ALAMBRE DE PUAS m 30.40 24.91 757.26
03.03.02.01.04 PUERTA EN CERCO PERIMETRICO und 1.00 224.17 224.17
03.03.03 CONEXIONES DOMICILIARIAS (113 UND) SISTEMA - LAS MANZANAS 12,782.56
03.03.03.01 SUMINISTRO E INSTALACION DE ACCESORIOS 12,782.56
03.03.03.01.01 SUMINISTRO E INSTALACION DE CONEXIONES DOMICILIARIAS DE AGUA und 113.00 113.12 12,782.56
03.03.04 INSTALACION DE PILETAS CON LAVADERO (113 UND) - LAS MANZANAS 51,092.52
03.03.04.01 TRABAJOS PRELIMINARES 216.01
03.03.04.01.01 LIMPIEZA DE TERRENO MANUAL m2 122.04 0.99 120.82
03.03.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 122.04 0.78 95.19
03.03.04.02 MOVIMIENTO DE TIERRAS 6,570.09
03.03.04.02.01 EXCAVACION MANUAL DE TERRENO m3 36.61 33.90 1,241.08
03.03.04.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 24.92 18.84 469.49
03.03.04.02.03 CAMA DE ARENA e=0.05m m3 30.51 152.17 4,642.71
03.03.04.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 14.62 14.83 216.81
03.03.04.03 OBRAS DE CONCRETO ARMADO 13,978.68
03.03.04.03.01 CONCRETO f'c=175 kg/cm2, Sin mezcladora m3 11.81 471.38 5,567.00
03.03.04.03.02 ENCOFRADO Y DESENCOFRADO m2 156.51 37.47 5,864.43
03.03.04.03.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 576.30 4.42 2,547.25
03.03.04.04 MUROS Y TABIQUES 6,132.99
03.03.04.04.01 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZC. C:A=1:5, AP. DE SOGA m2 59.33 56.19 3,333.75
03.03.04.04.02 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZC. C:A=1:5, AP. DE CANTO m2 53.39 52.43 2,799.24
03.03.04.05 REVOQUES Y ENLUCIDOS 10,090.01
03.03.04.05.01 TARRAJEO PULIDO EN LAVADERO - INTERIORES, CON MORTERO C:A 1:5, E=1.5 CM m2 144.92 22.37 3,241.86
03.03.04.05.02 TARRAJEO DE LAVADERO - EXTERIORES, CON MORTERO C:A 1:5, E=1.5 CM m2 293.66 23.32 6,848.15
03.03.04.06 CONEXION DOMICILIARIA, INC. VALVULAS Y ACCESORIOS 10,894.33
03.03.04.06.01 ACCESORIOS EN LAVADEROS MULTIUSOS AGUA Y DESAGÜE und 113.00 96.41 10,894.33
03.03.04.07 VARIOS 3,210.41
03.03.04.07.01 PINTURA OCRE COLOR ROJO EN PILETA m2 438.58 7.32 3,210.41
03.03.05 UNIDADES BASICAS CON ARRASTRE HIDRAULICO Y BIODIGESTOR (113 UND) 1,081,488.21
03.03.05.01 ESTRUCTURAS Y ARQUITECTURA 658,447.79
03.03.05.01.01 TRABAJOS PRELIMINARES 1,632.08
03.03.05.01.01 LIMPIEZA DE TERRENO MANUAL m2 922.08 0.99 912.86
03.03.05.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 922.08 0.78 719.22
03.03.05.01.02 MOVIMIENTO DE TIERRAS 12,108.47
03.03.05.01.02 EXCAVACION MANUAL DE TERRENO PARA CIMIENTOS m3 189.84 33.90 6,435.58
03.03.05.01.02 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 237.30 14.83 3,519.16
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
04.01.07.03.02 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 126.23 14.83 1,871.99
04.01.07.03.03 CAJA DE REGISTRO DE LODOS 8,640.00
04.01.07.03.03 CAJA DE REGISTRO PARA LODOS DE 24"x24" pza 64.00 135.00 8,640.00
04.01.07.03.04 TANQUE BIODIGESTOR 66,097.92
04.01.07.03.04 INSTALACION DE BIODIGESTOR DE 600 LITROS und 64.00 1,032.78 66,097.92
04.01.07.04 ZANJA DE PERCOLACION 31,820.00
04.01.07.04.01 TRABAJOS PRELIMINARES 1,064.83
04.01.07.04.01 LIMPIEZA DE TERRENO MANUAL m2 601.60 0.99 595.58
04.01.07.04.01 TRAZO Y REPLANTEO PRELIMINAR m2 601.60 0.78 469.25
04.01.07.04.02 MOVIMIENTO DE TIERRAS 25,180.49
04.01.07.04.02 EXCAVACION MANUAL EN TERRENO NATURAL m3 253.44 33.90 8,591.62
04.01.07.04.02 RELLENO CON GRAVA 1" PARA FILTRO m3 115.20 102.84 11,847.17
04.01.07.04.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 144.00 18.84 2,712.96
04.01.07.04.02 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 136.80 14.83 2,028.74
04.01.07.04.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS 5,574.68
04.01.07.04.03 SUM. Y COLOC. DE TUBERIA PVC SAL NTP 399.003, DIA=2" m 160.00 6.30 1,008.00
04.01.07.04.03 SUM. Y COLOC. DE TUBERIA PERFORADA PVC SAL NTP 399.003, DIA=2" m 640.00 5.27 3,372.80
04.01.07.04.03 ACCESORIOS PVC DESAGÜE glb 1.00 1,193.88 1,193.88
04.01.08 FILTRO LENTO (01 UND) 29,759.27
04.01.08.01 TRABAJOS PRELIMINARES 49.42
04.01.08.01.01 LIMPIEZA DE TERRENO MANUAL m2 21.30 0.99 21.09
04.01.08.01.02 TRAZO Y REPLANTEO PRELIMINAR m 21.30 1.33 28.33
04.01.08.02 MOVIMIENTO DE TIERRAS 1,130.55
04.01.08.02.01 EXCAVACIÓN MANUAL EN TERRENO NORMAL m3 21.56 33.90 730.88
04.01.08.02.02 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 26.95 14.83 399.67
04.01.08.03 OBRAS DE CONCRETO SIMPLE 674.44
04.01.08.03.01 SOLADO DE CONCRETO C:H 1:10, E=0.10m m2 20.45 32.98 674.44
04.01.08.04 OBRAS DE CONCRETO ARMADO 20,020.31
04.01.08.04.01 CONCRETO EN CAJA DE VALVULAS DE INGRESO F'C=210 KG/CM2, Sin Mezcladora m3 17.81 545.45 9,714.46
04.01.08.04.02 ENCOFRADO Y DESENCOFRADO DE CAJA DE VALVULAS DE INGRESO m2 120.04 46.09 5,532.64
04.01.08.04.03 ACERO DE REFUERZO fy=4200 Kg/cm2 kg 897.95 4.42 3,968.94
04.01.08.04.04 CURADO DE CONCRETO m2 120.04 6.70 804.27
04.01.08.05 REVOQUES, ENLUCIDOS Y MOLDURAS 5,230.97
04.01.08.05.01 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE, MEZCLA 1:3, E= 1.5 cm m2 101.95 26.70 2,722.07
04.01.08.05.02 TARRAJEO EN EXTERIORES (MORTERO C:A=1:3), E=1.5cm m2 105.95 23.68 2,508.90
04.01.08.06 VARIOS 2,653.58
04.01.08.06.01 LECHO FILTRANTE m3 3.96 131.55 520.94
04.01.08.06.02 LADRILLO SOPORTE DE LECHO FILTRANTE und 248.00 0.98 243.04
04.01.08.06.03 ACCESORIOS EN FILTRO LENTO glb 1.00 1,295.22 1,295.22
04.01.08.06.04 SUM. E INST. TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 3.00 140.36 421.08
04.01.08.06.05 PINTURA EN MUROS EXTERIORES (DOS MANOS) m2 18.09 9.58 173.30
05 QUINUAMAYO BAJO - AGUA POTABLE 1,135,333.03
05.01 SISTEMA QUINUAMAYO BAJO 1,135,333.03
05.01.01 CAPTACION DE LADERA (04 UNID) 25,052.19
05.01.01.01 RECONSTRUCCIÓN DE CAPTACIÓN DE LADERA - QUINUAMAYO BAJO 25,052.19
05.01.01.01.01 TRABAJOS PRELIMINARES 345.36
05.01.01.01.01 LIMPIEZA DEL TERRENO MANUAL y DESBROCE m2 66.80 2.97 198.40
05.01.01.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 66.80 2.20 146.96
05.01.01.01.02 DEMOLICION DE ESTRUCTURA EN MAL ESTADO 1,934.20
05.01.01.01.02 DEMOLICION DE ESTRUCTURA DE CONCRETO m3 7.56 237.31 1,794.06
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
05.01.01.01.02 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 9.45 14.83 140.14
05.01.01.01.03 MOVIMIENTO DE TIERRAS 1,357.02
05.01.01.01.03 EXCAVACION MANUAL DE TERRENO m3 12.19 33.90 413.24
05.01.01.01.03 MEJORAMIENTO DE BASE CON AFIRMADO E=0.10m m3 0.39 103.06 40.19
05.01.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 60.93 14.83 903.59
05.01.01.01.04 OBRAS DE CONCRETO SIMPLE 1,900.31
05.01.01.01.04 CONCRETO SIMPLE EN FILTRO f'c=140 kg/cm2 m3 2.88 338.34 974.42
05.01.01.01.04 DADOS DE CONCRETO f'c=140 kg/cm2 m3 0.05 338.34 16.92
05.01.01.01.04 PIEDRA D=4" ASENTADA CON MEZCLA C:H 1:8 m2 2.00 259.94 519.88
05.01.01.01.04 CONCRETO EN POSTES DE CERCO PERIMETRICO f'c=140 kg/cm2 m3 1.15 338.34 389.09
05.01.01.01.05 OBRAS DE CONCRETO ARMADO 12,184.24
05.01.01.01.05 ENCOFRADO Y DESENCOFRADO m2 73.28 46.09 3,377.48
05.01.01.01.05 CONCRETO f'c=175 kg/cm2 CON ADITIVO IMPERMEABILIZANTE m3 10.75 449.29 4,829.87
05.01.01.01.05 ACERO DE REFUERZO fy=4200 Kg/cm2 kg 443.30 4.42 1,959.39
05.01.01.01.05 CURADO DE CONCRETO m2 301.12 6.70 2,017.50
05.01.01.01.06 REVOQUES Y ENLUCIDOS 2,070.42
05.01.01.01.06 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE MEZCLA 1.1, E=2.0cm m2 40.42 27.02 1,092.15
05.01.01.01.06 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E=1.5cm m2 41.95 23.32 978.27
05.01.01.01.07 ACCESORIOS EN CAPTACION 1,395.64
05.01.01.01.07 INSTALACION DE ACCESORIOS EN CAPTACION 2" und 2.00 277.22 554.44
05.01.01.01.07 INSTALACION DE ACCESORIOS EN CAPTACION 1.5" und 2.00 420.60 841.20
05.01.01.01.08 MATERIAL GRANULAR PARA FILTRO 776.11
05.01.01.01.08 FILTRO I - PIEDRA CHICA m3 1.08 122.03 131.79
05.01.01.01.08 FILTRO II - GRAVA m3 1.92 122.03 234.30
05.01.01.01.08 FILTRO III - MATERIAL GRANULAR m3 3.36 122.03 410.02
05.01.01.01.09 CERCO PERIMETRICO 1,526.45
05.01.01.01.09 EXCAVACION MANUAL DE TERRENO m3 1.58 33.90 53.56
05.01.01.01.09 CERCO PERIMETRICO C/ALAMBRE DE PUAS Y POSTES DE MADERA glb 1.00 540.65 540.65
05.01.01.01.09 PUERTA EN CERCO PERIMETRICO und 4.00 233.06 932.24
05.01.01.01.10 VARIOS 1,562.44
05.01.01.01.10 SUM. E INST. TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 4.00 157.78 631.12
05.01.01.01.10 SUM. E INST. TAPA SANITARIA METALICA DE 0.40x0.40x1/8" und 4.00 132.36 529.44
05.01.01.01.10 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 41.95 9.58 401.88
05.01.02 CAMARA DE REUNION (01 UNID) - SISTEMA QUINUAMAYO BAJO 3,160.80
05.01.02.01 TRABAJOS PRELIMINARES 8.37
05.01.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.61 0.99 3.57
05.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m 3.61 1.33 4.80
05.01.02.02 MOVIMIENTO DE TIERRAS 103.00
05.01.02.02.01 EXCAVACIÓN MANUAL EN TERRENO NORMAL m3 1.81 33.90 61.36
05.01.02.02.02 NIVELACIÓN INTERIOR Y APISONADO m2 3.61 2.25 8.12
05.01.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 2.26 14.83 33.52
05.01.02.03 OBRAS DE CONCRETO SIMPLE 11.26
05.01.02.03.01 CONCRETO F'C=140 KG/CM2, Sin Mezcladora m3 0.03 375.47 11.26
05.01.02.04 OBRAS DE CONCRETO ARMADO 1,850.56
05.01.02.04.01 CONCRETO F'C=175 KG/CM2, Sin Mezcladora m3 1.59 505.23 803.32
05.01.02.04.02 ENCOFRADO Y DESENCOFRADO m2 13.52 46.09 623.14
05.01.02.04.03 ACERO DE REFUERZO fy=4200 Kg/cm2 kg 95.95 4.42 424.10
05.01.02.05 REVOQUES Y ENLUCIDOS 371.44
05.01.02.05.01 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE MEZCLA 1:2, E=2cm m2 6.04 29.89 180.54
05.01.02.05.02 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E=1.5cm m2 7.84 24.35 190.90
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
05.01.05.03.02 CONCRETO f'c=140 kg/cm2 + 30%PM MAX 3", Sin Mezcladora m3 1.53 381.30 583.39
05.01.05.03.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VEREDA Y CUNETA DE RESERVORIO m2 4.69 37.47 175.73
05.01.05.04 OBRAS DE CONCRETO ARMADO 6,769.95
05.01.05.04.01 CONCRETO F'C=210 KG/CM2, Sin Mezcladora m3 5.35 545.45 2,918.16
05.01.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN RESERVORIO m2 50.45 37.47 1,890.36
05.01.05.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 352.51 4.42 1,558.09
05.01.05.04.04 CURADO DE CONCRETO m2 60.20 6.70 403.34
05.01.05.05 REVOQUES, REVESTIMIENTOS Y PINTURA 1,568.49
05.01.05.05.01 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE MEZCLA 1:2, E=1.5cm m2 18.04 27.80 501.51
05.01.05.05.02 TARRAJEO EN EXTERIORES (MORTERO C:A=1:3), E=1.5cm m2 32.08 23.68 759.65
05.01.05.05.03 PINTURA EN MUROS EXTERIORES (DOS MANOS) m2 32.08 9.58 307.33
05.01.05.06 VARIOS 974.57
05.01.05.06.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 2.00 157.78 315.56
05.01.05.06.02 SUM. E INST. DE SISTEMA DE CLORACION POR GOTEO und 1.00 288.43 288.43
05.01.05.06.03 WATER STOP DIAM 6" m 9.77 37.93 370.58
05.01.05.07 ESCALERA TIPO GATO 238.38
05.01.05.07.01 ESCALERA CON PELDAÑOS DE F°G° 5/8" und 1.00 238.38 238.38
05.01.05.08 VALVULAS Y ACCESORIOS EN CAJA DE VALVULAS 2,743.03
05.01.05.08.01 SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE ENTRADA D=2" glb 1.00 786.49 786.49
05.01.05.08.02 SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE SALIDA D=2" glb 1.00 481.16 481.16
05.01.05.08.03 SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE LIMPIEZA Y REBOSE D=2" glb 1.00 571.96 571.96
05.01.05.08.04 SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE VENTILACION D=2" glb 1.00 311.82 311.82
05.01.05.08.05 SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE BY PASS D=2" glb 1.00 591.60 591.60
05.01.05.09 CERCO PERIMETRICO 963.69
05.01.05.09.01 MOVIMIENTO DE TIERRAS 23.73
05.01.05.09.01 EXCAVACIÓN MANUAL EN TERRENO NORMAL m3 0.70 33.90 23.73
05.01.05.09.02 OBRAS DE CONCRETO SIMPLE 266.91
05.01.05.09.02 CONCRETO f'c=140 kg/cm2 + 30%PM MAX 3", Sin Mezcladora m3 0.70 381.30 266.91
05.01.05.09.03 VARIOS 673.05
05.01.05.09.03 CERCO PERIMETRICO C/ALAMBRE DE PUAS glb 1.00 494.57 494.57
05.01.05.09.03 PUERTA EN CERCO PERIMETRICO und 1.00 178.48 178.48
05.01.06 RESERVORIO RECTANGULAR DE 3.00 m3 (01 UNID) - SISTEMA QUINUAMAYO BAJO 12,791.59
05.01.06.01 TRABAJOS PRELIMINARES 48.83
05.01.06.01.01 LIMPIEZA DE TERRENO MANUAL m2 27.59 0.99 27.31
05.01.06.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 27.59 0.78 21.52
05.01.06.02 MOVIMIENTO DE TIERRAS 226.28
05.01.06.02.01 EXCAVACIÓN MANUAL EN TERRENO NORMAL m3 3.62 33.90 122.72
05.01.06.02.02 NIVELACIÓN INTERIOR Y APISONADO m2 16.17 2.25 36.38
05.01.06.02.03 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 4.53 14.83 67.18
05.01.06.03 OBRAS DE CONCRETO SIMPLE 985.40
05.01.06.03.01 CONCRETO F'C=140 KG/CM2, Sin Mezcladora m3 0.82 375.47 307.89
05.01.06.03.02 CONCRETO f'c=140 kg/cm2 + 30%PM MAX 3", Sin Mezcladora m3 1.37 381.30 522.38
05.01.06.03.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VEREDA Y CUNETA DE RESERVORIO m2 4.14 37.47 155.13
05.01.06.04 OBRAS DE CONCRETO ARMADO 5,812.21
05.01.06.04.01 CONCRETO F'C=210 KG/CM2, Sin Mezcladora m3 4.39 545.45 2,394.53
05.01.06.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN RESERVORIO m2 44.36 37.47 1,662.17
05.01.06.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 318.35 4.42 1,407.11
05.01.06.04.04 CURADO DE CONCRETO m2 52.00 6.70 348.40
05.01.06.05 REVOQUES, REVESTIMIENTOS Y PINTURA 1,317.38
05.01.06.05.01 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE MEZCLA 1:2, E=1.5cm m2 18.04 27.80 501.51
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
05.01.08.04.03 TEE PVC SP DE 1" NTP 399.002 und 10.00 6.01 60.10
05.01.08.04.04 TEE PVC SP DE 3/4" NTP 399.002 und 2.00 4.47 8.94
05.01.08.04.05 REDUCCION PVC SP DE 2" a 1 1/2" NTP 399.002 und 2.00 4.35 8.70
05.01.08.04.06 REDUCCION PVC SP DE 2" a 3/4" NTP 399.002 und 1.00 5.74 5.74
05.01.08.04.07 REDUCCIÓN PVC SP DE 3/4" A 1/2" NTP 399.002 und 57.00 2.94 167.58
05.01.08.04.08 REDUCCION PVC SP DE 1 1/2" a 1" NTP 399.002 und 3.00 4.02 12.06
05.01.08.04.09 REDUCCION PVC SP DE 1 1/2" a 3/4" NTP 399.002 und 4.00 3.74 14.96
05.01.08.04.10 REDUCCION PVC SP DE 1" a 3/4" NTP 399.002 und 14.00 5.80 81.20
05.01.08.04.11 CODO PVC SP 1" x 45° und 5.00 4.88 24.40
05.01.08.04.12 CODO PVC SP 3/4" x 90° und 2.00 4.88 9.76
05.01.08.04.13 CODO PVC SP 3/4" x 45° und 2.00 5.08 10.16
05.01.09 CAMARA DISTRIBUIDORA DE CAUDALES (01 UNID) 5,935.23
05.01.09.01 TRABAJOS PRELIMINARES 2.93
05.01.09.01.01 LIMPIEZA DE TERRENO MANUAL m2 1.26 0.99 1.25
05.01.09.01.02 TRAZO Y REPLANTEO PRELIMINAR m 1.26 1.33 1.68
05.01.09.02 MOVIMIENTO DE TIERRAS 38.25
05.01.09.02.01 EXCAVACIÓN MANUAL EN TERRENO NORMAL m3 0.73 33.90 24.75
05.01.09.02.02 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 0.91 14.83 13.50
05.01.09.03 OBRAS DE CONCRETO SIMPLE 4,092.62
05.01.09.03.01 CONCRETO F'C=140 KG/CM2, Sin Mezcladora m3 10.90 375.47 4,092.62
05.01.09.04 OBRAS DE CONCRETO ARMADO 760.99
05.01.09.04.01 CONCRETO F'C=175 KG/CM2, Sin Mezcladora m3 0.66 505.23 333.45
05.01.09.04.02 ENCOFRADO Y DESENCOFRADO m2 5.77 46.09 265.94
05.01.09.04.03 ACERO DE REFUERZO fy=4200 Kg/cm2 kg 36.56 4.42 161.60
05.01.09.05 REVOQUES Y ENLUCIDOS 147.67
05.01.09.05.01 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE MEZCLA 1:3, E=1.5cm m2 3.05 26.70 81.44
05.01.09.05.02 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E=1.5cm m2 2.72 24.35 66.23
05.01.09.06 VALVULAS Y ACCESORIOS 588.67
05.01.09.06.01 SUMINISTRO E INSTALACIÓN DE ACCESORIOS glb 1.00 588.67 588.67
05.01.09.07 VARIOS 304.10
05.01.09.07.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 1.00 157.78 157.78
05.01.09.07.02 SUM. E INST. TAPA SANITARIA METALICA 0.40x0.40x1/8" und 1.00 114.08 114.08
05.01.09.07.03 PINTURA EN MUROS EXTERIORES (ESMALTE) m2 2.72 11.32 30.79
05.01.09.07.04 PIEDRA ASENTADA CON MEZCLA 1:8, CEMENTO HORMIGÓN m2 0.04 36.26 1.45
05.01.10 TUBERÍA DISTRIBUIDORA DE CAUDALES C-10 42,671.70
05.01.10.01 TRABAJOS PRELIMINARES 2,167.70
05.01.10.01.01 LIMPIEZA DE TERRENO MANUAL m2 878.40 0.99 869.62
05.01.10.01.02 TRAZO Y REPLANTEO PRELIMINAR m 976.00 1.33 1,298.08
05.01.10.02 MOVIMIENTO DE TIERRAS 31,066.08
05.01.10.02.01 EXCAVACION MANUAL DE ZANJAS, A=0.45m x H=0.90m EN TERRENO NORMAL m 976.00 15.57 15,196.32
05.01.10.02.02 CAMA DE APOYO E=0.10m, A=0.45m PARA TUBERIA m 976.00 6.59 6,431.84
05.01.10.02.03 RELLENO CON MATERIAL PROPIO ZARANDEADO E=0.20m, A=0.45m m 976.00 3.56 3,474.56
05.01.10.02.04 RELLENO Y COMPACTACION DE ZANJAS MANUAL E=0.60m, A=0.45m m 976.00 6.11 5,963.36
05.01.10.03 TUBERIAS Y PRUEBA HIDRAULICA 9,437.92
05.01.10.03.01 SUM. Y COLOC. DE TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=1.5" m 976.00 8.55 8,344.80
05.01.10.03.02 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS m 976.00 1.12 1,093.12
05.01.11 TUBERÍA DISTRIBUIDORA DE CAUDALES C-15 51,097.20
05.01.11.01 TRABAJOS PRELIMINARES 2,665.20
05.01.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,080.00 0.99 1,069.20
05.01.11.01.02 TRAZO Y REPLANTEO PRELIMINAR m 1,200.00 1.33 1,596.00
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
05.01.15.07.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 14.00 157.78 2,208.92
05.01.15.07.02 SUM. E INST. TAPA SANITARIA METALICA 0.40x0.40x1/8" und 14.00 114.08 1,597.12
05.01.15.07.03 PINTURA EN MUROS EXTERIORES (DOS MANOS) m2 103.60 9.58 992.49
05.01.16 PASE AEREO N°01 L=15.00 m (01 UND), TUBERÍA 1 1/2" 5,606.76
05.01.16.01 TRABAJOS PRELIMINARES 11.70
05.01.16.01.01 LIMPIEZA DEL TERRENO MANUAL m2 8.77 0.99 8.68
05.01.16.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.87 0.78 3.02
05.01.16.02 MOVIMIENTO DE TIERRAS 92.55
05.01.16.02.01 EXCAVACION MANUAL m3 2.73 33.90 92.55
05.01.16.03 OBRAS DE CONCRETO SIMPLE 310.03
05.01.16.03.01 SOLADO BASE TORRE DE SUSP. Y CAM. ANCLAJE, E=4", Sin Mezcladora m2 7.61 40.74 310.03
05.01.16.04 OBRAS DE CONCRETO ARMADO 1,213.63
05.01.16.04.01 CONCRETO F'C=210 KG/CM2, TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.28 545.45 152.73
05.01.16.04.02 CONCRETO F'C=175 KG/CM2, ZAPATAS TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.79 388.61 307.00
05.01.16.04.03 CONCRETO F'C=175 KG/CM2, CÁMARA DE ANCLAJE, Sin Mezcladora m3 1.94 388.61 753.90
05.01.16.05 ACERO fy= 4200 kg/cm2 254.77
05.01.16.05.01 ACERO DE REFUERZO fy=4200 Kg/cm2, TORRE DE SUSPENSIÓN kg 57.64 4.42 254.77
05.01.16.06 ENCOFRADO Y DESENCOFRADO 972.55
05.01.16.06.01 ZAPATAS, TORRES DE SUSPENSIÓN m2 3.74 81.33 304.17
05.01.16.06.02 COLUMNAS, TORRE DE SUSPENSIÓN m2 4.40 61.41 270.20
05.01.16.06.03 CÁMARA DE ANCLAJE m2 7.04 56.56 398.18
05.01.16.07 REVOQUES Y ENLUCIDOS 220.19
05.01.16.07.01 TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 4.40 28.94 127.34
05.01.16.07.02 ZAPATA DE TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 1.45 23.99 34.79
05.01.16.07.03 CÁMARA DE ANCLAJE C/MORTERO 1:5 x 1.5CM m2 2.42 23.99 58.06
05.01.16.08 CABLES TIPO BOA 1,087.90
05.01.16.08.01 CABLE DE ACERO TIPO BOA DE 3/8" m 24.41 27.27 665.66
05.01.16.08.02 CABLE DE ACERO TIPO BOA DE 1/4" m 22.75 18.56 422.24
05.01.16.09 ACCESORIOS VARIOS DE PASE AEREO 1,443.44
05.01.16.09.01 TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=1.5" m 19.47 10.23 199.18
05.01.16.09.02 TUBERIA POLIETILENO DIA=3" m 19.47 17.17 334.30
05.01.16.09.03 CODO PVC SP 1 1/2" x 45° und 4.00 8.36 33.44
05.01.16.09.04 FIERRO LISO MACIZO DE ANCLAJE Ø 3/8", L=0.15m und 2.00 14.14 28.28
05.01.16.09.05 ALAMBRE N°08 kg 10.00 5.26 52.60
05.01.16.09.06 GRAPAS DE 3/8" EN CABLE PRINCIPAL und 6.00 13.42 80.52
05.01.16.09.07 GRILLETE DE SEGURIDAD DE 1/2" EN CABLE PRINCIPAL und 16.00 15.92 254.72
05.01.16.09.08 ARGOLLA DE 2 1/2" x 1/8" PARA CABLE PRINCIPAL und 16.00 15.92 254.72
05.01.16.09.09 ABRAZADERA DE 1 1/2" x 1/4" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 9.58 38.32
05.01.16.09.10 PERNOS DE ANCLAJE DE 3/4" x 6" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 41.84 167.36
05.01.17 PASE AEREO N°02 L=15.00 m (01 UND), TUBERÍA 1" 5,428.31
05.01.17.01 TRABAJOS PRELIMINARES 11.70
05.01.17.01.01 LIMPIEZA DEL TERRENO MANUAL m2 8.77 0.99 8.68
05.01.17.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.87 0.78 3.02
05.01.17.02 MOVIMIENTO DE TIERRAS 92.55
05.01.17.02.01 EXCAVACION MANUAL m3 2.73 33.90 92.55
05.01.17.03 OBRAS DE CONCRETO SIMPLE 310.03
05.01.17.03.01 SOLADO BASE TORRE DE SUSP. Y CAM. ANCLAJE, E=4", Sin Mezcladora m2 7.61 40.74 310.03
05.01.17.04 OBRAS DE CONCRETO ARMADO 1,213.63
05.01.17.04.01 CONCRETO F'C=210 KG/CM2, TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.28 545.45 152.73
05.01.17.04.02 CONCRETO F'C=175 KG/CM2, ZAPATAS TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.79 388.61 307.00
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
05.01.17.04.03 CONCRETO F'C=175 KG/CM2, CÁMARA DE ANCLAJE, Sin Mezcladora m3 1.94 388.61 753.90
05.01.17.05 ACERO fy= 4200 kg/cm2 254.77
05.01.17.05.01 ACERO DE REFUERZO fy=4200 Kg/cm2, TORRE DE SUSPENSIÓN kg 57.64 4.42 254.77
05.01.17.06 ENCOFRADO Y DESENCOFRADO 972.55
05.01.17.06.01 ZAPATAS, TORRES DE SUSPENSIÓN m2 3.74 81.33 304.17
05.01.17.06.02 COLUMNAS, TORRE DE SUSPENSIÓN m2 4.40 61.41 270.20
05.01.17.06.03 CÁMARA DE ANCLAJE m2 7.04 56.56 398.18
05.01.17.07 REVOQUES Y ENLUCIDOS 220.19
05.01.17.07.01 TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 4.40 28.94 127.34
05.01.17.07.02 ZAPATA DE TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 1.45 23.99 34.79
05.01.17.07.03 CÁMARA DE ANCLAJE C/MORTERO 1:5 x 1.5CM m2 2.42 23.99 58.06
05.01.17.08 CABLES TIPO BOA 1,087.90
05.01.17.08.01 CABLE DE ACERO TIPO BOA DE 3/8" m 24.41 27.27 665.66
05.01.17.08.02 CABLE DE ACERO TIPO BOA DE 1/4" m 22.75 18.56 422.24
05.01.17.09 ACCESORIOS VARIOS DE PASE AEREO 1,264.99
05.01.17.09.01 TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=1" m 19.47 7.03 136.87
05.01.17.09.02 TUBERIA POLIETILENO DIA=2" m 19.47 11.92 232.08
05.01.17.09.03 CODO PVC SP 1" x 45° und 4.00 4.88 19.52
05.01.17.09.04 FIERRO LISO MACIZO DE ANCLAJE Ø 3/8", L=0.15m und 2.00 14.14 28.28
05.01.17.09.05 ALAMBRE N°08 kg 10.00 5.26 52.60
05.01.17.09.06 GRAPAS DE 3/8" EN CABLE PRINCIPAL und 6.00 13.42 80.52
05.01.17.09.07 GRILLETE DE SEGURIDAD DE 1/2" EN CABLE PRINCIPAL und 16.00 15.92 254.72
05.01.17.09.08 ARGOLLA DE 2 1/2" x 1/8" PARA CABLE PRINCIPAL und 16.00 15.92 254.72
05.01.17.09.09 ABRAZADERA DE 1 1/2" x 1/4" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 9.58 38.32
05.01.17.09.10 PERNOS DE ANCLAJE DE 3/4" x 6" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 41.84 167.36
05.01.18 CRUCE DE TUBERIA EN ALCANTARILLA L=15.00m, TUBERÍA F°G° 1" 787.89
05.01.18.01 TRABAJOS PRELIMINARES 11.95
05.01.18.01.01 LIMPIEZA DEL TERRENO MANUAL m2 6.75 0.99 6.68
05.01.18.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 6.75 0.78 5.27
05.01.18.02 MOVIMIENTO DE TIERRAS 33.23
05.01.18.02.01 EXCAVACION MANUAL m3 0.63 33.90 21.36
05.01.18.02.02 RELLENO DE ZANJA CON MATERIAL PROPIO m3 0.63 18.84 11.87
05.01.18.03 TUBERIA DE FIERRO GALVANIZADO 337.95
05.01.18.03.01 TUBERIA DE FIERRO GALVANIZADO Ø1" m 15.00 22.53 337.95
05.01.18.04 ACCESORIOS VARIOS 404.76
05.01.18.04.01 CODO FIERRO GALVANIZADO DE 1" x 90° und 8.00 6.57 52.56
05.01.18.04.02 CODO FIERRO GALVANIZADO DE 1" x 45° und 4.00 6.57 26.28
05.01.18.04.03 UNION UNIVERSAL PVC ROSCA DE 1" und 2.00 7.13 14.26
05.01.18.04.04 ADAPTADOR UPR PVC DE 1" und 2.00 6.18 12.36
05.01.18.04.05 NIPLE DE PVC DE 1" x 2" und 2.00 5.38 10.76
05.01.18.04.06 ABRAZADERA DE F°G° DE 1" und 9.00 11.08 99.72
05.01.18.04.07 PERNOS PARA ABRAZADERA DE F°G° und 18.00 10.49 188.82
05.01.19 CONEXIONES DOMICILIARIAS (131 UND) SISTEMA - QUINUAMAYO BAJO 82,871.99
05.01.19.01 TRABAJOS PRELIMINARES 4,723.57
05.01.19.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,780.80 0.99 1,762.99
05.01.19.01.02 TRAZO Y REPLANTEO PRELIMINAR m 2,226.00 1.33 2,960.58
05.01.19.02 MOVIMIENTO DE TIERRAS 53,357.22
05.01.19.02.01 EXCAVACION MANUAL DE ZANJAS, A=0.40m x H=0.70m EN TERRENO NORMAL m 2,226.00 10.77 23,974.02
05.01.19.02.02 CAMA DE APOYO E=0.10, A=0.45 PARA TUBERÍA m 2,226.00 6.42 14,290.92
05.01.19.02.03 RELLENO CON MATERIAL PROPIO FINO E=0.20M, A=0.45M m 2,226.00 3.16 7,034.16
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
05.01.19.02.04 RELLENO Y COMPACTACIÓN DE ZANJAS MANUAL E=0.40M, A=0.45M m 2,226.00 3.62 8,058.12
05.01.19.03 TUBERIAS Y PRUEBA HIDRAULICA 9,972.48
05.01.19.03.01 TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=1/2" m 2,226.00 3.36 7,479.36
05.01.19.03.02 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS m 2,226.00 1.12 2,493.12
05.01.19.04 SUMINISTRO E INSTALACION DE ACCESORIOS 14,818.72
05.01.19.04.01 SUMINISTRO E INSTALACION DE CONEXIONES DOMICILIARIAS DE AGUA und 131.00 113.12 14,818.72
05.01.20 INSTALACION DE PILETAS CON LAVADERO (32 UND) 14,466.63
05.01.20.01 TRABAJOS PRELIMINARES 61.17
05.01.20.01.01 LIMPIEZA DE TERRENO MANUAL m2 34.56 0.99 34.21
05.01.20.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 34.56 0.78 26.96
05.01.20.02 MOVIMIENTO DE TIERRAS 1,860.70
05.01.20.02.01 EXCAVACION MANUAL DE TERRENO m3 10.37 33.90 351.54
05.01.20.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 7.06 18.84 133.01
05.01.20.02.03 CAMA DE ARENA e=0.05m m3 8.64 152.17 1,314.75
05.01.20.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 4.14 14.83 61.40
05.01.20.03 OBRAS DE CONCRETO ARMADO 3,956.42
05.01.20.03.01 CONCRETO f'c=175 kg/cm2, Sin mezcladora m3 3.34 471.38 1,574.41
05.01.20.03.02 ENCOFRADO Y DESENCOFRADO m2 44.32 37.47 1,660.67
05.01.20.03.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 163.20 4.42 721.34
05.01.20.04 MUROS Y TABIQUES 1,736.73
05.01.20.04.01 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZC. C:A=1:5, AP. DE SOGA m2 16.80 56.19 943.99
05.01.20.04.02 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZC. C:A=1:5, AP. DE CANTO m2 15.12 52.43 792.74
05.01.20.05 REVOQUES Y ENLUCIDOS 2,857.35
05.01.20.05.01 TARRAJEO PULIDO EN LAVADERO - INTERIORES, CON MORTERO C:A 1:5, E=1.5 CM m2 41.04 22.37 918.06
05.01.20.05.02 TARRAJEO DE LAVADERO - EXTERIORES, CON MORTERO C:A 1:5, E=1.5 CM m2 83.16 23.32 1,939.29
05.01.20.06 CONEXION DOMICILIARIA, INC. VALVULAS Y ACCESORIOS 3,085.12
05.01.20.06.01 ACCESORIOS EN LAVADEROS MULTIUSOS AGUA Y DESAGÜE und 32.00 96.41 3,085.12
05.01.20.07 VARIOS 909.14
05.01.20.07.01 PINTURA OCRE COLOR ROJO EN PILETA m2 124.20 7.32 909.14
05.01.21 UNIDADES BASICAS CON ARRASTRE HIDRAULICO Y BIODIGESTOR (32 UND) 306,837.34
05.01.21.01 ESTRUCTURAS Y ARQUITECTURA 186,464.98
05.01.21.01.01 TRABAJOS PRELIMINARES 462.18
05.01.21.01.01 LIMPIEZA DE TERRENO MANUAL m2 261.12 0.99 258.51
05.01.21.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 261.12 0.78 203.67
05.01.21.01.02 MOVIMIENTO DE TIERRAS 3,428.90
05.01.21.01.02 EXCAVACION MANUAL DE TERRENO PARA CIMIENTOS m3 53.76 33.90 1,822.46
05.01.21.01.02 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 67.20 14.83 996.58
05.01.21.01.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 21.67 18.84 408.26
05.01.21.01.02 NIVELACIÓN INTERIOR Y APISONADO m2 89.60 2.25 201.60
05.01.21.01.03 OBRAS DE CONCRETO SIMPLE 19,969.34
05.01.21.01.03 CIMIENTOS CORRIDOS MEZCLA C:H 1:10 +30% P.G., Sin mezcladora m3 35.84 233.57 8,371.15
05.01.21.01.03 SOBRECIMIENTOS MEZCLA C:H 1:8 + 25% PM, Sin mezcladora m3 9.00 333.04 2,997.36
05.01.21.01.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 120.00 50.99 6,118.80
05.01.21.01.03 CONCRETO EN FALSO PISO MEZCLA C:H 1:10 E=10CM, Sin Mezcladora m2 99.60 24.92 2,482.03
05.01.21.01.04 OBRAS DE CONCRETO ARMADO 49,222.23
05.01.21.01.04 CONCRETO EN COLUMNAS f'c=175 kg/cm2, Sin mezcladora m3 12.72 526.33 6,694.92
05.01.21.01.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 181.36 61.41 11,137.32
05.01.21.01.04 ACERO DE REFUERZO EN COLUMNAS, FY=4200 KG/CM2 kg 2,799.37 4.42 12,373.22
05.01.21.01.04 CONCRETO EN VIGAS f'c=175 kg/cm2, Sin mezcladora m3 8.26 421.71 3,483.32
05.01.21.01.04 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 102.40 73.68 7,544.83
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
06.01.05.03.04 SUM. Y COLOC. DE TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=3/4" m 12,585.00 4.73 59,527.05
06.01.05.03.05 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS m 29,242.00 1.12 32,751.04
06.01.05.04 SUMINISTRO E INSTALACION DE ACCESORIOS 2,423.59
06.01.05.04.01 TEE PVC SP DE 2" NTP 399.002 und 41.00 13.81 566.21
06.01.05.04.02 TEE PVC SP DE 1 1/2" NTP 399.002 und 35.00 8.61 301.35
06.01.05.04.03 TEE PVC SP DE 1" NTP 399.002 und 27.00 6.01 162.27
06.01.05.04.04 TEE PVC SP DE 3/4" NTP 399.002 und 70.00 4.47 312.90
06.01.05.04.05 TEE PVC SP DE 1/2" NTP 399.002 und 2.00 3.17 6.34
06.01.05.04.06 REDUCCION PVC SP DE 2" a 1 1/2" NTP 399.002 und 4.00 4.35 17.40
06.01.05.04.07 REDUCCION PVC SP DE 2" a 3/4" NTP 399.002 und 22.00 5.74 126.28
06.01.05.04.08 REDUCCION PVC SP DE 2" a 1/2" NTP 399.002 und 12.00 4.93 59.16
06.01.05.04.09 REDUCCIÓN PVC SP DE 3/4" A 1/2" NTP 399.002 und 73.00 2.94 214.62
06.01.05.04.10 REDUCCION PVC SP DE 1 1/2" a 1" NTP 399.002 und 7.00 4.02 28.14
06.01.05.04.11 REDUCCION PVC SP DE 1 1/2" a 3/4" NTP 399.002 und 15.00 3.74 56.10
06.01.05.04.12 REDUCCION PVC SP DE 1 1/2" a 1/2" NTP 399.002 und 17.00 3.74 63.58
06.01.05.04.13 REDUCCION PVC SP DE 1" a 3/4" NTP 399.002 und 21.00 5.80 121.80
06.01.05.04.14 REDUCCION PVC SP DE 1" a 1/2" NTP 399.002 und 20.00 6.10 122.00
06.01.05.04.15 CODO PVC SP 2" x 45° und 8.00 12.28 98.24
06.01.05.04.16 CODO PVC SP 1 1/2" x 45° und 5.00 8.36 41.80
06.01.05.04.17 CODO PVC SP 1" x 45° und 6.00 4.88 29.28
06.01.05.04.18 CODO PVC SP 3/4" x 45° und 8.00 5.08 40.64
06.01.05.04.19 CODO PVC SP 1/2" x 45° und 2.00 4.78 9.56
06.01.05.04.20 CODO PVC SP 3/4" x 90° und 4.00 4.88 19.52
06.01.05.04.21 CODO PVC SP 1" x 90° und 3.00 6.08 18.24
06.01.05.04.22 CODO PVC SP 1/2" x 90° und 2.00 4.08 8.16
06.01.06 CAMARA DISTRIBUIDORA DE CAUDALES 01 - (01 UNID) 5,843.96
06.01.06.01 TRABAJOS PRELIMINARES 2.93
06.01.06.01.01 LIMPIEZA DE TERRENO MANUAL m2 1.26 0.99 1.25
06.01.06.01.02 TRAZO Y REPLANTEO PRELIMINAR m 1.26 1.33 1.68
06.01.06.02 MOVIMIENTO DE TIERRAS 38.25
06.01.06.02.01 EXCAVACIÓN MANUAL EN TERRENO NORMAL m3 0.73 33.90 24.75
06.01.06.02.02 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 0.91 14.83 13.50
06.01.06.03 OBRAS DE CONCRETO SIMPLE 4,092.62
06.01.06.03.01 CONCRETO F'C=140 KG/CM2, Sin Mezcladora m3 10.90 375.47 4,092.62
06.01.06.04 OBRAS DE CONCRETO ARMADO 760.99
06.01.06.04.01 CONCRETO F'C=175 KG/CM2, Sin Mezcladora m3 0.66 505.23 333.45
06.01.06.04.02 ENCOFRADO Y DESENCOFRADO m2 5.77 46.09 265.94
06.01.06.04.03 ACERO DE REFUERZO fy=4200 Kg/cm2 kg 36.56 4.42 161.60
06.01.06.05 REVOQUES Y ENLUCIDOS 147.67
06.01.06.05.01 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE MEZCLA 1:3, E=1.5cm m2 3.05 26.70 81.44
06.01.06.05.02 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E=1.5cm m2 2.72 24.35 66.23
06.01.06.06 VALVULAS Y ACCESORIOS 491.85
06.01.06.06.01 SUMINISTRO E INSTALACIÓN DE ACCESORIOS glb 1.00 491.85 491.85
06.01.06.07 VARIOS 309.65
06.01.06.07.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 1.00 157.78 157.78
06.01.06.07.02 SUM. E INST. TAPA SANITARIA METALICA 0.40x0.40x1/8" und 1.00 114.08 114.08
06.01.06.07.03 PINTURA EN MUROS EXTERIORES (ESMALTE) m2 3.21 11.32 36.34
06.01.06.07.04 PIEDRA ASENTADA CON MEZCLA 1:8, CEMENTO HORMIGÓN m2 0.04 36.26 1.45
06.01.07 CAMARA DISTRIBUIDORA DE CAUDALES 02 - (01 UNID) 5,820.56
06.01.07.01 TRABAJOS PRELIMINARES 2.93
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
06.01.15.09.08 ARGOLLA DE 2 1/2" x 1/8" PARA CABLE PRINCIPAL und 30.00 15.92 477.60
06.01.15.09.09 ABRAZADERA DE 1 1/2" x 1/4" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 9.58 38.32
06.01.15.09.10 PERNOS DE ANCLAJE DE 3/4" x 6" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 41.84 167.36
06.01.16 PASE AEREO N° 06 L=25.00 m (01 UND), TUBERÍA 1 1/2" 9,092.86
06.01.16.01 TRABAJOS PRELIMINARES 16.00
06.01.16.01.01 LIMPIEZA DEL TERRENO MANUAL m2 11.60 0.99 11.48
06.01.16.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 5.80 0.78 4.52
06.01.16.02 MOVIMIENTO DE TIERRAS 160.69
06.01.16.02.01 EXCAVACION MANUAL m3 4.74 33.90 160.69
06.01.16.03 OBRAS DE CONCRETO SIMPLE 469.32
06.01.16.03.01 SOLADO BASE TORRE DE SUSP. Y CAM. ANCLAJE, E=4", Sin Mezcladora m2 11.52 40.74 469.32
06.01.16.04 OBRAS DE CONCRETO ARMADO 2,143.57
06.01.16.04.01 CONCRETO F'C=210 KG/CM2, TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.56 545.45 305.45
06.01.16.04.02 CONCRETO F'C=175 KG/CM2, ZAPATAS TORRE DE SUSPENSIÓN, Sin Mezcladora m3 1.69 388.61 656.75
06.01.16.04.03 CONCRETO F'C=175 KG/CM2, CÁMARA DE ANCLAJE, Sin Mezcladora m3 3.04 388.61 1,181.37
06.01.16.05 ACERO fy= 4200 kg/cm2 389.23
06.01.16.05.01 ACERO DE REFUERZO fy=4200 Kg/cm2, TORRE DE SUSPENSIÓN kg 88.06 4.42 389.23
06.01.16.06 ENCOFRADO Y DESENCOFRADO 1,487.28
06.01.16.06.01 ZAPATAS, TORRES DE SUSPENSIÓN m2 6.16 81.33 500.99
06.01.16.06.02 COLUMNAS, TORRE DE SUSPENSIÓN m2 7.44 61.41 456.89
06.01.16.06.03 CÁMARA DE ANCLAJE m2 9.36 56.56 529.40
06.01.16.07 REVOQUES Y ENLUCIDOS 354.46
06.01.16.07.01 TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 7.44 28.94 215.31
06.01.16.07.02 ZAPATA DE TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 2.42 23.99 58.06
06.01.16.07.03 CÁMARA DE ANCLAJE C/MORTERO 1:5 x 1.5CM m2 3.38 23.99 81.09
06.01.16.08 CABLES TIPO BOA 1,984.96
06.01.16.08.01 CABLE DE ACERO TIPO BOA DE 3/8" m 43.04 27.27 1,173.70
06.01.16.08.02 CABLE DE ACERO TIPO BOA DE 1/4" m 43.71 18.56 811.26
06.01.16.09 ACCESORIOS VARIOS DE PASE AEREO 2,087.35
06.01.16.09.01 TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=1.5" m 31.35 10.23 320.71
06.01.16.09.02 TUBERIA POLIETILENO DIA=3" m 31.35 17.17 538.28
06.01.16.09.03 CODO PVC SP 1 1/2" x 45° und 4.00 8.36 33.44
06.01.16.09.04 FIERRO LISO MACIZO DE ANCLAJE Ø 3/8", L=0.15m und 2.00 14.14 28.28
06.01.16.09.05 ALAMBRE N°08 kg 10.00 5.26 52.60
06.01.16.09.06 GRAPAS DE 3/8" EN CABLE PRINCIPAL und 6.00 13.42 80.52
06.01.16.09.07 GRILLETE DE SEGURIDAD DE 1/2" EN CABLE PRINCIPAL und 26.00 15.92 413.92
06.01.16.09.08 ARGOLLA DE 2 1/2" x 1/8" PARA CABLE PRINCIPAL und 26.00 15.92 413.92
06.01.16.09.09 ABRAZADERA DE 1 1/2" x 1/4" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 9.58 38.32
06.01.16.09.10 PERNOS DE ANCLAJE DE 3/4" x 6" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 41.84 167.36
06.01.17 PASE AEREO N° 07 L=20.00 m (01 UND), TUBERÍA 2" 7,252.85
06.01.17.01 TRABAJOS PRELIMINARES 13.55
06.01.17.01.01 LIMPIEZA DEL TERRENO MANUAL m2 9.99 0.99 9.89
06.01.17.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.69 0.78 3.66
06.01.17.02 MOVIMIENTO DE TIERRAS 124.75
06.01.17.02.01 EXCAVACION MANUAL m3 3.68 33.90 124.75
06.01.17.03 OBRAS DE CONCRETO SIMPLE 376.85
06.01.17.03.01 SOLADO BASE TORRE DE SUSP. Y CAM. ANCLAJE, E=4", Sin Mezcladora m2 9.25 40.74 376.85
06.01.17.04 OBRAS DE CONCRETO ARMADO 1,682.56
06.01.17.04.01 CONCRETO F'C=210 KG/CM2, TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.47 545.45 256.36
06.01.17.04.02 CONCRETO F'C=175 KG/CM2, ZAPATAS TORRE DE SUSPENSIÓN, Sin Mezcladora m3 1.08 388.61 419.70
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
06.01.17.04.03 CONCRETO F'C=175 KG/CM2, CÁMARA DE ANCLAJE, Sin Mezcladora m3 2.59 388.61 1,006.50
06.01.17.05 ACERO fy= 4200 kg/cm2 322.93
06.01.17.05.01 ACERO DE REFUERZO fy=4200 Kg/cm2, TORRE DE SUSPENSIÓN kg 73.06 4.42 322.93
06.01.17.06 ENCOFRADO Y DESENCOFRADO 1,242.74
06.01.17.06.01 ZAPATAS, TORRES DE SUSPENSIÓN m2 4.56 81.33 370.86
06.01.17.06.02 COLUMNAS, TORRE DE SUSPENSIÓN m2 6.24 61.41 383.20
06.01.17.06.03 CÁMARA DE ANCLAJE m2 8.64 56.56 488.68
06.01.17.07 REVOQUES Y ENLUCIDOS 293.10
06.01.17.07.01 TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 6.24 28.94 180.59
06.01.17.07.02 ZAPATA DE TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 1.81 23.99 43.42
06.01.17.07.03 CÁMARA DE ANCLAJE C/MORTERO 1:5 x 1.5CM m2 2.88 23.99 69.09
06.01.17.08 CABLES TIPO BOA 1,390.62
06.01.17.08.01 CABLE DE ACERO TIPO BOA DE 3/8" m 31.08 27.27 847.55
06.01.17.08.02 CABLE DE ACERO TIPO BOA DE 1/4" m 29.26 18.56 543.07
06.01.17.09 ACCESORIOS VARIOS DE PASE AEREO 1,805.75
06.01.17.09.01 TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=2" m 25.26 10.53 265.99
06.01.17.09.02 TUBERIA POLIETILENO DIA=4" m 25.26 19.27 486.76
06.01.17.09.03 CODO PVC SP 2" x 45° und 4.00 12.28 49.12
06.01.17.09.04 FIERRO LISO MACIZO DE ANCLAJE Ø 3/8", L=0.15m und 2.00 14.14 28.28
06.01.17.09.05 ALAMBRE N°08 kg 10.00 5.26 52.60
06.01.17.09.06 GRAPAS DE 3/8" EN CABLE PRINCIPAL und 6.00 13.42 80.52
06.01.17.09.07 GRILLETE DE SEGURIDAD DE 1/2" EN CABLE PRINCIPAL und 20.00 15.92 318.40
06.01.17.09.08 ARGOLLA DE 2 1/2" x 1/8" PARA CABLE PRINCIPAL und 20.00 15.92 318.40
06.01.17.09.09 ABRAZADERA DE 1 1/2" x 1/4" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 9.58 38.32
06.01.17.09.10 PERNOS DE ANCLAJE DE 3/4" x 6" PARA ANCLAJE SUPERIOR EN COLUMNA und 4.00 41.84 167.36
06.01.18 PASE AEREO N° 08 L=8.00 m (01 UND), TUBERÍA 1 1/2" 3,413.52
06.01.18.01 TRABAJOS PRELIMINARES 8.43
06.01.18.01.01 LIMPIEZA DEL TERRENO MANUAL m2 6.57 0.99 6.50
06.01.18.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.47 0.78 1.93
06.01.18.02 MOVIMIENTO DE TIERRAS 50.17
06.01.18.02.01 EXCAVACION MANUAL m3 1.48 33.90 50.17
06.01.18.03 OBRAS DE CONCRETO SIMPLE 195.96
06.01.18.03.01 SOLADO BASE TORRE DE SUSP. Y CAM. ANCLAJE, E=4", Sin Mezcladora m2 4.81 40.74 195.96
06.01.18.04 OBRAS DE CONCRETO ARMADO 658.53
06.01.18.04.01 CONCRETO F'C=210 KG/CM2, TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.16 545.45 87.27
06.01.18.04.02 CONCRETO F'C=175 KG/CM2, ZAPATAS TORRE DE SUSPENSIÓN, Sin Mezcladora m3 0.42 388.61 163.22
06.01.18.04.03 CONCRETO F'C=175 KG/CM2, CÁMARA DE ANCLAJE, Sin Mezcladora m3 1.05 388.61 408.04
06.01.18.05 ACERO fy= 4200 kg/cm2 107.72
06.01.18.05.01 ACERO DE REFUERZO fy=4200 Kg/cm2, TORRE DE SUSPENSIÓN kg 24.37 4.42 107.72
06.01.18.06 ENCOFRADO Y DESENCOFRADO 635.83
06.01.18.06.01 ZAPATAS, TORRES DE SUSPENSIÓN m2 2.60 81.33 211.46
06.01.18.06.02 COLUMNAS, TORRE DE SUSPENSIÓN m2 2.60 61.41 159.67
06.01.18.06.03 CÁMARA DE ANCLAJE m2 4.68 56.56 264.70
06.01.18.07 REVOQUES Y ENLUCIDOS 134.49
06.01.18.07.01 TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 2.60 28.94 75.24
06.01.18.07.02 ZAPATA DE TORRE DE SUSPENSIÓN C/MORTERO 1:5 x 1.5CM m2 0.85 23.99 20.39
06.01.18.07.03 CÁMARA DE ANCLAJE C/MORTERO 1:5 x 1.5CM m2 1.62 23.99 38.86
06.01.18.08 CABLES TIPO BOA 608.37
06.01.18.08.01 CABLE DE ACERO TIPO BOA DE 3/8" m 15.36 27.27 418.87
06.01.18.08.02 CABLE DE ACERO TIPO BOA DE 1/4" m 10.21 18.56 189.50
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
06.01.20.05.01 VALVULA TIPO GLOBO DE BRONCE DE 2" INC. ACCESORIOS und 4.00 181.25 725.00
06.01.20.05.02 VALVULA TIPO GLOBO DE BRONCE DE 1 1/2" INC. ACCESORIOS und 1.00 145.15 145.15
06.01.20.05.03 VALVULA TIPO GLOBO DE BRONCE DE 1" INC. ACCESORIOS und 1.00 125.59 125.59
06.01.20.05.04 VALVULA TIPO GLOBO DE BRONCE DE 3/4" INC. ACCESORIOS und 4.00 98.20 392.80
06.01.20.06 VARIOS 1,176.58
06.01.20.06.01 FILTRO DE GRAVA DIA. MAX. 1/2" m3 0.10 166.20 16.62
06.01.20.06.02 TAPA SANITARIA METALICA 0.40x0.40x1/8" und 10.00 114.08 1,140.80
06.01.20.06.03 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 2.00 9.58 19.16
06.01.21 VALVULA DE CONTROL (26 UNID) 13,173.51
06.01.21.01 TRABAJOS PRELIMINARES 29.45
06.01.21.01.01 LIMPIEZA DEL TERRENO MANUAL m2 16.64 0.99 16.47
06.01.21.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 16.64 0.78 12.98
06.01.21.02 MOVIMIENTO DE TIERRAS 561.94
06.01.21.02.01 EXCAVACION MANUAL m3 9.98 33.90 338.32
06.01.21.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 16.64 2.25 37.44
06.01.21.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 3.64 18.84 68.58
06.01.21.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 7.93 14.83 117.60
06.01.21.03 OBRAS DE CONCRETO SIMPLE 4,453.15
06.01.21.03.01 CONCRETO F'C=140 KG/CM2, Sin Mezcladora m3 4.18 375.47 1,569.46
06.01.21.03.02 ENCOFRADO Y DESENCOFRADO m2 76.96 37.47 2,883.69
06.01.21.04 REVOQUES Y ENLUCIDOS 558.36
06.01.21.04.01 TARRAJEO INTERIOR C/MORTERO 1:5 x 1.5CM m2 24.96 22.37 558.36
06.01.21.05 SUMINISTRO E INSTALACION DE ACCESORIOS 3,225.11
06.01.21.05.01 VALVULA COMPUERTA DE BRONCE PARA 2" INC. ACCESORIOS und 6.00 209.31 1,255.86
06.01.21.05.02 VALVULA COMPUERTA DE BRONCE PARA 1.5" INC. ACCESORIOS und 6.00 90.45 542.70
06.01.21.05.03 VALVULA COMPUERTA DE BRONCE PARA 1" INC. ACCESORIOS und 9.00 114.85 1,033.65
06.01.21.05.04 VALVULA COMPUERTA DE BRONCE PARA 3/4" INC. ACCESORIOS und 5.00 78.58 392.90
06.01.21.06 VARIOS 4,345.50
06.01.21.06.01 FILTRO DE GRAVA DIA. MAX. 1/2" m3 8.00 166.20 1,329.60
06.01.21.06.02 TAPA SANITARIA METALICA 0.40x0.40x1/8" und 26.00 114.08 2,966.08
06.01.21.06.03 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 5.20 9.58 49.82
06.01.22 CRUCE DE TUBERIA EN ALCANTARILLA L=15.00m, TUBERÍA F°G° 3/4" (04 UND) 3,065.94
06.01.22.01 TRABAJOS PRELIMINARES 47.79
06.01.22.01.01 LIMPIEZA DEL TERRENO MANUAL m2 27.00 0.99 26.73
06.01.22.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 27.00 0.78 21.06
06.01.22.02 MOVIMIENTO DE TIERRAS 132.91
06.01.22.02.01 EXCAVACION MANUAL PARA COLOCACION DE BLOQUE DE CONCRETO m3 2.52 33.90 85.43
06.01.22.02.02 RELLENO DE ZANJA CON MATERIAL PROPIO m3 2.52 18.84 47.48
06.01.22.03 TUBERIA DE FIERRO GALVANIZADO 1,351.80
06.01.22.03.01 TUBERIA DE FIERRO GALVANIZADO Ø1" m 60.00 22.53 1,351.80
06.01.22.04 ACCESORIOS VARIOS 1,533.44
06.01.22.04.01 CODO FIERRO GALVANIZADO DE 3/4" x 90° und 32.00 5.72 183.04
06.01.22.04.02 CODO FIERRO GALVANIZADO DE 3/4" x 45° und 16.00 5.72 91.52
06.01.22.04.03 UNION UNIVERSAL PVC ROSCA DE 3/4" und 8.00 6.28 50.24
06.01.22.04.04 ADAPTADOR UPR PVC DE 3/4" und 8.00 4.68 37.44
06.01.22.04.05 NIPLE DE PVC DE 3/4" x 2" und 8.00 6.18 49.44
06.01.22.04.06 ABRAZADERA DE F°G° DE 3/4" und 36.00 10.18 366.48
06.01.22.04.07 PERNOS PARA ABRAZADERA DE F°G° und 72.00 10.49 755.28
06.01.23 CONEXIONES DOMICILIARIAS (182 UND) SISTEMA LA TOMA 130,738.76
06.01.23.01 TRABAJOS PRELIMINARES 7,645.57
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
07.01.05.05.01 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE MEZCLA 1:2, E=2cm m2 4.24 29.89 126.73
07.01.05.05.02 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E=1.5cm m2 5.60 24.35 136.36
07.01.05.05.03 PINTURA EN MUROS EXTERIORES (DOS MANOS) m2 5.60 9.58 53.65
07.01.05.06 VÁLVULAS Y ACCESORIOS EN CÁMARA CRP-T6 701.59
07.01.05.06.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 1.00 157.78 157.78
07.01.05.06.02 SUMINISTRO E INSTALACIÓN DE ACCESORIOS glb 1.00 543.81 543.81
07.01.06 RESERVORIO RECTANGULAR DE 7.00 m3 (01 UNID) - SISTEMA TUYUPAMPA 15,050.03
07.01.06.01 TRABAJOS PRELIMINARES 48.83
07.01.06.01.01 LIMPIEZA DE TERRENO MANUAL m2 27.59 0.99 27.31
07.01.06.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 27.59 0.78 21.52
07.01.06.02 MOVIMIENTO DE TIERRAS 324.85
07.01.06.02.01 EXCAVACIÓN MANUAL EN TERRENO NORMAL m3 4.93 33.90 167.13
07.01.06.02.02 NIVELACIÓN INTERIOR Y APISONADO m2 29.43 2.25 66.22
07.01.06.02.03 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 6.17 14.83 91.50
07.01.06.03 OBRAS DE CONCRETO SIMPLE 1,130.84
07.01.06.03.01 CONCRETO F'C=140 KG/CM2, Sin Mezcladora m3 0.99 375.47 371.72
07.01.06.03.02 CONCRETO f'c=140 kg/cm2 + 30%PM MAX 3", Sin Mezcladora m3 1.53 381.30 583.39
07.01.06.03.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VEREDA Y CUNETA DE RESERVORIO m2 4.69 37.47 175.73
07.01.06.04 OBRAS DE CONCRETO ARMADO 6,769.95
07.01.06.04.01 CONCRETO F'C=210 KG/CM2, Sin Mezcladora m3 5.35 545.45 2,918.16
07.01.06.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN RESERVORIO m2 50.45 37.47 1,890.36
07.01.06.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 352.51 4.42 1,558.09
07.01.06.04.04 CURADO DE CONCRETO m2 60.20 6.70 403.34
07.01.06.05 REVOQUES, REVESTIMIENTOS Y PINTURA 1,785.89
07.01.06.05.01 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE MEZCLA 1:2, E=1.5cm m2 25.86 27.80 718.91
07.01.06.05.02 TARRAJEO EN EXTERIORES (MORTERO C:A=1:3), E=1.5cm m2 32.08 23.68 759.65
07.01.06.05.03 PINTURA EN MUROS EXTERIORES (DOS MANOS) m2 32.08 9.58 307.33
07.01.06.06 VARIOS 974.57
07.01.06.06.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 2.00 157.78 315.56
07.01.06.06.02 SUM. E INST. DE SISTEMA DE CLORACION POR GOTEO und 1.00 288.43 288.43
07.01.06.06.03 WATER STOP DIAM 6" m 9.77 37.93 370.58
07.01.06.07 ESCALERA TIPO GATO 238.38
07.01.06.07.01 ESCALERA CON PELDAÑOS DE F°G° 5/8" und 1.00 238.38 238.38
07.01.06.08 VALVULAS Y ACCESORIOS EN CAJA DE VALVULAS 2,813.03
07.01.06.08.01 SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE ENTRADA D=2" glb 1.00 830.49 830.49
07.01.06.08.02 SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE SALIDA D=2" glb 1.00 481.16 481.16
07.01.06.08.03 SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE LIMPIEZA Y REBOSE D=2" glb 1.00 571.96 571.96
07.01.06.08.04 SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE VENTILACION D=2" glb 1.00 311.82 311.82
07.01.06.08.05 SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE BY PASS D=2" glb 1.00 617.60 617.60
07.01.06.09 CERCO PERIMETRICO 963.69
07.01.06.09.01 MOVIMIENTO DE TIERRAS 23.73
07.01.06.09.01 EXCAVACIÓN MANUAL EN TERRENO NORMAL m3 0.70 33.90 23.73
07.01.06.09.02 OBRAS DE CONCRETO SIMPLE 266.91
07.01.06.09.02 CONCRETO f'c=140 kg/cm2 + 30%PM MAX 3", Sin Mezcladora m3 0.70 381.30 266.91
07.01.06.09.03 VARIOS 673.05
07.01.06.09.03 CERCO PERIMETRICO C/ALAMBRE DE PUAS glb 1.00 494.57 494.57
07.01.06.09.03 PUERTA EN CERCO PERIMETRICO und 1.00 178.48 178.48
07.01.07 LINEA DE ADUCCION - SISTEMA TUYUPAMPA 1,251.25
07.01.07.01 TRABAJOS PRELIMINARES 79.96
07.01.07.01.01 LIMPIEZA DE TERRENO MANUAL m2 32.40 0.99 32.08
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
08.01.09.03.02 SUM. Y COLOC. DE TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=1.5" m 2,488.00 8.55 21,272.40
08.01.09.03.03 SUM. Y COLOC. DE TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=1" m 1,449.00 5.35 7,752.15 7,752.15 100.00%
08.01.09.03.04 SUM. Y COLOC. DE TUBERIA PVC SP NTP 399.002 CLASE 10, DIA=3/4" m 5,942.00 4.73 28,105.66 5,510.18 19.61% 22,595.48 80.39%
08.01.09.03.05 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS m 12,580.00 1.12 14,089.60 14,089.60 100.00%
08.01.09.04 SUMINISTRO E INSTALACION DE ACCESORIOS 808.39 808.39 100.00%
08.01.09.04.01 TEE PVC SP DE 2" NTP 399.002 und 2.00 13.81 27.62 27.62 100.00%
08.01.09.04.02 TEE PVC SP DE 1 1/2" NTP 399.002 und 11.00 8.61 94.71
08.01.09.04.03 TEE PVC SP DE 1" NTP 399.002 und 5.00 6.01 30.05
08.01.09.04.04 TEE PVC SP DE 3/4" NTP 399.002 und 9.00 4.47 40.23 40.23 100.00%
08.01.09.04.05 TEE PVC SP DE 1/2" NTP 399.002 und 2.00 3.17 6.34 6.34 100.00%
08.01.09.04.06 REDUCCION PVC SP DE 2" a 1 1/2" NTP 399.002 und 4.00 4.35 17.40
08.01.09.04.07 REDUCCION PVC SP DE 2" a 3/4" NTP 399.002 und 8.00 5.74 45.92 45.92 100.00%
08.01.09.04.08 REDUCCION PVC SP DE 2" a 1/2" NTP 399.002 und 12.00 4.93 59.16 59.16 100.00%
08.01.09.04.09 REDUCCIÓN PVC SP DE 3/4" A 1/2" NTP 399.002 und 25.00 2.94 73.50 73.50 100.00%
08.01.09.04.10 REDUCCION PVC SP DE 1 1/2" a 1" NTP 399.002 und 2.00 4.02 8.04 8.04 100.00%
08.01.09.04.11 REDUCCION PVC SP DE 1 1/2" a 3/4" NTP 399.002 und 7.00 3.74 26.18
08.01.09.04.12 REDUCCION PVC SP DE 1 1/2" a 1/2" NTP 399.002 und 5.00 3.74 18.70 14.98 80.11% 3.72 19.89%
08.01.09.04.13 REDUCCION PVC SP DE 1" a 3/4" NTP 399.002 und 9.00 5.80 52.20 52.20 100.00%
08.01.09.04.14 REDUCCION PVC SP DE 1" a 1/2" NTP 399.002 und 11.00 6.10 67.10 67.10 100.00%
08.01.09.04.15 CODO PVC SP 1" x 45° und 6.00 4.88 29.28 29.28 100.00%
08.01.09.04.16 CODO PVC SP 3/4" x 90° und 4.00 4.88 19.52
08.01.09.04.17 CODO PVC SP 1/2" x 90° und 2.00 4.08 8.16
08.01.09.04.18 CODO PVC SP 1" x 90° und 3.00 6.08 18.24
08.01.09.04.19 CODO PVC SP 3/4" x 45° und 12.00 5.08 60.96
08.01.09.04.20 CODO PVC SP 2" x 45° und 7.00 12.28 85.96
08.01.09.04.21 CODO PVC SP 1/2" x 45° und 4.00 4.78 19.12
08.01.10 VALVULA DE AIRE (10 UNID) 4,462.14 4,462.14 100.00%
08.01.10.01 TRABAJOS PRELIMINARES 11.33 11.33 100.00%
08.01.10.01.01 LIMPIEZA DEL TERRENO MANUAL m2 6.40 0.99 6.34 6.34 100.00%
08.01.10.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 6.40 0.78 4.99
08.01.10.02 MOVIMIENTO DE TIERRAS 254.91 254.91 100.00%
08.01.10.02.01 EXCAVACION MANUAL DE TERRENO m3 3.96 33.90 134.24 134.24 100.00%
08.01.10.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 6.40 2.25 14.40 14.40 100.00%
08.01.10.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 1.40 18.84 26.38
08.01.10.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 3.05 14.83 45.23 45.23 100.00%
08.01.10.02.05 EMPEDRADO EXTERIOR SIN MORTERO DE 0.60m x 0.40m m2 2.40 14.44 34.66 34.66 100.00%
08.01.10.03 OBRAS DE CONCRETO SIMPLE 1,713.62 1,240.96 72.42% 472.66 27.58%
08.01.10.03.01 CONCRETO F'C=140 KG/CM2, Sin Mezcladora m3 1.61 375.47 604.51
08.01.10.03.02 ENCOFRADO Y DESENCOFRADO m2 29.60 37.47 1,109.11 1,109.11 100.00%
08.01.10.04 REVOQUES Y ENLUCIDOS 214.75 214.75 100.00%
08.01.10.04.01 TARRAJEO EN EXTERIORES (MORTERO CA 1:5) E=1.5 CM m2 9.60 22.37 214.75 214.75 100.00%
08.01.10.05 SUMINISTRO E INSTALACION DE ACCESORIOS 1,090.95 1,090.95 100.00%
08.01.10.05.01 VALVULA TIPO GLOBO DE BRONCE DE 2" INC. ACCESORIOS und 1.00 181.25 181.25 181.25 100.00%
08.01.10.05.02 VALVULA TIPO GLOBO DE BRONCE DE 1 1/2" INC. ACCESORIOS und 1.00 145.15 145.15
08.01.10.05.03 VALVULA COMPUERTA DE BRONCE PARA 1" INC. ACCESORIOS und 1.00 77.15 77.15
08.01.10.05.04 VALVULA TIPO GLOBO DE BRONCE DE 3/4" INC. ACCESORIOS und 7.00 98.20 687.40
08.01.10.06 VARIOS 1,176.58
08.01.10.06.01 FILTRO DE GRAVA DIA. MAX. 1/2" m3 0.10 166.20 16.62
08.01.10.06.02 TAPA SANITARIA METALICA 0.40x0.40x1/8" und 10.00 114.08 1,140.80
08.01.10.06.03 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 2.00 9.58 19.16
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
08.01.14.04.01 SUMINISTRO E INSTALACION DE CONEXIONES DOMICILIARIAS DE AGUA und 107.00 113.12 12,103.84 10,838.05
08.01.15 INSTALACION DE PILETAS CON LAVADERO (107 UND) - PAMPA GRANDE 48,378.63
08.01.15.01 TRABAJOS PRELIMINARES 204.54
08.01.15.01.01 LIMPIEZA DE TERRENO MANUAL m2 115.56 0.99 114.40
08.01.15.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 115.56 0.78 90.14
08.01.15.02 MOVIMIENTO DE TIERRAS 6,221.19
08.01.15.02.01 EXCAVACION MANUAL DE TERRENO m3 34.67 33.90 1,175.31
08.01.15.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 23.59 18.84 444.44
08.01.15.02.03 CAMA DE ARENA e=0.05m m3 28.89 152.17 4,396.19
08.01.15.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 13.84 14.83 205.25
08.01.15.03 OBRAS DE CONCRETO ARMADO 13,235.07
08.01.15.03.01 CONCRETO f'c=175 kg/cm2, Sin mezcladora m3 11.18 471.38 5,270.03
08.01.15.03.02 ENCOFRADO Y DESENCOFRADO m2 148.20 37.47 5,553.05
08.01.15.03.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 545.70 4.42 2,411.99
08.01.15.04 MUROS Y TABIQUES 5,807.61
08.01.15.04.01 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZC. C:A=1:5, AP. DE SOGA m2 56.18 56.19 3,156.75
08.01.15.04.02 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZC. C:A=1:5, AP. DE CANTO m2 50.56 52.43 2,650.86
08.01.15.05 REVOQUES Y ENLUCIDOS 9,554.43 9,554.43 100.00%
08.01.15.05.01 TARRAJEO PULIDO EN LAVADERO - INTERIORES, CON MORTERO C:A 1:5, E=1.5 CM m2 137.23 22.37 3,069.84 3,069.84 100.00%
08.01.15.05.02 TARRAJEO DE LAVADERO - EXTERIORES, CON MORTERO C:A 1:5, E=1.5 CM m2 278.07 23.32 6,484.59 6,484.59 100.00%
08.01.15.06 CONEXION DOMICILIARIA, INC. VALVULAS Y ACCESORIOS 10,315.87
08.01.15.06.01 ACCESORIOS EN LAVADEROS MULTIUSOS AGUA Y DESAGÜE und 107.00 96.41 10,315.87 9,900.01
08.01.15.07 VARIOS 3,039.92
08.01.15.07.01 PINTURA OCRE COLOR ROJO EN PILETA m2 415.29 7.32 3,039.92
08.01.16 UNIDADES BASICAS CON ARRASTRE HIDRAULICO Y BIODIGESTOR (107 UND) 1,016,881.06
08.01.16.01 ESTRUCTURAS Y ARQUITECTURA 623,485.97
08.01.16.01.01 TRABAJOS PRELIMINARES 1,545.42 1,455.09 94.15% 90.33
08.01.16.01.01 LIMPIEZA DE TERRENO MANUAL m2 873.12 0.99 864.39 810.87 93.81% 53.52
08.01.16.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 873.12 0.78 681.03
08.01.16.01.02 MOVIMIENTO DE TIERRAS 11,465.59
08.01.16.01.02 EXCAVACION MANUAL DE TERRENO PARA CIMIENTOS m3 179.76 33.90 6,093.86
08.01.16.01.02 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO MANUAL) HASTA D. PROM=30m m3 224.70 14.83 3,332.30
08.01.16.01.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 72.47 18.84 1,365.33
08.01.16.01.02 NIVELACIÓN INTERIOR Y APISONADO m2 299.60 2.25 674.10
08.01.16.01.03 OBRAS DE CONCRETO SIMPLE 66,771.30
08.01.16.01.03 CIMIENTOS CORRIDOS MEZCLA C:H 1:10 +30% P.G., Sin mezcladora m3 119.84 233.57 27,991.03
08.01.16.01.03 SOBRECIMIENTOS MEZCLA C:H 1:8 + 25% PM, Sin mezcladora m3 30.09 333.04 10,021.17
08.01.16.01.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 401.25 50.99 20,459.74
08.01.16.01.03 CONCRETO EN FALSO PISO MEZCLA C:H 1:10 E=10CM, Sin Mezcladora m2 333.04 24.92 8,299.36
08.01.16.01.04 OBRAS DE CONCRETO ARMADO 164,581.34
08.01.16.01.04 CONCRETO EN COLUMNAS f'c=175 kg/cm2, Sin mezcladora m3 42.53 526.33 22,384.81
08.01.16.01.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 606.42 61.41 37,240.25
08.01.16.01.04 ACERO DE REFUERZO EN COLUMNAS, FY=4200 KG/CM2 kg 9,360.40 4.42 41,372.97
08.01.16.01.04 CONCRETO EN VIGAS f'c=175 kg/cm2, Sin mezcladora m3 27.61 421.71 11,643.41
08.01.16.01.04 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 342.40 73.68 25,228.03
08.01.16.01.04 ACERO DE REFUERZO EN VIGAS, FY=4200 KG/CM2 kg 6,043.41 4.42 26,711.87
08.01.16.01.05 MUROS Y TABIQUES 90,140.00
08.01.16.01.05 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZC. C:A=1:5, AP. DE SOGA m2 1,604.20 56.19 90,140.00
08.01.16.01.06 REVOQUES Y ENLUCIDOS 77,285.96
08.01.16.01.06 TARRAJEO EN MUROS Y COLUMNAS, MORTERO C:A 1:5, E=1.5 CM m2 2,715.39 23.68 64,300.44
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 82067 EN EL C.P. HUALQUI, DISTRITO D
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
PART. DESCRIPCION
UNID METRADO P.UNIT. PARCIAL PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL
COSTO DIRECTO S/. 14,837,371.71 166,765.32 233,912.42 923,102.78 1,134,211.35 185,758.39 182,817.28
GASTOS GENERALES 28.60% S/. 4,243,221.65 47,691.89 66,894.75 263,990.81 324,364.06 53,123.56 52,282.46
UTILIDAD 7.00% 1,038,616.02 11,673.57 16,373.87 64,617.19 79,394.79 13,003.09 12,797.21
SUB TOTAL S/. 20,119,209.38 226,130.78 317,181.04 1,251,710.78 1,537,970.20 251,885.04 247,896.95
I.G.V. 18.00% S/. 3,621,457.69 40,703.54 57,092.59 225,307.94 276,834.64 45,339.31 44,621.45
VALOR REFERENCIAL S/. 23,740,667.07 266,834.32 1.12% 374,273.63 1.58% 1,477,018.72 6.22% 1,814,804.84 7.64% 297,224.35 1.25% 292,518.40
SUPERVISION Y LIQUIDACION 1.50% S/. 356,110.01
EXPEDIENTE TÉCNICO 40000.00 S/. 40,000.00
PRESUPUESTO TOTAL 24,136,777.08 266,834.32 641,107.95 2,118,126.68 3,932,931.52 4,230,155.87 4,522,674.27
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
68.22% 30,381.22 499.64% 2,216.88 36.46% 932.17 15.33% 0.00 0.00% 0.00 0.00% 693.55 11.41% 1,928,277.27
0.00
323,963.76
5,416.65
5,416.65
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
19,976.00
8,454.84
4,567.41
12,342.27
10,905.33
1,436.94
1.90
1.50
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
38.99
4.32
7.91
13.64
665.98
195.24
361.96
64.43
64.43
543.75
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
1,860.38
631.12
652.40
4,092.46
1,288.66
678.00
859.60
926.88
1,940.64
47.46
47.46
533.82
100.00% 533.82
100.00% 1,359.36
80.01% 200.54 19.99% 1,002.94
53.30
21.38
541.58
151.34
158.16
146.64
239.28
212.40
507,372.43
27,940.18
11,208.78
400,421.40
195,870.60
82,902.20
76,863.80
78,202.46
6,982.65
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
7,752.15
28,105.66
14,089.60
808.39
27.62
0.00
0.00
40.23
6.34
0.00
45.92
59.16
73.50
8.04
18.70
52.20
67.10
29.28
4,462.14
11.33
6.34
254.91
134.24
14.40
45.23
34.66
1,713.62
1,109.11
214.75
214.75
1,090.95
181.25
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
300.65
2050.29% 1,157,906.75 19042.51% 339,262.09 5579.38% 484,145.53 7962.08% 11,407.81 187.61% 58,354.24 959.67% 15,154.70 249.23% 2,216,784.53
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
304.17
270.20
398.18
220.19
100.00% 34.79
26.60% 58.06
1,087.90
665.66
100.00% 422.24
27.32% 1,505.85
375.19
49.12
100.00% 52.60
100.00% 80.52
100.00% 254.72
0.00
100.00% 38.32
100.00% 167.36
100.00% 70,557.50
100.00% 1,514.30
100.00% 2,542.96
45,830.64 100.00% 45,830.64
100.00% 12,275.04
100.00% 6,041.92
100.00% 6,921.44
25.12% 6,414.31 74.88% 8,565.76
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
9,554.43
3,069.84
6,484.59
5.85% 1,545.42
6.19% 864.39
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
1,867.00
25,602.32
25,602.32
80,482.19 100.00% 80,482.19
11,645.88
50,110.24
9,262.99
37,453.11
37,453.11
984.83
550.84
433.99
17,199.73
1,004.82
74,293.94
100.00% 5,325.93
100.00% 11,324.88
7,089.82
6,866.19
7,568.11
7,225.71 100.00% 7,225.71
2,674.02 100.00% 2,674.02
55,138.17
100.00% 12,600.32
100.00% 3,919.41
100.00% 6,227.40
100.00% 9,630.00
N° 82067 EN EL C.P. HUALQUI, DISTRITO DE JESÚS - CAJAMARCA - CAJAMARCA
SUB TOTAL
% PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
138,613.17
606.05 100.00% 606.05
338.98 100.00% 338.98
267.07 100.00% 267.07
8,424.15
1,500.79
14,445.00
3,391.77
9,141.10
1,685.25
36,400.00
17.20% 28,900.00
28,900.00
15,452.45
15,452.45
60,499.21
1.23% 2,112,856.56 8.90% 660,882.99 2.78% 776,152.83 3.27% 18,253.17 0.08% 447,434.42 1.88% 365,984.78 1.54% 8,904,239.01