Documentos de Académico
Documentos de Profesional
Documentos de Cultura
OfficeConnect
t Sta 7 ity
Por 6 = Activ
Gigabit Switch
= 1000
Blue
• Power adapter for use with the Switch 8VA, 27.7 BTU/hr
power requirement
• Stacking clip Gigabit Switch 16
22.5VA, 77.9 BTU/hr
• Four rubber feet power requirement
• This Installation Guide Depth:
• Support and Safety Information sheet Width:
225 mm (8.08 in.)
135.4 mm (5.33 in.)
Height: 6
OfficeConnect
5
4 8
3
®
7010
3C16
2
1
35.35 mm
= Full
On
8
lex 7 nk
Dup 6 Upli
bit
tus 8 5 Giga
This guide will use the term Switch when referring to the OfficeConnect
Sta 4
with
Port 7 ch 8
3
(1.36 in.)
ct Swit
2
6 1
nne
5 Gb
E
ceCo
Offi
4
3 8
2 tus 7 ity
t Sta
OfficeConnect Switch 8
1 Por
6 = Activ
Depth:
5 Flash
4
3 = 10M
w
2 Yello
Gigabit Switch.
1 100M
E n=
Gb Gree
M
= 1000
Width:
Blue
15
8
16
3
2 13
4 5 6
1 2 3
3C1670800A
Port Status Duplex 10-30VDC
On = Full 1A MAX
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
Blue = 1000M Green = 100M Yellow = 10M Flash = Activity OfficeConnect Gigabit Switch 8 OK 8 1
WARNING: Please read the ‘Important Safety Information’ section in 1 Fit the clip across the top of the unit, as shown in Figure 2 (picture 1), There are two slots on the underside of the Switch that can be used for wall To connect OfficeConnect units (such as gateways or other switches) to
the Support and Safety Information sheet before you start. ensuring that the longer sections of the fastening pieces are pointing mounting. The Switch must be mounted with the LEDs facing upwards. your Switch you need:
downwards. • One suitable Twisted Pair (TP) cable for each unit
VORSICHT: Bitte lesen Sie den Abschnitt ‘Wichtige When wall mounting the unit, ensure it is within reach of the power
2 Align the fastening pieces over the slots found on each side of the unit. outlet 3Com recommends Category 5E cable for Gigabit connections.
Sicherheitsinformationen’ sorgfältig durch, bevor Sie das Gerät einschalten.
3 Push the clip down gently to secure it, ensuring that the fastening pieces
AVERTISSEMENT: Veuillez lire attentivement la section "Consignes snap into the slots on the unit. When wall mounting the unit, ensure that the rubber feet are not fixed Workstation Connections
importantes de sécurité" avant de mettre en route. To connect workstations or other equipment (such as servers) directly to
To fit another unit: Mounting Instructions for Cement Walls
When positioning your Switch, ensure: your Switch, you need:
1 Rest the second unit on the top of the clip and align it with the front of 1 Make two holes 150 mm (5.9 in.) apart and insert two nylon or similar
• It is out of direct sunlight and away from sources of heat. 1 One adapter card for each workstation to be connected to a port on
the unit below. screw anchors that are suitable for the wall construction.
the Switch. The adapter card must be capable of communicating at the
• Cabling is away from power lines, fluorescent lighting fixtures, and 2 Press down gently on the unit to secure it onto the clip, ensuring the 2 Fix two suitable screws into the anchors, leaving their heads 3 mm required connection speed. For example, if you want to use a Gigabit
sources of electrical noise such as radios, transmitters and broadband fastening pieces fit into the slots on the unit below, as shown in Figure 2 (0.12 in.) clear of the wall surface. The screws should be at least 30 mm connection, you must install a 1000BASE-T adapter card. 3Com
amplifiers. (picture 2). (1.2 in.) long, produce a range of easy to install 1000BASE-T Network adapter cards.
• Water or moisture cannot enter the case of the unit. 3 Remove any connections in the Switch and locate it over the screw heads. 2 An operating system (for example Netware or Windows
• Air flow around the unit and through the vents in the side of the case is When in line, gently push the Switch on to the wall and move it 95/98/Me/2000/XP) with network support configured, running on your
not restricted. 3Com recommends you provide a minimum of 25 mm downwards to secure. workstations.
1 2
(1 in.) clearance. Fastening
Piece Mounting Instructions for Wood Walls 3 One suitable Twisted Pair cable for each workstation.
Using the Rubber Feet 1 Make two holes 150 mm (5.9 in.) apart.
Fastening
Use the four self-adhesive rubber feet to prevent your Switch from moving Piece
2 Fix two suitable screws directly into the wall, leaving their heads 3 mm
around on your desk, or when stacking with flat top OfficeConnect units. (0.12 in.) clear of the wall surface. The screws should be at least 20 mm 1
Only stick the feet to the marked areas at each corner on the underside of (0.75 in.) long, 3
your Switch. 3 Remove any connections in the Switch and locate it over the screw heads.
When in line, gently push the Switch on to the wall and move it 2
Using a Stacking Clip
downwards to secure.
Use a stacking clip when stacking your Switch with other curved
OfficeConnect units. The stacking clip allows you to stack units neatly and Figure 2 Stacking Your Units together
securely. CAUTION: When making connections, be careful not to push the x
Yellown = 1000
Gree
3C1670
00 Full
= 10/1 Full
500A
t Sw
itch
5
Duple 5 Gigabi
Yellow
5
= 10M
Flash
= Act
ivity
M or
must be stacked above larger units. CAUTION: Only wall mount single units, do not wall mount
= 100
Green