Sequence Pekerjaan Test Pile, Galian, Piling, Dan RC
Sequence Pekerjaan Test Pile, Galian, Piling, Dan RC
TEST PILE
1 BTF (2 TITIK)
4 ABR (8 TITIK)
5 INLET (1 TITIK)
6 CLARIFIER (1 TITIK)
7 CCT (1 TITIK)
CMC
SEQUENCE
GALIAN
1. ABR
2. INLET&ODOR
3. ABR EDB
4. NTF FPS AND BTF FPS
5. CCT
6. CLARIFIER
7. SITE WASTE PUMP&
SEPTAGE RECEIVAL
STATION
8. SDB
CMC
SEQUENCE
PILING
PILING RIG 1
1. ABR (ZONA 1-2)
2. ODOR
3. BTF
4. NTF FPS
5. BTF FPS
PILING RIG 2
1. ABR EDB
2. INLET
3. ABR (ZONA 3-4)
4. CCT
5. CLARIFIER
CMC
SEQUENCE
RC
1. ABR
2. ABR EDB
3. INLET&ODOR
4. BTF
5. BTF FPS&NTF FPS
6. CCT
7. CLARIFIER