CRONOGRAMA GENERAL -MES 1 MES 0 MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14

ITEM -S7 -S6 -S5 -S4 -S3 -S2 -S1 S0 S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S16 S17 S18 S19 S20 S21 S22 S23 S24 S25 S26 S27 S28 S29 S30 S31 S32 S33 S34 S35 S36 S37 S38 S39 S40 S41 S42 S43 S44 S45 S46 S47 S48 S49 S50 S51 S52 S53 S54 S55 S56
DEMOLICIÓN DE ESTRUCTURA EXISTENTE X X X X X
EXCAVACIÓN MASIVA X X X X X X X X X X X X X X X X X X
MOVIMIENTO DE EXCAVACIÓN DE BANQUETAS X X X X X X X X X X X X X X X X X X
TIERRAS ELIMINACIÓN DE RAMPA x X X
EXCAV. LOCALES X X X X
MURO ANCLADO X X X X X X X X X X X X X X X X X X X X
ZAPATAS X X X
CIMENTACIÓN CISTERNA X X X X
PERSONAL DE CONSTRUCTORA
DUCTOS Y LOSA CONTRATERRENO X X X X X
180
SÓTANO X X X X X X X X X X
ESTRUCTURA 160
EDIFICIO
140
X X X X X X X X X
SÓTANO X X X X X X X X X X X X
ACABADOS HÚMEDOS 120
EDIFICIO 100 X X X X X X X X X X X X X
SÓTANO 80 X X X X X X X X X X X X X X
ACABADOS SECOS
EDIFICIO 60 X X X X X X X X X X X X X X X X X
INSTALACIONES 40 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
20
EQUIPAMIENTO X X X X X X X X X X X X X
0
OBRAS EXTERIORES -MES 1 MES 0 MES 1 MES X
2 X X X X X X X X X X X X X X

PERSONAL TOTAL DE CONSTRUCTORA POR MES 0 0 37 38 38 57 67 118 117 170 132 143 143 71 45 0
OBRA :
CLIENTE:
HECHO POR:

CRONOGRAMA GENERAL -SEMANA 4 -SEMANA 3 -SEMANA 2 -SEMANA 1 SEMANA 0 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8 SEMANA 9 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 13 SEMANA 14 SEMANA 15 SEMANA 16 SEMANA 17 SEMANA 18 SEMANA 19 SEMANA 20 SEMANA 21 SEMANA 22 SEMANA 23 SEMANA 24 SEMANA 25 SEMANA 26 SEMANA 27 SEMANA 28 SEMANA 29 SEMANA 30 SEMANA 31 SEMANA 32 SEMANA 33 SEMANA 34 SEMANA 35 SEMANA 36 SEMANA 37 SEMANA 38 SEMANA 39 SEMANA 40 SEMANA 41 SEMANA 42 SEMANA 43 ###
ITEM PARTIDAS -24 -23 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216
ESTRUCTURA EXISTENTE

DESMONTAJES X X X X X
DEMOLICIÓN DE SUPERESTRUCTURAS X X X X
DEMOLICIÓN DE

DEMOLICIÓN DE SÓTANOS X X X X
DEMOLICIÓN DE PISCINA X X X X
DEMOLICIÓN DE PAREDES PERIMÉTRICAS X X X X X
DEMOLICIÓN DE CIMENTACIÓN EXISTENTE X X X X X
CARGÍO Y ELIMINACIÓN DE MATERIAL X X X X X X X X X X X X X X X X X X
LIMPIEZA Y DESBROCE 3 3 2
EXCAVACIÓN MASIVA

EXCAVACIÓN HASTA EL NIVEL -SOT1 1 4 4 4 4 4 4 4 4 4 4 4 4 4


EXCAVACIÓN HASTA EL NIVEL -SOT2 4 4 4 4 4 4 4 4 4 4 4 4 4
EXCAVACIÓN HASTA EL NIVEL -SOT3 4 4 4 4 4 4 4 4 4 4 4 4 4
EXCAVACIÓN HASTA EL NIVEL -SOT4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
EXCAVACIÓN HASTA EL NIVEL -SOT5 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
EXCAVACIÓN HASTA EL NIVEL -SOT6 4 4 4 4 4 4 4 4 4
RETIRO DE BANQUETAS ANILLO 1 2 2 2 2 2 2 2 2 2 2 2 2 2
RETIRO DE BANQUETAS ANILLO 2 2 2 2 2 2 2 2 2 2 2 2 2 2
EXCAVACIÓN DE
BANQUETAS

RETIRO DE BANQUETAS ANILLO 3 2 2 2 2 2 2 2 2 2 2 2 2 2


MOVIMIENTO DE TIERRAS

RETIRO DE BANQUETAS ANILLO 4 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2


RETIRO DE BANQUETAS ANILLO 5 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
RETIRO DE BANQUETAS ANILLO 6 2 2 2 2 2 2 2 2 2 2
RETIRO DE BANQUETAS ANILLO 7 (SIN ANCLAJE) 2 2 2 2 2 2 2 2 2
EXCAVACIÓN DE RAMPA NIVEL -SOT1 1 1
ELIMINACIÓN DE

EXCAVACIÓN DE RAMPA NIVEL -SOT2 1 1


RAMPA

EXCAVACIÓN DE RAMPA NIVEL -SOT3 1 1


EXCAVACIÓN DE RAMPA NIVEL -SOT4
EXCAVACIÓN DE RAMPA NIVEL -SOT5
EXCAVACIÓN DE RAMPA NIVEL -SOT6
EXCAVACIÓN DE CISTERNA 16 16 16 16 8
EXCAVACIÓN DE CIMIENTOS AISLADOS 10 10 10 10 10 10 10 10 10 10
LOCALES
EXCAV.

PERFILADO DE CISTERNA 2 2 2 2
PERFILADO DE CIMIENTOS AISLADOS 2 2 2 2 2 2 2 2 2 2
EXCAVACIÓN DE DUCTOS DE EXTRACCIÓN DE CO 1 1 1 1 1 1 1 4 4 2
PERFORACIÓN E INYECCIÓN DE BULBO X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
PERFILADO, DESQUINCHE Y PICA DE CHUTE 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
COLOCACIÓN DE ACERO 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
ANCLADO
MURO

ENCOFRADO DE MURO CONTRATERRENO 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14


VACIADO DE CONCRETO DE MURO CONTRATERRENO 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
DESENCOFRADO DE MUROS X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
TENSADO DE PAÑO X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
PERFILADO Y PAÑETEO DE CIMENTACIÓN X X X X X X X X X X
ZAPATA

SOLADO DE CIMENTACIÓN 5 5 5 5 5 5 5 5 5 5
ACERO DE ZAPATA 2 2 2 2 2 2 2 2 2 2
CONCRETO DE ZAPATA 4 4 4 4 4 4 4 4 4 4
PERFILADO Y PAÑETEO DE CIMENTACIÓN X X X X
SOLADO DE CIMENTACIÓN 5 5 5 5
ACERO DE ZAPATA 4 4 4 4
CONCRETO DE ZAPATA 4 4 4 4
CISTERNA

ACERO DE VERTICALES 4 4 4 4
ENCOFRADO DE VERTICALES 8 8 8 8
CIMENTACIÓN

CONCRETO DE VERTICALES + LOSA DE PISO 10


IMPERMEABILIZACION DE CISTERNA 4 4 4 4
ENCOFRADO DE TECHO 10 10 10 10
ACERO DE TECHO 6 6 6 6
CONCRETO DE TECHO 6 6 6 6
RELLENO EN EXCAVACIONES PROFUNDAS 6 6 6 6 6 6 6 6 6 6 6 6 6
ACERO EN DUCTOS DE EXTRACCIÓN DE CO 2 2 2 2 2 2 2 2 2 2 2 2 2
ENCOFRADO DE DUCTOS DE EXTRACCIÓN DE CO 2 2 2 2 2 2 2 2 2 2 2 2 2
DUCTOS Y LOSA

CONCRETO EN DUCTOS DE EXTRACCIÓN DE CO 4 4 4 4 4 4 4 4 4 4 4 4 4


RELLENO EN EXCAVACIONES SUPERFICIALES 2 2 2 2 2 2 2 2 2 2 2 2 2
COMPACTADO DE RAZANTE 1 1 1 1 1 1 1 1 1 1 1 1 1
ENCOFRADO DE LOSA DE SOTANO 2 2 2 2 2 2 2 2
CONCRETO DE LOSA DE SOTANO 10 10 10 10 10 10 10 10
CORTE DE LOSA DE SOTANO 2 2 2 2 2 2 2 2
ACERO DE VERTICALES 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
ENCOFRADO DE VERTICALES 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 6
CONCRETO DE VERTICALES 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 6
SOTANO

ENCOFRADO DE LOSA MACIZA 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38


ACERO DE LOSA MACIZA 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
INSTALACIONES EN LOSA MACIZA 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
CONCRETO DE LOSA MACIZA 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17
ESTRUCTURA

Acero en columnas yplacas 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38

Encofrado en columnas y placas 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27

Concreto en columnas y placas 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11

Encofrado fondo de vigas 1S1 1S2 1S3 1S4 1S5 1S6 2S1 2S2 2S3 2S4 2S5 2S6 3S1 3S2 3S3 3S4 3S5 3S6 4S1 4S2 4S3 4S4 4S5 4S6 5S1 5S2 5S3 5S4 5S5 5S6 6S1 6S2 6S3 6S4 6S5 6S6 7S1 7S2 7S3 7S4 7S5 7S6

Acero en vigas
EDIFICIO

1S1 1S2 1S3 1S4 1S5 1S6 2S1 2S2 2S3 2S4 2S5 2S6 3S1 3S2 3S3 3S4 3S5 3S6 4S1 4S2 4S3 4S4 4S5 4S6 5S1 5S2 5S3 5S4 5S5 5S6 6S1 6S2 6S3 6S4 6S5 6S6 7S1 7S2 7S3 7S4 7S5 7S6

Encofrado costado de vigas 1S1 1S2 1S3 1S4 1S5 1S6 2S1 2S2 2S3 2S4 2S5 2S6 3S1 3S2 3S3 3S4 3S5 3S6 4S1 4S2 4S3 4S4 4S5 4S6 5S1 5S2 5S3 5S4 5S5 5S6 6S1 6S2 6S3 6S4 6S5 6S6 7S1 7S2 7S3 7S4 7S5 7S6

Encofrado fondo de losas 1S1 1S2 1S3 1S4 1S5 1S6 2S1 2S2 2S3 2S4 2S5 2S6 3S1 3S2 3S3 3S4 3S5 3S6 4S1 4S2 4S3 4S4 4S5 4S6 5S1 5S2 5S3 5S4 5S5 5S6 6S1 6S2 6S3 6S4 6S5 6S6 7S1 7S2 7S3 7S4 7S5 7S6

Colocacion de acero el losas 1S1 1S2 1S3 1S4 1S5 1S6 2S1 2S2 2S3 2S4 2S5 2S6 3S1 3S2 3S3 3S4 3S5 3S6 4S1 4S2 4S3 4S4 4S5 4S6 5S1 5S2 5S3 5S4 5S5 5S6 6S1 6S2 6S3 6S4 6S5 6S6 7S1 7S2 7S3 7S4 7S5 7S6

II.EE y II.SS en losas 1S1 1S2 1S3 1S4 1S5 1S6 2S1 2S2 2S3 2S4 2S5 2S6 3S1 3S2 3S3 3S4 3S5 3S6 4S1 4S2 4S3 4S4 4S5 4S6 5S1 5S2 5S3 5S4 5S5 5S6 6S1 6S2 6S3 6S4 6S5 6S6 7S1 7S2 7S3 7S4 7S5 7S6

Concreto en losas 1S1 1S2 1S3 1S4 1S5 1S6 2S1 2S2 2S3 2S4 2S5 2S6 3S1 3S2 3S3 3S4 3S5 3S6 4S1 4S2 4S3 4S4 4S5 4S6 5S1 5S2 5S3 5S4 5S5 5S6 6S1 6S2 6S3 6S4 6S5 6S6 7S1 7S2 7S3 7S4 7S5 7S6

Desencofrado de vigas 1S1 1S2 1S3 1S4 1S5 1S6 2S1 2S2 2S3 2S4 2S5 2S6 3S1 3S2 3S3 3S4 3S5 3S6 4S1 4S2 4S3 4S4 4S5 4S6 5S1 5S2 5S3 5S4 5S5 5S6 6S1 6S2 6S3 6S4 6S5 6S6 7S1 7S2 7S3 7S4 7S5 7S6

F.C.R.SOLAQUEO DE TECHO / FALSO CIELO 6 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4


MUROS DE LADRILLO (EMPLANTILLADO) 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
MUROS DE LADRILLO (PRIMERA ALTURA) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
MUROS DE LADRILLO (SEGUNDA ALTURA) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
MUROBLOQUES DE CONCRETO (UNICON) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
SÓTANO

PLACAS P-7 (MINERA LUREN) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2


SOLAQUEO DE MUROS 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
TARRAJEO MUROS 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
COLOCACIÓN DE CARPINTERÍA METÁLICA X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
CONTRAPISOS 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
PISO
ACABADOS HÚMEDOS

PISOS DE CEMENTO REFORZADO CON ENDURECEDOR 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2


PORCELANATO DE ALTO TRÁNSITO 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
F.C.R.SOLAQUEO DE TECHO / FALSO CIELO 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
MUROS DE LADRILLO (EMPLANTILLADO) 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
MUROS DE LADRILLO (PRIMERA ALTURA) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
MUROS DE LADRILLO (SEGUNDA ALTURA) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
BLOQUES DE CONCRETO (UNICON) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
MUROPLACAS P-7 (MINERA LUREN) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
EDIFICIO

SOLAQUEO DE MUROS 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
TARRAJEO MUROS / TARRAJEO RAYADO 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
ZÓCALO DE PORCELANATO 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
CERÁMICOS ESMALTADOS CON JUNTA TOMADA 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
COLOCACIÓN DE CARPINTERÍA METÁLICA X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
CONTRAPISOS 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
PISO
PISOS DE CEMENTO REFORZADO CON ENDURECEDOR 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
PORCELANATO DE ALTO TRÁNSITO 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
SUSPENDIDO PLACAS DE YESO CON JUNTA TOMADA X X X X X X X X X X X X X X X X X X X X X X X X X X X X
F.C.R.
PINTURA DE TECHOS X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
MUROPINTURA LATEX EN MUROS X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
COLOCACIÓN DE TOPELLANTAS X X X X X X X X X X X X X X X X X X X X
PISO
PINTURA DE CARPINTERÍA METÁLICA X X X X X X X X X X X X X X X X X X X X
SÓTANO

COLOCACIÓN DE MARCOS Y PUERTAS DE MADERA X X X X X X X X X X X X X X X X X X X X X X X X X X X X


COLOCACIÓN DE REJILLAS Y DIFUSORES X X X X X X X X X X X X X X X X X X X X
COLOCACIÓN DE CRISTALERÍA (MAMPARAS Y VENTANAS) X X X X X X X X X X X X X X X X X X X X X X X X X X X X
OTROS
COLOCACIÓN DE LUMINARIAS 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
COLOCACIÓN DE APARATOS SANITARIOS 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
COLOCACIÓN DE ACCESORIOS SANITARIOS 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
ESTRUCTURA DE SUSPENDIDO X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
F.C.R.PLANCHAS DE YESO EN F.C.R. CON JUNTA TOMADA X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
ACABADOS SECOS

PINTURA DE TECHOS X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
PINTURA LATEX EN MUROS X X X X X X X X X X X X X X X X X X X X X
ESMALTE SINTÉTICO SEMIMATE X X X X X X X X X X X X X X X X X X X X X
REVESTIMIENTO DE VINÍLICO EN MUROS X X X X X X X X X X X X X X X X
MURO
ZOCALO DE VINÍLICO X X X X X X X X X X X X X X X X
ZÓCALO SANITARIO DE VINÍLICO X X X X X X X X X X X X X X X X
REVESTIMIENTO ACÚSTICO X X X X X X X X X X X
EDIFICIO

PISO VINÍLICO DE ALTO TRÁNSITO X X X X X X


PISO PISO VINÍLICO DE ALTO TRÁNSITO CON RESISTENCIA A QUÍMICOS X X X X X X
PINTURA DE CARPINTERÍA METÁLICA X X X
COLOCACIÓN DE CRISTALERÍA (MAMPARAS Y VENTANAS)
COLOCACIÓN DE MARCOS Y PUERTAS DE MADERA
COLOCACIÓN DE REJILLAS Y DIFUSORES
OTROS
COLOCACIÓN DE LUMINARIAS
COLOCACIÓN DE APARATOS SANITARIOS
COLOCACIÓN DE ACCESORIOS SANITARIOS
COLOCACIÓN DE SEÑALETICA

0 0 0 0 0 4 37 37 37 37 37 38 37 37 38 37 38 37 37 53 57 67 62 66 64 114 110 118 110 93 101 111 117 170 169 104 104 114 120 132 128 139 143 71 71 71 61 45 ###
TOTAL DE MANO DE OBRA DE CONSTRUCTORA
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3 3 4 4 6 12 20 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 38 38 37 37 37 37 37 37 37 37 37 37 38 38 37 37 37 37 37 37 37 37 38 38 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 53 53 53 53 57 49 49 57 59 63 67 62 62 58 47 47 47 37 42 52 60 66 64 54 54 48 56 80 111 113 114 110 110 110 110 110 110 116 118 116 114 110 110 110 107 95 93 93 93 93 93 93 99 97 101 101 101 103 105 111 111 111 111 111 111 115 117 117 117 117 121 170 169 131 121 104 104 104 104 104 104 104 104 104 104 104 104 104 104 104 104 114 114 120 120 120 118 120 132 132 132 130 128 122 126 127 127 139 139 135 133 135 143 80 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 61 61 53 53 51 47 45 29 29 29 29 29
EXTRAPOLACIÓN PARA PROYECTO
AREAS m2 256.00 TORRE

CANTIDADES TOTALES TORRE METRADOS


Concreto m3 -
Encofrado m2 -
Acero kg -
ELEMENTOS HORIZONTALES (LOSAS Y VIGAS) TORRE TORRE
Concreto m3 64.00 9.00
Encofrado m2 291.10 43.00
Acero kg 7,533.72 2,500.00
RATIOS TORRE
Encofrado m2/m2 1.14
Acero kg/m2 29.43
ELEMENTOS VERTICALES TORRE TORRE
Concreto m3 34.60 20.00
Encofrado m2 224.00 100.00
Acero kg 5,379.37 2,000.00
RATIOS TORRE
Encofrado m2/m2 0.88
Acero kg/m2 21.01
TORRE CONSIDERACIONES

RATIO PERSONAL JORNADA DE 8 HORAS


#DIV/0! 9.00
#DIV/0! 19.00
#DIV/0! 23.00
RATIO PERSONAL
1.8700 3.00
1.1900 7.00
0.0400 13.00
23.00

RATIO PERSONAL
2.3900 6.00
0.9400 12.00
0.0400 10.00
28.00
RENDIMIENTO
# OBREROS
# HORAS POR CUADRILLA
DESCRIPCION DE LA ACTIVIDAD UND CAPATAZ OPERARIO OFICIAL AYUDANTE POR VELOCIDAD
DIA ( HH /
CUADRILLA
UND )

COLUMNAS - H > 6.00 mt M2 0.10 1.00 1.00 2.10 8.50 10.00 1.79

PLACAS - H > 6.00 mt. M2 0.10 1.00 1.00 2.10 8.50 13.00 1.37

VIGAS - COSTADO - H > 6.00 mt. M2 0.10 1.00 1.00 2.10 8.50 10.00 1.79

VIGAS - FONDO - H > 6.00 mt. M2 0.10 1.00 1.00 2.10 8.50 10.00 1.79

LOSAS MACIZAS - H > 6.00 mt. M2 0.10 1.00 1.00 2.10 8.50 12.00 1.49

LOSAS ALIGERADAS - H > 6.00 mt. M2 0.10 1.00 1.00 2.10 8.50 7.00 2.55

MUROS DE SOSTENIMIENTO M2 0.10 1.00 1.00 2.10 8.50 25.00 0.71

SUBZAPATAS M2 0.10 1.00 1.00 2.10 8.50 20.00 0.89

CIMIENTOS CORRIDOS M2 0.10 1.00 1.00 2.10 8.50 8.50 2.10

ZAPATAS M2 0.10 1.00 1.00 2.10 8.50 4.50 3.97

VIGAS DE CIMENTACION M2 0.10 1.00 1.00 2.10 8.50 8.00 2.23

LOSA SOBRE TERRENO M2 0.10 1.00 1.00 2.10 8.50 3.00 5.95

CANALETAS M2 0.10 1.00 1.00 2.10 8.50 18.00 0.99

CISTERNA M2 0.10 1.00 1.00 2.10 8.50 25.00 0.71

LOSAS MACIZAS - H < 3.00 mt. M2 0.10 1.00 1.00 2.10 8.50 15.00 1.19

LOSAS ALIGERADAS - H < 3.00 mt. M2 0.10 1.00 1.00 2.10 8.50 18.00 0.99

VIGAS - COSTADO - H < 6.00 mt. M2 0.10 1.00 1.00 2.10 8.50 10.00 1.79

VIGAS - FONDO - H < 6.00 mt. M2 0.10 1.00 1.00 2.10 8.50 3.60 4.96
RENDIMIENTO
# OBREROS
# HORAS POR CUADRILLA
DESCRIPCION DE LA ACTIVIDAD UND CAPATAZ OPERARIO OFICIAL AYUDANTE POR VELOCIDAD
DIA ( HH /
CUADRILLA
UND )

ESCALERAS M2 0.10 1.00 1.00 2.10 8.50 10.00 1.79


# OBREROS
Descripciòn de la Actividad OBRA CAPATAZ OPERARIO OFICIAL AYUDANTE POR
CUADRILLA

PROYECTO 1 0.50 2.00 4.00 6.50

CONCRETO - SUBZAPATAS M3 PROYECTO 2 0.50 2.00 1.00 8.00 11.50

PROYECTO 3 0.10 2.00 4.00 6.10

PROYECTO 1 0.50 2.00 3.00 5.50

CONCRETO - SOLADOS M2 PROYECTO 2 0.50 2.00 1.00 8.00 11.50

PROYECTO 3 0.20 2.00 5.00 7.20

PROYECTO 1 0.50 2.00 3.00 5.50

CONCRETO - CIMIENTOS CORRIDOS M3 PROYECTO 2 0.50 1.00 1.00 10.00 12.50

PROYECTO 3 0.10 2.00 4.00 6.10

PROYECTO 1 0.50 2.00 3.00 5.50

CONCRETO - ZAPATAS M3 PROYECTO 2 0.50 2.00 5.00 7.50

PROYECTO 3 0.10 2.00 3.00 5.10

PROYECTO 1 0.50 2.00 3.00 5.50

CONCRETO - VIGAS DE CIMENTACION M3 PROYECTO 2 0.50 2.00 5.00 7.50

PROYECTO 3 0.10 2.00 3.00 5.10

PROYECTO 1 0.50 3.00 3.00 6.50

CONCRETO - COLUMNAS M3 PROYECTO 2 0.50 2.00 4.00 6.50

PROYECTO 3 0.10 2.00 4.00 6.10

PROYECTO 1 0.50 4.00 3.00 7.50

CONCRETO - PLACAS M3 PROYECTO 2 0.50 4.00 3.00 7.50


# OBREROS
Descripciòn de la Actividad OBRA CAPATAZ OPERARIO OFICIAL AYUDANTE POR
CONCRETO - PLACAS M3 CUADRILLA

PROYECTO 3 0.10 2.00 5.00 7.10

PROYECTO 1 0.50 4.00 3.00 7.50

CONCRETO - MUROS DE SOSTENIMIENTO M3 PROYECTO 2 0.10 1.00 2.00 6.00 9.10

PROYECTO 3 0.10 2.00 5.00 7.10

PROYECTO 1 0.50 4.00 3.00 7.50

CONCRETO - CISTERNA M3 PROYECTO 2 0.50 2.00 2.00 3.00 7.50

PROYECTO 3 0.10 2.00 5.00 7.10

PROYECTO 1 0.50 5.00 3.00 2.00 10.50

CONCRETO - VIGAS M3 PROYECTO 2 0.50 5.00 3.00 2.00 10.50

PROYECTO 3 0.10 6.00 4.00 10.10

PROYECTO 1 0.50 5.00 3.00 2.00 10.50

CONCRETO - LOSAS MACIZAS M3 PROYECTO 2 0.50 4.00 3.00 3.00 10.50

PROYECTO 3 0.10 7.27 4.00 11.37

PROYECTO 1 0.50 5.00 3.00 2.00 10.50

CONCRETO - LOSAS ALIGERADAS M3 PROYECTO 2 0.00

PROYECTO 3 0.10 7.27 4.00 11.37

PROYECTO 1 0.50 3.00 3.00 6.50

CONCRETO EN ESCALERAS M3 PROYECTO 2 0.50 1.00 2.00 3.00 6.50

PROYECTO 3 0.10 3.00 3.00 6.10

PROYECTO 1 0.50 2.00 6.00 8.50

CONCRETO EN CANALETAS M3
# OBREROS
Descripciòn de la Actividad OBRA CAPATAZ OPERARIO OFICIAL AYUDANTE POR
CUADRILLA

CONCRETO EN CANALETAS M3 PROYECTO 2 0.50 2.00 2.00 3.00 7.50

PROYECTO 3 0.10 3.00 4.00 7.10

PROYECTO 1 0.50 5.00 3.00 2.00 10.50

CONCRETO EN LOSA SOBRE TERRENO M3 PROYECTO 2 0.50 11.00 1.00 8.00 20.50

PROYECTO 3 0.10 2.00 4.00 6.10


RENDIMIENTO RENDIMIENTO
CUADRILLA ( CUADRILLA
UND / DIA ) ( HH / UND )

40.00 1.30

20.00 4.60

40.00 1.22

80.00 0.55

200.00 0.46

100.00 0.58

40.00 1.10

17.50 5.71

50.00 0.98

45.00 0.98

50.00 1.20

45.00 0.91

45.00 0.98

50.00 1.20

50.00 0.82

18.00 2.89

23.00 2.26

19.00 2.57

30.00 2.00

30.00 2.00
RENDIMIENTO RENDIMIENTO
CUADRILLA ( CUADRILLA
UND / DIA ) ( HH / UND )

33.20 1.71

30.00 2.00

40.00 1.82

30.00 1.89

30.00 2.00

30.00 2.00

30.00 1.89

45.00 1.87

40.00 2.10

41.00 1.97

45.00 1.87

45.00 1.87

41.00 2.22

45.00 1.87

1.00 0.00

41.00 2.22

30.00 1.73

30.00 1.73

38.00 1.28

16.00 4.25
RENDIMIENTO RENDIMIENTO
CUADRILLA ( CUADRILLA
UND / DIA ) ( HH / UND )

40.00 1.50

6.50 8.74

20.00 4.20

40.00 4.10

45.00 1.08