Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Boletín Abril 2019 PDF
Boletín Abril 2019 PDF
B-SGI-0419
BOLETÍN MENSUAL
Abril 2019
CONTENIDO
4. INTERCONEXIONES
5. HORAS DE CONGESTIÓN EN LOS PRINCIPALES EQUIPOS DE TRANSMISIÓN ABRIL 2018 - ABRIL 2019
7. MANTENIMIENTOS EJECUTADOS
9. COMPENSACIÓN A TRANSMISORAS
9.1. COMPENSACIÓN A TRANSMISORAS POR PEAJE DE CONEXIÓN Y TRANSMISION, SISTEMA PRINCIPAL
Y SISTEMA GARANTIZADO DE TRANSMISIÓN
9.2. PORCENTAJE DE COMPENSACIÓN POR PEAJE DE CONEXIÓN Y TRANSMISIÓN
9.3. COMPENSACIÓN A TRANSMISORAS POR INGRESO TARIFARIO DEL SISTEMA PRINCIPAL Y
SISTEMA GARANTIZADO DE TRANSMISIÓN
9.4. PORCENTAJE DE COMPENSACIÓN POR INGRESO TARIFARIO
HUAURA POWER 12,175.694 12,175.694 7,693.995 58.25% 18.647 9.000 18.402 107.18%
HYDRO PATAPO 593.128 593.128 0.989 -
INLAND 64,531.554 64,531.554 62,536.226 3.19% 91.585 88.961 89.501 2.95%
IYEPSA 291.308 291.308 3,558.175 -91.81% - - -
KALLPA 368,757.050 107,034.183 475,791.234 656,257.076 -27.50% 879.637 1,044.612 1,036.948 -15.79%
MAJA ENERGIA 1,502.153 1,502.153 2,555.728 -41.22% 2.170 3.716 2.410 -41.60%
MOQUEGUA FV 3,445.851 3,445.851 3,716.123 -7.27% - - -
ORAZUL ENERGY PERÚ 233,560.333 9,943.629 243,503.962 245,526.948 -0.82% 353.536 353.421 347.551 0.03%
P.E. MARCONA 14,534.084 14,534.084 11,094.475 31.00% 4.935 26.574 24.817 -81.43%
P.E. TRES HERMANAS 43,598.644 43,598.644 36,452.785 19.60% 23.803 88.915 79.651 -73.23%
PANAMERICANA SOLAR 3,741.927 3,741.927 4,005.657 -6.58% - - -
PETRAMAS 4,672.042 4,672.042 3,876.637 20.52% 4.894 4.409 8.003 11.01%
PLANTA ETEN 22.320 22.320 - - - -
RIO DOBLE 13,556.964 13,556.964 13,151.689 3.08% 18.767 18.943 18.803 -0.93%
SAMAY I 389.986 389.986 339.726 14.79% - - -
SAN GABAN 40,233.359 40,233.359 79,222.128 -49.21% - 110.792 110.867 -100.00%
SAN JACINTO - - - 3.860
SANTA ANA 10,615.650 10,615.650 14,084.476 -24.63% - 19.976 19.980 -100.00%
SANTA CRUZ 21,469.567 21,469.567 22,232.217 -3.43% 26.436 26.819 32.648 -1.43%
SDF ENERGIA 19,842.992 19,842.992 19,614.166 1.17% 27.615 27.352 27.528 0.96%
SHOUGESA 1,258.783 1,258.783 - - - 28.874
SINERSA 5,829.028 5,829.028 5,942.144 -1.90% 8.253 8.808 7.520 -6.30%
STATKRAFT 223,908.446 223,908.446 256,069.488 -12.56% 328.356 400.794 338.760 -18.07%
TACNA SOLAR 3,677.709 3,677.709 4,057.737 -9.37% - - -
TERMOCHILCA 171,995.985 171,995.985 124,977.119 286.815 293.382 290.163 -2.24%
TERMOSELVA 8,165.754 8,165.754 3,049.849 167.74% - - -
TOTAL 2,884,800.79 1,061,469.32 400,085.73 4,346,355.85 4,207,898.12 3.29% 6,917.74 6,710.67 6,990.67 3.09%
TOTAL DEMANDA DEL SEIN 4,346,357.57 4,207,898.12 3.29% 6,917.739 6,710.67 6,990.67 3.09%
● Cuadro N°1: Producción de energía eléctrica y máxima potencia coincidente por empresa generadora.
● Máxima Potencia calculada durante los periodos de hora punta acorde al PR-30 y PR-43.
(1) Ingreso a operación comercial de la unidad G1 de la C.H. Zaña, propiedad de ELECTROZAÑA S.A.C. a partir de las 00:00 horas del 15.02.2019
(2) Ingreso a operación comercial de la C.H. Patapo, propiedad de HYDROPATAPO. a partir de las 00:00 horas del 15.03.2019
(3) Ingreso a operación comercial de la C.H. Callahuanca, propiedad de la empresa ENEL GENERACIÓN PERÚ.a partir de las 00:00 horas del 30.03.2019
(4) Se incluye la operación por pruebas de la C.T. San Jacinto , propiedad de la empresa AGROINDUSTRIAS SAN JACINTO S.A.A.a partir de las 00:00 horas del 13.04.2019.
Página 1
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
1.3. PARTICIPACIÓN POR EMPRESAS EN LA PRODUCCIÓN TOTAL DE ENERGÍA DEL MES DE ABRIL DEL 2019
CHINANGO SDF ENERGIA
CELEPSA EGEMSA INLAND P.E. TRES HERMANAS EMGE HUANZA
3.02% 0.46%
3.47% 2.73% 1.48% 1.00% 0.76% EMGE JUNÍN
0.59% P.E. MARCONA
ENEL GREEN POWER PERU ENERGÍA EÓLICASAN GABAN
1.81% 0.33%
1.01% 0.93% SANTA CRUZ
GEPSA
ENEL GENERACION PIURA 0.49% HIDROELECTRICA HUANCHOR
FENIX POWER EGASA 0.73%
0.91% 0.32%
3.53% 2.07%
EGESUR AGUA AZUL
0.32% 0.32%
TERMOCHILCA
3.96% RIO DOBLE
0.31%
HIDROMARAÑON/ CELEPSA
RENOVABLES
STATKRAFT 0.31%
5.15%
SANTA ANA
0.24%
ORAZUL ENERGY PERÚ
5.60% HUAURA POWER
0.28%
ELECTRO ZAÑA
0.24%
ANDEAN POWER
0.234%
TERMOSELVA
EMGE HUALLAGA
0.19%
7.09%
AIPSA
0.18%
SINERSA
0.13%
ELECTROPERU
KALLPA 13.89% AGROAURORA
10.95% 0.12%
PETRAMAS
0.11%
PANAMERICANA SOLAR
0.09%
ENGIE
11.93% TACNA SOLAR
ENEL GENERACION
PERU 0.08%
12.10% ELECTRICA SANTA ROSAHIDROCAÑETE
0.00% 0.05% GTS MAJES
0.08%
IYEPSA MAJA ENERGIA
0.01% 0.03% MOQUEGUA FV
0.08%
SAMAY I
HYDRO PATAPO GTS REPARTICION
0.01%
0.01% 0.08%
GRAFICO N° 1.2
SHOUGESA ELECTRICA YANAPAMPA EGECSAC
0.03% 0.06% 0.08%
Gráfico N° 1: Participación de cada empresa generadora en la producción de energía eléctrica en el mes de abril 2019.
MW Variación
6800 12.0%
6600
10.0%
6400
8.0%
6200
Gráfico N° 2: Evolución de la máxima potencia coincidente mensual en bornes de generación periodo 2017-2019
Página 2
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
1.5. COMPARACIÓN DE LA COBERTURA DE LA MÁXIMA DEMANDA POR TIPO DE GENERACIÓN (SIN CONSIDERAR LA IMPORTACIÓN DESDE ECUADOR)
MW
▲
7000 -15.29% 425.81
502.65
6000
▲ 19.20% 2,294.15
∇ -5%
1,924.61
5000
4000
GENERACIÓN RER
3000 TERMOELÉCTRICAS
▲
-2.00%
4,283.42 4,197.78
2000 HIDROELÉCTRICAS
1000
− 1,1%
0
2018 2019
DIA: 24/04/2018 DIA: 23/04/2019
HORA: 18:45 HORA: 18:45
Gráfico N°3: Comparación de la cobertura del tipo de generación en la máxima demanda coincidente en abril
6,000
5,000
4,000
3,000
2,000
1,000
Gráfico N°4: Cobertura del tipo de recurso energético en el diagrama de carga del día de maxima potencia coincidente abril 2019
CCOMB
28.830% TG
MCI
4.115%
0.290%
TV
0.379%
AEROGENERADOR
2.207%
HIDRO
64.180%
Gráfico N°5: Cobertura del tipo de tecnología en la máxima potencia coincidente abril 2019
Página 3
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
Máxima potencia coincidente (MW) Energía producida mensual (GWh) Acumulado anual (GWh)
Abr-2019 Abr-2018
Día: Día:
Tipo de Generación Variación Variación Variación
23/04/2019 24/04/2018 Abr-2019 Abr-2018 2019 2018
abr 19/ abr 18 abr 19/ abr 18 2019/2018
HORA: 18:45 HORA: 18:45
Hidráulica 4,197.777 4,283.415 -1.999% 2,884.801 2,884.687 0.004% 11,042.493 11,108.511 -0.594%
Gas Natural de Camisea 2,196.063 1,876.254 17.045% 1,011.139 967.579 4.502% 4,749.722 4,169.057 13.928%
Gas Natural de Malacas 0.000 48.357 -100.000% 8.123 25.312 -67.911% 132.745 140.738 -5.680%
Gas Natural de Aguaytía 0.000 0.000 8.166 3.050 167.743% 53.411 68.649 -22.197%
Gas Natural de La Isla (*) 0.000 0.000 0.000 0.000
Diesel 2 98.084 0.000 32.783 8.233 298.204% 90.140 51.004 76.731%
Carbón 0.000 0.000 0.000 6.667 -100.000% 18.283 26.902 -32.036%
Residual 500 0.000 0.000 1.259 0.000 37.968 1.750 2069.133%
Residual 6 0.000 0.000 0.000 0.011 -100.000% 0.065 1.405 -95.400%
Total Generación sin RER 6,491.924 6,208.026 4.573% 3,946.270 3,895.538 1.302% 16,124.825 15,568.015 3.577%
Hidráulica 242.044 174.450 38.747% 175.429 127.832 37.234% 646.467 473.008 36.672%
Aerogenerador 152.691 309.015 -50.588% 149.552 115.011 30.033% 504.790 386.689 30.541%
Solar 0.000 0.000 57.145 58.172 -1.764% 231.073 226.186 2.161%
Biogás 4.894 4.409 11.006% 4.672 3.877 20.518% 22.499 16.667 34.994%
Biomasa - Bagazo 26.185 14.774 77.235% 13.287 7.469 77.902% 43.877 27.996 56.726%
Total Generación RER 425.815 502.649 -15.286% 400.086 312.360 28.085% 1,448.706 1,130.545 28.142%
Exportación hacia Ecuador 0.000 0.000 0.000 0.000 0.000 0.000
Importación desde Ecuador 0.000 0.000 1.721 0.000 2.273 2.121 7.193%
Intercambios Internacionales 0.000 0.000 1.721 0.000 2.273 2.121 7.193%
TOTALES CONSIDERANDO INTERCAMBIOS
6,917.739 6,710.675 3.086% 4,348.077 4,207.898 3.33% 17,575.805 16,700.681 5.240%
INTERNACIONALES
Cuadro N°3: Detalle de recurso energético
(*) La Isla: Yacimiento ubicado en el Distrito de Colán, Provincia Paita, Región Piura que abastece a la central termoeléctrica Tablazo de SDE PIURA S.A.C.
Nota:
La clasificación presentada en la utilización de recursos renovables se encuentra conformada por las las siguientes centrales:
Hidro: C.H. Carhuaquero IV, Caña Brava, C.H. La Joya, C.H. Santa Cruz I,II, C.H. Poechos II, C.H. Roncador, C.H. Purmacana, C.H. Renovandes H1, C.H. Her I, C.C.H.H. Angel I, II , III,
C.H. Huasahuasi I, C.H. Huasahuasi II, C.H. Nueva Imperial, ,C.H. Yanapampa, C.H. Las Pizarras, C.H. Runatullo III, C.H. Runatullo II, C.H. Canchayllo, C.H. Potrero, C.H. Carhuac., C.H. Zaña
Eólico: Parque Eólico Marcona, Parque Eólico Talara, Parque Eólico Cupisnique y Parque Eólico Tres Hermanas, Parque Eólico Wayra
Bagazo: C.T. Paramonga, C.T. Maple Etanol (RER No Adjudicada)
Biogás : C.T. Huaycoloro, C.T. La Gringa V, C.T. Doña Catalina (Residuos sólidos urbanos)
Solar : C.S. Majes, C.S. Repartición, C.S. Tacna Solar , C.S. Panamericana Solar y Moquegua FV, C.S. Rub, C.S. Intipampa
G
G Diesel 2
R
C 1.418%
Otros
7.573% Residual 500
0.000%
Generación RER
Hidráulica 6.155%
60.681%
Gráfico N°6: Participación de los recursos energéticos en la máxima potencia coincidente de abril 2019
Diesel 2
0.754%
G…
Residual 6
0.000% Carbón
0.000%
Otros
10.363%
Residual 500
0.029%
Generación RER
Hidráulica 9.205%
66.373%
Gráfico N°7: Participación de los recursos energéticos en la producción de energía eléctrica de abril 2019
Página 4
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
100%
80%
60%
40%
20%
0%
ENERO 17
ENERO 18
ENERO 19
JUNIO 17
JUNIO 18
JULIO 17
JULIO 18
AGOSTO 17
AGOSTO 18
SETIEMBRE 17
SETIEMBRE 18
NOVIEMBRE 17
NOVIEMBRE 18
FEBRERO 17
FEBRERO 18
FEBRERO 19
MARZO 17
MARZO 18
MARZO 19
ABRIL 17
ABRIL 18
ABRIL 19
MAYO 17
MAYO 18
OCTUBRE 17
OCTUBRE 18
DICIEMBRE 17
DICIEMBRE 18
Gráfico N°8: Evolución de la utilización de los recursos energéticos en la producción de energía eléctrica periodo 2017-2019
Página 5
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
Página 6
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
VOLUMEN VOLUMEN
VARIACION
LAGUNA/ EMBALSE ÚTIL ÚTIL
%
30-04-2019 30-04-2018
Represa Aguada Blanca 27.351 22.976 -14.61%
Represa El Frayle 121.102 122.667 -5.26%
Represa El Pañe 100.325 100.507 -0.82%
Represa Pillones 81.031 79.873 1.46%
Represa Bamputañe 31.776 39.849 -32.71%
Represa Challhuanca 26.050 26.100 1.32%
Laguna Sibinacocha 108.940 101.890 -3.60%
Laguna Aricota 237.212 226.112 5.14%
Lagunas San Gaban 33.250 31.730 0.74%
Lago Junín 335.737 314.741 -8.05%
Lagunas ELECTROPERU 184.630 208.050 -16.85%
Lago Viconga 22.537 25.701 -22.52%
Lagunas STATKRAFT 66.114 56.022 28.14%
Pomacocha 27.906 28.446 -36.58%
Lagunas Cullicocha (ORAZUL) 6.078 6.142 -23.20%
Lagunas Aguashcocha (ORAZUL) 7.567 7.656 -30.80%
Lagunas Rajucolta (ORAZUL) 0.827 0.414 28.99%
Lagunas ENEL 224.244 208.667 11.09%
Laguna Yuracmayo 46.575 48.956 -21.89%
Laguna Paucarcocha 67.332 64.263 -2.78%
Gallito Ciego 381.831 331.944 54.13%
Cuadro N°9: Volúmen útil de los principales embalses y lagunas del SEIN al término del periodo mensual (30 de abril)
350
300
250
200
150
100
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
semanas
Gráfico N°12: Evolución semanal del volumen del lago JUNÍN durante los años 2015 - 2019
Página 7
BOLETIN
BOLETIN MENSUAL- ABRIL 2019 MENSUAL-
ABRIL 2019
250
200
150
100
50
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
semanas
Gráfico N°13: Evolución semanal del volumen de las lagunas de ENEL durante los años 2015 - 2019
400
350
300
250
200
150
2015 2016 2017 2018 2019
100
50
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
semanas
Gráfico N°14 Evolución semanal del volumen de los embalses de EGASA durante los años 2015 - 2019.
Página 8
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
400
350
300
250
200
150
100
50
0
1 4 8 12 16 20 24 28 32 36 39 43 48 52 4 8 12 16 20 24 28 32 36 40 44 48 52 4 8 12 16 20 24 28 32 35 40 44 48 52 4 8 14 18
2016 2017 2018 2019
SEMANAS
Gráfico N°15: Evolución del promedio semanal de caudales de los ríos SANTA, CHANCAY y PATIVILCA en los años 2016 - 2019.
Página 9
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
m3/s
50
CAUDALES DE LOS RÍOS RÍMAC Y SANTA EULALIA
45
40
35
30
25
20
15
10
5
0
1 4 8 12 16 20 24 28 32 36 39 43 48 52 4 8 12 16 20 24 28 32 36 40 44 48 52 4 8 12 16 20 24 28 32 35 40 44 48 52 4 8 14 18
2016 2017 2018 2019
RÍMAC SANTA EULALIA SEMANAS
Gráfico N°16: Evolución del promedio semanal de caudales de los ríos RÍMAC y SANTA EULALIA en los años 2016 - 2018.
600
500
400
300
200
100
0
1 4 8 12 16 20 24 28 32 36 39 43 48 52 4 8 12 16 20 24 28 32 36 40 44 48 52 4 8 12 16 20 24 28 32 35 40 44 48 52 4 8 14 18
2016 2017 2018 2019
MANTARO TULUMAYO TARMA SEMANAS
Gráfico N°17: Evolución del promedio semanal de caudales de los ríos MANTARO, TULUMAYO y TARMA en los años 2016 - 2019.
25
20
15
10
0
1 4 8 12 16 20 24 28 32 36 39 43 48 52 4 8 12 16 20 24 28 32 36 40 44 48 52 4 8 12 16 20 24 28 32 35 40 44 48 52 4 8 14 18
2016 2017 2018 2019
TURBINADO CHARCANI V INGRESO ARICOTA SEMANAS
Gráfico N°18: Evolución del promedio semanal de caudales de las cuencas CHILI y ARICOTA en los años 2016 - 2019.
500
400
300
200
100
0
1 4 8 12 16 20 24 28 32 36 39 43 48 52 4 8 12 16 20 24 28 32 36 40 44 48 52 4 8 12 16 20 24 28 32 35 40 44 48 52 4 8 14 18
2016 2017 2018 2019
NATURAL VILCANOTA NATURAL SAN GABÁN SEMANAS
Gráfico N°19: Evolución del promedio semanal de caudales VILCANOTA y SAN GABÁN en los años 2016 - 2019.
Página 10
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
4. INTERCONEXIONES
600
500
400
300
200
100
0
SEM 01 SEM 02 SEM 03 SEM 04 SEM 05 SEM 06 SEM 07 SEM 08 SEM 09 SEM 10 SEM 11 SEM 12 SEM 13 SEM 14 SEM 15 SEM 16 SEM 17 SEM 18
Gráfico N°20: Potencia máxima transmitida por semana en el enlace centro - norte
1,200
1,000
800
600
400
200
0
SEM 01 SEM 02 SEM 03 SEM 04 SEM 05 SEM 06 SEM 07 SEM 08 SEM 09 SEM 10 SEM 11 SEM 12 SEM 13 SEM 14 SEM 15 SEM 16 SEM 17 SEM 18
Gráfico N°21: Potencia máxima transmitida por semana en el enlace centro - sur
ENLACE 220 kV ENLACE 500 kV
Página 11
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
5. HORAS DE CONGESTIÓN EN LOS PRINCIPALES EQUIPOS DE TRANSMISIÓN ABRIL 2018 - ABRIL 2019
SAN
POMACOCH CARAPONGO- HUACHO - LA NIÑA - CARHUAMAYO
ENLACE COMBAPATA- JUAN - HUANZA- S.E. S.E. MARCONA - SANTA ROSA-
MES CENTRO SUR QUENCORO
A- CALLAHUANC PARAMONGA PIURA POMACOCHA
SANTA CARABAYLLO INDEPENDECIA MARCONA SAN NICOLAS CHAVARRÍA
- OROYA
CARHUAMAY A NUEVA OESTE - SAN JUAN NUEVA
ROSA N.
O
Febrero 2018 0.00 0.00 0.00 0.00 0.00 0.00 8.40 0.58 0.00 48.93 0.00 3.03 6.93 12.80
Marzo 2018 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.33 0.00 0.00 7.90 18.47
Abril 2018 0.00 0.00 0.00 0.00 0.00 0.00 76.60 0.00 67.77 78.90 0.00 0.00 0.00 0.00
Mayo 2018 0.00 0.00 0.00 0.00 0.00 0.00 12.93 0.00 6.85 0.00 0.00 0.27 0.50 0.00
Junio 2018 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.80 0.00
Julio 2018 14.13 0.00 0.00 0.00 0.00 0.00 0.00 7.05 0.00 0.00 0.00 0.00 0.00 0.00
Agosto 2018 0.00 0.00 0.00 0.00 0.00 0.00 10.47 7.25 0.00 0.00 8.28 0.00 0.00 0.00
Setiembre 2018 0.00 0.00 0.00 0.00 16.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Octubre 2018 0.00 0.00 0.00 0.00 0.00 0.00 40.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Noviembre 2018 0.00 0.00 0.00 0.00 0.00 0.00 102.20 0.00 2.27 13.30 7.48 18.97 19.28 2.43
Diciembre 2018 0.00 0.00 0.00 0.00 0.00 0.00 56.20 0.00 0.00 0.00 0.00 295.13 0.00 39.83
Enero 2019 0.00 0.00 0.00 0.00 0.00 7.98 70.33 0.00 6.23 3.27 0.00 195.98 0.00 41.15
Febrero 2019 0.00 0.00 0.00 0.00 0.00 0.00 104.40 0.00 76.33 18.40 513.35 0.00 8.13 0.00
Marzo 2019 0.00 0.00 0.00 0.00 0.00 0.00 1.07 0.00 0.53 10.67 38.40 0.00 0.00 2.13
Abril 2019 0.00 1.12 2.87 1.60 0.00 0.00 26.77 0.00 14.27 0.00 13.82 0.00 0.00 0.00
TOTAL (HORAS) 14.133 1.120 2.870 1.600 16.133 7.983 510.233 14.883 174.253 174.800 581.337 513.387 47.550 116.817
Cuadro N°12: Horas de congestión de los principales equipos de transmisión del SEIN en los últimos 15 meses.
700
600
500
400
300
200
100
0
Febrero Marzo 2018 Abril 2018 Mayo 2018 Junio 2018 Julio 2018 Agosto 2018 Setiembre Octubre Noviembre Diciembre Enero 2019 Febrero 2019 Marzo 2019 Abril 2019
2018 2018 2018 2018 2018
ENLACE HUACHO - PARAMONGA NUEVA LA NIÑA - PIURA OESTE POMACOCHA - SAN JUAN
CENTRO SUR
Gráfico N°22: Horas de congestión en los últimos 15 meses de los principales equipos de transmisión del SEIN.
Página 12
B-SGI-
0419
BOLETIN MENSUAL- ABRIL 2019
Fecha:
21/05/201
250.0
225.0
200.0
175.0
150.0
125.0
100.0
COSTO MARGINAL
MEDIA MÓVIL 12
COSTO MARGINAL
PROMEDIO MENSUAL
75.0 PRECIO DE LA
ENERGIA EN BARRA
50.0
25.0
0.0
Ene 08
Mar 08
Jul 08
Set 08
Nov 08
Ene 09
Mar 09
Jul 09
Set 09
Nov 09
Ene 10
Mar 10
Jul 10
Nov 10
Ene 11
Mar 11
Jul 11
Set 11
Nov 11
Ene 12
Mar 12
Jul 12
Set 12
Nov 12
Ene 13
Mar 13
Jul 13
Set 13
Nov 13
Ene 14
Mar 14
Jul 14
Set 14
Nov 14
Ene 15
Mar 15
Jul 15
Set 15
Nov 15
Ene 16
Mar 16
Jul 16
Set 16
Nov 16
Ene 17
Mar 17
Jul 17
Set 17
Nov 17
Ene 18
Mar 18
Jul 18
Set 18
Nov 18
Ene 19
Mar 19
May 08
May 09
May 10
Set-10
May 11
May 12
May 13
May 14
May 15
May 16
May 17
May 18
Gráfico N°23: Evolución de los costos marginales promedio mensual en la barra Santa Rosa, tarifa en barra y tasa de cambio al cierre de cada mes.
Cuadro N°13: Variación de los costos marginales promedio mensual en la barra Santa Rosa.
Página 13
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
350.00
300.00
250.00
200.00
150.00
100.00
50.00
0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
DIAS
TUMBES - R6 CHILINA SULZ 12 - R500 D2 SAN NICOLAS TV 1 - R500
RECKA TG1 - D2 RF ETEN TG1 - D2 RF ILO2 TG1 - D2
CHILINA TG - D2
Gráfico N°24: Evolución de los costos marginales diarios de los principales modos de operación con combustible líquido en el mes de abril 2019
EVOLUCIÓN DE LOS COSTOS VARIABLES PROMEDIOS Y COSTO MARGINAL DE CORTO PLAZO ABRIL 2019
USD/MWh
12
10
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
DIAS
Gráfico N°25: Evolución de los costos marginales diarios de los principales modos de operación con Gas Natural en el mes de abril 2019 y costo marginal de corto plazo.
Página 14
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
Área Norte
Cmg (USD/MWh)
12.00
10.00
8.00
6.00
4.00
2.00
0.00
PIURA OESTE 220 CHICLAYO 220 TRUJILLO 220 CHIMBOTE1 138 CAJAMARCA 220
MAXIMO MEDIO MINIMO
Gráfico N°26: Costos marginales registrados en las principales barras del área norte durante el mes de abril
Área Centro
Cmg (USD/MWh)
14.00
9.00
4.00
-1.00
CHAVARRIA 220 SANTA ROSA 220 SAN JUAN 220 CARABAYLLO 220 INDEPENDENCIA 220 POMACOCHA 220 OROYA NUEVA 50
-6.00
Gráfico N°27: Costos marginales registrados en las principales barras del área centro durante el mes de abril
Área Sur
Cmg (USD/MWh)
14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00
TINTAYA NUEVA 220 PUNO 138 SOCABAYA 220 MOQUEGUA 138 DOLORESPATA 138 COTARUSE 220 SAN GABAN 138
Gráfico N°28: Costos marginales registrados en las principales barras del área sur durante el mes de abril
Página 15
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
7. MANTENIMIENTOS EJECUTADOS
EMPRESA CENTRAL UNIDAD DESCRIPCION DEL MANTENIMIENTO INICIO FINAL DURACION OBSERVACIONES
MANTENIMIENTO ELECTRICO
MANTENIMIENTO TOTAL DEL GENERADOR CON EXTRACCION DEL ROTOR
ABC CON APOYO DE TALLER TURBINAS Y PERSONAL DEL TURBO MANTENIMIENTO
ELECTRICOMANTENIMIENTO TOTAL DEL GENERADOR CON EXTRACCION DEL
ROTORABC CON APOYO DE TALLER TURBINAS Y PERSONAL DEL TURBO
MANTENIMIENTO ANUAL.REVISION PARCIAL DEL GENERADOR MANTENIMIENTO
AGROINDUSTRIAS SAN JACINTO S A ANUAL
SAN JACINTO CENTRAL 1/04/2019 00:00 1/05/2019 00:00 720 NO PROGRAMADO
A REVISION PARCIAL DEL GENERADOR REVISION DEL GENERADOR ABC CON
APOYO DE TALLER DE TURBINAS Y PERSONAL DEL TURBO MANTENIMIENTO
GENERAL DE LAS CALDERAS Y LINEAS DE VAPOR REVISION PARCIAL TURBINA
PRUEBAS EN FRIO Y CALIENTE MANTENIMIENTO GENERAL DE LAS CALDERAS Y
LINEAS DE VAPOR CAMBIO DE ACEITE TURBO REVISION PARCIAL TURBINA
PRUEBAS EN FRIO Y CALIENTE MANTENIMIENTO GENERAL DE LAS CALDERAS Y
LINEAS DE VAPOR
ELECTROPERU MANTARO G7 MANTENIMIENTO MAYOR GENERADOR 6/04/2019 00:00 8/04/2019 20:32 68.5 PROGRAMADO
ELECTROPERU RESTITUCIÓN G2 MANTENIMIENTO MAYOR GENERADOR 13/04/2019 00:09 14/04/2019 18:45 42.6 PROGRAMADO
EMPRESA DE GENERACION
RENOVANDES H1 G1 MANTENIMIENTO DEL GENERADOR (COJINETE DE GRUPO) 19/04/2019 07:06 26/04/2019 19:08 180 NO PROGRAMADO
ELECTRICA SANTA ANA
ENEL GENERACION PERU S.A.A. VENTANILLA TV INSPECCIÓN NO DESTRUCTIVA . NDE. INSPECCIÓN MAYOR 100 EOH 16/04/2019 00:00 1/05/2019 00:00 360 PROGRAMADO
ENEL GENERACION PIURA S.A. MALACAS TG4 REEMPLAZO DE AVR Y SFC REVISIÓN ALARMA POR FALLA TIERRA ROTOR. 21/04/2019 18:40 1/05/2019 00:00
ENGIE CHILCA 2 TV42 MANTENIMIENTO ANUAL DE UNIDAD Y SISTEMAS AUXILIARES 12/04/2019 00:00 23/04/2019 00:00 264 PROGRAMADO
ENGIE ILO 4 CENTRAL MANTENIMIENTO BOP/UPS/DC (TODA LA PLANTA F/S ) 18/04/2019 00:00 19/04/2019 22:19 46.3 PROGRAMADO
ENGIE ILO 4 TG41 TG41 - MANTENIMIENTO ANUAL 13/04/2019 00:00 18/04/2019 00:00 120 PROGRAMADO
ENGIE ILO 4 TG42 TG42 - MANTENIMIENTO ANUAL 18/04/2019 00:00 23/04/2019 00:00 120 PROGRAMADO
ENGIE ILO 4 TG43 TG43 - MANTENIMIENTO ANUAL MANTENIMIENTO SISTEMA DE VIRADO. 23/04/2019 00:00 29/04/2019 21:39 165.7 PROGRAMADO
FENIX POWER PERÚ FENIX GT11 BALANCEO DE TURBINA TG11 POR TRASIENTE TERMICO 16/04/2019 00:00 18/04/2019 00:00 48 NO PROGRAMADO
KALLPA GENERACION S.A. KALLPA TV MANTENIMIENTO MAYOR DE TURBINA A VAPOR DE LA CT KALLPA. 1/04/2019 00:00 1/05/2019 00:00 720 PROGRAMADO
Página 16
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
EMPRESA CENTRAL UNIDAD DESCRIPCION DEL MANTENIMIENTO INICIO FINAL DURACION OBSERVACIONES
PETRAMAS CT DOÑA CATALINA G1 MANTENIMIENTO DE 4000 HRS 4/04/2019 05:06 5/04/2019 11:40 30.6 PROGRAMADO
PETRAMAS CT DOÑA CATALINA G1 SALIDA DE SERVICIO POR CUMPLIMIENTO DE META. 24/04/2019 00:36 30/04/2019 21:48 165.2 NO PROGRAMADO
PETRAMAS CT DOÑA CATALINA G2 MANTENIMIENTO DE 5000 HRS 11/04/2019 05:37 13/04/2019 09:24 51.8 PROGRAMADO
PETRAMAS CT DOÑA CATALINA G2 SALIDA DE SERVICIO POR CUMPLIMIENTO DE META 24/04/2019 00:34 30/04/2019 21:45 165.2 NO PROGRAMADO
MANTENIMIENTO DE 53000 HRS SALIDA DE SERVICIO POR CUMPLIMIENTO DE
PETRAMAS HUAYCOLORO G1 22/04/2019 05:04 30/04/2019 20:01 207 PROGRAMADO
META
PETRAMAS HUAYCOLORO G2 MANTENIMIENTO DE 52000 HRS 8/04/2019 04:23 9/04/2019 14:31 34.1 PROGRAMADO
PETRAMAS HUAYCOLORO G2 SALIDA DE SERVICIO POR CUMPLIMIENTO DE META. 24/04/2019 00:37 30/04/2019 20:02 163.4 NO PROGRAMADO
PETRAMAS LA GRINGA V G2 MANTENIMIENTO DE 23000 HRS 16/04/2019 04:19 17/04/2019 20:13 39.9 PROGRAMADO
RETIRO DEL INYECTOR N°1 DEL GRUPO N°1. INSPECCION Y RETIRO DE INYECTOR
STATKRAFT S.A CHEVES G1 13/04/2019 07:04 14/04/2019 20:00 36.9 NO PROGRAMADO
1-4 DE LA UNIDAD N?1
STATKRAFT S.A OROYA G1 REBOBINADO DE LA UNIDAD GENERADORA 1/04/2019 00:00 6/04/2019 00:00
STATKRAFT S.A OROYA G1 REBOBINADO DE LA UNIDAD GENERADORA. 13/04/2019 00:00 17/04/2019 09:30
N° de mantenimientos
mayores
12
10 EJECUTADOS NO PROGRAMADOS
8 PROGRAMADOS NO EJECUTADOS
6 PROGRAMADOS EJECUTADOS
● En abril 2019 se programaron 42 actividades de mantenimientos mayores de generación, de las cuales 31 se ejecutaron por parte de las empresas según lo previsto. Asimismo, se ejecutaron 13 mantenimientos
mayores no programados. Por lo cual se considera que se cumplió con el programa de mantenimiento mensual en un 73,81%.
● Se considera la Resolución OSINERG N° 221-2011-OC/CD “Procedimiento para la supervisión de la Gestión de la Coordinación y de la Programación de los programas mensuales de mantenimiento mayor de la
Actividad de Generación aprobados por el COES SINAC” vigente a partir de enero 2012.
Página 17
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
ENTREGAS- ENTREGAS-
EMPRESAS ENTREGAS RETIROS EMPRESAS ENTREGAS RETIROS
RETIROS RETIROS
AGRO INDUSTRIAL PARAMONGA 8,029.244 0.000 8,029.244 AGRO INDUSTRIAL PARAMONGA 184,533.383 0.000 184,533.383
AGROAURORA S.A.C. 5,238.063 10,408.567 -5,170.504 AGROAURORA S.A.C. 132,819.152 256,258.552 -123,439.400
AGROINDUSTRIAS SAN JACINTO S A A 0.000 0.000 AGROINDUSTRIAS SAN JACINTO S A A 0.000 0.000
ANDEAN POWER S.A.C. 9,933.117 9,933.117 ANDEAN POWER S.A.C. 235,745.441 235,745.441
CELEPSA 149,772.124 132,675.781 17,096.343 CELEPSA 3,401,546.481 3,142,682.545 258,863.936
CELEPSA RENOVABLES S.R.L. 13,255.496 13,255.496 CELEPSA RENOVABLES S.R.L. 304,581.958 304,581.958
CHINANGO S.A.C. 129,755.831 44,768.617 84,987.214 CHINANGO S.A.C. 2,835,697.989 1,119,118.901 1,716,579.088
EGASA 88,626.504 60,474.228 28,152.275 EGASA 2,161,875.812 1,507,522.603 654,353.209
EGEMSA 117,540.304 62,926.773 54,613.531 EGEMSA 2,607,749.296 1,506,536.197 1,101,213.099
EGESUR 13,585.912 14,921.976 -1,336.064 EGESUR 341,865.683 371,344.652 -29,478.969
ELECTRICA SANTA ROSA 128.500 10,757.839 -10,629.339 ELECTRICA SANTA ROSA 2,993.640 264,221.419 -261,227.779
ELECTRICA YANAPAMPA SAC 2,417.420 2,417.420 ELECTRICA YANAPAMPA SAC 56,200.317 56,200.317
ELECTRO ZAÑA S.A.C. 9,838.908 9,838.908 ELECTRO ZAÑA S.A.C. 240,316.386 240,316.386
ELECTROPERU 599,790.303 453,163.083 146,627.220 ELECTROPERU 13,341,169.768 11,202,610.460 2,138,559.308
EMPRESA DE GENERACION ELECTRICA CANCHAYLLO SAC 3,418.942 3,418.942 EMPRESA DE GENERACION ELECTRICA CANCHAYLLO SAC 76,111.956 76,111.956
EMPRESA DE GENERACION ELECTRICA DE JUNIN 25,098.275 0.000 25,098.275 EMPRESA DE GENERACION ELECTRICA DE JUNIN 563,286.236 0.000 563,286.236
EMPRESA DE GENERACION ELECTRICA SANTA ANA 10,377.148 10,377.148 EMPRESA DE GENERACION ELECTRICA SANTA ANA 227,059.348 227,059.348
EMPRESA DE GENERACION HUALLAGA 305,633.261 141,349.844 164,283.416 EMPRESA DE GENERACION HUALLAGA 6,477,179.952 3,516,140.298 2,961,039.653
EMPRESA DE GENERACION HUANZA 32,495.039 53,925.790 -21,430.752 EMPRESA DE GENERACION HUANZA 772,335.056 1,235,926.613 -463,591.557
EMPRESA ELECTRICA AGUA AZUL 13,679.448 13,679.448 EMPRESA ELECTRICA AGUA AZUL 322,960.990 322,960.990
EMPRESA ELECTRICA RIO DOBLE 13,633.874 13,633.874 EMPRESA ELECTRICA RIO DOBLE 322,873.629 322,873.629
ENEL GENERACION PERU S.A.A. 519,411.046 743,220.004 -223,808.958 ENEL GENERACION PERU S.A.A. 12,523,809.418 18,085,682.098 -5,561,872.680
ENEL GENERACION PIURA S.A. 38,902.756 52,002.958 -13,100.202 ENEL GENERACION PIURA S.A. 1,034,756.699 1,295,762.333 -261,005.633
ENEL GREEN POWER PERU S.A. 78,212.097 78,212.097 ENEL GREEN POWER PERU S.A. 1,934,696.332 1,934,696.332
ENERGÍA EÓLICA S.A. 43,972.054 43,972.054 ENERGÍA EÓLICA S.A. 1,122,280.376 1,122,280.376
ENGIE 507,461.214 698,524.207 -191,062.993 ENGIE 12,157,019.568 16,805,748.699 -4,648,729.131
FENIX POWER PERÚ 149,180.727 195,908.226 -46,727.499 FENIX POWER PERÚ 3,679,535.298 4,860,778.792 -1,181,243.494
GENERADORA ENERGÍA DEL PERÚ 30,899.011 30,899.011 GENERADORA ENERGÍA DEL PERÚ 762,192.093 762,192.093
GTS MAJES S.A.C 3,496.746 3,496.746 GTS MAJES S.A.C 90,790.920 90,790.920
GTS REPARTICION S.A.C. 3,409.896 3,409.896 GTS REPARTICION S.A.C. 87,968.611 87,968.611
HIDROCAÑETE S.A. 2,356.719 2,356.719 HIDROCAÑETE S.A. 56,208.785 56,208.785
HIDROELECTRICA HUANCHOR S.A.C. 13,975.303 11,331.679 2,643.625 HIDROELECTRICA HUANCHOR S.A.C. 306,979.283 254,687.613 52,291.670
HIDROELECTRICA SANTA CRUZ 20,812.093 20,812.093 HIDROELECTRICA SANTA CRUZ 464,686.218 464,686.218
HUAURA POWER GROUP S.A. 11,969.652 370.802 11,598.850 HUAURA POWER GROUP S.A. 278,748.298 9,304.756 269,443.542
HYDRO PATAPO S.A.C. 598.630 598.630 HYDRO PATAPO S.A.C. 14,615.139 14,615.139
INFRAESTRUCTURA Y ENERGIAS DEL PERU 291.308 291.308 INFRAESTRUCTURA Y ENERGIAS DEL PERU 5,715.785 5,715.785
INLAND ENERGY SAC 64,406.109 48,374.459 16,031.650 INLAND ENERGY SAC 1,448,368.118 1,194,535.892 253,832.225
KALLPA GENERACION S.A. 470,309.384 859,807.755 -389,498.372 KALLPA GENERACION S.A. 11,118,424.341 21,356,790.565 -10,238,366.223
MAJA ENERGIA S.A.C. 1,453.017 1,453.017 MAJA ENERGIA S.A.C. 33,365.279 33,365.279
MINERA CERRO VERDE -307.355 -307.355 MINERA CERRO VERDE -7,420.807 -7,420.807
MOQUEGUA FV S.A.C. 3,410.638 3,410.638 MOQUEGUA FV S.A.C. 87,848.564 87,848.564
ORAZUL ENERGY PERÚ 242,020.413 83,989.585 158,030.827 ORAZUL ENERGY PERÚ 5,633,574.056 2,073,238.022 3,560,336.034
PANAMERICANA SOLAR SAC. 3,695.614 3,695.614 PANAMERICANA SOLAR SAC. 95,198.504 95,198.504
PARQUE EOLICO MARCONA S.A.C. 14,533.813 14,533.813 PARQUE EOLICO MARCONA S.A.C. 342,709.998 342,709.998
PARQUE EOLICO TRES HERMANAS S.A.C. 43,395.741 43,395.741 PARQUE EOLICO TRES HERMANAS S.A.C. 1,031,154.225 1,031,154.225
PETRAMAS 4,483.553 4,483.553 PETRAMAS 105,487.704 105,487.704
PLANTA DE RESERVA FRIA DE GENERACION DE ETEN S.A. -385.060 -385.060 PLANTA DE RESERVA FRIA DE GENERACION DE ETEN S.A. -9,294.799 -9,294.799
SAMAY I S.A. -718.792 -718.792 SAMAY I S.A. -15,187.856 -15,187.856
SAN GABAN 40,200.954 19,487.268 20,713.687 SAN GABAN 820,390.897 476,996.426 343,394.471
SDF ENERGIA 19,666.845 11,325.785 8,341.060 SDF ENERGIA 487,228.503 273,051.292 214,177.211
SHOUGESA 937.209 40,456.379 -39,519.170 SHOUGESA 186,723.085 972,792.170 -786,069.085
SINERSA 5,889.650 5,889.650 SINERSA 146,617.852 146,617.852
STATKRAFT S.A 221,730.339 153,256.347 68,473.991 STATKRAFT S.A 4,982,456.004 3,760,499.076 1,221,956.928
TACNA SOLAR SAC. 3,646.086 3,646.086 TACNA SOLAR SAC. 94,032.474 94,032.474
TERMOCHILCA 168,553.151 109,303.025 59,250.126 TERMOCHILCA 4,063,293.840 2,661,601.624 1,401,692.216
TERMOSELVA 7,947.732 55,034.357 -47,086.626 TERMOSELVA 166,771.521 1,364,022.645 -1,197,251.124
RETIRO NO CUBIERTO EN EL MCP 1,393.087 -1,393.087 RETIRO NO CUBIERTO EN EL MCP 32,757.330 -32,757.330
TOTAL 4,292,066.004 4,069,158.424 222,907.580 TOTAL 99,940,646.803 99,600,611.572 340,035.231
Cuadro N°18: Entrega y retiro de energía por cada generadora en las barras de transferencia. Cuadro N°19: Entrega y retiro valorizado por cada generadora en las barras de transferencia.
• Para cada Participante se determinará su Saldo de Transferencias, el cual resulta de la sumatoria de las valorizaciones de sus Entregas menos la sumatoria de las valorizaciones de sus Retiros. El Saldo de Transferencias Total
corresponderá al valor negativo de la sumatoria de los Saldos de Transferencias de todos los Participantes según numeral 9.1.2.2 del Nuevo PR-10 (Vigente desde 01.01.2018)
• En los saldos de meses anteriores se consideran las Revisiones especificadas en el numeral 3.6 del Informe COES/D/DO/STR-INF-046-2019
8.2 TRANSFERENCIAS DE POTENCIA
MÁXIMA 10,000
POTENCIA
DEMANDA A POTENCIA
MES FIRME
NIVEL DE FIRME
REMUNERABLE 8,000
GENERACIÓN
RSC= Retiros Sin Contrato GráficoN°30: comparación de la máxima potencia coincidente, firme y remunerable de abril
Página 18
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
EMPRESA DE GENERACION ELECTRICA CANCHAYLLO SAC 66,905.950 0.000 -6.836 58.334 0.000 66,957.448
EMPRESA DE GENERACION ELECTRICA DE JUNIN 103,880.986 9,943.589 -10.617 48.016 0.000 93,974.796
EMPRESA DE GENERACION ELECTRICA RIO BAÑOS S.A.C. 0.000 0.000 0.000 0.000 0.000 0.000
EMPRESA DE GENERACION ELECTRICA SANTA ANA 293,797.419 0.000 -30.912 263.708 0.000 294,030.214
EMPRESA ELECTRICA AGUA AZUL 0.000 0.000 0.000 0.000 0.000 0.000
EMPRESA ELECTRICA RIO DOBLE 38,608.033 0.000 -3.946 33.662 0.000 38,637.749
ENEL GENERACION PERU S.A.A. 21,232,775.762 22,874,378.652 425.193 -628,200.012 0.000 -2,269,377.709
ENEL GENERACION PIURA S.A. 2,328,323.686 2,004,612.742 -44.650 69,608.977 0.000 393,275.271
GENERADORA ENERGÍA DEL PERÚ 352,220.205 0.000 -35.998 307.094 0.000 352,491.301
HUAURA POWER GROUP S.A. 190,312.359 10,073.638 -17.225 159.385 0.000 180,380.881
PARQUE EOLICO MARCONA S.A.C. 0.000 4.427 0.000 0.938 0.000 -3.489
PARQUE EOLICO TRES HERMANAS S.A.C. 0.000 154.494 0.063 32.746 0.000 -121.685
Página 19
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
Página 20
B-SGI-
0419
BOLETIN MENSUAL- ABRIL 2019
Fecha:
21/05/201
9 . COMPENSACIÓN A TRANSMISORAS
9.1. COMPENSACIÓN A TRANSMISORAS POR PEAJE DE CONEXIÓN Y TRANSMISION, SISTEMA PRINCIPAL Y SISTEMA GARANTIZADO DE TRANSMISIÓN
ATN
PATRIMONIO TRANSMISORA
ABY CONCESIONA RED DE TRANSMISORA
EN MINERA ELECTRICA
TRANSMISIÓN RIA LINEA DE EGEMSA ETESELVA ISA PERU ENERGIA DEL REDESUR SAN GABAN TRANSMANT ELECTRICA DEL
EMPRESA FIDEICOMISO - ANTAMINA DEL SUR 2 TOTAL
SUR TRANSMISION PERU ARO SUR S.A.C
RUC S.A.C.
CCNCM S.A.C.
20554655417
SGT SGT SGT SPT SPT SPT SPT SPT SPT SPT SPT SGT SGT
KALLPA GENERACION S.A. -68.4 -23.8 -24.6 -0.1 -2.6 -14.3 -0.2 -95.9 -20.6 -0.1 -235.6 -8.1 -9.4 -503.7
ENEL GENERACION PERU
0.8 0.3 0.3 0.0 0.0 0.2 0.0 1.1 0.2 0.0 2.8 0.1 0.1 5.9
S.A.A.
ENGIE 2.1 0.7 0.7 0.0 0.1 0.4 0.0 2.9 0.6 0.0 7.4 0.2 0.3 15.6
ELECTROPERU 326,063.0 113,465.2 117,315.3 372.4 12,464.4 68,067.8 719.4 463,446.2 98,171.5 585.9 1,168,120.8 38,457.1 44,908.8 2,452,157.7
FENIX POWER PERÚ 210,854.6 73,374.3 75,864.1 240.8 8,060.3 44,017.3 465.2 299,692.8 63,484.4 378.9 755,486.0 24,869.0 29,041.1 1,585,828.6
STATKRAFT S.A 234,866.3 81,730.1 84,503.4 268.3 8,978.2 49,029.9 518.2 333,729.0 70,713.9 422.0 840,585.4 27,701.0 32,348.2 1,765,393.7
EMPRESA DE GENERACION
124,932.1 43,474.6 44,949.7 142.7 4,775.8 26,080.4 275.6 177,582.4 37,614.7 224.5 447,492.8 14,734.9 17,206.9 939,487.3
HUALLAGA
TERMOCHILCA 58,373.1 20,313.0 21,002.3 66.7 2,231.4 12,185.8 128.8 82,963.2 17,575.1 104.9 209,057.9 6,884.7 8,039.7 438,926.5
ORAZUL ENERGY PERÚ 28,446.8 9,899.1 10,235.0 32.5 1,087.4 5,938.5 62.8 40,400.7 8,564.8 51.1 101,584.6 3,355.1 3,918.0 213,576.3
CELEPSA -0.1 -0.0 -0.0 -0.0 -0.0 -0.0 -0.0 -0.1 -0.0 -0.0 -0.1 -0.0 -0.0 -0.3
EGASA 1,635,364.4 569,083.0 588,393.3 1,867.8 62,514.9 341,393.2 3,608.0 2,324,282.1 492,377.7 2,938.5 5,857,662.3 192,880.8 225,239.2 12,297,605.3
TERMOSELVA -1.2 -0.4 -0.4 -0.0 -0.0 -0.2 -0.0 -1.6 -0.4 -0.0 -4.0 -0.1 -0.2 -8.6
CHINANGO S.A.C. 1,011.2 351.9 363.8 1.2 38.7 211.1 2.2 1,437.1 304.5 1.8 3,621.4 119.3 139.3 7,603.4
ENEL GENERACION PIURA
509,033.1 177,136.1 183,146.7 581.4 19,458.7 106,264.0 1,123.0 723,466.4 153,260.4 914.6 1,823,260.6 60,037.2 70,109.3 3,827,791.7
S.A.
EMPRESA DE GENERACION
162,984.9 56,716.4 58,640.9 186.2 6,230.4 34,024.2 359.6 231,645.7 49,071.7 292.9 583,786.1 19,223.0 22,448.0 1,225,609.9
HUANZA
INLAND ENERGY SAC 2,374,866.0 826,418.8 854,461.0 2,712.4 90,783.7 495,769.0 5,239.5 3,375,474.2 715,027.8 4,267.2 8,508,266.0 280,100.3 327,091.0 17,860,477.0
EGEMSA 203,578.5 70,842.4 73,246.2 232.5 7,782.2 42,498.4 449.1 289,231.2 61,293.7 365.8 728,308.2 24,010.8 28,038.9 1,529,877.8
SHOUGESA 7.5 2.6 2.7 0.0 0.3 1.6 0.0 10.6 2.3 0.0 26.8 0.9 1.0 56.2
EGESUR 2,175,595.7 757,075.6 782,764.9 2,484.9 83,166.2 454,170.0 4,799.8 3,092,129.4 655,031.3 3,909.2 7,792,835.7 256,597.7 299,645.5 16,360,205.9
SDF ENERGIA 707,368.3 246,153.9 254,506.4 807.9 27,040.5 147,667.8 1,560.6 1,005,283.8 212,975.4 1,271.0 2,532,988.1 83,429.6 97,426.0 5,318,479.3
HIDROELECTRICA
-46.6 -16.2 -16.8 -0.1 -1.8 -9.7 -0.1 -65.3 -14.0 -0.1 -159.9 -5.5 -6.4 -342.5
HUANCHOR S.A.C.
SAN GABAN 3.3 1.2 1.2 0.0 0.1 0.7 0.0 4.8 1.0 0.0 12.3 0.4 0.5 25.4
ELECTRICA SANTA ROSA -1.5 -0.5 -0.6 -0.0 -0.1 -0.3 -0.0 -2.2 -0.5 -0.0 -5.3 -0.2 -0.2 -11.4
EMPRESA DE GENERACION
33,246.9 11,569.5 11,962.0 38.0 1,270.9 6,940.5 73.4 47,258.2 10,010.0 59.7 119,123.8 3,921.3 4,579.1 250,053.4
ELECTRICA DE JUNIN
HUAURA POWER GROUP
946.0 329.2 340.3 1.1 36.2 197.5 2.1 1,344.6 284.8 1.7 3,389.0 111.6 130.3 7,114.2
S.A.
ENERGÍA EÓLICA S.A. 159,573.0 55,529.1 57,413.3 182.3 6,100.0 33,311.9 352.1 226,798.4 48,044.4 286.7 571,579.8 18,820.6 21,978.0 1,199,969.6
GTS REPARTICION S.A.C. 2,881,698.9 1,002,789.3 1,036,816.1 3,291.3 110,158.3 601,573.8 6,357.7 4,095,262.5 867,625.7 5,177.9 10,318,666.9 339,878.0 396,897.3 21,666,193.7
ANDEAN POWER S.A.C. 2.0 0.7 0.7 0.0 0.1 0.4 0.0 2.9 0.6 0.0 7.2 0.2 0.3 15.2
MOQUEGUA FV S.A.C. 336,123.5 116,966.1 120,935.0 383.9 12,848.9 70,168.0 741.6 477,735.8 101,200.5 604.0 1,203,917.2 39,643.6 46,294.4 2,527,562.4
AGROINDUSTRIAS SAN
0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.2 0.0 0.0 0.5
JACINTO S A A
PARQUE EOLICO MARCONA
0.4 0.1 0.1 0.0 0.0 0.1 0.0 0.5 0.1 0.0 1.3 0.0 0.0 2.7
S.A.C.
PANAMERICANA SOLAR
-21.3 -7.4 -7.7 -0.0 -0.8 -4.4 -0.0 -29.6 -6.4 -0.0 -71.7 -2.5 -2.9 -154.8
SAC.
ELECTRICA YANAPAMPA
-5.4 -1.9 -2.0 -0.0 -0.2 -1.1 -0.0 -7.5 -1.6 -0.0 -18.2 -0.6 -0.7 -39.4
SAC
EMPRESA DE GENERACION
ELECTRICA CANCHAYLLO 32,994.7 11,481.7 11,871.3 37.7 1,261.3 6,887.9 72.8 47,209.0 9,934.1 59.3 120,350.0 3,891.5 4,544.4 250,595.5
SAC
HIDROCAÑETE S.A. 38,910.8 13,540.4 13,999.9 44.4 1,487.4 8,122.9 85.8 55,219.0 11,715.3 69.9 138,780.2 4,589.3 5,359.2 291,924.6
PETRAMAS 117,298.7 40,818.2 42,203.3 134.0 4,484.0 24,486.9 258.8 166,714.0 35,316.4 210.8 420,151.1 13,834.6 16,155.6
GTS MAJES S.A.C 416,011.6 144,766.0 149,678.2 475.1 15,902.8 86,845.2 917.8 590,657.7 125,253.3 747.5 1,485,524.4 49,065.9 57,297.4 3,123,142.9
AGROAURORA S.A.C. 222,515.8 77,432.3 80,059.7 254.1 8,506.1 46,451.7 490.9 316,261.0 66,995.4 399.8 797,008.7 26,244.3 30,647.2 1,673,267.1
TOTAL 13,555,511.5 4,717,120.7 4,877,183.1 15,482.4 518,184.8 2,829,802.9 29,906.4 19,265,101.9 4,081,311.4 24,356.8 48,547,069.9 1,598,786.2 1,867,004.8 101,926,822.9
Cuadro N°24: Compensación a transmisoras por peaje de conexión y transmision, sistema principal y sistema garantizado de transmisión
MINERA ANTAMINA
0.029%
RED DE ENERGIA DEL PERU
18.901%
TRANSMANTARO
47.629% REDESUR
SAN GABAN 4.004%
0.024%
Gráfico N°31: Porcentaje de compensación por peaje de conexión y transmisión abril 2019
Página 21
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
9.3. COMPENSACIÓN A TRANSMISORAS POR INGRESO TARIFARIO DEL SISTEMA PRINCIPAL Y SISTEMA GARANTIZADO DE TRANSMISIÓN
INGRESO TARIFARIO QUE CORRESPONDE PAGAR ( S/ ) :
CONCESIONARIA
ABY ATN PATRIMONIO TRANSMISORA
LINEA DE RED DE ENERGIA
TRANSMISIÓN EN FIDEICOMISO - ETESELVA ISA PERU REDESUR TRANSMANTARO ELECTRICA DEL
EMPRESA TRANSMISION DEL PERU TOTAL
SUR RUC 20554655417 SUR 2 S.A.C.
CCNCM S.A.C.
ENEL GENERACION PERU S.A.A. 12,405.7 65,051.3 1,341.0 46,851.4 66,159.2 10,066.6 618.6 59,393.1 2,524.9 264,411.8
ENGIE 11,316.2 59,338.0 1,223.2 42,736.6 60,348.6 9,182.5 564.3 54,176.8 2,303.2 241,189.4
ELECTROPERU 7,959.6 41,737.2 860.4 30,060.1 42,448.0 6,458.8 396.9 38,106.9 1,620.0 169,647.8
FENIX POWER PERÚ 4,929.9 25,850.9 532.9 18,618.4 26,291.2 4,000.4 245.8 23,602.4 1,003.4 105,075.4
STATKRAFT S.A 3,579.2 18,768.0 386.9 13,517.1 19,087.6 2,904.3 178.5 17,135.5 728.5 76,285.5
EMPRESA DE GENERACION HUALLAGA 3,577.5 18,759.1 386.7 13,510.8 19,078.6 2,903.0 178.4 17,127.4 728.1 76,249.6
ORAZUL ENERGY PERÚ 3,210.9 16,837.0 347.1 12,126.4 17,123.8 2,605.5 160.1 15,372.5 653.5 68,436.9
TERMOCHILCA 2,489.5 13,054.3 269.1 9,402.0 13,276.6 2,020.1 124.1 11,918.8 506.7 53,061.4
EGASA 2,110.6 11,067.3 228.1 7,970.9 11,255.8 1,712.7 105.2 10,104.7 429.6 44,985.0
CELEPSA 1,971.8 10,339.5 213.1 7,446.8 10,515.6 1,600.0 98.3 9,440.2 401.3 42,026.7
TERMOSELVA 1,555.4 8,156.0 168.1 5,874.1 8,294.9 1,262.1 77.6 7,446.6 316.6 33,151.5
CHINANGO S.A.C. 1,450.7 7,607.2 156.8 5,478.9 7,736.7 1,177.2 72.3 6,945.5 295.3 30,920.6
ENEL GENERACION PIURA S.A. 1,360.3 7,132.7 147.0 5,137.2 7,254.2 1,103.8 67.8 6,512.3 276.9 28,992.1
SAN GABAN 1,025.6 5,378.0 110.9 3,873.3 5,469.6 832.2 51.1 4,910.2 208.7 21,859.7
EGEMSA 972.0 5,097.0 105.1 3,671.0 5,183.8 788.8 48.5 4,653.7 197.8 20,717.7
EMPRESA DE GENERACION HUANZA 871.3 4,568.8 94.2 3,290.5 4,646.6 707.0 43.4 4,171.4 177.3 18,570.5
INLAND ENERGY SAC 544.3 2,854.2 58.8 2,055.6 2,902.8 441.7 27.1 2,605.9 110.8 11,601.2
EGESUR 493.1 2,585.5 53.3 1,862.1 2,629.5 400.1 24.6 2,360.6 100.4 10,509.1
SDF ENERGIA 244.2 1,280.7 26.4 922.4 1,302.5 198.2 12.2 1,169.3 49.7 5,205.7
GENERADORA ENERGÍA DEL PERÚ 205.8 1,079.0 22.2 777.1 1,097.4 167.0 10.3 985.2 41.9 4,385.8
ANDEAN POWER S.A.C. 177.2 929.4 19.2 669.4 945.2 143.8 8.8 848.6 36.1 3,777.7
HIDROELECTRICA HUANCHOR S.A.C. 175.2 918.6 18.9 661.6 934.3 142.2 8.7 838.7 35.7 3,733.9
AGRO INDUSTRIAL PARAMONGA 99.0 518.9 10.7 373.7 527.8 80.3 4.9 473.8 20.1 2,109.2
HIDROELECTRICA SANTA CRUZ 70.1 367.6 7.6 264.8 373.9 56.9 3.5 335.7 14.3 1,494.3
AGROAURORA S.A.C. 64.6 338.8 7.0 244.0 344.5 52.4 3.2 309.3 13.1 1,377.0
EMPRESA DE GENERACION ELECTRICA
60.7 318.2 6.6 229.2 323.7 49.2 3.0 290.6 12.4 1,293.5
DE JUNIN
SINERSA 45.9 240.4 5.0 173.2 244.5 37.2 2.3 219.5 9.3 977.3
PETRAMAS 44.0 230.5 4.8 166.0 234.4 35.7 2.2 210.5 8.9 936.9
EMPRESA DE GENERACION ELECTRICA
39.1 205.0 4.2 147.6 208.5 31.7 1.9 187.1 8.0 833.1
CANCHAYLLO SAC
AGROINDUSTRIAS SAN JACINTO S A A 38.0 199.4 4.1 143.6 202.8 30.9 1.9 182.0 7.7 810.3
HIDROCAÑETE S.A. 23.2 121.4 2.5 87.5 123.5 18.8 1.2 110.9 4.7 493.6
EMPRESA ELECTRICA RIO DOBLE 22.6 118.3 2.4 85.2 120.3 18.3 1.1 108.0 4.6 480.7
ELECTRICA YANAPAMPA SAC 20.6 108.0 2.2 77.8 109.9 16.7 1.0 98.6 4.2 439.2
HYDRO PATAPO S.A.C. 4.9 25.5 0.5 18.4 26.0 3.9 0.2 23.3 1.0 103.7
MAJA ENERGIA S.A.C. 4.6 24.1 0.5 17.3 24.5 3.7 0.2 22.0 0.9 97.8
ELECTRICA SANTA ROSA 1.2 6.3 0.1 4.5 6.4 1.0 0.1 5.7 0.2 25.5
SHOUGESA -0.2 -1.2 -0.0 -0.9 -1.2 -0.2 -0.0 -1.1 -0.0 -4.9
TOTAL 77,786.5 407,885.7 8,408.4 293,768.8 414,832.4 63,119.9 3,878.7 372,407.5 15,831.9 1,657,919.7
Cuadro N°25: Compensación a transmisoras por ingreso tarifario del sistema principal y sistema garantizado de transmisión
TRANSMANTARO
-22.462%
ISA PERU
-25.021%
Página 22
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
Desconectó la línea L-6007 (Puno - Tucari) de 60 kV, cuya causa no fue informada por MINERA ARUNTANI, titular de la línea. El sistema de protección señalizó la activación de la función de distancia (21). Como
consecuencia se interrumpió el suministro de la S.E. Tucari con un total de 0,05 MW. A las 15:32 h, se conectó la línea y se inició la normalización del suministro interrumpido. A las 15:33 h, desconectó nuevamente la línea
mientras se realizaban las maniobras de restablecimiento. A las 16:32 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Desconectó la línea L-2192 (Cajamarca Norte - Cáclic) de 220 kV, cuya causa no fue informada por CONCESIONARIA LÍNEA DE TRANSMISIÓN CCNCM, titular de la línea. El sistema de protección señalizó la activación de
la función diferencial de línea (87) y ubicó la falla a 54,6 km de la S.E. Cajamarca Norte. Como consecuencia se activó el esquema de mínima tensión en la S.E. Moyobamba y desconectó la línea L-6091 (Moyobamba –
Rioja) con lo cual se interrumpió un total de 12,10 MW de las subestaciones Rioja, Nueva Cajamarca y Cementos Selva. Asimi9smo, los usuarios libres MINERA GOLD FIELDS y MINERA YANACOCHA, redujeron su carga
en 12,40 MW y 26,00 MW, respectivamente. A las 21:37 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Desconectó la línea L-6027 (Puno - Pomata - Ilave) de 60 kV, por falla. De acuerdo con lo informado por ELECTROPUNO, titular de la línea, la falla se produjo por descargas atmosféricas. El sistema de protección señalizó la
activación de la función de sobre corriente a tierra (50N). Como consecuencia se interrumpió el suministro de las subestaciones Puno, Pomata e Ilave con un total de 5,30 MW. A las 18:08 h, se conectó la línea y se inició la
normalización del suministro interrumpido.
Página 23
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
Desconectó la línea L-6027 (Puno - Pomata - Ilave) de 60 kV, por falla. De acuerdo con lo informado por ELECTROPUNO, titular de la línea, la falla se produjo por descargas atmosféricas. El sistema de protección señalizó la
activación de la función de sobre corriente a tierra (50N). Como consecuencia se interrumpió el suministro de las subestaciones Puno, Pomata e Ilave con un total de 5,80 MW. A las 18:35 h, se conectó la línea y se inició la
normalización del suministro interrumpido.
Desconectó de la línea L-6024 (Azángaro – Putina) de 60 kV, por falla. De acuerdo con lo informado por ELECTRO PUNO, titular de la línea, la falla se produjo por descargas atmosféricas. El sistema de protección señalizó la
activación de la función diferencial de línea (87). Como consecuencia se interrumpió el suministro de las subestaciones Ananea y Huancané con un total de 5,12 MW. A las 08:09 h, se conectó la línea y se inició la
normalización del suministro interrumpido.
Desconectó la línea L-2114 (Malvinas – Mirador) de 220 kV, cuya causa no fue informada por ENEL DISTRIBUCIÓN PERÚ, titular de la línea. No se produjo interrupción de suministros en el SEIN. A las 11:39 h, desconectó la
línea L-2115 (Malvinas – Mirador) de 220 kV y, como consecuencia, se interrumpió el suministro de las subestaciones Mirones y Pando con un total de 86,00 MW, aproximadamente. A las 11:51 h, se inició la normalización de
suministros a través de las líneas L-621/L-622 (Chavarría – Mirones) de 60 kV. Las líneas L-2114 y L-2115, quedaron fuera de servicio para su inspección.
Desconectó la línea L-1002 (Machupicchu - Quencoro) de 138 kV, por falla. De acuerdo con lo informado por EGEMSA, titular de la línea, la falla se produjo por derrumbe en la zona. Asimismo, desconectó el alimentador ESE
(Aguas Calientes) interrumpiendo un total de 2,00 MW. La línea y el alimentador quedaron fuera de servicio para su inspección.
Desconectó la línea L-1001 (Machupicchu - Dolorespata) de 138 kV, por falla. De acuerdo con lo informado por EGEMSA, titular de la línea, la falla se produjo por derrumbe en la zona. Como consecuencia el usuario libre
INCASAC redujo su carga en 5,00 MW. A las 21:56 h, se desconectó de forma manual el grupo G1 de la C.H. Machupicchu, por seguridad. No se produjo interrupción de suministros en el SEIN. A las 21:57 h, el CCO-COES
coordinó con el CC-CAC normalizar el total de sus suministros reducidos. La línea quedó fuera de servicio para su inspección.
Página 24
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
Desconectó la línea L-6046 (Cajamarca Norte - Moyococha) de 60 kV, cuya causa no fue informada por HIDRANDINA, titular de la línea. El sistema de protección señalizó la activación de la función diferencial de línea (87L).
Como consecuencia se interrumpió el suministro de las subestaciones Moyococha, San Marcos y Cajabamba con un total de 7,30 MW. Asimismo, desconectó la C.H. Potrero cuando generaba 10,01 MW. A las 12:30 h, se
conectó la línea y se inició la normalización del suministro interrumpido.
Desconectó la línea L-6027 (Puno - Pomata - Ilave) de 60 kV, cuya causa no fue informada por ELECTROPUNO, titular de la línea. El sistema de protección señalizó la activación de la función de sobre corriente a tierra
(50N/51N). Como consecuencia se interrumpió el suministro de las subestaciones Pomata e Ilave con un total de 5,22 MW. A las 21:39 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Desconectó el SVC de la S.E. San José, cuya causa no fue informada por MINERA CERRO VERDE, titular del equipo. Como consecuencia el usuario libre MINERA CERRO VERDE redujo su carga en 10,00 MW. No se
produjo interrupción de suministros en el SEIN. A las 07:55 h, el CCO-COES coordinó con el CC-MCV normalizar el total de sus suministros reducidos. A las 10:42 h entró en servicio el SVC.
Desconectó la línea L-1125 (Aguaytía - Pucallpa) de 138 KV, por falla monofásica a tierra en la fase “R”. De acuerdo con lo informado por ISA PERÚ, titular de la línea, la falla se produjo por descargas atmosféricas. El sistema
de protección señalizó la activación de la función de distancia (21) y ubicó la falla a 21,7 km de la S.E. Pucallpa. Como consecuencia se interrumpió el suministro de las subestaciones Pucallpa EUC, Parque Industrial y
Yarinacocha con un total de 50,60 MW. A las 15:04 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Desconectó la línea L-6619 (El Carmen – Tambo de Mora) de 60 kV, por falla monofásica a tierra en la fase “T”. De acuerdo con lo informado por ELECTRO DUNAS, titular de la línea, la falla se produjo por poda de caña.
Como consecuencia se interrumpió el suministro de la S.E. Tambo de Mora con un total de 1,80 MW. A las 14:06 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Página 25
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
Desconectó la barra de 138 kV de la S.E. Trujillo Noroeste, cuya causa no fue informada por HIDRANDINA, titular del equipo. Cabe resaltar que la línea L-1117 (Trujillo Norte - Porvenir) de 138 kV se encontraba fuera de servicio
por mantenimiento. Como consecuencia se interrumpió el suministro de las subestaciones Trujillo Sur, Trujillo Noroeste, Huaca del Sol, Porvenir, Viru, Chao y Salaverry con un total de 89,00 MW. A las 15:57 h, se conectó la línea L-
1117 (Trujillo Norte - Porvenir) de 138 kV y se inició la normalización del suministro interrumpido.
El CCO-COES coordinó con el usuario libre SIDER PERU limitar su demanda a carga lineal, por déficit de generación en el SEIN, debido a la desconexión manual de la unidad TV de la C.T. Chilca 1 por fuga de aceite. A las 09:32
h, el CCO-COES coordinó con el usuario libre ACEROS AREQUIPA limitar su demanda a carga lineal. A las 09:47 h y 09:50 h, el CCO-COES coordinó con ACEROS AREQUIPA y SIDER PERU, normalizar el total de sus
suministros interrumpidos, respectivamente.
Desconectó la barra de 10 kV de la S.E. Tambo de Mora, cuya causa no fue informada por ELECTRODUNAS, titular del equipo. Como consecuencia se interrumpió el suministro de los alimentadores TM102 y TM104 con un total
de 2,90 MW. A las 09:59 h, se energizó la barra y se inició la normalización del suministro interrumpido.
Disminución (MW) :
Energía Interrumpida (MWh) : 0.8
Desconectó la línea L-1135 (Espina Colorada - Cutervo) de 138 kV, por falla externa en la línea L-1138 (Cutervo – Nueva Jaén) de 138 kV de titularidad de la empresa ELECTRO ORIENTE, de acuerdo con lo informado por
ELECTRONORTE, titular de la línea. Como consecuencia, se interrumpió el suministro de las subestaciones Cutervo y Nueva Jaén. Asimismo, desconectó la C.H. Las Pizarras cuando generaba 19,08 MW. A las 14:30 h, se
conectó la línea L-1135 y se inició la normalización del suministro interrumpido en la S.E. Cutervo. A las 14:47 h, se conectó la línea L-1138 y se inició la normalización del suministro interrumpido en la S.E. Nueva Jaén. A las 15:06
h, sincronizó la C.H. Las Pizarras con el SEIN.
Desconectó la línea L-6027 (Puno - Pomata - Ilave) de 60 kV, cuya causa no fue informada por ELECTROPUNO, titular de la línea. El sistema de protección señalizó la activación de la función de distancia (21). Como consecuencia
se interrumpió el suministro de las subestaciones Puno, Pomata e Ilave con un total de 4,40 MW. A las 21:13 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Página 26
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
Desconectó la línea L-6546 (Pomacocha - San Antonio) de 60 kV, por falla. De acuerdo con lo informado por MINERA VOLCAN, titular de la línea, la falla se produjo por descargas atmosféricas. Como consecuencia se interrumpió el
suministro de la S.E. San Antonio con un total de 17,20 MW. A las 16:49 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Desconectó la línea L-6027 (Puno - Pomata - Ilave) de 60 kV, cuya causa no fue informada por ELECTROPUNO, titular de la línea. El sistema de protección señalizó la activación de la función de sobre corriente de fases (50/51).
Como consecuencia se interrumpió el suministro de las subestaciones Pomata e Ilave con un total de 5,17 MW. A las 17:58 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Desconectó la línea L-1014 (San Gabán - Mazuco) de 138 kV, por falla trifásica. De acuerdo con lo informado por ELECTRO SUR ESTE, titular de la línea, la falla se produjo por descargas atmosféricas. El sistema de protección
ubicó la falla a una distancia de 24,38 km de la S.E. San Gabán. Como consecuencia se interrumpió el suministro de las subestaciones Mazuco y Puerto Maldonado con un total de 14,64 MW. Asimismo, desconectaron las CC.HH.
Ángel I, Ángel II y Ángel III cuando generaban un total de 26,70 MW. A las 23:05 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Desconectó la línea L-1014 (San Gabán II - Mazuco) de 138 kV, por falla monofásica fase “S”. De acuerdo con lo informado por ELECTRO SUR ESTE, titular de la línea, la falla se produjo por descargas atmosféricas. El sistema de
protección señalizó la activación de la función de distancia (21) y ubicó la falla a 35,1 km de la S.E. San Gabán. Como consecuencia se interrumpió el suministro de las subestaciones Mazuco y Puerto Maldonado con un total de 10,70
MW. Asimismo, desconectaron las CC.HH. Ángel I, II y III cuando generaban un total de 47,60 MW. A las 00:24 h, se conectó la línea y se inició la normalización del suministro interrumpido. A las 00:57 h, sincronizó la C.H. El Angel III
con el SEIN. A las 01:28 h, sincronizó la C.H. El Angel I con el SEIN. A las 01:38 h, sincronizó la C.H. El Angel II con el SEIN.
Desconectó la línea L-6652 (Piura Oeste - Textil Piura) de 60 kV, cuya causa no fue informada por ENOSA, titular de la línea. El sistema de protección señalizó la activación de la función de sobre corriente de fases (51). Como
consecuencia se interrumpió el suministro de la S.E. Castilla con un total de 19,52 MW. A las 13:02 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Página 27
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
Desconectó la línea L-6525 (Pachachaca - Oroya Nueva) de 50 kV, por falla bifásica a tierra entre las fases “R” y “S”. De acuerdo con lo informado por STATKRAFT, titular de la línea, la falla se produjo por descargas atmosféricas. El
sistema de protección señalizó la activación de la función de distancia (21). Como consecuencia se interrumpió el suministro de la S.E. Curipata con un total de 0,10 MW. A las 16:57 h, se energizó la línea y se inició la normalización del
suministro interrumpido.
Desconectó de la línea L-6024 (Azángaro – Putina) de 60 kV, por falla. De acuerdo con lo informado por ELECTRO PUNO, titular de la línea, la falla se produjo por descargas atmosféricas. El sistema de protección señalizó la activación
de la función diferencial de línea (87). Como consecuencia se interrumpió el suministro de las subestaciones Ananea y Huancané con un total de 5,30 MW. A las 03:09 h, se conectó la línea y se inició la normalización del suministro
interrumpido.
Desconectó la línea L-6027 (Puno - Pomata - Ilave) de 60 kV, cuya causa no fue informada por ELECTROPUNO, titular de la línea. El sistema de protección señalizó la activación de la función de sobre corriente de fases (50/51). Como
consecuencia se interrumpió el suministro de las subestaciones Pomata e Ilave con un total de 4,85 MW. A las 20:26 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Desconectó la línea L-6515 (Carhuamayo - Shelby) de 50 kV, por falla. De acuerdo con lo informado por STATKRAFT, titular de la línea, la falla se produjo por fuertes vientos. Como consecuencia se interrumpió el suministro de la S.E.
Shelby con un total de 2,25 MW. A las 18:34 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Se produjo un recierre monofásico exitoso en la línea L-5031 (Aucayacu – Tocache) de 500 kV, por falla monofásica a tierra en la fase “S”. De acuerdo con lo informado por TRANSMANTARO, titular de la línea, el motivo de la falla se
encuentra en investigación. Como consecuencia el usuario libre MINERA CERRO VERDE redujo su carga de 284,00 MW a 108,00 MW. No se produjo interrupción de suministros en el SEIN. A las 14:19 h, el CCO-COES coordinó con
el CC-MCV normalizar el total de sus suministros reducidos.
Página 28
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
Desconectó la línea L-6634 (Aguas Calientes – Cajabamba) de 60 kV, por falla. De acuerdo con lo informado por HIDRANDINA, titular de la línea, la falla se produjo por descargas atmosféricas. El sistema de protección
señalizó la activación de la función de sobre corriente de fase a tierra (50N/51N). Como consecuencia se interrumpió el suministro de las subestaciones Cajabamba y La Morena con un total de 9,90 MW. A las 16:06 h, se
conectó la línea y se inició la normalización del suministro interrumpido.
Desconectó el transformador T46-162 de la S.E. Combapata, cuya causa no fue informada por REP, titular del equipo. Como consecuencia se interrumpió el suministro de las subestaciones Combapata, Sicuani y Llusco con
un total de 6,49 MW. A las 10:07 h, se inició la normalización parcial del suministro interrumpido en sistema aislado mediante la generación de las CC.HH. Langui y Hercca. A las 11:27 h, se conectó el transformador y se
culminó con la normalización del suministro interrumpido.
Desconectó la línea L-6027 (Puno - Pomata - Ilave) de 60 kV, cuya causa no fue informada por ELECTROPUNO, titular de la línea. Como consecuencia se interrumpió el suministro de las subestaciones Pomata e Ilave con
un total de 6,30 MW. A las 17:44 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Desconectó la línea L-6007 (Puno - Tucari) de 60 kV, cuya causa no fue informada por MINERA ARUNTANI, titular de la línea. El sistema de protección señalizó la activación de la función de distancia (21). Como
consecuencia se interrumpió el suministro de la S.E. Tucari con un total de 5,11 MW. A las 17:38 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Desconectó la línea L-6007 (Puno - Tucari) de 60 kV, cuya causa no fue informada por MINERA ARUNTANI, titular de la línea. El sistema de protección señalizó la activación de la función de distancia (21). Como
consecuencia se interrumpió el suministro de la S.E. Tucari con un total de 4,99 MW. A las 18:08 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Página 29
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
Desconectó la línea L-6655 (Paramonga Nueva - 09 de Octubre) de 66 kV, cuya causa no fue informada por HIDRANDINA, titular de la línea. Como consecuencia se interrumpió el suministro de la S.E. Huarmey con un total
de 6,32 MW. A las 21:57 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Desconectó la línea L-1031 (Repartición - Majes) de 138 kV, cuya causa no fue informada por SEAL, titular de la línea. Como consecuencia se interrumpió el suministro de las subestaciones Majes y Camaná con un total de
15,72 MW. El sistema de protección señalizó la activación de la función de distancia (21). A las 13:15 h, se conectó la línea y se inició la normalización del suministro interrumpido. Cabe resaltar que se presentaron demoras
de 32,0 minutos en la normalización de suministros de la S.E. Camaná, debido a que la empresa GTS MAJES, no cerró los interruptores de la S.E. Pedregal.
Desconectó la línea L-1015 (Mazuco - Puerto Maldonado) de 138 kV, por falla monofásica a tierra en la fase "R". De acuerdo con lo informado por ELECTRO SUR ESTE, titular de la línea, la falla se produjo por descargas
atmosféricas. El sistema de protección señalizó la activación de la función de distancia (21) y ubicó la falla a una distancia de 4,8 km de la S.E. Mazuco. Como consecuencia se interrumpió el suministro de la S.E. Puerto
Maldonado con un total de 7,18 MW. Asimismo, desconectaron las CC.HH. Ángel I, II y III cuando generaban un total de 29,6 MW. A las 02:22 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Página 30
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
Desconectó la línea L-6655 (Paramonga Nueva – 09 de Octubre) de 66 kV, por falla. De acuerdo con lo informado por HIDRANDINA, titular de la línea, la falla se produjo por actos vandálicos. El sistema de protección señalizó la
activación de la función de sobre corriente de fases (50/51). Como consecuencia se interrumpió el suministro de la S.E. Puerto Antamina con un total de 2,90 MW. A las 05:28 h, se conectó la línea y se inició la normalización del
suministro interrumpido.
Desconectó la línea L-1203 (Yaupi – Oxapampa) de 138 kV, por falla monofásica a tierra en la fase “S”. De acuerdo con lo informado por ELECTROCENTRO, titular de la línea, la falla se produjo por descargas atmosféricas.
Como consecuencia se interrumpió el suministro de la S.E. Oxapampa con un total de 5,70 MW. A las 06:25 h, se conectó la línea y se inició la normalización del suministro interrumpido.
Página 31
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
BARRA 1 1 41.24
CELDA 1 1 0.64
GENERADOR
1 1 21.50
TERMOELÉCTRICO
SUBESTACION 1 1 3.64
SVC 1 1 7.00
TOTAL 16 0 0 3 24 0 0 43 323.64
Cuadro N°26: Número de fallas y energía interrumpida (MWh) por tipo de equipo y Causa según clasificacion CIER en el mes de abril 2019
FALLAS POR TIPO DE CAUSA - ABRIL 2019 FALLAS POR TIPO DE EQUIPO
N° DE FALLAS
FNI OTR FNA
40
35
30
FNA 25
37% 20
15
10
FNI
56% 5
0
OTR
7%
Gráfico N°33: Porcentaje de participación por tipo de causa en el Gráfico N°34 Comparación en el número de fallas por tipo de equipo.
número de fallas.
200
150
100
50
Gráfico N°35: Comparación de la energía interrumpida aproximada por tipo de equipo en abril 2019
NOTA: El valor de la estimación de la energía interrumpida es obtenida con los registros de potencia de las interrupciones y/o disminuciones de carga por su respectivo periodo de interrupción.
La estadística de fallas corresponde a los eventos y fallas que ocasionaron interrupción y/o disminución del suministro eléctrico.
Página 36
B-SGI-0419
BOLETIN MENSUAL- ABRIL 2019 Fecha:
21/05/2019
11.2. ENERGÍA INTERRUMPIDA (MWh) POR FALLAS EN LAS DIFERENTES ZONAS DEL SISTEMA ELÉCTRICO.
ENERGÍA INTERRUMPIDA (MWh) EN ABRIL 2019
(TIPO DE FALLA EN CADA ZONA DEL LINEA DE GENERADOR TRANSFORMADOR
BARRA CELDA SUBESTACIÓN SVC TOTAL
SISTEMA ELÉCTRICO) TRANSMISION TERMOELÉCTRICO 3D
FENOMENOS NATURALES Y AMBIENTALES 22.800 22.800
L. AGUAS CALIENTES - CAJABAMBA - LINEA L-6634 0.420 0.420
L. AGUAYTÍA - PUCALLPA - LINEA L-1125 13.610 13.610
L. AZÁNGARO - PUTINA - LINEA L-6024 0.260 0.260
L. CARHUAMAYO - SHELBY - LINEA L-6515 0.040 0.040
L. MACHUPICCHU - CACHIMAYO - LINEA L-1001 0.330 0.330
L. MACHUPICCHU - QUENCORO - LINEA L-1002 0.030 0.030
L. MAZUCO - PTO MALDONADO - LINEA L-1015 0.960 0.960
L. PACHACHACA - OROYA NUEVA - LINEA L-6525 0.030 0.030
L. POMACOCHA - SAN ANTONIO - LINEA L-6546 1.080 1.080
L. PUNO - POMATA - ILAVE - LINEA L-6027 0.560 0.560
L. PUNO - TUCARI - LINEA L-6007 0.710 0.710
L. SAN GABÁN II - MAZUCO - LINEA L-1014 3.530 3.530
L. YAUPI - OXAPAMPA - LINEA L-1203 1.240 1.240
NO IDENTIFICADO 130.530 41.240 0.640 0.000 3.640 7.000 25.380 208.430
L. CAJAMARCA NORTE - CACLIC - LINEA L-2192 7.080 7.080
L. CAJAMARCA NORTE - MOYOCOCHA - LINEA L-6046 1.830 1.830
L. COLCABAMBA - POROMA - LINEA L-5031 35.200 35.200
L. ESPINA COLORADA - CUTERVO - LINEA L-1135 0.800 0.800
L. MALVINAS - MIRADOR - LINEA L-2114 17.200 17.200
L. ÑAÑA - SANTA CLARA - LINEA L-655 32.550 32.550
L. PARAMONGA N. - 09 DE OCTUBRE - LINEA L-6655 1.430 1.430
L. PIURA OESTE - TEXTIL PIURA - LINEA L-6651 16.590 16.590
L. PUNO - POMATA - ILAVE - LINEA L-6027 9.420 9.420
L. PUNO - TUCARI - LINEA L-6007 4.050 4.050
L. REPARTICION - MAJES - LINEA L-1031 4.380 4.380
S.E. CAMANÁ - SSEE SS.EE. 3.640 3.640
S.E. COMBAPATA - TRAFO3D T46-162 24.990 24.990
S.E. PARAMONGA NUEVA - CELDA CL6694 0.640 0.640
S.E. SAN JOSE - SVC SVC-5931 7.000 7.000
S.E. TAMBO DE MORA - TRAFO3D TM TR2-60/10 0.390 0.390
S.E. TRUJILLO NOROESTE - BARRA BARRA138KV 41.240 41.240
OTRAS CAUSAS 70.910 0.000 0.000 21.500 0.000 0.000 0.000 92.410
C.T. CHILCA 1 - TV 21.500 21.500
L. EL CARMEN - PEDREGAL - LINEA L-6619_Proyecto 0.060 0.060
L. SAN JUAN - ATOCONGO - LINEA L-645 70.850 70.850
TOTAL 224.240 41.240 0.640 21.500 3.640 7.000 25.380 323.640
Cuadro N°27: Energía interrumpida (MWh) en cada zona del sistema eléctrico interconectado durante el mes de abril 2019, considerando los tipos de falla y tipos de equipo.
ENERGÍA INTERRUMPIDA (MWh) EN CADA ZONA DEL SISTEMA ELÉCTRICO DURANTE ABRIL 2019
3.5
3
MWh
2.5
1.5
0.5
Gráfico N°36: Energía interrumpida (MWh) en cada zona del sistema eléctrico interconectado durante el mes de abril 2019 considerando los tipos de equipo.
Página 37
B-SGI-0219
BOLETIN MENSUAL - ABRIL 2019 Fecha:
21/05/2019
USUARIOS
AÑOS MESES GENERADORAS TRANSMISORAS DISTRIBUIDORAS TOTAL
LIBRES
JULIO 15 7 9 35 66
2008
DICIEMBRE 16 7 10 36 69
MARZO 17 7 10 37 71
2009
DICIEMBRE 21 7 10 38 76
MARZO 21 7 10 38 76
2010
DICIEMBRE 23 8 10 39 80
MARZO 24 8 10 39 81
2011 NOVIEMBRE 28 8 10 40 86
DICIEMBRE 29 8 10 40 87
MARZO 29 8 10 39 86
2012 NOVIEMBRE 36 8 10 38 92
DICIEMBRE 38 8 10 38 94
MARZO 39 8 10 36 93
2013
DICIEMBRE 40 10 10 38 98
MARZO 41 10 10 38 99
2014
DICIEMBRE 44 12 11 46 113
MARZO 44 12 11 46 113
2015 JULIO 47 13 11 47 118
NOVIEMBRE 48 13 11 47 119
MARZO 49 13 11 47 120
2016
DICIEMBRE 52 15 13 52 132
FEBRERO 52 15 13 53 133
2017
DICIEMBRE 54 15 13 57 139
FEBRERO 55 15 13 58 141
2018 JULIO 57 16 13 62 148
DICIEMBRE 59 16 13 68 156
FEBRERO 60 17 13 75 165
2019
MAYO 60 18 13 74 165
Página 35
B-SGI-0219
BOLETIN MENSUAL - ABRIL 2019 Fecha:
21/05/2019
12.4. CAMBIO DE DENOMINACIÓN Y FUSIÓN DE EMPRESAS INTEGRANTES DEL COES (2010 - 2018)
FUSIÓN Fusión de Electroandes y Cahua (Por la cual Electroandes ha absorbido a Cahua) 1/01/2010
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de "Electroandes" a "SN POWER PERÚ S.A." 2/03/2010
2010
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de "Electro Sur Medio S.A.A" a "ELECTRODUNAS S.A.A" 24/04/2010
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de "Gold Fields La Cima S.A" a "Gold Fields La Cima S.A.A" 15/12/2010
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “Cementos Lima S.A.A” a “Unión Andina de Cementos S.A.A”. 17/08/2012
2012
FUSIÓN Fusión entre Unión Andina de Cementos S.A.A como sociedad absorbente y Cemento Andino S.A. como absorbida. 19/12/2012
2013 CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “XTRATA TINTAYA S.A”. a “Compañía Minera Antapaccay S.A”. 22/08/2013
2014 CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “SNPOWER PERU S.A”. a “STATKRAFT PERU S.A”. 4/10/2014
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “XSTRATA LAS BAMBAS S.A”. a “LAS BAMBAS MINING COMPANY S.A.” 15/10/2014
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “LAS BAMBAS MINING COMPANY S.A”. a “MINERA LAS BAMBAS S.A.” 22/04/2015
2015 FUSIÓN Fusión de STATKRAFT PERÚ S.A. y Empresa de Generación Electrica Cheves S.A. (De la cual la segunda absorbe los activos y pasivos de la primera) 1/08/2015
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “Empresa de Generación Electrica Cheves S.A”. a “STATKRAFT PERÚ S.A.” 23/11/2015
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “AGROPECUARIA AURORA S.A.C”. a “AGROAURORA S.A.C” 5/01/2016
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “TERMOCHILCA S.A.C. a TERMOCHILCA S.A.” 5/01/2016
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “ABENGOA TRANSMISORA NORTE S.A. a ATN S.A.” 18/03/2016
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “ENERSUR S.A. a ENGIE ENERGÍA PERÚ S.A.” 29/03/2016
2016
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “Abengoa Transmisión Sur S.A.” a “ABY Transmisión Sur S.A.” 13/04/2016
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “EDEGEL S.A.A” a “ENEL GENERACIÓN PERÚ S.A.A.” 9/11/2016
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “EMPRESA ELÉCTRICA DE PIURA S.A.” a “ENEL GENERACIÓN PIURA S.A.” 9/11/2016
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “EDELNOR” a “ENEL DISTRIBUCIÓN PERÚ S.A.A” 29/11/2016
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “DUKE ENERGY EGENOR S. EN C. POR A.” a “ORAZUL ENERGY EGENOR S. EN C. POR A.” 9/02/2017
FUSIÓN Fusión de ORAZUL ENERGY EGENOR S. EN C. POR A. y la empresa ORAZUL ENERGY PERÚ S.A. (De la cual la segunda absorbe los activos y pasivos de la primera) 17/08/2017
FUSIÓN Fusión de KALLPA GENERACIÓN S.A. y la empresa CERRO DEL AGUILA S.A. (De la cual la segunda absorbe los activos y pasivos de la primera) 16/08/2017
2017
FUSIÓN Fusión de EMPRESA CONCESIONARIA ENERGÍA LIMPIA S.A.C y la empresa PETRAMAS S.A.C. (De la cual la segunda absorbe los activos y pasivos de la primera) 14/12/2017
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “CERRO DEL AGUILA S.A.” a “KALLPA GENERACIÓN S.A.” 29/09/2017
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “TRANSMISORA ELÉCTRICA DEL SUR S.A.” a “TRANSMISORA ELÉCTRICA DEL SUR S.A.C.” 6/10/2017
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “HIDROELECTRICA MARAÑON S.R.L.” a “CELEPSA RENOVABLES S.R.L.” 12/03/2018
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “VOTORANTIM METAIS - CAJAMARQUILLA S.A.” a “NEXA RESOURCES CAJAMARQUILLA S.A.” 23/05/2018
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de “MESSER GASES DEL PERÚ S.A.” a “AIR PRODUCTS PERÚ S.A.” 9/10/2018
2018 CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de la empresa MILPO ANDINA PERÚ S.A.C. con el nombre de NEXA RESOURCES EL PORVENIR S.A.C. 19/11/2018
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de la COMPAÑIA MINERA MILPO S.A.A. con el nombre de NEXA RESOURCES PERÚ S.A.A. 19/11/2018
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de la empresa PRODUCTOS TISSUE DEL PERÚ S.A. con el nombre de la empresa PRODUCTOS TISSUE DEL PERÚ S.A.C. 12/12/2018
CAMBIO DENOMINACIÓN SOCIAL Cambio de denominación social de la empresa PARQUE EOLICO MARCONA S.R.L. con el nombre de la empresa PARQUE EOLICO MARCONA S.A.C. 13/12/2018
Página 36
Director Ejecutivo (e)
Ing. Leonardo Dejo Prado
Elaborado por:
Especialista de Gestión de la Información
Ing. Edgar Egúsquiza
Contactos:
COES
Sub Dirección de Gestión de Información
Calle Manuel Roaud y Paz Soldán 364
San Isidro - Lima
Perú
+51 (1) 611 - 8585
Anexo: 655
sgi@coes.org.pe
Atención al Cliente:
+51 (1)611-8585 Anexo 620
Suscripciones: http://www.coes.org.pe/Portal/publicaciones/suscripcion/index