COSTO POR SEMANA SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN
Descripción Und. Metrado Precio (S/.) Parcial (S/.)
ITEM 1 A2 A3 A4 A5 A6 A7 A8 A9 A 10 A 11 A 12 A 13 A 14 A 15 A 16 A 17 A 18 A 19 A 20 A 21 A 22 A 23 A 24
SIFON
COSTO POR
Descripción Und. Metrado Precio (S/.) Parcial (S/.)
ITEM
LINEAS DE CONDUCCION HACIA ANTARARA Y VILCABAMBA 174,976.62
OBRAS PRELIMINARES 7,284.26
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 524.34 524.34 ### 524.34
OFICINAS Y ALMACEN RESIDENCIA DE OBRA m2 80.00 53.46 4,276.80 ### 4,276.80
TRAZO Y REPLANTEO LINEA DE CONDUCCION KM 8.11 306.18 2,483.12 ###
###
### 827.71
MOVIMIENTO DE TIERRAS 35,495.32
REFINE, NIVELACION Y COMPACTACION DE FONDOS m2 4,440.80 1.72 7,638.18 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### 7,638.18
RELLENO C/MATERIAL SELECCIONADO COMPACTADO MANUALm3 1,332.24 7.49 9,978.48 ###
###
###
###
###
###
###
###
###
###
###
###
###
### 9,978.48
RELLENO C/MATERIAL PROPIO, COMPACTADO MANUALMENTE m3 2,664.48 6.71 17,878.66 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### 17,878.66
ESTRUCTURA DE ENTRADA Y SALIDA DEL SIFON 13,479.65
EXCAVACION DE PLATAFORMA MATERIAL SUELTO A MANO m3 2.18 16.20 35.32 ### 35.32
REFINE, NIVELACION Y COMPACTACION DE FONDOS m2 23.60 1.72 40.59 ### 40.59
ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURASm2 69.35 17.48 1,212.24 ### 1,212.24
ACERO F'Y=4200 KG/CM2 kg 837.09 4.08 3,415.33 ### 3,415.33
CONCRETO FC=210 KG/CM2 m3 16.40 369.81 6,064.88 ### 6,064.88
CONCRETO FC=140 KG/CM2 m3 1.36 326.93 444.62 ### 444.62
CONCRETO FC=140 KG/CM2 + 30%p.g m3 6.19 264.54 1,637.50 ### 1,637.50
PLANCHA DE FIERRO GALVANIZADO e= 1/4" * m2 4.79 131.35 629.17 ### 629.17
ATRAQUES O ANCLAJES 52,778.58
EXCAVACION CAJA CANAL MATERIAL SUELTO A MANO m3 109.16 52.96 5,781.11 ###
###
###
###
###
###
###
### 5,781.11
EXCAVACION CAJA CANAL ROCA SUELTA A MANO m3 27.29 31.65 863.73 ###
### 863.73
EXCAVACION CAJA CANAL ROCA FIJA A MANO CON COMPRE m3 40.00 130.57 5,222.80 ###
### 5,222.80
ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURASm2 124.00 17.48 2,167.52 ###
###
###
###
###
###
### 2,167.52
CONCRETO FC=175 KG/CM2 m3 134.00 289.13 38,743.42 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
### 38,743.4
PASE AEREO (ACUEDUCTO DE C.A. 20 ml)
ZAPATAS Y PEDESTALES 6,112.82
EXCAVACION DE PLATAFORMA ROCA SUELTA A MANO m3 8.30 26.38 218.95 ### 218.95
DERIVACION DE RIOS P/EJECUSION DE OBRAS m 10.00 229.31 2,293.10 ###
### 2,293.10
EXCAVACION DE ZANJAS BAJO AGUA CON MAQUINARIA m3 19.50 4.48 87.36 ###
### 87.36
ENROCADO CON PIEDRA GRANDE m2 20.00 12.12 242.40 ###
### 242.40
ENCOFRADO Y DESENCOFRADO NORMAL PARA ZAPATA BAJO m2 14.90 19.21 286.23 ### 286.23
ACERO FY= 4200 Kg/cm2 kg 321.90 4.27 1,374.51 ### 1,374.51
FALSACIMENTACION DE CONCRETO (MEZCLA DE CEMENTO:HOR
m3 1.80 272.35 490.23 ### 490.23
CONCRETO FC=210 KG/CM2 P/ZAPATA BAJO AGUA m3 2.70 343.94 928.64 ### 928.64
RELLENO COMPACTADO MANUAL MATERIAL PROPIO m3 16.70 7.89 131.76 ### 131.76
ELIMINACION DE MATERIAL EXCEDENTE (d<5KM) m3 7.00 8.52 59.64 ### 59.64
COLUMNAS 4,215.85
ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURASm2 28.60 17.48 499.93 ### 499.93
ACERO F'Y=4200 KG/CM2 kg 314.00 4.08 1,281.12 ### 1,281.12
CONCRETO FC=210 KG/CM2 m3 4.40 369.81 1,627.16 ### 1,627.16
PROTECCION DE COLUMNAS Y ESTRIBOS Cº 175 kg/cm2 + 50% m3 4.00 201.91 807.64 ### 807.64
VIGAS 16,388.67
ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURASm2 136.00 17.48 2,377.28 ### 2,377.28
ACERO F'Y=4200 KG/CM2 kg 1,568.80 4.08 6,400.70 ### 6,400.70
CONCRETO FC=210 KG/CM2 m3 20.58 369.81 7,610.69 ### 7,610.69
COSTO POR
Descripción Und. Metrado Precio (S/.) Parcial (S/.)
ITEM
ESTRUCTURA DE PURGA DE SEDIMENTOS 7,698.49
ACERO FY= 4200 Kg/cm2 kg 924.70 4.27 3,948.40 ###
###
### 3,948.40
CONCRETO FC=210 KG/CM2 m3 8.55 304.22 2,601.08 ### 2,601.08
CONCRETO FC=175 KG/CM2 +50% P.G m3 4.30 207.67 892.98 ### 892.98
TAPA METALICA DE SEGURIDAD und 1.00 88.19 88.19 ### 88.19
ELIMINACION DE MATERIAL EXCEDENTE (d<5KM) m3 19.70 8.52 167.84 ### 167.84
MESES 01 MESES 02 MESES 03 MESES 04 MESES 05 MESES 06
COSTO POR SEMANA SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN SEMAN
Descripción Und. Metrado Precio (S/.) Parcial (S/.)
ITEM 1 A2 A3 A4 A5 A6 A7 A8 A9 A 10 A 11 A 12 A 13 A 14 A 15 A 16 A 17 A 18 A 19 A 20 A 21 A 22 A 23 A 24
SEMAN
A 24
17,878.66
SES 06
SEMAN
A 24
###
###
###
###
38422.8
3368.81
1,921.14
1,152.68
41,496.62
CUADRO RESUMEN DE VALORIZ
VALORIZACION
SALDO
ANTERIOR ACTUAL ACUMULADO
(S/. ) % (S/. ) % (S/. ) % (S/. ) %
FECHA 9/1/2010
MONTO S/702,290.82
DISTRITO : CURPAHUASI
CURVA S
AVANCE PROGRAMADO AVANCE EJECUTADO
Parcial Acumulado Parcial Acumulado
S/. S/. % S/. S/.
0 0 0 0
SEPTIEMBRE 57,901.88 57,901.88 8.24% 61,052.12 61,052.12
OCTUBRE 81,942.50 139,844.38 19.91% 75,025.12 136,077.24
NOVIEMBRE 33,847.53 173,691.91 24.73% 34,025.10 170,102.34
DIEMBRE 245,873.51 419,565.42 59.74% 247,053.50 417,155.84
ENERO 119,356.59 538,922.01 76.74% 121,058.12 538,213.96
FEBRERO 163,368.81 702,290.82 100.00% 164,078.78 702,292.74
CURVA S
250.00%
100.00%
200.00%
76.64%
150.00%
59.40%
100.00%
100.00%
24.22% 76.74%
50.00% 19.38%
59.74%
8.69%
19.91% 24.73%
0.00%
8.24%
SEPTIEMBRE OCTUBRE NOVIEMBRE DIEMBRE ENERO FEBRERO
V. EJECUTADO A .PROGRAMADO
CUR EN LOS DISTRITOS
CE EJECUTADO
%
ESTADO DE LA OBRA
8.69% + 0.45%
19.38% - -0.54%
24.22% - -0.51%
59.40% - -0.34%
76.64% - -0.10%
100.00% + 0.00%
100.00%
76.64%
100.00%
76.74%
ENERO FEBRERO
GRAMADO
1-Sep-10 27-Sep-10
HITO INICIO DE OBRA 0 S/0.00
OBRAS CIVILES 0 S/4,987.73
OBRAS PRELIMINARES 0 S/4,791.36
OFICINA Y ALMACEN DE OBRA 0 S/2,221.00
TRAZO Y REPLANTEO DEL SIFON 0 S/459.27
REFINE, NIVELACION Y COMPACTACION
S/2,111.09
DE FONDOS 0
RELLENO COMPACTADO MANUAL CON
S/0.00
MATERIAL SELECCIONADO 0
RELENO COMPACTADO MANUAL
S/0.00
MATERIAL PROPIO 0
RELENO Y COMPACTADO ZANJAS 0 S/0.00
ESTRUCTURAS DE ENTRADA AL SIFON 0 S/196.37
EXCAVACION DE CAJA CANAL MATERIAL
S/181.60
SUELTO A MANO 0
REFINE, NIVELACION Y COMPACTACION
S/14.77
DE FONDOS 0
ENCOFRADO Y DESENCOFRADO NORMAL
PARA ESTRUCTURAS DE CONCRETO (OBRAS S/0.00
DE ARTE) 0
ACERO FY=4200KG/CM2 0 S/0.00
CONCRETO FC=210KG/CM2 0 S/0.00
CONCRETO FC=140KG/CM2 0 S/0.00
CONCRETO FC=140KG/CM2+30% P.G 0 S/0.00
PLANCHA DE FIERRO GALVANIZADO
e=1/4" S/0.00
0
ESTRUCTURAS DE SALIDA DEL SIFON 0 S/0.00
EXCAVACION DE CAJA CANAL MATERIAL
S/0.00
SUELTO A MANO 0
REFINE, NIVELACION Y COMPACTACION
S/0.00
DE FONDOS 0
ENCOFRADO Y DESENCOFRADO NORMAL
PARA ESTRUCTURAS DE CONCRETO (OBRAS S/0.00
DE ARTE) 0
ACERO FY=4200KG/CM2 0 S/0.00
CONCRETO FC=210KG/CM2 0 S/0.00
CONCRETO FC=140KG/CM2 0 S/0.00
CONCRETO FC=140KG/CM2+30% P.G 0 S/0.00
PLANCHA DE FIERRO GALVANIZADO
S/0.00
e=1/4" 0
ATRAQUES O ANCLAJES 0 S/0.00
EXCAVACION DE CAJA CANAL MATERIAL
S/0.00
SUELTO A MANO 0
EXCAVACION ROCA SUELTA A MANO 0 S/0.00
EXCAVACION DE CAJA CANAL ROCA FIJA A
S/0.00
MANO CON COMPRESORA 0
ENCOFRADO Y DESENCOFRADO NORMAL
PARA ESTRUCTURAS DE CONCRETO (OBRAS S/0.00
DE ARTE) 0
CONCRETO FC=175KG/CM2 0 S/0.00
ENCOFRADO Y DESENCOFRADO NORMAL
PARA ESTRUCTURAS DE CONCRETO (OBRAS S/0.00
DE ARTE) 0
ACERO FY=4200KG/CM2 0 S/0.00
PLANCHA DE FIERRO GALVANIZADO
S/0.00
e=1/4" 0
APOYO EN TRAMOS DE DOS 0 S/0.00
EXCAVACION ROCA SUELTA A MANO 0 S/0.00
ENCOFRADO Y DESENCOFRADO NORMAL
PARA ESTRUCTURAS DE CONCRETO (OBRAS S/0.00
DE ARTE) 0
CONCRETO FC=175KG/CM2 0 S/0.00
ENCOFRADO Y DESENCOFRADO NORMAL
PARA ESTRUCTURAS DE CONCRETO (OBRAS S/0.00
DE ARTE) 0
ACERO FY=4200KG/CM2 0 S/0.00
PLANCHA DE FIERRO GALVANIZADO
S/0.00
e=1/4" 0
PASE VEHICULAR CARRETERAS 2 UND 0 S/0.00
EXCAVACION ROCA SUELTA A MANO 0 S/0.00
ENROCADO CON PIEDRA GRANDE 0 S/0.00
ENCOFRADO Y DESENCOFRADO NORMAL
S/0.00
PARA ZAPATAS BAJO AGUA 0
ACERO FY=4200KG/CM2 0 S/0.00
FALSA CIMENTACION DE CONCRETO
(MEZCLA DE CEMENTO:HORMIGON 1:10+30% S/0.00
P.G) 0
CONCRETO FC=210KG/CM2 P/ZAPATA
S/0.00
BAJO AGUA 0
CONCRETO FC=175KG/CM2 0 S/0.00
RELLENO COMPACTADO MANUAL CON
MATERIAL PROPIO S/0.00
0
ELIMINACION DE MATERIAL EXECEDENTE
S/0.00
(D<5KM) 0
CURVA
AVANCE PROGRAMAD
Parcial
S/.
0
SEPTIEMBRE 57,901.88
OCTUBRE 81,942.50
NOVIEMBRE 33,847.53
DIEMBRE 245,873.51
ENERO 119,356.59
FEBRERO 163,368.81
Chart Title
120.00%
100.00%
80.00%
60.00%
40.00%
20.00%
0.00%
SEPTIEMBRE OCTUBRE NOVIEMBRE DIEMBRE ENERO FEBRERO
Column G Column J
23-Oct-10 18-Nov-10 14-Dec-10 9-Jan-11 4-Feb-11 26-Feb-11
S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
S/66,424.58 S/181,431.35 ### ### ### ###
S/51,497.89 S/53,421.77 S/53,421.77 S/53,421.77 S/53,421.77 S/53,421.77
S/2,221.00 S/2,221.00 S/2,221.00 S/2,221.00 S/2,221.00 S/2,221.00
S/459.27 S/459.27 S/459.27 S/459.27 S/459.27 S/459.27
CURVA "S"
CURVA S
AVANCE PROGRAMADO AVANCE EJECUTADO
Acumulado Parcial Acumulado
S/. % S/. S/. %
0 0 0 ESTADO DE LA OBRA
57,901.88 8.24% 61,052.12 61,052.12 8.69% + 0.45%
139,844.38 19.91% 75,025.12 136,077.24 19.38% - -0.54%
173,691.91 24.73% 34,025.10 170,102.34 24.22% - -0.51%
419,565.42 59.74% 247,053.50 417,155.84 59.40% - -0.34%
538,922.01 76.74% 121,058.12 538,213.96 76.64% - -0.10%
702,290.82 100.00% 164,078.78 702,292.74 100.00% + 0.00%
Chart Title
250000
200000
150000
100000
50000
0
1-Sep-10 1-Oct-10 1-Nov-10 1-Dec-10 1-Jan-11 1-Feb-11