Está en la página 1de 14

Item Titulo Fecha

Proyecto de contruccion de ductos para


1 Jul-95
el trasnporte de hidrocarburos

Estudio de Impacto ambiental del Lote 31


2 -C Apr-95
Vol 1 de 5

3 Estudio de impacto ambiental May-95

Manual de procedimientos operativos


4
para gasoductos

Aguaytia pipeline project


5 Jun-96
Basic of desing

Aguaytia energy del Peru S.R.L.


Canal Pucalpillo: Instalacion de hitos de
6 referencia, regla limnimetrica y boyas ene Oct-97
eje de canal.
Drawing documental transmittal
7 As Built Dwgs. Aug-98
Aguaytia Gas Project

Drawing documental transmittal


8 As Built Dwgs. Aug-98
Cathodic Protection
Aguaytia pipeline Project
9 Hydrostatic test procedures Sep-97

10 Operations and maintenance manual

11 Operation and manintenance plan


Standard operating procedures for
12
corrosion

13 Standard operating procedures for


pipelines

Security, welding procedures, hidrostatics


14 pipeline project, equipment & personnel,
construction safety manual, etc

Aguaytia pipeline project Construction


15 Oct-96
drawings
Aguaytia pipeline project Construction
15 Oct-96
drawings

Aguaytia pipeline project


10" Gas line Neshuya facilities - Aguaytia
16 Oct-96
power plant
Construction drawings

Aguaytia pipeline project


12" Gas line and 4" NGL line
17 Oct-96
Aguaytia gas plant - Neshuya facilities
Construction drawings
Aguaytia pipeline project
12" Gas line and 4" NGL line
17 Oct-96
Aguaytia gas plant - Neshuya facilities
Construction drawings

Aguaytia pipeline project


6" Gas line and 4" NGL line
18 Neshuya facilities - Yarinacocha power Oct-96
plant
Construction drawings

Aguaytia pipeline project


19 Facilities Oct-96
Construction drawings

Aguaytia pipeline project


20 Welding procedures Aug-96

Aguaytia pipeline Project


21 Welding procedures & Hydrostatic test Aug-96
procedures
Documentos Aguaytia Energy del Peru
22
S.R.Ltda.
23 Otros planos a detalle
Contenido
Memoria descriptiva del proyecto
Hojas de calculo
Planos
Especificaciones tesnicas
Estudio de impacto ambiental
Informe de auditoria
relacion de profesionales responsables del proyecto
Resumen ejecutivo
Introduccion
Marco normativo
Descripcion del proyecto
Linea base ambiental
Impactos potenciales del proyecto propuesto

Consulta con las agencias gubernamentales (AG), comunidades


afectadas y organizaciones no gubernamentales (ONG)

Introduccion
Sumario ejecutivo
Estudio de impacto ambiental
Introduccion
Indice
Procedimientos
Formularios
Introducction
Basic of desing
Methodology
Calculations results
Desing data and calculations
Introduccion
Generalidades
Metodologia
Trabajos ejecutados
Recomendaciones
Anexos
Plot plan - Aguaytia gas plant
Plot plan - Aguaytia power plant
10" Gas line, Neshuya - Aguaytia power plant
10" Gas line, Neshuya - Aguaytia power plant
10" Gas line, Neshuya - Aguaytia power plant
10" Gas line, Neshuya - Aguaytia power plant
10" Gas line, Neshuya - Aguaytia power plant
10" Gas line, Neshuya - Aguaytia power plant
10" Gas line, Neshuya - Aguaytia power plant
10" Gas line, Neshuya - Aguaytia power plant
10" Gas line, Neshuya - Aguaytia power plant
10" Gas line, Neshuya - Aguaytia power plant
10" Gas line, Neshuya - Aguaytia power plant
Well N° 6-P Gas plant-4" Gathering line
Well N° 9-P, N°2X-P and 5-P Gas plant 4" Gathering line
4" LPG line transfer station-barge loading terminal
Gas plant Well N° 3-I 3" Reinjecction line
Gas plant Well N° 7-I and N° 8-I 3" Reinjecction line

6" Gas Line & 4" NGL line Neshuya fractionation plant - Yarinacocha

6" Gas Line & 4" NGL line Neshuya fractionation plant - Yarinacocha

6" Gas Line & 4" NGL line Neshuya fractionation plant - Yarinacocha

6" Gas Line & 4" NGL line Neshuya fractionation plant - Yarinacocha

6" Gas Line & 4" NGL line Neshuya fractionation plant - Yarinacocha

6" Gas Line & 4" NGL line Neshuya fractionation plant - Yarinacocha

Plot plant - Fractionation plant


Plot plan - Neshuya facilities
Plot plan - Yarinacocha power plant
4" Lasoline Line - Fracctionation plant existing 4" Line

Cathodic protecction and monitoring plan aguaytia pipeline project

Rectifier & anode bed location Aguaytia gas plant


Rectifier & anode bed location Aguaytia fractionation plant
Rectifier & anode bed location Aguaytia Powe plant
Cathodic protecction wiring neshuya facilities
Concrete envelope details
Envelope ending point Aguaytia Power plant
Vertical anode installation aguaytia Power plant
Typical rectifier installation aguaytia Power plant
Connection box aguaytia gas plant
Section G-G Aguaytia gas plant
Concrete envelope details Fractionation plant
Vertical anode installation Fractioantion plant
Typical rectifier installation Fractionation plant
Connection box Fractionation plant
Envelope ending point Neshuya facilities
Construction detail Neshuya facilities
Insulating flange
Tank 150 Bbl. Capacity
Cathodic protection test site installation type "CA"
Cathodic protection test site installation type "I" bing fink CP tes
station
Cathodic protection test site installation type "T" bing fink CP tes
station
Caweld connetion
Powder-weld connetion to steel pipe
General information
Test equipment
Cleaning
Filling
Pressuring and hold period
Assement of test
Dewatering
Driying
Final hydrostatic test report
Appendices
Intent and purpose
Normal operations
Maintenance procedures
Abnormal operations
Emergency operations
Asme B 31.4 - 1992
References
Forms
General
Materials
Desing
welding
General construction
Hydrostatic testing
Pipeline systems
Corrosion control
Pipeline facilities
Compressor facilities
Measurement facilities
Emergency plan
Appendices
Pipe-to-soil potential measurement
Line current flow measurement
Shunt or resistor current flow measurement
pH measurement
Collection of samples for analysis
Rectifier inspection
Impresser current anode bed inspection
Galvanic anode inspection
Casing isolation testing
Insulating joint isolation testing
Foreign structure interface testing and mitigation
Close interval pipe-to-soil potencial survey
Inline tool pipeline inspection
Cathodic protection current requirement testing
Grounding cell inspection
Sulfate reducing bacteria test
Pipeline field costing systems
Paint application and inspection
Annual pipeline corrosion control survey
Annual station survey
Annual communication tower survey
Initial rectifier inspection and operation
Bi-monthly rectifier inspection
Bi-monthly critical bond inspection
Pipe and coating inspection for atmospheric pipe
Pipe and coating inspection for buried pipe
Internal corrosion monitoring
Buried storage tanks
Shutdown activities
General construction guidelines
Construction processes
Pipeline manintenance
Inspection and damage prevention
Valve control inspection and maintenance
General
Qualification of welding procedures for pipeline, compressor stations,
pump stations and fabricated assemblies
Qualification of welders for pipeline, compressor stations, and
fabricated assemblies
Preheating and stress relieving
Visual and nondestructive inspection
Repair or removal of defects
Special details
Plot plans
Schematics
Alignment sheets
Main line valves and scrapers
Blow offs
River crossings
Meter stations
Separators
Road crossings
Insulation flanges
Test leads
Fencing
welding procedures
Hydrotest procedures
Plano general
Typical minor river and creek crossings
Typical minor river crossing concrete weight
Open cut public road crossing
Open cut private road crossing
Typical swamp areas set-on concrete weight
Ditch detail
Backfill sack breaker
Washout and erosion prevention
Cadweld connection
Powder-weld connetion to steel pipe
10" Gas line schematic
Weld bevels
10" Gas line alignment sheets (11 dwgs.)
12"x10" Lauching trap
Valve setting - KP 18.909
Valve setting - KP 54.318
12"x10" Receiving trap
San Alejandro river crossing
Tahuayo river crossing -KP 6.830
Tahuayo river crossing -KP 10.710
Tahuayo river crossing -KP 15.336
Huipoca river crossing -KP 76.574
Huacamayo river crossing -KP 81.890
Main line valve fencing
Plano general
Typical minor river and creek crossings
Typical minor river crossing concrete weight
Open cut public road crossing
Open cut private road crossing
Typical swamp areas set-on concrete weight
Ditch detail
Backfill sack breaker
Washout and erosion prevention
Cadweld connection
Powder-weld connetion to steel pipe
12" Neshuya Gas line schematic
4" NGL line schematic
Weld bevels
12" Gas line & 4" NGL line alignment sheets (5 dwgs.)
16" x 12" lauching trap
12" line valve setting - KP 18.097
16" x 12" receiving trap
6" x 4" lauching trap
4" line valve setting - Aguayti river
4" line valve setting - Uruya river
4" line valve setting - Tahuayo river
4" line valve setting - KP 39.320
Aguaytia river crossing
Uruya river crossing - KP 6.830
Tahuayo river crossing - KP 37.971
Main line valve fencing
Plano general
Typical minor river and creek crossings
Typical minor river crossing concrete weight
Open cut public road crossing
Open cut private road crossing
Typical swamp areas set-on concrete weight
Ditch detail
Backfill sack breaker
Washout and erosion prevention
Cadweld connection
Powder-weld connetion to steel pipe
6" Aguaytia gas line schematic
4" Aguaytia gas line schematic
Weld bevels
6" Gas Line & 4" NGL line alignment sheets (7 dwgs.)
8" x 6 " launching trap
6" line valve setting - KP 29.391
8" x 6" receinving trap
4" NGL line - Neshuya river valve setting
4" NGL line - KP 68.711 valve setting
6" x 4" receiving trap
Neshuya river crossing
Main line valve fencing
Aguaytia gas plant facilities
Neshuya facilities
Aguaytia power plant facilities
Fractionation plant facilities
Yarinacocha power plant facilities