RENDIMIENTO DE CONCRETO POR 1 M3 PARA:

PROPORCION

CEMENTO

GRAVA
ARENA
AGUA
RESISTENCIA CANTIDAD DE MATERIAL PARA 1 M3

BULTOS

BOTES

BOTES
BOTES
CEMENTO 8 BULTOS
100 Kg/m2 ARENA 6 1/2 X 8 X 19 LT. = 988 LT. = 0.988 M 3 1 2 1/4 6 1/2 7
GRAVA 7 3/4 X 8 X 19 LT. = 1064 LT. = 1.064 M 3

CEMENTO 8 BULTOS
150 Kg/m 2
ARENA 5 X 8 X 19 LT. = 760 LT. = 0.760 M 3 1 2 5 5 3/4
GRAVA 5 3/4 X 8 X 19 LT. = 874 LT. = 0.874 M 3

CEMENTO 8 BULTOS
200 Kg/m 2
ARENA 4 X 8 X 19 LT. = 608 LT. = 0.608 M 3 1 1 1/2 4 5
GRAVA 5 X 8 X 19 LT. = 780 LT. = 0.780 M 3

CEMENTO 8 BULTOS
250 Kg/m2 ARENA 3 X 8 X 19 LT. = 456 LT. = 0.456 M 3 1 1 1/3 3 4
GRAVA 4 X 8 X 19 LT. = 608 LT. = 0.608 M 3

RENDIMIENTO DE MORTERO POR 1 M3 PARA:


PROPORCION
MORTERO

ARENA
RESISTENCIA CANTIDAD DE MATERIAL PARA 1 M3
BULTOS

BOTES

MORTERO 8.77 BULTOS


PLANTILLAS 1 M3 1 6
ARENA

MUROS DE MORTERO 13.16 BULTOS


1 4
TABIQUE ARENA 1 M3

RENDIMIENTO DE FIERRO POR 1 ML.


ALAMBRE 0.030 KG. / ML.
No. 2 ALAMBRÓN 0.388 KG. / ML.
No. 3 VARILLA 0.56 KG. / ML.
No. 4 VARILLA 0.994 KG. / ML.