Usamos h = 0.30 m
b = 0.25 m
Ejes Area Tributaria Tipo P. Aligerado Long. Vigas P. Vigas P. Muerto P. Muro
2-A 5.625 m² C4 5062.50 Kg 4.50 m 2610.00 Kg 2531.25 Kg 7897.50 Kg
2-B 6.675 m² C3 6007.50 Kg 5.50 m 2830.50 Kg 3003.75 Kg 2808.00 Kg
2-C 6.675 m² C3 6007.50 Kg 5.50 m 3397.50 Kg 3003.75 Kg 2808.00 Kg
2-D 5.625 m² C4 5062.50 Kg 4.50 m 2610.00 Kg 2531.25 Kg 7897.50 Kg
3-A 6.806 m² C3 6125.40 Kg 5.03 m 2896.20 Kg 3062.70 Kg 17058.60 Kg
3-B 8.381 m² C1 7542.90 Kg 3.03 m 3683.70 Kg 3771.45 Kg 5089.50 Kg
3-C 8.381 m² C1 7542.90 Kg 3.03 m 3683.70 Kg 3771.45 Kg 5089.50 Kg
3-D 6.806 m² C3 6125.40 Kg 5.03 m 2896.20 Kg 3062.70 Kg 17058.60 Kg
4-A 6.019 m² C3 5417.10 Kg 4.68 m 2707.20 Kg 2708.55 Kg 2843.10 Kg
4-B 8.694 m² C1 7824.60 Kg 5.68 m 3494.70 Kg 3912.30 Kg 8529.30 Kg
4-C 8.328 m² C1 7495.20 Kg 5.68 m 3494.70 Kg 3747.60 Kg 0.00 Kg
4-D 5.051 m² C3 4545.90 Kg 4.25 m 2475.00 Kg 2272.95 Kg 7020.00 Kg
5-A 3.038 m² C3 2734.20 Kg 3.35 m 1989.00 Kg 1367.10 Kg 10881.00 Kg
5-B 8.348 m² C1 7513.20 Kg 6.22 m 3786.30 Kg 3756.60 Kg 15163.20 Kg
5-C 9.514 m² C1 8562.60 Kg 6.22 m 3786.30 Kg 4281.30 Kg 10249.20 Kg
5-D 4.759 m² C3 4283.10 Kg 4.12 m 2404.80 Kg 2141.55 Kg 10494.90 Kg
6-A 6.728 m² C3 6055.20 Kg 4.99 m 2874.60 Kg 3027.60 Kg 9617.40 Kg
6-B 10.641 m² C1 9576.90 Kg 6.43 m 3899.70 Kg 4788.45 Kg 7897.50 Kg
6-C 11.148 m² C1 10033.20 Kg 6.68 m 3899.70 Kg 5016.60 Kg 3510.00 Kg
6-D 7.706 m² C3 6935.40 Kg 5.43 m 3112.20 Kg 3467.70 Kg 11583.00 Kg
7-A 4.073 m² C4 3665.70 Kg 3.81 m 2237.40 Kg 1832.85 Kg 12495.60 Kg
7-B 5.883 m² C3 5294.70 Kg 4.81 m 3024.90 Kg 2647.35 Kg 10530.00 Kg
7-C 5.883 m² C3 5294.70 Kg 4.81 m 3024.90 Kg 2647.35 Kg 10530.00 Kg
7-D 4.073 m² C4 3665.70 Kg 3.81 m 2237.40 Kg 1832.85 Kg 12495.60 Kg
UNPRG
INGENIERIA CIVIL CONCRETO ARMADO I
m
PROYECTO VIVIENDA MULTIFAMILIAR - 3 PSIOS
METRADO DE CARGA
DIMENSIONES
Viga Principales b = 0.25 m h = 0.35 m
Vigas Secundarias : b = 0.25 m h = 0.30 m
Columna: 0.25 m 0.25 m
PESO POR METRO CUADRADO
P. Esp. Del Cº: Γc 2.40 T/m³ Acabado 0.15 T/m²
Azotea: S/C 0.10 T/m³ P. Tab.Eq. 2º piso 0.32 T/m²
Vivienda (S/C) 0.20 T/m² P. Tab.Eq. 3º piso 0.32 T/m²
Aligerado (0.20cm) 0.30 T/m² Ancho Tributario B
P. Esp. Muro de Albañileria 1800 Kg/m³
Altura Entrepiso 2.60 m
Parapeto 1.00 m
1. PRIMER PISO
A-B 4.00 m 2.50 m 0.21 T/m 0.68 T/m 0.38 T/m 0.00 m 0.00 T/m
2 B-C 2.00 m 2.50 m 0.21 T/m 0.68 T/m 0.38 T/m 0.00 m 0.00 T/m
C-D 4.00 m 2.50 m 0.21 T/m 0.68 T/m 0.38 T/m 0.00 m 0.00 T/m
A-B 4.00 m 3.03 m 0.21 T/m 0.83 T/m 0.45 T/m 2.08 m 0.37 T/m
3 B-C 2.00 m 3.03 m 0.21 T/m 0.83 T/m 0.45 T/m 0.00 m 0.00 T/m
C-D 4.00 m 3.03 m 0.21 T/m 0.83 T/m 0.45 T/m 2.08 m 0.37 T/m
A-B 4.00 m 2.68 m 0.21 T/m 0.73 T/m 0.40 T/m 0.00 m 0.00 T/m
4 B-C 2.00 m 2.68 m 0.21 T/m 0.73 T/m 0.40 T/m 0.00 m 0.00 T/m
C-D 4.00 m 2.68 m 0.21 T/m 0.73 T/m 0.40 T/m 0.00 m 0.00 T/m
A-B 4.00 m 3.22 m 0.21 T/m 0.89 T/m 0.48 T/m 4.00 m 0.70 T/m
5 B-C 2.00 m 3.22 m 0.21 T/m 0.89 T/m 0.48 T/m 0.92 m 0.32 T/m
C-D 4.00 m 3.22 m 0.21 T/m 0.89 T/m 0.48 T/m 3.18 m 0.56 T/m
A-B 4.00 m 3.43 m 0.21 T/m 0.95 T/m 0.51 T/m 1.25 m 0.22 T/m
6 B-C 2.00 m 3.43 m 0.21 T/m 0.95 T/m 0.51 T/m 2.00 m 0.70 T/m
C-D 4.00 m 3.43 m 0.21 T/m 0.95 T/m 0.51 T/m 0.00 m 0.00 T/m
A-B 4.00 m 1.81 m 0.21 T/m 0.47 T/m 0.27 T/m 4.00 m 0.70 T/m
7 B-C 2.00 m 1.81 m 0.21 T/m 0.47 T/m 0.27 T/m 2.00 m 0.70 T/m
C-D 4.00 m 1.81 m 0.21 T/m 0.47 T/m 0.27 T/m 4.00 m 0.70 T/m
Para las vigas secundarias ya no se considera la carga viva, solo la carga muerta, por lo tanto no habra combinacion de carga
1.2. VIGAS SECUNDARIAS Carga Ubicada en 2º Pis
Carga
Longitud Carga Viva
Eje Eje Longuitud (m) P. Propio Viga Peso de Muro Muerta 1.4 * Wm
muro (m) (Wv)
(Wm)
2-3 2.90 m 0.18 T/m 2.90 m 0.70 T/m 0.88 T/m no 1.23 T/m
3-4 2.65 m 0.18 T/m 2.65 m 0.70 T/m 0.88 T/m no 1.23 T/m
A 4-5 2.20 m 0.18 T/m 2.20 m 0.70 T/m 0.88 T/m no 1.23 T/m
5-6 3.48 m 0.18 T/m 1.18 m 0.24 T/m 0.42 T/m no 0.59 T/m
6-7 3.12 m 0.18 T/m 3.12 m 0.70 T/m 0.88 T/m no 1.23 T/m
2-3 2.90 m 0.18 T/m 2.25 m 0.54 T/m 0.72 T/m no 1.01 T/m
3-4 2.65 m 0.18 T/m 1.40 m 0.37 T/m 0.55 T/m no 0.77 T/m
B
B 4-5 2.20 m 0.18 T/m 2.20 m 0.70 T/m 0.88 T/m no 1.23 T/m
5-6 3.48 m 0.18 T/m 1.22 m 0.25 T/m 0.43 T/m no 0.60 T/m
6-7 3.12 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
2-3 2.90 m 0.18 T/m 2.25 m 0.54 T/m 0.72 T/m no 1.01 T/m
3-4 2.65 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
C 4-5 2.20 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
5-6 3.48 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
6-7 3.12 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
2-3 2.90 m 0.18 T/m 2.90 m 0.70 T/m 0.88 T/m no 1.23 T/m
3-4 2.65 m 0.18 T/m 2.65 m 0.70 T/m 0.88 T/m no 1.23 T/m
D 4-5 2.20 m 0.18 T/m 0.67 m 0.21 T/m 0.39 T/m no 0.55 T/m
5-6 3.48 m 0.18 T/m 3.48 m 0.70 T/m 0.88 T/m no 1.23 T/m
6-7 3.12 m 0.18 T/m 3.12 m 0.70 T/m 0.88 T/m no 1.23 T/m
2. SEGUNDO PISO
A-B 4.00 m 2.50 m 0.21 T/m 0.68 T/m 0.38 T/m 0.00 m 0.00 T/m
2 B-C 2.00 m 2.50 m 0.21 T/m 0.68 T/m 0.38 T/m 0.00 m 0.00 T/m
C-D 4.00 m 2.50 m 0.21 T/m 0.68 T/m 0.38 T/m 0.00 m 0.00 T/m
A-B 4.00 m 3.03 m 0.21 T/m 0.83 T/m 0.45 T/m 2.08 m 0.37 T/m
3 B-C 2.00 m 3.03 m 0.21 T/m 0.83 T/m 0.45 T/m 0.00 m 0.00 T/m
C-D 4.00 m 3.03 m 0.21 T/m 0.83 T/m 0.45 T/m 2.08 m 0.37 T/m
A-B 4.00 m 2.68 m 0.21 T/m 0.73 T/m 0.40 T/m 0.00 m 0.00 T/m
4 B-C 2.00 m 2.68 m 0.21 T/m 0.73 T/m 0.40 T/m 0.00 m 0.00 T/m
C-D 4.00 m 2.68 m 0.21 T/m 0.73 T/m 0.40 T/m 0.00 m 0.00 T/m
A-B 4.00 m 3.22 m 0.21 T/m 0.89 T/m 0.48 T/m 4.00 m 0.70 T/m
5 B-C 2.00 m 3.22 m 0.21 T/m 0.89 T/m 0.48 T/m 0.77 m 0.27 T/m
C-D 4.00 m 3.22 m 0.21 T/m 0.89 T/m 0.48 T/m 3.18 m 0.56 T/m
A-B 4.00 m 3.43 m 0.21 T/m 0.95 T/m 0.51 T/m 1.25 m 0.22 T/m
6 B-C 2.00 m 3.43 m 0.21 T/m 0.95 T/m 0.51 T/m 2.00 m 0.70 T/m
C-D 4.00 m 3.43 m 0.21 T/m 0.95 T/m 0.51 T/m 0.00 m 0.00 T/m
A-B 4.00 m 1.81 m 0.21 T/m 0.47 T/m 0.27 T/m 4.00 m 0.70 T/m
7 B-C 2.00 m 1.81 m 0.21 T/m 0.47 T/m 0.27 T/m 2.00 m 0.70 T/m
C-D 4.00 m 1.81 m 0.21 T/m 0.47 T/m 0.27 T/m 4.00 m 0.70 T/m
Para las vigas secundarias ya no se considera la carga viva, solo la carga muerta, por lo tanto no habra combinacion de carga
2.2. VIGAS SECUNDARIAS Carga Ubicada en 3º Pis
Carga
Longitud Carga Viva
Eje Eje Longuitud (m) P. Propio Viga Peso Muro Muerta 1.4 * Wm
muro (m) (Wv)
(Wm)
2-3 2.90 m 0.18 T/m 2.90 m 0.70 T/m 0.88 T/m no 1.23 T/m
3-4 2.65 m 0.18 T/m 2.65 m 0.70 T/m 0.88 T/m no 1.23 T/m
A 4-5 2.20 m 0.18 T/m 2.20 m 0.70 T/m 0.88 T/m no 1.23 T/m
5-6 3.48 m 0.18 T/m 1.18 m 0.24 T/m 0.42 T/m no 0.59 T/m
6-7 3.12 m 0.18 T/m 3.12 m 0.70 T/m 0.88 T/m no 1.23 T/m
2-3 2.90 m 0.18 T/m 2.10 m 0.51 T/m 0.69 T/m no 0.96 T/m
3-4 2.65 m 0.18 T/m 1.40 m 0.37 T/m 0.55 T/m no 0.77 T/m
B 4-5 2.20 m 0.18 T/m 2.20 m 0.70 T/m 0.88 T/m no 1.23 T/m
5-6 3.48 m 0.18 T/m 1.22 m 0.25 T/m 0.43 T/m no 0.60 T/m
B
6-7 3.12 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
2-3 2.90 m 0.18 T/m 2.10 m 0.51 T/m 0.69 T/m no 0.96 T/m
3-4 2.65 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
C 4-5 2.20 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
5-6 3.48 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
6-7 3.12 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
2-3 2.90 m 0.18 T/m 2.90 m 0.70 T/m 0.88 T/m no 1.23 T/m
3-4 2.65 m 0.18 T/m 2.65 m 0.70 T/m 0.88 T/m no 1.23 T/m
D 4-5 2.20 m 0.18 T/m 0.67 m 0.21 T/m 0.39 T/m no 0.55 T/m
5-6 3.48 m 0.18 T/m 3.48 m 0.70 T/m 0.88 T/m no 1.23 T/m
6-7 3.12 m 0.18 T/m 3.12 m 0.70 T/m 0.88 T/m no 1.23 T/m
3. TERCER PISO
A-B 4.00 m 2.50 m 0.21 T/m 0.68 T/m 0.38 T/m 0.00 m 0.00 T/m
2 B-C 2.00 m 2.50 m 0.21 T/m 0.68 T/m 0.38 T/m 0.00 m 0.00 T/m
C-D 4.00 m 2.50 m 0.21 T/m 0.68 T/m 0.38 T/m 0.00 m 0.00 T/m
A-B 4.00 m 3.03 m 0.21 T/m 0.83 T/m 0.45 T/m 0.00 m 0.00 T/m
3 B-C 2.00 m 3.03 m 0.21 T/m 0.83 T/m 0.45 T/m 0.00 m 0.00 T/m
C-D 4.00 m 3.03 m 0.21 T/m 0.83 T/m 0.45 T/m 0.00 m 0.00 T/m
A-B 4.00 m 2.68 m 0.21 T/m 0.73 T/m 0.40 T/m 0.00 m 0.00 T/m
4 B-C 2.00 m 2.68 m 0.21 T/m 0.73 T/m 0.40 T/m 0.00 m 0.00 T/m
C-D 4.00 m 2.68 m 0.21 T/m 0.73 T/m 0.40 T/m 0.00 m 0.00 T/m
A-B 4.00 m 3.22 m 0.21 T/m 0.89 T/m 0.48 T/m 0.00 m 0.00 T/m
5 B-C 2.00 m 3.22 m 0.21 T/m 0.89 T/m 0.48 T/m 0.00 m 0.00 T/m
C-D 4.00 m 3.22 m 0.21 T/m 0.89 T/m 0.48 T/m 0.00 m 0.00 T/m
A-B 4.00 m 3.43 m 0.21 T/m 0.95 T/m 0.51 T/m 0.00 m 0.00 T/m
6 B-C 2.00 m 3.43 m 0.21 T/m 0.95 T/m 0.51 T/m 0.00 m 0.00 T/m
C-D 4.00 m 3.43 m 0.21 T/m 0.95 T/m 0.51 T/m 0.00 m 0.00 T/m
A-B 4.00 m 1.81 m 0.21 T/m 0.47 T/m 0.27 T/m 4.00 m 0.70 T/m
7 B-C 2.00 m 1.81 m 0.21 T/m 0.47 T/m 0.27 T/m 2.00 m 0.70 T/m
C-D 4.00 m 1.81 m 0.21 T/m 0.47 T/m 0.27 T/m 4.00 m 0.70 T/m
Para las vigas secundarias ya no se considera la carga viva, solo la carga muerta, por lo tanto no habra combinacion de carga
2.2. VIGAS SECUNDARIAS Carga Ubicada en la Azo
Carga
Longitud Carga Viva
Eje Eje Longuitud (m) P. Propio Viga Peso Muro Muerta 1.4 * Wm
muro (m) (Wv)
(Wm)
2-3 2.90 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
3-4 2.65 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
A 4-5 2.20 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
5-6 3.48 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
6-7 3.12 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
2-3 2.90 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
3-4 2.65 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
B 4-5 2.20 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
5-6 3.48 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
6-7 3.12 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
2-3 2.90 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
C
3-4 2.65 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
C 4-5 2.20 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
5-6 3.48 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
6-7 3.12 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
2-3 2.90 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
3-4 2.65 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
D 4-5 2.20 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
5-6 3.48 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
6-7 3.12 m 0.18 T/m 0.00 m 0.00 T/m 0.18 T/m no 0.25 T/m
Carga Ubicada en 2º Piso
0.80 T/m 2.059 T/m 0.500 T/m 2.88 T/m 0.85 T/m 3.73 T/m
0.80 T/m 2.059 T/m 0.500 T/m 2.88 T/m 0.85 T/m 3.73 T/m
0.80 T/m 2.059 T/m 0.500 T/m 2.88 T/m 0.85 T/m 3.73 T/m
0.97 T/m 2.832 T/m 0.606 T/m 3.96 T/m 1.03 T/m 4.99 T/m
0.97 T/m 2.467 T/m 0.606 T/m 3.45 T/m 1.03 T/m 4.48 T/m
0.97 T/m 2.832 T/m 0.606 T/m 3.96 T/m 1.03 T/m 4.99 T/m
0.86 T/m 2.197 T/m 0.536 T/m 3.08 T/m 0.91 T/m 3.99 T/m
0.86 T/m 2.197 T/m 0.536 T/m 3.08 T/m 0.91 T/m 3.99 T/m
0.86 T/m 2.197 T/m 0.536 T/m 3.08 T/m 0.91 T/m 3.99 T/m
1.03 T/m 3.315 T/m 0.644 T/m 4.64 T/m 1.09 T/m 5.74 T/m
1.03 T/m 2.936 T/m 0.644 T/m 4.11 T/m 1.09 T/m 5.20 T/m
1.03 T/m 3.171 T/m 0.644 T/m 4.44 T/m 1.09 T/m 5.53 T/m
1.10 T/m 2.994 T/m 0.686 T/m 4.19 T/m 1.17 T/m 5.36 T/m
1.10 T/m 3.476 T/m 0.686 T/m 4.87 T/m 1.17 T/m 6.03 T/m
1.10 T/m 2.774 T/m 0.686 T/m 3.88 T/m 1.17 T/m 5.05 T/m
0.58 T/m 2.230 T/m 0.362 T/m 3.12 T/m 0.62 T/m 3.74 T/m
0.58 T/m 2.230 T/m 0.362 T/m 3.12 T/m 0.62 T/m 3.74 T/m
0.58 T/m 2.230 T/m 0.362 T/m 3.12 T/m 0.62 T/m 3.74 T/m
Wu = 1.4 (Wm)
1.7 * Wv
+ 1.7 (Wv)
0.81 T/m 2.07 T/m 0.50 T/m 2.90 T/m 0.85 T/m 3.75 T/m
0.81 T/m 2.07 T/m 0.50 T/m 2.90 T/m 0.85 T/m 3.75 T/m
0.81 T/m 2.07 T/m 0.50 T/m 2.90 T/m 0.85 T/m 3.75 T/m
0.98 T/m 2.84 T/m 0.61 T/m 3.98 T/m 1.03 T/m 5.01 T/m
0.98 T/m 2.48 T/m 0.61 T/m 3.47 T/m 1.03 T/m 4.50 T/m
0.98 T/m 2.84 T/m 0.61 T/m 3.98 T/m 1.03 T/m 5.01 T/m
0.87 T/m 2.21 T/m 0.54 T/m 3.09 T/m 0.91 T/m 4.00 T/m
0.87 T/m 2.21 T/m 0.54 T/m 3.09 T/m 0.91 T/m 4.00 T/m
0.87 T/m 2.21 T/m 0.54 T/m 3.09 T/m 0.91 T/m 4.00 T/m
1.04 T/m 3.33 T/m 0.64 T/m 4.66 T/m 1.09 T/m 5.76 T/m
1.04 T/m 2.90 T/m 0.64 T/m 4.06 T/m 1.09 T/m 5.15 T/m
1.04 T/m 3.18 T/m 0.64 T/m 4.46 T/m 1.09 T/m 5.55 T/m
1.11 T/m 3.01 T/m 0.69 T/m 4.21 T/m 1.17 T/m 5.38 T/m
1.11 T/m 3.49 T/m 0.69 T/m 4.89 T/m 1.17 T/m 6.05 T/m
1.11 T/m 2.79 T/m 0.69 T/m 3.90 T/m 1.17 T/m 5.07 T/m
0.59 T/m 2.24 T/m 0.36 T/m 3.13 T/m 0.62 T/m 3.75 T/m
0.59 T/m 2.24 T/m 0.36 T/m 3.13 T/m 0.62 T/m 3.75 T/m
0.59 T/m 2.24 T/m 0.36 T/m 3.13 T/m 0.62 T/m 3.75 T/m
Wu = 1.4 (Wm)
1.7 * Wv
+ 1.7 (Wv)
0.00 T/m 1.26 T/m 0.25 T/m 1.76 T/m 0.43 T/m 2.19 T/m
0.00 T/m 1.26 T/m 0.25 T/m 1.76 T/m 0.43 T/m 2.19 T/m
0.00 T/m 1.26 T/m 0.25 T/m 1.76 T/m 0.43 T/m 2.19 T/m
0.00 T/m 1.50 T/m 0.30 T/m 2.10 T/m 0.52 T/m 2.61 T/m
0.00 T/m 1.50 T/m 0.30 T/m 2.10 T/m 0.52 T/m 2.61 T/m
0.00 T/m 1.50 T/m 0.30 T/m 2.10 T/m 0.52 T/m 2.61 T/m
0.00 T/m 1.34 T/m 0.27 T/m 1.88 T/m 0.46 T/m 2.33 T/m
0.00 T/m 1.34 T/m 0.27 T/m 1.88 T/m 0.46 T/m 2.33 T/m
0.00 T/m 1.34 T/m 0.27 T/m 1.88 T/m 0.46 T/m 2.33 T/m
0.00 T/m 1.58 T/m 0.32 T/m 2.22 T/m 0.55 T/m 2.77 T/m
0.00 T/m 1.58 T/m 0.32 T/m 2.22 T/m 0.55 T/m 2.77 T/m
0.00 T/m 1.58 T/m 0.32 T/m 2.22 T/m 0.55 T/m 2.77 T/m
0.00 T/m 1.68 T/m 0.34 T/m 2.35 T/m 0.58 T/m 2.93 T/m
0.00 T/m 1.68 T/m 0.34 T/m 2.35 T/m 0.58 T/m 2.93 T/m
0.00 T/m 1.68 T/m 0.34 T/m 2.35 T/m 0.58 T/m 2.93 T/m
0.00 T/m 1.65 T/m 0.18 T/m 2.31 T/m 0.31 T/m 2.62 T/m
0.00 T/m 1.65 T/m 0.18 T/m 2.31 T/m 0.31 T/m 2.62 T/m
0.00 T/m 1.65 T/m 0.18 T/m 2.31 T/m 0.31 T/m 2.62 T/m
Wu = 1.4 (Wm)
1.7 * Wv
+ 1.7 (Wv)
3.90 m
A B C D
4.25 m 2.25 m 4.25 m
A B C D
4.25 m 2.25 m 4.25 m ESTADO 2
2.80 m 2.80 m
2.80 m 0.85 T/m
2.90 T/m 2.90 T/m 2.90 T/m
0.85 T/m 3.75 T/m
2.80 m 2.80 m
2.80 m 0.85 T/m 0.85 T/m
2.88 T/m 2.88 T/m 2.88 T/m
0.85 T/m 0.85 T/m 3.73 T/m 3.73 T/m
3.90 m 3.90 m
3.90 m
A B C D
A B C D 4.25 m 2.25 m 4.25 m
4.25 m 2.25 m 4.25 m
ESTADO 3
ESTADO 3: ESTADO PARA CARGA VIVA
0.43 T/m
0.43 T/m 1.76 T/m 1.76 T/m 1.76 T/m
2.19 T/m
A B C D A B C D
4.25 m 2.25 m 4.25 m 4.25 m 2.25 m 4.25 m
2.80 m
2.80 m
3.90 m
A B C D
4.25 m 2.25 m 4.25 m
2.80 m
2.80 m
A B C D
4.25 m 2.25 m 4.25 m
ESTADO 4
A B C D
4.25 m 2.25 m 4.25 m
ESTADO 5
0.43 T/m 0.43 T/m
1.76 T/m 1.76 T/m 1.76 T/m
2.19 T/m 2.19 T/m
A B C D
4.25 m 2.25 m 4.25 m
PROYECTO VIVIENDA MULTIFAMILIAR - 3 PSIOS
2.80 m
2.3114 -1.3829
-0.0002 -0.0002
0.0005 0.0001
-0.0009 -0.0008
0.0024 0.0006
-0.0057 -0.0029
0.0051 0.0031
0.0029 -0.0230
0.0500 0.0095
0.0186 -0.2154
0.0095 -0.0705
0.6361 -0.7407
1.5933 -0.3427
1 0.2036 0.2836 11 0.1441
0.5127 0.2605
-5.6177 5.6177
1.1439 2.8804 1.4402
-0.6695 -1.3390
0.0068 0.0171 0.0086
-0.1947 -0.3894
0.0359 0.0903 0.0452
-0.0208 -0.0416
0.0036 0.0092 0.0046
-0.0026 -0.0053
0.0017 0.0043 0.0021
-0.0007 -0.0015
0.0003 0.0009 0.0004
-0.0002 -0.0003
1.1923 -3.5040 5.3416
3.90 m
0.5961
0.0002
0.0008
0.0018
0.0179
0.0034
0.5720
13 14
4.25 m
7 8
0.5488 0.5488 0.2905
0.1607 -0.9235 0.9235 0.1607 -3.2949
-0.8559
-0.5187 -1.7711 -0.8855
-0.3427 1.1285 2.2570 0.6610 1.1949
-0.1496 -0.5108 -0.2554 0.4188 -0.1815
-0.0705 0.0050 0.0099 0.0029 0.0053
0.0037 0.0126 0.0063 -0.0108 -0.0060
0.0095 0.0029 0.0058 0.0017 0.0031
-0.0021 -0.0072 -0.0036 -0.0065 -0.0013
0.0031 0.0031 0.0062 0.0018 0.0033
-0.0011 -0.0039 -0.0020 -0.0014 -0.0007
0.0006 0.0011 0.0022 0.0006 0.0012
-0.0003 -0.0011 -0.0006 -0.0003 -0.0002
0.0001 0.0003 0.0006 0.0002 0.0003
-1.0680 -2.0645 -0.0001
2.0645 1.0680 -3.1326
-0.3529
-0.0001 0.3529
-0.0003 0.0001
-0.0011 0.0006
-0.0083 0.0027
-0.0773 0.0221
-0.2659 0.3274
15
2.25 m 4.25 m
ESTADO 2 MOMENTOS DE EMPOTRAMIENTO
M111 -5.62 Tn-m M1112
M111 5.62 Tn-m M1211
M29 -4.36 Tn-m M910
M92 4.36 Tn-m M109
M37 -3.29 Tn-m M78
M73 3.29 Tn-m M87
-1.8797
-0.0001
0.0003 1.4949
-0.0004 -0.0010
0.0010 0.0015
-0.0007 -0.0039
0.0048 0.0040
-0.0033 -0.0179
0.0323 0.0313
-0.1004 -0.0190
-0.0675 0.0924
-0.0319
-0.4735 0.5034
-1.2721 0.9361
0.2626 0.2626 5 2 0.2626 0.2626
0.4748 0.4748
5.6407 -0.7967 0.7967 -4.3612
-2.2998 -1.2721 0.9361 1.6923
0.0372 -0.4190
0.7571 -0.0267 -0.0319 -0.0577
-0.1220 -0.0675 0.0345 -0.0545
-0.0195 -0.0031 -0.0190 -0.0343
0.0584 0.0323 0.0054 0.0315
-0.0117 -0.0032 -0.0179 -0.0324
0.0087 0.0048 0.0019 0.0089
-0.0024 -0.0006 -0.0039 -0.0070
0.0018 0.0010 0.0005 0.0019
-0.0005 -0.0001 -0.0010 -0.0018
0.0005 0.0003 0.0005
-0.0001 1.7385 -3.2330
4.0111 -2.1316
-2.3115 2.1835
-0.0002 -0.0005
0.0005 0.0009
-0.0011 -0.0019
0.0024 0.0039
-0.0065 -0.0090
0.0161 0.0108
-0.0062 -0.0095
-0.0337 0.0690
-0.0534 -0.0160
0.0745
-0.6361 0.4681
-1.5933 1.5933
0.2836 0.2036 4 1 0.2036 0.2836
0.5127 0.5127
5.6177 -5.6177
-2.8804 -1.1439 1.1439 2.8804
-0.7306
0.8243 0.0535 0.1346
-0.0965 -0.0383 -0.2272
0.0556 0.0495 0.1247
-0.0112 -0.0044 -0.0287
0.0067 0.0078 0.0196
-0.0117 -0.0046 -0.0047
0.0016 0.0028 0.0070
-0.0020 -0.0008 -0.0012
0.0004 0.0006 0.0016
-0.0004 -0.0002 -0.0003
3.5039 -1.1923 1.2581 -3.4424
-0.5962 0.6291
-0.0001 0.0003
-0.0004 0.0014
-0.0023 0.0039
-0.0022 0.0248
-0.0192 0.0267
-0.5720 0.5720
16 13
MENTOS DE EMPOTRAMIENTO
-1.22 Tn-m M124 -5.62 Tn-m
1.22 Tn-m M412 5.62 Tn-m
-1.58 Tn-m M105 -4.36 Tn-m
1.58 Tn-m M510 4.36 Tn-m
-0.74 Tn-m M86 -3.29 Tn-m
0.74 Tn-m M68 3.29 Tn-m
7 8
0.2905 0.5488 0.5488 0.2905
3.2949 0.1607 -0.7442 0.7442 0.1607 -3.2949
0.9100 -0.9100
-1.0054 -0.5562 -1.8992 -0.9496
0.1670 -0.2318 1.2101 2.4202 0.7088 1.2813
-0.3327 -0.1841 -0.6285 -0.3143 0.2813 -0.2086
0.0566 -0.0302 0.0663 0.1326 0.0388 0.0702
-0.0269 -0.0149 -0.0509 -0.0254 -0.0298 -0.0189
0.0072 0.0174 0.0203 0.0407 0.0119 0.0215
-0.0131 -0.0072 -0.0247 -0.0123 -0.0104 -0.0049
0.0027 0.0049 0.0076 0.0152 0.0044 0.0080
-0.0044 -0.0024 -0.0084 -0.0042 -0.0023 -0.0016
0.0009 0.0011 0.0022 0.0044 0.0013 0.0024
-0.0012 -0.0007 -0.0023 -0.0011 -0.0005 -0.0005
0.0003 0.0006 0.0012 0.0003 0.0006
3.0555 -1.0038 -2.0515 -0.0001
2.0515 1.0038 -3.0555
-0.3942
-0.0001 0.3942
-0.0005 0.0002
-0.0018 0.0010
-0.0114 0.0044
-0.0902 0.0295
-0.2902 0.3590
14
4.25 m 2.25 m
ESTADO 4
0.6439 0.3561 6 3
3.2949 -0.4681
-1.8201 -1.0068
0.6407 0.0074
-0.4173 -0.2308
0.0351 0.0237
-0.0379 -0.0210
0.0108 0.0045
-0.0098 -0.0054
0.0040 0.0010
-0.0032 -0.0018
0.0012 0.0003
-0.0009 -0.0005
0.0003
1.6977 -1.6974
-1.4953
-0.0003
0.0005
-0.0009
0.0021
-0.0027
0.0090
-0.0105
0.0475
-0.1154
0.0149
-0.5034
-0.9361
10 0.2626 0.2626 5 2
0.4748
4.3612 -0.7967
-1.6923 -0.9361
0.5086 -0.0618
0.0269 0.0149
-0.0538 -0.0116
0.0858 0.0475
-0.0187 -0.0049
0.0162 0.0090
-0.0042 -0.0010
0.0037 0.0021
-0.0009 -0.0002
0.0010 0.0005
-0.0002
3.2333 -1.7384
-2.1839
-0.0005
0.0010
-0.0020
0.0045
-0.0099
0.0237
-0.0232
0.0074
-0.1236
-0.4681
-1.5933
12 0.2836 0.2036 4 1
0.5127
5.6177
-2.8804 -1.1439
0.9039
-0.2235 -0.0888
0.0743
-0.0419 -0.0166
0.0111
-0.0179 -0.0071
0.0026
-0.0036 -0.0014
0.0006
-0.0008 -0.0003
3.4421 -1.2582
-0.6291
-0.0002
-0.0007
-0.0036
-0.0083
-0.0444
-0.5720
15 16 13
4.25 m
MOMENTOS DE EMPOTRAMIENTO
M111 -4.34 Tn-m M1112 -1.57 Tn-m M124 -4.34 Tn-m
M111 4.34 Tn-m M1211 1.57 Tn-m M412 4.34 Tn-m
M29 -5.64 Tn-m M910 -1.22 Tn-m M105 -5.64 Tn-m
M92 5.64 Tn-m M109 1.22 Tn-m M510 5.64 Tn-m
M37 -2.66 Tn-m M78 -0.92 Tn-m M86 -2.66 Tn-m
M73 2.66 Tn-m M87 0.92 Tn-m M68 2.66 Tn-m
7
0.3561 0.6439 0.2905 0.5488
0.6599 -2.6552 2.6552 0.1607 -0.9235
0.7106 1.2847 0.6423
0.0462 -0.3449 -0.6897 -0.3815 -1.3028
0.1064 0.1923 0.0961 -0.3752 0.8301
0.0140 -0.0800 -0.1601 -0.0886 -0.3024
0.0235 0.0425 0.0213 -0.0941 -0.0517
-0.0014 0.0181 0.0362 0.0200 0.0683
-0.0060 -0.0108 -0.0054 -0.0003 -0.0140
0.0002 0.0029 0.0057 0.0032 0.0108
-0.0011 -0.0020 -0.0010 0.0007 -0.0018
0.0001 0.0003 0.0006 0.0003 0.0012
-0.0001 -0.0002 -0.0001 0.0000 -0.0002
0.0000 0.0001 0.0001 0.0002
1.5523 -1.5523 0.0000 0.0000
2.6012 -0.9155 -1.6858
-1.1612 -2.8237
0.0000
1.8548 0.0000 -0.0001
0.0001 0.0000 0.0000
-0.0005 0.0000 0.0000
0.0004 0.0002 -0.0005
-0.0030 0.0014 0.0047
-0.0027 0.0016 -0.0044
0.0118 -0.0006 -0.0021
0.0280 0.0100 0.0343
0.0532 -0.1882 -0.6425
0.0924 -0.0443 1.5719
0.3553 -0.7505 -2.5628
1.3198 -0.1908 -1.2224
0.2626 0.2626 9 0.1385 0.4728
0.4748 0.2503 0.1385
0.6152 -5.6407 5.6407
1.3198 2.3859 1.1929
-0.0289 -0.6784 -1.3568 -0.7505
0.0924 0.1671 0.0836 -0.2522
0.0102 -0.1701 -0.3402 -0.1882
0.0280 0.0507 0.0253 -0.0652
-0.0008 -0.0005 -0.0011 -0.0006
-0.0027 -0.0049 -0.0025 -0.0046
0.0002 0.0012 0.0025 0.0014
0.0004 0.0007 0.0004 -0.0001
0.0000 0.0000 0.0000 0.0000
0.0001 0.0003 0.0001 -0.0001
0.0000 0.0000 0.0000
2.0339 -3.8887 0.0000
5.2450 -1.2601
0.4278 -0.2313
0.0000 0.0000
0.0002 0.0000
-0.0006 0.0000
0.0073 -0.0033
-0.0208 -0.0468
0.4417 -0.1811
14
4.25 m 2.25 m
8
0.5488 0.2905 0.6439 0.3561 6
0.9235 0.1607 -2.6552 2.6552 -0.6599
-0.6423 -1.2847 -0.7106
-0.6514
1.6603 0.4862 0.8790 0.4395 -0.0645
-0.1512 0.4603 -0.1207 -0.2414 -0.1335
-0.1034 -0.0303 -0.0547 -0.0274 0.0056
0.0342 0.0100 0.0070 0.0140 0.0077
-0.0281 -0.0082 -0.0149 -0.0074 -0.0001
0.0054 -0.0013 0.0024 0.0048 0.0027
-0.0036 -0.0011 -0.0019 -0.0010 -0.0001
0.0006 -0.0001 0.0004 0.0007 0.0004
-0.0004 -0.0001 -0.0002 -0.0001 0.0000
0.0001 0.0000 0.0000 0.0001 0.0001
-0.0001 0.0000 0.0000 0.0000
0.0000 1.5523 -1.5523
1.6858 0.9154 -2.6012
-0.4278
0.2313 0.0000
0.0000 0.0000
0.0001 -0.0007
0.0003 0.0041
0.0096 0.0105
0.2212 -0.4417
15 16
4.25 m
PROYECTO VIVIENDA MULTIFAMILIAR - 3 PSIOS
-0.3219
K23 116.26 32552.08 cm4 280.00 cm µ23 -0.131 µ56 -0.131 5º 3 -3.2949
ΣK 442.69 -0.500 -0.500 -0.1781
NUDO 3 NUDO 6 0.5034 0.9100
K K I (cm4) L (cm) µ µ µ µ 0.6010 1.0866
K32 116.26 32552.08 cm4 280.00 cm µ32 -0.178 µ65 -0.178 0.6208 1.1224
K37 210.17 89322.92 cm4 425.00 cm µ37 -0.322 µ68 -0.322 0.6253 1.1305
ΣK 326.43 -0.500 -0.500 0.6263 1.1321
NUDO 7 NUDO 8 0.6264 1.1324
K K I (cm4) L (cm) µ µ µ µ 0.6264 1.1325
K73 210.17 89322.92 cm4 425.00 cm µ73 -0.145 µ86 -0.145 0.6265 1.1325
K79 116.26 32552.08 cm4 280.00 cm µ79 -0.080 µ810 -0.080 0.6265 1.1325
K78 396.99 89322.92 cm4 225.00 cm µ78 -0.274 µ87 -0.274 1.5865 -1.5865
ΣK 723.42 -0.500 -0.500
NUDO 9 NUDO 10
K K I (cm4) L (cm) µ µ µ µ -0.3750 -0.0966
K911 116.26 32552.08 cm4 280.00 cm µ911 -0.069 µ1012 -0.069 -0.1145
K92 210.17 89322.92 cm4 425.00 cm µ92 -0.125 µ105 -0.125 -0.1181
K97 116.26 32552.08 cm4 280.00 cm µ97 -0.069 µ108 -0.069 -0.1191
K910 396.99 89322.92 cm4 225.00 cm µ910 -0.236 µ109 -0.236 -0.1194
ΣK 839.68 -0.500 -0.500 -0.1194
NUDO 11 NUDO 12 -0.1195
K K I (cm4) L (cm) µ µ µ µ -0.1195
K111 210.17 89322.92 cm4 425.00 cm µ111 -0.130 µ124 -0.130 -0.1195
K119 116.26 32552.08 cm4 280.00 cm µ119 -0.072 µ1210 -0.072
K1112 396.99 89322.92 cm4 225.00 cm µ1112 -0.246 µ1211 -0.246
K1114 83.47 32552.08 cm4 390.00 cm µ1114 -0.052 µ1215 -0.052
ΣK 806.89 -0.500 -0.500 0.4681
0.4605
0.4574
0.4546
0.4535
0.4532
0.4531
0.4531
0.4531
1.5326
-0.1313
-0.2374
3º 2 -4.3612
-0.1313
0.4681 0.8462
0.4605 0.8325
0.4574 0.8268
0.4546 0.8218
0.4535 0.8198
0.4532 0.8192
0.4531 0.8191
0.4531 0.8191
0.4531 0.8191
1.7082 -3.2408
-0.3750 -0.0916
-0.0651
-0.0632
-0.0628
-0.0626
-0.0625
-0.0625
-0.0625
-0.0625
0.7967
0.8469
0.8609
0.8637
0.8643
0.8645
0.8646
0.8646
0.8646
2.1822
-0.1418
-0.2564
1º 1 -5.6177
-0.1018
0.5720 1.4402
0.6080 1.5310
0.6181 1.5564
0.6201 1.5614
0.6205 1.5625
0.6207 1.5628
0.6207 1.5630
0.6207 1.5630
0.6207 1.5630
1.1310 -3.3133
-0.3750 -0.1081
-0.1080
-0.1096
-0.1102
-0.1104
-0.1104
-0.1104
-0.1104
-0.1104
0.5655
13
COEF. DE DESPLAZAMIENTO
K δ K δ
116.26 -0.375 δ32 116.26 -0.375
116.26 -0.375 δ79 116.26 -0.375
116.26 -0.375 δ810 116.26 -0.375
116.26 -0.375 δ65 116.26 -0.375
465.03 Σ 465.03
7
-0.1453
-0.2744
-0.2744
-3.2949 6º 3.2949 2.3714 -0.9235 0.9235 -1.7317
-0.0804 -0.0804
-0.4442 -0.2457 -0.8390 0.6788 0.1988
-0.5344 -0.2956 -1.0094 0.8067 0.2362
-0.5532 -0.3060 -1.0450 0.8226 0.2409
-0.5562 -0.3077 -1.0506 0.8242 0.2414
-0.5566 -0.3079 -1.0513 0.8243 0.2414
-0.5566 -0.3079 -1.0514 0.8243 0.2414
-0.5566 -0.3079 -1.0514 0.8243 0.2414
-0.5566 -0.3079 -1.0514 0.8243 0.2414
-0.5566 -0.3079 -1.0514 0.8243 0.2414
3.3141 -1.1122 -2.2020 1.5207 1.0523
-0.2237 0.3584
-0.2870 0.3847
-0.2888 0.3820
-0.2870 0.3808
-0.2865 0.3806
-0.2864 0.3806
-0.2864 0.3806
-0.2864 0.3806
-0.2864 0.3806
-0.8806 1.0026
9
-0.0692 -0.0692
-0.1252
-0.2364
-0.2364
-4.3612 4º 4.3612 2.7803 -1.5809 1.5809 -4.0597
-0.0692 -0.0692
-0.4044 -0.2237 -0.7639 1.2237 0.3584
-0.5188 -0.2870 -0.9799 1.3138 0.3847
-0.5221 -0.2888 -0.9861 1.3045 0.3820
-0.5189 -0.2870 -0.9802 1.3005 0.3808
-0.5179 -0.2865 -0.9783 1.2998 0.3806
-0.5177 -0.2864 -0.9780 1.2997 0.3806
-0.5177 -0.2864 -0.9779 1.2997 0.3806
-0.5177 -0.2864 -0.9779 1.2997 0.3806
-0.5177 -0.2864 -0.9779 1.2997 0.3806
4.1449 -1.0272 -2.2370 3.2025 1.3413
-4.1449
-0.3750 -0.2260 -0.3750
-0.2094
-0.2065
-0.2056
-0.2054
-0.2053
-0.2052
-0.2052
-0.2052
-0.3950 0.2997
-0.4456 0.3486
-0.4539 0.3495
-0.4543 0.3494
-0.4544 0.3495
-0.4545 0.3495
-0.4545 0.3496
-0.4545 0.3496
-0.4545 0.3496
-1.1954 1.0797
11
-0.0720 -0.0720
-0.1302
-0.2460
-0.2460
-0.4286 0.3478
14 15
8
-0.1453
-0.3219
-0.6599
-0.6983
-0.7101
-0.7097
-0.7092
-0.7091
-0.7091
-0.7091
-0.7091
-1.8555
10
-0.1313
-0.1252
-0.2374
-5.6407 10º 5.6407 5.6407 5 9º
-0.1313
0.6479 -1.1929 -0.6599
0.6956 -1.2625 -0.6983
0.6906 -1.2836 -0.7101
0.6885 -1.2830 -0.7097
0.6881 -1.2822 -0.7092
0.6881 -1.2819 -0.7091
0.6881 -1.2819 -0.7091
0.6881 -1.2819 -0.7091
0.6881 -1.2819 -0.7091
-5.5464 3.7649 -1.9094
-0.6152
-0.6105
-0.6156
-0.6143
-0.6143
-0.6144
-0.6144
-0.6144
-0.6144
-1.9379
12
-0.1418
-0.1302
-0.2564
-0.4054
16
PROYECTO VIVIENDA MULTIFAMILIAR - 3 PSIOS
-0.3219
K23 116.26 32552.08 cm4 280.00 cm µ23 -0.131 µ56 -0.131 5º 3 -2.6552
ΣK 442.69 -0.500 -0.500 -0.1781
NUDO 3 NUDO 6 0.3553 0.6423
K K I (cm4) L (cm) µ µ µ µ 0.4114 0.7438
K32 116.26 32552.08 cm4 280.00 cm µ32 -0.178 µ65 -0.178 0.4309 0.7789
K37 210.17 89322.92 cm4 425.00 cm µ37 -0.322 µ68 -0.322 0.4355 0.7873
ΣK 326.43 -0.500 -0.500 0.4364 0.7889
NUDO 7 NUDO 8 0.4365 0.7891
K K I (cm4) L (cm) µ µ µ µ 0.4365 0.7891
K73 210.17 89322.92 cm4 425.00 cm µ73 -0.145 µ86 -0.145 0.4365 0.7891
K79 116.26 32552.08 cm4 280.00 cm µ79 -0.080 µ810 -0.080 0.4365 0.7891
K78 396.99 89322.92 cm4 225.00 cm µ78 -0.274 µ87 -0.274 1.5115 -1.5115
ΣK 723.42 -0.500 -0.500
NUDO 9 NUDO 10
K K I (cm4) L (cm) µ µ µ µ -0.3750 -0.0721
K911 116.26 32552.08 cm4 280.00 cm µ911 -0.069 µ1012 -0.069 -0.0691
K92 210.17 89322.92 cm4 425.00 cm µ92 -0.125 µ105 -0.125 -0.0720
K97 116.26 32552.08 cm4 280.00 cm µ97 -0.069 µ108 -0.069 -0.0732
K910 396.99 89322.92 cm4 225.00 cm µ910 -0.236 µ109 -0.236 -0.0735
ΣK 839.68 -0.500 -0.500 -0.0735
NUDO 11 NUDO 12 -0.0736
K K I (cm4) L (cm) µ µ µ µ -0.0736
K111 210.17 89322.92 cm4 425.00 cm µ111 -0.130 µ124 -0.130 -0.0736
K119 116.26 32552.08 cm4 280.00 cm µ119 -0.072 µ1210 -0.072
K1112 396.99 89322.92 cm4 225.00 cm µ1112 -0.246 µ1211 -0.246
K1114 83.47 32552.08 cm4 390.00 cm µ1114 -0.052 µ1215 -0.052
ΣK 806.89 -0.500 -0.500 0.6599
0.7117
0.7154
0.7134
0.7123
0.7121
0.7120
0.7120
0.7120
1.8605
-0.1313
-0.2374
3º 2 -5.6407
-0.1313
0.6599 1.1929
0.7117 1.2866
0.7154 1.2934
0.7134 1.2897
0.7123 1.2878
0.7121 1.2873
0.7120 1.2872
0.7120 1.2871
0.7120 1.2871
1.9186 -3.7791
-0.3750 -0.1183
-0.1193
-0.1197
-0.1195
-0.1193
-0.1192
-0.1192
-0.1192
-0.1192
0.6152
0.6061
0.6115
0.6131
0.6135
0.6137
0.6137
0.6138
0.6138
1.9395
-0.1418
-0.2564
1º 1 -4.3382
-0.1018
0.4417 1.1122
0.4351 1.0956
0.4390 1.1055
0.4402 1.1084
0.4405 1.1091
0.4406 1.1094
0.4406 1.1095
0.4406 1.1096
0.4406 1.1096
0.8099 -2.7494
-0.3750 -0.0905
-0.0718
-0.0709
-0.0713
-0.0713
-0.0714
-0.0714
-0.0714
-0.0714
0.4050
13
COEF. DE DESPLAZAMIENTO
K δ K δ
116.26 -0.375 δ32 116.26 -0.375
116.26 -0.375 δ79 116.26 -0.375
116.26 -0.375 δ810 116.26 -0.375
116.26 -0.375 δ65 116.26 -0.375
465.03 Σ 465.03
7
-0.1453
-0.2744
-0.3750 -0.1730
-0.1836
-0.1877
-0.1890
-0.1893
-0.1893
-0.1893
-0.1893
-0.1893
-0.3443
-0.3936
-0.3963
-0.3948
-0.3943
-0.3942
-0.3942
-0.3942
-0.3942
-1.0288
9
-0.0692
-0.1252
-0.2364
-5.6407 4º 5.6407 4.0597 -1.5809 1.5809
-0.0692
-0.6224 -0.344299 -1.1757 0.8419
-0.7116 -0.3936 -1.3441 0.9475
-0.7165 -0.3963 -1.3534 0.9406
-0.7137 -0.3948 -1.3481 0.9373
-0.7129 -0.3943 -1.3465 0.9369
-0.7127 -0.3942 -1.3462 0.9368
-0.7127 -0.3942 -1.3462 0.9369
-0.7127 -0.3942 -1.3462 0.9369
-0.7127 -0.3942 -1.3462 0.9369
5.5024 -1.1371 -3.3365 2.1085
-5.5024
-0.3750 -0.2108
-0.2233
-0.2230
-0.2224
-0.2221
-0.2221
-0.2220
-0.2220
-0.2220
-0.2792
-0.3395
-0.3483
-0.3485
-0.3486
-0.3486
-0.3486
-0.3487
-0.3487
-1.0915
11
-0.0720
-0.1302
-0.2460
-4.3382 2º 4.3382 2.7637 -1.5745 1.5745
-0.0517
-0.5048 -0.20047 -0.9535 1.3982
-0.6138 -0.2437 -1.1593 1.5531
-0.6296 -0.2500 -1.1893 1.5545
-0.6299 -0.2502 -1.1899 1.5540
-0.6301 -0.2502 -1.1902 1.5544
-0.6303 -0.2503 -1.1905 1.5545
-0.6303 -0.2503 -1.1905 1.5545
-0.6303 -0.2503 -1.1906 1.5545
-0.6303 -0.2503 -1.1906 1.5545
4.1872 -0.6946 -2.4011 3.4930
-0.3750 -0.2007
-0.1942
-0.1934
-0.1938
-0.1939
-0.1939
-0.1939
-0.1939
-0.1939
-0.3473
14
8
-0.2744
-0.1453
-0.3219
0.2465 -0.4681
0.2775 -0.4534
0.2754 -0.4531
0.2745 -0.4512
0.2744 -0.4506
0.2744 -0.4505
0.2744 -0.4505
0.2744 -0.4505
0.2744 -0.4505
0.8574 -1.5282
10
-0.0692 -0.1313
-0.2364
-0.1252
-0.2374
-2.7803 -4.3612 10º 4.3612 4.3612 5 9º
-0.0692 -0.1313
0.2465 0.4457 -0.8462 -0.4681
0.2775 0.5016 -0.8197 -0.4534
0.2754 0.4979 -0.8192 -0.4531
0.2745 0.4962 -0.8157 -0.4512
0.2744 0.4960 -0.8147 -0.4506
0.2744 0.4960 -0.8145 -0.4505
0.2744 0.4960 -0.8145 -0.4505
0.2744 0.4960 -0.8145 -0.4505
0.2744 0.4960 -0.8145 -0.4505
1.2178 -4.1837 3.2283 -1.7001
0.4095 -0.7967
0.4548 -0.8500
0.4552 -0.8640
0.4551 -0.8647
0.4552 -0.8650
0.4552 -0.8651
0.4552 -0.8651
0.4552 -0.8651
0.4552 -0.8651
1.1848 -2.1808
12
-0.0720 -0.1418
-0.2460
-0.1302
-0.2564
-4.0432 -5.6177 8º 5.6177 5.6177 4 7º
-0.0517 -0.1018
0.2940 0.7402 -1.4402 -0.5720
0.3265 0.8222 -1.5367 -0.6103
0.3268 0.8230 -1.5620 -0.6203
0.3267 0.8227 -1.5632 -0.6208
0.3268 0.8229 -1.5637 -0.6210
0.3268 0.8230 -1.5639 -0.6211
0.3268 0.8230 -1.5640 -0.6211
0.3268 0.8230 -1.5640 -0.6211
0.3268 0.8230 -1.5640 -0.6211
0.8579 -5.5357 3.3127 -1.131882
0.4289 -0.5659
15 16
PROYECTO VIVIENDA MULTIFAMILIAR - 3 PSIOS
MOMENTOS CALCULADOS CON EL SAP - PORTICO 2-2 MOMENTOS CALCULADOS CON EL SAP - PORTICO 3-3
VIGAS
PRIMER
PISO SEGUNDO
Viga 12 - 4 5.886 Tn-m 3.870 Tn-m 4.490 Tn-m VIGAS Viga 9 - 10 5.124 Tn-m 4.966 Tn-m
PISO
Viga 2 - 9 4.465 Tn-m 5.864 Tn-m 4.210 Tn-m Viga 10 - 5 7.798 Tn-m 5.937 Tn-m
SEGUND
VIGAS Viga 9 - 10 3.536 Tn-m 2.450 Tn-m 0.000 Tn-m Viga 3 - 7 2.805 Tn-m 4.531 Tn-m
O PISO TERCER
Viga 10 - 5 4.509 Tn-m 3.923 Tn-m 3.220 Tn-m Viga 7 - 8 3.207 Tn-m 3.337 Tn-m
PISO
Viga 3 - 7 1.979 Tn-m 2.929 Tn-m 2.460 Tn-m Viga 8 - 6 4.589 Tn-m 2.757 Tn-m
TERCER
Viga 7 - 8 1.933 Tn-m 2.558 Tn-m 0.000 Tn-m
PISO
Viga 8 - 6 3.581 Tn-m 2.131 Tn-m 3.050 Tn-m MOMENTOS CALCULADOS CON EL SAP - PORTICO 7-7
Mº Maximos Negativos Mº Max.
ENVOLVENTE
Izquierda Derecha Posiitivo Mº Max. Negativos
ENVOLVENTE
Viga 1 - 11 3.928 Tn-m 5.886 Tn-m 4.490 Tn-m Izquierda Derecha
PRIMER
Viga 11 - 12 3.794 Tn-m 3.794 Tn-m 0.000 Tn-m Viga 1 - 11 3.954 Tn-m 5.867 Tn-m
PISO PRIMER
Viga 12 - 4 5.886 Tn-m 3.928 Tn-m 4.550 Tn-m Viga 11 - 12 3.746 Tn-m 3.746 Tn-m
PISO
Viga 2 - 9 4.519 Tn-m 5.864 Tn-m 4.280 Tn-m Viga 12 - 4 5.867 Tn-m 3.954 Tn-m
SEGUND
VIGAS Viga 9 - 10 3.536 Tn-m 3.536 Tn-m 0.000 Tn-m Viga 2 - 9 4.628 Tn-m 5.821 Tn-m
O PISO SEGUNDO
Viga 10 - 5 5.864 Tn-m 4.519 Tn-m 4.280 Tn-m VIGAS Viga 9 - 10 3.403 Tn-m 3.403 Tn-m
PISO
Viga 3 - 7 2.131 Tn-m 3.581 Tn-m 3.430 Tn-m Viga 10 - 5 5.821 Tn-m 4.628 Tn-m
TERCER
Viga 7 - 8 2.558 Tn-m 2.558 Tn-m 0.000 Tn-m Viga 3 - 7 2.437 Tn-m 4.169 Tn-m
PISO TERCER
Viga 8 - 6 3.581 Tn-m 2.131 Tn-m 3.430 Tn-m Viga 7 - 8 2.965 Tn-m 2.965 Tn-m
PISO
Viga 8 - 6 4.169 Tn-m 2.437 Tn-m
MOMENTOS CALCULADOS CON HARDY CROSS Y KANI - PORTICO 2-2
Mº Max. Negativos Mº Max.
ESTADO 1
Izquierda Derecha Posiitivo
Viga 1 - 11 ### 5.342 Tn-m 4.230 Tn-m
PRIMER
Viga 11 - 12 ### 3.253 Tn-m 0.000 Tn-m
PISO
Viga 12 - 4 ### 3.504 Tn-m 4.230 Tn-m
Viga 2 - 9 ### 5.371 Tn-m 3.950 Tn-m
SEGUND
VIGAS Viga 9 - 10 ### 2.946 Tn-m 0.000 Tn-m
O PISO
Viga 10 - 5 ### 4.011 Tn-m 3.950 Tn-m
Viga 3 - 7 ### 3.133 Tn-m 2.750 Tn-m
TERCER
Viga 7 - 8 ### 2.064 Tn-m 0.000 Tn-m
PISO
Viga 8 - 6 ### 1.808 Tn-m 2.750 Tn-m
Mº Max. Negativos Mº Max.
ESTADO 2
Izquierda Derecha Posiitivo
Viga 1 - 11 ### 5.216 Tn-m 3.180 Tn-m
PRIMER
Viga 11 - 12 ### 3.091 Tn-m 0.000 Tn-m
PISO
Viga 12 - 4 ### 3.442 Tn-m 4.550 Tn-m
Viga 2 - 9 ### 4.279 Tn-m 3.180 Tn-m
SEGUND
VIGAS Viga 9 - 10 ### 2.394 Tn-m 0.000 Tn-m
O PISO
Viga 10 - 5 ### 3.233 Tn-m 3.180 Tn-m
Viga 3 - 7 ### 3.056 Tn-m 3.100 Tn-m
TERCER
Viga 7 - 8 ### 2.052 Tn-m 0.000 Tn-m
PISO
Viga 8 - 6 ### 1.698 Tn-m 3.100 Tn-m
Mº Max. Negativos Mº Max.
ESTADO 3
Izquierda Derecha Posiitivo
Viga 1 - 11 ### 4.251 Tn-m 3.460 Tn-m
PRIMER
Viga 11 - 12 ### 2.675 Tn-m 0.000 Tn-m
PISO
Viga 12 - 4 ### 2.766 Tn-m 3.460 Tn-m
Viga 2 - 9 ### 5.245 Tn-m 4.280 Tn-m
SEGUND
VIGAS Viga 9 - 10 ### 2.824 Tn-m 0.000 Tn-m
O PISO
Viga 10 - 5 ### 3.889 Tn-m 4.280 Tn-m
Viga 3 - 7 ### 2.601 Tn-m 3.430 Tn-m
TERCER
Viga 7 - 8 ### 1.686 Tn-m 0.000 Tn-m
PISO
Viga 8 - 6 ### 1.552 Tn-m 3.430 Tn-m
Mº Max. Negativos Mº Max.
ESTADO 4
Posiitivo
Mº Max.
ESTADO 4
Izquierda Derecha Posiitivo
Viga 1 - 11 ### 5.537 Tn-m 4.490 Tn-m
PRIMER
Viga 11 - 12 ### 2.410 Tn-m 0.000 Tn-m
PISO
Viga 12 - 4 ### 2.749 Tn-m 3.490 Tn-m
Viga 2 - 9 ### 4.145 Tn-m 3.220 Tn-m
SEGUND
VIGAS Viga 9 - 10 ### 3.202 Tn-m 0.000 Tn-m
O PISO
Viga 10 - 5 ### 3.765 Tn-m 4.210 Tn-m
Viga 3 - 7 ### 3.314 Tn-m 3.050 Tn-m
TERCER
Viga 7 - 8 ### 1.521 Tn-m 0.000 Tn-m
PISO
Viga 8 - 6 ### 1.510 Tn-m 2.460 Tn-m
Mº Max. Negativos Mº Max.
ESTADO 5
Izquierda Derecha Posiitivo
Viga 1 - 11 ### 4.187 Tn-m 3.490 Tn-m
PRIMER
Viga 11 - 12 ### 3.493 Tn-m 0.000 Tn-m
PISO
Viga 12 - 4 ### 3.313 Tn-m 4.490 Tn-m
Viga 2 - 9 ### 5.502 Tn-m 4.210 Tn-m
SEGUND
VIGAS Viga 9 - 10 ### 2.108 Tn-m 0.000 Tn-m
O PISO
Viga 10 - 5 ### 3.228 Tn-m 3.220 Tn-m
Viga 3 - 7 ### 2.575 Tn-m 2.460 Tn-m
TERCER
Viga 7 - 8 ### 2.211 Tn-m 0.000 Tn-m
PISO
Viga 8 - 6 ### 1.585 Tn-m 3.050 Tn-m
Mº Maximos Negativos Mº Max.
ENVOLVENTE
Izquierda Derecha Posiitivo
Viga 1 - 11 2.749 Tn-m 5.537 Tn-m 4.490 Tn-m
PRIMER
Viga 11 - 12 2.401 Tn-m 3.493 Tn-m 0.000 Tn-m
PISO
Viga 12 - 4 4.185 Tn-m 3.504 Tn-m 4.550 Tn-m
Viga 2 - 9 3.233 Tn-m 5.502 Tn-m 4.280 Tn-m
SEGUND
VIGAS Viga 9 - 10 2.237 Tn-m 3.202 Tn-m 0.000 Tn-m
O PISO
Viga 10 - 5 4.184 Tn-m 4.011 Tn-m 4.280 Tn-m
Viga 3 - 7 1.511 Tn-m 3.314 Tn-m 3.430 Tn-m
TERCER
Viga 7 - 8 1.511 Tn-m 2.211 Tn-m 0.000 Tn-m
PISO
Viga 8 - 6 2.573 Tn-m 1.808 Tn-m 3.430 Tn-m
SAP - PORTICO 3-3
Mº Max.
Posiitivo
5.940 Tn-m
0.000 Tn-m
5.940 Tn-m
5.610 Tn-m
0.000 Tn-m
5.610 Tn-m
3.570 Tn-m
0.000 Tn-m
3.570 Tn-m
Mº Max.
Posiitivo
4.840 Tn-m
0.000 Tn-m
4.840 Tn-m
4.540 Tn-m
0.000 Tn-m
4.540 Tn-m
3.280 Tn-m
0.000 Tn-m
3.280 Tn-m
Mº Max.
Posiitivo
6.740 Tn-m
0.000 Tn-m
6.750 Tn-m
6.380 Tn-m
0.000 Tn-m
6.160 Tn-m
3.720 Tn-m
0.000 Tn-m
3.730 Tn-m
Mº Max.
Posiitivo
6.310 Tn-m
0.000 Tn-m
5.970 Tn-m
5.950 Tn-m
0.120 Tn-m
5.620 Tn-m
3.970 Tn-m
0.000 Tn-m
3.970 Tn-m
Mº Max.
Posiitivo
4.540 Tn-m
0.000 Tn-m
4.540 Tn-m
4.210 Tn-m
0.000 Tn-m
4.210 Tn-m
3.610 Tn-m
0.000 Tn-m
3.610 Tn-m
PROYECTO VIVIENDA MULTIFAMILIAR - 3 PSIOS
MOMENTOS CALCULADOS CON EL SAP - PORTICO A-A MOMENTOS CALCULADOS CON EL SAP - PORTICO B-B
Mº Max. Negativos
ENVOLVENTE Mº Max. Posiitivo
Izquierda Derecha
Volado 0.610 Tn-m 0.000 Tn-m
Viga 2 - 3 1.148 Tn-m 1.020 Tn-m 0.640 Tn-m
Viga 3 - 4 0.777 Tn-m 1.115 Tn-m 0.540 Tn-m
Volado 0.673 Tn-m 0.468 Tn-m 0.000 Tn-m
Viga 5 - 6 1.674 Tn-m 1.412 Tn-m 0.910 Tn-m
Viga 6 - 7 0.900 Tn-m 1.675 Tn-m 0.880 Tn-m
Volado 0.610 Tn-m 0.000 Tn-m
Viga 2 - 3 1.131 Tn-m 1.073 Tn-m 0.620 Tn-m
Viga 3 - 4 0.673 Tn-m 1.124 Tn-m 0.580 Tn-m
Volado 0.000 Tn-m 0.164 Tn-m
Viga 5 - 6 1.193 Tn-m 1.726 Tn-m 0.990 Tn-m
Viga 6 - 7 1.025 Tn-m 1.628 Tn-m 0.830 Tn-m
Volado 0.186 Tn-m 0.000 Tn-m
Viga 2 - 3 0.281 Tn-m 0.362 Tn-m 0.210 Tn-m
Viga 3 - 4 0.257 Tn-m 0.290 Tn-m 0.180 Tn-m
Volado 0.000 Tn-m 0.097 Tn-m
Viga 5 - 6 0.407 Tn-m 0.458 Tn-m 0.320 Tn-m
Viga 6 - 7 0.362 Tn-m 0.407 Tn-m 0.260 Tn-m
COMBINACIONES RECOMENDADAS
PROYECTO VIVIENDA MULTIFAMILIAR - 3 PSIOS 1/2 - 3/8" Area b min
2 Φ 3/8 1.420 cm² 14.34 cm
DISEÑO DE VIGAS PRINCIPALES 1 Φ 1/2 + 1 Φ 3/8 2.000 cm² 14.66 cm
3 Φ 3/8 2.130 cm² 17.83 cm
VIGAS PRINCIPALES EJE 2-2 2 Φ 1/2 2.580 cm² 14.98 cm
Mº Max. Negativos Mº Max. 1 Φ 1/2 + 2 Φ 3/8 2.710 cm² 18.15 cm
PISO VIGAS
Izquierda Derecha Posiitivo 4 Φ 3/8 2.840 cm² 21.32 cm
Viga A - B 2.749 Tn-m 5.537 Tn-m 4.490 Tn-m 2 Φ 1/2 + 1 Φ 3/8 3.290 cm² 18.47 cm
PRIMER
Viga B - C 2.401 Tn-m 3.493 Tn-m 0.000 Tn-m 3 Φ 1/2 3.870 cm² 18.79 cm
PISO
Viga C - D 4.185 Tn-m 3.504 Tn-m 4.550 Tn-m 2 Φ 1/2 + 2 Φ 3/8 4.000 cm² 21.96 cm
Viga A - B 3.233 Tn-m 5.502 Tn-m 4.280 Tn-m 3 Φ 1/2 + 1 Φ 3/8 4.580 cm² 22.28 cm
SEGUNDO
Viga B - C 2.237 Tn-m 3.202 Tn-m 0.000 Tn-m 4 Φ 1/2 5.160 cm² 22.60 cm
PISO
Viga C - D 4.184 Tn-m 4.011 Tn-m 4.280 Tn-m 5/8 - 1" Area b min
Viga A - B 1.511 Tn-m 3.314 Tn-m 3.430 Tn-m 1 Φ 1 + 1 Φ 5/8 7.080 cm² 16.57 cm
TERCER
Viga B - C 1.511 Tn-m 2.211 Tn-m 0.000 Tn-m 2Φ1 10.200 cm² 17.52 cm
PISO
Viga C - D 2.573 Tn-m 1.808 Tn-m 3.430 Tn-m 2 Φ 1+ 1 Φ 5/8 12.180 cm² 21.65 cm
2 Φ 1+ 2 Φ 5/8 14.160 cm² 25.78 cm
1. DIMENSION Y PROPIEDADES DE LA VIGA 3Φ1 15.300 cm² 22.60 cm
b= 25.00 cm Peralte Efectivo de la seccion: 3/4 - 1" Area b min
h= 35.00 cm Ф Asumo : 3/4" 1.91 cm 1 Φ 3/4 + 1 Φ 1 7.950 cm² 16.89 cm
f'c = 210 Kg/cm² Ф Estribos : 3/8" 0.95 cm 1 Φ 1 + 2 Φ 3/4 10.800 cm² 21.34 cm
fy = 4200 Kg/cm² d: h - Recub - Фestrib - Фasumo/2 2 Φ 1 + 1 Φ 3/4 13.050 cm² 21.97 cm
β= 0.85 d: 29.10 cm 2 Φ 1+ 2 Φ 3/4 15.900 cm² 26.42 cm
Recub = 4.00 cm
Asumir: a = 0.10.d
As = 3.065 cm²
As = 3.064 cm²
As = 3.064 cm²
As = 3.064 cm²
As = 3.064 cm²
Usar 1 Φ 1/2 + 1 Φ 5/8
TERCER PISO
Mmax (-) 1.511 Tn-m
b= 25.00 cm
d= 29.10 cm
Ф= 0.9
Asumir: a = 0.10.d
As = 1.447 cm²
As = 1.407 cm²
As = 1.406 cm²
As = 1.406 cm²
Usar 2 Φ 1/2
Mmax (-) 2.211 Tn-m
b= 25.00 cm
d= 29.10 cm
Ф= 0.9
Asumir: a = 0.10.d
As = 2.116 cm²
As = 2.082 cm²
As = 2.081 cm²
As = 2.080 cm²
Usar 3 Φ 3/8
COMBINACIONES RECOMENDADAS
1/2 - 5/8" Area b min ACEROS COMERCIALES
1 Φ 1/2 + 1 Φ 5/8 3.270 cm² 15.30 cm BARRA DIAMETRO Peso Area
2 Φ 5/8 3.960 cm² 15.62 cm numero pulg cm Kg/m cm2
2 Φ 1/2 + 1 Φ 5/8 4.560 cm² 19.11 cm 3 3/8 0.95 0.559 0.71
1 Φ 1/2 + 2 Φ 5/8 5.250 cm² 19.43 cm 4 1/2 1.27 0.993 1.29
3 Φ 1/2 + 1 Φ 5/8 5.850 cm² 22.92 cm 5 5/8 1.59 1.552 1.98
3 Φ 5/8 5.940 cm² 19.75 cm 6 3/4 1.91 2.235 2.85
2 Φ 1/2 + 2 Φ 5/8 6.540 cm² 23.24 cm 7 7/8 2.22 3.042 3.88
1 Φ 1/2 + 3 Φ 5/8 7.230 cm² 23.56 cm 8 1 2.54 3.973 5.1
4 Φ 5/8 7.920 cm² 23.88 cm 9 1 1/8 2.86 5.028 6.45
1/2 - 3/4" Area b min 10 1 1/4 3.18 6.207 8.19
1 Φ 1/2 + 1 Φ 3/4 4.140 cm² 15.62 cm 11 1 3/8 3.49 7.511 9.58
2 Φ 1/2 + 1 Φ 3/4 5.430 cm² 19.43 cm 12 1 1/2 3.81 8.938 11.4
2 Φ 3/4 5.700 cm² 15.62 cm
1 Φ 1/2 + 2 Φ 3/4 6.990 cm² 20.07 cm
3 Φ 3/4 8.550 cm² 20.71 cm
2 Φ 1/2 + 2 Φ 3/4 8.280 cm² 23.88 cm
4 Φ 3/4 11.400 cm² 25.16 cm
N Y PROPIEDADES DE LA VIGA
Peralte Efectivo de la seccion:
3/4" 1.91 cm
3/8" 0.95 cm
h - Recub - Фestrib - Фasumo/2
29.10 cm
ADES DE LA VIGA
Efectivo de la seccion:
1.91 cm
0.95 cm
h - Recub - Фestrib - Фasumo/2
ACERO MINIMO
1.420 cm²
2.000 cm²
ACERO MAXIMO
11.400 cm²
12.180 cm²
PISO VIGAS
Viga A - B
PRIMER
Viga B - C
PISO
Viga C - D
Viga A - B
SEGUND
Viga B - C
O PISO
Viga C - D
Viga A - B
TERCER
Viga B - C
PISO
Viga C - D
1. DIMENSION Y PROPIEDADES D
b= 25.00 cm
h= 35.00 cm
f'c = 210 Kg/cm²
fy = ###
β= 0.85
Recub = 4.00 cm
0.0163
4 Φ 3/4 11.400 cm²
2 Φ 1+ 1 Φ 5/8 12.180 cm²
TERCER PISO
2.91 cm
3.58 cm REPETIR
3.62 cm REPETIR
3.62 cm OK
a = 0.10.d a =2.91 cm
5.682 cm² a =5.35 cm REPETIR
5.944 cm² a =5.59 cm REPETIR
5.972 cm² a =5.62 cm REPETIR
5.975 cm² a =5.62 cm OK
5.975 cm²
a = 0.10.d a =2.91 cm
3.070 cm² a =2.89 cm REPETIR
3.068 cm² a =2.89 cm OK
3.068 cm²
a = 0.10.d a =2.91 cm
2.639 cm² a =2.48 cm REPETIR
2.618 cm² a =2.46 cm REPETIR
2.617 cm² a =2.46 cm OK
2.617 cm²
1 Φ 1/2 + 2 Φ 3/8 As =2.710 cm²
B. ACEROS NEGATIVOS Izquierda Derecha FORMULAS
M max 3.954 Tn-m 5.867 Tn-m
PRIMER
PISO M max 3.746 Tn-m 3.746 Tn-m
Mu
M max 5.867 Tn-m 3.954 Tn-m As
M max 4.628 Tn-m 5.821 Tn-m
. fy.(d a / 2)
SEGUNDO
M max 3.403 Tn-m 3.403 Tn-m
PISO
M max 5.821 Tn-m 4.628 Tn-m As . fy
a
M max 2.437 Tn-m 4.169 Tn-m 0 . 85 . f ' c .b
TERCER
M max 2.965 Tn-m 2.965 Tn-m
PISO
M max 4.169 Tn-m 2.437 Tn-m
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
Ф=
Asumir:
As =
As =
As =
As =
Usar
Mmax (+)
b=
d=
Ф=
Asumir:
As =
As =
As =
As =
Usar
S RECOMENDADAS
1/2 - 5/8" Area ACEROS COMERCIALES
1 Φ 1/2 + 1 Φ 5/8 3.270 cm² BARRA DIAMETRO Peso Area
2 Φ 5/8 3.960 cm² numero pulg cm Kg/m cm2
2 Φ 1/2 + 1 Φ 5/8 4.560 cm² 3 3/8 0.95 0.559 0.71
1 Φ 1/2 + 2 Φ 5/8 5.250 cm² 4 1/2 1.27 0.993 1.29
3 Φ 1/2 + 1 Φ 5/8 5.850 cm² 5 5/8 1.59 1.552 1.98
3 Φ 5/8 5.940 cm² 6 3/4 1.91 2.235 2.85
2 Φ 1/2 + 2 Φ 5/8 6.540 cm² 7 7/8 2.22 3.042 3.88
1 Φ 1/2 + 3 Φ 5/8 7.230 cm² 8 1 2.54 3.973 5.1
4 Φ 5/8 7.920 cm² 9 1 1/8 2.86 5.028 6.45
1/2 - 3/4" Area 10 1 1/4 3.18 6.207 8.19
1 Φ 1/2 + 1 Φ 3/4 4.140 cm² 11 1 3/8 3.49 7.511 9.58
2 Φ 1/2 + 1 Φ 3/4 5.430 cm² 12 1 1/2 3.81 8.938 11.4
2 Φ 3/4 5.700 cm²
1 Φ 1/2 + 2 Φ 3/4 6.990 cm²
3 Φ 3/4 8.550 cm²
2 Φ 1/2 + 2 Φ 3/4 8.280 cm²
11.400 cm²
REPETIR
REPETIR
OK
As =2.000 cm²
ES EJE B-B
Mº Max. Posiitivo
0.000 Tn-m
0.560 Tn-m
0.290 Tn-m
0.300 Tn-m
0.500 Tn-m
0.240 Tn-m
0.000 Tn-m
0.520 Tn-m
0.300 Tn-m
0.300 Tn-m
0.500 Tn-m
0.220 Tn-m
0.000 Tn-m
0.190 Tn-m
0.160 Tn-m
0.040 Tn-m
0.280 Tn-m
0.300 Tn-m
DADES DE LA VIGA
te Efectivo de la seccion:
1.91 cm
0.95 cm
h - Recub - Фestrib - Фasumo/2
L ACERO MINIMO
1.420 cm²
2.000 cm²
ACERO MAXIMO
10.200 cm²
FUERZO EN LA VIGA
FORMULAS B. ACEROS NEGATIVOS Izquierda
Volado 0.515 Tn-m
0 = colocar acero minimo Viga 2 - 3 0.933 Tn-m
PRIMER Viga 3 - 4 0.617 Tn-m
PISO
PRIMER
PISO Viga 4 - 5 0.764 Tn-m
Viga 5 - 6 0.809 Tn-m
Mu Viga 6 - 7 0.239 Tn-m
As Volado 0.493 Tn-m
. fy.(d a / 2)
Viga 2 - 3 0.858 Tn-m
SEGUNDO Viga 3 - 4 0.621 Tn-m
As . fy PISO
a Volado 0.729 Tn-m
0 . 85 . f ' c .b Viga 5 - 6 0.793 Tn-m
Viga 6 - 7 0.306 Tn-m
Volado 0.186 Tn-m
Viga 2 - 3 0.340 Tn-m
TERCER Viga 3 - 4 0.253 Tn-m
PISO Volado 0.275 Tn-m
Viga 5 - 6 0.540 Tn-m
Viga 6 - 7 0.229 Tn-m
REPETIR
REPETIR
OK
As =2.000 cm²
VIGAS PRINCIPALES EJE C-C
Mº Max. Negativos
PISOS VIGAS
Izquierda Derecha
Volado 0.515 Tn-m 0.000 Tn-m
Viga 2 - 3 0.846 Tn-m 0.876 Tn-m
PRIMER Viga 3 - 4 0.208 Tn-m 0.524 Tn-m
PISO Viga 4 - 5 0.279 Tn-m 0.225 Tn-m
Viga 5 - 6 0.500 Tn-m 0.452 Tn-m
Viga 6 - 7 0.265 Tn-m 0.517 Tn-m
Volado 0.493 Tn-m 0.000 Tn-m
Viga 2 - 3 0.768 Tn-m 0.890 Tn-m
SEGUNDO Viga 3 - 4 0.234 Tn-m 0.405 Tn-m
PISO Volado 0.242 Tn-m 0.251 Tn-m
Viga 5 - 6 0.468 Tn-m 0.483 Tn-m
Viga 6 - 7 0.323 Tn-m 0.490 Tn-m
Volado 0.186 Tn-m 0.000 Tn-m
Viga 2 - 3 0.351 Tn-m 0.317 Tn-m
TERCER Viga 3 - 4 0.296 Tn-m 0.284 Tn-m
PISO Volado 0.281 Tn-m 0.282 Tn-m
Viga 5 - 6 0.504 Tn-m 0.430 Tn-m
Viga 6 - 7 0.218 Tn-m 0.523 Tn-m
TERCER PISO
Mmax (+) 0.190 Tn-m
b= 25.00 cm
d= 24.10 cm
Ф= 0.9
ADES DE LA VIGA
e Efectivo de la seccion:
1.91 cm
0.95 cm
h - Recub - Фestrib - Фasumo/2
ACERO MINIMO
1.420 cm²
2.000 cm²
ACERO MAXIMO
10.200 cm²
FUERZO EN LA VIGA
FORMULAS B. ACEROS NEGATIVOS Izquierda
Volado 0.515 Tn-m
0 = colocar acero minimo Viga 2 - 3 0.846 Tn-m
PRIMER Viga 3 - 4 0.208 Tn-m
PISO
PRIMER
PISO Viga 4 - 5 0.279 Tn-m
Viga 5 - 6 0.500 Tn-m
Mu Viga 6 - 7 0.265 Tn-m
As Volado 0.493 Tn-m
. fy.(d a / 2)
Viga 2 - 3 0.768 Tn-m
SEGUNDO Viga 3 - 4 0.234 Tn-m
As . fy PISO
a Volado 0.242 Tn-m
0 . 85 . f ' c .b Viga 5 - 6 0.468 Tn-m
Viga 6 - 7 0.323 Tn-m
Volado 0.186 Tn-m
Viga 2 - 3 0.351 Tn-m
TERCER Viga 3 - 4 0.296 Tn-m
PISO Volado 0.281 Tn-m
Viga 5 - 6 0.504 Tn-m
Viga 6 - 7 0.218 Tn-m
REPETIR
REPETIR
OK
As =2.000 cm²
VIGAS PRINCIPALES EJE D-D
PISOS VIGAS
Volado
Viga 2 - 3
PRIMER Viga 3 - 4
PISO Viga 4 - 5
Viga 5 - 6
Viga 6 - 7
Volado
Viga 2 - 3
SEGUNDO Viga 3 - 4
PISO Volado
Viga 5 - 6
Viga 6 - 7
Volado
Viga 2 - 3
TERCER Viga 3 - 4
PISO Volado
Viga 5 - 6
Viga 6 - 7
1. DIMENSION Y PROPIEDADES DE LA
b= 25.00 cm
h= 30.00 cm
f'c = 210 Kg/cm²
fy = 4200 Kg/cm²
β= 0.85
Recub = 4.00 cm
Asumir: a = 0.10.d
REPETIR As = 1.017 cm²
REPETIR As = 0.986 cm²
OK As = 0.985 cm²
As = 0.985 cm²
As =2.000 cm² Usar 1 Φ 1/2 + 1 Φ 3/8
TERCER PISO
Mmax (+) 0.210 Tn-m
b= 25.00 cm
d= 24.10 cm
Ф= 0.9
Asumir: a = 0.10.d
As = 0.243 cm²
As = 0.232 cm²
As = 0.232 cm²
As = 0.232 cm²
PISO Usar 1 Φ 1/2 + 1 Φ 3/8
Mmax (+) 0.320 Tn-m
b= 25.00 cm
d= 24.10 cm
Ф= 0.9
Asumir: a = 0.10.d
REPETIR As = 0.370 cm²
REPETIR As = 0.354 cm²
OK As = 0.354 cm²
As = 0.354 cm²
As =2.000 cm² Usar 1 Φ 1/2 + 1 Φ 3/8
REPETIR
REPETIR
OK
As =2.000 cm²
REPETIR
REPETIR
OK
As =2.000 cm²
VIGAS PRINCIPALES EJE D-D
Mº Max. Negativos Mº Max.
Izquierda Derecha Posiitivo
0.610 Tn-m 0.000 Tn-m 0.000 Tn-m
1.148 Tn-m 1.020 Tn-m 0.640 Tn-m
0.777 Tn-m 1.115 Tn-m 0.540 Tn-m
0.673 Tn-m 0.468 Tn-m 0.000 Tn-m
1.674 Tn-m 1.412 Tn-m 0.910 Tn-m
0.900 Tn-m 1.675 Tn-m 0.880 Tn-m
0.610 Tn-m 0.000 Tn-m 0.000 Tn-m
1.131 Tn-m 1.073 Tn-m 0.620 Tn-m
0.673 Tn-m 1.124 Tn-m 0.580 Tn-m
0.000 Tn-m 0.164 Tn-m 0.000 Tn-m
1.193 Tn-m 1.726 Tn-m 0.990 Tn-m
1.025 Tn-m 1.628 Tn-m 0.830 Tn-m
0.186 Tn-m 0.000 Tn-m 0.000 Tn-m
0.281 Tn-m 0.362 Tn-m 0.210 Tn-m
0.257 Tn-m 0.290 Tn-m 0.180 Tn-m
0.000 Tn-m 0.097 Tn-m 0.000 Tn-m
0.407 Tn-m 0.458 Tn-m 0.320 Tn-m
0.362 Tn-m 0.407 Tn-m 0.260 Tn-m
0.0163
2Φ1 10.200 cm²
Φ 1/2 + 1 Φ 3/8 As =2.000 cm² Usar 1 Φ 1/2 + 1 Φ 3/8 As =2.000 cm² TERCER PISO
Mmax (+) 0.260 Tn-m Mmax (+) 0.186 Tn-m
b= 25.00 cm b= 25.00 cm
d= 24.10 cm d= 24.10 cm
Ф= 0.9 Ф= 0.9
Asumir: a = 0.10.d
As = 0.297 cm²
As = 0.283 cm²
As = 0.283 cm²
As = 0.283 cm²
Usar 1 Φ 1/2 + 1 Φ 3/8
Mmax (+) 0.407 Tn-m
b= 25.00 cm
d= 24.10 cm
Ф= 0.9
Asumir: a = 0.10.d
As = 0.471 cm²
As = 0.451 cm²
As = 0.451 cm²
As = 0.451 cm²
Usar 1 Φ 1/2 + 1 Φ 3/8
Mmax (+) 0.407 Tn-m
b= 25.00 cm
d= 24.10 cm
Ф= 0.9
Asumir: a = 0.10.d
As = 0.471 cm²
As = 0.451 cm²
As = 0.451 cm²
As = 0.451 cm²
Usar 1 Φ 1/2 + 1 Φ 3/8
Izquierda Derecha FORMULAS
0.610 Tn-m 0.000 Tn-m
1.148 Tn-m 1.020 Tn-m
0.777 Tn-m 1.115 Tn-m 0 = colocar acero minimo
0.673 Tn-m 0.468 Tn-m
1.674 Tn-m 1.412 Tn-m Mu
0.900 Tn-m 1.675 Tn-m As
. fy.(d a / 2)
0.610 Tn-m 0.000 Tn-m
1.131 Tn-m 1.073 Tn-m
0.673 Tn-m 1.124 Tn-m As . fy
a
0.000 Tn-m 0.164 Tn-m 0 . 85 . f ' c .b
1.193 Tn-m 1.726 Tn-m
1.025 Tn-m 1.628 Tn-m
0.186 Tn-m 0.000 Tn-m
0.281 Tn-m 0.362 Tn-m
0.257 Tn-m 0.290 Tn-m
0.000 Tn-m 0.097 Tn-m
0.407 Tn-m 0.458 Tn-m
0.362 Tn-m 0.407 Tn-m
a =2.41 cm
a =0.44 cm REPETIR
a =0.42 cm REPETIR
a =0.42 cm OK
a =2.41 cm
a =1.82 cm REPETIR
a =1.80 cm REPETIR
a =1.80 cm OK
TERCER PISO
a =2.41 cm
a =0.39 cm REPETIR
a =0.38 cm REPETIR
a =0.38 cm OK
a =2.41 cm
a =0.11 cm REPETIR
a =0.10 cm OK
a =0.10 cm OK
1 Φ 1/2 + 1 Φ 3/8 As =2.000 cm²
a =2.41 cm
a =0.39 cm REPETIR
a =0.38 cm REPETIR
a =0.38 cm OK
DISEÑO DE LOSA ALIGERADA NOTA: Las celdas que estan de fondo blanco son
combinaciones que no se pueden tomar porque son
menores que el acerro minimo o mayores que el acero
1. METRADO DE CARGAS maximo.
P. Losa Alig. (h=20 cm) 300 Kg/m²
Peso Muerto 150 Kg/m²
P. Tabiqueria Equivalent 324 Kg/m²
Carga Muerta (Cm) 774 Kg/m²
Wu Cm = 1.4 Cm 1083 Kg/m²
2. MOMENTOS DE FLEXION
EMVOLVENTE ALIGERADO A
APOYO Mº NEGATIVO TRAMO Mº POSITIVO
2 1.610 2-3 1.140
3 1.820 3-4 0.810
4 1.590 4-5 1.040
5 0.000
EMVOLVENTE ALIGERADO B
APOYO Mº NEGATIVO TRAMO Mº POSITIVO
6 2.050 6-7 1.990
7 0.000
EMVOLVENTE ALIGERADO C
APOYO Mº NEGATIVO TRAMO Mº POSITIVO
2 1.610 2-3 1.100
3 1.920 3-4 0.980
4 1.149 4-5 0.360
5 1.960 5-6 1.530
6 3.040 6-7 1.880
7 0.000
EMVOLVENTE ALIGERADO D
APOYO Mº NEGATIVO TRAMO Mº POSITIVO
3 0.000 3-4 0.780
4 1.095 4-5 0.050
5 1.240 5-6 0.970
6 1.978 6-7 1.210
7 0.000
EMVOLVENTE ALIGERADO E
APOYO Mº NEGATIVO TRAMO Mº POSITIVO
2 1.460 2-3 0.790
3 1.520 3-4 0.680
4 1.050
EMVOLVENTE ALIGERADO F
APOYO Mº NEGATIVO TRAMO Mº POSITIVO
5 0.000 5-6 1.970
6 2.870 6-7 1.430
7 0.000
EMVOLVENTE ALIGERADO G
APOYO Mº NEGATIVO TRAMO Mº POSITIVO
B 0.000 B-C 0.900
C 0.000
Mu As . fy
ALIGERADO TIPO A As a
. fy.( d a / 2) 0 . 85 . f ' c .b
Mu As . fy
ALIGERADO TIPO B As a
. fy.( d a / 2) 0 . 85 . f ' c .b
Mu As . fy
ALIGERADO TIPO C As a
. fy.( d a / 2) 0 . 85 . f ' c .b
Mu As . fy
ALIGERADO TIPO D As a
. fy.( d a / 2) 0 . 85 . f ' c .b
Mu As . fy
ALIGERADO TIPO E As a
. fy.( d a / 2) 0 . 85 . f ' c .b
Mu As . fy
ALIGERADO TIPO F As a
. fy.( d a / 2) 0 . 85 . f ' c .b
Mu As . fy
ALIGERADO TIPO G As a
. fy.( d a / 2) 0 . 85 . f ' c .b
O O O O 0.05 m
0.20 m
0.15 m
O O O O
0.30 m 0.10 m 0.30 m 0.10 m 0.30 m
1.00 m
2.5 VIGUETAS
5. ACERO MAXIMO POR VIGUETA
As max = Pmax.b.d
ρ maxina = 0.75 ρb = 0.01627
Cuantia Balanceada (ρb) 0.022 cm²
As max = 6.924 cm²
As max / Vigueta = 2.770 cm²
2 Φ 1/2 As =2.580 cm²
As a
REPETIR As VIGUETA #REF!
OK USAR 1 ф 1/2" + 1 ф 3/8"
0.709 cm²
As =0.710 cm²
REPETIR
OK
0.504 cm²
As =0.710 cm²
REPETIR
OK
0.647 cm²
As =0.710 cm²
REPETIR
OK
1.238 cm²
As =1.290 cm²
REPETIR
OK
0.684 cm²
As =0.710 cm²
REPETIR
OK
0.609 cm²
As =0.710 cm²
REPETIR
OK
0.224 cm²
As =0.710 cm²
REPETIR
OK
0.952 cm²
As =1.290 cm²
REPETIR
OK
1.169 cm²
As =1.290 cm²
REPETIR
OK
0.485 cm²
As =0.710 cm²
REPETIR
OK
0.031 cm²
As =0.710 cm²
REPETIR
OK
0.603 cm²
As =0.710 cm²
REPETIR
OK
0.752 cm²
As =1.290 cm²
REPETIR
OK
0.491 cm²
As =0.710 cm²
REPETIR
OK
0.423 cm²
As =0.710 cm²
REPETIR
OK
1.226 cm²
As =1.290 cm²
REPETIR
OK
0.889 cm²
As =1.290 cm²
REPETIR
OK
0.560 cm²
As =0.710 cm²
As a
As VIGUETA #REF!
USAR 1 ф 3/8"
PROYECTO VIVIENDA MULTIFAMILIAR - 3 PSIOS
TOTALMENTE CARGADA
A. MOMENTOS DE EMPOTRAMIENTO
M34 = -1.00 Tn-m
M43 = 1.00 Tn-m
M45 = -0.71 Tn-m Wu Cm = 1.4 Cm 1083 Kg/m
M54 = 0.71 Tn-m Wu Cv = 1.7 Cv 340 Kg/m
M56 = -1.65 Tn-m Wu = 1423 Kg/m
M65 = 1.65 Tn-m
M67 = -1.35 Tn-m
M76 = 1.35 Tn-m
B. FACTORES DE DISTRIBUCION
NUDO 3 K34 = 0.000043 FD34 = 1.0000
ΣK = 0.000043 1.0000
NUDO 4 K43 = 0.000043 F43 = 0.3879
K45 = 0.000068 F45 = 0.6121
ΣK = 0.000111 1.0000
NUDO 5 K54 = 0.000068 F54 = 0.6036
K56 = 0.000045 F56 = 0.3964
ΣK = 0.000113 1.0000
NUDO 6 K65 = 0.000045 F65 = 0.5464
K67 = 0.000037 F67 = 0.4536
ΣK = 0.000082 1.0000
NUDO 7 K76 = 0.000049 F76 = 1.0000
ΣK = 0.000049 1.0000
C. DISTRIBUCION DE MOMENTOS
3 4 5
CARGA VIVA 1
A. MOMENTOS DE EMPOTRAMIENTO
M34 = -1.00 Tn-m
M43 = 1.00 Tn-m
M45 = -0.54 Tn-m Wu Cm = 1.4 Cm 1083 Kg/m
M54 = 0.54 Tn-m Wu Cv = 1.7 Cv 340 Kg/m
M56 = -1.65 Tn-m Wu = 1423 Kg/m
M65 = 1.65 Tn-m
M67 = -1.03 Tn-m
M76 = 1.03 Tn-m
C. DISTRIBUCION DE MOMENTOS
3 4 5
CARGA VIVA 2
2.900 m 2.450 m 3.730 m 3.370 m
A. MO MENTOS DE EMPOTRAMIENTO
M34 = -0.76 Tn-m
M43 = 0.76 Tn-m
M45 = -0.71 Tn-m Wu Cm = 1.4 Cm 1083 Kg/m
M54 = 0.71 Tn-m Wu Cv = 1.7 Cv 340 Kg/m
M56 = -1.26 Tn-m Wu = 1423 Kg/m
M65 = 1.26 Tn-m
M67 = -1.35 Tn-m
M76 = 1.35 Tn-m
C. DISTRIBUCION DE MOMENTOS
3 4 5
CARGA VIVA 3
A. MO MENTOS DE EMPOTRAMIENTO
M34 = -1.00 Tn-m
M43 = 1.00 Tn-m
M45 = -0.71 Tn-m Wu Cm = 1.4 Cm 1083 Kg/m
M54 = 0.71 Tn-m Wu Cv = 1.7 Cv 340 Kg/m
M56 = -1.26 Tn-m Wu = 1423 Kg/m
M65 = 1.26 Tn-m
M67 = -1.03 Tn-m
M76 = 1.03 Tn-m
C. DISTRIBUCION DE MOMENTOS
3 4 5
CARGA VIVA 4
A. MO MENTOS DE EMPOTRAMIENTO
M34 = -0.76 Tn-m
M43 = 0.76 Tn-m
M45 = -0.71 Tn-m Wu Cm = 1.4 Cm 1083 Kg/m
M54 = 0.71 Tn-m Wu Cv = 1.7 Cv 340 Kg/m
M56 = -1.65 Tn-m Wu = 1423 Kg/m
M65 = 1.65 Tn-m
M67 = -1.03 Tn-m
M76 = 1.03 Tn-m
C. DISTRIBUCION DE MOMENTOS
3 4 5
CARGA VIVA 5
2.900 m 2.450 m 3.730 m 3.370 m
A. MO MENTOS DE EMPOTRAMIENTO
M34 = -0.76 Tn-m
M43 = 0.76 Tn-m
M45 = -0.54 Tn-m Wu Cm = 1.4 Cm 1083 Kg/m
M54 = 0.54 Tn-m Wu Cv = 1.7 Cv 340 Kg/m
M56 = -1.65 Tn-m Wu = 1423 Kg/m
M65 = 1.65 Tn-m
M67 = -1.35 Tn-m
M76 = 1.35 Tn-m
C. DISTRIBUCION DE MOMENTOS
3 4 5
CARGA VIVA 6
A. MO MENTOS DE EMPOTRAMIENTO
M34 = -1.00 Tn-m
M43 = 1.00 Tn-m
M45 = -0.71 Tn-m Wu Cm = 1.4 Cm 1083 Kg/m
M54 = 0.71 Tn-m Wu Cv = 1.7 Cv 340 Kg/m
M56 = -1.65 Tn-m Wu = 1423 Kg/m
M65 = 1.65 Tn-m
M67 = -1.03 Tn-m
M76 = 1.03 Tn-m
C. DISTRIBUCION DE MOMENTOS
3 4 5
CARGA VIVA 7
A. MO MENTOS DE EMPOTRAMIENTO
M34 = -0.76 Tn-m
M43 = 0.76 Tn-m
M45 = -0.71 Tn-m Wu Cm = 1.4 Cm 1083 Kg/m
M54 = 0.71 Tn-m Wu Cv = 1.7 Cv 340 Kg/m
M56 = -1.65 Tn-m Wu = 1423 Kg/m
M65 = 1.65 Tn-m
M67 = -1.35 Tn-m
M76 = 1.35 Tn-m
C. DISTRIBUCION DE MOMENTOS
3 4 5
EMVOLVENTE
0.0000 1.0951 -1.0951 1.2399 -1.2400
APOYO 3 APOYO 4 APOYO 5
EMVOLVENTE ALIGERADO D
APOYO Mº NEGATIVO TRAMO Mº POSITIVO
3 0.0000 3-4 0.78
4 -1.0951 4-5 0.05
5 -1.2400 5-6 0.97
6 -1.9780 6-7 1.21
7 0.0000
6 7
6 7
6 7
6 7
6 7
6 7
As . fy wu .l (M i M j )
Mr . fy. As .(d a / 2) a Vi
0 . 85 . f ' c .b w 2 l
Carga Ultima (Wu) 1423 Kg/m
Pm = 702.00 Kg
Vn V c
Resist.a la compresion : f'c 210 Kg/cm²
Fluencia del acero 4200 Kg/cm² Vc 0 .53 f'c. bw. d
Ancho de columna (t) : 0.25 cm
Base de vigueta: bw 25.00 cm
Peralte Efectivo de la seccion: 17.03 cm
Cortante tomado por el cº: ΦVc 2779 Kg/cm²
ALIGERADO A
1.310 m 3.370 m
arriba (-) abajo (+)
APOYO As/ vigueta Ast a Mr Vi Vi'
Volado -702.00 Kg
6 1 Φ 1/2 1.290 cm² 3.225 cm² 3.04 cm 1890.42 Kg-m -2566.62 Kg 2637.01 Kg
7 1 Φ 3/8 0.710 cm² 1.775 cm² 1.67 cm 1086.25 Kg-m -2159.75 Kg
Vmax 2637.01 Kg
Vud 2216.76 Kg
DISEÑO DE LOSA CORRECTO
ALIGERADO C
0.930 m 3.150 m 2.890 m 2.450 m 3.730 m 3.370 m
arriba (-) abajo (+)
APOYO As/ vigueta Ast a Mr Vi Vi'
Volado -702.00 Kg
2 1 Φ 1/2 1.290 cm² 3.225 cm² 3.04 cm 1890.42 Kg-m -2025.74 Kg 2241.81 Kg
3 1 Φ 1/2 1.290 cm² 3.225 cm² 3.04 cm 1890.42 Kg-m -2241.81 Kg 2056.77 Kg
4 1 Φ 1/2 1.290 cm² 3.225 cm² 3.04 cm 1890.42 Kg-m -2056.77 Kg 1743.63 Kg
5 1 Φ 1/2 1.290 cm² 3.225 cm² 3.04 cm 1890.42 Kg-m -1743.63 Kg 2654.59 Kg
6 1/2 1.290 cm² 3.225 cm² 3.04 cm 1890.42 Kg-m -2654.59 Kg 2637.01 Kg
7 1 Φ 3/8 0.710 cm² 1.775 cm² 1.67 cm 1086.25 Kg-m -2159.75 Kg
Vmax 2654.59 Kg
Vud 2234.34 Kg
DISEÑO DE LOSA CORRECTO
ALIGERADO D
ALIGERADO E
3.730 m 3.370 m
arriba (-) abajo (+)
APOYO As/ vigueta Ast a Mr Vi Vi'
5 1 Φ 3/8 0.710 cm² 1.775 cm² 1.67 cm 1086.25 Kg-m 2438.99 Kg
6 1/2 1.290 cm² 3.225 cm² 3.04 cm 1890.42 Kg-m -2870.19 Kg 2637.01 Kg
7 1 Φ 3/8 0.710 cm² 1.775 cm² 1.67 cm 1086.25 Kg-m -2159.75 Kg
Vmax 2870.19 Kg
Vud 2449.94 Kg
DISEÑO DE LOSA CORRECTO
ALIGERADO G
3.730 m
arriba (-) abajo (+)
APOYO As/ vigueta Ast a Mr Vi Vi'
B 1 Φ 3/8 0.710 cm² 1.775 cm² 1.67 cm 1086.25 Kg-m 2654.59 Kg
C 1 Φ 3/8 0.710 cm² 1.775 cm² 1.67 cm 1086.25 Kg-m -2654.59 Kg
Vmax 2654.59 Kg
Vud 2234.34 Kg
DISEÑO DE LOSA CORRECTO
PROYECTO VIVIENDA MULTIFAMILIAR - 3 PSIOS
DATOS:
f'c = 210 Kg/cm²
fy = 4200 Kg/cm²
Ǿ flex. 0.9
Ǿ corte 0.85
b: 25.00 cm
h: 35.00 cm
d: 29.10 cm
t: 25.00 cm
4.25 m 2.25 m
4.25 m 2.25 m
2. DIAGRAMA DE FUERZA CORTANTE
arriba (-) abajo (+)
APOYO Mr Vi Vi'
APOYO A 3.426 Tn-m 7.304 Tn
wu .li (Mri Mrj )
APOYO B 6.091 Tn-m -8.558 Tn 4.786 Tn Vi
APOYO C 4.769 Tn-m -3.611 Tn 8.105 Tn 2 li
APOYO D 4.030 Tn-m -7.757 Tn
-8.558 Tn -3.611 Tn
4.25 m 2.25 m
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
Espaciamiento debe ser: d/2 14.55 cm Espaciamiento debe ser: d/2 14.55 cm
12.50 cm 12.50 cm
4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 2.000 m Z= 1.500 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquilament 7.304 Tn Cubre Tranquilament 4.786 Tn
4.25 m 2.25 m
4.25 m 2.25 m
-11.693 Tn -5.044 Tn
4.25 m 2.25 m
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
Espaciamiento debe ser: d/2 14.55 cm Espaciamiento debe ser: d/2 14.55 cm
12.50 cm 12.50 cm
4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 2.000 m Z= 1.500 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquilament 9.533 Tn Cubre Tranquilament 5.044 Tn
4.25 m 2.25 m
-8.958 Tn -4.486 Tn
4.25 m 2.25 m
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
Espaciamiento debe ser: d/2 14.55 cm Espaciamiento debe ser: d/2 14.55 cm
12.50 cm 12.50 cm
4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 2.500 m Z= 1.500 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquilament 7.988 Tn Cubre Tranquilament 4.486 Tn
4.25 m 2.25 m
4.25 m 2.25 m
4.25 m 2.25 m
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
Espaciamiento debe ser: d/2 14.55 cm Espaciamiento debe ser: d/2 14.55 cm
12.50 cm 12.50 cm
4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 2.500 m Z= 1.500 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquilament 11.489 Tn Cubre Tranquilament 5.855 Tn
4.25 m 2.25 m
4.25 m 2.25 m
2. DIAGRAMA DE FUERZA CORTANTE
arriba (-) abajo (+)
APOYO Mr Vi Vi'
APOYO A 7.278 Tn-m 10.686 Tn
wu .li (Mri Mrj )
APOYO B 10.246 Tn-m -12.083 Tn 6.787 Tn Vi
APOYO C 10.246 Tn-m -6.787 Tn 11.430 Tn 2 li
APOYO D 7.278 Tn-m -10.033 Tn
-12.083 Tn -6.787 Tn
4.25 m 2.25 m
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
Espaciamiento debe ser: d/2 14.55 cm Espaciamiento debe ser: d/2 14.55 cm
12.50 cm 12.50 cm
4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 2.000 m Z= 1.500 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquilament 10.686 Tn Cubre Tranquilament 6.787 Tn
4.25 m 2.25 m
4.25 m 2.25 m
-8.595 Tn -4.204 Tn
4.25 m 2.25 m
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 2.000 m Z= 1.500 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquilament 7.287 Tn Cubre Tranquilament 4.204 Tn
DATOS:
f'c = 210 Kg/cm²
fy = 4200 Kg/cm²
Ǿ flex. 0.9
Ǿ corte 0.85
b: 25.00 cm
h: 35.00 cm
d: 29.10 cm
t: 25.00 cm
4.25 m 4.25 m
MOMENTOS RESISTENTES:
Usando las formulas de flexion simple:
4.25 m 4.25 m
2. DIAGRAMA DE FUERZA CORTANTE
arriba (-)
APOYO Mr Vi
APOYO A 3.426 Tn-m
APOYO B 6.091 Tn-m -8.591 Tn
APOYO C 4.769 Tn-m -3.628 Tn
APOYO D 4.748 Tn-m -7.958 Tn
-7.757 Tn
4.25 m 4.25 m
7.336 Tn
Vc 0.53 f ´c b d Vud Vn
3. DISEÑO DEL REFUERZO TRANSVERSAL
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRI 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 2.500 m Z= 2.000 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranqu 8.105 Tn Cubre Tranquilame 7.336 Tn
4.25 m 4.25 m
MOMENTOS RESISTENTES:
Usando las formulas de flexion simple:
4.25 m 4.25 m
-9.849 Tn
4.25 m 4.25 m
10.226 Tn
Vc 0.53 f ´c b d Vud Vn
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRI 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 2.500 m Z= 2.500 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranqu 11.377 Tn Cubre Tranquilame 10.226 Tn
6.540 cm² Wu = 3.99 T/m 4.560 cm² 4.560 cm² Wu = 4.00 T/m
4.25 m 4.25 m
MOMENTOS RESISTENTES:
Usando las formulas de flexion simple:
4.25 m 4.25 m
-7.988 Tn
4.25 m 4.25 m
8.023 Tn
Vc 0.53 f ´c b d Vud Vn
Vc 0.53 f ´c b d Vud Vn
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRI 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 2.500 m Z= 2.500 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranqu 8.958 Tn Cubre Tranquilame 8.023 Tn
4.25 m 4.25 m
MOMENTOS RESISTENTES:
Usando las formulas de flexion simple:
4.25 m 4.25 m
4.25 m 4.25 m
11.531 Tn
Vc 0.53 f ´c b d Vud Vn
3. DISEÑO DEL REFUERZO TRANSVERSAL
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRI 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 2.500 m Z= 2.500 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranqu 12.458 Tn Cubre Tranquilame 11.531 Tn
4.25 m 4.25 m
MOMENTOS RESISTENTES:
Usando las formulas de flexion simple:
4.25 m 4.25 m
2. DIAGRAMA DE FUERZA CORTANTE
arriba (-)
APOYO Mr Vi
APOYO A 7.278 Tn-m
APOYO B 10.246 Tn-m -12.127 Tn
APOYO C 8.622 Tn-m -6.089 Tn
APOYO D 7.278 Tn-m -10.460 Tn
-10.033 Tn
4.25 m 4.25 m
10.731 Tn
Vc 0.53 f ´c b d Vud Vn
3. DISEÑO DEL REFUERZO TRANSVERSAL
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRI 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 2.500 m Z= 2.000 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranqu 11.430 Tn Cubre Tranquilame 10.731 Tn
4.25 m 4.25 m
MOMENTOS RESISTENTES:
Usando las formulas de flexion simple:
4.25 m 4.25 m
-7.287 Tn
4.25 m 4.25 m
7.649 Tn
Vc 0.53 f ´c b d Vud Vn
3. DISEÑO DEL REFUERZO TRANSVERSAL
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRI 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 2.500 m Z= 2.500 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranqu 8.595 Tn Cubre Tranquilame 7.649 Tn
As . fy
a Mr . fy. As .(d a / 2)
0 . 85 . f ' c .b w
2.25 m 4.25 m
4.804 Tn 7.968 Tn
DO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
para que tome el corte Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
14.55 cm Espaciamiento debe ser: d/2 14.55 cm Espaciamiento debe ser: d/2
12.50 cm 12.50 cm
ENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIB 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 1.500 m Z= 2.500 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquil 4.804 Tn Cubre Tranqu 7.968 Tn
DES CUBIERTAS 5. DETERMINACION DE LAS LONGITUDES CUBIERTAS 5. DETERMINACION DE LAS LONGITUDES CUBIERTAS
As . fy
a Mr . fy. As .(d a / 2)
0 . 85 . f ' c .b w
abajo (+)
Vi'
2.25 m 4.25 m
5.065 Tn 11.564 Tn
DO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
para que tome el corte Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
14.55 cm Espaciamiento debe ser: d/2 14.55 cm Espaciamiento debe ser: d/2
12.50 cm 12.50 cm
ENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIB 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 1.500 m Z= 2.500 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquil 5.065 Tn Cubre Tranqu 11.564 Tn
DES CUBIERTAS 5. DETERMINACION DE LAS LONGITUDES CUBIERTAS 5. DETERMINACION DE LAS LONGITUDES CUBIERTAS
As . fy
a
0 . 85 . f ' c .b w
Mr . fy. As .(d a / 2)
abajo (+)
Vi'
2.25 m 4.25 m
4.504 Tn 8.993 Tn
DO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
para que tome el corte Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
14.55 cm Espaciamiento debe ser: d/2 14.55 cm Espaciamiento debe ser: d/2
12.50 cm 12.50 cm
ENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIB 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 1.500 m Z= 2.500 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquil 4.504 Tn Cubre Tranqu 8.993 Tn
DES CUBIERTAS 5. DETERMINACION DE LAS LONGITUDES CUBIERTAS 5. DETERMINACION DE LAS LONGITUDES CUBIERTAS
As . fy
a Mr . fy. As .(d a / 2)
0 . 85 . f ' c .b w
abajo (+)
Vi'
11.531 Tn
wu .li (Mri Mrj )
5.794 Tn Vi
12.500 Tn 2 li
-12.928 Tn -5.794 Tn -11.103 Tn
2.25 m 4.25 m
5.794 Tn 12.500 Tn
DO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
para que tome el corte Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
14.55 cm Espaciamiento debe ser: d/2 14.55 cm Espaciamiento debe ser: d/2
12.50 cm 12.50 cm
ENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIB 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 1.500 m Z= 2.500 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquil 5.794 Tn Cubre Tranqu 12.500 Tn
DES CUBIERTAS 5. DETERMINACION DE LAS LONGITUDES CUBIERTAS 5. DETERMINACION DE LAS LONGITUDES CUBIERTAS
As . fy
a Mr . fy. As .(d a / 2)
0 . 85 . f ' c .b w
2.25 m 4.25 m
7.533 Tn 11.092 Tn
DO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
para que tome el corte Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
14.55 cm Espaciamiento debe ser: d/2 14.55 cm Espaciamiento debe ser: d/2
12.50 cm 12.50 cm
ENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIB 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 1.500 m Z= 2.500 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquil 7.533 Tn Cubre Tranqu 11.092 Tn
DES CUBIERTAS 5. DETERMINACION DE LAS LONGITUDES CUBIERTAS 5. DETERMINACION DE LAS LONGITUDES CUBIERTAS
As . fy
a Mr . fy. As .(d a / 2)
0 . 85 . f ' c .b w
abajo (+)
Vi'
7.649 Tn
wu .li (Mri Mrj )
4.217 Tn Vi
8.281 Tn 2 li
2.25 m 4.25 m
4.217 Tn 8.281 Tn
DO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
para que tome el corte Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
ENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIB 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
Z= 1.500 m Z= 2.500 m
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquil 4.217 Tn Cubre Tranqu 8.281 Tn
DES CUBIERTAS 5. DETERMINACION DE LAS LONGITUDES CUBIERTAS 5. DETERMINACION DE LAS LONGITUDES CUBIERTAS
DATOS:
f'c = 210 Kg/cm²
fy = 4200 Kg/cm²
Ǿ flex. 0.9
Ǿ corte 0.85
b: 25.00 cm
h: 35.00 cm
d: 29.10 cm
t: 25.00 cm
4.25 m 4.25 m
4.25 m 2.25
2. DIAGRAMA DE FUERZA CORTANTE
arriba (-) abajo (+)
APOYO Mr Vi Vi'
APOYO A 2.686 Tn-m 4.336 Tn
wu .li (Mri M
APOYO B 4.030 Tn-m -4.968 Tn 2.463 Tn Vi
APOYO C 4.030 Tn-m -2.463 Tn 4.968 Tn 2 li
APOYO D 2.686 Tn-m -4.336 Tn
-4.968 Tn
4.25 m
4.336 Tn 2.463 Tn
TRAMO A-B
TE A UNA DISTANCIA "d" CALCULO DEL CORTANTE A UNA DISTANCIA "d" CALCULO DEL CORTANTE
Vud = 3.425 Tn
ADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMA
zo para que tome el corte Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerz
AMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIA
Z= 2.000 m Z=
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn
Cubre Tranquilame 4.336 Tn
VIGA PRINCIPAL: VP
4.25 m 4.25 m
4.25 m 2.25
-6.038 Tn
4.25 m
5.068 Tn 2.940 Tn
TRAMO A-B
TE A UNA DISTANCIA "d" CALCULO DEL CORTANTE A UNA DISTANCIA "d" CALCULO DEL CORTANTE
Vud = 3.515 Tn
ADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMA
zo para que tome el corte Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerz
AMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIA
Z= 2.000 m Z=
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn
Cubre Tranquilame 5.068 Tn
º VIGA PRINCIPAL: VP
4.25 m 2.25
-5.274 Tn
4.25 m
4.642 Tn 2.625 Tn
TRAMO A-B
TE A UNA DISTANCIA "d" CALCULO DEL CORTANTE A UNA DISTANCIA "d" CALCULO DEL CORTANTE
Vud = 3.089 Tn
ADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMA
zo para que tome el corte Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerz
AMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIA
Z= 2.000 m Z=
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn
Cubre Tranquilame 4.642 Tn
º VIGA PRINCIPAL: VP
4.25 m 4.25 m
4.25 m 2.25
4.25 m
5.564 Tn 3.111 Tn
TRAMO A-B
TE A UNA DISTANCIA "d" CALCULO DEL CORTANTE A UNA DISTANCIA "d" CALCULO DEL CORTANTE
Vud = 4.012 Tn
ADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMA
zo para que tome el corte Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerz
AMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIA
Z= 2.500 m Z=
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn
Cubre Tranquilame 5.564 Tn
VIGA PRINCIPAL: VP
4.25 m 4.25 m
4.25 m 2.25
2. DIAGRAMA DE FUERZA CORTANTE
arriba (-) abajo (+)
APOYO Mr Vi Vi'
APOYO A 4.748 Tn-m 6.233 Tn
wu .li (Mri Mrj
APOYO B 4.748 Tn-m -6.233 Tn 3.300 Tn Vi
APOYO C 4.748 Tn-m -3.300 Tn 6.686 Tn 2 li
APOYO D 2.822 Tn-m -5.779 Tn
-6.233 Tn
4.25 m
6.233 Tn 3.300 Tn
TRAMO A-B
TE A UNA DISTANCIA "d" CALCULO DEL CORTANTE A UNA DISTANCIA "d" CALCULO DEL CORTANTE
Vud = 4.680 Tn
ADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMA
zo para que tome el corte Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerz
AMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIA
Z= 2.500 m Z=
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn
Cubre Tranquilame 6.233 Tn
VIGA PRINCIPAL: VP
4.25 m 4.25 m
4.25 m 2.25
-6.052 Tn
4.25 m
5.082 Tn 2.947 Tn
TRAMO A-B
TE A UNA DISTANCIA "d" CALCULO DEL CORTANTE A UNA DISTANCIA "d" CALCULO DEL CORTANTE
Vud = 3.530 Tn
ADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMA
zo para que tome el corte Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerz
AMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIA
Z= 2.000 m Z=
@ 10.0 cm @ 10.0 cm
Vs = 17.352 Tn
Cubre Tranquilame 5.082 Tn
2.25 m 4.25 m
Mr . fy. As .(d a / 2)
APOYO C APOYO D
As = 3.870 cm² As = 2.580 cm²
a= 3.642 cm a= 2.428 cm
Mr C = 4.030 Tn-m/m Mr D = 2.686 Tn-m/m
2.25 m 4.25 m
wu .li (Mri Mrj )
Vi
2 li
-2.463 Tn -4.336 Tn
2.25 m 4.25 m
4.968 Tn
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
Espaciamiento debe ser: d/2 14.55 cm Espaciamiento debe ser: d/2 14.55 cm
12.50 cm 12.50 cm
DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
1.500 m Z= 2.500 m
@ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquilame 2.463 Tn Cubre Tranquilame 4.968 Tn
2.25 m 4.25 m
Mr . fy. As .(d a / 2)
APOYO C APOYO D
As = 4.560 cm² As = 2.580 cm²
a= 4.292 cm a= 2.428 cm
Mr C = 4.748 Tn-m/m Mr D = 2.686 Tn-m/m
Mr C = 4.748 Tn-m Mr D = 2.686 Tn-m
2.25 m 4.25 m
-2.940 Tn -5.068 Tn
2.25 m 4.25 m
6.038 Tn
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
Espaciamiento debe ser: d/2 14.55 cm Espaciamiento debe ser: d/2 14.55 cm
12.50 cm 12.50 cm
DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
1.500 m Z= 2.500 m
@ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquilame 2.940 Tn Cubre Tranquilame 6.038 Tn
Mr . fy. As .(d a / 2)
APOYO C APOYO D
As = 3.870 cm² As = 2.580 cm²
a= 3.642 cm a= 2.428 cm
Mr C = 4.030 Tn-m/m Mr D = 2.686 Tn-m/m
2.25 m 4.25 m
-2.625 Tn -4.642 Tn
2.25 m 4.25 m
5.274 Tn
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
Espaciamiento debe ser: d/2 14.55 cm Espaciamiento debe ser: d/2 14.55 cm
12.50 cm 12.50 cm
DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
1.500 m Z= 2.500 m
@ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquilame 2.625 Tn Cubre Tranquilame 5.274 Tn
2.25 m 4.25 m
Mr . fy. As .(d a / 2)
APOYO C APOYO D
As = 4.560 cm² As = 2.580 cm²
a= 4.292 cm a= 2.428 cm
Mr C = 4.748 Tn-m/m Mr D = 2.686 Tn-m/m
2.25 m 4.25 m
2.25 m 4.25 m
6.361 Tn
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
Espaciamiento debe ser: d/2 14.55 cm Espaciamiento debe ser: d/2 14.55 cm
12.50 cm 12.50 cm
DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
1.500 m Z= 2.500 m
@ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquilame 3.111 Tn Cubre Tranquilame 6.361 Tn
2.25 m 4.25 m
Mr . fy. As .(d a / 2)
APOYO C APOYO D
As = 4.560 cm² As = 2.710 cm²
a= 4.292 cm a= 2.551 cm
Mr C = 4.748 Tn-m/m Mr D = 2.822 Tn-m/m
2.25 m 4.25 m
wu .li (Mri Mrj )
Vi
2 li
-3.300 Tn -5.779 Tn
2.25 m 4.25 m
6.686 Tn
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
Espaciamiento debe ser: d/2 14.55 cm Espaciamiento debe ser: d/2 14.55 cm
12.50 cm 12.50 cm
DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
1.500 m Z= 2.500 m
@ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquilame 3.300 Tn Cubre Tranquilame 6.686 Tn
2.25 m 4.25 m
Mr . fy. As .(d a / 2)
APOYO C APOYO D
As = 4.560 cm² As = 2.580 cm²
a= 4.292 cm a= 2.428 cm
Mr C = 4.748 Tn-m/m Mr D = 2.686 Tn-m/m
Mr C = 4.748 Tn-m Mr D = 2.686 Tn-m
2.25 m 4.25 m
-2.947 Tn -5.082 Tn
2.25 m 4.25 m
6.052 Tn
MAXIMO CORTANTE TOMADO POR EL REFUERZO MAXIMO CORTANTE TOMADO POR EL REFUERZO
Si se puede diseñar refuerzo para que tome el corte Si se puede diseñar refuerzo para que tome el corte
DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS 4. DETERMINACION DEL ESPACIAMIENTO DE LOS ESTRIBOS
1.500 m Z= 2.500 m
@ 10.0 cm
Vs = 17.352 Tn Vs = 17.352 Tn
Cubre Tranquilame 2.947 Tn Cubre Tranquilame 6.052 Tn
COMBINACIONES RECOMENDADAS
1/2 - 3/8" Area 1/2 - 5/8"
2 Φ 3/8 1.420 cm² 1 Φ 1/2 + 1 Φ 5/8
1 Φ 1/2 + 1 Φ 3/8 2.000 cm² 2 Φ 5/8
3 Φ 3/8 2.130 cm² 2 Φ 1/2 + 1 Φ 5/8
2 Φ 1/2 2.580 cm² 1 Φ 1/2 + 2 Φ 5/8
1 Φ 1/2 + 2 Φ 3/8 2.710 cm² 3 Φ 1/2 + 1 Φ 5/8
4 Φ 3/8 2.840 cm² 3 Φ 5/8
2 Φ 1/2 + 1 Φ 3/8 3.290 cm² 2 Φ 1/2 + 2 Φ 5/8
3 Φ 1/2 3.870 cm² 1 Φ 1/2 + 3 Φ 5/8
2 Φ 1/2 + 2 Φ 3/8 4.000 cm² 4 Φ 5/8
3 Φ 1/2 + 1 Φ 3/8 4.580 cm² 1/2 - 3/4"
4 Φ 1/2 5.160 cm² 1 Φ 1/2 + 1 Φ 3/4
5/8 - 1" Area 2 Φ 1/2 + 1 Φ 3/4
1 Φ 1 + 1 Φ 5/8 7.080 cm² 2 Φ 3/4
2Φ1 10.200 cm² 1 Φ 1/2 + 2 Φ 3/4
2 Φ 1+ 1 Φ 5/8 12.180 cm² 3 Φ 3/4
2 Φ 1+ 2 Φ 5/8 14.160 cm² 2 Φ 1/2 + 2 Φ 3/4
3Φ1 15.300 cm² 4 Φ 3/4
3/4 - 1" Area
1 Φ 3/4 + 1 Φ 1 7.950 cm² NOTA: Las celdas que est
combinaciones que no se puede
1 Φ 1 + 2 Φ 3/4 10.800 cm² que el acerro minimo o mayores
2 Φ 1 + 1 Φ 3/4 13.050 cm² cuando estan sobrepasan
2 Φ 1+ 2 Φ 3/4 15.900 cm²
- DISEÑO
S RECOMENDADAS
1/2 - 5/8" Area ACEROS COMERCIALES
1 Φ 1/2 + 1 Φ 5/8 3.270 cm² BARRA DIAMETRO Peso Area
2 Φ 5/8 3.960 cm² numero pulg cm Kg/m cm2
2 Φ 1/2 + 1 Φ 5/8 4.560 cm² 3 3/8 0.95 0.559 0.71
1 Φ 1/2 + 2 Φ 5/8 5.250 cm² 4 1/2 1.27 0.993 1.29
3 Φ 1/2 + 1 Φ 5/8 5.850 cm² 5 5/8 1.59 1.552 1.98
3 Φ 5/8 5.940 cm² 6 3/4 1.91 2.235 2.85
2 Φ 1/2 + 2 Φ 5/8 6.540 cm² 7 7/8 2.22 3.042 3.88
1 Φ 1/2 + 3 Φ 5/8 7.230 cm² 8 1 2.54 3.973 5.1
4 Φ 5/8 7.920 cm² 9 1 1/8 2.86 5.028 6.45
1/2 - 3/4" Area 10 1 1/4 3.18 6.207 8.19
1 Φ 1/2 + 1 Φ 3/4 4.140 cm² 11 1 3/8 3.49 7.511 9.58
2 Φ 1/2 + 1 Φ 3/4 5.430 cm² 12 1 1/2 3.81 8.938 11.4
2 Φ 3/4 5.700 cm²
1 Φ 1/2 + 2 Φ 3/4 6.990 cm²
3 Φ 3/4 8.550 cm²
2 Φ 1/2 + 2 Φ 3/4 8.280 cm²
11.400 cm²