RESUMEN METRADO

CASETA POZO 01 SAN PABLO

ITEMS PARTIDA TOTAL UND.

01 CASETA POZO 01 SAN PABLO


01.01 TRABAJOS PRELIMINARES
01.01.01 LIMPIEZA PRELIMINAR DEL TERRENO 135.15 M2
01.01.02 TRAZO, NIVEL Y REPLANTEO 135.15 M2

01.02 MOVIMIENTO DE TIERRAS


01.02.01 CORTE DE TERRENO MANUAL 7.59 M3
01.02.02 EXCAVACIÓN DE ZANJAS P/ZAPATAS 6.00 M3
01.02.03 EXCAVACION DE ZANJAS P/CIMIENTOS 24.58 M3
01.02.04 EXCAVACIÓN DE ZANJAS P/SARDINEL DE VEREDA 1.22 M3
01.02.05 EXCAVACION EN CAJA DE REBOSE Y LIMPIA 2.15 M3
01.02.06 RELLENO C/HORMIGÓN E=15cm. COMPACTADO C/EQUIPO 107.58 M2
01.02.07 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE D = 5 Km 19.25 M3

01.03 OBRAS DE CONCRETO SIMPLE


01.03.01 CIMIENTOS
01.03.01.01 SOLADO C:H 1:10 E = 10 CM 34.61 M2
01.03.01.02 CIMIENTO CORRIDO 1:10 (C:H) + 30% P.G 17.48 M3
01.03.01.02 FALSO PISO E=4" 1:8 69.88 M2

01.03.02 VEREDAS
01.03.02.01 CONCRETO P/VEREDAS FROTACHADO F'c = 140 Kg/cm2 48.95 M2
01.03.02.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS 6.11 M2
01.03.02.03 JUNTAS DE DILATACION 16.20 M

01.03.03 CANALETA
01.03.03.01 CONCRETO F'C=175 KG/CM2 PARA CANALETA 0.48 M3
01.03.03.02 ENCOFRADO Y DESENCOFRADO DE CANALETA 3.38 M2

01.04 OBRAS DE CONCRETO ARMADO


01.04.01 ZAPATAS
01.04.01.01 CONCRETO F'C=210 KG/CM2 EN ZAPATAS 3.98 M3
01.04.01.02 ACERO FY=4200 KG/CM2 EN ZAPATAS 61.23 KG

01.04.02 SOBRECIMIENTOS REFORZADOS


01.04.02.01 CONCRETO F'C=210 KG/CM2 EN SOBRECIMIENTOS 2.74 M3
01.04.02.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO 24.29 M2
01.04.02.03 ACERO FY=4200 KG/CM2 EN SOBRECIMIENTOS 182.57 KG

01.04.03 CAJA DE REBOSE Y LIMPIA


01.04.03.01 CONCRETO F'C=210 KG/CM2 EN CAJA DE REBOSE Y LIMPIA 3.02 M3
01.04.03.02 ENCOFRADO Y DESENCOFRADO EN CAJA DE REBOSE Y LIMPIA 6.90 M2
01.04.03.03 ACERO FY=4200 KG/CM2 EN CAJA DE REBOSE Y LIMPIA 28.22 KG

01.04.04 COLUMNAS
01.04.04.01 CONCRETO F'C=210 KG/CM2 EN COLUMNAS 3.25 M3
01.04.04.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS 27.40 M2
01.04.04.03 ACERO FY=4200 KG/CM2 EN COLUMNAS 387.97 KG

01.04.05 VIGAS
01.04.05.01 CONCRETO F'C= 210 KG/CM2 EN VIGAS 4.14 M3
01.04.05.02 ENCOFRADO Y DESENCOFRADO EN VIGAS 19.07 M2
01.04.05.03 ACERO FY=4200 KG/CM2 EN VIGAS 463.94 KG

01.04.06 LOSAS ALIGERADAS


01.04.06.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA 6.83 M3
01.04.06.02 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA 78.00 M2
01.04.06.03 ACERO FY=4200 KG/CM2 EN LOSA ALIGERADA 501.83 KG
01.04.06.04 LADRILLO HUECO DE ARCILLA DE 15 x 30 x 30 650.00 UND

01.05 MUROS Y TABIQUES


01.05.01 MURO DE SOGA LADRILLO KING-KONG 12.76 M2
01.05.02 MURO DE CABEZA LADRILLO KING-KONG 76.75 M2

01.06 REVOQUES Y ENLUCIDOS


01.06.01 TARRAJEO PRIMARIO RAYADO C/MEZCLA 1:5 E=2 CM 8.20 M2
01.06.02 TARRAJEO DE MUROS INTERIORES C.A. 1:5 E=2 cm 99.51 M2
01.06.03 TARRAJEO DE MUROS EXTERIORES C.A. 1:5 E=2 cm 73.99 M2
01.06.04 TARRAJEO DE COLUMNAS MEZCLA C:A 1.5, E=2cm. 27.40 M2
01.06.05 TARRAJEO DE VIGAS MEZCLA C:A 1.5, E=2cm. 19.07 M2
01.06.06 TARRAJEO DE VANOS MEZCLA C:A 1:5 E = 2cm. 61.60 M

01.07 CIELORASO
01.07.01 ENLUCIDO DE CIELO RASO CON MORTERO 1:4 E = 1.5 CM 78.00 M2

01.08 CONTRAZOCALOS
01.08.01 ZOCALO DE CERAMICO DE COLOR DE 20 x 33 cm 6.45 M2
01.08.02 CONTRAZOCALO CEMENTO PULIDO H = 30 CM 66.00 M

01.09 CARPINTERIA METALICA


01.09.01 PUERTA METALICA PM-1 7.50 M2
01.09.02 PUERTA METALICA PM-2 7.50 M2
01.09.03 PUERTA C/TRIPLAY P-4, 9MM 1.68 M2
01.09.04 PUERTA C/TRIPLAY P-4, 9MM 1.47 M2
01.09.05 VENTANA METALICA VM-1 2.31 M2
01.09.06 VENTANA METALICA VM-2 2.16 M2
01.09.07 VENTANA METALICA VM-3 1.20 M2
01.09.08 VENTANA METALICA VM-4 0.36 M2
01.09.09 TAPA DE FIBRA DE VIDRIO 0.75M x 0.80M x 0.05M 1.00 UND
01.09.10 REJILLA METALICA 0.75M x 0.80M x 0.05M 1.00 UND

01.10 COBERTURAS
01.10.01 TUBO RECTANGULAR 6" x 2" x 3 MM 8.00 M
01.10.02 COBERTURA DE POLICARBONATO COLOR BLANCO E=10 MM 6.25 M2

01.11 PINTURA
01.11.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES 173.50 M2
01.11.02 PINTURA LATEX EN COLUMNAS Y VIGAS 46.47 M2
01.11.03 PINTURA LATEX EN VANOS 15.40 M2
01.11.04 PINTURA LATEX EN CONTRAZOCALO H =0.30m. 66.00 M2
01.12 PISOS Y PAVIMENTOS
01.12.01 CONTRAPISO MORTERO 1: 4 E = 2 cm. 52.50 M2
01.12.02 PISO PULIDO Y BRUÑADO 52.50 M2

01.13 INSTALACIONES SANITARIAS


01.13.01 AGUA POTABLE
01.13.01.01 SALIDA DE AGUA FRIA PVC 3.00 UND
01.13.01.02 RED DE DISTRIBUCIÓN DE AGUA DE 1/2" 1.00 UND
01.13.01.03 VALVULA ESFERICA DE 1/2" 1.00 UND

01.13.02 DESAGÜE
01.13.02.01 SALIDA DE DESAGUE TUBERÍA 4" 1.00 UND
01.13.02.02 SALIDA DE DESAGUE TUBERÍA 2" 2.00 UND
01.13.02.03 SALIDA P/TUB. DE VENTILACIÓN 2" 1.00 UND
01.13.02.04 RED COLECTORA DE DESAGUE DE 4" PVC SAP 6.90 UND
01.13.02.05 REGISTROS DE BRONCE 4" 1.00 UND
01.13.02.06 SUMIDERO DE 2" 1.00 UND
01.13.02.07 CAJA DE REGISTRO DE DESAGÜE 30x60 cm C/TAPA DE CONCRETO 1.00 UND

01.13.03 APARATOS Y ACCESORIOS SANITARIOS


01.13.03.01 INODORO DE LOSA BLANCA BAJO C/ACCES. 1.00 UND
01.13.03.02 LAVATORIO DE LOSA BLANCA INCLYUYE GRIFERIAA 1.00 UND
01.13.03.03 KIT DE ACCESORIOS SANITARIOS DE LOSA BLANCA 1.00 UND
01.13.03.04 COLOCACIÓN DE APARATOS SANITARIOS 3.00 UND
01.13.03.05 COLOCACIÓN DE ACCESORIOS SANITARIOS 4.00 UND

01.14 INSTALACIONES ELECTRICAS


01.14.01 INSTALACIONES
01.01.01.01 SALIDA DE CENTRO DE LUZ 8.00 PTO
01.01.01.02 SALIDA TOMACORRIENTE DOBLE 3.00 PTO
01.01.01.03 SALIDA DE FUERZA P/ELECTROBOMBA 1.00 PTO
01.01.01.04 SALIDA DE PARED INTERRUPTOR 3.00 PTO
01.01.01.05 TUBERIA PVC SAP 20 MM (3/4") 13.00 M
01.01.01.06 CABLE ELECTRICO TW 16 MM2 22.00 M
01.01.01.07 CABLE ELECTRICO TW 4 MM2 12.00 M
01.01.01.08 TABLERO ELECTRICO TG GABINETE METALICO S/DISEÑO 1.00 UND
01.01.01.09 PUESTA A TIERRA TIPO VARILLA PARA M.T., CONDUCTOR 25 mm2, CARBON Y SAL 1.00 UND

01.14.02 ARTEFACTOS
01.14.02.01 FLUORESCENTE RECTO 2X40 WR 3.00 UND
01.14.02.02 LAMPARA AHORRADORA 18 WATTS 5.00 UND

01.15 INSTALACIONES ELECTROMECANICAS


01.15.01 SUMINISTRO 0.00 0.00
01.15.01.01 ELECTROBOMBA SUMERGIBLE EJE VERTICAL 47.13 LPS, HDT 105.24 M. 1.00 UND

01.15.02 COLUMNA DE DESCARGA


01.15.02.01 TUBERIA DE ACERO SCH-40 DE 250 MM X 3.00 M CON ROSCA 25.00 UND
01.15.02.02 NIPLE ROSCADO SCH 40 DE 250 MM 24.00 UND

01.15.03 TABLERO DE ARRANQUE PARA BOMBA SUMERGIBLE


01.15.03.01 TABLERO DE ARRANQUE ELECTRONICO PARA ELECTROBOMBA DE 110 HP 1.00 UND
01.15.03.02 CABLE VULCANIZADO N°3X14. 100.00 M
01.15.03.03 TABLERO GENERAL 1.00 UND

01.15.04 EQUIPO DE CLORINACION


01.15.04.01 CLORINADOR AL VACIO/0.5 LB/DIA CON DOS DOSIFICADORES 1.00 UND
01.15.04.02 BALANZA REFORZADA CAPACIDAD DE 100 KG 1.00 UND
01.15.04.03 ELECTROBOMBA REFORZADA PRESION BOOSTER 1.00 UND

01.15.05 LINEA DE DESCARGA


01.15.05.01 UNION DRESER 250 MM 1.00 UND
01.15.05.02 TEE HD. BB. DE 250 MM 2.00 UND
01.15.05.03 VALVULA CHECK BB. 250 MM 1.00 UND
01.15.05.04 VALVULA DE COMPUERTA HD. BB 250 MM 1.00 UND
01.15.05.05 CODO HD. BB. 250 MM X 45° 3.00 UND
01.15.05.06 CODO HD. BB. 250 MM X 90° 1.00 UND
01.15.05.07 VALVULA DE AIRE HD. BB. 50 MM 1.00 UND
01.15.05.08 VALVULA DISCIPADORA DE PRESION HD. BB. 250 MM 1.00 UND
01.15.05.09 MANOMETRO DE PRESION DE 0-150 PSI C/ACCESORIOS DE CONEXION DE 1/2" 2.00 UND
01.15.05.10 MEDIDOR DE CAUDAL ELECTROMAGNETICO DE 250 MM BB. 1.00 UND
01.15.05.11 ADAPTADOR PVC BRIDA - CAMPANA 250 MM 1.00 UND
01.15.05.12 NIPLE BB. HD. 250 MM X 0.20 M 3.00 UND
01.15.05.13 NIPLE BB. HD. 250 MM X 0.35 M 1.00 UND
01.15.05.14 NIPLE BRIDA - ESPIGA HD. 250 MM X 0.35 M 1.00 UND
01.15.05.15 NIPLE BB. HD. 250 MM X 0.45 M 1.00 UND
01.15.05.16 NIPLE BB. HD. 250 MM X 0.65 M 1.00 UND
01.15.05.17 NIPLE BRIDA - ESPIGA HD. 250 MM X 0.65 M 1.00 UND
01.15.05.18 NIPLE BB. HD. 250 MM X 1.00 M 1.00 UND
01.15.05.19 NIPLE BB. HD. 250 MM X 2.10 M 2.00 UND

01.15.06 LINEA DE ALIVIO


01.15.06.01 VALVULA DE COMPUERTA HD. BB 250 MM 2.00 UND
01.15.06.02 VALVULA DE ALIVIO DE PRESION HD. BB. 250 MM 1.00 UND
01.15.06.03 TEE HD. BB. DE 250 MM 1.00 UND
01.15.06.04 CODO HD. BB. 250 MM X 90° 2.00 UND
01.15.06.05 UNION DRESER 250 MM 1.00 UND
01.15.06.06 NIPLE BRIDA - ESPIGA HD. 250 MM X 0.25 M 2.00 UND
01.15.06.07 NIPLE BB. HD. 250 MM X 0.45 M 1.00 UND
01.15.06.08 NIPLE BB. HD. 250 MM X 2.40 M 1.00 UND

01.15.07 PINTURA TUBERIAS DE FIERRO


01.15.07.01 PINTURA ANTICORROSIVA EPOXICA TUBERIAS DE FIERRO 5.00 M2
01.02.05 EXCAVACION EN CAJA DE REBOSE Y LIMPIA 2.15 M3
CAJA DE REBOSE Y LIMPIA 1.10 1.95 1.00 1.00 2.15

01.02.06 RELLENO C/HORMIGÓN E=15cm. COMPACTADO C/EQUIPO 107.58 M2


AREA INTERIOR 1.00 10.75 6.50 69.88
AREA VEREDA 1.00 12.85 1.20 15.42
1.00 27.85 0.80 22.28

01.02.07 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE D = 5 Km 14.81 19.25 M3


VOL. ELIM. = (VOL. EXC. + VOL. CORTE) * F.E.
VOL. ELIM. = 39.88 * 1.30 = 51.84 M3

01.03 OBRAS DE CONCRETO SIMPLE


01.03.01 CIMIENTOS
01.03.01.01 SOLADO C:H 1:10 E = 10 CM 34.61 M2
ZAPATA Z-1 4.00 1.20 1.00 4.80
CASETA DE BOMBEO
EJE 1-1 ENTRE EJES A y D 1.00 11.25 0.60 6.75
EJE S/N ENTRE EJES A y B 1.00 4.00 0.45 1.80
EJE 3-3 ENTRE EJES A y D 1.00 11.25 0.60 6.75
EJE A-A ENTRE EJES 1 y 3 1.00 5.35 0.60 3.21
EJE B-B ENTRE EJES 1 y 3 1.00 0.90 0.45 0.41
EJE D-D ENTRE EJES 1 y 3 1.00 5.80 0.60 3.48

CANALETA 1.00 7.50 0.35 2.63


BASE GENERADOR 1.00 2.20 1.20 2.64
CAJA DE REBOSE Y LIMPIA 1.00 1.95 1.10 2.15

01.03.01.02 CIMIENTO CORRIDO 1:10 (C:H) + 30% P.G 17.48 M3


CASETA DE BOMBEO
EJE 1-1 ENTRE EJES A y D 1.00 11.25 0.60 0.80 5.40
EJE S/N ENTRE EJES A y B 1.00 4.00 0.45 0.60 1.08
EJE 3-3 ENTRE EJES A y D 1.00 11.25 0.60 0.80 5.40
EJE A-A ENTRE EJES 1 y 3 1.00 5.35 0.60 0.80 2.57
EJE B-B ENTRE EJES 1 y 3 1.00 0.90 0.45 0.60 0.24
EJE D-D ENTRE EJES 1 y 3 1.00 5.80 0.60 0.80 2.78

01.03.01.02 FALSO PISO E=4" 1:8 69.88 M2


AREA INTERIOR 1.00 10.75 6.50 69.88

01.03.02 VEREDAS
01.03.02.01 CONCRETO P/VEREDAS FROTACHADO F'c = 140 Kg/cm2 48.95 M2
VEREDA LARGO 2.00 12.85 1.20 30.84
VEREDA ANCHO 2.00 7.50 0.80 12.00
SARDINEL DE VEREDA LARGO 2.00 12.85 0.15 3.86
SARDINEL DE VEREDA ANCHO 2.00 7.50 0.15 2.25

01.03.02.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS 6.11 M2


VEREDA LARGO 2.00 12.85 0.15 3.86
VEREDA ANCHO 2.00 7.50 0.15 2.25

01.03.02.03 JUNTAS DE DILATACION 16.20 M


VEREDA 14.00 1.00 14.00
RAMPA 1.00 2.20 2.20

01.03.03 CANALETA
01.03.03.01 CONCRETO F'C=175 KG/CM2 PARA CANALETA 0.48 0.48 M3
CANALETA 1.00 7.50 0.80 0.08 0.48

01.03.03.02 ENCOFRADO Y DESENCOFRADO DE CANALETA 3.38 M2


CANALETA 2.00 7.50 0.23 3.38 0.23

01.04 OBRAS DE CONCRETO ARMADO


01.04.01 ZAPATAS
01.04.01.01 CONCRETO F'C=210 KG/CM2 EN ZAPATAS 3.98 M3
ZAPATA Z-1 4.00 1.20 1.00 0.50 2.40
BASE GENERADOR 1.00 2.20 1.20 0.60 1.58

01.04.01.02 ACERO FY=4200 KG/CM2 EN ZAPATAS 61.23 61.23 KG


01.04.02 SOBRECIMIENTOS REFORZADOS
01.04.02.01 CONCRETO F'C=210 KG/CM2 EN SOBRECIMIENTOS 2.74 M3
CASETA DE BOMBEO
EJE 1-1 ENTRE EJES A y D 1.00 3.85 0.25 0.45 0.43
EJE S/N ENTRE EJES A y B 1.00 3.45 0.15 0.30 0.16
EJE 3-3 ENTRE EJES A y D 1.00 10.25 0.25 0.45 1.15
EJE A-A ENTRE EJES 1 y 3 1.00 5.35 0.15 0.30 0.24
EJE B-B ENTRE EJES 1 y 3 1.00 1.15 0.15 0.30 0.05
EJE D-D ENTRE EJES 1 y 3 1.00 6.25 0.25 0.45 0.70

01.04.02.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO 24.29 M2


CASETA DE BOMBEO
EJE 1-1 ENTRE EJES A y D 2.00 3.85 0.45 3.47
EJE S/N ENTRE EJES A y B 2.00 3.45 0.30 2.07
EJE 3-3 ENTRE EJES A y D 2.00 10.25 0.45 9.23
EJE A-A ENTRE EJES 1 y 3 2.00 5.35 0.30 3.21
EJE B-B ENTRE EJES 1 y 3 2.00 1.15 0.30 0.69
EJE D-D ENTRE EJES 1 y 3 2.00 6.25 0.45 5.63

01.04.02.03 ACERO FY=4200 KG/CM2 EN SOBRECIMIENTOS 182.57 182.57 KG

01.04.03 CAJA DE REBOSE Y LIMPIA


01.04.03.01 CONCRETO F'C=210 KG/CM2 EN CAJA DE REBOSE Y LIMPIA 3.02 M3
CAJA DE REBOSE Y LIMPIA 2.00 1.10 0.15 1.00 0.07
2.00 1.65 0.15 1.00 0.05
1.00 1.10 0.15 0.80 0.17
1.00 1.95 0.80 0.15 2.74

01.04.03.02 ENCOFRADO Y DESENCOFRADO EN CAJA DE REBOSE Y LIMPIA 6.90 M2


CAJA DE REBOSE Y LIMPIA 2.00 1.10 1.00 2.20
2.00 1.65 1.00 3.30
2.00 0.80 0.80 1.28
1.00 0.80 0.15 0.12

01.04.03.03 ACERO FY=4200 KG/CM2 EN CAJA DE REBOSE Y LIMPIA 28.22 28.22 KG


01.04.04 COLUMNAS
01.04.04.01 CONCRETO F'C=210 KG/CM2 EN COLUMNAS 3.25 M3
COLUMNAS C-1 6.00 0.25 0.25 4.00 1.50
COLUMNAS C-2 4.00 0.50 0.25 3.50 1.75

01.04.04.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS 27.40 M2


COLUMNAS C-1 6.00 4.00 0.50 12.00
COLUMNAS C-2 4.00 3.50 1.10 15.40

01.04.04.03 ACERO FY=4200 KG/CM2 EN COLUMNAS 387.97 387.97 KG

01.04.05 VIGAS
01.04.05.01 CONCRETO F'C= 210 KG/CM2 EN VIGAS 4.14 M3
VIGA V-100 2.00 6.50 0.25 0.20 0.65
VIGA V-101 2.00 6.50 0.25 0.40 1.30
VIGA V-A 2.00 12.00 0.25 0.20 1.20
VIGA V-B 1.00 12.00 0.15 0.20 0.36
1.00 8.60 0.15 0.20 0.26
DINTEL 2.00 3.00 0.25 0.25 0.38

01.04.05.02 ENCOFRADO Y DESENCOFRADO EN VIGAS 19.07 M2


VIGA V-100 2.00 6.50 0.20 2.60
VIGA V-101 2.00 6.50 0.65 8.45
VIGA V-A 1.00 12.00 0.20 2.40
VIGA V-B 1.00 12.00 0.20 2.40
1.00 8.60 0.20 1.72
DINTEL 2.00 3.00 0.25 1.50

01.04.05.03 ACERO FY=4200 KG/CM2 EN VIGAS 463.94 463.94 KG

01.04.06 LOSAS ALIGERADAS


01.04.06.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA 6.83 M3
VOLUMEN DE LOSA MACISA 1.00 12.00 6.50 0.20 15.60
VOLUMEN DE LADRILLOS 650.00 0.30 0.30 0.15 -8.78
01.04.06.02 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA 78.00 M2
LOSA ALIGERADA 1.00 12.00 6.50 78.00

01.04.06.03 ACERO FY=4200 KG/CM2 EN LOSA ALIGERADA 501.83 501.83 KG

01.04.06.04 LADRILLO HUECO DE ARCILLA DE 15 x 30 x 30 650.00 650.00 650.00 UND

01.05 MUROS Y TABIQUES


01.05.01 MURO DE SOGA LADRILLO KING-KONG 12.76 M2
EJE S/N ENTRE EJES A y B 1.00 2.90 0.70 2.03
1.00 2.90 1.45 4.21
EJE B - B ENTRE EJES 1 y 3 1.00 2.90 1.25 3.63
1.00 2.90 1.00 2.90

01.05.02 MURO DE CABEZA LADRILLO KING-KONG 76.75 M2


EJE 1 - 1 ENTRE EJES A y E 2.00 2.90 0.95 5.51
1.00 2.90 3.85 11.17
VANOS -1.00 0.60 3.85 -2.31
EJE 3 - 3 ENTRE EJES A y E 1.00 2.90 10.25 29.73
VANOS -1.00 0.60 0.60 -0.36
-1.00 0.90 2.00 -1.80
EJE A - A ENTRE EJE 1 y 3 1.00 2.90 6.25 18.13
VANOS -1.00 1.80 1.20 -2.16
EJE D -DE ENTRE EJE 1 y 3 1.00 2.90 6.50 18.85

01.06 REVOQUES Y ENLUCIDOS


01.06.01 TARRAJEO PRIMARIO RAYADO C/MEZCLA 1:5 E=2 CM 8.20 M2
BAÑO 1.00 1.40 1.25 1.75
1.00 1.50 4.30 6.45

01.06.02 TARRAJEO DE MUROS INTERIORES C.A. 1:5 E=2 cm 99.51 M2


EJE S/N ENTRE EJES A y B 2.00 2.90 0.70 4.06
2.00 2.90 1.45 8.41
EJE B - B ENTRE EJES 1 y 3 2.00 2.90 1.25 7.25
2.00 2.90 1.00 5.80
EJE 1 - 1 ENTRE EJES A y E 1.00 2.90 0.95 2.76
1.00 2.90 3.85 11.17
VANOS -1.00 0.60 3.85 -2.31
EJE 3 - 3 ENTRE EJES A y E 1.00 2.90 10.25 29.73
VANOS -1.00 0.60 0.60 -0.36
-1.00 0.90 2.00 -1.80
EJE A - A ENTRE EJE 1 y 3 1.00 2.90 6.25 18.13
VANOS -1.00 1.80 1.20 -2.16
EJE D -DE ENTRE EJE 1 y 3 1.00 2.90 6.50 18.85

01.06.03 TARRAJEO DE MUROS EXTERIORES C.A. 1:5 E=2 cm 73.99 M2


EJE 1 - 1 ENTRE EJES A y E 1.00 2.90 0.95 2.76
1.00 2.90 3.85 11.17
VANOS -1.00 0.60 3.85 -2.31
EJE 3 - 3 ENTRE EJES A y E 1.00 2.90 10.25 29.73
VANOS -1.00 0.60 0.60 -0.36
-1.00 0.90 2.00 -1.80
EJE A - A ENTRE EJE 1 y 3 1.00 2.90 6.25 18.13
VANOS -1.00 1.80 1.20 -2.16
EJE D -DE ENTRE EJE 1 y 3 1.00 2.90 6.50 18.85

01.06.04 TARRAJEO DE COLUMNAS MEZCLA C:A 1.5, E=2cm. 27.40 M2


COLUMNAS C-1 6.00 4.00 0.50 12.00
COLUMNAS C-2 4.00 3.50 1.10 15.40

01.06.05 TARRAJEO DE VIGAS MEZCLA C:A 1.5, E=2cm. 19.07 M2


VIGA V-100 2.00 6.50 0.20 2.60
VIGA V-101 2.00 6.50 0.65 8.45
VIGA V-A 1.00 12.00 0.20 2.40
VIGA V-B 1.00 12.00 0.20 2.40
1.00 8.60 0.20 1.72
DINTEL 2.00 3.00 0.25 1.50

01.06.06 TARRAJEO DE VANOS MEZCLA C:A 1:5 E = 2cm. 61.60 M


PUERTA METALICA PM-1 2.00 3.00 6.00
1.00 2.50 2.50
PUERTA METALICA PM-2 2.00 3.00 6.00
1.00 2.50 2.50
PUERTA METALICA PM-3 2.00 2.10 4.20
1.00 0.80 0.80
PUERTA METALICA PM-4 2.00 2.10 4.20
1.00 0.70 0.70
VENTANA METALICA VM-1 2.00 3.85 7.70
2.00 0.60 1.20
VENTANA METALICA VM-2 2.00 1.20 2.40
2.00 1.80 3.60
VENTANA METALICA VM-2 2.00 3.60 7.20
2.00 2.50 5.00
VENTANA METALICA VM-3 2.00 2.00 4.00
2.00 0.60 1.20
VENTANA METALICA VM-4 2.00 0.60 1.20
2.00 0.60 1.20

01.07 CIELORASO
01.07.01 ENLUCIDO DE CIELO RASO CON MORTERO 1:4 E = 1.5 CM 78.00 M2
LOSA ALIGERADA 1.00 12.00 6.50 78.00

01.08 CONTRAZOCALOS
01.08.01 ZOCALO DE CERAMICO DE COLOR DE 20 x 33 cm 6.45 M2
BAÑO 1.00 1.50 4.30 6.45

01.08.02 CONTRAZOCALO CEMENTO PULIDO H = 30 CM 66.00 M


EJE 1 - 1 ENTRE EJES A y E 2.00 11.00 22.00
EJE 3 - 3 ENTRE EJES A y E 2.00 11.00 22.00
EJE A - A ENTRE EJE 1 y 3 2.00 5.50 11.00
EJE E - E ENTRE EJE 1 y 3 2.00 5.50 11.00

01.09 CARPINTERIA METALICA


01.09.01 PUERTA METALICA PM-1 1.00 2.50 3.00 7.50 7.50 M2
01.09.02 PUERTA METALICA PM-2 1.00 2.50 3.00 7.50 7.50 M2
01.09.03 PUERTA C/TRIPLAY P-4, 9MM 1.00 2.10 0.80 1.68 1.68 M2
01.09.04 PUERTA C/TRIPLAY P-4, 9MM 1.00 2.10 0.70 1.47 1.47 M2
01.09.05 VENTANA METALICA VM-1 1.00 0.60 3.85 2.31 2.31 M2
01.09.06 VENTANA METALICA VM-2 1.00 1.80 1.20 2.16 2.16 M2
01.09.07 VENTANA METALICA VM-3 1.00 0.60 2.00 1.20 1.20 M2
01.09.08 VENTANA METALICA VM-4 1.00 0.60 0.60 0.36 0.36 M2
01.09.09 TAPA DE FIBRA DE VIDRIO 0.75M x 0.80M x 0.05M 1.00 1.00 1.00 UND
01.09.10 REJILLA METALICA 0.75M x 0.80M x 0.05M 1.00 1.00 1.00 UND

01.10 COBERTURAS
01.10.01 TUBO RECTANGULAR 6" x 2" x 3 MM 4.00 2.00 8.00 8.00 M
01.10.02 COBERTURA DE POLICARBONATO COLOR BLANCO E=10 MM 1.00 2.50 2.50 6.25 6.25 M2

01.11 PINTURA
01.11.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES 173.50 173.50 173.50 M2
01.11.02 PINTURA LATEX EN COLUMNAS Y VIGAS 46.47 46.47 46.47 M2
01.11.03 PINTURA LATEX EN VANOS 15.40 15.40 15.40 M2
01.11.04 PINTURA LATEX EN CONTRAZOCALO H =0.30m. 66.00 66.00 66.00 M2

01.12 PISOS Y PAVIMENTOS


01.12.01 CONTRAPISO MORTERO 1: 4 E = 2 cm. 1.00 10.50 5.00 52.50 52.50 M2
01.12.02 PISO PULIDO Y BRUÑADO 1.00 10.50 5.00 52.50 52.50 M2

01.13 INSTALACIONES SANITARIAS


01.13.01 AGUA POTABLE
01.13.01.01 SALIDA DE AGUA FRIA PVC 3.00 3.00 3.00 UND
01.13.01.02 RED DE DISTRIBUCIÓN DE AGUA DE 1/2" 1.00 8.00 1.00 1.00 UND
01.13.01.03 VALVULA ESFERICA DE 1/2" 1.00 1.00 1.00 UND

01.13.02 DESAGÜE
01.13.02.01 SALIDA DE DESAGUE TUBERÍA 4" 1.00 1.00 1.00 UND
01.13.02.02 SALIDA DE DESAGUE TUBERÍA 2" 2.00 2.00 2.00 UND
01.13.02.03 SALIDA P/TUB. DE VENTILACIÓN 2" 1.00 1.00 1.00 UND
01.13.02.04 RED COLECTORA DE DESAGUE DE 4" PVC SAP 1.00 6.90 6.90 6.90 UND
01.13.02.05 REGISTROS DE BRONCE 4" 1.00 1.00 1.00 UND
01.13.02.06 SUMIDERO DE 2" 1.00 1.00 1.00 UND
01.13.02.07 CAJA DE REGISTRO DE DESAGÜE 30x60 cm C/TAPA DE CONCRETO 1.00 1.00 1.00 UND

01.13.03 APARATOS Y ACCESORIOS SANITARIOS


01.13.03.01 INODORO DE LOSA BLANCA BAJO C/ACCES. 1.00 1.00 1.00 UND
01.13.03.02 LAVATORIO DE LOSA BLANCA INCLYUYE GRIFERIAA 1.00 1.00 1.00 UND
01.13.03.03 KIT DE ACCESORIOS SANITARIOS DE LOSA BLANCA 1.00 1.00 1.00 UND
01.13.03.04 COLOCACIÓN DE APARATOS SANITARIOS 3.00 3.00 3.00 UND
01.13.03.05 COLOCACIÓN DE ACCESORIOS SANITARIOS 4.00 4.00 4.00 UND

01.14 INSTALACIONES ELECTRICAS


01.14.01 INSTALACIONES
01.01.01.01 SALIDA DE CENTRO DE LUZ 8.00 8.00 8.00 PTO
01.01.01.02 SALIDA TOMACORRIENTE DOBLE 3.00 3.00 3.00 PTO
01.01.01.03 SALIDA DE FUERZA P/ELECTROBOMBA 1.00 1.00 1.00 PTO
01.01.01.04 SALIDA DE PARED INTERRUPTOR 3.00 3.00 3.00 PTO
01.01.01.05 TUBERIA PVC SAP 20 MM (3/4") 13.00 13.00 13.00 M
01.01.01.06 CABLE ELECTRICO TW 16 MM2 22.00 22.00 22.00 M
01.01.01.07 CABLE ELECTRICO TW 4 MM2 12.00 12.00 12.00 M
01.01.01.08 TABLERO ELECTRICO TG GABINETE METALICO S/DISEÑO 1.00 1.00 1.00 UND

01.01.01.09 PUESTA A TIERRA TIPO VARILLA PARA M.T., CONDUCTOR 25 mm2, CARBON 1.00 1.00 1.00 UND
Y SAL

01.14.02 ARTEFACTOS
01.14.02.01 FLUORESCENTE RECTO 2X40 WR 2.00 3.00 3.00 UND
01.14.02.02 LAMPARA AHORRADORA 18 WATTS 1.00 5.00 5.00 UND
METRADO DE ACE

01 CASETA POZO 01 SAN PABLO


01.04 OBRAS DE CONCRETO ARMADO
01.04.01 ZAPATAS
01.04.01.02 ACERO FY=4200 KG/CM2 EN ZAPATAS

Descripción Ø Cantidad
de N° veces
Elementos
ZAPATA Z-1 1/2" 1.00 4.00
1/2" 1.00 4.00

01 CASETA POZO 01 SAN PABLO


01.04 OBRAS DE CONCRETO ARMADO
01.04.02 SOBRECIMIENTOS REFORZADOS
01.04.02.03 ACERO FY=4200 KG/CM2 EN SOBRECIMIENTOS

Descripción Ø Cantidad
de N° veces
Elementos
EJE 1 - 1 ENTRE EJES A y D 3/8" 1.00 1.00
ESTRIBOS 1/4" 1.00 1.00

EJE S/N ENTRE EJES A y B 3/8" 1.00 1.00


ESTRIBOS 1/4" 1.00 1.00

EJE 3 - 3 ENTRE EJES A y D 3/8" 1.00 1.00


ESTRIBOS 1/4" 1.00 1.00

EJE A - A ENTRE EJE 1 y 3 3/8" 1.00 1.00


ESTRIBOS 1/4" 1.00 1.00

EJE B - B ENTRE EJE 1 y 3 3/8" 1.00 1.00


ESTRIBOS 1/4" 1.00 1.00

EJE D-D ENTRE EJES 1 y 3 3/8" 1.00 1.00


ESTRIBOS 1/4" 1.00 1.00

01 CASETA POZO 01 SAN PABLO


01.04 OBRAS DE CONCRETO ARMADO
01.04.03 CAJA DE REBOSE Y LIMPIA
01.04.03.03 ACERO FY=4200 KG/CM2 EN CAJA DE REBOSE Y LIMPIA

Descripción Ø Cantidad
de N° veces
Elementos
CAJA DE REBOSE Y LIMPIA 3/8" 1.00 1.00
3/8" 1.00 1.00
3/8" 1.00 2.00
3/8" 1.00 2.00
3/8" 1.00 2.00

01 CASETA POZO 01 SAN PABLO


01.04 OBRAS DE CONCRETO ARMADO
01.04.04 COLUMNAS
01.04.04.03 ACERO FY=4200 KG/CM2 EN COLUMNAS

Descripción Ø Cantidad
de N° veces
Elementos
COLUMNAS C-1 1/2" 1.00 6.00
ESTRIBOS 3/8" 1.00 6.00

COLUMNAS C-2 1/2" 1.00 4.00


ESTRIBOS 3/8" 1.00 4.00

01 CASETA POZO 01 SAN PABLO


01.04 OBRAS DE CONCRETO ARMADO
01.04.05 VIGAS
01.04.05.03 ACERO FY=4200 KG/CM2 EN VIGAS

Descripción Ø Cantidad
de N° veces
Elementos
VIGA V-100 1/2" 1 2.00
ESTRIBOS 3/8" 1 2.00

VIGA V-101 1/2" 1 2.00


ESTRIBOS 3/8" 1 2.00

VIGA V-A 1/2" 1 2.00


ESTRIBOS 3/8" 1 2.00

VIGA V-B 3/8" 1 1.00


3/8" 1 1.00
ESTRIBOS 1/4" 1 1.00
1/4" 1 1.00

DINTEL 3/8" 1 2.00


ESTRIBOS 1/4" 1 2.00
01 CASETA POZO 01 SAN PABLO
01.04 OBRAS DE CONCRETO ARMADO
01.04.06 LOSAS ALIGERADAS
01.04.06.03 ACERO FY=4200 KG/CM2 EN LOSA ALIGERADA

Descripción Ø Cantidad
de N° veces
Elementos
VIGUETA 1/2" 1 1.00
3/8" 1 1.00
1/4" 1 34.00

ACERO DE TEMPERATURA 1/4" 1 2


METRADO DE ACERO

Acero Fy= 4,200Kg/cm2


6 mm 1/4" 3/8" 1/2" 5/8" 3/4" 1" Sub Total
Nº de Kg
Long.
Piezas 0.22 0.25 0.56 0.99 1.55 2.24 3.97
7.00 1.20 33.60 33.40
7.00 1.00 28.00 27.83

Acero Fy= 4,200Kg/cm2


Sub Total
Nº de 6 mm 1/4" 3/8" 1/2" 5/8" 3/4" 1" Kg
Long.
Piezas 0.22 0.25 0.56 0.99 1.55 2.24 3.97
6.00 13.00 78.00 43.68
28.00 1.30 36.40 9.10

4.00 3.75 15.00 8.40


16.00 1.00 16.00 4.00

6.00 13.00 78.00 43.68


28.00 1.30 36.40 9.10

6.00 6.50 39.00 21.84


14.00 1.30 18.20 4.55

4.00 6.50 26.00 14.56


14.00 1.30 18.20 4.55

4.00 6.50 26.00 14.56


14.00 1.30 18.20 4.55

Acero Fy= 4,200Kg/cm2


Sub Total
Nº de 6 mm 1/4" 3/8" 1/2" 5/8" 3/4" 1" Kg
Piezas Long.
0.22 0.25 0.56 0.99 1.55 2.24 3.97
9.00 1.10 9.90 5.54
6.00 1.95 11.70 6.55
6.00 1.10 13.20 7.39
4.00 1.15 9.20 5.15
4.00 0.80 6.40 3.58

Acero Fy= 4,200Kg/cm2


6 mm 1/4" 3/8" 1/2" 5/8" 3/4" 1" Sub Total
Nº de Kg
Piezas Long.
0.22 0.25 0.56 0.99 1.55 2.24 3.97
4.00 5.00 120.00 119.28
32.00 1.10 211.20 118.27

4.00 4.50 72.00 71.57


32.00 1.10 140.80 78.85

Acero Fy= 4,200Kg/cm2


6 mm 1/4" 3/8" 1/2" 5/8" 3/4" 1" Sub Total
Nº de Long. Kg
Piezas 0.22 0.25 0.56 0.99 1.55 2.24 3.97
6.00 7.50 90.00 89.46
34.00 1.00 68.00 38.08

6.00 7.50 90.00 89.46


34.00 1.50 102.00 57.12

4.00 13.00 104.00 103.38


44.00 1.00 88.00 49.28

2.00 13.00 26.00 14.56


2.00 8.60 17.20 9.63
44.00 0.25 11.00 2.75
32.00 0.25 8.00 2.00

2.00 3.00 12.00 6.72


12.00 0.25 6.00 1.50
Acero Fy= 4,200Kg/cm2
6 mm 1/4" 3/8" 1/2" 5/8" 3/4" 1" Sub Total
Nº de Kg
Piezas Long.
0.22 0.25 0.56 0.99 1.55 2.24 3.97
26.00 6.50 169.00 167.99
26.00 6.50 169.00 94.64
26.00 0.20 176.80 44.20

60 6.5 780.00 195.00


.
Total
Kg

61.23

Total
Kg

182.57

Total
Kg
28.22

Total
Kg

387.97

Total
Kg

463.94
Total
Kg

501.83