Obras de conducción

Dimensionar secciones: rectangular, trapezoidal y circular para Q=50 m3/s,


n=0.033, S=0.009
Rectangular
V = 1/n R2/3 S1/2
Rh = A/P
Q=V*A
Propuesta b = 32 m
𝑏𝑦 32𝑦
Rh = 𝑏+2𝑦 = 32+2𝑦

A = by = 32y
Q = A/n R2/3 S1/2
32𝑦 32𝑦
50 m3/s = ( )( 32+2𝑦 )2/3 (0.009)1/2
0.033

y = 0.7057 m
Revisiones:
b = 32 m
y = 0.7057 m
A = 22.5824 m2
P = b + 2y = 33.4114 m
Rh = 0.6759 m
T= 32m

Luis José Ochoa Arroyo 213401438 Obras Hidráulicas D03


Trapezoidal
Q = A/n R2/3 S1/2
Propuesta: t=2; b=8m
A= (b+ty)y = (20m + 1.5y)y
(𝑏+𝑡𝑦)𝑦 (20+1.5𝑦)𝑦
Rh= 𝑏+2𝑦√1+𝑡 2 = 20+1.5𝑦√1+1.52

(20+1.5𝑦)𝑦 (20+1.5𝑦)𝑦 2
50 m3/s = ( )( 20+2𝑦√1+1.52)3 (0.009)1/2
0.033

y= 1.1204
Revisiones
A=24.2909 m2
P=24.0396 m
Rh=0.6058 m
T=23.3612 m

Circular
Q = A/n R2/3 S1/2
Propuesta: Θ=20
(20−sen20)𝐷 2 sin(20) 𝐷 2
50 m3/s =(( )/0.033)((1 − ) )3 (0.009)1/2
8 20 4

D=2.6707 m
(θ−senθ)𝐷 2
A= 8
=17.0176 m2
θD
P= 2 =26.702 m

sin(θ) 𝐷
Rh=(1 − θ
) 4 = 0.6562 m
θ
T=(sin 2 )𝐷=0.4638 m

Luis José Ochoa Arroyo 213401438 Obras Hidráulicas D03