NOTES AND SPECIFICATIONS

1. SPECIAL CASES OR PROPOSED CHANGES TO THESE


SPECIFICATIONS MUST BE DISCUSSED WITH AND
APPROVED BY BY THE DEPUTY MANAGER: ROADS
PLANNING.

2. CONSTRUCTION SPECIFICATIONS MUST BE ACCORDING


TO THE RELEVANT STANDARD DETAIL DRAWINGS AND
STANDARD SPECIFICATIONS FOR MUNICIPAL CIVIL
ENGINEERING WORKS, 3rd EDITION, 2005.

SECTION A-A

A A

D B

C C

B D
AMENDMENTS
NR. DATE APPROVED DESCRIPTION

NOTE:
ABCD = SERVITUDE FOR
MUNICIPAL PURPOSES
DESIGNED DRAWN

J. DU PREEZ S. AUDIE
SIGNATURE:......................................................................... DATE:....................................

DESIGN CHECKED BY INFRASTRUCTURE TECHNICAL INFORMATION


MANAGEMENT
L.G. JOHANNES Pr. Eng. D.J. CHALMERS

SIGNATURE:......................................................................... DATE:.................................... SIGNATURE:......................................................................... DATE:....................................

CITY OF TSHWANE
ROADS AND TRANSPORT DEPARTMENT
Mr P. Letlonkane Ms. L. V. Kegakilwe-Piki
GROUP HEAD EXECUTIVE DIRECTOR

P.O. BOX 1409 P.O. BOX 1409


PRETORIA PRETORIA
0001 0001
DRAWING APPROVED BY EXECUTIVE DIRECTOR
Ms. L. V. Kegakilwe-Piki

SIGNATURE:............................................................................. DATE:......................................................

PLAN OF TEMPORARY TURNING CIRCLE PERMANENT TURNING CIRCLE PLAN OF PERMANENT TURNING HEAD
LOCATION OF PROJECT:

FIGURE 2 FIGURE 3
TYPICAL STANDARD
FIGURE 1
SCALE 1: 50
SCALE 1: 50 SCALE 1: 50
DETAILS
DESCRIPTION OF PROJECT

TURNING FACILITIES:
DESIGN FLOW CHART
AND DETAILS
CONTRACT No. : PROJECT No. :

DATE : SCALE : ORIGINAL PAPER SIZE:

FEBRUARY 2017 AS SHOWN A1


DRAWING NO. SHEET NO:
0
PLN002 1 OF 1 REVISION