Process Responsibility (Mr. ) Project Start Oct-20 Nov'20
RAS0131 1.09.2020 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Plan
Design Drawing Amrinder S
Actual
Plan
Forging Drawing Amrinder S
Actual
Plan
Process Drawing Amrinder S
Actual
Plan
Forging Die Amrinder S
Actual
Plan
Forging Ajay
Actual
Plan
Normalising AJAY PPC
Actual
Plan
Flange Rough Manpreet
Actual
Plan
Total Length Manpreet
Actual
Plan
Strainghtening Manpreet
Actual
Plan
Rough Turning Manpreet
Actual
Plan
CNC 1 Manpreet
Actual
Plan
CNC 2 Manpreet
Actual
Plan
Hobbing Z12 Manpreet
Actual
Plan
Inspection Gurpreet
Actual
Plan
Roll Marking Manpreet
Actual
Plan
Ind. Hrd./MPI/Temp Manpreet
Actual
Plan
Inspection Gurpreet
Actual
Plan
Straightening Manpreet
Actual
Plan
Face Cut Manpreet
Actual
Plan
Inspection Manpreet
Actual
Plan
Despatch Gurpreet
Actual