A Feasibility Study
Presented to the Faculty Members of the
School of Hospitality Management
Divine Word College of Legazpi
Legazpi City
By:
Decemeber 2020
Section 1
MARKET STUDY
This portion shows the product, the target market, historical data, projected
demand and projected supply, the market competition, the sales forecast and the
marketing programs on how to promote the business to feasible and doable. This
Product Description
offer chicken, turkey, beef, or veal. Thin slices are shaved off the cooked surface as it
beyond.
ShawarMaize is prepared from thin cuts of seasoned marinated beef,. The slices
are stacked on a skewer about 60 cm (20 in) high. Chicken fat may be added to provide
extra fat for juiciness and flavor. A motorized spit slowly turns the stack of meat in front
of a heating element, continuously roasting the outer layer. Shavings are cut off the
HISTORICAL POPULATION
Table 1
Historical Data
Table 1 shows the total population of Daraga National High School for the last 3 years.
These data was given by the school principal. It shows that in 2019 the population
Demand Analysis
Demand is when the price of a good or product decreases, the relative price of
that product makes the buyer more eager to buy that good or product.
Projected Demand
Table 2 shows the projected demand for the next three years. It shows the
frequency was based from the result; where majority of the respondents they will buy
Supply Analysis
Supply is also one important factor of the feasibility study in a business and it
Table 3
Competitor’s Supply
The proponents gathered the data through casual interview from the competitors.
Table 4
Projected Supply
2021 161,568
2022 164,736
2023 167,904
Total 494,208
Table 4 explains the projected supply for the next three years. According to the
owner of competitor’s business, an average of 2% per year is the increase in their sales.
Gap analysis involves analyzing current market offering to assess the extent to
Table 5
Table 5 shows that there is still a wide gap could be filled by the proposed, which means
that there is a great opportunity for the proposed business to be successful in the future.
Table 6
Sales Forecast
Marketing Program
represents the 4 P’s marketing. Product, Price, Place, and Promotion that are vital for
Product
Price
The product will be sold in cash basis. The business will see to it that the
price of the food would be made affordable to all kinds of people, specially to the
students.
Costing
Beef Shawarma
A good location is always a factor for generating good profit. The proposed kiosk
will be placed at Brgy Sagpon, Daraga, Albay infront of Daraga National High
Figure 2
Location Map
Figure 3
Location
Promotion
The proponents of this study will use tarpaulin and through social media to
Figure 4
Business Logo
Table 7
Promotional Cost
Items Quantity Cost Total Cost
Tarpaulin 3 pcs 100.00 300.00
Total 300.00
Source: Lumenario Design Decal & Tarpaulin Printing
Table 8 shows the total cost of the promotion approaches of the proposed business.
Section 2
Production Study
This section presents the product description. It includes the production and
control, improvements, utilities and the cost of the rendering of the services of the
proposed business.
Product Description
are stacked on a skewer about 60 cm (20 in) high. Chicken fat may be added to provide
extra fat for juiciness and flavor. A motorized spit slowly turns the stack of meat in front
of a heating element, continuously roasting the outer layer. Shavings are cut off the
Shawarma is not only tasty but provides a great source of vitamin A. It is known that this
vitamin for eye health, and in strengthening the immune system. Shawarma is
recommended with more than one source of vitamin A such as turnip, carrots next to
lettuce, tomatoes and onions. Another healthy benefit of shawarma contains a good
proportion of vitamin B6. This vital vitamin is important for maintaining the health of the
nervous system, protecting the immune system, and supporting brain function. Several
studies have confirmed that vitamin B6 deficiency can lead to stress, depression and
muscle pain.
Production Process
MISE EN PLACE
PREPARATION OF
INGREDIENTS
COOKING
FINISHED PRODUCT
Figure 5
TAKING OF ORDERS
PAYMENT
PREPARATION
SERVING
Figure 6
Table 8 presents all the raw material that will be needed in the proposed business. It
shows the total cost from daily to yearly.
Table 9
Machineries and Equipment
Table 9 shows the list of the packaging cost needed in the proposed business.
Table 11
Kitchen Utensils
Table 11 shows the list of the kitchen utensils, unit, price, of each item and the
Table 12
Office Supplies
Consumable Items Unit Price Total
Ballpen 4 P 5.00 P 20.00
Record Book 2 36.25 72.50
Total P92.50
Non-Consumable Items Unit Price Total
Calculator 1 265.00 P 265.00
Total P357.50
Source: Yashano Mall
Table 12 shows the lists of the office supplies, unit and price of each item. It also
shows the total cost of the office supplies consumable and non-consumable.
Table 13
Furniture and Fixtures
Items Quantity Unit Total
Tables 2 725.00 1,450.00
Chairs 8 155.00 1,240.00
Total 2,690.00
Source: Yashano Mall
Table 13 shows the lists of furniture and fixtures to be used in the proposed
business.
Table 14
Cleaning Supplies
Total
Consumable Items Quantity Unit Cost Monthly Annually
Dishwashing Liquid 1L 120.00 P 120.00 P120.00 P1,440.00
Sponge 2 pcs 10.00 10.00 10.00 120.00
Rugs 4 pcs 12.00 48.00 48.00 576.00
Trash Bags 1 pack 55.00 55.00 55.00 660.00
Total P 233.00 P 233.00 P 2,796.00
Non-Consumable Total Annually
Items Quantity Unit Cost
Trash Bins 2 pcs 72.75 P 145.50 P 145.50
Mop 1 pc 236.75 236.75 236.75
Soft Broom 1 pc 80.00 80.00 80.00
Dust pan 1 pc 50.00 50.00 50.00
Total P 512.25 P 512.25
Source: Yashano Mall
Table 14 shows the lists of the cleaning supplies, unit, price of each items and
the total cost of the cleaning supplies. Consumable items will be bought monthly and
Table 15
Sanitary Supplies
Total Monthl
Consumable Items Quantity Unit Cost y Annually
Disposable Plastic Gloves 1 pack 50.00 50.00 200.00 2,400.00
Tissue 1 pack 55.00 55.00 220.00 2,640.00
Total 105.00 420.00 5,040.00
Total
Non-Consumable Items Quantity Unit Cost Annually
Hand Towel 3 pcs 12.00 36.00 72.00
Hairnet 2 pcs 10.00 20.00 40.00
Apron 2 pcs 45.00 90.00 180.00
Total 146.00 292.00
Source: Yashano Mall
Table 15 shows the lists of the sanitary supplies, unit of each item, total
cost monthly and total cost annually of the sanitary supplies. Consumable items will be
Table 16
Utilities Expense
Utilities Monthly Consumption
Gas 780.00
Water (25 L) 300.00
Electricity 1,000.00
Total P 2,080.00
Source: Petron Gasul, LCWD, APEC
Table 16 shows the possible water and electricity bill that the proponents need to
Table 17
Improvement Cost
Items Quantity Unit Total Cost
Paint 1 gal 515.00 515.00
Paint Brush 2 pcs 59.25 118.50
Roller Brush 1 pc 165.75 165.75
Total 799.25
Source
Table 17 shows the lists of the materials needed for the improvement cost.
Quality Control
The proponents will provide supreme quality control. All the materials and
ingredients that will be used should be in a good quality. Teamwork will also be
executed in order to change and retain leaders who frequently raise the store, provide
accomplish goals.
Proper disposal of wastes can help in maintaining the environment clean and
safe. Proper disposal of wastes and segregation will be observed. Biodegradable will
Section 3
ORGANIZATION AND MANAGEMENT STUDY
This section presents the discussion of the management aspect of the business,
it will show the form of ownership, organizational structure, duties and responsibilities,
business registration and permits, and the timeline as presented in the Gantt Chart.
common fund with the intention of dividing the profits among themselves.
The proponents, as the owners of the business, are the managers of the
organization.
CAPITALIZATION
The proposed business will need P130,023.08 to start the business operation of
ShawarMaize. The partners will equally share said amount as their capital contribution
TABLE 18
Capitalization
Partners Amount
Arevalo, Emmanuel P 65,011.54
Jaucian, Charles P 65,011.54
Total P 130,023.08
Table 19
SALARY
LEGAL REQUIREMENTS
Table 20
Registration Amount
Mayor’s Permit P 1,000.00
BIR 500.00
SEC 2,040.00
Barangay Clearance 66.00
TOTAL 1,566.00
Table 20 shows the list of legal requirements needed in the proposed business.
Gantt Chart
Items Aug Sept Oct Nov Dec Jan
Preparation of
Feasibility Study
Capital Sourcing
Purchasing of Materials
Business Registration
Promotion
Start of Operation
Business
Section 4
Financial Study
This section contains all the calculations of the projected cost. The importance of this
section is to provide the provide the proponents idea whether the business is feasible or
not
ShawarMaize
Project Cost
Working Capital
Raw Materials ₱ 60,000.00
Office Supply 450.00
Cleaning Supply 745.25
Sanitary Supply 566.00
Utilities Expense 2,080.00
Salaries Expense 21,600.00
Packaging 1,200.00
Rent Expense 5,000.00 ₱ 95,641.25
Pre-Operating Expenses
Promotion ₱ 300.00
Permits and Licenses 1,566.00
Improvement Cost 799.25 ₱ 2,665.25
Tota
l ₱ 123,831.50
Contingency Cost (5%) ₱ 6,191.58
Total Project Cost ₱ 130,023.08