I =129,765 pri.A 1
10
RELE 01
ENEL S.A.A.
RC2226
AJUSTES DE PROTECCION
FUSE 00 = FUSE 01 51P:
Corriente nominal PMI Y E. PROT. CURVE: IEC VI
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P:
CURVE: DEFINITE TIME
PICK UP: 450 A
RECLOSER 02 TIME DIAL: 0.01 Seg
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 100
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
120 NA2XSAY L-126m AAAC 70
E. PROT\Cub_3\RECLOSER 50P/51P
I =129,765 pri.A
1000
10
RELE 01
DESEMBARCADERO
PESQUERO ARTESANAL
DE HUACHO
COORDINACION DE LA PROTECCION
EN 10.0 KV
OCTUBRE 2020
CONTENIDO
1. OBJETIVOS
3
2. ALCANCES 3
2
3. NORMAS EMPLEADAS
3
13 ANEXOS 31
15 CATALOGOS 35
1) OBJETIVOS
3
del cliente '' Desembarcadero Pesquero Artesanal de Huacho '' y el elemento
principal de protección perteneciente a la empresa distribuidora de energía
eléctrica Enel Distribución Perú S.A.A.
Mostrar la operación y verificar la actuación entre el fusible y los relés del Sistema
de Utilización ante corrientes de fallas a fase y fallas a tierra, realizando
simulaciones mediante el programa Power Factory - Digsilent 14.1
2) ALCANCES
3) NORMAS EMPLEADAS
El estudio presentado ha sido desarrollado en base a las siguientes normas
- IEC 60282-1 High-Voltage Fuses – Part 1: Current-Limiting Fuses.
- IEC 60787 Application Guide for the Selection of Fuse-Links of High-Voltage Fuses
for Transformer Circuit Applications.
- IEEE C37.48.1 Guide for the Operation, Classification, Application, and Coordination
of Current-Limiting Fuses with Rated Voltages 1 – 38 Kv
- IEEE C37.112 Standard Inverse-Time Characteristic Equations for overcurrent
Relays.
- IEC 255-3 Electrical Relays – Part 3: Single Input Energizing Quantity Measuring
Relays with Dependent or Independent Time
4
SISTEMA DE UTILIZACION EN 10.0 KV - 300KW
"DESEMBARCADERO PESQUERO ARTESANAL DE HUACHO"
S.E. 500KVA
BARRA 01 BARRA 02
RELE Nº2
50N/51N
70 mm2 NA2XSY L-29.75m 50/51
T 500KVA
PMI
BARRA 0 1737 Transformador
V=10.0KV Seco 500KVA
C.C.=300KW 10-20/0.38KV
Pcc3F=68 MVA Dyn5 (10KV)
CUT-OUT
FUSE 00
FUSE 00
C a b le 3 - 1 x7 0 m m 2 N A 2 X S Y - 1 5 m
BORNES DE BT
BARRA DE ENEL
RELE Nº1
ENEL
ENEL
Nodes Branches
Fig. 1.- Esquema Unifilar del Sistema de Utilización en media tensión
5) PARAMETROS ELECTRICOS
5.1. Parámetros eléctricos de Transformadores de Distribución
Impe-
Unp Uns Sn Inp Ins
dancia
Tipo de Taps Grupo de Aisla-
U U S Zcc I I refriger (AT) conexión miento
KV KV KVA % A A
Capacidad Ubicación
Código Tipo KV
Catalogo A
FUSE 00 K 10 40 PMI
5
Tabla 03. Parámetros eléctricos de Fusibles.
I =346,410 pri.A
1000
[s]
100
FUSE 00
I=30A
Curva de daño del
Transformador 500KVA
Tipo Seco
10.0/0.38KV
Grupo: Dyn5
uktr: 6%
Corriente nominal
Transformador 500KVA
10 In = 28.86A
0,1
0,01
10,00 kV 1 10 100 1000 10000 [pri.A]
500 KVA FUSE 00
6
6) SIMULACION DE FLUJO DE POTENCIA
En el siguiente diagrama se presenta la simulación de flujo de potencia para la comprobación del cumplimiento de la NTCSE en los valores de las tensiones y el
porcentaje de cargabilidad del transformador alimentando la carga contratada. Se modeló el sistema eléctrico en el programa Power Factory – DigSilent 14.1
DIgSILENT
I =129,765 pri.A
1000
10
RELE 01
ENEL S.A.A.
RC2226 CURVA DE DAÑOS
AJUSTES DE PROTECCION AAAC 3-1x70mm2
FUSE 00 = FUSE 01 51P: 8.75 KA
Corriente nominal PMI Y E. PROT. CURVE: IEC VI 1.0 seg
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P: CURVA DE DAÑOS
CURVE: DEFINITE TIME NA2XSAY 3-1x120mm2
PICK UP: 450 A 11.3 KA
TIME DIAL: 0.01 Seg 1.0 seg
RECLOSER 02
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000 [pri.A] 100000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
SISTEMA DE UTILIZACION EN 10.0 KV - 300KW
"DESEMBARCADERO PESQUERO ARTESANAL DE HUACHO"
S.E. 500KVA
T 500KVA
PMI
Ul=10,00
u=1,00 BARRA 0 1737 Transformador
phiu=0,00
V=10.0KV Seco 500KVA
C.C.=300KW 10-20/0.38KV
Pcc3F=68 MVA Dyn5 (10KV)
CUT-OUT P=-0,3000 MW
FUSE 00 I=0,5492 kA Ul=0,37
FUSE 00
U1l=0,3710 kV u=0,98
Fus 40A BARRA 03 phiu=-152,11
Tipo K
BARRA 380V
P=0,3000 MW
I=0,5492 kA
C a b le 3 - 1x7 0 m m 2 N A 2 X S Y - 1 5 m U1l=0,3710 kV
BORNES DE BT
Ul=10,00 BARRA DE ENEL
u=1,00
phiu=0,00
P=0,3000 MW RELE Nº1
I=0,0209 kA
U1l=10,0000 kV ENEL
ENEL
DIgSILENT
I =129,765 pri.A
1000
10
RELE 01
ENEL S.A.A.
RC2226 CURVA DE DAÑOS
AJUSTES DE PROTECCION AAAC 3-1x70mm2
FUSE 00 = FUSE 01 51P: 8.75 KA
Corriente nominal PMI Y E. PROT. CURVE: IEC VI 1.0 seg
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P: CURVA DE DAÑOS
CURVE: DEFINITE TIME NA2XSAY 3-1x120mm2
PICK UP: 450 A 11.3 KA
TIME DIAL: 0.01 Seg 1.0 seg
RECLOSER 02
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000 [pri.A] 100000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
SISTEMA DE UTILIZACION EN 10.0 KV - 300KW
"DESEMBARCADERO PESQUERO ARTESANAL DE HUACHO"
S.E. 500KVA
T 500KVA
PMI
Skss=68,00 MVA
Ikss=3,93 kA BARRA 0 1737 Transformador
ip=9,69 kA
V=10.0KV Seco 500KVA
C.C.=300KW 10-20/0.38KV
Pcc3F=68 MVA Dyn5 (10KV)
ip=33,580 kA Ikss=12,11 kA
Fus 40A BARRA 03 ip=33,58 kA
Tipo K
BARRA 380V
=
=
C a b le 3 - 1 x7 0 m m 2 N A 2 X S Y - 1 5 m =
BORNES DE BT
Skss=68,00 MVA BARRA DE ENEL
Ikss=3,93 kA
ip=9,69 kA
Skss=68,000 MVA RELE Nº1
Ikss=3,926 kA
ip=9,694 kA ENEL
ENEL
I =129,765 pri.A
1000
10
RELE 01
ENEL S.A.A.
RC2226
AJUSTES DE PROTECCION
FUSE 00 = FUSE 01 51P:
Corriente nominal PMI Y E. PROT. CURVE: IEC VI
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P:
CURVE: DEFINITE TIME
PICK UP: 450 A
RECLOSER 02 TIME DIAL: 0.01 Seg
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
120 NA2XSAY L-126m AAAC 70
E. PROT\Cub_3\RECLOSER 50P/51P
I =129,765 pri.A
1000
10
RELE 01
Del análisis de los resultados generales de cortocircuito trifásico se tienen las siguientes
anotaciones:
La capacidad térmica del cable de media tensión 3-1x.70mm2 NA2XSY 18/30K se encuentra
lo suficientemente dimensionada para soportar la corriente de cortocircuito para un tiempo de
apertura de la protección de 0.02 seg.
Máx Icc (PD) = 3.926 KA < 70.78 KA (Cable 3-1x70mm2 NA2XSY, tap = 0.02seg)
8.1. Protección principal del punto de diseño, RELE 01, pertenece al relé RC2154 en 10 KV.
Aguas arriba al punto de diseño fijado por Enel Distribución Perú S.A.A., se encuentra un relé de
protección, el cual deberá establecer una adecuada coordinación y selectividad con las
protecciones proyectadas del cliente “DESEMBARCADERO PESQUERO ARTESANAL DE
HUACHO”
RELÉ 02
Funciones de Protección Código Valores de Ajuste
I = 43 Amperios
Sobrecorriente temporizada de fases 51 Curva : IEC EI
TD: 0.20 Segundos
I = 570 Amperios
Sobrecorriente instantánea de fases 50 Curva : Tiempo Definido
TD: 0.05 Segundos
I = 3 Amperios
Sobrecorriente temporizada de neutro 51N Curva : Tiempo Definido
TD: 0.3 Segundos
I = 10 Amperios
Sobrecorriente Instantanea de neutro 50N Curva : Tiempo Definido
TD: 0.1 Segundos
In = 500/(10*1.7321) = 28.86 A
Corriente de ajuste entre 1.2 a 1.5 la In
Entonces:
T 500KVA
Transformador
Seco 500KVA
10-20/0.38KV
Dyn5 (10KV)
Skss=7,972 MVA
Ikss=12,112 kA Skss=7,97 MVA
ip=33,580 kA Ikss=12,11 kA
BARRA 03 ip=33,58 kA
BARRA 380V
=
=
C a b le 3 - 1 x7 0 m m 2 N A 2 X S Y - 1 5 m =
BORNES DE BT
DIgSILENT
I =129,765 pri.A
1000
10
RELE 01
ENEL S.A.A.
RC2226 CURVA DE DAÑOS
AJUSTES DE PROTECCION AAAC 3-1x70mm2
FUSE 00 = FUSE 01 51P: 8.75 KA
Corriente nominal PMI Y E. PROT. CURVE: IEC VI 1.0 seg
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P: CURVA DE DAÑOS
CURVE: DEFINITE TIME NA2XSAY 3-1x120mm2
PICK UP: 450 A 11.3 KA
TIME DIAL: 0.01 Seg 1.0 seg
RECLOSER 02
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000 [pri.A] 100000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
120 NA2XSAY L-126m AAAC 70
SISTEMA DE UTILIZACION EN 10.0 KV - 300KW
"DESEMBARCADERO PESQUERO ARTESANAL DE HUACHO"
S.E. 500KVA
T 500KVA
PMI
Skss=68,00 MVA
Ikss=3,93 kA BARRA 0 1737 Transformador
ip=9,69 kA
V=10.0KV Seco 500KVA
C.C.=300KW 10-20/0.38KV
Pcc3F=68 MVA Dyn5 (10KV)
BORNES DE BT
Ul=0,000 kV BARRA DE ENEL
u=0,000 p.u.
phiu=0,000 deg
Skss=68,000 MVA RELE Nº1
Ikss=3,926 kA
ip=0,000 kA ENEL
ENEL
Max. 3-Phase Short-Circuit acc. to IEC60909 Fig. 4.- Simulación de cortocircuito trifásico en el PMI-PROY
Short Circuit Nodes Nodes
Initial Short-Circuit Power [MVA] Line-Line Voltage, Magn
Initial Short-Circuit Current [kA] Voltage, Magnitude [p.u
Peak Short-Circuit Current [kA] Voltage, Angle [deg]
D Ig SIL EN T
I =3925,982 pri.A
1000
[s]
100
CABLE NA2XSY
3-1x70mm2 18/30KV
186A
FUSE 00
PMI
I=40A
10
CURVA DE DAÑOS
NA2XSY 3-1x70mm2
6.612 KA
1.0 seg
RELE 01
ENEL
1
0.300 s
0,1
0.010 s
0,01
10,00 kV 10 100 1000 10000 [pri.A] 100000
70 NA2XSY FUSE 00
BARRA DE ENEL\Cub_2\RELE 01 - 50/51
Fig. 5 Gráfica de coordinación de la protección para una falla R=0 ohm en el PMI-PROY.
Analizando las gráficas Nº 4, y Nº 5.
De ocurrir una falla de cortocircuito trifásica en el PMI-PROY, el valor de la corriente de falla sería de
3925.982 Amperios lo cual produciría la actuación de la protección en el PMI mediante la fundición
casi instantánea del fusible 00 de 40A tipo K para un tiempo de 0.010 seg.
CONCLUSIÓN:
I =129,765 pri.A
1000
10
RELE 01
ENEL S.A.A.
RC2226
AJUSTES DE PROTECCION
FUSE 00 = FUSE 01 51P:
Corriente nominal PMI Y E. PROT. CURVE: IEC VI
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P:
CURVE: DEFINITE TIME
PICK UP: 450 A
RECLOSER 02 TIME DIAL: 0.01 Seg
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
120 NA2XSAY L-126m AAAC 70
E. PROT\Cub_3\RECLOSER 50P/51P
I =129,765 pri.A
1000
10
RELE 01
Actuará la protección del PMI mediante la fundición del fusible de
40A tipo K en un tiempo de 0.010 seg.
Actuara la protección de ENEL - Relé 01 en un tiempo de 0.3 seg.
Luego de la actuación del fusible de 40 A , el cliente deberá de
remediar la falla ocasionada y coordinar con ENEL la reposición de la energía.
Skss Ikss Ip T
EQUIPO
(MVA) (kA) (kA) (seg)
FUSE 00 68.00 3.93 9.69 0.010
RELE 01 68.00 3.93 9.69 0.30
9.2 Simulación de falla en bornes MT de la celda de llegada. (Cortocircuito trifásico en la celda de llegada proy. – Coordinación de los FUSES 00,
Relé 01 )
DIgSILENT
I =129,765 pri.A
1000
10
RELE 01
ENEL S.A.A.
RC2226 CURVA DE DAÑOS
AJUSTES DE PROTECCION AAAC 3-1x70mm2
FUSE 00 = FUSE 01 51P: 8.75 KA
Corriente nominal PMI Y E. PROT. CURVE: IEC VI 1.0 seg
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P: CURVA DE DAÑOS
CURVE: DEFINITE TIME NA2XSAY 3-1x120mm2
PICK UP: 450 A 11.3 KA
TIME DIAL: 0.01 Seg 1.0 seg
RECLOSER 02
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000 [pri.A] 100000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
120 NA2XSAY L-126m AAAC 70
SISTEMA DE UTILIZACION EN 10.0 KV - 300KW
"DESEMBARCADERO PESQUERO ARTESANAL DE HUACHO"
S.E. 500KVA
T 500KVA
PMI
Ul=0,094 kV
u=0,009 p.u. BARRA 0 1737 Transformador
phiu=-66,254 deg
V=10.0KV Seco 500KVA
C.C.=300KW 10-20/0.38KV
Pcc3F=68 MVA Dyn5 (10KV)
BORNES DE BT
Ul=0,094 kV BARRA DE ENEL
u=0,009 p.u.
phiu=-66,254 deg
Skss=67,767 MVA RELE Nº1
Ikss=3,913 kA
ip=0,000 kA ENEL
ENEL
Max. 3-Phase Short-Circuit acc. to IEC60909 Fig. 6.- Simulación de cortocircuito trifásico en bornes MT de la Celda de llegada en la S.E.
Short Circuit Nodes Nodes
Initial Short-Circuit Power [MVA] Line-Line Voltage, Magn
Initial Short-Circuit Current [kA] Voltage, Magnitude [p.u
Peak Short-Circuit Current [kA] Voltage, Angle [deg]
D IgSILEN T
I =3912,544 pri.A
1000
[s]
FUSE 00
PMI
I=40A
10
CURVA DE DAÑOS
NA2XSY 3-1x70mm2
RELE 01
ENEL
1
0.300 s
0,1
0.010 s
0,01
10,00 kV 10 100 1000 10000 [pri.A] 100000
70 NA2XSY FUSE 00
BARRA DE ENEL\Cub_2\RELE 01 - 50/51
Fig. 7 Gráfica de coordinación de la protección para una falla R=0 ohm en bornes de MT de la celda de llegada en la S.E.
Analizando las gráficas Nº 06, y Nº 07.
I =129,765 pri.A
1000
10
RELE 01
ENEL S.A.A.
RC2226
AJUSTES DE PROTECCION
FUSE 00 = FUSE 01 51P:
Corriente nominal PMI Y E. PROT. CURVE: IEC VI
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P:
CURVE: DEFINITE TIME
PICK UP: 450 A
RECLOSER 02 TIME DIAL: 0.01 Seg
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
120 NA2XSAY L-126m AAAC 70
E. PROT\Cub_3\RECLOSER 50P/51P
I =129,765 pri.A
1000
10
RELE 01
CONCLUSIÓN:
Skss Ikss Ip T
EQUIPO
(MVA) (kA) (kA) (seg)
FUSE 00 67.77 3.91 9.57 0.010
RELE 01 67.77 3.91 9.57 0.30
9.3 Simulación de falla en bornes de MT del transformador. (Cortocircuito trifásico en bornes de MT del transformador proy. – Coordinación de los
Fuse 00,Relé 01 y Relé 02)
DIgSILENT
I =129,765 pri.A
1000
10
RELE 01
ENEL S.A.A.
RC2226 CURVA DE DAÑOS
AJUSTES DE PROTECCION AAAC 3-1x70mm2
FUSE 00 = FUSE 01 51P: 8.75 KA
Corriente nominal PMI Y E. PROT. CURVE: IEC VI 1.0 seg
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P: CURVA DE DAÑOS
CURVE: DEFINITE TIME NA2XSAY 3-1x120mm2
PICK UP: 450 A 11.3 KA
TIME DIAL: 0.01 Seg 1.0 seg
RECLOSER 02
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000 [pri.A] 100000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
120 NA2XSAY L-126m AAAC 70
SISTEMA DE UTILIZACION EN 10.0 KV - 300KW
"DESEMBARCADERO PESQUERO ARTESANAL DE HUACHO"
S.E. 500KVA
T 500KVA
PMI
Ul=0,142 kV
u=0,014 p.u. BARRA 0 1737 Transformador
phiu=-66,028 deg
V=10.0KV Seco 500KVA
C.C.=300KW 10-20/0.38KV
Pcc3F=68 MVA Dyn5 (10KV)
BORNES DE BT
Ul=0,142 kV BARRA DE ENEL
u=0,014 p.u.
phiu=-66,028 deg
Skss=67,649 MVA RELE Nº1
Ikss=3,906 kA
ip=0,000 kA ENEL
ENEL
Max. 3-Phase Short-Circuit acc. to IEC60909 Fig. 8.- Simulación de cortocircuito trifásico en bornes de MT del transformador en la S.E.
Short Circuit Nodes Nodes
Initial Short-Circuit Power [MVA] Line-Line Voltage, Magn
Initial Short-Circuit Current [kA] Voltage, Magnitude [p.u
Peak Short-Circuit Current [kA] Voltage, Angle [deg]
D Ig SIL EN T
I =3905,712 pri.A
1000
10
CABLE NA2XSY
3-1x70mm2 18/30KV
6.61 KA
RELE 01 1.0 seg
ENEL
1
RELE 02
AJUSTES DE PROTECCION
51:
CURVE: IEC EXTREMADAMENTE INVERSA
PICK UP: 43 A 0.300 s
TIME DIAL: 0.20 Seg
50:
CURVE: DEFINITE TIME
PICK UP: 570 A
TIME DIAL: 0.05 Seg
0,1
0.050 s
Corriente Inrush
I=346.41 A
t=0.10 s
0.010 s
0,01
10,00 kV 1 10 100 1000 10000 [pri.A] 100000
500 KVA 70 NA2XSY
FUSE 00 BARRA DE ENEL\Cub_2\RELE 01 - 50/51
BARRA 01\Cub_1\50P/51P
Fig. 9 Gráfica de coordinación de la protección para una falla en bornes de MT del transformador.
Analizando las gráficas Nº 8, y Nº 9.
I =129,765 pri.A
1000
10
RELE 01
ENEL S.A.A.
RC2226
AJUSTES DE PROTECCION
FUSE 00 = FUSE 01 51P:
Corriente nominal PMI Y E. PROT. CURVE: IEC VI
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P:
CURVE: DEFINITE TIME
PICK UP: 450 A
RECLOSER 02 TIME DIAL: 0.01 Seg
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
120 NA2XSAY L-126m AAAC 70
E. PROT\Cub_3\RECLOSER 50P/51P
I =129,765 pri.A
1000
10
RELE 01
CONCLUSIÓN:
Skss Ikss Ip T
EQUIPO
(MVA) (kA) (kA) (seg)
FUSE 00 67.65 3.91 9.50 0.010
RELE 01 67.65 3.91 9.50 0.30
RELE 02 67.65 3.91 9.50 0.05
9.4 Simulación de falla en bornes BT del transformador en la S.E. (Cortocircuito trifásico en los bornes de BT del transformador – Coordinación del
Fuse 00, Relé 01 y Relé 02)
DIgSILENT
I =129,765 pri.A
1000
10
RELE 01
ENEL S.A.A.
RC2226 CURVA DE DAÑOS
AJUSTES DE PROTECCION AAAC 3-1x70mm2
FUSE 00 = FUSE 01 51P: 8.75 KA
Corriente nominal PMI Y E. PROT. CURVE: IEC VI 1.0 seg
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P: CURVA DE DAÑOS
CURVE: DEFINITE TIME NA2XSAY 3-1x120mm2
PICK UP: 450 A 11.3 KA
TIME DIAL: 0.01 Seg 1.0 seg
RECLOSER 02
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000 [pri.A] 100000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
120 NA2XSAY L-126m AAAC 70
SISTEMA DE UTILIZACION EN 10.0 KV - 300KW
"DESEMBARCADERO PESQUERO ARTESANAL DE HUACHO"
S.E. 500KVA
T 500KVA
PMI
Ul=9,216 kV
u=0,922 p.u. BARRA 0 1737 Transformador
phiu=150,688 deg
V=10.0KV Seco 500KVA
C.C.=300KW 10-20/0.38KV
Pcc3F=68 MVA Dyn5 (10KV)
ip=33,580 kA Ikss=12,11 kA
Fus 40A BARRA 03 ip=33,58 kA
Tipo K
BARRA 380V
=
=
C a b le 3 - 1 x7 0 m m 2 N A 2 X S Y - 1 5 m =
BORNES DE BT
Ul=9,216 kV BARRA DE ENEL
u=0,922 p.u.
phiu=150,688 deg
Skss=7,972 MVA RELE Nº1
Ikss=0,460 kA
ip=0,000 kA ENEL
ENEL
100
FUSE 00
I=40A
Curva de daño del
Transformador 500KVA
Tipo Seco
10.0/0.38KV
Grupo: Dyn5
uktr: 6%
Corriente nominal
Transformador 500KVA
10 In = 28.86A
CABLE NA2XSY
3-1x70mm2 18/30KV
6.61 KA
1.0 seg
RELE 01
1 RELE 02 ENEL
AJUSTES DE PROTECCION
51:
CURVE: IEC EXTREMADAMENTE INVERSA
PICK UP: 43 A
TIME DIAL: 0.20 Seg 0.300 s
50: Corriente Inrush
CURVE: DEFINITE TIME I=346.41 A
PICK UP: 570 A t=0.10 s
TIME DIAL: 0.05 Seg 0.162 s
0,1
0,01
10,00 kV 1 10 100 1000 10000 [pri.A] 100000
500 KVA 70 NA2XSY
FUSE 00 BARRA DE ENEL\Cub_2\RELE 01 - 50/51
BARRA 01\Cub_1\50P/51P
Fig. 11 Gráfica de coordinación de la protección para una falla R=0 ohm en bornes de BT del transformador en la S.E.
Analizando las gráficas Nº 10, y Nº 11.
I =129,765 pri.A
1000
10
RELE 01
ENEL S.A.A.
RC2226
AJUSTES DE PROTECCION
FUSE 00 = FUSE 01 51P:
Corriente nominal PMI Y E. PROT. CURVE: IEC VI
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P:
CURVE: DEFINITE TIME
PICK UP: 450 A
RECLOSER 02 TIME DIAL: 0.01 Seg
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
120 NA2XSAY L-126m AAAC 70
E. PROT\Cub_3\RECLOSER 50P/51P
I =129,765 pri.A
1000
10
RELE 01
CONCLUSIÓN:
Skss Ikss Ip T
EQUIPO
(MVA) (kA) (kA) (seg)
FUSE 00 7.97 12.11 33.58 0.162
RELE 02 7.97 12.11 33.58 0.162
RELE 01 7.97 12.11 33.58 0.300
10). FALLAS A TIERRA EN SISTEMAS ELECTRICOS CON NEUTRO AISLADO.
I =129,765 pri.A
1000
10
RELE 01
ENEL S.A.A.
RC2226
AJUSTES DE PROTECCION
FUSE 00 = FUSE 01 51P:
Corriente nominal PMI Y E. PROT. CURVE: IEC VI
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P:
CURVE: DEFINITE TIME
PICK UP: 450 A
RECLOSER 02 TIME DIAL: 0.01 Seg
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
120 NA2XSAY L-126m AAAC 70
E. PROT\Cub_3\RECLOSER 50P/51P
I =129,765 pri.A
1000
10
RELE 01
valores normales de carga como resultado de una alta resistencia de contacto del conductor
eléctrico con el terreno.
Es importante indicar que generalmente en nuestro medio ( en la ciudad de Lima) el tipo de
puesta a tierra del neutro del sistema de distribución de 10 kV es con el neutro sin conexión física
a tierra ( Neutro aislado) lo cual hace más difícil la detección de una falla a tierra.
En el gráfico de a continuación mostramos el comportamiento de las corrientes homopolares en
un sistema de distribución con neutro aislado ante una falla a tierra. Como se puede apreciar, en
el alimentador con la falla a tierra existe una corriente desde la barra de la S.E. hacia la falla.
Debido a que la conexión en delta del transformador de potencia aísla al transformador del
sistema de distribución, de acuerdo a la teoría de las componentes simétricas, según la ley de
Kirchoff esta corriente tiene que regresar a la barra a través de los otros alimentadores y de sus
capacidades homopolares teniendo una dirección contraria; es decir, ante una falla a tierra de un
alimentador, en todos los alimentadores de la S.E. circulan corrientes homopolares siendo la
dirección de la corriente homopolar en el alimentador con falla en un sentido y en sentido
contrario en todos los otros alimentadores.
La corriente de falla a tierra depende entonces de la impedancia de falla ( resistencia de falla a
tierra en el punto de contacto) y del aporte capacitivo de los alimentadores que no están
involucrados en la falla.
Fig. 12 Fallas a tierra en sistemas con neutro aislado
Por consiguiente, con la finalidad que la detección de la falla a tierra sea selectiva mediante el
empleo de relés de tierra no direccionales como en el presente caso se requiere conocer lo
siguiente:
Para el presente caso corresponde al cable principal de Media Tensión desde el PMI hasta la
subestación particular.
Reemplazando se tiene:
El ajuste del relé de tierra deberá ajustarse por encima de este valor para evitar falsas aperturas
en caso de que la falla sea en otro punto de la red de ENEL.
2) Al producirse una falla se inicia la actuación de la protección principal que tiene un tiempo de
actuación mínimo (tR), sin ningún retraso adicional, que termina dando una orden de apertura
al Interruptor.
3) La falla se extingue después de la operación de apertura de la corriente de falla por parte del
interruptor que tiene un tiempo de operación (t52).
5) La falla será extinguida por la protección de respaldo después del tiempo de apertura del
interruptor (t52)
Fig. 13 Coordinación entre Relé principal y Relé de respaldo.
RELÉ 02 (SUBESTACION)
10.2 Ajuste de la protección de Tierra del RELE 01, proporcionado por ENEL.
De acuerdo a la información proporcionada por la empresa ENEL., el relé de tierra del cliente
deberá de coordinar con el relé 01 de ENEL.
10
RELE 01
ENEL S.A.A.
RC2226 CURVA DE DAÑOS
AJUSTES DE PROTECCION AAAC 3-1x70mm2
FUSE 00 = FUSE 01 51P: 8.75 KA
Corriente nominal PMI Y E. PROT. CURVE: IEC VI 1.0 seg
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P: CURVA DE DAÑOS
CURVE: DEFINITE TIME NA2XSAY 3-1x120mm2
PICK UP: 450 A 11.3 KA
TIME DIAL: 0.01 Seg 1.0 seg
RECLOSER 02
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000 [pri.A] 100000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
120 NA2XSAY L-126m AAAC 70
D Ig SIL EN T
10
RELE 02
AJUSTES DE PROTECCION
[s] 51N: RELE 01
CURVE: DEFINITE TIME ENEL S.A.A.
PICK UP: 3 A
TIME DIAL: 0.3 Seg
50N: 51N(SEF):
CURVE: DEFINITE TIME CURVE: DEFINITE TIME
PICK UP: 10 A PICK UP: 6 A
TIME DIAL: 0.1 Seg TIME DIAL: 0.8 Seg
50N:
CURVE: DEFINITE TIME
PICK UP: 16 A
1 TIME DIAL: 0.5 Seg
0,1
0,01
10,00 kV 0,1 1 10 100 [pri.A] 1000
BARRA DE ENEL\Cub_2\RELE 01- 50N/51N BARRA 01\Cub_1\50N/51N
Fig. 14 Coordinación de la protección para fallas a Tierra entre el Relé 01 de ENEL y el Relé 02 del DESEMBARCADERO PESQUERO ARTESANAL DE
HUACHO
11). PROTECCION PRINCIPAL DEL CABLE NA2XSY 18/30KV.
La protección principal del cable Subterráneo NA2XSY 3-1x70 mm 2 estará dado por los
fusibles de 40 amperios tipo “K”.
La siguiente tabla resume las magnitudes corriente-tiempo de la Fig. 15 (ver siguiente página)
de donde se determina que las corrientes de cortocircuito existentes no dañaran al cable
debido a que el tiempo de despeje de la corriente de falla por parte del fusible de 40
amperios, será en un tiempo menor a los 10 milisegundos para la corriente de falla ubicada
I =129,765 pri.A
1000
10
RELE 01
ENEL S.A.A.
RC2226
AJUSTES DE PROTECCION
FUSE 00 = FUSE 01 51P:
Corriente nominal PMI Y E. PROT. CURVE: IEC VI
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P:
CURVE: DEFINITE TIME
PICK UP: 450 A
RECLOSER 02 TIME DIAL: 0.01 Seg
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
120 NA2XSAY L-126m AAAC 70
E. PROT\Cub_3\RECLOSER 50P/51P
I =129,765 pri.A
1000
10
RELE 01
en el PMI (Icc 3912.54 Amperios). El cable de 3-1x70mm2 NA2XSY 18/30KV soporta una
corriente de falla de 66100 amperios para un tiempo de 10 milisegundos, por lo que estos
cables no sufrirán daño para la corriente de falla esperada.
CURVA DE DAÑO
NA2XSY 3-1x70mm2
[s] 6.61 KA
1.0 seg
DIgSILENT
I =129,765 pri.A
1000
0,1
10
RELE 01
ENEL S.A.A.
RC2226 CURVA DE DAÑOS
AJUSTES DE PROTECCION AAAC 3-1x70mm2
FUSE 00 = FUSE 01 51P: 8.75 KA
Corriente nominal PMI Y E. PROT. CURVE: IEC VI 1.0 seg
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P: CURVA DE DAÑOS
CURVE: DEFINITE TIME NA2XSAY 3-1x120mm2
PICK UP: 450 A 11.3 KA
TIME DIAL: 0.01 Seg 1.0 seg
RECLOSER 02
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
0,01 DEFINITE TIME
CURVE:
10,00
PICKkVUP:
1000
150 A 10000 [pri.A] 100000
TIME DIAL: 0.03 Seg 70 NA2XSY
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N CURVA DE DAÑOS DEL CABLE CURVA DE DAÑOS DEL CABLE Date: 10/1/2020
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A Annex:
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000 [pri.A] 100000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
120 NA2XSAY L-126m AAAC 70
Fig. 15.- Gráfica de la curva de daño del cable de media tensión, 3-1x70mm2 NA2XSY 18/30 KV
12). CONCLUSIONES Y RECOMENDACIONES
Se visualiza que la curva del fusible seleccionado en el PMI están por encima de la corriente
inrush y por debajo de la corriente máxima admisible lo cual hace posible un buen
funcionamiento al momento del arranque y alguna elevación de la corriente que pudiera darse
en el transformador que está protegiendo, la selección de un fusible de menor valor no
garantizara el funcionamiento del transformador al momento del arranque.
I =129,765 pri.A
1000
10
RELE 01
ENEL S.A.A.
RC2226
AJUSTES DE PROTECCION
FUSE 00 = FUSE 01 51P:
Corriente nominal PMI Y E. PROT. CURVE: IEC VI
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P:
CURVE: DEFINITE TIME
PICK UP: 450 A
RECLOSER 02 TIME DIAL: 0.01 Seg
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
120 NA2XSAY L-126m AAAC 70
E. PROT\Cub_3\RECLOSER 50P/51P
I =129,765 pri.A
1000
10
RELE 01
Se visualiza que los ajustes seleccionados para el relé 02 ubicado en la subestación particular
del cliente están por encima de la corriente inrush y por debajo de la corriente máxima
admisible lo cual hace posible un buen funcionamiento al momento del arranque y alguna
elevación de la corriente que pudiera darse en el transformador que está protegiendo.
Asimismo se verifica que los fusibles seleccionados protegerán los cables de media tensión
gracias a su rápida actuación ante las fallas trifásicas. Las curvas de protección de los
fusibles se encuentran por debajo de la curva de daño del cable de media tensión.
Ante una falla trifásica que ocurra en bornes de media tensión (10.0KV) en cualquier
punto, no dará la selectividad entre el fusible 00 proyectado y las protecciones de fase para el
rele 02. Por lo tanto en caso de falla trifásica, el cliente deberá de remediar la falla y solicitar
a ENEL el pago por la reposición del servicio en el PMI previa verificación por parte de ENEL.
De lo mencionado en el punto anterior, es importante entonces evitar en lo posible el origen de
fallas por cortocircuito de fases en barras de MT en la subestación del cliente, para lo cual, se
deberá instruir a los operadores de mantenimiento los procedimientos y secuencia de
maniobras a realizar en la subestación, con la finalidad de evitar falsas maniobras y la
consecuente interrupción del servicio.
Existirá una coordinación entre los relés de fallas a tierra relé 01 y relé 02 .
Ante la eventualidad de ocurrir incidencias, se recomienda llevar un registro de las
magnitudes de corrientes de falla, causa y localización de las mismas a fin de adaptar los
ajustes a la red.
El presente estudio, considera como configuración de operación del sistema la
topología radial con los parámetros eléctricos de la Red indicados en la Memoria Descriptiva y
bajo las condiciones de servicio normal. Cualquier cambio de la topología de la red y/o
parámetros eléctricos debe considerar el reajuste de las protecciones.
Solo el personal autorizado por Enel ejecutara la puesta en servicio, corte y
reposición en PMI.
En la ETAPA DE PRUEBAS ELECTRICAS referente al equipo de protección del
CLIENTE (Relé 02), se efectuara mediante una maleta de pruebas de inyección de corrientes
primarias con capacidad según requerimiento del estudio.
Se recomienda efectuar pruebas de disparo del sistema de protección del cliente con
una frecuencia de una vez cada dos años.
13) ANEXOS
13.1) PLANILLA DE AJUSTES
A continuación se señalara los ajustes que tiene el relé N° 01 existente de ENEL y los ajustes
que deberá de tener el relé N° 02 ubicado en la celda de protección en la subestación, así
como también se señalara los elementos de protección del sistema de utilización.
RELÉ 02 (SUBESTACION)
Cuadro de seteo del relé N° 02 para fallas a fase y tierra ubicado en la celda de protección del cliente
ELEMENTO DE TIPO DE
CODIGO UBICACION CAPACIDAD (A) TENSION (KV)
PROTECCION FUSIBLE
FUSE 00 FUSIBLE PMI 40 K 10
TRANSFORMADORES DE CORRIENTE
ITEM DESCRIPCION UNIDAD OFERTADO
1 Relación A/A 100 / 1
2 Protección 5P20
3 Medida Clase 1
4 Frecuencia Hz 60
TRANSFORMADOR HOMOPOLAR
ITEM DESCRIPCION UNIDAD OFERTADO
1 Relación A /A 50 / 1
2 Protección 5P10
3 Potencia VA 1,5
4 Frecuencia Hz 60
100 3.629
400 0.187
500 0.162
700 0.050
800 0.050
En la página siguiente se muestra una grafica de la curva con los puntos mencionados en el
cuadro anterior, los mismos puntos que se evaluaran en la etapa de pruebas eléctricas.
DIgSILENT
1000
[s]
100 I =50 A
T = 45.444 Seg.
DIgSILENT
I =129,765 pri.A
1000
8 0.3
11 0.1
I =129,765 pri.A
1000
10
RELE 01
ENEL S.A.A.
RC2226
AJUSTES DE PROTECCION
FUSE 00 = FUSE 01 51P:
Corriente nominal PMI Y E. PROT. CURVE: IEC VI
Transformador 250KVA K=15A PICK UP: 100 A
In = 6.30A 2.278 s TIME DIAL: 0.05 Seg
50P:
CURVE: DEFINITE TIME
PICK UP: 450 A
RECLOSER 02 TIME DIAL: 0.01 Seg
1 AGROALTO S.A.C.
AJUSTES DE PROTECCION
51N:
CURVE: IEC EI
PICK UP: 20 A
TIME DIAL: 0.07 Seg
50N: 0.285 s
CURVE: DEFINITE TIME
PICK UP: 150 A
TIME DIAL: 0.03 Seg
TC=200A/1A 0.136 s
PARAMETROS DE SETEO
0,1 51N
CURVE: IEC VI
PICK UP: 0.1 (Rango 0,1-2,5) * CT RATIO = 20 A
TIME DIAL: 0.07 Seg (Rango 0,02 - 60 seg) 0.062 s
50N:
CURVE: DEFINITE TIME Corriente Inrush
PICK UP: 0.75 (Rango 0,1 - 20) * CT RATIO = 150 A I=75.635 A 0.025 s
TIME DIAL: 0.03 Seg (Rango 0,03 - 10 seg) t=0.10 s
0.021 s
CORRIENTES DE PRUEBA
0.20x(200A)= 40A -- 1.87 Seg
0.40x(200A)= 80A -- 0.37 Seg
1.00x(200A)=200A -- 0.03 Seg
0,01
22,90 kV 1 10 100 1000 10000
FUSE 00 FUSE 03
250 KVA ALIM. AD-01\Cub_2\RC2226 50/51
120 NA2XSAY L-126m AAAC 70
E. PROT\Cub_3\RECLOSER 50P/51P
I =129,765 pri.A
1000
10
RELE 01
12 0.1
13 0.1
15) CATALOGO