Está en la página 1de 6

CORTE DE OBRA BLADOSEROS

PISO 1 BALDOSA

5.7 2.4 13.68


9.3 2.11 19.623
4.9 2.11 10.339
7.2 7.5 54
3 4.4 13.2
1.5 3.6 5.4
116.242 100% 116.242

PISO 6
POLILINEA COMPLETA 324 90% 291.6 32.4

PISO 7
POLILINEA COMPLETA 134.4 80% 107.52 26.88

BALDOSA 116.242 15000 1,743,630


BALDOSA 399.12 12000 4,789,440
DESTRONQUE 226.8 6000 1,360,800
TOTAL CORTE BALDOSEROS HONORIO 7,893,870
SEGURIDAD SOCIAL 5 70,000 350,000
SEGURIDAD SOCIAL 2 35,000 70,000
7,473,870
PRESTAMO HONORIO 400,000
TOTAL A PAGAR 7,073,870

CORTE 15 DE AGOSTO
CONSOLIDADO BALDOSA
PISO 6
PISO 6 472.09
HALL 295 PISO 7 393.9
BAÑOS ASCENSORES 49.8 TOTAL AMBOS PISOS 865.99
3 SALONES 127.29 METROS PAGADOS 634.3

TOTAL PISO 6 472.09 SALDO POR PAGAR 231.69

PISO 7
DESTRONQUE DE BALDOSA
HALL COMPLETO
CON SALONES 344 PISO 6 472.09
BAÑOS
ASCENSORES 49.9 PISO 7 393.9
TOTAL PISO 7 393.9 TOTAL AMBOS PISOS 865.99
METROS PAGADOS 552.8
METROS FALTANTES 313.19
CORTE BALDOSA

PISO 6 HALL
PISO 6 SALONES 43.9 3
TOTAL EJECUTADO
PAGADO CORTE ANTERIORE
TOTAL A COBRAR ESTE CORTE 100%

PISO 7

PISO7 HALL
PAGADO ANTERIORMENTE
TOTAL PARA ESTE CORTE A PAGAR 100%

DESTRONQUE
PISO 6
PISO 7
TOTAL PISOS
PAGADO ANTERIOR MENTE
TOTAL DESTRONQUE
SE PAGAN EL 80% 80%

TOTAL VALDOSA 235.18 12000


TOTAL DESTRONQUE 326 6000

ADICIONALES JORNALES
DESCUENTO DE SEGURIDAD
TOTAL A PAGAR

CORTE

BALDOSA 12000 231.69


DESTRONQUE 6000 313.19
100%
SE PAGA EL 80%
INSTALACION SOCALO 4000 70
DESCUENTO SEGURIDAD
ANTICIPO
TOTAL A PAGAR
291
131.7
422.7
291.6
131.1

211.6
107.52
104.08

422.7
211.6
634.3
226.8
407.5
326

2,822,160
1,956,000
4,778,160
200,000
245,000
4,733,160

2,780,280.00
1,879,140.00
4,659,420.00
3,727,536.00
280,000.00
205,000.00
400,000.00
3,402,536.00