MEMORIAS DE CANTIDADES DE OBRA

CONSTRUCCION JARDIN BRITISH COLUMBIA INTERNATIONAL SCHOOL

VEREDA SAN JOSE, MUNICIPIO DE LA CALERA CUNDINAMARCA

Item No. Descripción


5 ACABADOS DE PISO, PORCELANATOS Y ENCHAPES MUROS BAÑOS
MEMORIA ESCRITA Y CALCULOS
AREA

Localización / Observaciones REFERENCIA 1,10 Vlr. Unitario Vlr. Total

AULA 1 TIMBER 0422 77,968 $44.000 $3.430.592


AULA 2 TIMBER 0422 77,968 $44.000 $3.430.592
AULA 3 TIMBER 0422 77,968 $44.000 $3.430.592
AULA 4 TIMBER 0422 77,968 $44.000 $3.430.592
AULA 5 TIMBER 0422 77,968 $44.000 $3.430.592
AULA 6 TIMBER 0422 77,968 $44.000 $3.430.592
AULA 7 TIMBER 0422 77,968 $44.000 $3.430.592
AULA 8 TIMBER 0422 77,968 $44.000 $3.430.592
AULA 9 TIMBER 0422 77,968 $44.000 $3.430.592
AULA 10 TIMBER 0422 77,968 $44.000 $3.430.592
AULA 11 TIMBER 0422 77,968 $44.000 $3.430.592
AULA 12 TIMBER 0422 77,968 $44.000 $3.430.592
AULA 13 ARTES PLASTICAS TIMBER 0422 77,968 $44.000 $3.430.592
AULA 14 LABORATORIO DE CIENCIAS TIMBER 0422 77,968 $44.000 $3.430.592
BIBLIOTECA AMARILLO 8335 259,49 $44.000 $11.417.560
CORREDOR CIRCULACION PISO 2 Y PUNTO FIJO ESCALER NARANJA 8338 187,693 $44.000 $8.258.492
CORREDOR CIRCULACION PISO 1 Y PUNTO FIJO ESCALER VERDE 8633 277,607 $44.000 $12.214.708
RECEPCION PISO 1 45802 LVT CONCRETO CLARO 112,816 $58.000 $6.543.328
AREA ADMINISTRATIVA PISO 2 TODO BAÑO H=1,50 INCLUYE
TIMBER 1518 516,89 $44.000 $22.743.160
BAÑO DIRECCION GENERAL
AULA DE MUSICA Y DEPOSITO SOTANO LINOLEO 89,496 $50.000 $4.474.800
AULA DE DANZAS Y DEPOSITO SOTANO TIMBER 0422 89,496 $44.000 $3.937.824
AREA LOBBY PISCINA SOTANO AZUL 8353 157,619 $44.000 $6.935.236
NUEVO SALON FOTOCOPIAS Y AREAS AMPLIACION RAMPA AZUL 8353 49,5 $44.000 $2.178.000
OFICINA PISCINERO SOTANO AZUL CLARO 8624 17,116 $44.000 $753.104
ENFERMERIA NIVEL - 7,00 AZUL CLARO 8624 30,25 $44.000 $1.331.000
LUDOTECA 8361 347,127 $44.000 $15.273.588
ESCALERA 1 (2m DE ANCHO) AZUL 8353 44 $44.000 $1.936.000
ESCALERA 2 (2m DE ANCHO) VERDE 8633 44 $44.000 $1.936.000
ESCALERA 3 (2m DE ANCHO) NARANJA 8338 44 $44.000 $1.936.000
ADHESIVO PISO ROLLO – DRYBACK – ALFOMBRA 3105 $4.900 $15.214.500
INSTALACION PISO DRYBACK 101 $4.000 $404.000
INSTALACION PISO EN ROLLO 2830 $7.500 $21.225.000
SOLDADURA 1963 $2.000 $3.926.000
ADHESIVO 120 $4.900 $588.000
INSTALACION PISO ESCALERA MEDLEY 8624 120 $9.800 $1.176.000
GUARDAESCOBA ESCALERA 77 $5.850 $450.450
INSTALACION GUARDAESCOBA 77 $4.500 $346.500
PERFIL NARIZ DE CAUCHO 140 $12.500 $1.750.000
ADHESIVO NARIZ DE CAUCHO 140 $4.800 $672.000
INSTALACION PERFIL NARIZ DE CAUCHO 140 $6.000 $840.000
MEDIACAÑA ENFERMERIA 24 $9.000 $216.000
INSTALACION MEDIACAÑA 24 $2.500 $60.000
ADHESIVO MEDIACAÑA 24 $2.500 $60.000
GUARDAESCOBA PVC 1124 $5.850 $6.575.400
ADHESIVO GUARDAESCOBA PVC 1124 $2.500 $2.810.000
INSTALACION GUARDAESCOBA EN PVC 1124 $2.800 $3.147.200
MASTICO PREPARATORIO 3052 $7.000 $21.364.000
ADMINISTRACION – ALFOMBRA POR ELEGIR 92 $78.000 $7.176.000
INSTALACION ALFOMBRA 84 $6.500 $546.000
$238.444.138,00
19,00% $45.304.386,22
TOTAL $283.748.524,22