Está en la página 1de 6

1.

-METRADO DE CARGAS

METRADO DE CARGA MUERTA (CM) N° COLUMNAS


30
1.1 CALCULO DE AREA TOTAL (At)
AREA DE TOTAL DE COLUMNAS (m)
LARGO (m) ANCHO (m) TOTAL (m2)
37.5837 31.25 1174.49063 AREA TOTAL DE VIGAS PRINCIPALES

1.2 CALCULO DE AREA DE LOSA (Al) AREA TOTAL DE VIGAS SECUNDARI


1174.490625 10.8 83.00088 55.3
ESPESOR DE LOSA =0.20 SEGÚN LA
TOTAL (m2) 1025.38975
PESO DE 1 M3 DE CONCRETO A
PESO DE LA LOSA ESPESOR(0.20) (Pl) TOTAL (Tn)
1025.389745 0.3 10 3076.16924 PESO DE ACABADOS (

1.3 CALCULO DE PESO DE COLUMNA (Pc) PESO PROPIO OFICIN


3 0.36 30 10 2.4

TOTAL (Tn) 777.6

1.4 CALCULO DE PESO DE VIGA (Pv)

PESO VIGA PRINCIPAL


207.5022 0.24 2.4 10

TOTAL (Tn) 1195.21267

PESO VIGA SECUNDARIA


169.9185 0.24 2.4 10

TOTAL (Tn) 978.73056

1.5 CALCULO DE PESO ACABADO (Pacab)


1025.389745 0.1 9

TOTAL (Tn) 922.850771

1.6 CALCULO DE PESO DE TABIQUERIA (Ptab)


1025.389745 0.05 0.1 9 0.5

TOTAL Tn 692.138078

SUMATORIA DE CARGA MUERTA TOTAL

CALCULO DE PESO DE LOSA (Pl) 3076.16924


CALCULO DE PESO DE COLUMNA (Pc) 777.6
PESO VIGA PRINCIPAL 1195.21267
PESO VIGA SECUNDARIA 978.73056
CALCULO DE PESO ACABADO (Pacab) 922.850771
CALCULO PESO DE TABIQUERIA (Ptab) 692.138078

TOTAL (Tn) 7642.70132

2 CALCULO DE CARGA VIVA


1025.389745 3.5

TOTAL (Tn) 3588.86411

PESO TOTAL DE ( CV + CM)

CM 7642.701315375
CV 3588.8641075

TOTAL (Tn) 11231.56542288

3 CALCULO DE CM Y CV POR UNIDAD DE AREA


Tn/m2
CM/m2 7642.701315375 1174.49063 6.50724761
CV/m2 3588.8641075 1174.49063 3.0556771

4 CALCULO DE AREA TRIBUTARIA DE LA ZONA DE ESTUDIO

COLUMNA C-1 9.27 6.25 Atrib 57.9375

COLUMNA C-2 9.27 3.125 Atrib 28.96875

COLUMNA C-3 3.125 6.25 Atrib 19.53125

COLUMNA C-4 4.885 3.125 Atrib 15.265625


TOTAL 121.703125

5 CALCULO DE LAS CM Y CV PARA CADA COLUMNA

COLUMNA C-1
CM 6.507247612449 57.9375 377.013659
CV 3.055677100445 57.9375 177.038292
TOTAL 554.051951

COLUMNA C-2
CM 6.507247612449 28.96875 188.506829
CV 3.055677100445 28.96875 88.519146
TOTAL 277.025975

COLUMNA C-3
CM 6.507247612449 19.53125 127.09468
CV 3.055677100445 19.53125 59.6811934
TOTAL 186.775873

COLUMNA C-4
CM 6.507247612449 15.265625 99.3372018
CV 3.055677100445 15.265625 46.6468207
TOTAL 145.984023

6 CALCULO DE MxB - My2

EJE 1-1 1039.071538335 EJE A-A 1123.045970971

EJE 2-2 2770.259752767 EJE B-B 2035.707598257

EJE 3-3 2770.259752767 EJE C-C 2035.707598257

EJE 4-4 2770.259752767 EJE D-D 2035.707598257

EJE 5-5 1039.071538335 EJE E-E 2035.707598257

EJE F-F 1123.045970971


MxB -9701.61700537 My2 8396.173187572

7 CALCULO DE EXCENTRICIDAD

ex -0.09234432925

eY 0.095953303585
ARGAS

VIGAS SUPER/INFER COLUMNAS N° DE NIVELES ALTURA


0.24 0.36 10 2.8
0.24
E TOTAL DE COLUMNAS (m) 10.8

OTAL DE VIGAS PRINCIPALES (m2) 83.00088

OTAL DE VIGAS SECUNDARIAS (m2) 55.3

OR DE LOSA =0.20 SEGÚN LA E-020 (Tn) 0.3

O DE 1 M3 DE CONCRETO ARMADO (Tn) 2.4

PESO DE ACABADOS (Tn) 0.1

PESO PROPIO OFICINAS 0.35


TABIQUERIA MEDIA 0.05
TABIQUERIA COMPL. 0.1

También podría gustarte