Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Cargas Texum
Cargas Texum
com/global/LA/calculator/water-pipe-sizing-velocity
CARGAS AGUA FRIA Y CALIENTE
gpm
CANTIDAD CAPACIDAD FLUJO DE AGUA A 6:1 EN 3 MINUTOS
2 1200 640.3415155
1 300 160.0853789
1 150 80.04268943
2 50 26.68089648
0
VELOCIDAD DEL AGUA 1.7
SI LLENARAN MAQUINA 2DE 1200 KG 640 TUBERIA DN
ater-pipe-sizing-velocity.html
7200
11.244 640.3415155
CANTIDAD CAPACIDAD
2 1200 300
1 300 75
1 150 37.5
2 50 25
437.5
MAXIMO CONSUMO
GPM 300
http://www.tlv.com/global/LA/calculator/air-pipe-sizing-pressure-loss.html
http://mx.kaeser.com/Online_Services/Toolbox/Air_receiver_sizes/default.asp
TAMAÑO DE PULMON 2 M3
TIEMPO 3 MIN
PRESION INICIAL 0
http://www.tlv.com/global/LA/calculator/steam-pressure-loss-through-piping.html?advanced
http://www.tlv.com/global/LA/calculator/pipe-sizing-recovery-line-pressure-loss.html
CONSUMO
UNIT. DE
CANTIDAD CAPACIADA VAPOR KG/H TOTAL
2 1200 640.3415155 1280.683031
Teñidoras 1 300 160.0853789 160.0853789
1 150 80.04268943 80.04268943
2 50 26.68089648 53.36179296
TOTAL SI TODAS CALENTARAN 1574.172892
150
37.5
18.75
6.25
VAPOR velocidad 6.21 m/seg 212.5
800.4268943 KG/H caida de presi 0.38BAR
tuberia de DN100 4"
kg/h
TOMANDO EN CUENTA LLENADOS DRENAJES EL USO DE AGUA CON RELACION DE BAÑO 12:1
SE USAN APROXIMADAMENTE 100 LTS DE AGUA /KG TEÑIDO
810750
450750
ON DE BAÑO 12:1