No Pt Bt 1 St 1 Bt 2 St 2 St 3 Dt Ct
1 45.11 15.62 21.69 45.15 47.28 60.01 26.37 261.23
2 31.85 54.56 5.59 30.45 5.71 14.52 65 207.68
3 28.17 38.61 9.91 76.1 17.27 12.89 5.07 188.02
4 28.02 39.55 5.82 63.8 18.84 5.76 0 161.79
5 41,07 76,53 13,85 132,57 16,92 13,13 0 294,07
6 22.66 62.63 9.97 32.25 9.01 12.76 0 149.28
7 9.89 67.95 10.15 64.55 31.73 11.19 25.28 220.74
8 46.6 47.42 10.76 112.59 11.12 6.39 0 234.88
9 47.6 67.96 12.04 72.88 8.59 11.55 0 220.62
10 16,41 97,37 13,43 128,47 11,6 20,35 0 287,63
11 13.35 46.97 11.74 95.3 12.52 11.75 0 191.63
12 34.32 51.07 21.1 180.71 16.79 9.39 0 313.38
13 36.41 74.34 11.45 107.11 24.34 27.01 55.15 335.81
14 14.4 53.86 12.5 40.7 17.03 11.49 159.35 309.33
15 36,51 61,9 15,65 98,06 28,44 13,59 61,7 315,81
16 14.62 54.44 7.49 43.08 9.79 4.38 39.25 173.05
17 19.55 32.17 11.84 45.14 8.7 7.39 0 124.79
18 61.19 16.56 10.91 38.61 6.76 9.33 0 143.36
19 69.96 17.79 11 46.89 8.97 15.54 0 170.15
11.5947.
498.2154
.696.398.
980137.8
320 41,64 49,19 15,87 119,77 20,97 16,2 0 263,44
2221 14.61 82.84 11.48 64.91 11.86 11.72 22.17 219.59
23 54.99 55.08 6.2 63.21 7.19 12.51 258.22 457.4
24 38.97 67.8 13.4 54.22 13.8 13.93 35.2 237.32
25 32,69 65,25 16,28 106,74 28,95 19,21 44,35 273,47
26 23.89 57.39 11.47 26.34 8.44 9.7 141.66 278.89
27 22.7 37.65 15.8 59.72 36.03 11.59 287.24 470.73
28 32.35 16.88 7.6 46.46 20.56 15.65 43 182
29 13.46 14.49 5.78 9.28 71.85 8.87 131.11 254.84
30 12.29 36.23 4.28 10.87 28.17 26.35 0 118.19
Rata-rata 34,2135 60,18752 17,03641 120,0924 23,1428 21,4285 75,0425 351,14363
Keterangan :
Ct = waktu edar pemboran
Pt = waktu untuk mengambil posisi
Bt = waktu untuk mengebor
St = waktu untuk berhenti (waktu untuk menambah, mengganti batang bor,
mencabut rod dan untuk membersihkan lubang bor)
Dt = waktu untuk mengatasi hambatan-hambatan yang ada