Está en la página 1de 8

DETAILED MEASUREMENTS

Name of work : SLTF 2019-20 Flood Damages work :- Urgent BT patch works between km 0/000 and 6/850 of
Valillapuzha Elamaram Erattamuzhi road in Kondotty LAC

Agreement No: S.H.O Date :

Sl.
Description of work No. Length Breadth Depth Qty Amount
No.

1 55.4 Supplying and stacking 36mm size hard broken stone in standard heaps for
measurement.

2 55.2 Supplying and stacking 12mm hard blue granite broken stone in standard heaps for
measurement(IRC 3.2.1.a)

3 55.8.a Filling up pot holes (cut and formed to regular shapes and all loose and defective
materials removed) after supplying a prime coat of hot bitumen using 36mm departmental
broken stone and compacting with power roller to get a compact surface.

Pre measurement

1 0.70 0.70 0.10 0.049 m3


1 0.50 1.00 0.08 0.040
1 0.50 0.70 0.10 0.035
1 1.20 0.70 0.12 0.101
1 1.70 0.50 0.12 0.102
1 1.00 0.50 0.15 0.075
1 1.00 0.90 0.15 0.135
1 0.90 0.70 0.12 0.076
1 0.60 0.90 0.12 0.065
1 1.00 1.20 0.12 0.144
1 1.00 1.00 0.12 0.120
1 1.50 1.25 0.10 0.188
1 0.70 0.50 0.10 0.035
1 1.50 1.10 0.12 0.198
1 0.70 0.70 0.15 0.074
1 0.90 0.80 0.08 0.058
1 2.25 1.75 0.18 0.709
1 3.10 2.50 0.15 1.163
1 1.90 1.70 0.12 0.388
1 2.50 1.50 0.10 0.375
1 3.45 1.50 0.15 0.776
1 1.90 1.15 0.10 0.219
1 1.55 0.80 0.12 0.149
1 2.15 0.90 0.15 0.290
1 2.50 1.00 0.15 0.375
1 1.10 0.80 0.12 0.106
1 2.20 0.50 0.13 0.143
1 1.00 0.80 0.15 0.120
1 4.15 1.85 0.12 0.921
1 2.95 1.55 0.18 0.823
1 1.70 1.90 0.10 0.323
1 2.85 2.20 0.15 0.941
1 1.80 1.55 0.15 0.419
1 2.00 1.00 0.10 0.200
1 1.60 1.20 0.10 0.192
1 2.70 1.80 0.12 0.583
1 1.20 1.00 0.08 0.096
1 1.70 1.00 0.10 0.170
1 1.60 1.30 0.10 0.208
1 4.20 2.05 0.15 1.292
1 1.90 1.55 0.10 0.295
1 3.55 2.35 0.08 0.667
1 1.35 1.25 0.12 0.203
1 1.25 0.90 0.12 0.135
1 1.10 1.00 0.15 0.165
1 3.50 0.60 0.08 0.168
1 2.35 0.95 0.10 0.223
1 1.90 1.15 0.10 0.219
1 1.55 0.80 0.12 0.149
1 2.15 0.90 0.12 0.232
1 2.50 1.00 0.15 0.375
1 1.10 0.80 0.13 0.114
1 2.20 0.50 0.13 0.143
1 1.00 0.80 0.12 0.096
1 2.30 0.70 0.10 0.161
1 1.20 0.80 0.10 0.096
1 1.30 1.20 0.15 0.234
1 1.20 1.00 0.10 0.120
1 1.45 1.25 0.13 0.236
1 1.70 1.40 0.12 0.286
1 1.55 1.00 0.10 0.155
1 2.20 1.50 0.12 0.396
1 2.00 1.70 0.10 0.340
1 1.90 1.35 0.12 0.308
1 1.50 1.10 0.15 0.248
1 1.90 2.10 0.12 0.479
1 1.40 1.50 0.08 0.168
1 2.50 1.70 0.15 0.638
1 1.10 1.20 0.12 0.158
1 1.40 0.90 0.12 0.151
1 1.70 1.50 0.12 0.306
1 1.40 1.20 0.08 0.134
1 1.15 0.50 0.10 0.058
1 0.70 0.70 0.10 0.049
1 0.50 1.00 0.08 0.040
1 0.50 0.70 0.10 0.035
6 1.20 0.77 0.12 0.665
1 1.70 0.60 0.12 0.122
1 2.20 0.55 0.10 0.121
5 1.00 0.80 0.08 0.320
1 1.90 1.20 0.10 0.228
1 2.30 1.12 0.08 0.206
1 2.60 0.60 0.10 0.156
1 2.10 0.80 0.10 0.168
1 3.20 1.20 0.15 0.576
1 2.20 1.00 0.10 0.220
1 1.60 1.30 0.10 0.208
1 4.20 0.50 0.12 0.252
1 1.00 1.00 0.12 0.120
1 1.50 1.25 0.10 0.188
6 0.70 0.50 0.10 0.210
1 1.50 1.10 0.12 0.198
1 1.60 0.70 0.15 0.168
1 0.90 0.80 0.08 0.058
1 2.25 1.75 0.18 0.709
1 3.10 1.60 0.15 0.744
1 1.90 1.70 0.12 0.388
1 2.50 1.50 0.10 0.375
1 3.45 1.50 0.15 0.776
1 1.90 1.15 0.10 0.219
1 0.20 0.35 0.15 0.011
1 1.55 0.80 0.12 0.149
28.002 m3

4 55.9.a Filling up pot holes (cut and formed to regular shapes and all loose and defective
materials removed) after supplying a prime coat of hot bitumen using 12mm departmental
broken stone and compacting with power roller to get a compact surface

1 1.55 1.20 0.030 0.056


1 1.40 0.75 0.025 0.026
1 2.40 1.35 0.025 0.081
1 3.30 1.35 0.025 0.111
1 3.55 1.30 0.030 0.138
1 1.10 1.05 0.020 0.023
1 1.70 1.50 0.027 0.069
1 1.60 0.80 0.027 0.035
1 1.30 5.00 0.020 0.130
1 1.80 1.40 0.027 0.068
1 9.50 1.20 0.025 0.285
1 5.60 1.55 0.020 0.174
1 8.10 1.50 0.030 0.365
1 4.50 1.70 0.030 0.230
1 8.45 1.10 0.030 0.279
1 3.20 1.90 0.020 0.122
1 2.10 2.05 0.020 0.086
1 4.90 2.05 0.027 0.271
1 2.70 1.10 0.025 0.074
1 5.10 0.80 0.030 0.122
1 1.70 1.90 0.030 0.097
1 6.90 2.10 0.030 0.435
1 4.40 0.80 0.030 0.106
1 2.90 2.00 0.027 0.157
1 1.50 0.70 0.027 0.028
1 3.35 1.50 0.025 0.126
1 2.05 0.70 0.030 0.043
1 5.30 1.70 0.030 0.270
1 9.50 1.40 0.030 0.399
1 3.50 1.40 0.025 0.123
1 3.50 1.55 0.025 0.136
1 1.10 1.50 0.025 0.041
1 1.60 1.00 0.030 0.048
1 5.85 1.70 0.030 0.298
1 2.50 1.20 0.025 0.075
1 3.05 1.40 0.025 0.107
1 5.10 1.90 0.027 0.262
1 4.85 1.70 0.027 0.223
1 3.20 1.30 0.027 0.112
1 1.00 0.70 0.027 0.019
1 9.55 2.20 0.027 0.567
1 8.30 1.70 0.027 0.381
1 6.15 1.50 0.027 0.249
1 2.60 1.60 0.027 0.112
1 2.70 1.30 0.020 0.070
1 6.85 1.35 0.027 0.250
1 3.70 1.90 0.020 0.141
1 4.50 1.50 0.030 0.203
1 1.60 1.40 0.025 0.056
1 2.15 1.85 0.020 0.080
1 3.40 1.50 0.022 0.112
1 1.50 2.00 0.030 0.090
1 2.55 1.50 0.025 0.096
1 1.90 0.85 0.027 0.044
1 0.90 0.60 0.030 0.016
1 2.60 1.00 0.025 0.065
10 1.25 0.92 0.025 0.288
1 6.90 2.05 0.030 0.424
1 3.80 1.60 0.030 0.182
1 2.60 1.70 0.025 0.111
1 7.10 1.70 0.025 0.302
1 3.00 1.80 0.027 0.146
1 8.90 1.55 0.027 0.372
1 1.25 1.40 0.027 0.047
1 6.70 1.75 0.025 0.293
1 2.60 0.85 0.025 0.055
10.599

5 5.2.a Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure
distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned
with mechanical broom.

Pre- measurement
1 2.00 1.90 3.800
1 7.60 2.30 17.480
1 5.40 2.40 12.960
1 15.00 2.10 31.500
1 10.40 1.85 19.240
1 15.40 2.00 30.800
1 1.85 1.50 2.775
1 9.70 2.10 20.370
1 2.90 2.50 7.250
1 10.60 1.50 15.900
1 17.50 2.10 36.750
1 6.60 2.90 19.140
1 20.60 1.70 35.020
1 4.00 1.65 6.600
1 3.25 1.90 6.175
1 11.45 2.55 29.198
1 1.85 0.70 1.295
1 11.55 2.50 28.875
1 10.45 1.40 14.630
1 6.60 1.85 12.210
1 16.85 1.70 28.645
1 10.00 2.20 22.000
1 11.35 2.00 22.700
1 15.55 2.10 32.655
1 5.35 2.30 12.305
1 7.55 1.60 12.080
1 15.10 2.30 34.730
1 1.00 1.00 1.000
1 2.20 1.50 3.300
1 7.30 1.90 13.870
1 1.30 1.15 1.495
1 7.60 2.60 19.760
1 1.35 1.50 2.025
1 4.80 1.90 9.120
1 6.00 2.90 17.400
1 3.80 1.70 6.460
1 4.40 1.65 7.260
1 2.10 3.70 7.770
1 1.10 3.80 4.180
1 6.90 2.40 16.560
1 10.75 2.90 31.175
1 3.15 1.30 4.095
1 6.40 2.45 15.680
1 1.30 1.25 1.625
1 2.70 4.10 11.070
1 3.20 1.00 3.200
1 1.60 1.10 1.760
1 20.80 3.40 70.720
1 1.80 3.55 6.390
1 2.40 2.90 6.960
1 2.55 4.00 10.200
1 1.10 0.60 0.660
1 5.60 1.50 8.400
1 2.20 1.90 4.180
1 4.80 2.80 13.440
1 3.00 3.60 10.800
1 5.40 2.30 12.420
1 0.70 0.70 0.490
1 15.50 2.00 31.000
1 8.30 2.10 17.430
1 8.00 2.50 20.000
1 9.10 1.70 15.470
1 13.50 2.00 27.000
1 9.20 2.70 24.840
1 6.20 2.10 13.020
1 5.30 2.90 15.370
1 6.65 2.70 17.955
1 6.50 1.70 11.050
1 6.50 2.30 14.950
1 5.80 1.90 11.020
1 2.50 1.40 3.500
1 3.80 1.70 6.460
1 5.20 3.50 18.200
1 5.20 2.80 14.560
1 4.10 2.40 9.840
1 3.70 2.90 10.730
1 3.80 2.60 9.880
1 8.50 1.90 16.150
1 4.70 2.20 10.340
1 0.50 0.50 0.250
1 4.70 2.50 11.750
1 3.80 1.90 7.220
1 3.20 1.90 6.080
1 5.24 2.65 13.886
Total 1198.499 m2
6 5.7.1 Providing, laying and rolling of close-graded premix surfacing material of 20 mm
thickness composed of 11.2 mm to 0.09 mm (Type-A) aggregates using viscosity grade
bitumen ( VG - 30) to the required line, grade and level to serve as wearing course on a
previously prepared base, including mixing in a suitable HMP of appropriate capacity not
less
than 75 tonnes/hour., laying and rolling with a Smooth wheeled roller 8-10 tonne capacity,
and
finishing
Same asto required
item no.5 level and grade

También podría gustarte