#REF! #REF!
04 al 29 FEB. 01 al 31 MAR. 01 al 30
DESCRIPCIÓN Inicio Total
2016 2016 ABR. 2016
VALORIZACIO
N
Re-Programado 72,098.23 82,948.31 57,435.66 212,482.20
SITUACIÓN ACTUAL DE LA OBRA
Real 72,098.23 82,948.31 57,435.66 212,482.20
% PROGR Parcial 0% 33.93% 39.04% 27.03% 100.00% ATRASADA
110.0%
Acumulado 0% 33.93% 72.97% 100.00% 100.00% 47.45%
% REAL Parcial 0% 8.55% 16.97% 0.00% 25.52% 100.00%
72.97%
PORCENTAJE
70.0%
50.0%
33.93%
30.0%
25.52%
1 2 3
10.0% 8.55%
0.00%
0.00%
Inicio 04 al 29 FEB. 2016 01 al 31 MAR. 2016 01 al 30 ABR.
-10.0%
MESES
PROGRAMADO EJECUTADO
VALORIZACION DE OBRA PRINCIPAL Nº 02
ENTIDAD MUNICIPALIDAD
O B R A :MEJORAMIENTO DEL LOCAL MULTIUSO Y FORTALECIMIENTO DE CAPACIDADES EN LA COMUNIDAD
RESIDENTE : ING. GALLO PIO SUBE
INSPECTOR : ING. JHONY PUEDE CUMPLIR
FECHA :JULIO 2014
PRESUPUESTO CONTRACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO %
PRESUPUESTO CONTRACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO %
02.03.04.03 CONCRETO PARA VIGAS F´C=210kg/cm2 m3 11.54 327.06 3774.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.54 3,774.27 100.00%
02.03.05 LOSA ALIGERADA
02.03.05.01 ARMADURA DE ACERO EN LOSA ALIGERADA FY= 4200 kg/cm2 kg 855.76 4.17 3568.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 855.76 3,568.52 100.00%
02.03.05.02 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA m2 149.13 36.70 5473.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 149.13 5,473.07 100.00%
02.03.05.03 CONCRETO PARA LOSA ALIGERADA F´C= 210 kg/cm2 m3 13.42 353.21 4740.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.42 4,740.08 100.00%
02.03.05.04 LADRILLO HUECO DE ARCILLA h = 15 cm PARA LOSA ALIGERADO und 1,243.00 3.70 4599.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,243.00 4,599.10 100.00%
02.03.06 ESCALERA
02.03.06.01 ARMADURA DE ACERO EN ESCALERA FY= 4200 kg/cm2 kg 212.89 4.17 887.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 212.89 887.75 100.00%
02.03.06.02 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 12.59 38.41 483.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.59 483.58 100.00%
02.03.06.03 CONCRETO PARA ESCALERA F´C=210kg/cm2 m3 2.64 340.30 898.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.64 898.39 100.00%
02.03.07 COLUMNETAS
02.03.07.01 ARMADURA DE ACERO EN COLUMNETAS FY= 4200 kg/cm2 kg 42.88 4.17 178.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 42.88 178.81 100.00%
02.03.07.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETAS m2 4.80 25.43 122.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.80 122.06 100.00%
02.03.07.03 CONCRETO PARA COLUMNETAS F´C=175 kg/cm2 m3 0.50 317.25 158.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.50 158.63 100.00%
03 ARQUITECTURA
03.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MURO DE LADRILLO K.K. CABEZA CARAVISTA, MEZCLA C:A 1:5, E=1.5 m2 53.80 93.47 5028.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 53.80 5,028.69 100.00%
03.01.02 MURO DE LADRILLO K.K. SOGA CARAVISTA, MEZCLA C:A 1:5, E=1.5 m2 186.63 51.22 9559.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 186.63 9,559.19 100.00%
03.02 CIELO RASOS
03.02.01 CIELORASO CON MEZCLA C:A 1:5, E=1.5 CM m2 167.95 14.78 2482.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 167.95 2,482.30 100.00%
03.03 PISOS Y PAVIMENTOS
03.03.01 PISO DE CEMENTO ALISADO Y COLOREADO E=5 CM m2 167.95 21.42 3597.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 167.95 3,597.49 100.00%
03.03.02 VEREDA DE CONCRETO F´C=140 kg/cm2 m2 29.60 30.02 888.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 29.60 888.59 100.00%
03.04 CARPINTERIA DE MADERA
03.04.01 PUERTAS
03.04.01.01 PUERTA DE MADERA APANELADA m2 10.66 363.13 3870.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.66 3,870.97 100.00%
03.04.01.02 PUERTA DE MADERA CONTRAPLACADA m2 10.44 193.13 2016.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.44 2,016.28 100.00%
03.04.02 VENTANAS
03.04.02.01 VENTANA DE MADERA m2 24.31 193.13 4694.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 24.31 4,694.99 100.00%
03.05 CERRAJERIA
03.05.01 CERRADURA PARA PUERTA INGRESO und 4.00 70.00 280.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 280.00 100.00%
03.05.02 CERRADURA PARA PUERTA DE BAÑOS und 1.00 80.00 80.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 80.00 100.00%
03.05.03 CERRADURA PARA PUERTA INTERIORES und 5.00 40.00 200.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 200.00 100.00%
03.06 VIDRIOS, CRISTALES Y SIMILARES
03.06.01 VIDRIO SEMIDOBLE EN VENTANAS DE MADERA p2 261.62 5.00 1308.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 261.62 1,308.10 100.00%
03.07 PINTURAS
03.07.01 PINTURA LATEX EN MUROS INTERIORES m2 255.32 4.17 1064.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 255.32 1,064.68 100.00%
03.07.02 PINTURA LATEX EN MUROS EXTERIORES m2 94.97 6.11 580.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 94.97 580.27 100.00%
03.07.03 PINTURA LATEX EN CIELO RASO m2 167.95 4.28 718.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 167.95 718.83 100.00%
03.08 PLACA RECORDATORIO DE BRONCE
03.08.01 PLACA RECODATORIO DE BRONCE und 1.00 500.00 500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 500.00 100.00%
04 INSTALACIONES SANITARIAS
04.01 SISTEMA DE AGUA FRIA
04.01.01 SALIDA DE AGUA FRIA
04.01.01.01 SALIDA DE AGUA FRIA DE 1/2" pto 4.00 24.48 97.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 97.92 100.00%
04.01.02 REDES DE DISTRIBUCION
04.01.02.01 TUBERIA PVC SAP C-10 DE 1/2" m 21.10 4.21 88.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 21.10 88.83 100.00%
04.01.03 ACCESORIOS EN REDES DE AGUA
04.01.03.01 CODO PVC SAP C-10 DE 1/2" und 7.00 8.83 61.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 61.81 100.00%
04.01.03.02 TEE PVC SAP C-10 DE 1/2" und 5.00 9.77 48.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 48.85 100.00%
04.01.04 VALVULAS
PRESUPUESTO CONTRACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO %
04.01.04.01 VALVULA COMPUERTA DE BRONCE DE 1/2" und 2.00 72.41 144.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 144.82 100.00%
04.02 DESAGUE Y VENTILACION
04.02.01 SALIDA DE DESAGUE
04.02.01.01 SALIDA DE DESAGUE DE PVC 4" pto 3.00 13.15 39.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 39.45 100.00%
04.02.01.02 SALIDA DE DESAGUE DE PVC 2" pto 4.00 3.48 13.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 13.92 100.00%
04.02.02 REDES DE DERIVACION
04.02.02.01 TUBERIA DE PVC SAL 4" m 15.30 29.35 449.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.30 449.06 100.00%
04.02.02.02 TUBERIA DE PVC SAL 2" m 11.40 15.98 182.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.40 182.17 100.00%
04.02.03 REDES COLECTORAS
04.02.03.01 TUBERIA DE PVC SAL 4" m 12.80 29.35 375.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.80 375.68 100.00%
04.02.04 ACCESORIOS EN REDES DERIVADORAS Y COLECTORAS
04.02.04.01 CODO PVC SAL 4"X90° und 5.00 12.62 63.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 63.10 100.00%
04.02.04.02 CODO PVC SAL 2"X90° und 7.00 10.12 70.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 70.84 100.00%
04.02.04.03 TEE PVC SAL 4" und 2.00 12.62 25.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 25.24 100.00%
04.02.04.04 YEE PVC SAL 4" und 4.00 12.62 50.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 50.48 100.00%
04.02.04.05 YEE PVC SAL 2" und 3.00 10.12 30.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 30.36 100.00%
04.02.05 ADITAMENTOS VARIOS
04.02.05.01 REGISTRO DE BRONCE 4" und 1.00 23.15 23.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 23.15 100.00%
04.02.05.02 REGISTRO DE BRONCE 2" und 2.00 16.30 32.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 32.60 100.00%
04.02.06 CAMARA DE INSPECCION
04.02.06.01 CAJA DE REGISTRO DE DESAGUE 12" x 24" CON TAPA DE CONCRETO und 1.00 75.77 75.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 75.77 100.00%
05 INSTALACIONES ELECTRICAS
05.01 CONEXION A LA RED EXTERNA DE MEDIDORES
05.01.01 CONEXION A RED PUBLICA ELECTRICA und 1.00 600.00 600.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 600.00 100.00%
05.02 SALIDA PARA ALUMBRADO, TOMACORRIENTE Y FUERZA
05.02.01 SALIDA PARA ALUMBRADO pto 23.00 20.43 469.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.00 469.89 100.00%
05.02.02 SALIDA PARA TOMACORRIENTE DOBLE und 27.00 27.93 754.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.00 754.11 100.00%
05.02.03 SALIDA PARA INTERRUPTOR SIMPLE und 2.00 24.88 49.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 49.76 100.00%
05.02.04 SALIDA PARA INTERRUPTOR DOBLE und 7.00 30.93 216.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 216.51 100.00%
05.02.05 SALIDA PARA INTERRUPTOR TRIPLE und 1.00 73.93 73.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 73.93 100.00%
CANALIZACION, CONDUCTOS O TUBERIAS
05.03
05.03.01 TUBERIA PVC SEL 3/4" m 177.20 4.15 735.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 177.20 735.38 100.00%
05.04 CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS
05.04.01 CONDUCTOR THW 2.5MM2 PARA ALUMBRADO m 183.00 3.12 570.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 183.00 570.96 100.00%
05.04.02 CONDUCTOR THW 4.0MM2 PARA TOMACORRIENTE m 171.40 3.14 538.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 171.40 538.20 100.00%
05.04.03 CONDUCTOR NYY 16.0 MM2 PARA ALIMENTADOR m 19.20 8.05 154.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 19.20 154.56 100.00%
05.05 TABLEROS DE DISTRIBUCION
05.05.01 TABLERO DE DISTRIBUCION CAJA METALICA CON 12 POLOS pza 1.00 629.00 629.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 629.00 100.00%
05.06 INSTALACION DEL SISTEMA DE PUESTA A TIERRA
05.06.01 INSTALACION DE PUESTA A TIERRA und 1.00 710.62 710.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 710.62 100.00%
06 MOBILIARIO Y EQUIPAMIENTO
06.01 MOBILIARIO
06.01.01 MESA DE MADERA DE 1.20X0.70X0.70m und 10.00 100.42 1004.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 1,004.20 100.00%
06.01.02 SILLA PERSONAL DE 0.45X0.63X0.80 m und 3.00 100.42 301.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 301.26 100.00%
07 MITIGACION AMBIENTAL
07.01 MITIGACION DEL IMPACTO AMBIENTAL glb 1.00 1,000.00 1000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,000.00 100.00%
08 FORTALECIMIENTO Y CAPACITACION EN TEMAS DE GESTION COMUNITARIA
08.01 FORTALECIMIENTO Y CAPACITACION EN TEMAS DE GESTION COMUNITARIA glb 1.00 1,000.00 1000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,000.00 100.00%
09 ADICIONAL DEDUCTIVO VINCULANTE N° 01
09.01 ADICIONAL N°01
09.01.01 MURO DE CONTENCION
PRESUPUESTO CONTRACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO %
09.01.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 17.10 1.00 17.10 0.00 0.00 0.00% 17.10 17.10 100% 17.10 17.10 100.0% 0.00 0.00 0.0%
09.01.01.02 SOLADO PARA MURO DE CONTENCION DE 3" MEZCLA 1:12 C:H m2 16.56 14.01 231.96 0.00 0.00 0.00% 16.56 232.01 100% 16.56 232.01 100.0% 0.00 0.00 0.0%
09.01.01.03 ARMADURA DE ACERO PARA MURO DE CONTENCIONDE FC= 4200 kg/cm2 kg 315.61 3.17 1000.48 0.00 0.00 0.00% 315.61 1,000.48 100% 315.61 1,000.48 100.00% 0.00 0.00 0.00%
09.01.01.04 CONCRETO PARA MURO DE CONTENCION F´C=100kg/cm2 m3 20.815 176.92 3682.57 0.00 0.00 0.00% 20.82 3,682.57 100% 20.82 3,682.57 100.00% 0.00 0.00 0.00%
09.01.01.05 ENCOFRADO Y DESENCOFRADO PARA MURO DE CONTENCION m2 40.94 25.17 1030.46 0.00 0.00 0.00% 40.94 1,030.46 100% 40.94 1,030.46 100.00% 0.00 0.00 0.00%
COSTO DIRECTO 124,988.40 10,688.82 21,212.20 31,901.02 93,087.44
ACTIVIDADES PRECEDENCIA
A -
B A
C A
D A
E B,C,D